# Airbus Service Bulletin A340-27-5067

Copy: Revision 01 ("A340-27-5067 R01"), 43 pages: PDF https://openairdocs.org/files/sha256/90/d3/90d343d82e0e0eaeb1b6abecc0de1480bee76e572dfde38514d946d56f693d32; text https://openairdocs.org/service-documents/airbus/a340-27-5067/file/90d343d82e0e.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0627; AD 2017-25-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-27-5067
- Latest revision known: A340-27-5067, Revision 01, dated December 5, 2016 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a340-27-5067

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-25-13](https://openairdocs.org/ad/2017-25-13.md), effective Jan 22, 2018: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-27-5067/proposed.md).

## Text (43 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0627; AD 2017-25-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - THS ACT UATOR - DETAILED INSPECTION OF
PRIMARY AND SECONDARY LOAD PATH AT THE UPPER
ATTACHMENT LOCATION
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A340-27-5067
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft inspected by any previous issue.
REASON
Revision No. 01 has been issued to update the effectivity, update an AMM Task, clarify the work flow,
clarify the inspection, clarify the compliance time, and add illustrations.
CHANGES
The main changes of this revision are:
- Update the effectivity
- Update an AMM Task
- Clarify the work flow
- Clarify the inspection
- Clarify the compliance time
- Add illustrations
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
REASON
Objective/Action
 OBJECTIVE/ACTION UPDATED
 R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
ACCOMPLISHMENT INSTRUCTIONS
TASK 275067- 832-801-001-Inspection
Subtask 275067-941-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 275067-220-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
FIN UPDATED
CONFIGURATION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
MANPOWER RESSOURCE UPDATED
REFERENCES UPDATED
R
Subtask 275067-832-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 275067-832-002-001
 SUBTASK SOLUTION ADDED
 N
Subtask 275067-832-003-001
 SUBTASK SOLUTION ADDED
 N
Subtask 275067-720-001-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
FIN UPDATED
R
Subtask 275067-942-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Fig. A-FBAAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-FBAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FBAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-FBAAA Sheet 03
 SHEET UPDATED
 R
Fig. A-FBAAA Sheet 04
 SHEET ADDED
 N
Fig. A-FBAAA Sheet 05
 SHEET ADDED
 N
Fig. A-FBAAA Sheet 06
 SHEET ADDED
 N
Fig. A-FBAAA Sheet 07
 SHEET ADDED
 N
Fig. A-FBBAA
 FIGURE SOLUTION UPDATED
 R
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Fig. A-FBCAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FBCAA Sheet 01
 SHEET ADDED
 N
Fig. A-FBDAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FBDAA Sheet 01
 SHEET ADDED
 N
Fig. A-FBDAA Sheet 02
 SHEET ADDED
 N
Fig. A-FBDAA Sheet 03
 SHEET ADDED
 N
Fig. A-FFAAA
Fig. A-FFAAA Sheet 01
 SHEET UPDATED
 R
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Jul 01/16
REVISION No. : 01 - Dec 05/16
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340-500/600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - THS ACT UATOR - DETAILED INSPECTION OF
PRIMARY AND SECONDARY LOAD PATH AT THE UPPER
ATTACHMENT LOCATION
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
In the case of Trimmable Horizontal Stabilizer (THS) Actuator primary upper attachment failure and load
sharing between primary and secondary load path, the THS Actuator may not stall and in that case the
THS Actuator primary upper attachment failure remains hidden.
Continuous THS Actuator secondary load path loading could generate with time significant damage on
the THS Actuator. Severe damage may result in the disconnection of the THSA from the aircraft
structure.
There is today no indication provided to the flight crew in the cockpit of secondary load path
engagement at upper attachment level.
This Service Bulletin requires an inspection of the upper attachment area so as to verify the integrity of
the primary load path and the non-engagement of the upper secondary load path.
This inspection consists in a visual inspection, within 4000 FH or 800 FC after the aircraft’s first flight or
after last accomplishment of MRBR Task 27.40.00/07 whichever occurs first, of THS Actuator upper
attachment and no-back housing for damages and correct installation.
Load sharing between THS Actuator upper primary and secondary load path leads metal to metal
friction. Detailed visual inspection will allow to detect evidences of secondary load path engagement.
The accomplishment of this Service Bulletin will ensure detection and/or prevention of possible damage
at an early stage and will avoid expensive repairs.
The Operational/Maintenance Consequences of this Service Bulletin are covered by the update of the
affected publications detailed in "PLANNING INFORMATION".
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340-500/600
SERVICE BULLETIN
SUMMARY
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Equipment BFEA01
 1
 See SB
 THS Actuator
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06U 16R 32P 41N 70U 72W 81Q 83V AHY AIB BOE DLH ETD
F2I G4I HFY IBE IRM QAF QTR SAA TAM THA VIR
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 275067-832-801-001: Inspection
TOTAL MANHOURS
 3.00
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340-500/600
SERVICE BULLETIN
SUMMARY
Task 275067-832-801-001: Inspection
ELAPSED TIME (HOURS)
 3.00
APPENDICES
None
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF ALL
Z311
Z312
FR80
FR87
LH
RH
FR80
FR83
FR84
FR87
312AR
B
A
A
B
NO−BACK
HOUSING
PRIMARY
ATTACHMENT
GIMBAL
THS ACTUATOR
NOTE:
INSPECTION AREA
FAIL SAFE
SECONDARY
UPPER
ATTACHMENTS
1CS
F_SB_275067_5_SAAA_01_00
Figure A-FSAAA - Sheet 01
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340-500/600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - THS ACT UATOR - DETAILED INSPECTION OF
PRIMARY AND SECONDARY LOAD PATH AT THE UPPER
ATTACHMENT LOCATION
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-541 340-542 340-642
(2) Effectivity by MSN
0371 0376 0383 0391 0410 0416-0417 0426 0431 0440 0445 0449 0457 0460 0464
0468 0471 0478 0482 0485 0488 0492 0495 0499 0514 0517 0520 0523 0531 0534
0537 0540 0543 0547 0557 0560 0563 0566 0569 0572 0575 0577 0580 0583 0586
0601 0604 0606 0608 0611 0615 0617 0619 0622 0624 0626 0628 0630 0639 0672
0677 0681 0685 0689 0694 0698 0702 0706 0710 0715 0719 0723 0727 0736 0740
0744 0748 0753 0757 0761-0768 0771 0775 0779 0783 0787 0790 0794 0798 0804
0812 0829 0837 0846 0848 0870 0886 0894 0897 0902 0910 0912 0917 0924 0929
0933 0953 0960 0972 0981 0987 0993 1005 1017 1030 1040 1079 1091 1102 1122
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340-500/600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06U
 1091 1102
16R
 0622
32P
 0560
41N
 0924
70U
 0902
72W
 0917
81Q
 0563
83V
 0572
AHY
 0779 0886 0894
AIB
 0457 0471 0478 0485 0492 0499 0520 0608 0611 0685 0694
BOE
 0468 0488 0514 0577 0586
DLH
 0482 0517 0523 0537 0540 0543 0566 0569 0580 0583 0762 0763
0767 0771 0790 0794 0812 0846 0848 0897 0972 0981 0987 1005
ETD
 0757 0761 0783 0829 0837 0870 0929 0933 1030 1040
F2I
 0575 0706
 0723
G4I
 0748
HFY
 0910 0912
IBE
 0431 0440 0460 0601 0604 0606 0617 0619 0672 0702 0727 0744
0960 0993 1017 1079 1122
IRM
 0371 0376 0383 0391 0416 0449 0615
QAF
 0495
QTR
 0715 0740 0766 0798
SAA
 0410 0417 0426 0531 0534 0547 0557 0626 0630
TAM
 0445 0464
THA
 0624 0628 0677 0681 0689 0698 0710 0719 0775 0953
VIR
 0639 0736 0753 0764 0765 0768 0787 0804
(4) Configuration by MSN
MSN
 CONFIGURATION
0371 0376 0383 0391 0410 0416 0417 0426 0431 0440 0445
0449 0457 0460 0464 0468 0471 0478 0482 0485 0488 0492
0495 0499 0514 0517 0520 0523 0531 0534 0537 0540 0543
0547 0557 0560 0563 0566 0569 0572 0575 0577 0580 0583
0586 0601 0604 0606 0608 0611 0615 0617 0619 0622 0624
0626 0628 0630 0639 0672 0677 0681 0685 0689 0694 0698
0702 0706 0710 0715 0719 0723 0727 0736 0740 0744 0748
0753 0757 0761 0762 0763 0764 0765 0766 0767 0768 0771
0775 0779 0783 0787 0790 0794 0798 0804 0812 0829 0837
0846 0848 0870 0886 0894 0897 0902 0910 0912 0917 0924
0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030
1040 1079 1091 1102 1122
001
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340-500/600
SERVICE BULLETIN
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Equipment BFEA01
 1
Consumable CMLA01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
In the case of Trimmable Horizontal Stabilizer (THS) Actuator primary upper attachment
failure and load sharing between primary and secondary load path, the THS Actuator
may not stall and in that case the THS Actuator primary upper attachment failure
remains hidden.
Continuous THS Actuator secondary load path loading could generate with time
significant damage on the THS Actuator. Severe damage may result in the disconnection
of the THSA from the aircraft structure.
There is today no indication provided to the flight crew in the cockpit of secondary load
path engagement at upper attachment level.
(2) Objective/Action
This Service Bulletin requires an inspection of the upper attachment area so as to verify
the integrity of the primary load path and the non-engagement of the upper secondary
load path.
This inspection consists in a visual inspection, within 4000 FH or 800 FC after the
aircraft’s first flight or after last accomplishment of MRBR Task 27.40.00/07 whichever
occurs first, of THS Actuator upper attachment and no-back housing for damages and
correct installation.
Load sharing between THS Actuator upper primary and secondary load path leads metal
to metal friction. Detailed visual inspection will allow to detect evidences of secondary
load path engagement.
(3) Advantages
The accomplishment of this Service Bulletin will ensure detection and/or prevention of
possible damage at an early stage and will avoid expensive repairs.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340-500/600
SERVICE BULLETIN
(4) Operational/Maintenance Consequences
The Operational/Maintenance Consequences of this Service Bulletin are covered by the
update of the affected publications detailed in "PLANNING INFORMATION".
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 275067-832-801-001: Inspection
(1) Detailed Visual Inspection of the THS Actuator and Upper Attachments
(2) Detailed Visual Inspection Work Steps of the Upper THS Actuator Parts and Upper
Attachment
(3) Detailed Visual Inspection Work Steps of the Upper Attachment Fitting
(4) Detailed Visual Inspection Work Steps of the THS Actuator on the Bench
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done within the intervals given.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the intervals
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config 001 - Inspection of THS Actuator and Upper Attachment
Compliance time (whichever occurs
first)
Condition
 Action
Threshold
 Grace period
Repetitive interval
(whichever occurs
first)
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340-500/600
SERVICE BULLETIN
All Aircraft
 Do detailed visual
inspection, refer to
AMM Task
27-44-00-210-805
.
If the AMM task is
unavailable, refer
to SUBTASK
275067-832-001
001 Detailed Visual
Inspection Work
Steps of the Upper
THS Actuator Parts
and Upper
Attachment .
4000 FH/800 FC
after the aircraft’s
first flight or 4000
FH/800 FC after
last
accomplishment of
MRBR Task
27.40.00/07 or
4000 FH/800 FC
after last
accomplishment of
this SB whichever
occurs first.
3 months after
Revision 01 SB
issuance. Aircraft
inspected under
Revision 00 do not
require additional
inspection of
Revision 01
outside of the
Repetitive Interval.
None
No Findings
 None
 None
 None
 4000 FH/800 FC
Findings
 Remove THS
Actuator, refer to
AMM Task
27-44-51-000-801.
Before next flight.
 None
 None
Table 2, Config 001 - Inspection of Upper Attachment Fitting
Compliance time (whichever occurs
first)
Condition
 Action
Threshold
 Grace period
Repetitive Interval
(whichever occurs
first)
THS Actuator
Removed
Do a detailed
visual inspection of
the Upper
Attachment Fitting
in the aircraft, refer
to SUBTASK
275067-832-002
001 Detailed Visual
Inspection Work
Steps of the Upper
Attachment Fitting
 .
Before next flight.
 None
 None
No Findings
 Continue the
inspection.
Before next flight.
 None
 None
Findings
 Contact Airbus for
further instruction.
Continue the
inspection.
Before next flight.
 None
 None
Table 3, Config 001 - Inspection of THS Actuator
Compliance time (whichever occurs
first)
Condition
 Action
Threshold
 Grace period
Repetitive Interval
(whichever occurs
first)
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340-500/600
SERVICE BULLETIN
THS Actuator
Removed
Do a detailed
visual inspection of
the THS Actuator
on the bench, refer
to SUBTASK
275067-832-003
001 Detailed Visual
Inspection Work
Steps of the THS
Actuator on the
Bench
 .
Before next flight.
 None
 None
No Findings
 Reinstall THS
Actuator, refer to
AMM Task
27-44-51-400-801.
Before next flight.
 None
 4000 FH/800 FC
Findings
 Install a THS
Actuator. Refer to
AMM Task
27-44-51-400-801
and Note (1).
Before next flight.
 None
 4000 FH/800 FC
NOTE
 (1)
: A THS Actuator can be installed if:
- it is serviceable and
- it has accumulated less than 4000 FH/800 FC whichever occurs
first since new or since the last overhaul or since the last
accomplishment of this SB.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 275067-832-801-001: Inspection
Get Access
 1.00
On Aircraft
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340-500/600
SERVICE BULLETIN
Task 275067-832-801-001: Inspection
Detailed Visual Inspection of the THS Actuator and
Upper Attachments
1.00
Detailed Visual Inspection Work Steps of the Upper
THS Actuator Parts and Upper Attachment
0.00
Detailed Visual Inspection Work Steps of the Upper
Attachment Fitting
0.00
On Bench
Detailed Visual Inspection Work Steps of the THS
Actuator on the Bench
0.00
Close-Up
 1.00
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 12-34-24
27-44-00 27-44-51
Elec. Std. Practices Manual (ESPM)
 20-55-00
K. PUBLICATION AFFECTED
Aircraft Wiring List (AWL)
Impact on scheduled maintenance: Refer to MPD
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340-500/600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Vendor parts are to be procured from:
Equipment BFEA01
 GOODRICH ACTUATION SYSTEMS
13 Avenue de l’eguillette
BP 7186
95310
St-Ouen l’Aumone
CEDEX FRANCE
T e l :( 3 3 )13 43 26 30 0
F a x :( 3 3 )13 43 26 31 0
(2) Price and Availability
Equipment BFEA01
No AIRBUS kit will be provided.
Procurement terms for the equipment must be negotiated with the equipment supplier.
B. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner - Petroleum
Based
08BBB1
 As required
Lint Free Cotton Cloth
 14SBA1
 As required
(2) Components
None
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340-500/600
SERVICE BULLETIN
(3) Equipment
Equipment BFEA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 47175-200
 As
required
ACTUATOR
1
 47175-300
 As
required
ACTUATOR
1
 47175-500
 As
required
ACTUATOR
1
 47175-520
 As
required
ACTUATOR
1
 47175-530
 As
required
ACTUATOR
1
 47175-540
 As
required
ACTUATOR
NOTE
: The components listed above are only necessary if the THS Actuator
needs to be replaced after discovering findings from the detailed visual
inspection. The quantity of these items are to be ordered as required.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340-500/600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 275067-832-801-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE
IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS
AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340-500/600
SERVICE BULLETIN
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for further
instructions and approval.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
Task Associated Data
Zone
From 311 to 312
Modified FIN
1CS
Manpower
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
A. GENERAL
(1) Subtask 275067-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
(a) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(2) Subtask 275067-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340-500/600
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 275067-941-001-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
From
 311
 Work location
 from Frame 80 to Frame 87
To
 312
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 27-44-00-210-805
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Do the Job Set-up procedure as specified in the detailed visual inspection of the
THS Actuator (1CS) components, refer to AMM Task 27-44-00-210-805
 .
C. PROCEDURE
(1) Subtask 275067-220-001-001 - Detailed Visual Inspection of the THS Actuator and
Upper Attachments
Work Zones and Access Panels
Zone
 Access/Work location
From
 311
 Work location
 from Frame 83 to Frame 84
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340-500/600
SERVICE BULLETIN
To
 312
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
Material necessary to do the job
Equipment BFEA01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 47175-200
 As required
 ACTUATOR
1
 47175-300
 As required
 ACTUATOR
1
 47175-500
 As required
 ACTUATOR
1
 47175-520
 As required
 ACTUATOR
1
 47175-530
 As required
 ACTUATOR
1
 47175-540
 As required
 ACTUATOR
NOTE
: The components listed above are only necessary if the THS Actuator
needs to be replaced after discovering findings from the detailed visual
inspection. The quantity of these items are to be ordered as required.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
References
Aircraft Maintenance Manual (AMM)
 Task 27-44-00-210-805
Task 27-44-51-000-801
Task 27-44-51-400-801
Fig. A-FBBAA
Removal and Installation of the THS
Actuator
Sheet 01
(a) Do a detailed visual inspection of the THS Actuator (1CS) and Upper Attachment,
refer to AMM Task 27-44-00-210-805
 . If the AMM task is unavailable, refer to
SUBTASK 275067-832-001 001 Detailed Visual Inspection Work Steps of the
Upper THS Actuator Parts and Upper Attachment .
1
 If there are no findings on the THS Actuator (
 1CS) or Upper Attachment, no
further action is required at this time.
a
 Do the inspection again in accordance with Paragraph 1.E.(2).
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340-500/600
SERVICE BULLETIN
2
 If there are findings on the THS Actuator (1CS) or Upper Attachment, remove
the THS Actuator (1CS). Refer to AMM Task 27-44-51-000-801 and Fig. A-
FBBAA
.
FIN 1CS
1 THS ACTUATOR Item (1) Retain
a
 Do a detailed visual inspection of the fuselage primary and secondary
attachments of the Upper Attachment Fitting in the aircraft, refer to
SUBTASK 275067-832-002 001 Detailed Visual Inspection Work Steps of
the Upper Attachment Fitting
 .
<1> If there are no findings on the fuselage primary and secondary
attachments of the Upper Attachment Fitting in the aircraft, continue
to work step b.
<2> If there are findings on the fuselage primary and secondary
attachments of the Upper Attachment Fitting in the aircraft, contact
Airbus for further instruction before the next flight. Continue to work
step b.
b
 Do a detailed visual inspection of the THS Actuator (1CS) on the bench,
refer to SUBTASK 275067-832-003 001 Detailed Visual Inspection Work
Steps of the THS Actuator on the Bench
 .
<1> If there are no findings on the THS Actuator (1CS), reinstall the THS
Actuator (1CS). Refer to AMM Task 27-44-51-400-801 and Fig. A-
FBBAA
.
FIN 1CS
1 THS Actuator Item (1) Retained at
removal
<a> Continue to SUBTASK 275067-720-001 001 Test the THS
Actuator After Installation
 .
[1] Do inspection again in accordance with Paragraph 1.E.(2).
<2> If there are findings on the THS Actuator (1CS), replace the
THS Actuator (1CS) before the next flight. Refer to AMM Task
27-44-51-400-801 and Fig. A-FBBAA
.
FIN 1CS
As
required
THS Actuator 47175-200 Item 1
or
FIN 1CS
As
required
THS Actuator 47175-300 Item 1
or
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340-500/600
SERVICE BULLETIN
FIN 1CS
As
required
THS Actuator 47175-500 Item 1
or
FIN 1CS
As
required
THS Actuator 47175-520 Item 1
or
FIN 1CS
As
required
THS Actuator 47175-530 Item 1
or
FIN 1CS
As
required
THS Actuator 47175-540 Item 1
NOTE
: Install the same THS Actuator (1CS) part number
that was removed, or the associated Service
Bulletins must be reported accomplished to maintain
correct aircraft configuration.
<a> Continue to SUBTASK 275067-720-001 001 Test the THS
Actuator After Installation
 .
[1] Do inspection again in accordance with Paragraph 1.E.(2).
(2) Subtask 275067-832-001-001 - Detailed Visual Inspection Work Steps of the Upper
THS Actuator Parts and Upper Attachment
Work Zones and Access Panels
Zone
 Access/Work location
From
 311
 Work location
 from Frame 83 to Frame 84
To
 312
Manpower Resources
Manhours
 0.00
Minimum number of person
 0
Subtask elapsed time
 0.00
Skills
 NON SPECIFIC
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340-500/600
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
Petroleum Based
08BBB1
 As required
Lint Free Cotton Cloth
 14SBA1
 As required
References
Fig. A-FBAAA
Inspection of the THS Actuator Upper
Attachment Fitting
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
(a) Use a flashlight to do a detailed visual inspection of the base of the Rod Sphere,
located between the No-Back Housing and the Primary Attachment Gimbal, for
signs of wear and metallic particles, refer to Fig. A-FBAAA Sheet 01
 ,
 Fig. A-FBAAA
Sheet 03
, Fig. A-FBAAA Sheet 06
 , and Fig. A-FBAAA Sheet 07
 .
(b) Clean the Fail-Safe Upper Secondary Attachment, the Primary Attachment Gimbal,
and the No-Back Housing with cleaner and let them dry, refer to Fig. A-FBAAA
Sheet 01
.
Non Aqueous
Cleaner - Petroleum
Based
08BBB1 As required
Lint Free Cotton
Cloth
14SBA1 As required
(c) Use a flashlight to do a detailed visual inspection of the full surface of the
Primary Attachment Gimbal, the Upper Profile that points to the A/C structure, the
Lower Profile that points to the No-Back Housing, the Inner Profile, the Exterior
Profile, and the Spherical Bearings. Do the detailed visual inspection for incorrect
attachment, damaged protective finish, too much wear that causes locking axles
and gimbal recoil, cra cks, dents, distortions, signs of corrosion, or loss of Spherical
Bearings, refer to Fig. A-FBAAA Sheet 01
 , Fig. A-FBAAA Sheet 02
 , and Fig. A-
FBAAA Sheet 04
.
NOTE
: The use of a mirror is recommended to inspect the Inner Profile
because it is difficult to get access to this area.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340-500/600
SERVICE BULLETIN
(d) Use a flashlight to do a detailed visual inspection of the inner and outer faces of
each Outer Yoke Flange and the inner and outer faces of each Inner Yoke Flange
for cracks, ruptures, incorrect attachment, and damage to the protective finish.
Refer to Fig. A-FBAAA Sheet 01
 , Fig. A-FBAAA Sheet 02
 , and Fig. A-FBAAA
Sheet 05
.
NOTE
: The Yoke Flanges connect the No-Back Housing to the Primary
Attachment Gimbal.
(e) Use a flashlight to do a detailed visual inspection of the No-Back Housing
for cracks, dents, signs of corrosion, inco rrect attachment, and damage to the
protective finish, refer to Fig. A-FBAAA Sheet 01
 .
(3) Subtask 275067-832-002-001 - Detailed Visual Inspection Work Steps of the Upper
Attachment Fitting
Work Zones and Access Panels
Zone
 Access/Work location
From
 311
 Work location
 from
 Frame 83 to
 Frame 84
To
 312
Manpower Resources
Manhours
 0.00
Minimum number of person
 0
Subtask elapsed time
 0.00
Skills
 AIRFRAME
References
Fig. A-FBCAA
Inspection of the Upper Attachment
Fitting
Sheet
 01
(a) Do a detailed visual inspection on the primary and secondary attachments of the
Upper Attachment Fitting to check for wear , cracks, incorrect atta chment, corrosion,
or distortion evidence. Refer to Fig. A-FBCAA
.
(4) Subtask 275067-832-003-001 - Detailed Visual Inspection Work Steps of the THS
Actuator on the Bench
Manpower Resources
Manhours
 0.00
Minimum number of person
 0
Subtask elapsed time
 0.00
Skills
 NON SPECIFIC
References
Fig. A-FBDAA
Inspection of the THS Actuator on
Bench
Sheet
 01
Sheet
 02
Sheet
 03
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340-500/600
SERVICE BULLETIN
(a) Do a detailed visual inspection of the base of the Rod Sphere, located between
the No-Back Housing and the Primary Attachment Gimbal, for signs of wear and
metallic particles, refer to Fig. A-FBDAA Sheet 01
 and Fig. A-FBDAA Sheet 03
 .
(b) Do a detailed visual inspection of the full surface of the Primary Attachment Gimbal,
the Upper Profile that points to the A/C structure, the Lower Profile that points to
the No-Back Housing, the Inner Profile, the Exterior Profile, and the Spherical
Bearings. Do the detailed visual inspection for incorrect attachment, damaged
protective finish, too much wear that causes locking axles and gimbal recoil, cracks,
dents, distortions, signs of corrosion, or loss of Spherical Bearings, refer to Fig. A-
FBDAA
.
NOTE
: The use of a mirror is recommended to inspect the Inner Profile
because it is difficult to get access to this area.
(c) Do a detailed visual inspection of the inner and outer faces of each Outer Yoke
Flange and the inner and outer faces o f each Inner Yoke Flange for cracks,
ruptures, incorrect attachment, and damage to the protective finish. Refer to Fig. A-
FBDAA Sheet 01
.
NOTE
: The Yoke Flanges connect the No-Back Housing to the Primary
Attachment Gimbal.
D. TEST
(1) Subtask 275067-720-001-001 - Test the THS Actuator After Installation
Work Zones and Access Panels
Zone
 Access/Work location
From
 311
 Work location
 from Frame 80 to Frame 87
To
 312
Manpower Resources
Skills
 INSTRUMENT
References
Aircraft Maintenance Manual (AMM)
 Task 27-44-51-400-801
WARNING
: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT
CONTROLS ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN
CAUSE INJURY TO PERSONS AND/OR DAMAGE.
NOTE
: The testing of the THS Actuator (
 1CS) is only required if the THS
Actuator (
 1CS) has been removed during the inspection. If the THS
Actuator (
 1CS) has not been removed, proceed to the Close-up
procedure.
(a) Do the Test procedure as specified in the installation of the THS Actuator (1CS),
refer to AMM Task 27-44-51-400-801.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340-500/600
SERVICE BULLETIN
E. CLOSE-UP
(1) Subtask 275067-942-001-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
From
 311
 Work location
 from Frame 80 to Frame 87
To
 312
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 27-44-00-210-805
(a) Do the Close-up procedure as specified in the inspection of the THS Actuator
(1CS), refer to AMM Task 27-44-00-210-805
 .
(b) Put the aircraft back to its initial configuration.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340-500/600
SERVICE BULLETIN
**CONF ALL
Z311
Z312
FR80
FR87
LH
RH
FR80
FR83
FR84
FR87
312AR
B
A
A
B
NO−BACK
HOUSING
PRIMARY
ATTACHMENT
GIMBAL
THS ACTUATOR
C
1CS
FAIL SAFE
SECONDARY
UPPER
ATTACHMENTS
G
F_SB_275067_5_BAAA_01_01
Figure A-FBAAA - Sheet 01
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340-500/600
SERVICE BULLETIN
**CONF ALL
E F
FOR INSPECTION AREAS REFER TO SHEETS 4 AND 5.02
NOTE:
FOR INSPECTION AREAS REFER TO SHEET 3.01 LH SHOWN
RH SYMMETRICAL
C
A A
BASE OF
01
ROD SPHERE
NO−BACK YOKE (FWD)
02
A
A
A
A
B
B
SPHERICAL BEARING (LH)
NO−BACK YOKE (AFT)
02
SPHERICAL BEARING (RH)
SPHERICAL BEARING
GIMBAL
GIMBAL
F_SB_275067_5_BAAA_02_01
Figure A-FBAAA - Sheet 02
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340-500/600
SERVICE BULLETIN
**CONF ALL
D
NOTE:
INSPECTION AREA (AROUND THE ROD).
BASE OF ROD SPHERE INSPECTION
ROD
B B
FWD
D
F_SB_275067_5_BAAA_03_01
Figure A-FBAAA - Sheet 03
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340-500/600
SERVICE BULLETIN
**CONF ALL
UPPER SECONDARY
ATTACHMENTUPPER PROFILE
LOWER PROFILE
EXTERIOR PROFILE INNER PROFILE
THE UPPER PROFILE: SECTION FACING THE
THE LOWER PROFILE: SECTION FACING THE NO−BACK
THE EXTERIOR PROFILE: EXTERNAL SECTION OF THE GIMBAL
RUNNING AT 360 DEG AROUND THE EQUIPMENT.
THE INNER PROFILE: INTERNAL SECTION OF THE GIMBAL
SURROUNDING THE SECONDARY ATTACHMENT.
FIXING INTERFACE WITH THE AIRCRAFT STRUCTURE, EXCLUDING THE UPPER
SURFACE OF THE GIMBAL SURROUNDING THE SPHERICAL BEARING.
HOUSING, EXCEPT THE SURFACE COVERED BY THE NO−BACK YOKE.
IT IS RECOMMENDED TO USE A MIRROR.
DUE TO THE POOR ACCESSIBILITY AROUND THE NO−BACK HOUSING YOKE,
03
04
05
06
NO−BACK YOKE
UPPER GIMBAL INSPECTION
NOTE:
03
04
05 06
E
C C
C C
VIEW LOOKING AFT
F
W
D
F_SB_275067_5_BAAA_04_00
Figure A-FBAAA - Sheet 04
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340-500/600
SERVICE BULLETIN
**CONF ALL
OUTER FACE OF THE
YOKE FLANGEOUTER YOKE FLANGE
INNER YOKE FLANGE
INNER YOKE FLANGE
OUTER FACE OF THE
YOKE FLANGE
OUTER YOKE FLANGE
OUTER FACE OF THE
INNER YOKE FLANGE
UPPER SECONDARY
ATTACHMENT
NO−BACK YOKE
NO−BACK YOKE INSPECTION
F
D D
D D
VIEW LOOKING AFT
F
W
D
F_SB_275067_5_BAAA_05_00
Figure A-FBAAA - Sheet 05
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340-500/600
SERVICE BULLETIN
**CONF ALL
H
G
F_SB_275067_5_BAAA_06_00
Figure A-FBAAA - Sheet 06
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340-500/600
SERVICE BULLETIN
**CONF ALL
BASE
OF
ROD SPHERE
H
F_SB_275067_5_BAAA_07_00
Figure A-FBAAA - Sheet 07
Inspection of the THS Actuator Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340-500/600
SERVICE BULLETIN
**CONF ALL
Z311
Z312
FR80
FR87
LH
RH
FR80
FR83
FR84
FR87
312AR
B
A
A
B
1
(1)
F_SB_275067_5_BBAA_01_00
Figure A-FBBAA - Sheet 01
Removal and Installation of the THS Actuator
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340-500/600
SERVICE BULLETIN
**CONF ALL
Z311
Z312
FR80
FR87
LH
RH
FR80
FR83
FR84
FR87
312AR
B
A
A
B
PRIMARY
ATTACHMENT
SECONDARY
ATTACHMENT
UPPER ATTACHMENT
FITTING
F_SB_275067_5_BCAA_01_00
Figure A-FBCAA - Sheet 01
Inspection of the Upper Attachment Fitting
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340-500/600
SERVICE BULLETIN
**CONF ALL
C
Z311
Z312
FR80
FR87
LH
RH
FR80
FR83
FR84
FR87
312AR
B
A
A
B
PRIMARY
ATTACHMENT GIMBAL
SECONDARY
ATTACHMENT POINTS
YOKE
FLANGE
1
ON BENCH
F_SB_275067_5_BDAA_01_01
Figure A-FBDAA - Sheet 01
Inspection of the THS Actuator on Bench
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340-500/600
SERVICE BULLETIN
**CONF ALL
C
D
ON BENCH
F_SB_275067_5_BDAA_02_00
Figure A-FBDAA - Sheet 02
Inspection of the THS Actuator on Bench
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340-500/600
SERVICE BULLETIN
**CONF ALL
D
BASE
OF
ROD SPHERE
ON BENCH
F_SB_275067_5_BDAA_03_00
Figure A-FBDAA - Sheet 03
Inspection of the THS Actuator on Bench
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340-500/600
SERVICE BULLETIN
**CONF ALL
DO A DETAILED VISUAL INSPECTION OF THE THS ACTUATOR UPPER ATTACHMENT TO CHECK
FOR DEVIATION TO ATTACHMENT PARTS INSTALLATION. DO A DETAILED VISUAL INSPECTION
OF THE THS ACTUATOR UPPER ATTACHEMENTS AND NO−BACK HOUSING FOR CRACKS, DAMAGES,
OR METALLIC PIECES (REFER TO TABLE 1 IN PLANNING INFORMATION PARAGRAPH 1.E.(2) )
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT
THE INFORMATION GIVEN IN THE PROCEDURE AND 
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS
THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THE SERVICE BULLETIN.
ARE
THERE ANY
FINDINGS?
NO YES
DO INSPECTION AGAIN AS
PER PLANNING INFORMATION
PARAGRAPH 1.E.(2)
REPLACE THE THS
ACTUATOR BEFORE NEXT
FLIGHT
CONTACT AIRBUS FOR
INSTRUCTIONS BEFORE
NEXT FLIGHT
REMOVE THE THS
ACTUATOR BEFORE NEXT
FLIGHT
DO A DETAILED VISUAL INSPECTION OF THE
UPPER ATTACHMENT FITTING IN THE AIRCRAFT
(REFER TO TABLE 2 IN PLANNING INFORMATION
PARAGRAPH 1.E.(2) )
DO A DETAILED VISUAL INSPECTION OF
THE THS ACTUATOR ON BENCH (REFER
TO TABLE 3 IN PLANNING INFORMATION
PARAGRAPH 1.E.(2) )
ARE
THERE ANY
FINDINGS?
NO YES
ARE
THERE ANY
FINDINGS?
NO
RE−INSTALL THE THS
ACTUATOR BEFORE NEXT
FLIGHT
YES
F_SB_275067_5_FAAA_01_05
Figure A-FFAAA - Sheet 01
Flowchart
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340-500/600
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: FLIGHT CONTROLS - THS ACT UATOR - DETAILED INSPECTION OF
PRIMARY AND SECONDARY LOAD PATH AT THE UPPER
ATTACHMENT LOCATION
MODIFICATION No.: None
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340-500/600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 01/16 SERVICE BULLETIN No.: A340-27-5067
REVISION No.: 01 - Dec 05/16 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
