# Airbus Service Bulletin A340-28-4138

Copy: Revision 01 ("A340-28-4138 R01"), 53 pages: PDF https://openairdocs.org/files/sha256/31/ba/31bad80f037018a318213a22119a8fe454c698e92a638ddc867141de26506588; text https://openairdocs.org/service-documents/airbus/a340-28-4138/file/31bad80f0370.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-6418; AD 2016-20-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-28-4138
- Latest revision known: A340-28-4138, Revision 01, dated September 24, 2015 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a340-28-4138

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-20-10](https://openairdocs.org/ad/2016-20-10.md), effective Nov 22, 2016: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-28-4138/proposed.md).

## Text (53 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-6418; AD 2016-20-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSPECTION OF THE MAIN
STAND-BY AND TRANSFER PUMPS
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A340-28-4138
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to:
- update the FIN numbers throughout the accomplishment instructions
- update paragraph 1.A.(5) Configuration definition
- add a NOTE to give operators the option to check their aircraft records to confirm the fuel pump
configuration
- update the effectivity of this Service Bulletin.
CHANGES
FRONT MATTER
FUEL - MAIN FUEL PUMP SYSTEM -
INSPECTION OF THE MAIN STAND-BY
AND TRANSFER PUMPS
CONFIGURATION UPDATED
 R
SUMMARY
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
 CONFIGURATION LIST UPDATED
 R
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CONF 001
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
CONF 002
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
CONF 003
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
CONF 004
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
ACCOMPLISHMENT INSTRUCTIONS
TASK 284138- 832-895-001-Inspection
Task associated data - 001
 FIN UPDATED
 R
Task associated data - 002
 FIN UPDATED
 R
Task associated data - 003
 FIN UPDATED
 R
Task associated data - 004
 FIN UPDATED
 R
Subtask 284138-220-401-001
 SUBTASK SOLUTION UPDATED
FIN UPDATED
NOTE UPDATED
R
Subtask 284138-220-401-002
 SUBTASK SOLUTION UPDATED
FIN UPDATED
NOTE UPDATED
R
Subtask 284138-220-401-003
 SUBTASK SOLUTION UPDATED
FIN UPDATED
NOTE UPDATED
R
Subtask 284138-220-401-004
 SUBTASK SOLUTION UPDATED
FIN UPDATED
NOTE UPDATED
R
Fig. A-UFAAA
Fig. A-UFAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-UFAAB
Fig. A-UFAAB Sheet 01
 SHEET UPDATED
 R
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Jul 14/15
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REVISION No. : 01 - Sep 24/15
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSPECTION OF THE MAIN
STAND-BY AND TRANSFER PUMPS
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
There have been several in-service cases of stand-by fuel pump fuel leaks through the electrical
connector on A340 aircraft that have fuel pumps Part Number (PN) 568-1-28300-001 (Mk001),
568-1-28300-002 (Mk002) and 568-1-28300-101 (Mk101).
The fuel leaks were corrected on fuel pump PN 568-1-28300-003 (Mk003), 568-1-28300-004 (Mk004)
and 568-1-28300-103 (Mk103).
The current standard of fuel pump supplied in production is Mk103 and can be installed on any A340
aircraft and in any position.
This Service Bulletin requests a one-time Detailed Inspection (DI) of the fuel pumps installed on each
aircraft. It provides the process to identify the PN of the fuel pumps on an aircraft and to replace
the affected fuel pumps by applying a corrective Service Bulletin, as applicable to aircraft type and
configuration.
Aircraft with the Mk001 and Mk002 fuel pumps can be modified to an aircraft configuration with
Mk003 or Mk004 pumps with the embodiment of Modification No. 48991H14319 (Service Bulletin No.
A340-28-4124). The modification introduces grease in the void behind the pump connector in order to
prevent potential ice build up and consequent damage to pumps.
Aircraft with the Mk101 fuel pumps can be modified to an aircraft configuration with Mk103 fuel pumps
with the embodiment of Modification Nos. 202133H16554 and 202133H16556 (Service Bulletin No.
A340-28-4134). The modification improves sealing and potting around the rear of the pump connector
and also introduces grease in the void behind the pump.
Accomplishment of this Service Bulletin ensures all identified Mk001, Mk002 and Mk101 are replaced
by the new standard of fuel pumps to prevent potential fuel leaks.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
SUMMARY
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
No Material
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06Y 15R 15T 22O 31V 56W 74W 83V 98W 98X ABD AFR AIB
ALD ALK ARG BOE CAL CCA CPA DGA DLH F2I FIN G8E GAF
HFM HFY IBE IRC IRM KAC LAN M3R MAU MDG O2X
 PAL PUE
QAF S3R SAA SAS SFB SLM SVW SWR TAP THT THY UAE VCV
VIR XAX
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 NO
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
SUMMARY
MANPOWER
**CONF 001
Task 284138-832-895-001: Inspection
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 002
Task 284138-832-895-001: Inspection
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 003
Task 284138-832-895-001: Inspection
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 004
Task 284138-832-895-001: Inspection
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
APPENDICES
**CONF ALL
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
CENTER SPAR
RIB2 RIB3
Z541 (Z641)
A
C B
A
LH SHOWN
RH SIMILAR
B
100QA2
(100QA3) 101QA2
(101QA3)
F_SB_284138_7_SAAA_01_00
Figure A-U SAAA - S heet 01
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
CENTER SPAR
RIB3
C
D
RIB4
D
101QA1
(101QA4)
100QA1
(100QA4)
F_SB_284138_7_SAAA_02_00
Figure A-U SAAA - S heet 02
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
600QL1
600QL2
B
C
FR44
FR47
B
C
A
 − Z191 Z192
A
B C
F_SB_284138_7_SBAA_01_00
Figure A-U SBAA - S heet 01
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSPECTION OF THE MAIN
STAND-BY AND TRANSFER PUMPS
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-211 340-212 340-213 340-311 340-312 340-313
(2) Effectivity by MSN
0002 0004 0006 0009 0014 0020 0022-0023 0025-0026 0029 0031-0034 0038 0041
0043-0044 0046-0047 0049 0051 0056-0058 0061 0063 0074-0076 0078-0081
0084-0085 0089-0091 0093-0094 0101 0104 0114-0115 0117 0123 0125-0126 0128
0131 0134-0137 0139 0141-0142 0145-0147 0149-0152 0154 0156-0161 0163-0164
0166-0170 0173-0175 0178-0180 0182 0185-0187 0190 0192-0194 0196-0197 0199
0201-0202 0204 0207-0208 0210 0212-0218 0220-0221 0227-0228 0233 0236-0237
0242-0243 0245-0246 0252 0257 0260 0263-0264 0268 0270 0273-0274 0278 0280
0282 0292 0297 0302 0304 0307 0310 0318-0319 0321 0325 0327 0329 0331-0332
0335 0347 0352 0354-0355 0359 0363 0367 0373-0374 0377-0379 0381 0385 0387
0390 0395 0399 0402 0406 0411 0413 0415 0424 0429-0430 0433-0435 0438 0442
0446-0447 0450 0459 0467 0470 0474 0483 0528 0538 0541 0544-0546 0554 0556
0559 0561-0562 0582 0585 0590 0598 0643 0646 0651 0668 0793 0800 0835 0844
0921 0938 0955
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06Y
 0139 0149
15R
 0151
15T
 0009
22O
 0257
31V
 0093
56W
 0006
74W
 0047 0051
83V
 0216 0280 0292
98W
 0014 0022
98X
 0429
ABD
 0210
AFR
 0029 0078 0084 0186 0207 0237 0245 0246 0260 0307 0310 0377
0399
AIB
 0131 0141 0161 0182 0192 0199
ALD
 0156 0159 0178
ALK
 0032 0033 0034 0367 0374 0381
ARG
 0063 0074 0080 0085 0094 0123 0126 0128 0170 0193 0373
BOE
 0554
CAL
 0402 0406 0411 0415 0433 0541
CCA
 0201 0242 0243 0264
CPA
 0136 0137 0142 0147 0157 0160 0208 0218 0220 0227 0228
DGA
 0075 0081
DLH
 0135 0158 0213 0233 0252 0297 0304 0321 0325 0327 0335 0347
0352 0354 0379 0390 0434 0447
F2I
 0038 0043
FIN
 0058 0168 0174 0835 0844 0921 0938
G8E
 0173 0187 0196
GAF
 0274 0355
HFM
 0117
HFY
 0190 0202
IBE
 0125 0134 0145 0146 0217 0221 0329 0483
IRC
 0002
IRM
 0020 0056 0164
 0282
KAC
 0089 0090 0101 0104
LAN
 0359 0363 0442
M3R
 0061
MAU
 0076 0152 0194 0268 0793 0800
MDG
 0319
O2X
 0273
PAL
 0302 0318 0332 0387 0459 0474
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
OPERATOR
 MSN
PUE
 0212 0215
QAF
 0026 0528
S3R
 0004 0204
SAA
 0197 0378 0544 0582 0590 0643 0646 0651
SAS
 0167 0413 0424 0430 0435 0450 0467 0470
SFB
 0046
SLM
 0049
SVW
 0955
SWR
 0150 0154 0169 0175 0179 0263 0538 0545 0546 0556 0559 0561
0562 0585 0598
TAP
 0041 0044 0079 0091
THT
 0385 0395 0438 0446 0668
THY
 0023 0025 0057 0115 0180 0270 0331
UAE
 0163 0166 0185 0236
VCV
 0031
VIR
 0114 0214
XAX
 0278
(4) Configuration by MSN
MSN
 CONFIGURATION
0002 0004 0006 0009 0014 0020 0022 0023 0025 0026 0029
0031 0032 0033 0034 0038 0041 0043 0044 0046
 0047 0049
0051 0056 0057 0058 0061 0063 0074 0075 0076 0078 0079
0080 0081 0084 0085 0089 0090 0091 0093 0094 0101 0104
0114 0115 0117 0123 0125 0126 0128 0131 0134 0135 0136
0137 0139 0141 0142 0145 0146 0147 0149 0150 0151
 0152
0154 0156 0157 0158 0159 0160 0161 0163 0164 0166 0167
0168 0169 0170 0173 0174 0175 0178 0179 0180 0182 0185
0186 0187 0190 0192 0193 0194 0196 0197 0199 0201 0202
0204 0207 0208 0210 0212 0213 0214 0215 0216 0217 0218
0220 0221 0227 0228 0233 0236 0237 0242 0243 0245 0246
0252 0257 0260 0263 0264 0268 0270 0273 0274
 0278 0280
0282 0292 0297 0302 0304 0307 0310 0318 0319 0321 0325
0327 0329 0331 0332 0335 0347 0352 0354 0355
 0359 0363
0367 0373 0374 0377 0378 0379 0381 0385 0387 0390 0395
0399 0402 0406 0411 0413 0415 0424 0429
 0430 0433 0434
0435 0438 0442 0446 0447 0450 0459 0467 0470 0474 0483
0528 0538 0541 0544 0545 0546 0554 0556 0559 0561 0562
0582 0585 0590 0598 0643 0646 0651 0668 0793 0800 0835
0844 0921 0938 0955
001
 002 003
 004
(5) Configuration definition
**CONF 001
Config. 001 is valid for aircraft wit h Wing and Center Tank Fuel Pumps PN
568-1-28300-001 or 568-1-28300-002 as the baseline with:
- Modification No. 48991H14319 not embodied or Service Bulletin No. A340-28-4124 not
accomplished
- Modification No. 56775H16186 not embodied
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
- Service Bulletin No. A340-28-4134 (Modification Nos. 202133H16554 and
202133H16556) not accomplished.
**CONF 002
Config. 002 is valid for aircraft wit h Wing and Center Tank Fuel Pumps PN
568-1-28300-003 or 568-1-28300-004 as the baseline with:
- Modification No. 48991H14319 embodied or Service Bulletin No. A340-28-4124
accomplished
- Modification No. 56775H16186 not embodied
- Service Bulletin No. A340-28-4134 (Modification Nos. 202133H16554 and
202133H16556) not accomplished.
**CONF 003
Config. 003 is valid for aircraft wit h Wing and Center Tank Fuel Pumps PN
568-1-28300-101 as the baseline with:
- Modification No. 56775H16186 embodied
- Service Bulletin No. A340-28-4134 (Modification Nos. 202133H16554 and
202133H16556) not accomplished.
**CONF 004
Config. 004 is valid for aircraft wit h Wing and Center Tank Fuel Pumps PN
568-1-28300-103 as the baseline with:
- Service Bulletin No. A340-28-4134 (Modification Nos. 202133H16554 and
202133H16556) accomplished.
The following table gives further information of the Configuration Definition.
CONFIG.
 MODIFICATION NO.
48991H14319 OR
SERVICE BULLETIN
NO. A340-28-4124
MODIFICATION NO.
56775H16186
SERVICE BULLETIN
NO. A340-28-4134
(MODIFICATION NO.
202133H16554 AND
202133H16556)
001
002
 X
003
 X
004
 X
NOTE
: "X" is used for Modifications/Service Bulletins embodied before
accomplishment of this Service Bulletin.
(6) Material Effectivity
None
B. CONCURRENT REQUIREMENTS
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
C. REASON
(1) History
There have been several in-service cases of stand-by fuel pump fuel leaks through
the electrical connector on A340 aircraft that have fuel pumps Part Number (PN)
568-1-28300-001 (Mk001), 568-1-28300-002 (Mk002) and 568-1-28300-101 (Mk101).
The fuel leaks were corrected on fuel pump PN 568-1-28300-003 (Mk003),
568-1-28300-004 (Mk004) and 568-1-28300-103 (Mk103).
The current standard of fuel pump supplied in production is Mk103 and can be installed
on any A340 aircraft and in any position.
(2) Objective/Action
This Service Bulletin requests a one-time Detailed Inspection (DI) of the fuel pumps
installed on each aircraft. It provides the process to identify the PN of the fuel pumps on
an aircraft and to replace the affected fuel pumps by applying a corrective Service
Bulletin, as applicable to aircraft type and configuration.
Aircraft with the Mk001 and Mk002 fuel pumps can be modified to an aircraft
configuration with Mk003 or Mk004 pumps with the embodiment of Modification No.
48991H14319 (Service Bulletin No. A340-28-4124). The modification introduces grease
in the void behind the pump connector in order to prevent potential ice build up and
consequent damage to pumps.
Aircraft with the Mk101 fuel pumps can be modified to an aircraft configuration with
Mk103 fuel pumps with the embodiment of Modification Nos. 202133H16554 and
202133H16556 (Service Bulletin No. A340-28-4134). The modification improves sealing
and potting around the rear of the pump connector and also introduces grease in the
void behind the pump.
(3) Advantages
Accomplishment of this Service Bulletin ensures all identified Mk001, Mk002 and Mk101
are replaced by the new standard of fuel pumps to prevent potential fuel leaks.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 284138-832-895-001: Inspection
(1) Detailed Inspection (DI) of the Fuel Pumps
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
**CONF 002
Task 284138-832-895-001: Inspection
(1) Detailed Inspection (DI) of the Fuel Pumps
**CONF 003
Task 284138-832-895-001: Inspection
(1) Detailed Inspection (DI) of the Fuel Pumps
**CONF 004
Task 284138-832-895-001: Inspection
(1) Detailed Inspection (DI) of the Fuel Pumps
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
**CONF 001
Table 1, Config. 001 - A340-200 and A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-001 or 568-1-28300-002 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace Period
 Threshold
 Grace
Period
All aircraft
 Check the part number
for each Fuel Pump
Within 4 years
from ISB
issuance
None
 None
 None
If all fuel pumps are
568-1-28300-101
Replace the fuel
pumps in accordance
with SB A340-28-4134
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 8 years
from ISB
issuance
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
Table 1, Config. 001 - A340-200 and A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-001 or 568-1-28300-002 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace Period
 Threshold
 Grace
Period
If fuel pumps are
568-1-28300-001 or
568-1-28300-002 or
568-1-28300-101
Replace the fuel
pumps in accordance
with the applicable SB
A340-28-4124 or SB
A340-28-4134
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 6 years
from ISB
issuance
None
If fuel pumps
568-1-28300-001 or
568-1-28300-002 or
568-1-28300-101
are not installed
Contact AIRBUS and
report the
accomplishment of SB
A340-28-4124 or
A340-28-4134 as
applicable and send
the Inspection Report
Sheet
Within 30 days
report
accomplishment
None
 None
 None
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
**CONF 002
Table 1, Config. 002 - A340-200 or A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-003 and 568-1-28300-004 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace Period
 Threshold
 Grace
Period
All aircraft
 Check the part number
for each Fuel Pump
Within 4 years
from ISB
issuance
None
 None
 None
If all fuel pumps
are
568-1-28300-101
Replace the fuel
pumps in accordance
with SB A340-28-4134
Contact AIRBUS and
sned the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 8 years
from ISB
issuance
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
Table 1, Config. 002 - A340-200 or A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-003 and 568-1-28300-004 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace Period
 Threshold
 Grace
Period
If fuel pumps are
568-1-28300-001 or
568-1-28300-002 or
568-1-28300-101
Replace the fuel
pumps in accordance
with SB A340-28-4134
or restore configuration
of aircraft to MOD
48991H14319 (SB
A340-28-4124)
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 6 years
from ISB
issuance
None
If fuel pumps
568-1-28300-001 or
568-1-28300-002 or
568-1-28300-101
are not installed
Contact AIRBUS and
report the
accomplishment of SB
A340-28-4134 and
send the Inspection
Report Sheet
Within 30 days
report
accomplishment
None
 None
 None
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
**CONF 003
Table 1, Config. 003 - A340-200 and A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-101 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace Period
 Threshold
 Grace
Period
All aircraft
 Check the part number
for each Fuel Pump
Within 4 years
from ISB
issurance
None
 None
 None
If all fuel pumps
are
568-1-28300-101
Replace the fuel
pumps in accordance
with SB A340-28-4134
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 8 years
from ISB
issuance
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
Table 1, Config. 003 - A340-200 and A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-101 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace Period
 Threshold
 Grace
Period
If fuel pumps are
568-1-28300-001
or
568-1-28300-002
or
568-1-28300-101
Replace the fuel
pumps in accordance
with SB A340-28-4134
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 6 years
from ISB
issuance
None
If fuel pumps
568-1-28300-001
or
568-1-28300-002
or
568-1-28300-101
are not installed
Contact AIRBUS and
report the
accomplishment of SB
A340-28-4134 and
send the Inspection
Report Sheet
Within 30 days
report
accomplishment
None
 None
 None
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
**CONF 004
Table 1, Config. 004 - A340-200 and A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-103 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace
Period
Threshold
 Grace
Period
All aircraft
 Check the part number
for each Fuel Pump
Within 4 years
from ISB
issuance
None
 None
 None
If all fuel pumps
are
568-1-28300-101
Restore the
configuration of the
aircraft to Post MOD
202133H16554 and
202133H16556 (SB
A340-28-4134)
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 8 years
from ISB
issuance
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
Table 1, Config. 004 - A340-200 and A340-300 Detailed Inspection of Fuel Pumps with PN
568-1-28300-103 as baseline
Inspection
 Replacement
Condition
 Action
Threshold
 Grace
Period
Threshold
 Grace
Period
If fuel pumps are
568-1-28300-001
or
568-1-28300-002
or
568-1-28300-101
Restore the
configuration of the
aircraft to Post MOD
202133H16554 and
202133H16556 (SB
A340-28-4134)
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of the
SB and this ISB
None
 None
 Within 6 years
from ISB
issuance
None
If fuel pumps
568-1-28300-001
or
568-1-28300-002
or
568-1-28300-101
are not installed
Contact AIRBUS and
send the Inspection
Report Sheet and
Report
Accomplishment of this
ISB
Within 30 days
report
accomplishment
None
 None
 None
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
**CONF ALL
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approv al No. EASA. 21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
**CONF 001
Task 284138-832-895-001: Inspection
Get Access
 1.00
On Aircraft
Detailed Inspection (DI) of the Fuel Pumps
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 002
Task 284138-832-895-001: Inspection
Get Access
 1.00
On Aircraft
Detailed Inspection (DI) of the Fuel Pumps
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 003
Task 284138-832-895-001: Inspection
Get Access
 1.00
On Aircraft
Detailed Inspection (DI) of the Fuel Pumps
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 004
Task 284138-832-895-001: Inspection
Get Access
 1.00
On Aircraft
Detailed Inspection (DI) of the Fuel Pumps
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-31-57
06-41-53 06-41-57 24-41-00
28-21-51 28-26-51
Elec. Std. Practices Manual (ESPM)
 20-55-00
Service Bulletin (SB)
 A340-28-4124
A340-28-4134
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-31-57
06-41-53 06-41-57 24-41-00
28-21-51 28-26-51
Elec. Std. Practices Manual (ESPM)
 20-55-00
Service Bulletin (SB)
 A340-28-4124
A340-28-4134
**CONF 003
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-31-57
06-41-53 06-41-57 24-41-00
28-21-51 28-26-51
Elec. Std. Practices Manual (ESPM)
 20-55-00
Service Bulletin (SB)
 A340-28-4134
**CONF 004
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-31-57
06-41-53 06-41-57 24-41-00
28-21-51 28-26-51
Elec. Std. Practices Manual (ESPM)
 20-55-00
Service Bulletin (SB)
 A340-28-4134
**CONF ALL
K. PUBLICATION AFFECTED
Illustrated Parts Catalog (IPC)
 28-21-51 28-26-51
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
No Material Set
(2) Price and Availability
No Material Set
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
T e l:( 3 3 )56 71 90 62 2
E-mail : monitored.retrofit@airbus.com
F a x:( 3 3 )56 19 32 74 5
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 284138-832-895-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION
(CDCCL) CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A
POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN
THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A
CDCCL ITEM CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
Task Associated Data
**CONF 001
Zone
195 196 541 641
Modified FIN
100QA1
 100QA2
 100QA3
 100QA4
 101QA1
 101QA2
 101QA3
 101QA4
 600QL1
600QL2
Access
Door
 196HB
Panel
 195DB 196BB 196EB 196HB
Manpower
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 002
Zone
195 196 541 641
Modified FIN
100QA1
 100QA2
 100QA3
 100QA4
 101QA1
 101QA2
 101QA3
 101QA4
 600QL1
600QL2
Access
Door
 196HB
Panel
 195DB 196BB 196EB 196HB
Manpower
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF 003
Zone
195 196 541 641
Modified FIN
100QA1
 100QA2
 100QA3
 100QA4
 101QA1
 101QA2
 101QA3
 101QA4
 600QL1
600QL2
Access
Door
 196HB
Panel
 195DB 196BB 196EB 196HB
Manpower
TOTAL MANHOURS
 3.00
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
ELAPSED TIME (HOURS)
 3.00
**CONF 004
Zone
195 196 541 641
Modified FIN
100QA1
 100QA2
 100QA3
 100QA4
 101QA1
 101QA2
 101QA3
 101QA4
 600QL1
600QL2
Access
Door
 196HB
Panel
 195DB 196BB 196EB 196HB
Manpower
TOTAL MANHOURS
 3.00
ELAPSED TIME (HOURS)
 3.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 284138-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-31-57, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-53, Page Block 001 and
AMM 06-41-57, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001 and
AMM 06-31-57, Page Block 001.
(2) Subtask 284138-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
**CONF 002
(1) Subtask 284138-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-31-57, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-53, Page Block 001 and
AMM 06-41-57, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001 and
AMM 06-31-57, Page Block 001.
(2) Subtask 284138-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 003
(1) Subtask 284138-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-31-57, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-53, Page Block 001 and
AMM 06-41-57, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001 and
AMM 06-31-57, Page Block 001.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
(2) Subtask 284138-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 004
(1) Subtask 284138-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-31-57, Page Block 001
06-41-53, Page Block 001
06-41-57, Page Block 001
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-53, Page Block 001 and
AMM 06-41-57, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001 and
AMM 06-31-57, Page Block 001.
(2) Subtask 284138-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 284138-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 24-41-00-860-801
Task 28-21-51-000-801
Task 28-26-51-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
24-41-00-860-801.
(b) Do the job set-up as specified for the removal of the wing tank fuel pumps, refer to
AMM Task 28-21-51-000-801.
(c) Do the job set-up as specified for the removal of the center tank fuel transfer
pumps, refer to AMM Task 28-26-51-000-801.
**CONF 002
(1) Subtask 284138-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 24-41-00-860-801
Task 28-21-51-000-801
Task 28-26-51-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
24-41-00-860-801.
(b) Do the job set-up as specified for the removal of the wing tank fuel pumps, refer to
AMM Task 28-21-51-000-801.
(c) Do the job set-up as specified for the removal of the center tank fuel transfer
pumps, refer to AMM Task 28-26-51-000-801.
**CONF 003
(1) Subtask 284138-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 24-41-00-860-801
Task 28-21-51-000-801
Task 28-26-51-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
24-41-00-860-801.
(b) Do the job set-up as specified for the removal of the wing tank fuel pumps, refer to
AMM Task 28-21-51-000-801.
(c) Do the job set-up as specified for the removal of the center tank fuel transfer
pumps, refer to AMM Task 28-26-51-000-801.
**CONF 004
(1) Subtask 284138-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 24-41-00-860-801
Task 28-21-51-000-801
Task 28-26-51-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
24-41-00-860-801.
(b) Do the job set-up as specified for the removal of the wing tank fuel pumps, refer to
AMM Task 28-21-51-000-801.
(c) Do the job set-up as specified for the removal of the center tank fuel transfer
pumps, refer to AMM Task 28-26-51-000-801.
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 284138-220-401-001 - Detailed Inspection (DI) of the Fuel Pumps
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Door 196HB
Panel 196BB, Panel 196EB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Service Bulletin (SB)
 A340-28-4124
A340-28-4134
Fig. A-UFAAA
Flow Chart
Sheet 01
Fig. A-URAAA
Inspection Report Sheet
Sheet 01
Sheet 02
Sheet 03
Fig. A-URBAA
Accomplishment Report Sheet
Sheet 01
(a) In the wing tanks and the center tank, refer to Fig. A-UFAAA Sheet 01
 , Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 ,d oa
Detailed Inspection (DI) of the PNs on the Fuel Pumps 100QA1
 , 100QA2
 , 100QA3
 ,
100QA4
, 101QA1
 , 101QA2,
 101QA3,
 101QA4
, 600QL1 and 600QL2.
NOTE
: A review of aeroplane delivery and/or maintenance records is
acceptable to make this identification, provided those records can
be relied upon for the purpose of this requirement.
1
 Record the fuel pump configuration in the Inspection Report, refer to Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 .
NOTE
: This Inspection Report is for the operator traceability only and
it is not necessary to send this to AIRBUS.
(b) If any of the PNs are 568-1-28300-001, 568-1-28300-002 or 568-1-28300-101:
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If an operator has a corrective Modification/SB embodied, then
restore the post modification configuration of the aircraft with
unaffected fuel pumps only.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
1
 If all the fuel pumps are PN 568-1-28300-101, within 8 years from Inspection
Service Bulletin (ISB) issuance, replace the affected pumps, refer to Service
Bulletin No. A340-28-4134.
a
 Report the accomplishment of Service Bulletin No. A340-28-4134.
2
 If all or any of the fuel pumps are not PN 568-1-28300-101, within 6 years
from ISB issuance, replace the affected fuel pumps, refer to Service Bulletin
No. A340-28-4124 or Service Bulletin No. A340-28-4134.
a
 Report the accomplishment of Service Bulletin No. A340-28-4124 or
Service Bulletin No. A340-28-4134.
(c) If all the fuel pumps are PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103:
1
 If not already done, within 30 days of the inspection, report to AIRBUS the
accomplishment of Service Bulletin No. A340-28-4124 or Service Bulletin No.
A340-28-4134.
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If necessary, an operator can only replace an unaffected fuel
pump with another unaffected fuel pump. This must be done
within the 30 days provided for reporting of Service Bulletin
No. A340-28-4124 or Service Bulletin No. A340-28-4134
accomplishment.
(d) Report accomplishment of the inspection to AIRBUS, refer to Fig. A-URBAA Sheet
01
.
**CONF 002
(1) Subtask 284138-220-401-002 - Detailed Inspection (DI) of the Fuel Pumps
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Door 196HB
Panel 196BB, Panel 196EB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340
SERVICE BULLETIN
References
Service Bulletin (SB)
 A340-28-4124
A340-28-4134
Fig. A-UFAAB
Flow Chart
Sheet 01
Fig. A-URAAA
Inspection Report Sheet
Sheet 01
Sheet 02
Sheet 03
Fig. A-URBAA
Accomplishment Report Sheet
Sheet 01
(a) In the wing tanks and the center tank, refer to Fig. A-UFAAB Sheet 01
 , Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 ,d oa
Detailed Inspection (DI) of the PNs on the Fuel Pumps 100QA1
 , 100QA2
 , 100QA3
 ,
100QA4
, 101QA1
 , 101QA2,
 101QA3,
 101QA4
, 600QL1 and 600QL2.
NOTE
: A review of aeroplane delivery and/or maintenance records is
acceptable to make this identification, provided those records can
be relied upon for the purpose of this requirement.
1
 Record the fuel pump configuration in the Inspection Report, refer to Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 .
NOTE
: This Inspection Report is for the operator traceability only and
it is not necessary to send this to AIRBUS.
(b) If any of the PNs are 568-1-28300-001, 568-1-28300-002 or 568-1-28300-101:
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If an operator has a corrective Modification/SB embodied, then
restore the post modification configuration of the aircraft with
unaffected fuel pumps only.
1
 If all the fuel pumps are PN 568-1-28300-101, within 8 years from Inspection
Service Bulletin (ISB) issuance, replace the affected pumps, refer to Service
Bulletin No. A340-28-4134.
a
 Report the accomplishment of Service Bulletin No. A340-28-4134.
2
 If all or any of the fuel pumps are not PN 568-1-28300-101, within 6
years from ISB issuance, replace the affected fuel pumps, refer to Service
Bulletin No. A340-28-4134 or restore the configuration of the aircraft to Post
Modification No. 48991H14319 (Service Bulletin No. A340-28-4124).
a
 Report the accomplishment of Service Bulletin No. A340-28-4124 or
Service Bulletin No. A340-28-4134.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340
SERVICE BULLETIN
(c) If all the fuel pumps are PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103:
1
 If not already done, within 30 days of the inspection, report to AIRBUS the
accomplishment of A340-28-4124 or A340-28-4134.
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If necessary, an operator can only replace an unaffected fuel
pump with another unaffected fuel pump. This must be done
within the 30 days provided for reporting of Service Bulletin
No. A340-28-4124 or Service Bulletin No. A340-28-4134
accomplishment.
(d) Report accomplishment of the inspection to AIRBUS, refer to Fig. A-URBAA Sheet
01
.
**CONF 003
(1) Subtask 284138-220-401-003 - Detailed Inspection (DI) of the Fuel Pumps
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Door 196HB
Panel 196BB, Panel 196EB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Service Bulletin (SB)
 A340-28-4134
Fig. A-UFAAC
Flow Chart
Sheet 01
Fig. A-URAAA
Inspection Report Sheet
Sheet 01
Sheet 02
Sheet 03
Fig. A-URBAA
Accomplishment Report Sheet
Sheet 01
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340
SERVICE BULLETIN
(a) In the wing tanks and the center tank, refer to Fig. A-UFAAC Sheet 01
 , Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 ,d oa
Detailed Inspection (DI) of the PNs on the Fuel Pumps 100QA1
 , 100QA2
 , 100QA3
 ,
100QA4
, 101QA1
 , 101QA2,
 101QA3,
 101QA4
, 600QL1 and 600QL2.
NOTE
: A review of aeroplane delivery and/or maintenance records is
acceptable to make this identification, provided those records can
be relied upon for the purpose of this requirement.
1
 Record the fuel pump configuration in the Inspection Report, refer to Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 .
NOTE
: This Inspection Report is for the operator traceability only and
it is not necessary to send this to AIRBUS.
(b) If any of the PNs are 568-1-28300-001, 568-1-28300-002 or 568-1-28300-101:
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If an operator has a corrective Modification/SB embodied, then
restore the post modification configuration of the aircraft with
unaffected fuel pumps only.
1
 If all the fuel pumps are PN 568-1-28300-101, within 8 years from Inspection
Service Bulletin (ISB) issuance, replace the affected pumps, refer to Service
Bulletin No. A340-28-4134.
a
 Report the accomplishment of Service Bulletin No. A340-28-4134.
2
 If all or any of the fuel pumps are not PN 568-1-28300-101, within 6 years
from ISB issuance, replace the affected fuel pumps, refer to Service Bulletin
No. A340-28-4134.
a
 Report the accomplishment of Service Bulletin No. A340-28-4134.
(c) If all the fuel pumps are PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103:
1
 If not already done, within 30 days of the inspection, report to AIRBUS the
accomplishment of Service Bulletin No. A340-28-4134.
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If necessary, an operator can only replace an unaffected fuel
pump with another unaffected fuel pump. This must be done
within the 30 days provided for reporting of Service Bulletin
No. A340-28-4134 accomplishment.
(d) Report accomplishment of the inspection to AIRBUS, refer to Fig. A-URBAA Sheet
01
.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340
SERVICE BULLETIN
**CONF 004
(1) Subtask 284138-220-401-004 - Detailed Inspection (DI) of the Fuel Pumps
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Door 196HB
Panel 196BB, Panel 196EB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Service Bulletin (SB)
 A340-28-4134
Fig. A-UFAAD
Flow Chart
Sheet 01
Fig. A-URAAA
Inspection Report Sheet
Sheet 01
Sheet 02
Sheet 03
Fig. A-URBAA
Accomplishment Report Sheet
Sheet 01
(a) In the wing tanks and the center tank, refer to Fig. A-UFAAD Sheet 01
 , Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 ,d oa
Detailed Inspection (DI) of the PNs on the Fuel Pumps 100QA1
 , 100QA2
 , 100QA3
 ,
100QA4
, 101QA1
 , 101QA2,
 101QA3,
 101QA4
, 600QL1 and 600QL2.
NOTE
: A review of aeroplane delivery and/or maintenance records is
acceptable to make this identification, provided those records can
be relied upon for the purpose of this requirement.
1
 Record the fuel pump configuration in the Inspection Report, refer to Fig. A-
URAAA Sheet 01
 , Fig. A-URAAA Sheet 02
 and Fig. A-URAAA Sheet 03
 .
NOTE
: This Inspection Report is for the operator traceability only and
it is not necessary to send this to AIRBUS.
(b) If any of the PNs are 568-1-28300-001, 568-1-28300-002 or 568-1-28300-101:
NOTE
: Fuel pumps PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103 are two-way interchangeable.
NOTE
: If an operator has a corrective Modification/SB embodied, then
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340
SERVICE BULLETIN
restore the post modification configuration of the aircraft with
unaffected fuel pumps only.
1
 If all the fuel pumps are PN 568-1-28300-101, within 8 years from Inspection
Service Bulletin (ISB) issuance, restore the configuration of the aircraft to Post
Modification Nos. 202133H16554 and 202133H16556 (Service Bulletin No.
A340-28-4134).
a
 Report the accomplishment of Modification Nos. 202133H16554 and
202133H16556 or Service Bulletin No. A340-28-4134.
2
 If all or any of the fuel pumps are not PN 568-1-28300-101, within 6 years
from ISB issuance, restore the configuration of the aircraft to Post Modification
Nos. 202133H16554 and 202133H16556 (Service Bulletin No. A340-28-4134).
a
 If the SB was accomplished but not reported, then report the
accomplishment of Service Bulletin No. A340-28-4134.
(c) If all the fuel pumps are PN 568-1-28300-003, 568-1-28300-004 and
568-1-28300-103:
1
 Report accomplishment of the inspection to AIRBUS, refer to Fig. A-URBAA
Sheet 01
 .
**CONF ALL
D. TEST
**CONF 001
None
**CONF 002
None
**CONF 003
None
**CONF 004
None
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340
SERVICE BULLETIN
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 284138-942-401-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 28-21-51-400-801
Task 28-26-51-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close up procedure as specified in the installation of the wing tank fuel
pumps, refer to AMM Task 28-21-51-400-801.
(c) Do the close up procedure as specified in the installation of the center tank fuel
pumps, refer to AMM Task 28-26-51-400-801.
(d) Put the aircraft back to its initial configuration.
**CONF 002
(1) Subtask 284138-942-401-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 31
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 28-21-51-400-801
Task 28-26-51-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close up procedure as specified in the installation of the wing tank fuel
pumps, refer to AMM Task 28-21-51-400-801.
(c) Do the close up procedure as specified in the installation of the center tank fuel
pumps, refer to AMM Task 28-26-51-400-801.
(d) Put the aircraft back to its initial configuration.
**CONF 003
(1) Subtask 284138-942-401-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 28-21-51-400-801
Task 28-26-51-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close up procedure as specified in the installation of the wing tank fuel
pumps, refer to AMM Task 28-21-51-400-801.
(c) Do the close up procedure as specified in the installation of the center tank fuel
pumps, refer to AMM Task 28-26-51-400-801.
(d) Put the aircraft back to its initial configuration.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 32
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340
SERVICE BULLETIN
**CONF 004
(1) Subtask 284138-942-401-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
541
 Work location
 from Rib 2 to Rib 4
641
 Work location
 from Rib 2 to Rib 4
195
 Access
 Panel 195DB
Work location
 from Frame 44 to Frame 47
196
 Access
 Panel 196BB, Panel 196EB, Panel 196HB
Work location
 from Frame 44 to Frame 47
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 28-21-51-400-801
Task 28-26-51-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close up procedure as specified in the installation of the wing tank fuel
pumps, refer to AMM Task 28-21-51-400-801.
(c) Do the close up procedure as specified in the installation of the center tank fuel
pumps, refer to AMM Task 28-26-51-400-801.
(d) Put the aircraft back to its initial configuration.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 33
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340
SERVICE BULLETIN
**CONF 001
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
YESNO
WITHIN 4 YEARS FROM ISB
ISSUANCE, CHECK THE PN FOR
EACH FUEL PUMP ON THE A/C
ANY FUEL PUMP PN
568−1−28300−001 OR
568−1−28300−002 OR
568−1−28300−101
INSTALLED?
ALL FUEL PUMP PN
568−1−28300−101
INSTALLED?
NOYES
WITHIN 8 YEARS FROM ISB
ISSUANCE, REPLACE AFFECTED PUMPS
AS PER SB 28−4134
AND REPORT ACCOMPLISHMENT
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
WITHIN 6 YEARS FROM ISB ISSUANCE,
REPLACE AFFECTED PUMPS AS PER
SB 28−4124
(INTRODUCTION OF PUMPS −003, −004)
OR
SB 28−4134
(INTRODUCTION OF PUMPS −103) AND
REPORT ACCOMPLISHMENT.
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
THE AIRCRAFT SB WILL MODIFY FUEL PUMPS IN THE FOLLOWING MANNER:
− SB 28−4124 − REPLACES MK001 OR MK002 WITH MK003 OR MK004
− SB 28−4134 − REPLACES MK001 OR MK002 OR MK003 OR MK004 OR MK101 WITH  MK103
REPORT ACCOMPLISHMENT OF THIS ISB
(AFTER EMBODIMENT OF THIS ISB, ONLY
PUMPS −003, −004 OR −103 MUST BE
INSTALLED − ALL AFFECTED FINS)
NO FURTHER ACTION
IF NOT ALREADY DONE, REPORT
EMBODIMENT OF
SB 28−4124 OR SB 28−4134,
AS APPLICABLE, WITHIN 30 DAYS
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
A340−200/300
CONFIG. 001
(AIRCRAFT CONFIGURATION WITH 568−1−28300−001 OR 568−1−28300−002 AS BASELINE)
MAY HAVE OTHER FUEL PUMPS THROUGH INTERCHANGEABILITY IN THE IPC01
NOTES:
01
F_SB_284138_7_FAAA_01_03
Figure A-UFAAA - Sheet 01
Flow Chart
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 34
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340
SERVICE BULLETIN
**CONF 002
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
YESNO
WITHIN 4 YEARS FROM ISB
ISSUANCE, CHECK THE PN FOR
EACH FUEL PUMP ON THE A/C
ANY FUEL PUMP PN
568−1−28300−001 OR
568−1−28300−002 OR
568−1−28300−101
INSTALLED?
ALL FUEL PUMP PN
568−1−28300−101
INSTALLED?
NOYES
WITHIN 8 YEARS FROM ISB
ISSUANCE, REPLACE AFFECTED PUMPS
AS PER SB 28−4134
AND REPORT ACCOMPLISHMENT
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
WITHIN 6 YEARS FROM ISB ISSUANCE,
REPLACE AFFECTED PUMPS AS PER
SB 28−4134
(INTRODUCTION OF PUMPS −103)
AND REPORT ACCOMPLISHMENT
OR
RESTORE THE CONFIGURATION OF THE
A/C TO:
POST MOD 48991 H14319 (SB 28−4124)
(PUMPS −003, −004, −103 ARE
THE AIRCRAFT SB WILL MODIFY FUEL PUMPS IN THE FOLLOWING MANNER:
− SB 28−4124 − REPLACES MK001 OR MK002 WITH MK003 OR MK004
− SB 28−4134 − REPLACES MK001 OR MK002 OR MK003 OR MK004 OR MK101 WITH  MK103
IF NOT ALREADY DONE, REPORT
EMBODIMENT OF
SB 28−4134 WITHIN 30 DAYS
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
A340−200/300
CONFIG. 002
(AIRCRAFT CONFIGURATION WITH 568−1−28300−003 OR 568−1−28300−004 AS BASELINE)
TWO−WAY INTERCHANGEABLE)
NO FURTHER ACTION
REPORT ACCOMPLISHMENT OF THIS ISB
(AFTER EMBODIMENT OF THIS ISB, ONLY
PUMPS −003, −004 OR −103 MUST BE
INSTALLED − ALL AFFECTED FINS)
MAY HAVE OTHER FUEL PUMPS THROUGH INTERCHANGEABILITY IN THE IPC01
NOTES:
01
F_SB_284138_7_FAAB_01_02
Figure A-UFAAB - Sheet 01
Flow Chart
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 35
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340
SERVICE BULLETIN
**CONF 003
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
YESNO
WITHIN 4 YEARS FROM ISB
ISSUANCE, CHECK THE PN FOR
EACH FUEL PUMP ON THE A/C
ANY FUEL PUMP PN
568−1−28300−001 OR
568−1−28300−002 OR
568−1−28300−101
INSTALLED?
ALL FUEL PUMP PN
568−1−28300−101
INSTALLED?
NOYES
WITHIN 8 YEARS FROM ISB
ISSUANCE, REPLACE AFFECTED PUMPS
AS PER SB 28−4134
AND REPORT ACCOMPLISHMENT
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
WITHIN 6 YEARS FROM ISB ISSUANCE,
REPLACE AFFECTED PUMPS AS PER
SB 28−4134
(INTRODUCTION OF PUMPS −103)
AND REPORT ACCOMPLISHMENT
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
THE AIRCRAFT SB WILL MODIFY FUEL PUMPS IN THE FOLLOWING MANNER:
− SB 28−4134− REPLACES MK001 OR MK002 OR MK003 OR MK004 OR MK101 WITH  MK103
IF NOT ALREADY DONE, REPORT
EMBODIMENT OF
SB 28−4134 WITHIN 30 DAYS
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
A340−200/300
CONFIG. 003
(AIRCRAFT CONFIGURATION WITH 568−1−28300−101 AS BASELINE)
NO FURTHER ACTION
REPORT ACCOMPLISHMENT OF THIS ISB
(AFTER EMBODIMENT OF THIS ISB, ONLY
PUMPS −003, −004 OR −103 MUST BE
INSTALLED − ALL AFFECTED FINS)
MAY HAVE OTHER FUEL PUMPS THROUGH INTERCHANGEABILITY IN THE IPC01
NOTES:
01
F_SB_284138_7_FAAC_01_01
Figure A-UFAAC - Sheet 01
Flow Chart
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 36
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340
SERVICE BULLETIN
**CONF 004
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
YESNO
WITHIN 4 YEARS FROM ISB
ISSUANCE, CHECK THE PN FOR
EACH FUEL PUMP ON THE A/C
ANY FUEL PUMP PN
568−1−28300−001 OR
568−1−28300−002 OR
568−1−28300−101
INSTALLED?
ALL FUEL PUMP PN
568−1−28300−101
INSTALLED?
NOYES
WITHIN 8 YEARS FROM ISB ISSUANCE
RESTORE THE CONFIGURATION OF THE
A/C TO:
POST MOD 202133 
(SB 28−4134).
NOTE: IF SB WAS EMBODIED BUT NOT
WITHIN 6 YEARS FROM ISB ISSUANCE,
RESTORE THE CONFIGURATION OF THE
A/C TO:
POST MOD 202133 
(POST SB 28−4134).
THE AIRCRAFT SB WILL MODIFY FUEL PUMPS IN THE FOLLOWING MANNER:
− SB 28−4134− REPLACES MK001 OR MK002 OR MK003 OR MK004 OR MK101 WITH  MK103
A340−200/300
CONFIG. 004
(AIRCRAFT CONFIGURATION WITH 568−1−28300−103 AS BASELINE)
NO FURTHER ACTION
REPORT ACCOMPLISHMENT OF THIS ISB
(AFTER EMBODIMENT OF THIS ISB, ONLY
PUMPS −003, −004 OR −103 MUST BE
INSTALLED − ALL AFFECTED FINS)
REPORTED, REPORT ACCOMPLISHMENT
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
NOTE: IF SB WAS EMBODIED BUT NOT
REPORTED, REPORT ACCOMPLISHMENT
(PUMPS −003, −004, −103 ARE
TWO−WAY INTERCHANGEABLE)
MAY HAVE OTHER FUEL PUMPS THROUGH INTERCHANGEABILITY IN THE IPC01
NOTES:
01
F_SB_284138_7_FAAD_01_02
Figure A-UFAAD - Sheet 01
Flow Chart
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 37
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340
SERVICE BULLETIN
**CONF ALL
SERVICE BULLETIN NO.: A340−28−4138
A/C MSN:
FLIGHT CYCLES:
FLIGHT HOURS:
DATE OF INSPECTION:
INSPECTION METHOD:       DETAIL INSPECTION
INSPECTION REPORT
FIN FUEL PUMP PN INSTALLED YES
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
100QA1
100QA2
100QA3
FOR OPERATOR TRACEABILITY ONLY
F_SB_284138_7_RAAA_01_02
Figure A-URAAA - Sheet 01
Inspection Report Sheet
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 38
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340
SERVICE BULLETIN
**CONF ALL
FIN FUEL PUMP PN INSTALLED YES
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
100QA4
101QA1
101QA2
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
101QA3
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
101QA4
F_SB_284138_7_RAAA_02_01
Figure A-URAAA - Sheet 02
Inspection Report Sheet
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 39
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340
SERVICE BULLETIN
**CONF ALL
FIN FUEL PUMP PN INSTALLED YES
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
568−1−28300−001
568−1−28300−002
568−1−28300−003
568−1−28300−004
568−1−28300−101
568−1−28300−103
600QL1
600QL2
F_SB_284138_7_RAAA_03_01
Figure A-URAAA - Sheet 03
Inspection Report Sheet
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 40
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340
SERVICE BULLETIN
**CONF ALL
SERVICE BULLETIN NO.: A340−28−4138
A/C MSN:
FLIGHT CYCLES:
FLIGHT HOURS:
DATE OF INSPECTION:
INSPECTION METHOD:       DETAIL INSPECTION
RETURN TO:
AIRBUS
CUSTOMER SERVICES ENGINEERING
FUEL SYSTEMS
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX
FRANCE
FAX +33 (0)5 61 93 36 14
E−mail: inspection.results@airbus.com
ACCOMPLISHMENT REPORT
SERVICE BULLETIN ACCOMPLISHED
28−4124
28−4134
MODIFICATION EMBODIED
48991H14319
202133H16554
202133H16556
YES NO YES NO
YES NO YES NO
YES NO
F_SB_284138_7_RBAA_01_00
Figure A-URBAA - Sheet 01
Accomplishment Report Sheet
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 41
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340
SERVICE BULLETIN
REPORTING SHEET
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSPECTION OF THE MAIN
STAND-BY AND TRANSFER PUMPS
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 14/15 SERVICE BULLETIN No.: A340-28-4138
REVISION No.: 01 - Sep 24/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
