# Airbus Service Bulletin A340-28-4140

Copy: No revision named ("SB A340-28-4140 R00"), 38 pages: PDF https://openairdocs.org/files/sha256/eb/e1/ebe1be54cce55b81c038e70a0ccfac66ddfe825aefd3624315033ac9b9ccac9e; text https://openairdocs.org/service-documents/airbus/a340-28-4140/file/ebe1be54cce5.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0270; AD 2018-14-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-28-4140
- Page: https://openairdocs.org/service-documents/airbus/a340-28-4140

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-14-04](https://openairdocs.org/ad/2018-14-04.md), effective Aug 13, 2018: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-28-4140/proposed.md).

## Text (38 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0270; AD 2018-14-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - TANKS - INSPECTION OF TRIM TANK OVERFLOW
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
While performing an assessment of Long Range (LR) family aircraft Ground Test Requirements (GTR),
it has been determined that the ’Production Test to Verify Tank Pressures during Refuel Overflow’ is not
performed on the trim tank.
The aim of this Inspection Service Bulletin (ISB) is to perform a trim tank overflow ground test and to
check that trim tank pressure values and trim surge tank pressure values are not exceeded.
Accomplishment of this Service Bulletin will ensure that there is no blockage of the vent pipes.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
SUMMARY
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit tool 284140T01R00
 1
 See SB
 Overflow pipe tool and pressure
transducer tool
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
01V 06Y 09M 14S 15R 17M 31V 39N 41N 65W 74W 83V 98W
ABD AFR AIB ALD ARG AXY BOE CAL CPA DGA DLH EDW F2I
FIN GAF HFM HFY IBE IRC IRM KAC KMF M3R MAU MDG MRJ
PAL PUE QQE ROI S3R SAA SAS SFB SLM SWR SYR TAP THT
THY VCV
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 28.12.00.008
OEB
 None
AOT
 None
SIL
 None
ISI
 00.00.00198
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 284140-832-895-001: Special Detailed Inspection of the Trim Tank Overflow
TOTAL MANHOURS
 17.50
ELAPSED TIME (HOURS)
 5.25
APPENDICES
Appendix 01 - Manpower Gantt Chart
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
B
A
VIEW LOOKING UP
FWD
VENT SYSTEM
TO BE INSPECTED
Z343
Z333
Z319
A
RIB3
LH INNER
VENT VALVE 
RH INNER
VENT VALVE 
RH OUTER
VENT VALVE 
MAIN VENT
PIPE OUTLET
RIB2
RIB3
B
705QN
LOCATION OF THE INLET
VALVE ACTUATOR
RIB3
MAIN VENT PIPE
SECONDARY VENT PIPE
VENT PIPE OUTLET
SURGE
SECONDARY
TANK
LH OUTER
VENT VALVE 
MAIN VENT
PIPE INLETS
F_SB_284140_7_SAAA_01_01
Figure A-USAAA - Sheet 01
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
FR40 FR47
FR46
FR47
Z140A
A
B
B
700QN2
700QN1
701QN
THE VALVE ACTUATORS
LOCATION OF
F_SB_284140_7_SBAA_01_00
Figure A-USBAA - Sheet 01
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - TANKS - INSPECTION OF TRIM TANK OVERFLOW
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-211 340-212 340-213 340-311 340-312 340-313
(2) Effectivity by MSN
0001-0002 0004 0009 0014 0020 0022-0023 0025-0026 0029 0031 0038 0041
0043-0044 0046-0047 0049 0051 0056-0058 0061 0063 0074-0076 0078-0081 0084
0089-0091 0093-0094 0101 0104 0114-0115 0117 0123 0125-0126 0128 0134-0135
0139 0145-0146 0149-0152 0154 0156-0160 0163-0164 0166-0170 0174-0175
0178-0180 0185-0186 0190 0192-0194 0197 0199 0201-0202 0204 0207-0208 0210
0212-0215 0217-0218 0221 0227 0233 0236-0237 0242-0243 0245-0246 0252 0257
0260 0263-0264 0268 0270 0274 0278 0280 0282 0292 0297 0302 0304 0307 0310
0318-0319 0321 0325 0327 0329 0331-0332 0335 0347 0352 0354-0355 0367
0373-0374 0377-0379 0381 0385 0387 0390 0395 0399 0402 0406 0411 0413 0415
0424 0430 0433-0435 0438 0446-0447 0450 0459 0467 0470 0474 0483 0528 0538
0541 0544-0546 0554 0556 0559 0561-0562 0582 0585 0590 0598 0643 0646 0651
0668 0793 0800 0835 0844 0921 0938 0955
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
01V
 0146
06Y
 0139 0149
09M
 0483
14S
 0058
15R
 0151
17M
 0955
31V
 0093
39N
 0168 0174
41N
 0009
65W
 0029
74W
 0047 0051
83V
 0280 0292
98W
 0014 0022
ABD
 0210
AFR
 0078 0084 0186 0207 0237 0245 0246 0260 0307 0310 0377
AIB
 0001 0192 0243 0264 0844
ALD
 0156 0159 0178
ARG
 0063 0074 0080 0123 0126 0128 0170 0193 0373
AXY
 0374
BOE
 0554
CAL
 0402 0406 0411 0415 0433 0541
CPA
 0157 0160 0208 0218 0227
DGA
 0075 0081
DLH
 0135 0158 0213 0233 0252 0297 0304 0321 0325 0327 0335 0347
0352 0354 0379 0390 0434 0447
EDW
 0562
F2I
 0038 0043 0094 0114 0214
FIN
 0835 0921 0938
GAF
 0274 0355
HFM
 0117 0163 0166 0185 0236 0367
HFY
 0190 0202
IBE
 0125 0134 0145 0217 0221 0329
IRC
 0002
IRM
 0020 0056 0164 0282
KAC
 0089 0090 0101 0104
KMF
 0278
M3R
 0061
MAU
 0076 0152 0194 0268 0793 0800
MDG
 0319
MRJ
 0257
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
OPERATOR
 MSN
PAL
 0302 0318 0332 0387 0459 0474
PUE
 0212 0215 0399
QQE
 0026 0528
ROI
 0199 0201
S3R
 0004 0204
SAA
 0197 0378 0544 0582 0590 0643 0646 0651
SAS
 0167 0413 0424 0430 0435 0450 0467 0470
SFB
 0046
SLM
 0049 0242
SWR
 0150 0154 0169 0175 0179 0263 0538 0545 0546 0556 0559 0561
0585 0598
SYR
 0381
TAP
 0041 0044 0079 0091
THT
 0385 0395 0438 0446 0668
THY
 0023 0025 0057 0115 0180 0270 0331
VCV
 0031
(4) Configuration by MSN
MSN
 CONFIGURATION
0001 0002 0004 0009 0014 0020 0022 0023 0025 0026 0029
0031 0038 0041 0043 0044 0046 0047 0049 0051 0056 0057
0058 0061 0063 0074 0075 0076 0078 0079 0080 0081 0084
0089 0090 0091 0093 0094 0101 0104 0114 0115 0117 0123
0125 0126 0128 0134 0135 0139 0145 0146 0149 0150 0151
0152 0154 0156 0157 0158 0159 0160 0163 0164 0166 0167
0168 0169 0170 0174 0175 0178 0179 0180 0185 0186 0190
0192 0193 0194 0197 0199 0201 0202 0204 0207 0208 0210
0212 0213 0214 0215 0217 0218 0221 0227 0233 0236 0237
0242 0243 0245 0246 0252 0257 0260 0263 0264 0268 0270
0274 0278 0280 0282 0292 0297 0302 0304 0307 0310 0318
0319 0321 0325 0327 0329 0331 0332 0335 0347 0352 0354
0355 0367 0373 0374 0377 0378 0379 0381 0385 0387 0390
0395 0399 0402 0406 0411 0413 0415 0424 0430 0433 0434
0435 0438 0446 0447 0450 0459 0467 0470 0474 0483 0528
0538 0541 0544 0545 0546 0554 0556 0559 0561 0562 0582
0585 0590 0598 0643 0646 0651 0668 0793 0800 0835 0844
0921 0938 0955
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit tool 284140T01R00
 1
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
While performing an assessment of Long Range (LR) family aircraft Ground Test
Requirements (GTR), it has been determined that the ’Production Test to Verify Tank
Pressures during Refuel Overflow’ is not performed on the trim tank.
(2) Objective/Action
The aim of this Inspection Service Bulletin (ISB) is to perform a trim tank overflow
ground test and to check that trim tank pressure values and trim surge tank pressure
values are not exceeded.
(3) Advantages
Accomplishment of this Service Bulletin will ensure that there is no blockage of the vent
pipes.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 284140-832-895-001: Special Detailed Inspection of the Trim Tank Overflow
(1) Install the Overflow Pipe Tool and the Pressure Transducer Tool for the Trim Surge
Tank
(2) Install the Pressure Transducer Tool for the Trim Tank
(3) Do the Trim Tank Overflow Ground Test
(4) Depending on the Inspection Results, do a Detailed Inspection of the NACA Duct
(5) Remove the Overflow Pipe Tool and the Pressure Transducer Tool for the Trim
Surge Tank
(6) Remove the Pressure Transducer Tool for the Trim Tank
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the thresholds
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Table 1, Config. 001 - Do a Special Detailed Inspection of the Trim Tank Overflow
Condition
 Action
 Compliance time
 Repetitive interval
All aircraft
 Do a special detailed
inspection of the trim
tank overflow in
accordance with TASK
284140-832-895 001
42 months from ISB
issuance date
None
Trim tank pressure
values exceeded
Contact AIRBUS and
follow their instructions
Before next flight
 None
Remove the overflow
pipe tool and the
pressure transducer
tools, in accordance
with SUBTASK
284140-080-402 001 for
the trim tank and
SUBTASK
284140-080-401 001 for
the trim surge tank
Before next flight
 None
AND
Trim tank pressure
values not exceeded,
and trim surge tank
pressure values not
exceeded
No further action
 None
 None
Remove the overflow
pipe tool and the
pressure transducer
tool, in accordance with
SUBTASK
284140-080-401 001 for
the trim surge tank
Before next flight
 None
AND
Trim tank pressure
values not exceeded,
and trim surge tank
pressure values
exceeded
Do a detailed inspection
of the NACA duct in
accordance with
SUBTASK
284140-832-402 001
Before next flight
 None
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
Table 1, Config. 001 - Do a Special Detailed Inspection of the Trim Tank Overflow
Condition
 Action
 Compliance time
 Repetitive interval
Remove the blockage or
do the applicable repair
procedure in
accordance with
SUBTASK
284140-832-402 001
Before next flight
 None
AND
Install the overflow pipe
tool and the pressure
transducer tool in
accordance with
SUBTASK
284140-480-401 001 for
the trim surge tank
Before next flight
 None
AND
NACA duct found
blocked or damaged
Repeat the trim tank
overflow ground test in
accordance with
SUBTASK
284140-832-401 001
Before next flight
 None
Install the overflow pipe
tool and the pressure
transducer tool in
accordance with
SUBTASK
284140-480-401 001 for
the trim surge tank
Before next flight
 None
AND
NACA duct not found
blocked or damaged
Repeat the trim tank
overflow ground test in
accordance with
SUBTASK
284140-832-401 001
Before next flight
 None
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 284140-832-895-001: Special Detailed Inspection of the Trim Tank Overflow
Get Access
 2.00
On Aircraft
Install the Overflow Pipe Tool and the Pressure
Transducer Tool for the Trim Surge Tank
2.00
Install the Pressure Transducer Tool for the Trim Tank
 1.00
Do the Trim Tank Overflow Ground Test
 6.00
Depending on the Inspection Results, do a Detailed
Inspection of the NACA Duct
2.00
Remove the Overflow Pipe Tool and the Pressure
Transducer Tool for the Trim Surge Tank
2.00
Remove the Pressure Transducer Tool for the Trim
Tank
1.00
Tests
 0.50
Close-Up
 1.00
TOTAL MANHOURS
 17.50
ELAPSED TIME (HOURS)
 5.25
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAA
 given in Appendix 01.
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-41-55 12-34-24
20-21-11 28-00-00 28-10-00
28-11-00 28-11-42 28-11-43
28-12-00 28-12-48 28-25-00
32-12-00 52-41-23
Elec. Std. Practices Manual (ESPM)
 20-55-00
Structural Repair Manual (SRM)
 51-42-00
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
No Material Set
(2) Price and Availability
No Material Set
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
E-mail: monitored.retrofit@airbus.com
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
None
(2) Components
NOTE
: To accomplish this Service Bulletin it is necessary to use the expendable
parts listed in the subsequent referenced task:
- AMM Task 28-12-48-400-801
- AMM Task 28-11-42-400-802
- AMM Task 28-11-43-400-801.
(3) Equipment
None
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
Tooling policy will be communicated by the Retrofit Information Letter (RIL).
(2) Tools
NOTE
: To accomplish this Service Bulletin it is necessary to use the tools listed
in the subsequent re ferenced tasks:
- AMM Task 28-11-43-000-801
- AMM Task 28-11-43-400-801
- AMM Task 28-11-42-000-802
- AMM Task 28-11-42-400-802
- AMM Task 28-12-00-210-805
- AMM Task 28-12-48-000-801
- AMM Task 28-12-48-400-801.
(3) Special Tools
Kit tool 284140T01R00
ITEM
 PART N˚
 KEYWORD
 QTY
 SEE
NOTES
2
 98F28109017000
 TOOL
 1
98F28109018000
 TOOL
 1
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 284140-832-895-001 - Special Detailed Inspection of the Trim Tank Overflow
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE
IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS
AND CAN CAUSE DAMAGE.
WARNING
: YOU MUST OBEY ALL THE SAFETY PROCEDURES WHEN YOU DO WORK IN
OR NEAR A FUEL TANK. IF YOU DO NOT OBEY THE SAFETY PROCEDURES,
T H E R EI SAR I S KO F :
- DEATH OR INJURY TO PERSONS
- DAMAGE TO THE AIRCRAFT OR TO OTHER EQUIPMENT.
WARNING
: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION
(CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A
POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN
THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A
CDCCL ITEM CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for further
instructions and approval.
Task Associated Data
Zone
140 190 210 319 343 346
Access
Door
 312AR
Panel
 198DB
Manpower
TOTAL MANHOURS
 17.50
ELAPSED TIME (HOURS)
 5.25
A. GENERAL
(1) Subtask 284140-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-41-55, Page Block 001
Task 20-21-11-911-801
Structural Repair Manual (SRM)
 51-42-00
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For the identification of access panels, refer to AMM 06-41-55, Page Block 001.
(c) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(d) Remove and install fasteners in accordance with SRM 51-42-00.
(2) Subtask 284140-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 284140-941-401-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 28-00-00-610-801
Task 28-10-00-910-810
Task 32-12-00-010-801
Task 52-41-23-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Open the Main Landing Gear (MLG) door Left Hand (LH) side to access to the
valves 700QN1, 700QN2 and 701QN, refer to AMM Task 32-12-00-010-801.
(c) Do the job set-up procedure as specified in the removal of the maintenance door
312AR to access to the valve 705QN, refer to AMM Task 52-41-23-000-801.
(d) Open the access panel 198DB to access to the refuel/defuel control panel 990VU.
(e) Obey the fuel safety procedures when you do work on the f uel syst em, refer to
AMM Task 28-00-00-610-801 and AMM Task 28-10-00-910-810.
(f) Put an access platforms in position at zones 343 and 346.
C. PROCEDURE
(1) Subtask 284140-480-401-001 - Install th e Overflow Pipe Tool and the Pressure
Transducer Tool for the Trim Surge Tank
Work Zones and Access Panels
Zone
 Access/Work location
346
 Work location
 from Rib 18 to Rib 19
Manpower Resources
Manhours
 2.00
Minimum number of person
 2
Subtask elapsed time
 1.00
Skills
 AIRFRAME
Material necessary to do the job
Kit tool 284140T01R00
ITEM
 PART N˚
 KEYWORD
 QTY
 SEE
NOTES
2
 98F28109017000
 TOOL
 1
98F28109018000
 TOOL
 1
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Task 28-11-43-000-801
Task 28-12-48-000-801
Structural Repair Manual (SRM)
 51-42-00
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
References
Fig. A-UBAAA
Installation of the Overflow Pipe Tool to
the NACA Vent Intake Panel
Sheet 01
Fig. A-UBCAA
Removal/Installation of the Trim Surge
Tank Water Drain Valve
Sheet 01
(a) Install the overflow pipe to the NACA vent intake panel on the lower skin of the trim
surge tank:
In accordance with SRM 51-42-00
Refer to Fig. A-UBAAA
1
 Remove the screws and washers from the NACA vent intake panel, refer to
AMM Task 28-12-48-000-801.
8 Screw Item (1) Retain
8 Washer Item (5) Retain
2
 Attach the overflow pipe tool to the NACA vent intake panel using the screws
provided:
Item 2 98F28109017000 Overflow Pipe Tool 1
NOTE
: Ensure you that the pipe hangs as vertically as possible.
3
 Place the open end of the hose into a standard 1000 liter container positioned
on the ground.
(b) Install the pressure transducer tool into the trim surge tank water drain valve
(5106QS):
Refer to AMM Task 20-21-11-911-801
In accordance with SRM 51-42-00
Refer to Fig. A-UBCAA
1
 Remove the trim tank outer drain valve, item (4).
Refer to AMM Task 28-11-43-000-801
Remove:
1 Trim Surge Tank Water
Drain Valve
Item (4) Retain
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
2
 Install the pressure transducer tool:
98F28109018000 Pressure
Transducer Tool
1
a
 Carefully screw by hand and tighten to 0.34 m.daN (30.09 lbf.in.).
b
 In case of leaks, increase the torque to a maximum value of 0.564 m.daN
(49.92 lbf.in.).
CAUTION
: DO NOT OVER TIGHTEN AS THIS CAN DAMAGE THE
WATER DRAIN VALVE.
(2) Subtask 284140-480-402-001 - Ins tall the Pressure Transducer Tool for the Trim
Tank
Work Zones and Access Panels
Zone
 Access/Work location
343
 Work location
 from Rib 3 to Rib 4
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Kit tool 284140T01R00
ITEM
 PART N˚
 KEYWORD
 QTY
 SEE
NOTES
98F28109018000
 TOOL
 1
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Task 28-11-42-000-802
Structural Repair Manual (SRM)
 51-42-00
Fig. A-UBBAA
Removal/Installation of the Trim Tank
Water Drain Valve
Sheet 01
(a) Install the pressure transducer in the trim tank water drain valve (5105QS2):
Refer to AMM Task 20-21-11-911-801
In accordance with SRM 51-42-00
Refer to Fig. A-UBBAA
1
 Remove the trim tank outer drain valve, item (6).
Refer to AMM Task 28-11-42-000-802
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
1 Trim Tank outer Drain
Valve
Item (6) Retain
2
 Install the pressure transducer tool:
98F28109018000 Pressure
Transducer Tool
1
a
 Carefully screw by hand and tighten to 0.34 m.daN (30.09 lbf.in.).
b
 In case of leaks, increase the torque to a maximum value of 0.564 m.daN
(49.92 lbf.in.).
CAUTION
: DO NOT OVER TIGHTEN AS THIS CAN DAMAGE THE
WATER DRAIN VALVE.
(3) Subtask 284140-832-401-001 - Do the Tr im Tank Overflow Ground Test
Work Zones and Access Panels
Zone
 Access/Work location
343
 Work location
 from Rib 3 to Rib 4
346
 Work location
 from Rib 18 to Rib 19
210
 Work location
 Door 831
Door 841
140
319
 Access
 Door 312AR
190
 Access
 Panel 198DB
Manpower Resources
Manhours
 6.00
Minimum number of person
 4
Subtask elapsed time
 1.50
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 28-25-00-650-801
Fig. A-UFAAA
Flowchart
Sheet 01
Fig. A-UBDAA
Location of the Valves Actuators
700QN1, 700QN2 and 701QN
Sheet 01
Fig. A-UBEAA
Location of the Inlet Valve Actuator
705QN
Sheet 01
CAUTION
: IF AT ANY POINT DURING THE TEST, EITHER THE TRIM TANK OR
THE TRIM SURGE TANK PRESSURES ARE EXCEEDED (I.E. TEST
FAIL) STOP THE TRANSFER IMMEDIATELY.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
(a) At the threshold given in the PLANNING INFORMATION paragraph E.(2):
Do the trim tank overflow ground test.
Refer to Fig. A-UFAAA
Refer to Fig. A-UBDAA
Refer to Fig. A-UBEAA
NOTE
: If at any time the tank pressures are exceeded then the test is
considered failed.
NOTE
: The trim tank shall be below high level. There should be sufficient
fuel in the wing tanks to ensure that the aircraft remains within
Center of Gravity (CG) limits throughout the test. In order to keep
the CG forward and have sufficient fuel for the AFT transfer, each
inner tank shall be greater than 20 T.
1
 Open the following valves using the Multipurpose Control and Display Unit
(MCDU) fuel valve test:
a
 LEFT AND RIGHT AFT TRANS FER VALVES: B and D (5700QA1 /
700QN1 and 5700QA1 / 700QN2)
b
 TRIM PIPE ISOLATION VALVE: W (5701QA / 701QN)
c
 TRIM TANK INLET VALVE: L (5705QA / 705QN).
2
 Disconnect the connectors of the following valve actuators in order to prevent
closure from the Fuel Control and Monitoring Computer (FCMC):
a
 On centre section rear spar:
<1> LEFT AND RIGHT AFT TRANSFER VALVES: B and D (700QN1
and 700QN2)
<2> TRIM PIPE ISOLATION VALVE: W (701QN).
b
 On trim tank:
<1> TRIM TANK INLET VALVE: L (705QN).
3
 On the OVERHEAD PANEL (245VU) select X FEED 1 to OPEN.
4
 On the OVERHEAD PANEL (245VU) select PUMP L INR TANK 1 to ON.
5
 Fill trim tank towards high level (which shall be monitored on the MCDU page
’FUEL - FCMC1 - SPECIFIC DATA - FUEL QUANTITIES’), ensuring that the
following pressures are not exceeded:
- Trim tank: 5.8 psi (400 mbar)
- Trim surge tank: 3 psi (210 mbar).
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
6
 When high level is reached, continue to fill the trim tank and then start to
overflow the trim tank (as observed by test person monitoring trim surge tank
pressure gauge).
NOTE
: High level and overflow indications can also be visualised on
the refuel/defuel control panel 990VU.
7
 Ensure that the tank pressures do not exceed the following at any time during
the overflow:
- Trim tank: 10.5 psi (725 mbar)
- Trim surge tank: 3 psi (210 mbar).
8
 Once an overflow has started, on the OVERHEAD PANEL (245VU) select X
FEED 4 to OPEN.
9
 On the OVERHEAD PANEL (245VU) select PUMP R INR TANK 4 to ON.
10
 Once the overflow had reached a steady state, on the OVERHEAD PANEL
(245VU) select X FEED 2 to OPEN and select X FEED 3 to OPEN.
11
 On the OVERHEAD PANEL (245VU) select PUMP L INR TANK 2 to ON and
PUMP R INR TANK 3 to ON.
12
 Once the overflow has reached steady state (approximately 30 seconds)
measure and record the tank pressures and ensure they are below the
following:
- Trim tank: 10.5 psi (725 mbar)
- Trim surge tank: 3 psi (210 mbar).
13
 On the OVERHEAD PANEL deselect ALL PUMPS.
14
 On the OVERHEAD PANEL (245VU) select all X FEED to CLOSED.
15
 Defuel the trim tank to at least below high level, refer to AMM Task
28-25-00-650-801.
NOTE
: High level indication has disappeared on the refuel/defuel
control panel 990VU.
16
 Reconnect all valve actuators.
17
 On the MCDU return all valves to CLOSED position.
NOTE
: When the valves are disconnected, they will be with an
indication FAiL UNKNOWN. When you reconnect them, they
will be with FAIL OPEN. In this state, you can return to the
CLOSED position.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
a
 If trim tank pressure values is exceeded:
<1> Contact AIRBUS before next flight and follow their instructions.
b
 If trim tank pressure values is not exceeded and trim surge tank pressure
values is not exceeded:
<1> Remove the tools in the trim surge tank in accordance with
SUBTASK 284140-080-401 001 Remove the Overflow Pipe Tool
and the Pressure Transducer Tool for the Trim Surge Tank .
<2> Remove the tool in the trim tank in accordance with SUBTASK
284140-080-402 001 Remove the Pressure Transducer Tool for the
Trim Tank .
<3> No further action.
c
 If trim tank pressure values is not exceeded and trim surge tank pressure
values is exceeded:
<1> Remove the tools in the trim surge tank in accordance with
SUBTASK 284140-080-401 001 Remove the Overflow Pipe Tool
and the Pressure Transducer Tool for the Trim Surge Tank .
<2> Do a detailed inspection of the NACA duct in accordance with
SUBTASK 284140-832-402 001 Depending on the Inspection
Results, do a Detailed Inspection of the NACA Duct .
<3> Install the tool in the trim surge tank in accordance with SUBTASK
284140-480-401 001 Install the Overflow Pipe Tool and the
Pressure Transducer Tool for the Trim Surge Tank .
<4> Repeat trim tank overflow ground test in accordance with SUBTASK
284140-832-401 001 Do the Trim Tank Overflow Ground Test .
(4) Subtask 284140-832-402-001 - Depending on the Inspection Results, do a Detailed
Inspection of the NACA Duct
Work Zones and Access Panels
Zone
 Access/Work location
346
 Work location
 from Rib 18 to Rib 19
Manpower Resources
Manhours
 2.00
Minimum number of person
 2
Subtask elapsed time
 1.00
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-00-210-803
Task 28-12-00-210-805
28-12-48, Page Block 401
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
References
Fig. A-UFAAA
Flowchart
Sheet 01
(a) Do a general visual inspection of the aperture leading to the flame arrestors (NACA
duct), refer to AMM Task 28-12-00-210-803.
And
Do a detailed inspection of the trim tank flame arrestor, refer to AMM Task
28-12-00-210-805.
1
 If damage or a blockage is found:
a
 Remove the blockage
Or
Do the applicable repair procedure.
NOTE
: If necessary, replace the applicable NACA duct assembly,
refer to AMM 28-12-48, Page Block 401.
(5) Subtask 284140-080-401- 001 - Remove the Overflow Pipe Tool and the Pressure
Transducer Tool for the Trim Surge Tank
Work Zones and Access Panels
Zone
 Access/Work location
346
 Work location
 from Rib 18 to Rib 19
Manpower Resources
Manhours
 2.00
Minimum number of person
 2
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Task 28-11-43-400-801
Task 28-12-48-400-801
Structural Repair Manual (SRM)
 51-42-00
Fig. A-UBAAA
Installation of the Overflow Pipe Tool to
the NACA Vent Intake Panel
Sheet 01
Fig. A-UBCAA
Removal/Installation of the Trim Surge
Tank Water Drain Valve
Sheet 01
(a) Remove the pressure transducer tool from the trim surge tank water drain valve
(5106QS):
Refer to AMM Task 20-21-11-911-801
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
In accordance with SRM 51-42-00
Refer to Fig. A-UBCAA
1
 Carefully remove the pressure transducer tool.
2
 Install the trim tank outer drain valve, item (4).
Refer to AMM Task 28-11-43-400-801
1 Trim Surge Tank Water
Drain Valve
Item (4) Retained at
removal
a
 Torque the outer drain valve item (4) to 0.34 m.daN (30.09 lbf.in).
b
 In case of leaks, increase the torque to a maximum value of 0.791 m.daN
(70.00 lbf.in).
CAUTION
: DO NOT OVER TIGHTEN AS THIS CAN DAMAGE THE
WATER DRAIN VALVE.
(b) Remove the overflow pipe tool from NACA vent intake panel on the lower skin of
the trim surge tank:
In accordance with SRM 51-42-00
Refer to Fig. A-UBAAA
1
 Remove the captive screws of the overflow pipe tool ensuring any residual fuel
in the tool is emptied into the 1000 liter container.
2
 Install the screws and washers on the NACA vent intake panel, refer to AMM
Task 28-12-48-400-801.
Install:
8 Screw Item (1) Retained at
removal
8 Washer Item (5) Retained at
removal
(6) Subtask 284140-080-402- 001 - Remove the Pressure Transducer Tool for the Trim
Tank
Work Zones and Access Panels
Zone
 Access/Work location
343
 Work location
 from Rib 3 to Rib 4
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Task 28-11-42-400-802
Structural Repair Manual (SRM)
 51-42-00
Fig. A-UBBAA
Removal/Installation of the Trim Tank
Water Drain Valve
Sheet 01
(a) Remove the pressure transducer tool from the trim tank water drain valve
(5105QS2):
Refer to AMM Task 20-21-11-911-801
In accordance with SRM 51-42-00
Refer to Fig. A-UBBAA
1
 Carefully remove the pressure transducer tool.
2
 Install the trim tank outer drain valve, item (6).
Refer to AMM Task 28-11-42-400-802
1 Trim Tank outer Drain
Valve
Item (6) Retained at
removal
a
 Torque the trim tank outer drain valve item (6) to 0.34 m.daN (30.09
lbf.in).
b
 In case of leaks, increase the torque to a maximum value of 0.791 m.daN
(70.00 lbf.in).
CAUTION
: DO NOT OVER TIGHTEN AS THIS CAN DAMAGE THE
WATER DRAIN VALVE.
D. TEST
(1) Subtask 284140-790-401-001 - Leak Test
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 28-11-00-790-823
(a) Do the leak test, refer to AMM Task 28-11-00-790-823.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
E. CLOSE-UP
(1) Subtask 284140-942-401-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 32-12-00-410-801
Task 52-41-23-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Close the access panel 198DB.
(c) Do the close-up procedure as specified after the installation of the maintenance
door 312AR, refer to AMM Task 52-41-23-400-801.
(d) Close the MLG door LH side, refer to AMM Task 32-12-00-410-801.
(e) Remove the access platforms.
(f) Put the aircraft back to its initial configuration.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
**CONF ALL
2
B
RIB21
RIB18
RIB19
A
B
TRIM SURGE TANK
WATER DRAIN VALVE
NACA VENT
INTAKE PANEL
TRIM TANK
NACA OUTLET
TRIM TANK
OVERPRESSURE PROTECTOR
SPAR BOX
Z346
A
5106QS
(1)
(5) x8
x8
F_SB_284140_7_BAAA_01_03
Figure A-UBAAA - Sheet 01
Installation of the Overflow Pipe Tool to the NACA Vent Intake Panel
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
**CONF ALL
Z343
A
B
A
B
RIB4
(6)
TRIM TANK
WATER DRAIN VALVE
RIB3
O−RING
5105QS2
F_SB_284140_7_BBAA_01_02
Figure A-UBBAA - Sheet 01
Removal/Installation of the Trim Tank Water Drain Valve
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
**CONF ALL
Z346
A
(4)
B
RIB21
RIB18
RIB19
A
B
TRIM SURGE TANK
WATER DRAIN VALVE
O−RING
5106QS
F_SB_284140_7_BCAA_01_02
Figure A-UBCAA - Sheet 01
Removal/Installation of the Trim Surge Tank Water Drain Valve
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
**CONF ALL
FR47
FR40 FR47
FR46 FR47
Z140A
A
B
B
C
C
C
700QN2
700QN1
701QN
C
TYPICAL VIEW
VALVE ACTUATOR
F_SB_284140_7_BDAA_01_00
Figure A-UBDAA - Sheet 01
Location of the Valves Actuators 700QN1, 700QN2 and 701QN
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
**CONF ALL
A
RIB2
RIB3
B
B
A
Z319
705QN
INLET VALVE
ACTUATOR
705QN
F_SB_284140_7_BEAA_01_00
Figure A-UBEAA - Sheet 01
Location of the Inlet Valve Actuator 705QN
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
**CONF ALL
DO A SPECIAL DETAILED INSPECTION OF THE TRIM TANK OVERFLOW, AT THE THRESHOLD GIVEN IN THE
PLANNING INFORMATION PARAGRAPH E.(2), IN ACCORDANCE WITH TASK 284140−832−895−001
YESNO
TRIM TANK
PRESSURE VALUES
EXCEEDED?
YES
TRIM SURGE
TANK PRESSURE VALUES
EXCEEDED?
NOTE:
NO FURTHER
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
ACTION
YES
REMOVE THE BLOCKAGE OR DO THE  
CONTACT AIRBUS AND
FOLLOW THEIR INSTRUCTIONS
BEFORE NEXT FLIGHT
APPLICABLE REPAIR PROCEDURE 
INSTALL THE OVERFLOW PIPE TOOL AND THE PRESSURE TRANSDUCER TOOLS,  IN ACCORDANCE WITH
SUBTASK 284140−480−401−001 FOR THE TRIM SURGE TANK AND SUBTASK 284140−480−402−001 FOR THE TRIM TANK
DO THE TRIM TANK OVERFLOW GROUND TEST,
IN ACCORDANCE WITH SUBTASK 284140−832−401−001
REMOVE THE OVERFLOW PIPE TOOL AND THE PRESSURE
TRANSDUCER TOOL, IN ACCORDANCE WITH SUBTASK 
284140−080−401−001 FOR THE TRIM SURGE TANK
DO AN INSPECTION OF THE APERTURE LEADING
TO THE FLAME ARRESTORS (NACA DUCT) AND
DO A DETAILED INSPECTION OF THE FLAME ARRESTOR,
IN ACCORDANCE WITH SUBTASK 284140−832−402−001
REMOVE THE OVERFLOW PIPE TOOL AND THE PRESSURE
TRANSDUCER TOOLS, IN ACCORDANCE WITH SUBTASK
284140−080−402−001 FOR THE TRIM TANK AND
SUBTASK 284140−080−401−001 FOR THE TRIM SURGE TANK
INSTALL THE OVERFLOW PIPE TOOL AND THE PRESSURE
TRANSDUCER TOOL, IN ACCORDANCE WITH SUBTASK
284140−480−401−001 FOR THE TRIM SURGE TANK
REPEAT THE TRIM TANK OVERFLOW GROUND TEST,
IN ACCORDANCE WITH SUBTASK 284140−832−401−001
IS THE NACA
DUCT BLOCKED OR
DAMAGED?
BEFORE NEXT FLIGHT
NO
NO
F_SB_284140_7_FAAA_01_00
Figure A-UFAAA - Sheet 01
Flowchart
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
Appendix 01 - Manpower Gantt Chart
**CONF ALL
For an explanation of the manhours and elapsed time, refer to the next page(s).
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340
SERVICE BULLETIN
Appendix 01 - Manpower Gantt Chart
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A330−28−4140
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
15.50
5.25
STEPS
0
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
:
:
SB ELAPSED TIME
(HOURS)
1 2 3
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
4 5
GET ACCESS 2.00 1.002
INSTALL THE OVERFLOW PIPE TOOL 2.00 1.002
AND THE PRESSURE TRANSDUCER
TOOL OF THE TRIM SURGE TANK
INSTALL THE PRESSURE 1.00 0.502
TRANSDUCER TOOL OF THE
TRIM TANK
DO THE TRIM TANK OVERFLOW 6.00 1.504
GROUND TEST
REMOVE THE OVERFLOW PIPE TOOL 2.00 1.002
AND THE PRESSURE TRANSDUCER
TOOL OF THE TRIM SURGE TANK
REMOVE THE PRESSURE 1.00 0.502
TRANSDUCER TOOL OF THE
TRIM TANK
TEST 0.50 0.252
CLOSE−UP 1.00 0.502
F_SB_284140_7_AAAA_01_01
Figure A-UAAAA - Sheet 01
Gantt Chart
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: FUEL - TANKS - INSPECTION OF TRIM TANK OVERFLOW
MODIFICATION No.: None
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: May 18/17 SERVICE BULLETIN No.: A340-28-4140
REVISION No.: 00 - May 18/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
