# Airbus Service Bulletin A340-28-4143

Copy: No revision named ("A340-28-4143 R00"), 32 pages: PDF https://openairdocs.org/files/sha256/f1/50/f150cbda339348c6d32a9b36abea3354fd9f66955afa558a2ccfa67b2ea99be4; text https://openairdocs.org/service-documents/airbus/a340-28-4143/file/f150cbda3393.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0184, the docket of AD 2021-12-18. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-28-4143
- Page: https://openairdocs.org/service-documents/airbus/a340-28-4143

## Text (32 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0184, the docket of AD 2021-12-18. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - APU FUEL PUMP SYSTEM - INSPECTION - A340 AFT APU
P93A19-202 AND P93A19-203 FUEL PUMPS
MODIFICATION No.:
None

### Page 2

A340
SERVICE BULLETIN
SUMMARY
REV 00 Oct 12/20 A340-28-4143
Page 2
ATA SYSTEM: 28
TITLE: FUEL - APU FUEL PUMP SYSTEM - INSPECTION - A340 AFT APU
P93A19-202 AND P93A19-203 FUEL PUMPS
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
The APU Aft Fuel Feed Pump (FIN 3QC) may have a potentially unsafe condition.
Degradation of the varnish on the printed circuit board can result in arcing within the
pump motor housings during specific failure case operations.
(2) Objective/Action
The objective of this Service Bulletin is to identify any APU Aft Fuel Feed Pump (FIN
3QC) which may be potentially unsafe and remove them from operation.
Operators are required to inspect the Part Number of the installed APU Aft Fuel Feed
Pump (FIN 3QC) and report the installed Part Number to AIRBUS.
The inspection can be satisfied either by monitoring the operator’s logbook for Part
Number replacement history for the APU Aft Fuel Feed Pump (FIN 3QC) or by direct
inspection on aircraft. The operator is held responsible for the accuracy of the chosen
means of inspection.
Operators are further required to replace or upgrade the installed APU Aft Fuel Feed
Pump (FIN 3QC), if required following inspection of the installed Part Number, and
report to AIRBUS.
(3) Advantages
Accomplishment of this Service Bulletin will identify and eliminate a potentially unsafe
condition, if one is identified, and ensure that the operator´s aircraft has the required
APU Aft Fuel Feed Pump (FIN 3QC) installed.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO

### Page 3

A340
SERVICE BULLETIN
SUMMARY
REV 00 Oct 12/20 A340-28-4143
Page 3
EVALUATION TABLE
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Inspection of the APU Aft Fuel Feed Pump 3QC
(a) T ask set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft Fuel Feed
Pump 3QC
No material
(2) Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the
inspection result)
(a) T ask set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU Aft Fuel
Feed Pump 3QC (Depending on the inspection result)
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note Fuel Pump
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
01V 06Y 14S 15R 17M 26L 31V 34N 36L 39N 41N 65W 68M 72T 82M 84W 90O 98W ABB
ABD AFR AIB ARG AXY BOE DGA DLH EDW F2I GAF HFM HFY IRC IRM KAC KMF LHT M3R MAU
MDG MRJ MSR PUE QQE ROI S3R SAA SAS SFB SWR SYR U6A VCV
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Inspection of the APU Aft Fuel Feed Pump 3QC
(a) T ask set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft Fuel Feed
Pump 3QC
AIRCRAFT NO
EQUIPMENT YES
(2) Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the
inspection result)
(a) T ask set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU Aft Fuel
Feed Pump 3QC (Depending on the inspection result)
AIRCRAFT NO

### Page 4

A340
SERVICE BULLETIN
SUMMARY
REV 00 Oct 12/20 A340-28-4143
Page 4
EQUIPMENT YES
I. MANPOWER
(1) Inspection of the APU Aft Fuel Feed Pump 3QC
(a) T ask set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft Fuel Feed
Pump 3QC
MANPOWER
TOTAL MAN-HOURS 1.75 h
ELAPSED TIME (HOURS) 1.75 h
(2) Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the
inspection result)
(a) T ask set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU Aft Fuel
Feed Pump 3QC (Depending on the inspection result)
MANPOWER
TOTAL MAN-HOURS 3.50 h
ELAPSED TIME (HOURS) 3.50 h

### Page 5

A340
SERVICE BULLETIN
SUMMARY
Figure ICN-A340-A-28XX4143-A-FAPE3-01AQ6-A-001-01 SHEET 1/1
REV 00 Oct 12/20 A340-28-4143General overview
Page 5
J. GENERAL OVERVIEW
CONF ALL
FR87
FR88
AFT FUEL 
FEED-PUMP
312AR
FR83
FR89
3QC
A
B
B
Z310
A
ICN-A340-A-28XX4143-A-FAPE3-01AQ6-A-001-01

### Page 6

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 6
ATA SYSTEM: 28
TITLE: FUEL - APU FUEL PUMP SYSTEM - INSPECTION - A340 AFT APU
P93A19-202 AND P93A19-203 FUEL PUMPS
1. PLANNING INFORMATION
A. APPLICABILITY
(1) Models
ON A/C 0026, 0031, 0063, 0074, 0075, 0080, 0081
340-211
ON A/C 0009, 0014, 0022, 0038, 0043, 0046, 0061, 0156, 0159, 0178
340-212
ON A/C 0004, 0151, 0204
340-213
ON A/C 0002, 0020, 0029, 0056, 0058, 0078, 0084, 0115
340-311
ON A/C 0041, 0044, 0047, 0051, 0076, 0079, 0091, 0094, 0367, 0374, 0381
340-312
ON A/C 0089, 0090, 0093, 0101, 0104, 0114, 0117, 0123, 0125, 0126, 0128, 0134, 0135,
0139, 0145, 0146, 0149, 0152, 0158, 0163, 0164, 0166, 0168, 0170, 0174, 0175, 0179,
0180, 0185, 0186, 0190, 0192-0194, 0197, 0199, 0201, 0202, 0207, 0208, 0210, 0212-0215,
0217, 0221, 0233, 0236, 0237, 0242, 0243, 0245, 0246, 0252, 0257, 0260, 0264, 0268,
0270, 0274, 0278, 0280, 0282, 0292, 0297, 0302, 0304, 0310, 0318, 0319, 0321, 0325,
0327, 0329, 0331, 0332, 0335, 0347, 0352, 0354, 0355, 0373, 0377-0379, 0385, 0387, 0390,
0395, 0399, 0402, 0406, 0411, 0413, 0415, 0424, 0430, 0433-0435, 0438, 0446, 0447, 0450,
0459, 0467, 0470, 0474, 0483, 0528, 0538, 0541, 0544-0546, 0554, 0556, 0559, 0561, 0562,
0582, 0585, 0590, 0598, 0643, 0646, 0651, 0668, 0793, 0800, 0835, 0844, 0921, 0938, 0955
340-313
CONF ALL
(2) Applicability by MSN
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0041 0043 0044 0046 0047
0051 0056 0058 0061 0063 0074-0076 0078-0081 0084 0089-0091 0093 0094 0101
0104 0114 0115 0117 0123 0125 0126 0128 0134 0135 0139 0145 0146 0149 0151
0152 0156 0158 0159 0163 0164 0166 0168 0170 0174 0175 0178-0180 0185 0186
0190 0192-0194 0197 0199 0201 0202 0204 0207 0208 0210 0212-0215 0217 0221
0233 0236 0237 0242 0243 0245 0246 0252 0257 0260 0264 0268 0270 0274 0278
0280 0282 0292 0297 0302 0304 0310 0318 0319 0321 0325 0327 0329 0331 0332
0335 0347 0352 0354 0355 0367 0373 0374 0377-0379 0381 0385 0387 0390 0395
0399 0402 0406 0411 0413 0415 0424 0430 0433-0435 0438 0446 0447 0450 0459
0467 0470 0474 0483 0528 0538 0541 0544-0546 0554 0556 0559 0561 0562 0582
0585 0590 0598 0643 0646 0651 0668 0793 0800 0835 0844 0921 0938 0955
(3) MSN by configuration
MSN CONFIGURATION
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0041
0043 0044 0046 0047 0051 0056 0058 0061 0063 0074 0075
0076 0078 0079 0080 0081 0084 0089 0090 0091 0093 0094
0101 0104 0114 0115 0117 0123 0125 0126 0128 0134 0135
0139 0145 0146 0149 0151 0152 0156 0158 0159 0163 0164
0166 0168 0170 0174 0175 0178 0179 0180 0185 0186 0190
001

### Page 7

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 7
MSN CONFIGURATION
0192 0193 0194 0197 0199 0201 0202 0204 0207 0208 0210
0212 0213 0214 0215 0217 0221 0233 0236 0237 0242 0243
0245 0246 0252 0257 0260 0264 0268 0270 0274 0278 0280
0282 0292 0297 0302 0304 0310 0318 0319 0321 0325 0327
0329 0331 0332 0335 0347 0352 0354 0355 0367 0373 0374
0377 0378 0379 0381 0385 0387 0390 0395 0399 0402 0406
0411 0413 0415 0424 0430 0433 0434 0435 0438 0446 0447
0450 0459 0467 0470 0474 0483 0528 0538 0541 0544 0545
0546 0554 0556 0559 0561 0562 0582 0585 0590 0598 0643
0646 0651 0668 0793 0800 0835 0844 0921 0938 0955
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The APU Aft Fuel Feed Pump (FIN 3QC) may have a potentially unsafe condition.
Degradation of the varnish on the printed circuit board can result in arcing within the
pump motor housings during specific failure case operations.
(2) Objective/Action
The objective of this Service Bulletin is to identify any APU Aft Fuel Feed Pump (FIN
3QC) which may be potentially unsafe and remove them from operation.
Operators are required to inspect the Part Number of the installed APU Aft Fuel Feed
Pump (FIN 3QC) and report the installed Part Number to AIRBUS.
The inspection can be satisfied either by monitoring the operator’s logbook for Part
Number replacement history for the APU Aft Fuel Feed Pump (FIN 3QC) or by direct
inspection on aircraft. The operator is held responsible for the accuracy of the chosen
means of inspection.
Operators are further required to replace or upgrade the installed APU Aft Fuel Feed
Pump (FIN 3QC), if required following inspection of the installed Part Number, and
report to AIRBUS.
(3) Advantages
Accomplishment of this Service Bulletin will identify and eliminate a potentially unsafe
condition, if one is identified, and ensure that the operator´s aircraft has the required
APU Aft Fuel Feed Pump (FIN 3QC) installed.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Inspection of the APU Aft Fuel Feed Pump 3QC

### Page 8

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 8
(a) T ask set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft Fuel Feed
Pump 3QC
1 Inspect the Part Number (PN) of the APU Aft Fuel Pump 3QC
2 Complete the Inspection Report sheet
(2) Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the
inspection result)
(a) T ask set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU Aft Fuel
Feed Pump 3QC (Depending on the inspection result)
1 Replace the APU Aft Fuel Feed Pump 3QC
2 Complete the Inspection Report sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds given but reference should be made to the AD for confirmation
of the mandated accomplishment timescale.
T able 1, CONF 001 — Inspection of the APU Aft Fuel Feed Pump 3QC
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Inspect the PN
of the APU Aft
Fuel Feed Pump,
refer to Ref. T ask
set A340-A-
28-XX-4143-
01ZZZ-93BZ-A
Within 3
months from
ISB issuance.
None None
APU Aft Fuel
Pump which have
Part Number
P93A19–204
or 229065.
No further action
in accordance
with this
Service Bulletin
     
APU Aft Fuel
Pump which have
Part Number
P93A19–202.
Replace the APU
AFT Fuel Pump
3QC, refer to Ref.
T ask set A340-
A-28-XX-4143-
02ZZZ-93CZ-A
Before Sep 30/23 None None
APU Aft Fuel
Pump which have
Part Number
P93A19–203.
Replace or
update the APU
AFT Fuel Pump
3QC, refer to
Ref. T ask A340-
A-28-XX-4143-
02ZZZ-920Z-A
Before Sep 30/23 None None

### Page 9

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 9
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
  No further action
in accordance
with this
Service Bulletin
     
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Inspection of the APU Aft Fuel Feed Pump 3QC
(a) T ask set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft Fuel Feed
Pump 3QC
PREPARATION
Job Set-up 0.50 h
PROCEDURE
Inspect the Part Number (PN) of the APU Aft Fuel Pump
3QC
0.50 h
Complete the Inspection Report sheet 0.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.50 h
TOTAL MAN-HOURS 1.75 h
ELAPSED TIME (HOURS) 1.75 h
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
(2) Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the
inspection result)

### Page 10

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 10
(a) T ask set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU Aft Fuel
Feed Pump 3QC (Depending on the inspection result)
PREPARATION
Job Set-up 0.50 h
PROCEDURE
Replace the APU Aft Fuel Feed Pump 3QC 2.00 h
Complete the Inspection Report sheet 0.25 h
PREPARATION FOR TEST
None
TEST
Do an operational T est of the APU Aft Fuel Pump 0.25 h
CLOSE-UP
Close-up 0.50 h
TOTAL MAN-HOURS 3.50 h
ELAPSED TIME (HOURS) 3.50 h
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Inspection of the APU Aft Fuel Feed Pump 3QC
(a) T ask set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft Fuel Feed
Pump 3QC
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-20-00, Page Block 001 06-31-53, Page Block 001
T ask 12-34-24-869-002 T ask 24-42-00-861-801
T ask 28-22-52-000-801
T ask 28-22-52-400-801
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179
(2) Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the
inspection result)
(a) T ask set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU Aft Fuel
Feed Pump 3QC (Depending on the inspection result)
AIRCRAFT MAINTENANCE MANUAL (AMM)
06-20-00, Page Block 001 06-31-53, Page Block 001
T ask 12-34-24-869-002 T ask 24-42-00-861-801

### Page 11

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 11
AIRCRAFT MAINTENANCE MANUAL (AMM)
T ask 28-22-52-000-801
T ask 28-22-52-400-801
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179
SERVICE BULLETIN (SB)
A340-28-4116
K. PUBLICATION AFFECTED
ILLUSTRATED PARTS CATALOG (IPC)
L. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 12

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 12
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU Aft
Fuel Feed Pump 3QC
MATERIAL QTY SEE NOTES
Interchangeable parts See SB
Spare parts See SB
Material for task set A340-A-28-XX-4143-02000-93CA-A Replacement of the APU
Aft Fuel Feed Pump 3QC (Depending on the inspection result)
MATERIAL QTY SEE NOTES
Equipment See SB
Interchangeable parts See SB
Spare parts See SB
B. TOOLING
No tools
C. CONSUMABLES
No consumables
D. LIST OF NEW PARTS
Equipment for task set A340-A-28-XX-4143-02000-93CA-A Replacement of the
APU Aft Fuel Feed Pump 3QC (Depending on the inspection result)
Procurement address F0422
Safran Aerotechnics, Safran Aerosystems
Fuel Circulation Departement
Boulevard Sagnat, Boite Postale N°3
42230 Roche La Moliere
FRANCE
Phone: +33 4 77 90 71 00
Fax: +33 4 7790 71 71 70
NOTE(S)
Vendor parts are to be procured from the address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 P93A19-204 (F0422) 1 PUMP (1)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
E. LIST OF EXISTING PARTS
Interchangeable parts for task set A340-A-28-XX-4143-01000-93BA-A Inspection
of the APU Aft Fuel Feed Pump 3QC
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
PUMP-FUEL FEED P93A19-202 P93A19-204 01 (1)
PUMP-FUEL FEED P93A19-203 P93A19-204 01 (1)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).

### Page 13

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 13
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
Interchangeable parts for task set A340-A-28-XX-4143-02000-93CA-A
Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the inspection
result)
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
PUMP-FUEL FEED P93A19-202 P93A19-204 01 (1)
PUMP-FUEL FEED P93A19-203 P93A19-204 01 (1)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
Spare parts for task set A340-A-28-XX-4143-01000-93BA-A Inspection of the APU
Aft Fuel Feed Pump 3QC
DESCRIPTION OLD PART No. SEE NOTES
PUMP-FUEL FEED P93A19-202 (1)
PUMP-FUEL FEED P93A19-203 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.
Spare parts for task set A340-A-28-XX-4143-02000-93CA-A Replacement of the
APU Aft Fuel Feed Pump 3QC (Depending on the inspection result)
DESCRIPTION OLD PART No. SEE NOTES
PUMP-FUEL FEED P93A19-202 (1)
PUMP-FUEL FEED P93A19-203 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.

### Page 14

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 14
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A340-A-28-XX-4143-01000-93BA-A (A340-A-28-XX-4143-01ZZZ-93BZ-A)
Inspection of the APU Aft Fuel Feed Pump 3QC
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: Discarded parts must be managed at the operator's discretion.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower

### Page 15

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 15
TOTAL MAN-HOURS 1.75 h
ELAPSED TIME (HOURS) 1.75 h
B. PREPARATION
(1) Task A340-A-28-XX-4143-01001-540A-A (A340-A-28-XX-4143-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
AMM
T ask 12-34-24-869-002
T ask 24-42-00-861-801
T ask 28-22-52-000-801
Procedure
NOTE: For the basic Aircraft configuration, refer to AMM Chapter “Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. AMM T ask 12-34-
24-869-002.
(b) Energize the ground service network, refer to Ref. AMM T ask 24-42-00-861-801.
(c) For the inspection of the APU Aft Fuel Feed Pump FIN 3QC Part Number on
aircraft, do the get access procedure as specified in the Removal of the Aft Fuel
Feed Pump, refer to Ref. AMM T ask 28-22-52-000-801.
C. PROCEDURE
(1) Task A340-A-28-XX-4143-01001-311A-A (A340-A-28-XX-4143-01ZZZ-311Z-A)
Inspect the Part Number (PN) of the APU Aft Fuel Pump 3QC
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
AMM 06-20-00, Page Block 00106-31-53, Page Block 001

### Page 16

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 16
Procedure
Ref. Fig. Identification Plate
Ref. Fig. Flow Chart
NOTE: The inspection can be done by monitoring the operator logbook for Part
Number (PN) replacement history of the APU Aft Fuel Feed Pump or by direct
inspection on aircraft.
(a) Standard Practices:
1 For the identification of zones, refer to Ref. AMM 06-20-00, Page Block 001.
2 For the Frame (FR) identification, refer to Ref. AMM 06-31-53, Page Block
001.
(b) Inspect the P/N of the APU Aft Fuel Feed Pump.
1 If the P/N is:
1 PUMP-FUEL FEED P93A19-204    
or
1 PUMP-FUEL FEED 229065    
a Complete and send the Inspection Report Sheet to AIRBUS in
accordance within the time-scale for Part Number reporting as
given in paragraph 1.E.(2) to report the installed Part Numbers in
accordance with Ref. T ask A340-A-28-XX-4143-01ZZZ-90AZ-A.
b No further action in accordance with this Service Bulletin.
2 If the P/N is:
1 PUMP-FUEL FEED P93A19-202 Item (1)  
a Complete and send the Inspection Report Sheet to AIRBUS in
accordance within the time-scale for Part Number reporting as
given in paragraph 1.E.(2) to report the installed Part Numbers in
accordance with Ref. T ask A340-A-28-XX-4143-01ZZZ-90AZ-A.
b Replace the APU Aft Fuel Feed Pump in accordance with Ref.
T ask A340-A-28-XX-4143-02ZZZ-920Z-A within the time-scale for
replacement or update as given in paragraph 1.E (2).
c Report the replacement to AIRBUS.
d No further action in accordance with this Service Bulletin.
3 If the P/N is:
1 PUMP-FUEL FEED P93A19-203 Item (1)  
a Complete and send the Inspection Report Sheet to AIRBUS in
accordance within the time-scale for Part Number reporting as
given in paragraph 1.E.(2) to report the installed Part Numbers in
accordance with Ref. T ask A340-A-28-XX-4143-01ZZZ-90AZ-A.
b Modify or replace the APU Aft Fuel Feed Pump in accordance with
Ref. T ask A340-A-28-XX-4143-02ZZZ-920Z-A within the time-scale for
replacement or update as given in paragraph 1.E (2).
c Report the replacement or update to AIRBUS.
d No further action in accordance with this Service Bulletin.

### Page 17

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4143-A-FAPE3-01AQ3-A-001-01 SHEET 1/2
REV 00 Oct 12/20 A340-28-4143Identification Plate
Page 17
CONF ALL
FR87
FR88
AFT FUEL 
FEED-PUMP
312AR
FR83
FR89
3QC
A
B
B
C
Z310
A
ICN-A340-A-28XX4143-A-FAPE3-01AQ3-A-001-01

### Page 18

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4143-A-FAPE3-01AQ4-A-001-01 SHEET 2/2
REV 00 Oct 12/20 A340-28-4143Identification Plate
Page 18
CONF ALL
C
D
3QC
3QC
IDENTIFICATION
PLATE
D
ICN-A340-A-28XX4143-A-FAPE3-01AQ4-A-001-01

### Page 19

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4143-A-FAPE3-01AQ2-A-006-01 SHEET 1/1
REV 00 Oct 12/20 A340-28-4143Flow Chart
Page 19
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE
INFORMATION GIVEN IN THE PROCEDURE AND COMPLIANCE
PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE
FOR TASKS OR COMPLIANCE TIMES GIVEN IN
THIS SERVICE BULLETIN.
FOR THE COMPLIANCE TIMES, REFER TO THE
ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
FUEL FEED PUMP 3QC
INSPECT THE P/N OF
THE INSTALLED APU AFT
IS INSTALLED
IF P/N
P93A19-202
OR
IF P/N
P93A19-204
P/N 229065
IS INSTALLED
INSTALLED P/N
TO AIRBUS
REPORT
IS INSTALLED
IF P/N
P93A19-203
NO FURTHER ACTION
IN ACCORDANCE WITH
THIS SERVICE BULLETIN
INSTALLED P/N
TO AIRBUS
REPORT
ACCOMPLISH
SERVICE BULLETIN
28-4116
REPLACEMENT
TO AIRBUS
REPORT
INSTALLED P/N
TO AIRBUS
REPORT
OR
REPLACE
THE PUMP
WITH
P/N P93A19-204
REPLACE
THE PUMP
WITH
P/N P93A19-204
MODIFICATION
TO AIRBUS
REPORT
ICN-A340-A-28XX4143-A-FAPE3-01AQ2-A-006-01

### Page 20

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 20
(2) Task A340-A-28-XX-4143-01001-90AA-A (A340-A-28-XX-4143-01ZZZ-90AZ-A)
Complete the Inspection Report sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Utility
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig. Part Number Report
Sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.
Additionally, send to monitored.retrofit@airbus.com.

### Page 21

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4143-A-FAPE3-01AQ5-A-006-01 SHEET 1/1
REV 00 Oct 12/20 A340-28-4143Part Number Report Sheet
Page 21
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-4143
DATE OF INSPECTION :
INSPECTION METHOD : GENERAL VISUAL
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
PART NUMBER INSTALLED YES NO
P93A19-202
APU AFT FUEL FEED PUMP 3QC 
P93A19-203
P93A19-204
229065
X
ADDITIONALLY SEND TO:
MONITORED.RETROFIT@AIRBUS.COM
ICN-A340-A-28XX4143-A-FAPE3-01AQ5-A-006-01

### Page 22

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 22
D. PREPARATION FOR TEST
None
E. TEST
None
F. CLOSE-UP
(1) Task A340-A-28-XX-4143-01001-740A-A (A340-A-28-XX-4143-01ZZZ-740Z-A)
Close-up
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-22-52-400-801
Procedure
NOTE: If you intend to accomplish an associated Repair T ask during the same layover
period, the subsequent Close-up procedure is not necessary.
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) After the inspection of the APU Aft Fuel Feed Pump FIN 3QC do the close-up
procedure as specified in the Installation of Aft Fuel Feed Pump, refer to Ref. AMM
T ask 28-22-52-400-801.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A340-A-28-XX-4143-02001-90AA-A (A340-A-28-XX-4143-02ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 23

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 23
Task set A340-A-28-XX-4143-02000-93CA-A (A340-A-28-XX-4143-02ZZZ-93CZ-A)
Replacement of the APU Aft Fuel Feed Pump 3QC (Depending on the inspection result)
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: Discarded parts must be managed at the operator's discretion.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 3.50 h
ELAPSED TIME (HOURS) 3.50 h
B. PREPARATION
(1) Task A340-A-28-XX-4143-02001-540A-A (A340-A-28-XX-4143-02ZZZ-540Z-A)
Job Set-up

### Page 24

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 24
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 12-34-24-869-002T ask 24-42-00-861-801
Procedure
NOTE: If you intend to accomplish this Repair during the same layover period as the
associated Inspection, the subsequent Preparation procedure is not necessary.
NOTE: For the basic Aircraft configuration, refer to AMM Chapter “Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. AMM T ask 12-34-
24-869-002.
(b) Energize the ground service network, refer to Ref. AMM T ask 24-42-00-861-801.
C. PROCEDURE
(1) Task A340-A-28-XX-4143-02001-920A-A (A340-A-28-XX-4143-02ZZZ-920Z-A)
Replace the APU Aft Fuel Feed Pump 3QC
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 1
Elapsed Time 2.00 h
Skills Airframe
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 P93A19-204 1 PUMP (1)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.

### Page 25

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 25
Referenced Information
Manuals/Drawings References/Sheets
AMM
06-20-00, Page Block 001
06-31-53, Page Block 001
T ask 28-22-52-000-801
T ask 28-22-52-400-801
SB A340-28-4116
Procedure
Ref. Fig. Location for Replacement
(a) Standard Practices:
1 For the identification of zones, refer to Ref. AMM 06-20-00, Page Block 001.
2 For the Frame (FR) identification, refer to Ref. AMM 06-31-53, Page Block
001.
3 For the removal of the Aft Fuel Feed Pump, refer to Ref. AMM T ask 28-22-52-
000-801.
4 For the installation of the Aft Fuel Feed Pump, refer to Ref. AMM T ask 28-22-
52-400-801.
(b) Replace the APU Aft Fuel Pump.
1 If the installed P/N is P93A19-202:
a Replace, refer to Ref. AMM T ask 28-22-52-000-801 and Ref. AMM T ask
28-22-52-400-801:
1 PUMP-FUEL FEED P93A19-202 Item (1) Discard
with
1 PUMP-FUEL FEED P93A19-204 Item 1
b Complete and send the Inspection Report Sheet in accordance with
Ref. T ask A340-A-28-XX-4143-04ZZZ-90AZ-A.
c No further action in accordance with this Service Bulletin.
2 If the installed P/N is P93A19-203:
a Accomplish the Service Bulletin, Ref. SB A340-28-4116 or replace,
refer to Ref. AMM T ask 28-22-52-000-801 and Ref. AMM T ask 28-22-
52-400-801:
1 PUMP-FUEL FEED P93A19-203 Item (1) Discard
with
1 PUMP-FUEL FEED P93A19-204 Item 1
b Complete and send the Inspection Report Sheet in accordance with
Ref. T ask A340-A-28-XX-4143-04ZZZ-90AZ-A.
c No further action in accordance with this Service Bulletin.

### Page 26

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4143-A-FAPE3-01AUN-A-001-01 SHEET 1/1
REV 00 Oct 12/20 A340-28-4143Location for Replacement
Page 26
CONF ALL
FR87
FR88
AFT FUEL 
FEED-PUMP
312AR
FR83
FR89
3QC
A
B
B
Z310
A
ICN-A340-A-28XX4143-A-FAPE3-01AUN-A-001-01

### Page 27

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 27
(2) Task A340-A-28-XX-4143-04001-90AA-A (A340-A-28-XX-4143-04ZZZ-90AZ-A)
Complete the Inspection Report sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig. Replacement Report
Sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.

### Page 28

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4143-A-FAPE3-01AUM-A-003-01 SHEET 1/1
REV 00 Oct 12/20 A340-28-4143Replacement Report Sheet
Page 28
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-4143
DATE OF INSPECTION :
INSPECTION METHOD : GENERAL VISUAL
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
X
PART NUMBER AFTER ACCOMPLISHMENT OF SERVICE BULLETIN 28-4143 YES NO
P93A19-202 REPLACED BY P93A19-204
APU AFT FUEL FEED PUMP 3QC 
P93A19-203 REPLACED BY P93A19-204
P93A19-203 UPGRADED DUE TO SERVICE BULLETIN 28-4116 TO  P93A19-204
ICN-A340-A-28XX4143-A-FAPE3-01AUM-A-003-01

### Page 29

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 29
D. PREPARATION FOR TEST
None
E. TEST
(1) Task A340-A-28-XX-4143-02001-320A-A (A340-A-28-XX-4143-02ZZZ-320Z-A)
Do an operational Test of the APU Aft Fuel Pump
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-22-52-400-801
Procedure
(a) After the replacement of the APU Aft Fuel Feed Pump do an operational test of
the pump as specified in the installation of the Aft Fuel Feed Pump, refer to Ref.
AMM T ask 28-22-52-400-801.
F. CLOSE-UP
(1) Task A340-A-28-XX-4143-02001-740A-A (A340-A-28-XX-4143-02ZZZ-740Z-A)
Close-up
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A340-A-28-XX-4143-03001-90AA-A (A340-A-28-XX-4143-03ZZZ-90AZ-A)
Administrative

### Page 30

A340
SERVICE BULLETIN
REV 00 Oct 12/20 A340-28-4143
Page 30
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 31

A340
SERVICE BULLETIN
APPENDIX
REV 00 Oct 12/20 A340-28-4143
Page 31
APPENDIX
A. REPORTING SHEET
TITLE: FUEL - APU FUEL PUMP SYSTEM - INSPECTION - A340 AFT APU
P93A19-202 AND P93A19-203 FUEL PUMPS
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 32

A340
SERVICE BULLETIN
APPENDIX
REV 00 Oct 12/20 A340-28-4143
Page 32
B. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.