Copy: No revision named ("SB A34028-4146_r00"), 45 pages: PDF https://openairdocs.org/files/sha256/a2/43/a243c1e6fc4ca7856ccdf550444a1ec7e4577cadbb41ab0afb464c199d7b384e; text https://openairdocs.org/service-documents/airbus/a340-28-4146/file/a243c1e6fc4c.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2026-8780, the docket of AD 2026-21-03. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-28-4146
- Page: https://openairdocs.org/service-documents/airbus/a340-28-4146

## Text (45 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2026-8780, the docket of AD 2026-21-03. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - A340 CFM ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
MODIFICATION No.:
None

### Page 2

A340
SERVICE BULLETIN
SUMMARY
REV 00 Nov 13/25 A340-28-4146
Page 2
ATA SYSTEM: 28
TITLE: FUEL - A340 CFM ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
Following an in-service event, a fuel leak was found due to the fuel system LP shut-off
valve failing to seal.
Due to potential dormancy of similar fuel leaks, operational check to confirm LP
shut-off valve isolates fuel supply to the associated ENG is required to ensure fleet
airworthiness.
(2) Objective/Action
T o confirm LP shut-off valve isolates fuel supply to the associated ENG.
(3) Advantages
Accomplishment of this Service Bulletin will ensure continued airworthiness by
identifying any potential fuel leak that can contribute to an uncontrolled ENG fire.
(4) Operational/Maintenance Consequences
If a leak is found during the inspection, then the valve will be replaced before the next
flight. Valve replacement requires a fuel tank entry.
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.

### Page 3

A340
SERVICE BULLETIN
SUMMARY
REV 00 Nov 13/25 A340-28-4146
Page 3
D. MAINTENANCE CONFIGURATION
MAINTENANCE CONFIGURATION
MINIMUM FUEL REQUIRED YES
E. MATERIAL PRICE INFORMATION
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-4146-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note LP shut-off valves
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
06Y 15J 15R 15T 17M 26L 27C 31V 34N 36L 56C 65W 68M 72T 82M 83X 84W 90O 98W AXY
BOE DLH E1L EDW F2I GAF HFL HFM IRC IRM KAC KMF LAL M3R MNM MRJ MSR QQE ROI S3R
SAA SAS SWR SYR USY VCV
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-4146-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
AIRCRAFT NO
EQUIPMENT YES
I. MANPOWER
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-4146-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
MANPOWER
TOTAL MAN-HOURS 27.25 h
ELAPSED TIME (HOURS) 3.75 h

### Page 4

A340
SERVICE BULLETIN
SUMMARY
Figure ICN-A340-A-28XX4146-A-FAPE3-01DBA-A-002-01 Fig.SA Sol.AA SHEET 1/2
REV 00 Nov 13/25 A340-28-4146General Overview
Page 4
J. GENERAL OVERVIEW
CONF ALL
F
A
D
FRONT
SPAR
THE INBOARD LOW PRESSURE (LP) SHUT-OFF VALVE 
OPERATIONAL CHECK TO CONFIRM
RIB8 RIB9
B
D
FRONT
SPAR
C
B
A
Z541
Z542
C
FRONT
SPAR
RIB24
RIB25
E
E
FRONT
SPAR
OPERATIONAL CHECK TO CONFIRM
THE OUTBOARD LP SHUT-OFF VALVE 
ISOLATES FUEL SUPPLY TO ENG(5400QA1)
ISOLATES FUEL SUPPLY TO ENGINE (ENG)(5400QA2)
ICN-A340-A-28XX4146-A-FAPE3-01DBA-A-002-01

### Page 5

A340
SERVICE BULLETIN
SUMMARY
Figure ICN-A340-A-28XX4146-A-FAPE3-01DBB-A-002-01 Fig.SA Sol.AA SHEET 2/2
REV 00 Nov 13/25 A340-28-4146General Overview
Page 5
CONF ALL
RIB8RIB9
G
J
FRONT
SPAR
H
FRONT
SPAR
RIB24
RIB25
K
H
G
F
Z641
Z642
K
FRONT
SPAR
OPERATIONAL CHECK TO CONFIRM
THE OUTBOARD LP SHUT-OFF VALVE 
FRONT
SPAR
OPERATIONAL CHECK TO CONFIRM
J
THE INBOARD LP SHUT-OFF VALVE 
ISOLATES FUEL SUPPLY TO ENG(5400QA3)
ISOLATES FUEL SUPPLY TO ENG(5400QA4)
ICN-A340-A-28XX4146-A-FAPE3-01DBB-A-002-01

### Page 6

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 6
ATA SYSTEM: 28
TITLE: FUEL - A340 CFM ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This Service Bulletin is only applicable to aircraft on which MOD 40024 (FUEL
SYSTEM-DEFINE BASIC SYSTEM) is embodied.
(1) Models
ON A/C 0026, 0031, 0063, 0074, 0075, 0080, 0081
340-211
ON A/C 0009, 0014, 0022, 0038, 0043, 0061, 0156, 0159, 0178
340-212
ON A/C 0004, 0151, 0204
340-213
ON A/C 0002, 0020, 0029, 0056, 0078, 0084, 0115
340-311
ON A/C 0047, 0051, 0076, 0094, 0367, 0374, 0381
340-312
ON A/C 0089, 0090, 0093, 0101, 0104, 0114, 0117, 0123, 0126, 0135, 0139, 0146, 0149,
0158, 0164, 0170, 0175, 0179, 0180, 0186, 0190, 0192-0194, 0197, 0199, 0201, 0202, 0207,
0208, 0212-0215, 0233, 0237, 0242, 0243, 0245, 0246, 0252, 0257, 0260, 0264, 0268, 0270,
0274, 0278, 0280, 0282, 0292, 0297, 0302, 0304, 0310, 0318, 0321, 0325, 0327, 0329,
0331, 0332, 0335, 0347, 0354, 0355, 0377-0379, 0387, 0390, 0399, 0402, 0406, 0411, 0415,
0424, 0434, 0447, 0459, 0467, 0474, 0483, 0528, 0538, 0545, 0546, 0554, 0556, 0559,
0561, 0562, 0582, 0585, 0598, 0643, 0646, 0651, 0668, 0793, 0800, 0835, 0844, 0921,
0938, 0955
340-313
CONF ALL
(2) Applicability by MSN
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0043 0047 0051 0056 0061
0063 0074-0076 0078 0080 0081 0084 0089 0090 0093 0094 0101 0104 0114 0115
0117 0123 0126 0135 0139 0146 0149 0151 0156 0158 0159 0164 0170 0175 0178-
0180 0186 0190 0192-0194 0197 0199 0201 0202 0204 0207 0208 0212-0215 0233
0237 0242 0243 0245 0246 0252 0257 0260 0264 0268 0270 0274 0278 0280 0282
0292 0297 0302 0304 0310 0318 0321 0325 0327 0329 0331 0332 0335 0347 0354
0355 0367 0374 0377-0379 0381 0387 0390 0399 0402 0406 0411 0415 0424 0434
0447 0459 0467 0474 0483 0528 0538 0545 0546 0554 0556 0559 0561 0562 0582
0585 0598 0643 0646 0651 0668 0793 0800 0835 0844 0921 0938 0955
(3) MSN by configuration
MSN CONFIGURATION
0002 0004 0009 0014 0020 0022 0026 0029 0031 0038 0043
0047 0051 0056 0061 0063 0074 0075 0076 0078 0080 0081
0084 0089 0090 0093 0094 0101 0104 0114 0115 0117 0123
0126 0135 0139 0146 0149 0151 0156 0158 0159 0164 0170
001

### Page 7

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 7
MSN CONFIGURATION
0175 0178 0179 0180 0186 0190 0192 0193 0194 0197 0199
0201 0202 0204 0207 0208 0212 0213 0214 0215 0233 0237
0242 0243 0245 0246 0252 0257 0260 0264 0268 0270 0274
0278 0280 0282 0292 0297 0302 0304 0310 0318 0321 0325
0327 0329 0331 0332 0335 0347 0354 0355 0367 0374 0377
0378 0379 0381 0387 0390 0399 0402 0406 0411 0415 0424
0434 0447 0459 0467 0474 0483 0528 0538 0545 0546 0554
0556 0559 0561 0562 0582 0585 0598 0643 0646 0651 0668
0793 0800 0835 0844 0921 0938 0955
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Following an in-service event, a fuel leak was found due to the fuel system LP shut-off
valve failing to seal.
Due to potential dormancy of similar fuel leaks, operational check to confirm LP
shut-off valve isolates fuel supply to the associated ENG is required to ensure fleet
airworthiness.
(2) Objective/Action
T o confirm LP shut-off valve isolates fuel supply to the associated ENG.
(3) Advantages
Accomplishment of this Service Bulletin will ensure continued airworthiness by
identifying any potential fuel leak that can contribute to an uncontrolled ENG fire.
(4) Operational/Maintenance Consequences
If a leak is found during the inspection, then the valve will be replaced before the next
flight. Valve replacement requires a fuel tank entry.
D. DESCRIPTION
NOTE: Make sure that the operational check is performed on only one ENG at a time.
T o accomplish this Service Bulletin it is necessary to:
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-4146-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
1 Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA1) Isolates Fuel Supply to ENG 1 on LH side
2 Depending on the Inspection Result, Replace the Outboard LP Shut-Off
Valve (5400QA1) on LH side

### Page 8

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 8
3 Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA2) Isolates Fuel Supply to ENG 2 on LH side
4 Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA2) on LH side
5 Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA3) Isolates Fuel Supply to ENG 3 on RH side
6 Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA3) on RH side
7 Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA4) Isolates Fuel Supply to ENG 4 on RH side
8 Depending on the Inspection Result, Replace the Outboard LP Shut-Off
Valve (5400QA4) on RH side
9 Complete and Send the Inspection Report Sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done in accordance with the below
compliance table.
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds and intervals given but reference should be made to the AD for
confirmation of the mandated accomplishment timescale.
T able 1, CONF 001 - Operational check to confirm the inboard and outboard LP shut-
off valves (FIN 5400QA1, FIN 5400QA2, FIN 5400QA3 and FIN 5400QA4) isolates fuel
supply to the associated ENGs on LH and RH sides
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do an
operational
check to confirm
the inboard and
outboard LP
shut-off valves
(FIN 5400QA1,
FIN 5400QA2,
FIN 5400QA3 and
FIN 5400QA4)
isolates fuel
supply to the
associated
ENGs on LH
and RH sides
in accordance
with Ref. T ask
set A340-A-
Before Dec
31/2028
None None

### Page 9

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 9
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
28-XX-4146-
01ZZZ-93BZ-A
If no leak
is found
After you
complete all
inspections,
complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A340-
A-28-XX-4146-
01ZZZ-90AZ-A
Upon completing
the inspection of
LP shut-off valves
None None
  and
  Do an
operational
check again
to confirm the
inboard and
outboard LP
shut-off valves
(FIN 5400QA1,
FIN 5400QA2,
FIN 5400QA3 and
FIN 5400QA4)
isolates fuel
supply to the
associated
ENGs on LH
and RH sides
in accordance
with Ref. T ask
set A340-A-
28-XX-4146-
01ZZZ-93BZ-A
None None 13000 Flight
Hour(s) or 6500
Flight Cycle(s)
or 12 year(s)
(whichever
occurs first)
from the last
inspection
If leak is found Replace the
affected LP shut-
off valve(s) (FIN
5400QA1 and/
or FIN 5400QA2
and/or FIN
5400QA3 and/or
FIN 5400QA4) in
accordance with
Ref. T ask A340-
A-28-XX-4146-
01ZZZ-920Z-A
and/or Ref. T ask
A340-A-28-XX-
4146-02ZZZ-
920Z-A and/or
Ref. T ask A340-
Before next flight None None

### Page 10

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 10
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
A-28-XX-4146-
03ZZZ-920Z-A
and/or Ref. T ask
A340-A-28-XX-
4146-04ZZZ-
920Z-A and send
the removed
valve(s) to Eaton
  and
  After you
complete all
inspections,
complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A340-
A-28-XX-4146-
01ZZZ-90AZ-A
Upon completing
the inspection of
LP shut-off valves
None None
  and
  Do an
operational
check again
to confirm the
inboard and
outboard LP
shut-off valves
(FIN 5400QA1,
FIN 5400QA2,
FIN 5400QA3 and
FIN 5400QA4)
isolates fuel
supply to the
associated
ENGs on LH
and RH sides
in accordance
with Ref. T ask
set A340-A-
28-XX-4146-
01ZZZ-93BZ-A
None None 13000 Flight
Hour(s) or 6500
Flight Cycle(s)
or 12 year(s)
(whichever
occurs first)
from the last
inspection
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER

### Page 11

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 11
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-4146-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
PREPARATION
Job Set-up 1.00 h
PROCEDURE
Do an Operational Check to Confirm the Outboard LP Shut-
Off Valve (5400QA1) Isolates Fuel Supply to ENG 1 on LH
side
1.00 h
Depending on the Inspection Result, Replace the Outboard
LP Shut-Off Valve (5400QA1) on LH side
4.00 h
Do an Operational Check to Confirm the Inboard LP Shut-
Off Valve (5400QA2) Isolates Fuel Supply to ENG 2 on LH
side
1.00 h
Depending on the Inspection Result, Replace the Inboard
LP Shut-Off Valve (5400QA2) on LH side
4.00 h
Do an Operational Check to Confirm the Inboard LP Shut-
Off Valve (5400QA3) Isolates Fuel Supply to ENG 3 on RH
side
1.00 h
Depending on the Inspection Result, Replace the Inboard
LP Shut-Off Valve (5400QA3) on RH side
4.00 h
Do an Operational Check to Confirm the Outboard LP Shut-
Off Valve (5400QA4) Isolates Fuel Supply to ENG 4 on RH
side
1.00 h
Depending on the Inspection Result, Replace the Outboard
LP Shut-Off Valve (5400QA4) on RH side
4.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
T est 4.00 h
CLOSE-UP
Close-up 2.00 h
TOTAL MAN-HOURS 27.25 h
ELAPSED TIME (HOURS) 3.75 h
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
H. WEIGHT AND BALANCE

### Page 12

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 12
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-4146-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
AIRCRAFT MAINTENANCE MANUAL (AMM)
T ask 12-34-24-860-802 T ask 28-24-00-710-807
T ask 28-24-41-000-801
T ask 28-24-41-000-802
T ask 28-24-41-400-801
T ask 28-24-41-400-802
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179 00.00.00217
OPERATOR INFORMATION TELEX (OIT)
999.0066/15
K. PUBLICATION AFFECTED
None
L. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored inspection. For detailed support,
please refer to the related RIL LR28M25000868.
For the organization of this monitored inspection, you are kindly requested to contact
AIRBUS retrofit management department: monitored.retrofit@airbus.com.

### Page 13

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 13
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A340-A-28-XX-4146-01000-93BA-A Operational Check to
Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and
RH sides
MATERIAL QTY SEE NOTES
Referenced consumables See SB
Equipment See SB
Referenced parts See SB
B. TOOLING
No tools
C. CONSUMABLES
Referenced consumables for task set A340-A-28-XX-4146-01000-93BA-A
Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
NOTE: The referenced consumables listed below are required only if the LP shut-off valve(s)
(FIN 5400QA1 and/or FIN 5400QA2 and/or FIN 5400QA3 and/or FIN 5400QA4) is/are
replaced.
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. AMM T ask 28-24-00-710-807
Ref. AMM T ask 28-24-41-400-801
Ref. AMM T ask 28-24-41-400-802
D. LIST OF NEW PARTS
Equipment for task set A340-A-28-XX-4146-01000-93BA-A Operational Check to
Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and
RH sides
Procurement address 20828
EATON LIMITED
SOUTHAMPTON ROAD
PO14 4QA TITCHFIELD
GRANDE BRETAGNE - UNITED KINGDOM (UK)
Phone: 01329853000
Fax: 01329853797
NOTE(S)
Vendor parts are to be procured from the address given above.
Procurement terms for the equipment must be negotiated with the equipment
supplier.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 HTE900212 (20828) 4 VALVE (1) (2)
NOTE(S)
(1): The components listed above are only necessary if leak is found. The quantity of
these items is to be ordered as required.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.

### Page 14

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 14
Referenced parts for task set A340-A-28-XX-4146-01000-93BA-A Operational
Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on
LH and RH sides
NOTE: The referenced parts listed below are required only if the LP shut-off valve(s) (FIN
5400QA1 and/or FIN 5400QA2 and/or FIN 5400QA3 and/or FIN 5400QA4) is/are replaced.
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. AMM T ask 28-24-00-710-807
Ref. AMM T ask 28-24-41-400-801
Ref. AMM T ask 28-24-41-400-802
E. LIST OF EXISTING PARTS
No parts

### Page 15

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 15
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A340-A-28-XX-4146-01000-93BA-A (A340-A-28-XX-4146-01ZZZ-93BZ-A)
Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH
and RH sides
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
NOTE: Section 3. includes procedures given in other documents or in other sections of this
Service Bulletin.
- You must obey the given procedure when the words "in accordance with" are used.
- You can use an accepted alternative procedure only when the words "refer to" are
used and you have a procedure that is accepted by the related local authority.
NOTE: T o add flexibility to your maintenance operations you can select to ignore steps or add
steps from paragraphs 3.B., 3.D., and 3.F . of section 3. as long as:
- you can do paragraphs 3.C. and 3.E.,
- and the technical intent of the Service Bulletin is met within the set parameters,
- and you can put the aircraft back into a serviceable condition.
NOTE: In section 3., the names of the manuals are given with their related acronyms. Refer to
the paragraph "1.J., References" for the definition of acronyms.
NOTE: This Service Bulletin is classified Mandatory or expected to be classified Mandatory by
an Airworthiness Directive (AD), paragraphs 3.C. and 3.E. of section 3. are Required for
Compliance (RC) and you must do them to comply with the AD.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations from the instructions, including the Required for Compliance (RC)
paragraphs contained in this Service Bulletin, contact AIRBUS for further instructions and
approval.
NOTE: The flowcharts supplement the information given in paragraphs "3.C. PROCEDURE"
and "1.E. COMPLIANCE". The flowcharts are not the primary source for the tasks or the
compliance times given in this Service Bulletin.
A. TASK SET ASSOCIATED INFORMATION
Maintenance Configuration
Minimum fuel required
Task Manpower
TOTAL MAN-HOURS 27.25 h
ELAPSED TIME (HOURS) 3.75 h

### Page 16

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 16
B. PREPARATION
(1) Task A340-A-28-XX-4146-01001-540A-A (A340-A-28-XX-4146-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 12-34-24-860-802T ask 28-24-00-710-807
Procedure
NOTE: For the basic aircraft configuration, refer to AMM Chapter “Introduction -
Aircraft Status for Maintenance" in the Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. AMM T ask 12-34-
24-860-802.
(b) Do the job set-up procedure as specified in the operational check to confirm LP
shut-off valves (FIN 5400QA1, FIN 5400QA2, FIN 5400QA3 and FIN 5400QA4)
isolates fuel supply to associated ENGs, refer to Ref. AMM T ask 28-24-00-710-
807.
C. PROCEDURE
(1) Task A340-A-28-XX-4146-01001-364A-A (A340-A-28-XX-4146-01ZZZ-364Z-A)
Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA1) Isolates Fuel Supply to ENG 1 on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
410 Access Panel 415AL, Panel 416AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure

### Page 17

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 17
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FA Flowchart.
(a) Do an operational check to confirm the outboard LP shut-off valve (FIN
5400QA1) isolates fuel supply to ENG 1 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA1) isolates fuel supply to ENG 1 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the outboard LP shut-off valve (FIN 5400QA1) and send
the removed valve to Eaton in accordance with Ref. T ask A340-A-
28-XX-4146-01ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA1) isolates fuel supply to ENG 1 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 18

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DBC-A-001-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Flowchart
Page 18
CONF ALL
NOYES
01
DO AN OPERATIONAL CHECK TO CONFIRM THE OUTBOARD
LOW PRESSURE (LP) SHUT-OFF VALVE (5400QA1)
ISOLATES FUEL SUPPLY TO ENGINE (ENG) 1
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE OUTBOARD LP SHUT-OFF VALVE (5400QA1)
AND SEND THE REMOVED VALVE TO EATON 01
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX4146-A-FAPE3-01DBC-A-001-01

### Page 19

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 19
(2) Task A340-A-28-XX-4146-01001-920A-A (A340-A-28-XX-4146-01ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Outboard LP Shut-Off Valve
(5400QA1) on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 542BB542
Work location From Rib 24 to Rib 25
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 HTE900212 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-801T ask 28-24-41-400-801
Procedure
Ref. Fig.BA Replacement of the Outboard LP Shut-Off Valve (5400QA1).
(a) Remove the outboard LP shut-off valve (FIN 5400QA1), refer to Ref. AMM T ask
28-24-41-000-801:
FIN 5400QA1
1 VALVE-LP FUEL   Item (1) Retain
(b) Send the removed outboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new outboard LP shut-off valve (FIN 5400QA1), refer to Ref. AMM T ask
28-24-41-400-801:
FIN 5400QA1
1 VALVE-LP FUEL HTE900212 Item 1

### Page 20

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB7-A-002-01 Fig.BA Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Replacement of the Outboard LP Shut-Off Valve (5400QA1)
Page 20
CONF ALL
A
Z542
A
FRONT
SPAR
RIB24
RIB25
B
B
FRONT
SPAR
5400QA1 1(1)
ICN-A340-A-28XX4146-A-FAPE3-01DB7-A-002-01

### Page 21

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 21
(3) Task A340-A-28-XX-4146-02001-364A-A (A340-A-28-XX-4146-02ZZZ-364Z-A)
Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA2) Isolates Fuel Supply to ENG 2 on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
420 Access Panel 425AL, Panel 426AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FB Flowchart.
(a) Do an operational check to confirm the inboard LP shut-off valve (FIN
5400QA2) isolates fuel supply to ENG 2 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA2) isolates fuel supply to ENG 2 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the inboard LP shut-off valve (FIN 5400QA2) and send the
removed valve to Eaton in accordance with Ref. T ask A340-A-28-
XX-4146-02ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).

### Page 22

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 22
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA2) isolates fuel supply to ENG 2 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 23

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB8-A-001-01 Fig.FB Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Flowchart
Page 23
CONF ALL
NOYES
01
DO AN OPERATIONAL CHECK TO CONFIRM THE
INBOARD LP SHUT-OFF VALVE (5400QA2)
ISOLATES FUEL SUPPLY TO ENG 2
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE INBOARD LP SHUT-OFF VALVE (5400QA2)
AND SEND THE REMOVED VALVE TO EATON 01
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX4146-A-FAPE3-01DB8-A-001-01

### Page 24

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 24
(4) Task A340-A-28-XX-4146-02001-920A-A (A340-A-28-XX-4146-02ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA2) on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 541DB, Panel 541FZ541
Work location From Rib 8 to Rib 9
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 HTE900212 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-802T ask 28-24-41-400-802
Procedure
Ref. Fig.BB Replacement of the Inboard LP Shut-Off Valve (5400QA2).
(a) Remove the inboard LP shut-off valve (FIN 5400QA2), refer to Ref. AMM T ask 28-
24-41-000-802:
FIN 5400QA2
1 VALVE-LP FUEL   Item (1) Retain
(b) Send the removed inboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new inboard LP shut-off valve (FIN 5400QA2), refer to Ref. AMM T ask
28-24-41-400-802:
FIN 5400QA2
1 VALVE-LP FUEL HTE900212 Item 1

### Page 25

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB1-A-002-01 Fig.BB Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Replacement of the Inboard LP Shut-Off Valve (5400QA2)
Page 25
CONF ALL
A
Z541
RIB8 RIB9
A
B
FRONT
SPAR
B
FRONT
SPAR
5400QA2 1(1)
ICN-A340-A-28XX4146-A-FAPE3-01DB1-A-002-01

### Page 26

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 26
(5) Task A340-A-28-XX-4146-03001-364A-A (A340-A-28-XX-4146-03ZZZ-364Z-A)
Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA3) Isolates Fuel Supply to ENG 3 on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
430 Access Panel 435AL, Panel 436AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FC Flowchart.
(a) Do an operational check to confirm the inboard LP shut-off valve (FIN
5400QA3) isolates fuel supply to ENG 3 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA3) isolates fuel supply to ENG 3 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the inboard LP shut-off valve (FIN 5400QA3) and send the
removed valve to Eaton in accordance with Ref. T ask A340-A-28-
XX-4146-03ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).

### Page 27

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 27
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA3) isolates fuel supply to ENG 3 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 28

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB9-A-001-01 Fig.FC Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Flowchart
Page 28
CONF ALL
NOYES
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE INBOARD LP SHUT-OFF VALVE (5400QA3)
AND SEND THE REMOVED VALVE TO EATON 01
01
DO AN OPERATIONAL CHECK TO CONFIRM THE
INBOARD LP SHUT-OFF VALVE (5400QA3)
ISOLATES FUEL SUPPLY TO ENG 3
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX4146-A-FAPE3-01DB9-A-001-01

### Page 29

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 29
(6) Task A340-A-28-XX-4146-03001-920A-A (A340-A-28-XX-4146-03ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA3) on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 641DB, Panel 641FZ641
Work location From Rib 8 to Rib 9
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 HTE900212 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-802T ask 28-24-41-400-802
Procedure
Ref. Fig.BC Replacement of the Inboard LP Shut-Off Valve (5400QA3).
(a) Remove the inboard LP shut-off valve (FIN 5400QA3), refer to Ref. AMM T ask 28-
24-41-000-802:
FIN 5400QA3
1 VALVE-LP FUEL   Item (1) Retain
(b) Send the removed inboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new inboard LP shut-off valve (FIN 5400QA3), refer to Ref. AMM T ask
28-24-41-400-802:
FIN 5400QA3
1 VALVE-LP FUEL HTE900212 Item 1

### Page 30

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB0-A-002-01 Fig.BC Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Replacement of the Inboard LP Shut-Off Valve (5400QA3)
Page 30
CONF ALL
A
Z641
RIB8RIB9
B
FRONT
SPAR
FRONT
SPAR
5400QA3 1(1)
A
B
ICN-A340-A-28XX4146-A-FAPE3-01DB0-A-002-01

### Page 31

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 31
(7) Task A340-A-28-XX-4146-04001-364A-A (A340-A-28-XX-4146-04ZZZ-364Z-A)
Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA4) Isolates Fuel Supply to ENG 4 on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
440 Access Panel 445AL, Panel 446AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FD Flowchart.
(a) Do an operational check to confirm the outboard LP shut-off valve (FIN
5400QA4) isolates fuel supply to ENG 4 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA4) isolates fuel supply to ENG 4 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the outboard LP shut-off valve (FIN 5400QA4) and send
the removed valve to Eaton in accordance with Ref. T ask A340-A-
28-XX-4146-04ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).

### Page 32

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 32
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-4146-01ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA4) isolates fuel supply to ENG 4 in accordance with
Ref. T ask set A340-A-28-XX-4146-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 33

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB6-A-001-01 Fig.FD Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Flowchart
Page 33
CONF ALL
YES
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE OUTBOARD LP SHUT-OFF VALVE (5400QA4)
AND SEND THE REMOVED VALVE TO EATON 01
01
DO AN OPERATIONAL CHECK TO CONFIRM THE
OUTBOARD LP SHUT-OFF VALVE (5400QA4)
ISOLATES FUEL SUPPLY TO ENG 4
NO
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX4146-A-FAPE3-01DB6-A-001-01

### Page 34

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 34
(8) Task A340-A-28-XX-4146-04001-920A-A (A340-A-28-XX-4146-04ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Outboard LP Shut-Off Valve
(5400QA4) on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 642BB642
Work location From Rib 24 to Rib 25
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 HTE900212 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-801T ask 28-24-41-400-801
Procedure
Ref. Fig.BD Replacement of the Outboard LP Shut-Off Valve (5400QA4).
(a) Remove the outboard LP shut-off valve (FIN 5400QA4), refer to Ref. AMM T ask
28-24-41-000-801:
FIN 5400QA4
1 VALVE-LP FUEL   Item (1) Retain
(b) Send the removed outboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new outboard LP shut-off valve (FIN 5400QA4), refer to Ref. AMM T ask
28-24-41-400-801:
FIN 5400QA4
1 VALVE-LP FUEL HTE900212 Item 1

### Page 35

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DAZ-A-002-01 Fig.BD Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-4146Replacement of the Outboard LP Shut-Off Valve (5400QA4)
Page 35
CONF ALL
A
Z642
FRONT
SPAR
RIB24
RIB25
B
B
FRONT
SPAR
5400QA4 1(1)
A
ICN-A340-A-28XX4146-A-FAPE3-01DAZ-A-002-01

### Page 36

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 36
(9) Task A340-A-28-XX-4146-01001-90AA-A (A340-A-28-XX-4146-01ZZZ-90AZ-A)
Complete and Send the Inspection Report Sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig.RA Inspection Report
sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.

### Page 37

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB2-A-002-01 Fig.RA Sol.AA SHEET 1/4
REV 00 Nov 13/25 A340-28-4146Inspection Report Sheet
Page 37
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-4146
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE OUTBOARD LP SHUT-OFF VALVE ISOLATES FUEL
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
SUPPLY TO ENG 1
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
SERIAL NUMBER OF THE OUTBOARD LP
SHUT-OFF VALVE (5400QA1) INSPECTED:
LEAK FOUND? YES NO
ICN-A340-A-28XX4146-A-FAPE3-01DB2-A-002-01

### Page 38

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB3-A-002-01 Fig.RA Sol.AA SHEET 2/4
REV 00 Nov 13/25 A340-28-4146Inspection Report Sheet
Page 38
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-4146
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE INBOARD LP SHUT-OFF VALVE ISOLATES FUEL SUPPLY
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
SERIAL NUMBER OF THE INBOARD LP
SHUT-OFF VALVE (5400QA2) INSPECTED:
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
TO ENG 2
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
LEAK FOUND? YES NO
ICN-A340-A-28XX4146-A-FAPE3-01DB3-A-002-01

### Page 39

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB4-A-002-01 Fig.RA Sol.AA SHEET 3/4
REV 00 Nov 13/25 A340-28-4146Inspection Report Sheet
Page 39
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-4146
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE INBOARD LP SHUT-OFF VALVE ISOLATES FUEL SUPPLY
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
TO ENG 3
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
SERIAL NUMBER OF THE INBOARD LP
SHUT-OFF VALVE (5400QA3) INSPECTED:
LEAK FOUND? YES NO
ICN-A340-A-28XX4146-A-FAPE3-01DB4-A-002-01

### Page 40

A340
SERVICE BULLETIN
Figure ICN-A340-A-28XX4146-A-FAPE3-01DB5-A-002-01 Fig.RA Sol.AA SHEET 4/4
REV 00 Nov 13/25 A340-28-4146Inspection Report Sheet
Page 40
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-4146
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE OUTBOARD LP SHUT-OFF VALVE ISOLATES FUEL
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
SERIAL NUMBER OF THE OUTBOARD LP
SHUT-OFF VALVE (5400QA4) INSPECTED:
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
SUPPLY TO ENG 4
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
LEAK FOUND? YES NO
ICN-A340-A-28XX4146-A-FAPE3-01DB5-A-002-01

### Page 41

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 41
D. PREPARATION FOR TEST
None
E. TEST
(1) Task A340-A-28-XX-4146-01001-320A-A (A340-A-28-XX-4146-01ZZZ-320Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 2
Elapsed Time 2.00 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-400-801T ask 28-24-41-400-802
Procedure
NOTE: The test procedure is required only if the LP shut-off valve(s) ( FIN 5400QA1
and/or FIN 5400QA2 and/or FIN 5400QA3 and/or FIN 5400QA4) is(are)
replaced.
(a) The logical workflow requires tests that must be accomplished in other tasks of
this Service Bulletin, these tests are given in the table below.
SB TASK AMM Task
Ref. T ask A340-A-28-XX-4146-01ZZZ-920Z-A
Ref. T ask A340-A-28-XX-4146-04ZZZ-920Z-A
Ref. AMM T ask 28-24-41-400-801
Ref. T ask A340-A-28-XX-4146-02ZZZ-920Z-A
Ref. T ask A340-A-28-XX-4146-03ZZZ-920Z-A
Ref. AMM T ask 28-24-41-400-802
F. CLOSE-UP
(1) Task A340-A-28-XX-4146-01001-740A-A (A340-A-28-XX-4146-01ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
Procedure
(a) Make sure that the work area is clean and clear of tools and other items.
(b) Do the close-up procedure as specified in the operational check to confirm LP
shut-off valves (FIN 5400QA1, FIN 5400QA2, FIN 5400QA3 and FIN 5400QA4)

### Page 42

A340
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-4146
Page 42
isolates fuel supply to associated ENGs, refer to Ref. AMM T ask 28-24-00-710-
807.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A340-A-28-XX-4146-02001-90AA-A (A340-A-28-XX-4146-02ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you completed all the work specified in
this Service Bulletin.

### Page 43

A340
SERVICE BULLETIN
APPENDIX
REV 00 Nov 13/25 A340-28-4146
Page 43
APPENDIX
A. GLOSSARY
GLOSSARY
ACRONYM FULL FORM
ENG Engine
LH Left Hand
LP Low Pressure
RH Right Hand

### Page 44

A340
SERVICE BULLETIN
APPENDIX
REV 00 Nov 13/25 A340-28-4146
Page 44
B. REPORTING SHEET
TITLE: FUEL - A340 CFM ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 45

A340
SERVICE BULLETIN
APPENDIX
REV 00 Nov 13/25 A340-28-4146
Page 45
C. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.