# Airbus Service Bulletin A340-28-5064

Copy: No revision named ("SB A340-28-5064_r00"), 45 pages: PDF https://openairdocs.org/files/sha256/a1/b4/a1b4b6e95f5a4b2869dd94729bf3d11174bca14838bc13123b42f3eb4e480e09; text https://openairdocs.org/service-documents/airbus/a340-28-5064/file/a1b4b6e95f5a.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2026-8780, the docket of AD 2026-21-03. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-28-5064
- Page: https://openairdocs.org/service-documents/airbus/a340-28-5064

## Text (45 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2026-8780, the docket of AD 2026-21-03. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - A340 RR ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
MODIFICATION No.:
None

### Page 2

A340-500/600
SERVICE BULLETIN
SUMMARY
REV 00 Nov 13/25 A340-28-5064
Page 2
ATA SYSTEM: 28
TITLE: FUEL - A340 RR ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
Following an in-service event, a fuel leak was found due to the fuel system LP shut-off
valve failing to seal.
Due to potential dormancy of similar fuel leaks, operational check to confirm LP
shut-off valve isolates fuel supply to the associated ENG is required to ensure fleet
airworthiness.
(2) Objective/Action
T o confirm LP shut-off valve isolates fuel supply to the associated ENG.
(3) Advantages
Accomplishment of this Service Bulletin will ensure continued airworthiness by
identifying any potential fuel leak that can contribute to an uncontrolled ENG fire.
(4) Operational/Maintenance Consequences
If a leak is found during the inspection, then the valve will be replaced before the next
flight. Valve replacement requires a fuel tank entry.
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.

### Page 3

A340-500/600
SERVICE BULLETIN
SUMMARY
REV 00 Nov 13/25 A340-28-5064
Page 3
D. MAINTENANCE CONFIGURATION
MAINTENANCE CONFIGURATION
MINIMUM FUEL REQUIRED YES
E. MATERIAL PRICE INFORMATION
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-5064-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note LP shut-off valves
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
15J 15T 26C 32P 64G 65W 68M 72T 72W 81Q 83V 89G 98W AHY ARA AZM DLH F1I F2I G4I
GBB IBE IRM KAC LHT QAF QTR R1T SAA THY URO USY VCV
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-5064-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
AIRCRAFT NO
EQUIPMENT YES
I. MANPOWER
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-5064-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
MANPOWER
TOTAL MAN-HOURS 27.25 h
ELAPSED TIME (HOURS) 3.75 h

### Page 4

A340-500/600
SERVICE BULLETIN
SUMMARY
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAR-A-002-01 Fig.SA Sol.AA SHEET 1/2
REV 00 Nov 13/25 A340-28-5064General Overview
Page 4
J. GENERAL OVERVIEW
CONF ALL
F
A
C
B
FRONT SPAR
E
(5400QA2)
D
FRONT
SPAR
B
RIB8 RIB10
D
RIB23
RIB24
E
C
A
Z542
Z543
OPERATIONAL CHECK TO CONFIRM THE INBOARD
LOW PRESSURE (LP) SHUT-OFF VALVE
ISOLATES FUEL SUPPLY TO ENGINE (ENG)
OPERATIONAL CHECK TO CONFIRM
ISOLATES FUEL SUPPLY TO ENG
(5400QA1)THE OUTBOARD LP SHUT-OFF VALVE
ICN-A340-A-28XX5064-A-FAPE3-01DAR-A-002-01

### Page 5

A340-500/600
SERVICE BULLETIN
SUMMARY
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAW-A-001-01 Fig.SA Sol.AA SHEET 2/2
REV 00 Nov 13/25 A340-28-5064General Overview
Page 5
CONF ALL
G
RIB23
RIB24
J
FRONT SPAR
J
H
RIB8RIB10
K
G
H
F
Z642
Z643
OPERATIONAL CHECK TO CONFIRM
ISOLATES FUEL SUPPLY TO ENG
(5400QA4)THE OUTBOARD LP SHUT-OFF VALVE
K
FRONT
SPAR
ISOLATES FUEL SUPPLY TO ENG
THE INBOARD LP SHUT-OFF VALVE (5400QA3)
OPERATIONAL CHECK TO CONFIRM
ICN-A340-A-28XX5064-A-FAPE3-01DAW-A-001-01

### Page 6

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 6
ATA SYSTEM: 28
TITLE: FUEL - A340 RR ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This Service Bulletin is only applicable to aircraft on which MOD 47084 (FUEL -
GENERAL - ADAPT BASIC DEFINITION FOR A340-500/600) is embodied.
(1) Models
ON A/C 0457, 0464, 0471, 0485, 0495, 0520, 0560, 0563, 0572, 0608, 0611, 0624, 0628,
0685, 0694, 0698, 0748, 0757, 0761, 0775, 0783, 0917, 1091, 1102
340-541
ON A/C 0886, 0894, 0902, 0910, 0912
340-542
ON A/C 0371, 0376, 0383, 0391, 0410, 0416, 0417, 0426, 0431, 0440, 0449, 0460, 0468,
0488, 0514, 0517, 0523, 0531, 0534, 0537, 0540, 0543, 0547, 0557, 0566, 0569, 0575,
0580, 0583, 0586, 0601, 0604, 0606, 0615, 0617, 0619, 0622, 0626, 0630, 0639, 0672,
0677, 0681, 0689, 0702, 0706, 0710, 0715, 0719, 0723, 0727, 0736, 0740, 0744, 0753,
0764-0766, 0768, 0771, 0779, 0787, 0794, 0798, 0804, 0829, 0837, 0846, 0848, 0870, 0897,
0924, 0929, 0933, 0953, 0960, 0972, 0981, 0987, 0993, 1005, 1017, 1030, 1040, 1079, 1122
340-642
CONF ALL
(2) Applicability by MSN
0371 0376 0383 0391 0410 0416 0417 0426 0431 0440 0449 0457 0460 0464 0468
0471 0485 0488 0495 0514 0517 0520 0523 0531 0534 0537 0540 0543 0547 0557
0560 0563 0566 0569 0572 0575 0580 0583 0586 0601 0604 0606 0608 0611 0615
0617 0619 0622 0624 0626 0628 0630 0639 0672 0677 0681 0685 0689 0694 0698
0702 0706 0710 0715 0719 0723 0727 0736 0740 0744 0748 0753 0757 0761 0764-
0766 0768 0771 0775 0779 0783 0787 0794 0798 0804 0829 0837 0846 0848 0870
0886 0894 0897 0902 0910 0912 0917 0924 0929 0933 0953 0960 0972 0981 0987
0993 1005 1017 1030 1040 1079 1091 1102 1122
(3) MSN by configuration
MSN CONFIGURATION
0371 0376 0383 0391 0410 0416 0417 0426 0431 0440 0449
0457 0460 0464 0468 0471 0485 0488 0495 0514 0517 0520
0523 0531 0534 0537 0540 0543 0547 0557 0560 0563 0566
0569 0572 0575 0580 0583 0586 0601 0604 0606 0608 0611
0615 0617 0619 0622 0624 0626 0628 0630 0639 0672 0677
0681 0685 0689 0694 0698 0702 0706 0710 0715 0719 0723
0727 0736 0740 0744 0748 0753 0757 0761 0764 0765 0766
0768 0771 0775 0779 0783 0787 0794 0798 0804 0829 0837
0846 0848 0870 0886 0894 0897 0902 0910 0912 0917 0924
0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030
1040 1079 1091 1102 1122
001
(4) Configuration definition

### Page 7

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 7
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Following an in-service event, a fuel leak was found due to the fuel system LP shut-off
valve failing to seal.
Due to potential dormancy of similar fuel leaks, operational check to confirm LP
shut-off valve isolates fuel supply to the associated ENG is required to ensure fleet
airworthiness.
(2) Objective/Action
T o confirm LP shut-off valve isolates fuel supply to the associated ENG.
(3) Advantages
Accomplishment of this Service Bulletin will ensure continued airworthiness by
identifying any potential fuel leak that can contribute to an uncontrolled ENG fire.
(4) Operational/Maintenance Consequences
If a leak is found during the inspection, then the valve will be replaced before the next
flight. Valve replacement requires a fuel tank entry.
D. DESCRIPTION
NOTE: Make sure that the operational check is performed on only one ENG at a time.
T o accomplish this Service Bulletin it is necessary to:
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-5064-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
1 Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA1) Isolates Fuel Supply to ENG 1 on LH side
2 Depending on the Inspection Result, Replace the Outboard LP Shut-Off
Valve (5400QA1) on LH side
3 Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA2) Isolates Fuel Supply to ENG 2 on LH side
4 Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA2) on LH side
5 Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA3) Isolates Fuel Supply to ENG 3 on RH side
6 Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA3) on RH side
7 Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA4) Isolates Fuel Supply to ENG 4 on RH side

### Page 8

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 8
8 Depending on the Inspection Result, Replace the Outboard LP Shut-Off
Valve (5400QA4) on RH side
9 Complete and Send the Inspection Report Sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done in accordance with the below
compliance table.
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds and intervals given but reference should be made to the AD for
confirmation of the mandated accomplishment timescale.
T able 1, CONF 001 - Operational check to confirm the inboard and outboard LP shut-
off valves (FIN 5400QA1, FIN 5400QA2, FIN 5400QA3 and FIN 5400QA4) isolates fuel
supply to the associated ENGs on LH and RH sides
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do an
operational
check to confirm
the inboard and
outboard LP
shut-off valves
(FIN 5400QA1,
FIN 5400QA2,
FIN 5400QA3 and
FIN 5400QA4)
isolates fuel
supply to the
associated
ENGs on LH
and RH sides
in accordance
with Ref. T ask
set A340-A-
28-XX-5064-
01ZZZ-93BZ-A
Before Dec
31/2028
None None
If no leak
is found
After you
complete all
inspections,
complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A340-
A-28-XX-5064-
02ZZZ-90AZ-A
Upon completing
the inspection of
LP shut-off valves
None None

### Page 9

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 9
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
  and
  Do an
operational
check again
to confirm the
inboard and
outboard LP
shut-off valves
(FIN 5400QA1,
FIN 5400QA2,
FIN 5400QA3 and
FIN 5400QA4)
isolates fuel
supply to the
associated
ENGs on LH
and RH sides
in accordance
with Ref. T ask
set A340-A-
28-XX-5064-
01ZZZ-93BZ-A
None None 13000 Flight
Hour(s) or 6500
Flight Cycle(s)
or 12 year(s)
(whichever
occurs first)
from the last
inspection
If leak is found Replace the
affected LP shut-
off valve(s) (FIN
5400QA1 and/
or FIN 5400QA2
and/or FIN
5400QA3 and/or
FIN 5400QA4 in
accordance with
Ref. T ask A340-
A-28-XX-5064-
01ZZZ-920Z-A
and/or Ref. T ask
A340-A-28-XX-
5064-02ZZZ-
920Z-A and/or
Ref. T ask A340-
A-28-XX-5064-
03ZZZ-920Z-A
and/or Ref. T ask
A340-A-28-XX-
5064-04ZZZ-
920Z-A and send
the removed
valve(s) to Eaton
Before next flight None None
  and
  After you
complete all
inspections,
complete
Upon completing
the inspection of
LP shut-off valves
None None

### Page 10

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 10
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A340-
A-28-XX-5064-
02ZZZ-90AZ-A
  and
  Do an
operational
check again
to confirm the
inboard and
outboard LP
shut-off valves
(FIN 5400QA1,
FIN 5400QA2,
FIN 5400QA3 and
FIN 5400QA4)
isolates fuel
supply to the
associated
ENGs on LH
and RH sides
in accordance
with Ref. T ask
set A340-A-
28-XX-5064-
01ZZZ-93BZ-A
None None 13000 Flight
Hour(s) or 6500
Flight Cycle(s)
or 12 year(s)
(whichever
occurs first)
from the last
inspection
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
(a) T ask set A340-A-28-XX-5064-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
PREPARATION

### Page 11

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 11
Job Set-up 1.00 h
PROCEDURE
Do an Operational Check to Confirm the Outboard LP Shut-
Off Valve (5400QA1) Isolates Fuel Supply to ENG 1 on LH
side
1.00 h
Depending on the Inspection Result, Replace the Outboard
LP Shut-Off Valve (5400QA1) on LH side
4.00 h
Do an Operational Check to Confirm the Inboard LP Shut-
Off Valve (5400QA2) Isolates Fuel Supply to ENG 2 on LH
side
1.00 h
Depending on the Inspection Result, Replace the Inboard
LP Shut-Off Valve (5400QA2) on LH side
4.00 h
Do an Operational Check to Confirm the Inboard LP Shut-
Off Valve (5400QA3) Isolates Fuel Supply to ENG 3 on RH
side
1.00 h
Depending on the Inspection Result, Replace the Inboard
LP Shut-Off Valve (5400QA3) on RH side
4.00 h
Do an Operational Check to Confirm the Outboard LP Shut-
Off Valve (5400QA4) Isolates Fuel Supply to ENG 4 on RH
side
1.00 h
Depending on the Inspection Result, Replace the Outboard
LP Shut-Off Valve (5400QA4) on RH side
4.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
T est 4.00 h
CLOSE-UP
Close-up 2.00 h
TOTAL MAN-HOURS 27.25 h
ELAPSED TIME (HOURS) 3.75 h
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides

### Page 12

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 12
(a) T ask set A340-A-28-XX-5064-01000-93BA-A Operational Check to Confirm LP
Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and RH sides
AIRCRAFT MAINTENANCE MANUAL (AMM)
T ask 12-34-24-860-802 T ask 28-24-00-710-807
T ask 28-24-41-000-801
T ask 28-24-41-000-802
T ask 28-24-41-400-801
T ask 28-24-41-400-802
ELECTRICAL STANDARD PRACTICES MANUAL (ESPM)
20-55-00
IN SERVICE INFORMATION (ISI)
00.00.00179 00.00.00217
OPERATOR INFORMATION TELEX (OIT)
999.0066/15
K. PUBLICATION AFFECTED
None
L. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored inspection. For detailed support,
please refer to the related RIL LR28M25000868.
For the organization of this monitored inspection, you are kindly requested to contact
AIRBUS retrofit management department: monitored.retrofit@airbus.com.

### Page 13

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 13
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A340-A-28-XX-5064-01000-93BA-A Operational Check to
Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and
RH sides
MATERIAL QTY SEE NOTES
Referenced consumables See SB
Equipment See SB
Referenced parts See SB
B. TOOLING
No tools
C. CONSUMABLES
Referenced consumables for task set A340-A-28-XX-5064-01000-93BA-A
Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the
Associated ENG on LH and RH sides
NOTE: The referenced consumables listed below are required only if the LP shut-off valve(s)
(FIN 5400QA1 and/or FIN 5400QA2 and/or FIN 5400QA3 and/or FIN 5400QA4) is/are
replaced.
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. AMM T ask 28-24-00-710-807
Ref. AMM T ask 28-24-41-400-801
Ref. AMM T ask 28-24-41-400-802
D. LIST OF NEW PARTS
Equipment for task set A340-A-28-XX-5064-01000-93BA-A Operational Check to
Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH and
RH sides
Procurement address
23507
EATON LIMITED
STATION ROAD
EX36 EDW SOUTH MOLTON
GRANDE BRETAGNE - UNITED KINGDOM (UK)
Phone: 01769573371
Fax: 01769572755
20828
EATON LIMITED
SOUTHAMPTON ROAD
PO14 4QA TITCHFIELD
GRANDE BRETAGNE - UNITED KINGDOM (UK)
Phone: 01329853000
Fax: 01329853797
NOTE(S)
Vendor parts are to be procured from the address given above.
Procurement terms for the equipment must be negotiated with the equipment
supplier.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 FRH120266M(23507) 2 VALVE (1) (2)

### Page 14

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 14
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 12M0090 (20828) 2 VALVE (1) (2)
NOTE(S)
(1): The components listed above are only necessary if leak is found. The quantity of
these items is to be ordered as required.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Referenced parts for task set A340-A-28-XX-5064-01000-93BA-A Operational
Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on
LH and RH sides
NOTE: The referenced parts listed below are required only if the LP shut-off valve(s) (FIN
5400QA1 and/or FIN 5400QA2 and/or FIN 5400QA3 and/or FIN 5400QA4) is/are replaced.
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. AMM T ask 28-24-00-710-807
Ref. AMM T ask 28-24-41-400-801
Ref. AMM T ask 28-24-41-400-802
E. LIST OF EXISTING PARTS
No parts

### Page 15

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 15
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A340-A-28-XX-5064-01000-93BA-A (A340-A-28-XX-5064-01ZZZ-93BZ-A)
Operational Check to Confirm LP Shut-Off Valve Isolates Fuel Supply to the Associated ENG on LH
and RH sides
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESPM 20-55-00.
NOTE: Section 3. includes procedures given in other documents or in other sections of this
Service Bulletin.
- You must obey the given procedure when the words "in accordance with" are used.
- You can use an accepted alternative procedure only when the words "refer to" are
used and you have a procedure that is accepted by the related local authority.
NOTE: T o add flexibility to your maintenance operations you can select to ignore steps or add
steps from paragraphs 3.B., 3.D., and 3.F . of section 3. as long as:
- paragraphs 3.C. and 3.E. can be done correctly,
- the technical intent of the Service Bulletin is met within the set parameters, and
- the aircraft can be put back into a serviceable condition.
You must also make sure that all the instructions related to the safety of personnel and
the safety and integrity of the aircraft are given.
NOTE: In section 3., the names of the manuals are given with their related acronyms. Refer to
the paragraph "1.J., References" for the definition of acronyms.
NOTE: This Service Bulletin is classified Mandatory or expected to be classified Mandatory by
an Airworthiness Directive (AD), paragraphs 3.C. and 3.E. of section 3. are Required for
Compliance (RC) and you must do them to comply with the AD.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations from the instructions, including the Required for Compliance (RC)
paragraphs contained in this Service Bulletin, contact AIRBUS for further instructions and
approval.
NOTE: The flowcharts supplement the information given in paragraphs "3.C. PROCEDURE"
and "1.E. COMPLIANCE". The flowcharts are not the primary source for the tasks or the
compliance times given in this Service Bulletin.
A. TASK SET ASSOCIATED INFORMATION
Maintenance Configuration
Minimum fuel required
Task Manpower

### Page 16

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 16
TOTAL MAN-HOURS 27.25 h
ELAPSED TIME (HOURS) 3.75 h
B. PREPARATION
(1) Task A340-A-28-XX-5064-01001-540A-A (A340-A-28-XX-5064-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 12-34-24-860-802T ask 28-24-00-710-807
Procedure
NOTE: For the basic aircraft configuration, refer to AMM Chapter “Introduction -
Aircraft Status for Maintenance" in the Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. AMM T ask 12-34-
24-860-802.
(b) Do the job set-up procedure as specified in the operational check to confirm LP
shut-off valves (FIN 5400QA1, FIN 5400QA2, FIN 5400QA3 and FIN 5400QA4)
isolates fuel supply to associated ENGs, refer to Ref. AMM T ask 28-24-00-710-
807.
C. PROCEDURE
(1) Task A340-A-28-XX-5064-02001-364A-A (A340-A-28-XX-5064-02ZZZ-364Z-A)
Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA1) Isolates Fuel Supply to ENG 1 on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
410 Access Panel 415AL, Panel 416AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15

### Page 17

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 17
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FA Flowchart.
(a) Do an operational check to confirm the outboard LP shut-off valve (FIN
5400QA1) isolates fuel supply to ENG 1 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA1) isolates fuel supply to ENG 1 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the outboard LP shut-off valve (FIN 5400QA1) and send
the removed valve to Eaton in accordance with Ref. T ask A340-A-
28-XX-5064-01ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA1) isolates fuel supply to ENG 1 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 18

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAT-A-003-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Flowchart
Page 18
CONF ALL
NOYES
01
DO AN OPERATIONAL CHECK TO CONFIRM THE OUTBOARD
LOW PRESSURE (LP) SHUT-OFF VALVE (5400QA1)
ISOLATES FUEL SUPPLY TO ENGINE (ENG) 1
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE OUTBOARD LP SHUT-OFF VALVE (5400QA1)
AND SEND THE REMOVED VALVE TO EATON 01
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX5064-A-FAPE3-01DAT-A-003-01

### Page 19

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 19
(2) Task A340-A-28-XX-5064-01001-920A-A (A340-A-28-XX-5064-01ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Outboard LP Shut-Off Valve
(5400QA1) on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 543NB543
Work location From Rib 23 to Rib 24
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 FRH120266M 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-801T ask 28-24-41-400-801
Procedure
Ref. Fig.BA Replacement of the Outboard LP Shut-Off Valve (5400QA1).
(a) Remove the outboard LP shut-off valve (FIN 5400QA1), refer to Ref. AMM T ask
28-24-41-000-801:
FIN 5400QA1
1 VALVE-
LP,ENGINE,OUTBOARD
  Item (1) Retain
(b) Send the removed outboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new outboard LP shut-off valve (FIN 5400QA1), refer to Ref. AMM T ask
28-24-41-400-801:
FIN 5400QA1
1 VALVE-
LP,ENGINE,OUTBOARD
FRH120266M Item 1

### Page 20

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAS-A-001-01 Fig.BA Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Replacement of the Outboard LP Shut-Off Valve (5400QA1)
Page 20
CONF ALL
A
Z543
RIB23
RIB24
B
A
FRONT SPAR
B
(1)
15400QA1
ICN-A340-A-28XX5064-A-FAPE3-01DAS-A-001-01

### Page 21

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 21
(3) Task A340-A-28-XX-5064-01001-364A-A (A340-A-28-XX-5064-01ZZZ-364Z-A)
Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA2) Isolates Fuel Supply to ENG 2 on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
420 Access Panel 425AL, Panel 426AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FB Flowchart.
(a) Do an operational check to confirm the inboard LP shut-off valve (FIN
5400QA2) isolates fuel supply to ENG 2 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA2) isolates fuel supply to ENG 2 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the inboard LP shut-off valve (FIN 5400QA2) and send the
removed valve to Eaton in accordance with Ref. T ask A340-A-28-
XX-5064-02ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).

### Page 22

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 22
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA2) isolates fuel supply to ENG 2 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 23

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAV-A-003-01 Fig.FB Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Flowchart
Page 23
CONF ALL
NOYES
01
DO AN OPERATIONAL CHECK TO CONFIRM THE
INBOARD LP SHUT-OFF VALVE (5400QA2)
ISOLATES FUEL SUPPLY TO ENG 2
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE INBOARD LP SHUT-OFF VALVE (5400QA2)
AND SEND THE REMOVED VALVE TO EATON 01
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX5064-A-FAPE3-01DAV-A-003-01

### Page 24

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 24
(4) Task A340-A-28-XX-5064-02001-920A-A (A340-A-28-XX-5064-02ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA2) on LH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 542BB, Panel 542CZ542
Work location From Rib 8 to Rib 10
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 12M0090 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-802T ask 28-24-41-400-802
Procedure
Ref. Fig.BB Replacement of the Inboard LP Shut-Off Valve (5400QA2).
(a) Remove the inboard LP shut-off valve (FIN 5400QA2), refer to Ref. AMM T ask 28-
24-41-000-802:
FIN 5400QA2
1 VALVE-INBOARD,LP   Item (2) Retain
(b) Send the removed inboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new inboard LP shut-off valve (FIN 5400QA2), refer to Ref. AMM T ask
28-24-41-400-802:
FIN 5400QA2
1 VALVE-INBOARD,LP 12M0090 Item 2

### Page 25

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAU-A-001-01 Fig.BB Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Replacement of the Inboard LP Shut-Off Valve (5400QA2)
Page 25
CONF ALL
A
Z542
B
RIB8
FRONT
SPAR
A
RIB8 RIB10
B
(2)
25400QA2
ICN-A340-A-28XX5064-A-FAPE3-01DAU-A-001-01

### Page 26

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 26
(5) Task A340-A-28-XX-5064-03001-364A-A (A340-A-28-XX-5064-03ZZZ-364Z-A)
Do an Operational Check to Confirm the Inboard LP Shut-Off Valve
(5400QA3) Isolates Fuel Supply to ENG 3 on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
430 Access Panel 435AL, Panel 436AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FC Flowchart.
(a) Do an operational check to confirm the inboard LP shut-off valve (FIN
5400QA3) isolates fuel supply to ENG 3 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807.
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA3) isolates fuel supply to ENG 3 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the inboard LP shut-off valve (FIN 5400QA3) and send the
removed valve to Eaton in accordance with Ref. T ask A340-A-28-
XX-5064-03ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).

### Page 27

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 27
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the inboard LP shut-off
valve (FIN 5400QA3) isolates fuel supply to ENG 3 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 28

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAO-A-003-01 Fig.FC Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Flowchart
Page 28
CONF ALL
NOYES
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE INBOARD LP SHUT-OFF VALVE (5400QA3)
AND SEND THE REMOVED VALVE TO EATON 01
01
DO AN OPERATIONAL CHECK TO CONFIRM THE
INBOARD LP SHUT-OFF VALVE (5400QA3)
ISOLATES FUEL SUPPLY TO ENG 3
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX5064-A-FAPE3-01DAO-A-003-01

### Page 29

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 29
(6) Task A340-A-28-XX-5064-03001-920A-A (A340-A-28-XX-5064-03ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Inboard LP Shut-Off Valve
(5400QA3) on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 642BB, Panel 642CZ642
Work location From Rib 8 to Rib 10
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 12M0090 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-802T ask 28-24-41-400-802
Procedure
Ref. Fig.BC Replacement of the Inboard LP Shut-Off Valve (5400QA3).
(a) Remove the inboard LP shut-off valve (FIN 5400QA3), refer to Ref. AMM T ask 28-
24-41-000-802:
FIN 5400QA3
1 VALVE-INBOARD,LP   Item (2) Retain
(b) Send the removed inboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new inboard LP shut-off valve (FIN 5400QA3), refer to Ref. AMM T ask
28-24-41-400-802:
FIN 5400QA3
1 VALVE-INBOARD,LP 12M0090 Item 2

### Page 30

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAQ-A-002-01 Fig.BC Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Replacement of the Inboard LP Shut-Off Valve (5400QA3)
Page 30
CONF ALL
A
Z642
A
RIB8RIB10
B
B
RIB8
FRONT
SPAR
(2)
2 5400QA3
ICN-A340-A-28XX5064-A-FAPE3-01DAQ-A-002-01

### Page 31

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 31
(7) Task A340-A-28-XX-5064-04001-364A-A (A340-A-28-XX-5064-04ZZZ-364Z-A)
Do an Operational Check to Confirm the Outboard LP Shut-Off Valve
(5400QA4) Isolates Fuel Supply to ENG 4 on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
440 Access Panel 445AL, Panel 446AR
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Engine
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
ISI 00.00.00217
OIT 999.0066/15
Procedure
NOTE: Make sure that the operational check is performed on only one ENG at a time.
Ref. Fig.FD Flowchart.
(a) Do an operational check to confirm the outboard LP shut-off valve (FIN
5400QA4) isolates fuel supply to ENG 4 within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2), refer to Ref. AMM T ask 28-24-00-710-807:
1 If leak is not found:
a After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
b Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA4) isolates fuel supply to ENG 4 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).
2 If leak is found:
a Replace the outboard LP shut-off valve (FIN 5400QA4) and send
the removed valve to Eaton in accordance with Ref. T ask A340-A-
28-XX-5064-04ZZZ-920Z-A within the threshold given in PLANNING
INFORMATION paragraph 1.E.(2).

### Page 32

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 32
b After you complete all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A340-A-28-XX-5064-02ZZZ-
90AZ-A.
NOTE: If there are findings, send a report to the responsible
authority and to AIRBUS in accordance with the regulations,
refer to AIRBUS Ref. OIT 999.0066/15 and Ref. ISI
00.00.00217.
c Do an operational check again to confirm the outboard LP shut-off
valve (FIN 5400QA4) isolates fuel supply to ENG 4 in accordance with
Ref. T ask set A340-A-28-XX-5064-01ZZZ-93BZ-A at the interval given
in PLANNING INFORMATION paragraph 1.E.(2).

### Page 33

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAP-A-003-01 Fig.FD Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Flowchart
Page 33
CONF ALL
YES
THE FLOWCHARTS SUPPLEMENT THE INFORMATION GIVEN IN PARAGRAPHS "3.C. PROCEDURE" AND
"1.E. COMPLIANCE". THE FLOWCHARTS ARE NOT THE PRIMARY SOURCE FOR THE TASKS OR THE
COMPLIANCE TIMES GIVEN IN THIS SERVICE BULLETIN.
IS THERE A
LEAK
FOUND?
CHECK AGAIN 01
DO AN OPERATIONAL
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
NOTE:
REPLACE THE OUTBOARD LP SHUT-OFF VALVE (5400QA4)
AND SEND THE REMOVED VALVE TO EATON 01
01
DO AN OPERATIONAL CHECK TO CONFIRM THE
OUTBOARD LP SHUT-OFF VALVE (5400QA4)
ISOLATES FUEL SUPPLY TO ENG 4
NO
AFTER YOU COMPLETE ALL INSPECTIONS,
COMPLETE AND SEND THE INSPECTION
REPORT SHEET TO AIRBUS 01
ICN-A340-A-28XX5064-A-FAPE3-01DAP-A-003-01

### Page 34

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 34
(8) Task A340-A-28-XX-5064-04001-920A-A (A340-A-28-XX-5064-04ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Outboard LP Shut-Off Valve
(5400QA4) on RH side
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 643NB643
Work location From Rib 23 to Rib 24
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 1
Elapsed Time 4.00 h
Skills Engine
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 FRH120266M 1 VALVE
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-000-801T ask 28-24-41-400-801
Procedure
Ref. Fig.BD Replacement of the Outboard LP Shut-Off Valve (5400QA4).
(a) Remove the outboard LP shut-off valve (FIN 5400QA4), refer to Ref. AMM T ask
28-24-41-000-801:
FIN 5400QA4
1 VALVE-
LP,ENGINE,OUTBOARD
  Item (1) Retain
(b) Send the removed outboard LP shut-off valve to:
Eaton Fuel & Motion Control Systems Division
United Kingdom (UK)
(c) Install the new outboard LP shut-off valve (FIN 5400QA4), refer to Ref. AMM T ask
28-24-41-400-801:
FIN 5400QA4
1 VALVE-
LP,ENGINE,OUTBOARD
FRH120266M Item 1

### Page 35

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAN-A-002-01 Fig.BD Sol.AA SHEET 1/1
REV 00 Nov 13/25 A340-28-5064Replacement of the Outboard LP Shut-Off Valve (5400QA4)
Page 35
CONF ALL
A
A
Z643
RIB23
RIB24
B
FRONT SPAR
B
(1)
1 5400QA4
ICN-A340-A-28XX5064-A-FAPE3-01DAN-A-002-01

### Page 36

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 36
(9) Task A340-A-28-XX-5064-02001-90AA-A (A340-A-28-XX-5064-02ZZZ-90AZ-A)
Complete and Send the Inspection Report Sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig.RA Inspection Report
sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.

### Page 37

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAJ-A-004-01 Fig.RA Sol.AA SHEET 1/4
REV 00 Nov 13/25 A340-28-5064Inspection Report
Page 37
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-5064
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE OUTBOARD LP SHUT-OFF VALVE ISOLATES FUEL
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
LEAK FOUND? YES NO
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
SUPPLY TO ENG 1
SERIAL NUMBER OF THE OUTBOARD LP
SHUT-OFF VALVE (5400QA1) INSPECTED:
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
ICN-A340-A-28XX5064-A-FAPE3-01DAJ-A-004-01

### Page 38

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAK-A-004-01 Fig.RA Sol.AA SHEET 2/4
REV 00 Nov 13/25 A340-28-5064Inspection Report
Page 38
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-5064
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE INBOARD LP SHUT-OFF VALVE ISOLATES FUEL SUPPLY
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
TO ENG 2
SERIAL NUMBER OF THE INBOARD LP SHUT-OFF
LEAK FOUND?
VALVE (5400QA2) INSPECTED:
YES NO
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
ICN-A340-A-28XX5064-A-FAPE3-01DAK-A-004-01

### Page 39

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAL-A-004-01 Fig.RA Sol.AA SHEET 3/4
REV 00 Nov 13/25 A340-28-5064Inspection Report
Page 39
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-5064
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE INBOARD LP SHUT-OFF VALVE ISOLATES FUEL SUPPLY
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
SERIAL NUMBER OF THE INBOARD LP SHUT-OFF
LEAK FOUND?
VALVE (5400QA3) INSPECTED:
YES NO
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
TO ENG 3
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
ICN-A340-A-28XX5064-A-FAPE3-01DAL-A-004-01

### Page 40

A340-500/600
SERVICE BULLETIN
Figure ICN-A340-A-28XX5064-A-FAPE3-01DAM-A-004-01 Fig.RA Sol.AA SHEET 4/4
REV 00 Nov 13/25 A340-28-5064Inspection Report
Page 40
CONF ALL
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A340-28-5064
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION REPORT
DO AN OPERATIONAL CHECK TO CONFIRM THE OUTBOARD LP SHUT-OFF VALVE ISOLATES FUEL
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
SERIAL NUMBER OF THE OUTBOARD LP
LEAK FOUND?
SHUT-OFF VALVE (5400QA4) INSPECTED:
YES NO
TRANSFER OF TITLE?
IF VALVE WAS REPLACED:
DATE OF THE NEW VALVE INSTALLATION
FLIGHT CYCLES SINCE INSTALLATION OF THE
YES NOHAS THE VALVE BEEN REPLACED SINCE THE
NEW VALVE:
FLIGHT HOURS SINCE INSTALLATION OF THE
NEW VALVE:
ONTO THE AIRCRAFT:
SUPPLY TO ENG 4
IF LEAK FOUND - RECORD THE LEAK RATE
DURING THE CURRENT
INSPECTION:
ICN-A340-A-28XX5064-A-FAPE3-01DAM-A-004-01

### Page 41

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 41
D. PREPARATION FOR TEST
None
E. TEST
(1) Task A340-A-28-XX-5064-01001-320A-A (A340-A-28-XX-5064-01ZZZ-320Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 2
Elapsed Time 2.00 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-41-400-801T ask 28-24-41-400-802
Procedure
NOTE: The test procedure is required only if the LP shut-off valve(s) ( FIN 5400QA1
and/or FIN 5400QA2 and/or FIN 5400QA3 and/or FIN 5400QA4) is(are)
replaced.
(a) The logical workflow requires tests that must be accomplished in other tasks of
this Service Bulletin, these tests are given in the table below.
SB TASK AMM Task
Ref. T ask A340-A-28-XX-5064-01ZZZ-920Z-A
Ref. T ask A340-A-28-XX-5064-04ZZZ-920Z-A
Ref. AMM T ask 28-24-41-400-801
Ref. T ask A340-A-28-XX-5064-02ZZZ-920Z-A
Ref. T ask A340-A-28-XX-5064-03ZZZ-920Z-A
Ref. AMM T ask 28-24-41-400-802
F. CLOSE-UP
(1) Task A340-A-28-XX-5064-01001-740A-A (A340-A-28-XX-5064-01ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Referenced Information
Manuals/Drawings References/Sheets
AMM T ask 28-24-00-710-807
Procedure
(a) Make sure that the work area is clean and clear of tools and other items.

### Page 42

A340-500/600
SERVICE BULLETIN
REV 00 Nov 13/25 A340-28-5064
Page 42
(b) Do the close-up procedure as specified in the operational check to confirm LP
shut-off valves (FIN 5400QA1, FIN 5400QA2, FIN 5400QA3 and FIN 5400QA4)
isolates fuel supply to associated ENGs, refer to Ref. AMM T ask 28-24-00-710-
807.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A340-A-28-XX-5064-01001-90AA-A (A340-A-28-XX-5064-01ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you completed all the work specified in
this Service Bulletin.

### Page 43

A340-500/600
SERVICE BULLETIN
APPENDIX
REV 00 Nov 13/25 A340-28-5064
Page 43
APPENDIX
A. GLOSSARY
GLOSSARY
ACRONYM FULL FORM
ENG Engine
LH Left Hand
LP Low Pressure
RH Right Hand
RR Rolls Royce

### Page 44

A340-500/600
SERVICE BULLETIN
APPENDIX
REV 00 Nov 13/25 A340-28-5064
Page 44
B. REPORTING SHEET
TITLE: FUEL - A340 RR ENGINE FUEL LP SHUT-OFF VALVE - OPERATIONAL
CHECK TO CONFIRM LP VALVE ISOLATES FUEL SUPPLY TO
ASSOCIATED ENGINE
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 45

A340-500/600
SERVICE BULLETIN
APPENDIX
REV 00 Nov 13/25 A340-28-5064
Page 45
C. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.