# Airbus Service Bulletin A340-29-4096

Copy: Revision 02 ("FAA-2016-3701_A340-29-4096_R02"), 179 pages: PDF https://openairdocs.org/files/sha256/35/05/350514696d44c4a07250f735f8bfe2866a285015d89b8d93e3d1c368315d6113; text https://openairdocs.org/service-documents/airbus/a340-29-4096/file/350514696d44.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-3701; AD 2016-21-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-29-4096
- Latest revision known: A340-29-4096, Revision 01 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a340-29-4096

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-21-08](https://openairdocs.org/ad/2016-21-08.md), effective Dec 27, 2016: Revisions 01 and 02

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-29-4096/proposed.md).

## Text (179 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-3701; AD 2016-21-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - MAIN HYDRAULIC POWER - REPLACE CHECK
VALVE PN CAR401 WITH IMPROVED CHECK VALVE PN CAR402
MODIFICATION No.: 203972D50812
This page transmits Revision No.02 of Service Bulletin No.A340-29-4096
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No.02 issued to:
- Add illustrations showing the location of the existing storage seal, lower O-ring and back-up ring.
- In para DESCRIPTION, ’on aircraft’ between quotation marks replaced by ’on aircraft’ between
apostrophes to avoid computing issues.
- In para DESCRIPTION, ’on bench’ between quotation marks replaced by ’on bench’ between
apostrophes to avoid computing issues.
- In para INDUSTRY SUPPORT INFORMATION, tel and fax numbers deleted for AIRBUS
CUSTOMER SERVICES DIRECTORATE contact.
- In all Test subtasks, sentence added to ensure there are no leaks from the unions on the manifold.
- In para PRICE AND AVAILABILITY, sentence S10 deleted.
CHANGES
SUMMARY
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
REFERENCES / REPERCUSSIONS
 REFERENCES/REPERCUSSIONS TABLE
UPDATED
R
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
CONF 002
 CONFIGURATION DEFINITION UPDATED
 R
DESCRIPTION
 DESCRIPTION UPDATED
 R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
Price and Availability
 PRICE AND AVAILABILITY UPDATED
 R
INDUSTRY SUPPORT INFORMATION
 INDUSTRY SUPPORT INFORMATION UPDATED
 R
ACCOMPLISHMENT INSTRUCTIONS
TASK 294096- 831-848-001-Modify the
Green HP Hydraulic Manifold on Aircraft
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-201-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-201-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-930-201-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-730-201-001
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-849-001-Modify the
Blue HP Hydraulic Manifold on Aircraft
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-202-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-202-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-202-001
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-850-001-Modify the
Yellow HP Hydraulic Manifold on Aircraft
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-203-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-203-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-203-001
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-851-001-Modify the
Green HP Hydraulic Manifold on Aircraft
TASK SOLUTION UPDATED
NOTE UPDATED
R
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 294096-910-204-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-204-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-204-001
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-852-001-Modify the
Green HP Hydraulic Manifold on Bench
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-205-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-205-002
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-205-002
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-853-001-Modify the
Blue HP Hydraulic Manifold on Aircraft
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-206-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-206-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-206-001
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-854-001-Modify the
Blue HP Hydraulic Manifold on Bench
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-207-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-207-002
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-207-002
 SUBTASK SOLUTION UPDATED
 R
TASK 294096- 831-855-001-Modify the
Yellow HP Hydraulic Manifold on Aircraft
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-208-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-208-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-208-001
 SUBTASK SOLUTION UPDATED
 R
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
TASK 294096- 831-856-001-Modify the
Yellow HP Hydraulic Manifold on Bench
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 294096-910-209-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 294096-831-209-002
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 294096-730-209-002
 SUBTASK SOLUTION UPDATED
 R
Fig. A-GBAAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GBAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GBAAA Sheet 03
 SHEET ADDED
 N
Fig. A-GBDAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBDAA Sheet 03
 SHEET UPDATED
 R
Fig. A-GBDAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GBDAA Sheet 05
 SHEET ADDED
 N
Fig. A-GBBAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBBAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GBBAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GBBAA Sheet 03
 SHEET ADDED
 N
Fig. A-GBEAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBEAA Sheet 03
 SHEET UPDATED
 R
Fig. A-GBEAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GBEAA Sheet 05
 SHEET ADDED
 N
Fig. A-GBCAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBCAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GBCAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GBCAA Sheet 03
 SHEET ADDED
 N
Fig. A-GBFAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBFAA Sheet 03
 SHEET UPDATED
 R
Fig. A-GBFAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GBFAA Sheet 05
 SHEET ADDED
 N
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
Revision No.01 issued to:
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Update the effectivity.
Clarify the accomplishment instructions following operator requests after the accomplishment of this
Service Bulletin at original issue.
Update the illustrations.
REVISION SEQUENCE
ORIGINAL: Aug 08/14
REVISION No. : 01 - Jul 30/15
REVISION No. : 02 - Apr 08/16
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - MAIN HYDRAULIC POWER - REPLACE CHECK
VALVE PN CAR401 WITH IMPROVED CHECK VALVE PN CAR402
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 203972D50812
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Due to in service leakage problems with the Hydraulic Check Valve (CV) PN CAR401 a repetitive
inspection has been mandated by an Airworthiness Directive (AD) to address the problem.
CV PN CAR401, can be installed on:
- 5316JM101, at the Green High Pressure (HP) manifold, (FIN 5102JM)
- 5316JM102, at the Green High Pressure (HP) manifold, (FIN 5102JM)
- 5316JM201, at the Blue High Pressure (HP) manifold, (FIN 6103JM)
- 5316JM301, at the Yellow High Pressure (HP) manifold, (FIN 7103JM).
CV PN CAR402 will be introduced for production and for mandatory replacement on in-service aircraft
as the successor of CV PN CAR401.
This Service Bulletin introduces an improved CV PN CAR402 for A340 aircraft. Where CV PN CAR401
is installed it can be replaced on the aircraft by CV PN CAR402. Where CV PN CAR401 is installed
and torqued to a value higher than 250Nm, the manifold must be removed and the CV replaced on
the bench by CV PN CAR402. Modification No. 201384D50293 (Service Bulletin No. A340-29-4091)
introduced a torque value of 400Nm for CV PN CAR401.
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
SUMMARY
Accomplishment of this Service Bulletin cancels the requirements of Service Bulletin No. A340-29-4086
and AOT 29L001-12.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 YES
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 YES
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Component COMPD01
 1
 See SB
 Packing
Equipment BFEZ01
 1
 See SB
 Check Valve
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Standard tool TOOLD01
 1
 1,660.00
 Installation Tooling
Component COMPD01
 1
 See SB
 Packing
Equipment BFEZ01
 1
 See SB
 Check Valve
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
06Y 15R 31V 39N
 41N
 74W 83V 98W 98X AFR AIB ALD ALK
ARG BOE CAL CPA DGA DLH F2I FIN G8E GAF HFM HFY IBE
IRC IRM KAC LAN M3R MAU MDG MRJ
 O2X
 PAL PUE QAF ROI
S3R SAA SAS SFB SLM SVW SWR TAP THT THY UAE VCV
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 29.10.00.034
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
SUMMARY
OEB
 None
AOT
 A29L001-12
SIL
 None
ISI
 00.00.00135
00.00.00198
00.00.00207
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 294096-831-848-001: Modify the Green HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-849-001: Modify the Blue HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-850-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-851-001: Modify the Green HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-852-001: Modify the Green HP Hydraulic Manifold on Bench
TOTAL MANHOURS
 0.00
Task 294096-831-853-001: Modify the Blue HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-854-001: Modify the Blue HP Hydraulic Manifold on Bench
TOTAL MANHOURS
 0.00
Task 294096-831-855-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 0.00
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
SUMMARY
Task 294096-831-856-001: Modify the Yellow HP Hydraulic Manifold on Bench
TOTAL MANHOURS
 0.00
**CONF 002
Task 294096-831-848-001: Modify the Green HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-849-001: Modify the Blue HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-850-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-851-001: Modify the Green HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-852-001: Modify the Green HP Hydraulic Manifold on Bench
TOTAL MANHOURS
 10.50
ELAPSED TIME (HOURS)
 10.50
Task 294096-831-853-001: Modify the Blue HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-854-001: Modify the Blue HP Hydraulic Manifold on Bench
TOTAL MANHOURS
 10.50
ELAPSED TIME (HOURS)
 10.50
Task 294096-831-855-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-856-001: Modify the Yellow HP Hydraulic Manifold on Bench
TOTAL MANHOURS
 10.50
ELAPSED TIME (HOURS)
 10.50
APPENDICES
**CONF ALL
Appendix 01: PN Evolution of the Green, Blue and Yellow System HP Hydraulic Manifolds
Appendix 02: Local Manufacture of Tooling
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
B
FR53.2
FR53.1
5102JM
FR46
FR47
7103JM
6103JM
Z190
A
A
B
MANIFOLD
MANIFOLD
MANIFOLD
F_SB_294096_6_SAAA_01_00
Figure A-GSAAA - Sheet 01
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - MAIN HYDRAULIC POWER - REPLACE CHECK
VALVE PN CAR401 WITH IMPROVED CHECK VALVE PN CAR402
MODIFICATION No.: 203972D50812
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This modification is embodied before delivery on aircraft with Manufacturer
Serial Number (MSN) 1537 and subsequent.
NOTE
: This Service Bulletin is only applicable to aircraft on which Mod No.
54491S18191 is embodied or Service Bulletin No. A340-29-4078 has been
accomplished.
NOTE
: This Service Bulletin is not applicable to aircraft on which Mod No.
203796D50774 has been embodied or Service Bulletin No. A340-29-4095 has
been accomplished.
(1) Models
340-211 340-212 340-213 340-311 340-312 340-313
(2) Effectivity by MSN
0002 0004 0009 0014 0020 0022-0023 0025-0026 0029 0031
 0038 0041 0043-0044
0046-0047 0049 0051 0056-0058 0061 0063 0074-0076 0078-0081 0084-0085
0089-0091 0093-0094 0101 0104 0114-0115 0117 0123 0125-0126 0128 0134-0137
0139 0142
 0145-0147 0149-0152 0154 0156-0160
 0163-0164 0166-0170 0174-0175
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
0178-0180 0185-0187 0190 0192-0194 0196-0197 0199 0201-0202 0204 0207-0208
0210 0212-0215
 0217-0218
 0220-0221 0227-0228 0233 0236-0237 0242-0243
0245-0246 0252 0257 0260 0263-0264 0268 0270 0273-0274 0278 0280 0282 0292
0297 0302 0304 0307 0310 0318-0319 0321 0325 0327 0329 0331-0332 0335 0347
0352 0354-0355 0363 0367 0373-0374 0377-0379 0381 0385 0387 0390 0395 0399
0402 0406 0411 0413 0415 0424 0429-0430 0433-0435 0438 0446-0447 0450 0459
0467 0470 0474 0483 0528 0538 0541 0544-0546 0554 0556 0559 0561-0562 0582
0585 0590 0598 0643 0646 0651 0668 0793 0800 0835 0844 0921 0938 0955
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06Y
 0139 0149
15R
 0151
31V
 0093
 0381
39N
 0168
 0174
41N
 0009
74W
 0047 0051
83V
 0280 0292
98W
 0014 0022
98X
 0429
AFR
 0029 0078 0084 0186 0207 0237 0245 0246 0260 0307 0310 0377
0399
AIB
 0192 0243
 0264
ALD
 0156 0159 0178
ALK
 0374
ARG
 0063 0074 0080 0085 0094 0123 0126 0128 0170 0193 0373
BOE
 0554
CAL
 0402 0406 0411 0415 0433 0541
CPA
 0136 0137 0142 0147 0157 0160 0208 0218 0220 0227 0228
DGA
 0075 0081
DLH
 0135 0158 0213 0233 0252 0297 0304 0321 0325 0327 0335 0347
0352 0354 0379 0390 0434 0447
F2I
 0038 0043 0114
 0214
FIN
 0058 0835 0844 0921 0938
G8E
 0187 0196
GAF
 0274 0355
HFM
 0117 0210
 0367
HFY
 0190 0202
IBE
 0125 0134 0145 0146 0217 0221 0329 0483
IRC
 0002
IRM
 0020 0056 0164 0282
KAC
 0089 0090 0101 0104
LAN
 0363
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
OPERATOR
 MSN
M3R
 0061
MAU
 0076 0152 0194 0268 0793 0800
MDG
 0319
MRJ
 0257
O2X
 0273
 0278
PAL
 0302 0318 0332 0387 0459 0474
PUE
 0212 0215
QAF
 0026 0528
ROI
 0199
 0201
S3R
 0004 0204
SAA
 0197 0378 0544 0582 0590 0643 0646 0651
SAS
 0167 0413 0424 0430 0435 0450 0467 0470
SFB
 0046
SLM
 0049 0242
SVW
 0955
SWR
 0150 0154 0169 0175 0179 0263 0538 0545 0546 0556 0559 0561
0562 0585 0598
TAP
 0041 0044 0079 0091
THT
 0385 0395 0438 0446 0668
THY
 0023 0025 0057 0115 0180 0270 0331
UAE
 0163 0166 0185 0236
VCV
 0031
(4) Configuration by MSN
MSN
 CONFIGURATION
0002 0004 0009 0014 0020 0022 0023 0025 0029 0031 0038
0041 0043 0044 0047 0049 0051 0056 0057 0061 0063 0074
0075 0076 0078 0079 0080 0081 0084 0085 0089 0090 0091
0093 0094 0101 0104 0114 0115 0117 0123 0125 0128 0134
0135 0136 0137 0139 0142 0145 0146 0147 0149 0151 0152
0156 0157 0158 0159 0160 0163 0164 0166 0167 0170 0178
0180 0185 0186 0187 0192 0193 0194 0196 0197 0199 0201
0202 0204 0207 0208 0210 0212 0213 0214 0215 0217 0218
0220 0221 0227 0228 0233 0237 0242 0243 0245 0246 0252
0257 0260 0264 0268 0270 0273 0274 0278 0280 0282 0292
0297 0302 0304 0307 0310 0318 0319 0321 0325 0327 0329
0331 0332 0335 0347 0352 0354 0363 0367 0373 0374 0377
0378 0379 0381 0385 0387 0390 0395 0399 0402 0406 0411
0413 0415 0424 0429 0430 0433 0434 0435 0438 0446 0447
0450 0459 0467 0470 0474 0483 0528 0541 0544 0554 0582
0590 0643 0646 0651 0668 0793 0800
001 002
0026 0046 0058 0126 0150 0154 0168 0169 0174 0175 0179
0190 0236 0263 0355
 0538 0545 0546 0556 0559 0561 0562
0585 0598 0835 0844 0921 0938 0955
002
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin that
have not embodied Modification No. 201384D50293 or not accomplished Service
Bulletin A340-29-4091.
**CONF 002
Config. 002 is valid for all the aircraft given in the effectivity of this Service Bulletin that
have embodied Modification No. 201384D50293, or have accomplished Service Bulletin
No. A340-29-4091 and may also have accomplished AOT 29L001-12.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLD01
 As required
Component COMPD01
 1
Equipment BFEZ01
 1
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLD01
 As required
Component COMPD01
 1
Equipment BFEZ01
 1
Standard tool TOOLD01
 1
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Due to in service leakage problems with the Hydraulic Check Valve (CV) PN CAR401 a
repetitive inspection has been mandated by an Airworthiness Directive (AD) to address
the problem.
CV PN CAR401, can be installed on:
- 5316JM101, at the Green High Pressure (HP) manifold, (FIN 5102JM)
- 5316JM102, at the Green High Pressure (HP) manifold, (FIN 5102JM)
- 5316JM201, at the Blue High Pressure (HP) manifold, (FIN 6103JM)
- 5316JM301, at the Yellow High Pressure (HP) manifold, (FIN 7103JM).
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
CV PN CAR402 will be introduced for production and for mandatory replacement on in-
service aircraft as the successor of CV PN CAR401.
(2) Objective/Action
This Service Bulletin introduces an improved CV PN CAR402 for A340 aircraft. Where
CV PN CAR401 is installed it can be replaced on the aircraft by CV PN CAR402. Where
CV PN CAR401 is installed and torqued to a value higher than 250Nm, the manifold
must be removed and the CV replaced on the bench by CV PN CAR402. Modification
No. 201384D50293 (Service Bulletin No. A340-29-4091) introduced a torque value of
400Nm for CV PN CAR401.
(3) Advantages
Accomplishment of this Service Bulletin cancels the requirements of Service Bulletin No.
A340-29-4086 and AOT 29L001-12.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
NOTE
: To accomplish this Service Bulletin, two possibilities are available for aircraft
in Config. 002 for each HP Hydraulic Manifold:
- either modify the HP manifold ’on aircraft’ for aircraft on which the CVs
have been re-torqued in accordance with AOT 29-L001-12
or
- modify the HP manifold ’on bench’ for aircraft on which the CVs have not
been re-torqued in accordance with AOT 29-L001-12.
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 294096-831-848-001: Modify the Green HP Hydraulic Manifold on Aircraft
(1) Modify the Green HP Manifold (FIN 5102JM)
(2) Reidentify the Green HP Manifold (FIN 5102JM)
Task 294096-831-849-001: Modify the Blue HP Hydraulic Manifold on Aircraft
(1) Modify the Blue HP Manifold (FIN 6103JM)
(2) Reidentify the Blue Manifold (FIN 6103JM)
Task 294096-831-850-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
(1) Modify the Yellow HP Manifold (FIN 7103JM)
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
(2) Reidentify the Yellow HP Manifold (FIN 7103JM)
**CONF 002
Task 294096-831-851-001: Modify the Green HP Hydraulic Manifold on Aircraft
(1) Modify the Green HP Manifold (FIN 5102JM)
(2) Reidentify the Green HP Manifold (FIN 5102JM)
Task 294096-831-852-001: Modify the Green HP Hydraulic Manifold on Bench
(1) Remove the Green HP Manifold (FIN 5102JM)
(2) Modify the Green HP Manifold (FIN 5102JM)
(3) Reidentify the Green HP Manifold (FIN 5102JM)
(4) Install the Green HP Manifold (FIN 5102JM)
Task 294096-831-853-001: Modify the Blue HP Hydraulic Manifold on Aircraft
(1) Modify the Blue HP Manifold (FIN 6103JM)
(2) Reidentify the Blue HP Manifold (FIN 6103JM)
Task 294096-831-854-001: Modify the Blue HP Hydraulic Manifold on Bench
(1) Remove the Blue HP Manifold (FIN 6103JM)
(2) Modify the Blue HP Manifold (FIN 6103JM)
(3) Reidentify the Blue HP Manifold (FIN 6103JM)
(4) Install the Blue HP Manifold (FIN 6103JM)
Task 294096-831-855-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
(1) Modify the Yellow HP Manifold (FIN 7103JM)
(2) Reidentify the Yellow HP Manifold (FIN 7103JM)
Task 294096-831-856-001: Modify the Yellow HP Hydraulic Manifold on Bench
(1) Remove the Yellow HP Manifold (FIN 7103JM)
(2) Modify the Yellow HP Manifold (FIN 7103JM)
(3) Reidentify the Yellow HP Manifold (FIN 7103JM)
(4) Install the Yellow HP Manifold (FIN 7103JM)
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
**CONF 001
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the threshold
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Manifold to be modified
 Threshold
 Action
Green HP Hydraulic
Manifold
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-848 001 Modify the
Green HP Hydraulic Manifold on Aircraft
Blue HP Hydraulic
Manifold
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-849 001 Modify the Blue
HP Hydraulic Manifold on Aircraft
Yellow HP Hydraulic
Manifold
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-850 001 Modify the
Yellow HP Hydraulic Manifold on Aircraft
**CONF 002
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the threshold
given but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
Manifold to be modified
 Threshold
 Action
Green HP Hydraulic
Manifold where CV have
been re-torqued in
accordance with AOT 29-
L001-12
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-851 001 Modify the
Green HP Hydraulic Manifold on Aircraft
Green HP Hydraulic
Manifold where CV have
not been re-torqued in
accordance with AOT 29-
L001-12
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-852 001 Modify the
Green HP Hydraulic Manifold on Bench
Blue HP Hydraulic
Manifold where CV have
been re-torqued in
accordance with AOT 29-
L001-12
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-853 001 Modify the Blue
HP Hydraulic Manifold on Aircraft
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
Manifold to be modified
 Threshold
 Action
Blue HP Hydraulic
Manifold where CV have
not been re-torqued in
accordance with AOT 29-
L001-12
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-854 001 Modify the Blue
HP Hydraulic Manifold on Bench
Yellow HP Hydraulic
Manifold where CV have
been re-torqued in
accordance with AOT 29-
L001-12
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-855 001 Modify the
Yellow HP Hydraulic Manifold on Aircraft
yellow HP Hydraulic
Manifold where CV have
not been re-torqued in
accordance with AOT 29-
L001-12
36 months from Issue of
this Service Bulletin
Do TASK 294096-831-856 001 Modify the
Yellow HP Hydraulic Manifold on Bench
**CONF ALL
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 294096-831-848-001: Modify the Green HP Hydraulic Manifold on Aircraft
Get Access
 1.00
On Aircraft
Modify the Green HP Manifold (FIN 5102JM)
 2.00
Reidentify the Green HP Manifold (FIN 5102JM)
 0.50
Tests
 3.00
Close-Up
 1.00
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
Task 294096-831-849-001: Modify the Blue HP Hydraulic Manifold on Aircraft
Get Access
 1.00
On Aircraft
Modify the Blue HP Manifold (FIN 6103JM)
 2.00
Reidentify the Blue Manifold (FIN 6103JM)
 0.50
Tests
 3.00
Close-Up
 1.00
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-850-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
Get Access
 1.00
On Aircraft
Modify the Yellow HP Manifold (FIN 7103JM)
 2.00
Reidentify the Yellow HP Manifold (FIN 7103JM)
 0.50
Tests
 3.00
Close-Up
 1.00
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-851-001: Modify the Green HP Hydraulic Manifold on Aircraft
On Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-852-001: Modify the Green HP Hydraulic Manifold on Bench
On Aircraft
On Bench
TOTAL MANHOURS
 0.00
Task 294096-831-853-001: Modify the Blue HP Hydraulic Manifold on Aircraft
On Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-854-001: Modify the Blue HP Hydraulic Manifold on Bench
On Aircraft
On Bench
TOTAL MANHOURS
 0.00
Task 294096-831-855-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
On Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-856-001: Modify the Yellow HP Hydraulic Manifold on Bench
On Aircraft
On Bench
TOTAL MANHOURS
 0.00
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
**CONF 002
Task 294096-831-848-001: Modify the Green HP Hydraulic Manifold on Aircraft
On Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-849-001: Modify the Blue HP Hydraulic Manifold on Aircraft
On Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-850-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
On Aircraft
TOTAL MANHOURS
 0.00
Task 294096-831-851-001: Modify the Green HP Hydraulic Manifold on Aircraft
Get Access
 1.00
On Aircraft
Modify the Green HP Manifold (FIN 5102JM)
 2.00
Reidentify the Green HP Manifold (FIN 5102JM)
 0.50
Tests
 3.00
Close-Up
 1.00
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-852-001: Modify the Green HP Hydraulic Manifold on Bench
Get Access
 1.50
On Aircraft
Install the Green HP Manifold (FIN 5102JM)
 1.00
On Bench
Remove the Green HP Manifold (FIN 5102JM)
 1.00
Modify the Green HP Manifold (FIN 5102JM)
 2.00
Reidentify the Green HP Manifold (FIN 5102JM)
 0.50
Tests
 3.00
Close-Up
 1.50
TOTAL MANHOURS
 10.50
ELAPSED TIME (HOURS)
 10.50
Task 294096-831-853-001: Modify the Blue HP Hydraulic Manifold on Aircraft
Get Access
 1.00
On Aircraft
Modify the Blue HP Manifold (FIN 6103JM)
 2.00
Reidentify the Blue HP Manifold (FIN 6103JM)
 0.50
Tests
 3.00
Close-Up
 1.00
TOTAL MANHOURS
 7.50
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
Task 294096-831-853-001: Modify the Blue HP Hydraulic Manifold on Aircraft
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-854-001: Modify the Blue HP Hydraulic Manifold on Bench
Get Access
 1.50
On Aircraft
Remove the Blue HP Manifold (FIN 6103JM)
 1.00
Install the Blue HP Manifold (FIN 6103JM)
 1.00
On Bench
Modify the Blue HP Manifold (FIN 6103JM)
 2.00
Reidentify the Blue HP Manifold (FIN 6103JM)
 0.50
Tests
 3.00
Close-Up
 1.50
TOTAL MANHOURS
 10.50
ELAPSED TIME (HOURS)
 10.50
Task 294096-831-855-001: Modify the Yellow HP Hydraulic Manifold on Aircraft
Get Access
 1.00
On Aircraft
Modify the Yellow HP Manifold (FIN 7103JM)
 2.00
Reidentify the Yellow HP Manifold (FIN 7103JM)
 0.50
Tests
 3.00
Close-Up
 1.00
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
Task 294096-831-856-001: Modify the Yellow HP Hydraulic Manifold on Bench
Get Access
 1.50
On Aircraft
Remove the Yellow HP Manifold (FIN 7103JM)
 1.00
Install the Yellow HP Manifold (FIN 7103JM)
 1.00
On Bench
Modify the Yellow HP Manifold (FIN 7103JM)
 2.00
Reidentify the Yellow HP Manifold (FIN 7103JM)
 0.50
Tests
 3.00
Close-Up
 1.50
TOTAL MANHOURS
 10.50
ELAPSED TIME (HOURS)
 10.50
**CONF ALL
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer’s Empty Weight (MEW) and do not include operator’s items. For the definition of
MEW and operator’s items, refer to the Weight and Balance Manual (WBM) Chapter 1-00-07.
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
Weight (kg)
 Weight (lb)
 Balance (kgm)
 Balance (lb.ft)
A340-200
 -1.752
 -3.863
 -59.177
 -428.024
A340-300
 -1.752
 -3.863
 -65.299
 -472.3
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-11-11 20-23-11
20-23-22 20-29-00 29-00-00
29-11-53 29-12-53 29-13-53
Consumable Material List (CML)
ATA Common Support Data Dictionary (CSDD),
Chapter 2
Elec. Std. Practices Manual (ESPM)
 20-55-00
Process and Material Specification (PMS)
 Process and Material Specification
(PMS) 01-06-12
Standards Manual (SM)
Weight and Balance Manual (WBM)
 Chapter 1-00-07
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-11-11 20-23-11
20-23-22 20-29-00 29-00-00
29-11-53 29-12-53 29-13-53
Consumable Material List (CML)
ATA Common Support Data Dictionary (CSDD),
Chapter 2
Elec. Std. Practices Manual (ESPM)
 20-55-00
Process and Material Specification (PMS)
 Process and Material Specification
(PMS) 01-06-12
Standards Manual (SM)
Weight and Balance Manual (WBM)
 Chapter 1-00-07
**CONF ALL
K. PUBLICATION AFFECTED
Aircraft Maintenance Manual (AMM)
 29-11-53 29-12-53 29-13-53
29-10-00
Illustrated Parts Catalog (IPC)
 29-11-53 29-12-53 29-13-53
29-11-03 29-12-03 29-13-03
Maintenance Planning Document (MPD)
 29-10-00-19-1
29-10-00-19-2
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
L. INTERCHANGEABILITY/MIXABILITY
The interchangeability/mixability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
**CONF 001
DESCRIPTION
 OLD PART N˚
 NEW PART N˚
 INT
 MIXABILITY
 SEE
NOTES
Seal Assy
 818114
 NAS1612-24
 03
 Not
Applicable
(1) (2)
Valve-check
 CAR401
 CAR402
 03
 NO
 (2)
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
NOTE
: Only the mixability configuration(s) and condition(s) stated in this Service
Bulletin are approved.
NOTE
 (1)
: The Seal and Check Valve are not interchangeable, but are one way
interchangeable when changed together.
NOTE
 (2)
: Manifold assembly equipped with PN CAR402 is not interchangeable with
Manifold assembly equipped with PN CAR401.
**CONF 002
DESCRIPTION
 OLD PART N˚
 NEW PART N˚
 INT
 MIXABILITY
 SEE
NOTES
Seal Assy
 818114
 NAS1612-24
 03
 Not
Applicable
(1) (2)
Valve-check
 CAR401
 CAR402
 03
 NO
 (2)
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
NOTE
: Only the mixability configuration(s) and condition(s) stated in this Service
Bulletin are approved.
NOTE
 (1)
: The Seal and Check Valve are not interchangeable, but are one way
interchangeable when changed together.
NOTE
 (2)
: Manifold assembly equipped with PN CAR402 is not interchangeable with
Manifold assembly equipped with PN CAR401.
**CONF ALL
M. SPARES
Valve-check CAR401
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
AIRBUS Material, Logistics and Suppliers do not stock standard hardware as competitive
multiple suppliers ensure access to minimum prices. AIRBUS recommends Customers
with aircraft shown in the effectivity of this Service Bulletin to send a purchase order to
KLX Aerospace Solutions. The address is:
Component COMPD01
 KLX Aerospace Solutions
10000 NW 15th Terrace Miami
FL 33172
USA
Tel EMEA: +49 (0) 40 822 285 31500
Tel US: +1 305 925 2600
Tel ASIA: +1 310 900 1300
Fax EMEA: +49 (0) 40 822 285 31010
Fax US: +1 305 507 7191
Fax ASIA: +1 310 819 1200
SITA: MIAMMCR
E-Mail: AOGdesk@klx.com
internet: http://www.KLXaerospace.com
or, alternatively any other source on the open
market.
Vendor parts are to be procured from
Equipment BFEZ01
 UTC AEROSPACE SYSTEMS (UTAS)
13 AVENUE DE L’EGUILLETTE
95310 SAINT OUEN L’AUMONE
FRANCE
For ordering by fax: +33 (0)1 34 32 63 10
For ordering by phone: +33 (0)1 34 32 63 00
(2) Price and Availability
No AIRBUS kit will be provided.
Operator supplied standard hardware parts required to accomplish this Service Bulletin
are to be supplied from the Operator’s stock.
B. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
E-mail: monitored.retrofit@airbus.com
For the accomplishment of this Service Bulletin before Jul 31/17, AIRBUS will credit the
manhours indicated in this Service Bulletin at the agreed in-house warranty labor rate for
claims received not later than 90 days after completion of the last affected aircraft of your
fleet.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
To accomplish this Service Bulletin it is necessary to use the consumables listed in AMM
Task 20-23-22-910-801.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Phosphate Ester Hydraulic Fluid-
General Power
02ABA1
 As required
Varnish Polyurethane-- Marking
Structure
04SAB2
 As required
Varnish Polyurethane-Low Voc
External Structure
04SBA3
 As required
Non Aqueous Cleaner - General
 08BAA9
 As required
Non Aqueous Cleaner-- Petroleum
Based
08BBB1
 As required
Wire-Locking Dia: 1 Mm (0.041
Inch) Cres
14QGC1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
2
 NAS1612-24
 4
 PACKING
 (2)
 818114
 03
4
 NAS1612-8
 2
 PACKING
8
 NAS1612-16
 8
 PACKING
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
14
 NAS1612-10
 3
 PACKING
15
 NAS1612-12
 3
 PACKING
21
 NAS1612-4
 1
 PACKING
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
(3) Equipment
Equipment BFEZ01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
3
 CAR402
 4
 VALVE
 (3)
 CAR401
 03
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
For the table to identify the PN evolution o f the Green, Blue and Yello w system HP Hydraulic
Manifolds, refer to Fig. A-GABAA
 given in Appendix 01: PN Evolution of the Green, Blue and
Yellow System HP Hydraulic Manifolds .
F. TOOLING
(1) Tooling - Price and Availability
(a) Procurement Addresses
NOTE
: Tooling that follows must be requested for aircraft in CONF 002
only.
Customers with aircraft shown in the effectivity of this Service Bulletin should send
a purchase order to AIRBUS. Quote the number of this Service Bulletin. The
address is:
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
Standard tool TOOLD01
 AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 Hamburg
Germany
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 40 12
For ordering by E-mail:
ifd.spares@airbus.com
As an alternative, the operators can
manufacture the tool kit locally at their
workshop, refer to Appendix 02: Local
Manufacture of Tooling .
(b) Price and Availability
Standard tool TOOLD01
Cost
 1,660.00 USD
Availability
 60 calendar days from receipt of order
(2) Tools
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
54
 97F29108805000
 Kit-Instl, CAR401 VLV
 1
(3) Special Tools
None
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 294096-831-848-001 - Modify the Green HP Hydraulic Manifold on Aircraft
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: DO NOT WORK ON ALL THREE HYDRAULIC SYSTEMS DURING THE SAME
MAINTENANCE INPUT WITH THE SAME MAINTENANCE PERSONNEL. THIS
IS TO MAKE SURE THAT A POSSIBLE MAINTENANCE ERROR ON ONE
SYSTEM IS NOT DONE AGAIN ON A DIFFERENT SYSTEM. A MAINTENANCE
ERROR ON MORE THAN ONE HYDRAULIC SYSTEM CAN CAUSE SYSTEM
FAILURE ON MULTIPLE SYSTEMS. IF MAINTENANCE IS NECESSARY ON
MORE THAN ONE SYSTEM AT THE SAME TIME AND INVOLVES LINES /
COMPONENTS DISCONNECTION, DIFFERENT MAINTENANCE PERSONNEL
MUST BE USED FOR EACH SYSTEM.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: AIRBUS generally recommends not to open th e three hydraulic systems during
the same maintenance input. Therefore it is recommended to apply this Service
Bulletin during two different maintenance inputs, for instance the Yellow and Blue
hydraulic system first and the Green hydraulic system at a later opportunity.
NOTE
: Discarded parts must be managed at the operator’s discretion.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for further
instructions and approval.
Task Associated Data
**CONF 001
Zone
147 190
Modified FIN
5102JM 5316JM101 5316JM102
Access
Door
 197CB 811
Manpower
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
**CONF 002
Manpower
TOTAL MANHOURS
 0.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 294096-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-11-11-911-803
Task 20-29-00-911-801
Task 29-00-00-910-805
Consumable Material List (CML)
(a) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Materials List (CML).
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the safety procedures of the h ydraulic systems, refer to AMM Task
29-00-00-910-805.
(f) For the removal/installation of O-ring seals, refer to AMM Task 20-29-00-911-801.
(g) Put a blanking plug on an open manifold port.
(h) For wirelocking safety procedures and warnings, refer to AMM Task
20-11-11-911-803.
(2) Subtask 294096-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
None
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 294096-941-201-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 20-23-22-910-801
Task 29-11-53-000-806
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers are closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Do the Job Set-up procedure for the removal of the CV FIN 5316JM101 and FIN
5316JM102, refer to AMM Task 29-11-53-000-806.
(c) Inspect the red marking on all the manifold unions. Apply red marking on the
unions where it is not visible, refer to AMM Task 20-23-22-910-801.
**CONF 002
None
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 294096-831-201-001 - Modify the Green HP Manifold (FIN 5102JM)
Work Zones and Access Panels
Zone
 Access/Work location
147
 Access
 Door 811, Door 197CB
Work location
 from Frame 53.1 to Frame 53.2
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
2
 NAS1612-24
 2
 PACKING
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Equipment BFEZ01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
3
 CAR402
 2
 VALVE
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Phosphate Ester Hydraulic
Fluid-General Power
02ABA1
 As required
Varnish Polyurethane--
Marking Structure
04SAB2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Wire-Locking Dia: 1 Mm
(0.041 Inch) Cres
14QGC1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 20-23-22-910-801
Task 29-11-53-000-806
Fig. A-GBAAA
Removal and Installation of the CVs and
Re-identification of the Green Hydraulic
System HP Manifold
Sheet 01
Sheet 02
Sheet 03
(a) Remove the CVs from the Green HP manifold (FIN 5102JM), refer to AMM Task
29-11-53-000-806.
1
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340
SERVICE BULLETIN
CAUTION
: DO NOT USE POINTED, SHARP OR METAL TOOLS TO
REMOVE THE O-RING OR SQUARE SEAL OR BACK-UP
RINGS. SHARP EDGES CAN CAUSE DAMAGE TO THE
BOBBINS (GROOVES OR SEAL CONTACT SURFACES).
As shown in Fig. A-GBAAA Sheet 01
 , View B, cut and discard the lockwire
then remove:
FIN 5316JM101
1 Valve-check CAR401 Item (3) Discard
FIN 5316JM101
1 Seal Assy 818114 Item (2) Discard
and
FIN 5316JM102
1 Valve-check CAR401 Item (3) Discard
FIN 5316JM102
1 Seal Assy 818114 Item (2) Discard
(b) Install the CVs on the Green HP manifold (FIN 5102JM).
1
 Clean the related components and work areas with:
Non Aqueous
Cleaner - General
08BAA9 As required
and
Textile - Lint Free
Cotton
14SBA1 As required
2
CAUTION
: ONLY USE THE SPECIFIED LUBRICANT TO LUBRICATE
THE FITTING THREADS.
Apply to the threads of the CVs:
Phosphate Ester
Hydraulic Fluid-
General Power
02ABA1 As required
3
 Discard the storage seals from the new CVs.
4
 As shown in Fig. A-GBAAA Sheet 01
 ,V i e wBa n d Fig. A-GBAAA Sheet 03
 ,
install:
FIN 5316JM101
1 Valve-check CAR402 Item 3
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340
SERVICE BULLETIN
FIN 5316JM101
1 Packing NAS1612-24 Item 2
and
FIN 5316JM102
1 Valve-check CAR402 Item 3
FIN 5316JM102
1 Packing NAS1612-24 Item 2
a
 Before installation, make sure that the back-up ring is flush with the
groove in the CVs, Item 3.
(c) Torque the CVs, Item 3, two times:
1
 Torque the CVs between 230 and 250 Nm (169.64-184.39 lbf.ft).
2
 Undo the CVs by a 1/8th turn.
3
 Torque the CVs between 230 and 250 Nm (169.64-184.39 lbf.ft).
(d) Make a red mark on the CV and the manifold, refer to AMM Task
20-23-22-910-801.
1
 Use:
Varnish
Polyurethane--
Marking Structure
04SAB2 As required
(e) As shown in Fig. A-GBAAA Sheet 01
 , View B, safety the two CVs, Item 3, with:
Wire-Locking Dia: 1
Mm (0.041 Inch)
Cres
14QGC1 As required
(2) Subtask 294096-930-201-001 - Reidentify the Green HP Manifold (FIN 5102JM)
Work Zones and Access Panels
Zone
 Access/Work location
147
 Access
 Door 811, Door 197CB
Work location
 from Frame 53.1 to Frame 53.2
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish Polyurethane-Low
Voc External Structure
04SBA3
 As required
Non Aqueous Cleaner--
Petroleum Based
08BBB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
Fig. A-GBAAA
Removal and Installation of the CVs and
Re-identification of the Green Hydraulic
System HP Manifold
Sheet 01
Sheet 02
Sheet 03
(a) Re-identify the Green HP manifold (FIN 5102JM) refer to Process and Material
Specification (PMS) 01-06-12, Fig. A-GBAAA Sheet 01
 , Fig. A-GBAAA Sheet 02
 ,
Views C and D (For information) and the table given in Appendix 01: PN Evolution
of the Green, Blue and Yellow System HP Hydraulic Manifolds .
1
 Clean the Manifold identification PN located on the body of the Green HP
Manifold (FIN /5102JM), use:
Textile - Lint Free
Cotton
14SBA1 As required
made moist with
Non Aqueous
Cleaner-- Petroleum
Based
08BBB1 As required
2
 Use an indelible ink pen to re-identify the Green HP Manifold with the new PN,
refer to the table, given in Appendix 01: PN Evolution of the Green, Blue and
Yellow System HP Hydraulic Manifolds .
NOTE
: If old HP manifold PN cannot be found at the location shown into
Fig. A-GBAAA Sheet 02
 , Views C and D, the IPC body manifold PN
should be used to find the new HP manifold PN, refer to the table
given in Appendix 01: PN Evolution of the Green, Blue and Yellow
System HP Hydraulic Manifolds
NOTE
: In case the old PN is written in the hidden face of the Green HP
Manifold, cross the old PN and reidentify the manifold on a visible
face.
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340
SERVICE BULLETIN
3
 Apply varnish to the new identification PN, use:
Varnish
Polyurethane-Low
Voc External
Structure
04SBA3 As required
**CONF 002
None
**CONF ALL
D. TEST
**CONF 001
(1) Subtask 294096-730-201-001 - Test of the Green Hydraulic Manifold (FIN 5102JM)
Work Zones and Access Panels
Zone
 Access/Work location
147
 Access
 Door 811, Door 197CB
Work location
 from Frame 53.1 to Frame 53.2
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 20-23-11-400-801
Task 20-23-11-917-801
Task 20-23-11-917-802
Task 20-23-22-910-801
Task 20-29-00-911-801
Task 29-00-00-210-801
Task 29-00-00-863-801
Task 29-00-00-864-801
Task 29-11-53-400-806
Fig. A-GCAAA
Torque Check of the Hydraulic Unions
on the Green Hydraulic System HP
Manifold
Sheet 01
(a) Inspect the red marking on all the plug-in unions on the manifold.
1
 If any red marking is not aligned:
a
 Disconnect the pipe from the plug-in union.
b
 Remove the plug-in union from the manifold.
c
 Replace the packing of the plug-in union with a new one, refer to AMM
Task 20-29-00-911-801.
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340
SERVICE BULLETIN
d
 As shown in Fig. A-GCAAA Sheet 01
 , View B, install and tighten
all removed plug-in unions on the manifold, refer to AMM Task
20-29-00-911-801 and Table 1, below.
e
 As shown in Fig. A-GCAAA Sheet 01
 , View B, install and tighten the pipe
to the plug-in union and manifold, refer to AMM Task 20-23-11-917-802
and Table 1, below.
Item No.
 Pipe Torque Value (Nm)
 Item No.
 Union Torque Value
(Nm)
(26)
 54-59
 (5)
 34.7-35.8
(25)
 85-95
 (9)
 116.4-118.6
Table 1
(b) Tighten all connections of the pipes connected to the manifold on both sides
which have been not already tightened during previous step, refer to AMM Task
20-23-11-400-801, AMM Task 20-23-11-917-801 and Table 1, above.
(c) Make a new red mark on any of the unions where the red mark is no longer aligned
or not clearly visible, refer to AMM Task 20-23-22-910-801.
(d) Remove the safety clip(s) and/or tag(s) and close/unlock the circuit breaker(s) as
specified in the Job Set-up in the Installation of the Check-Valves, refer to AMM
Task 29-11-53-400-806.
(e) Pressurize the Green hydraulic system with the electric pump, refer to AMM Task
29-00-00-863-801.
(f) Make sure there are no leaks from the unions on the manifold.
(g) Make sure there are no leaks from the connections of the CVs.
(h) Make sure there are no leaks from the pipe connections.
(i) Check for air in the Green hydraulic syst em, refer to AMM Tas k 29-00-00-210-801.
(j) Depressurize the Green hydraulic syst em, refer to AMM Tas k 29-00-00-864-801.
**CONF 002
None
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340
SERVICE BULLETIN
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 294096-942-201-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
190
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 29-11-53-400-806
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Job Close-up procedure for the installation of the CV FIN 5316JM101 and
FIN 5316JM102, refer to AMM Task 29-11-53-400-806.
(c) Put the aircraft back to its initial configuration.
**CONF 002
None
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340
SERVICE BULLETIN
Task 294096-831-849-001 - Modify the Blue HP Hydraulic Manifold on Aircraft
**CONF ALL
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: DO NOT WORK ON ALL THREE HYDRAULIC SYSTEMS DURING THE SAME
MAINTENANCE INPUT WITH THE SAME MAINTENANCE PERSONNEL. THIS
IS TO MAKE SURE THAT A POSSIBLE MAINTENANCE ERROR ON ONE
SYSTEM IS NOT DONE AGAIN ON A DIFFERENT SYSTEM. A MAINTENANCE
ERROR ON MORE THAN ONE HYDRAULIC SYSTEM CAN CAUSE SYSTEM
FAILURE ON MULTIPLE SYSTEMS. IF MAINTENANCE IS NECESSARY ON
MORE THAN ONE SYSTEM AT THE SAME TIME AND INVOLVES LINES /
COMPONENTS DISCONNECTION, DIFFERENT MAINTENANCE PERSONNEL
MUST BE USED FOR EACH SYSTEM.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 31
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340
SERVICE BULLETIN
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: AIRBUS generally recommends not to open th e three hydraulic systems during
the same maintenance input. Therefore it is recommended to apply this Service
Bulletin during two different maintenance inputs, for instance the Yellow and Blue
hydraulic system first and the Green hydraulic system at a later opportunity.
NOTE
: Discarded parts must be managed at the operator’s discretion.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for further
instructions and approval.
Task Associated Data
**CONF 001
Zone
195
Modified FIN
5316JM201 6103JM
Access
Door
 195BB 811
Manpower
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
**CONF 002
Manpower
TOTAL MANHOURS
 0.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 294096-910-202-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 32
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-11-11-911-803
Task 20-29-00-911-801
Task 29-00-00-910-805
Consumable Material List (CML)
(a) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Materials List (CML).
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the safety procedures of the h ydraulic systems, refer to AMM Task
29-00-00-910-805.
(f) For the removal/installation of O-ring seals, refer to AMM Task 20-29-00-911-801.
(g) Put a blanking plug on an open manifold port.
(h) For wirelocking safety procedures and warnings, refer to AMM Task
20-11-11-911-803.
(2) Subtask 294096-839-202-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
None
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 294096-941-202-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 33
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 20-23-22-910-801
Task 29-12-53-000-806
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers are closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Do the Job Set-up procedure for the removal of the CV FIN 5316JM201, refer to
AMM Task 29-12-53-000-806.
(c) Inspect the red marking on all the manifold unions. Apply red marking on the
unions where it is not visible, refer to AMM Task 20-23-22-910-801.
**CONF 002
None
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 294096-831-202-001 - Modify the Blue HP Manifold (FIN 6103JM)
Work Zones and Access Panels
Zone
 Access/Work location
195
 Access
 Door 811, Door 195BB
Work location
 from Frame 45 to Frame 46
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 34
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
2
 NAS1612-24
 1
 PACKING
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Equipment BFEZ01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
3
 CAR402
 1
 VALVE
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Phosphate Ester Hydraulic
Fluid-General Power
02ABA1
 As required
Varnish Polyurethane--
Marking Structure
04SAB2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Wire-Locking Dia: 1 Mm
(0.041 Inch) Cres
14QGC1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 20-23-22-910-801
Task 29-12-53-000-806
Fig. A-GBBAA
Removal and Installation of the CV and
Re-identification of the Blue Hydraulic
System HP Manifold
Sheet 01
Sheet 02
Sheet 03
(a) Remove the CV from the Blue HP manifold (FIN 6103JM), refer to AMM Task
29-12-53-000-806.
1
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 35
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340
SERVICE BULLETIN
CAUTION
: DO NOT USE POINTED, SHARP OR METAL TOOLS TO
REMOVE THE O-RING OR SQUARE SEAL OR BACK-UP
RINGS. SHARP EDGES CAN CAUSE DAMAGE TO THE
BOBBINS (GROOVES OR SEAL CONTACT SURFACES).
As shown in Fig. A-GBBAA Sheet 01
 , View B, cut and discard the lockwire
then remove:
FIN 5316JM201
1 Valve-check CAR401 Item (3) Discard
FIN 5316JM201
1 Seal Assy 818114 Item (2) Discard
(b) Install the CV on the Blue HP manifold (FIN 6103JM).
1
 Clean the related components and work areas with:
Non Aqueous
Cleaner - General
08BAA9 As required
and
Textile - Lint Free
Cotton
14SBA1 As required
2
CAUTION
: ONLY USE THE SPECIFIED LUBRICANT TO LUBRICATE
THE FITTING THREADS.
Apply to the threads of the CV:
Phosphate Ester
Hydraulic Fluid-
General Power
02ABA1 As required
3
 Discard the storage seals from the new CVs.
4
 As shown in Fig. A-GBBAA Sheet 01
 ,V i e wBa n d Fig. A-GBBAA Sheet 03
 ,
install:
FIN 5316JM201
1 Valve-check CAR402 Item 3
FIN 5316JM201
1 Packing NAS1612-24 Item 2
a
 Before installation, make sure that the back-up ring is flush with the
groove in the CVs, Item 3.
(c) Torque the CV, Item 3, two times:
1
 Torque the CV between 230 and 250 Nm (169.64-184.39 lbf.ft).
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 36
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340
SERVICE BULLETIN
2
 Undo the CV by a 1/8th turn.
3
 Torque the CV between 230 and 250 Nm (169.64-184.39 lbf.ft).
(d) Make a red mark on the CV and the manifold, refer to AMM Task
20-23-22-910-801.
1
 Use:
Varnish
Polyurethane--
Marking Structure
04SAB2 As required
(e) As shown in Fig. A-GBBAA Sheet 01
 ,V i e wB ,s a f e t yt h eC V ,I t e m3 ,w i t h :
Wire-Locking Dia: 1
Mm (0.041 Inch)
Cres
14QGC1 As required
(2) Subtask 294096-930-202-001 - Reidentify the Blue Manifold (FIN 6103JM)
Work Zones and Access Panels
Zone
 Access/Work location
195
 Access
 Door 811, Door 195BB
Work location
 from Frame 45 to Frame 46
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish Polyurethane-Low
Voc External Structure
04SBA3
 As required
Non Aqueous Cleaner--
Petroleum Based
08BBB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
Fig. A-GBBAA
Removal and Installation of the CV and
Re-identification of the Blue Hydraulic
System HP Manifold
Sheet 01
Sheet 02
Sheet 03
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 37
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340
SERVICE BULLETIN
(a) Re-identify the Blue HP manifold (FIN 6103JM) refer to Process and Material
Specification (PMS) 01-06-12, Fig. A-GBBAA Sheet 01
 , Fig. A-GBBAA Sheet 02
 ,
Views C (For information) and the table given in Appendix 01: PN Evolution of the
Green, Blue and Yellow System HP Hydraulic Manifolds .
1
 Clean the Manifold identification PN located on the body of the Blue HP
Manifold (FIN 6103JM), use:
Textile - Lint Free
Cotton
14SBA1 As required
made moist with
Non Aqueous
Cleaner-- Petroleum
Based
08BBB1 As required
2
 Use an indelible ink pen to re-identify the Blue HP Manifold with the new PN,
refer to the table given in Appendix 01: PN Evolution of the Green, Blue and
Yellow System HP Hydraulic Manifolds .
NOTE
: If old HP manifold PN cannot be found at the location shown into
Fig. A-GBBAA Sheet 02
 , View C, the IPC body manifold PN should
be used to find the new HP manifold PN, refer to the table given in
Appendix 01: PN Evolution of the Green, Blue and Yellow System
HP Hydraulic Manifolds
3
 Apply varnish to the new identification PN, use:
Varnish
Polyurethane-Low
Voc External
Structure
04SBA3 As required
**CONF 002
None
**CONF ALL
D. TEST
**CONF 001
(1) Subtask 294096-730-202-001 - Test the Blue HP Manifold (FIN 6103JM)
Work Zones and Access Panels
Zone
 Access/Work location
195
 Access
 Door 811, Door 195BB
Work location
 from Frame 45 to Frame 46
Manpower Resources
Skills
 AIRFRAME
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 38
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 20-23-11-400-801
Task 20-23-11-917-801
Task 20-23-11-917-802
Task 20-23-22-910-801
Task 20-29-00-911-801
Task 29-00-00-210-801
Task 29-00-00-863-802
Task 29-00-00-864-802
Task 29-12-53-400-805
Fig. A-GBBAA
Removal and Installation of the CV and
Re-identification of the Blue Hydraulic
System HP Manifold
Sheet 01
Sheet 02
Sheet 03
Fig. A-GDAAA
Torque Check of the Hydraulic Unions
on the Blue Hydraulic System HP
Manifold
Sheet 01
(a) Inspect the red marking on all the plug-in unions on the manifold.
1
 If any red marking is not aligned:
a
 Disconnect the pipe from the plug-in union.
b
 Remove the plug-in union from the manifold.
c
 Replace the packing of the plug-in union with a new one, refer to AMM
Task 20-29-00-911-801.
d
 As shown in Fig. A-GDAAA Sheet 01
 , View B, install and tighten
all removed plug-in unions on the manifold, refer to AMM Task
20-29-00-911-801 and Table 2, below.
e
 As shown in Fig. A-GDAAA Sheet 01
 , View B, install and tighten the pipe
to the plug-in union and manifold, refer to AMM Task 20-23-11-917-802
and Table 2, below.
Item No.
 Pipe Torque Value (Nm)
 Item No.
 Union Torque Value
(Nm)
(29)
 85-95
 (9)
 116.4-118.6
(30)
 85-95
 (16)
 72.9-74
(31)
 54-59
 (5)
 34.7-35.8
(32)
 81-89
 (12)
 116.4-118.6
(33)
 75-83
 (13)
 50.3-51.4
(34)
 85-95
 (16)
 116.4-118.6
(35)
 75-83
 (13)
 50.3-51.4
Table 2
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 39
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340
SERVICE BULLETIN
(b) Tighten all connections of the pipes connected to the manifold on both sides
which have been not already tightened during previous step, refer to AMM Task
20-23-11-400-801, AMM Task 20-23-11-917-801 and Table 2, above.
(c) Make a new red mark on all the unions where the red mark is not aligned or no
longer visible, refer to AMM Task 20-23-22-910-801.
(d) Remove the safety clip(s) and/or tag(s) and close/unlock the circuit breaker(s) as
specified in the Job Set-up in the Installation of the Blue HP Manifold-Supply
Check-Valves, refer to AMM Task 29-12-53-400-805.
(e) Pressurize the Blue hydraulic system with the electric pump, refer to AMM Task
29-00-00-863-802.
(f) Make sure there are no leaks from the unions on the manifold.
(g) Make sure there are no leaks from the connections of the CV.
(h) Make sure there are no leaks from the pipe connections.
(i) Check for air in the Blue hydraulic syst em, refer to AMM Tas k 29-00-00-210-801.
(j) Depressurize the Blue h ydraulic system, refer to AMM Task 29-00-00-864-802.
**CONF 002
None
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 294096-942-202-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
195
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 29-12-53-400-806
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Job Close-up procedure for the installation of the CV FIN 5316JM201, refer
to AMM Task 29-12-53-400-806.
(c) Put the aircraft back to its initial configuration.
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 40
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340
SERVICE BULLETIN
**CONF 002
None
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 41
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A340
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 42
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A340
SERVICE BULLETIN
Task 294096-831-850-001 - Modify the Yellow HP Hydraulic Manifold on Aircraft
**CONF ALL
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: DO NOT WORK ON ALL THREE HYDRAULIC SYSTEMS DURING THE SAME
MAINTENANCE INPUT WITH THE SAME MAINTENANCE PERSONNEL. THIS
IS TO MAKE SURE THAT A POSSIBLE MAINTENANCE ERROR ON ONE
SYSTEM IS NOT DONE AGAIN ON A DIFFERENT SYSTEM. A MAINTENANCE
ERROR ON MORE THAN ONE HYDRAULIC SYSTEM CAN CAUSE SYSTEM
FAILURE ON MULTIPLE SYSTEMS. IF MAINTENANCE IS NECESSARY ON
MORE THAN ONE SYSTEM AT THE SAME TIME AND INVOLVES LINES /
COMPONENTS DISCONNECTION, DIFFERENT MAINTENANCE PERSONNEL
MUST BE USED FOR EACH SYSTEM.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 43
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A340
SERVICE BULLETIN
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: AIRBUS generally recommends not to open th e three hydraulic systems during
the same maintenance input. Therefore it is recommended to apply this Service
Bulletin during two different maintenance inputs, for instance the Yellow and Blue
hydraulic system first and the Green hydraulic system at a later opportunity.
NOTE
: Discarded parts must be managed at the operator’s discretion.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact Airbus for further
instructions and approval.
Task Associated Data
**CONF 001
Zone
196
Modified FIN
5316JM301 7103JM
Access
Door
 195BB 196BB 811
Manpower
TOTAL MANHOURS
 7.50
ELAPSED TIME (HOURS)
 7.50
**CONF 002
Manpower
TOTAL MANHOURS
 0.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 294096-910-203-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 44
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-11-11-911-803
Task 20-29-00-911-801
Task 29-00-00-910-805
Consumable Material List (CML)
(a) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Materials List (CML).
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the safety procedures of the h ydraulic systems, refer to AMM Task
29-00-00-910-805.
(f) For the removal/installation of O-ring seals, refer to AMM Task 20-29-00-911-801.
(g) Put a blanking plug on an open manifold port.
(h) For wirelocking safety procedures and warnings, refer to AMM Task
20-11-11-911-803.
(2) Subtask 294096-839-203-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
None
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 294096-941-203-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 45
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 20-23-22-910-801
Task 29-13-53-000-804
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers are closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Do the Job Set-up procedure for the removal of the CV FIN 5316JM301, refer to
AMM Task 29-13-53-000-804.
(c) Inspect the red marking on all the manifold unions. Apply red marking on the
unions where it is not visible, refer to AMM Task 20-23-22-910-801.
**CONF 002
None
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 294096-831-203-001 - Modify the Yellow HP Manifold (FIN 7103JM)
Work Zones and Access Panels
Zone
 Access/Work location
196
 Access
 Door 811, Door 196BB
Work location
 from Frame 45 to Frame 46
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 46
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
2
 NAS1612-24
 1
 PACKING
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Equipment BFEZ01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
3
 CAR402
 1
 VALVE
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Phosphate Ester Hydraulic
Fluid-General Power
02ABA1
 As required
Varnish Polyurethane--
Marking Structure
04SAB2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Wire-Locking Dia: 1 Mm
(0.041 Inch) Cres
14QGC1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 20-23-22-910-801
Task 29-13-53-000-804
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
Fig. A-GBCAA
Removal and Installation of the CV and
Re-identification the Yellow Hydraulic
System HP Manifold
Sheet 01
Sheet 02
Sheet 03
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 47
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A340
SERVICE BULLETIN
(a) Remove the CV, Item 3 from the Yellow HP manifold (FIN 7103JM), refer to AMM
Task 29-13-53-000-804.
1
CAUTION
: DO NOT USE POINTED, SHARP OR METAL TOOLS TO
REMOVE THE O-RING OR SQUARE SEAL OR BACK-UP
RINGS. SHARP EDGES CAN CAUSE DAMAGE TO THE
BOBBINS (GROOVES OR SEAL CONTACT SURFACES).
As shown in Fig. A-GBCAA Sheet 01
 , View B, cut and discard the lockwire
then remove:
FIN 5316JM301
1 Valve-check CAR401 Item (3) Discard
FIN 5316JM301
1 Seal Assy 818114 Item (2) Discard
(b) Install the CV on the Yellow HP manifold (FIN 7103JM).
1
 Clean the related components and work areas with:
Non Aqueous
Cleaner - General
08BAA9 As required
and
Textile - Lint Free
Cotton
14SBA1 As required
2
CAUTION
: ONLY USE THE SPECIFIED LUBRICANT TO LUBRICATE
THE FITTING THREADS.
Apply to the threads of the CV:
Phosphate Ester
Hydraulic Fluid-
General Power
02ABA1 As required
3
 Discard the storage seals from the new CVs.
4
 As shown in Fig. A-GBCAA Sheet 01
 , View B and Fig. A-GBCAA Sheet 03
 ,
install:
FIN 5316JM301
1 Valve-check CAR402 Item 3
FIN 5316JM301
1 Packing NAS1612-24 Item 2
DATE: Aug 08/14 SERVICE BULLETIN No.: A340-29-4096
REVISION No.: 02 - Apr 08/16 Page: 48
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a340-29-4096/file/350514696d44.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
