# Airbus Service Bulletin A340-32-5115

Copy: Revision 01 ("A340-32-5115 R01"), 49 pages: PDF https://openairdocs.org/files/sha256/f4/a5/f4a59868fbb55f5aa90819fd6315cff632c9b58c36bf4c4ad714cdd68b622524; text https://openairdocs.org/service-documents/airbus/a340-32-5115/file/f4a59868fbb5.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-0459; AD 2016-14-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-32-5115
- Latest revision known: A340-32-5115, Revision 01, dated December 11, 2015 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a340-32-5115

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-14-08](https://openairdocs.org/ad/2016-14-08.md), effective Aug 16, 2016: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-32-5115/proposed.md).

## Text (49 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-0459; AD 2016-14-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER
CARDAN PIN AND NUT
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A340-32-5115
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to:
- update the Reason paragraph
- update the Compliance.
CHANGES
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
MATERIAL PRICE INFORMATION
 MATERIAL PRICE INFORMATION TABLE
UPDATED
R
MATERIAL PRICE INFORMATION TABLE
UPDATED
R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
REFERENCES / REPERCUSSIONS
 REFERENCES/REPERCUSSIONS TABLE
UPDATED
R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
CONF 001
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
CONF 002
 CONFIGURATION DEFINITION UPDATED
CONFIGURATION DESCRIPTION UPDATED
R
Material Effectivity
 MATERIAL EFFECTIVITY ADDED
 N
MATERIAL EFFECTIVITY ADDED
 N
MATERIAL EFFECTIVITY DELETED FOR
APPLICABLE MSN
D
MATERIAL EFFECTIVITY DELETED FOR
APPLICABLE MSN
D
REASON
History
 HISTORY UPDATED
 R
Objective/Action
 OBJECTIVE/ACTION UPDATED
 R
Advantages
 ADVANTAGES UPDATED
 R
Operational/Maintenance
Consequences
OPERATIONAL/MAINTENANCE CONSEQUENCES
UPDATED
R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
 MATERIAL - PRICE AND AVAI LABILITY UPDATED
 R
Procurement Addresses
 PROCUREMENT ADDRESSES PARAGRAPH
DELETED
D
Price and Availability
 PRICE AND AVAILABILITY PARAGRAPH
DELETED
D
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLB01
 CONSUMABLE MATERIAL SET UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
R
Equipment
 EQUIPMENT UPDATED
 R
Equipement BFEB01
 PART MATERIAL SET DELETED
 D
Equipement BFEB02
 PART MATERIAL SET DELETED
 D
ACCOMPLISHMENT INSTRUCTIONS
TASK 325115- 832-895-001-Inspection
 TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 325115-832-401-002
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
QUANTITY UPDATED
CONFIGURATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
REFERENCES UPDATED
R
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 325115-832-402-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
QUANTITY UPDATED
CONFIGURATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
REFERENCES UPDATED
R
Subtask 325115-833-401-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
FIN UPDATED
NOTE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 325115-833-402-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PART NUMBER DESCRIPTION UPDATED
FIN UPDATED
NOTE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 325115-410-401-002
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
PART NUMBER DESCRIPTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 325115-410-402-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
ITEM NUMBER UPDATED
PART NUMBER UPDATED
KEYWORD UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
PART NUMBER DESCRIPTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 325115-832-401-004
 SUBTASK SOLUTION ADDED
 N
Subtask 325115-832-402-003
 SUBTASK SOLUTION ADDED
 N
Subtask 325115-833-401-004
 SUBTASK SOLUTION ADDED
 N
Subtask 325115-833-402-003
 SUBTASK SOLUTION ADDED
 N
Subtask 325115-410-401-004
 SUBTASK SOLUTION ADDED
 N
Subtask 325115-410-402-003
 SUBTASK SOLUTION ADDED
 N
Subtask 325115-832-401-003
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 325115-832-402-002
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 325115-833-401-003
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 325115-833-402-002
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 325115-410-401-003
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 325115-410-402-002
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 325115-700-401-001
 SUBTASK SOLUTION UPDATED
LOCATION UPDATED
R
Subtask 325115-700-401-001
 SUBTASK SOLUTION UPDATED
LOCATION UPDATED
R
Fig. A-UBAAA
 FIGURE SOLUTION UPDATED
CONFIGURATION UPDATED
R
Fig. A-UBAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-UBAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-UBAAA Sheet 03
 SHEET DELETED
 D
Fig. A-UBAAB
 FIGURE SOLUTION DELETED FOR APPLICABLE
MSN
D
Fig. A-UBBAA
Fig. A-UBBAA Sheet 01
 SHEET UPDATED
 R
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Feb 17/15
REVISION No. : 01 - Dec 11/15
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340-500/600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER
CARDAN PIN AND NUT
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Inspection of an A330 aircraft fitted with Basic Main Landing Gear (MLG) has shown that the MLG Side
Stay Upper Cardan Pin (UCP) can migrate from its original position and that the UCP nut and retainer
can become detached. The reported MLG sidestay UCP migration event had been caused by corrosion,
due to lack of jointing compound and inadequate sealant application during MLG installation. Therefore,
this issue affects any MLG that has had a UCP replacement or re-installation, since Entry Into Service
(EIS), irrespective of MLG overhaul.
The loss of the side stay UCP locking function can lead to a complete migration of the UCP and
disconnection of the MLG side stay upper arm from the aircraft structure.
An inspection is considered necessary to capture any corrosion that may be present on the UCP and
associated nut threads. Corrosion may contribute to migration of the UCP. The aim of this inspection
Service Bulletin is to request operators to:
- do a Detailed Inspection (DET) of the Side Stay Upper Cardan Pin Locking Assembly
- check for corrosion, pitting and/or damage to the threads on the UCP and UCP Nut
- if corrosion, pitting and/or damage is found on the UCP or UCP Nut, the damaged parts are to be
replaced before further flight.
Accomplishment of this Inspection Service Bulletin (ISB) will help in the early detection of corrosion
and/or damage to the UCP and nut retainer assembly. This minimizes the possibility of a potential
unsafe condition arising from the disconnection of the upper side stay arm from the aircraft structure.
In addition, to prevent any improper re-installation of an Upper Cardan Pin on a MLG, Airbus amended
the applicable Aircraft Maintenance Manual (AMM) on OCT 01/14.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340-500/600
SERVICE BULLETIN
SUMMARY
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
AIRCRAFT JACKING
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
**CONF 001
No Material
**CONF 002
No Material
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
06U 15T
 16R
 31V 32P 70U 72W 81Q AHY AIB BOE
 DLH ETD
HFY I2L IBE IRM
 QAF QTR SAA TAM THA UAE VIR
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340-500/600
SERVICE BULLETIN
SUMMARY
OBRM
 NO
MANPOWER
**CONF 001
Task 325115-832-895-001: Inspection
TOTAL MANHOURS
 23.00
ELAPSED TIME (HOURS)
 13.00
**CONF 002
Task 325115-832-895-001: Inspection
TOTAL MANHOURS
 23.00
ELAPSED TIME (HOURS)
 13.00
APPENDICES
**CONF ALL
Appendix 01 - Elapsed Time Assumption
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF ALL
NOTE:
AREA OF INSPECTION
SIDE STAY
UPPER CARDAN PIN
LOCKING ASSEMBLY
A
A
SIDE STAY
LH SHOWN
RH SIMILAR
5012GM
(5013GM)
F_SB_325115_7_SAAA_01_01
Figure A-U SAAA - S heet 01
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340-500/600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 32
TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER
CARDAN PIN AND NUT
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-541 340-542 340-642
(2) Effectivity by MSN
0371 0376 0383 0391 0410 0416-0417 0426 0431 0436 0440 0445 0449 0453 0457
0460 0464 0468 0471 0475 0478 0482 0485 0488 0492 0495 0499 0514 0517 0520
0523 0531 0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572 0575 0577
0580 0583 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622 0624 0626 0628
0630 0639 0672 0677 0681 0685 0689 0694 0698 0702 0706 0710 0715 0719 0723
0727 0736 0740 0744 0748 0753 0757 0761-0768 0771 0775 0779 0783 0787 0790
0794 0798 0804 0812 0829 0837 0846 0848 0870 0886 0894 0897 0902 0910 0912
0917 0924 0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030 1040 1079
1091 1102 1122
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340-500/600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06U
 1091 1102
15T
 0924
16R
 0622
31V
 0436
32P
 0560
70U
 0902
72W
 0917
81Q
 0563
AHY
 0779 0886 0894
AIB
 0478 0492 0499
BOE
 0468 0488 0514 0577 0586
DLH
 0482 0517 0523 0537 0540 0543 0566 0569 0580 0583 0762 0763
0767 0771 0790 0794 0812 0846 0848 0897 0972 0981 0987 1005
ETD
 0748 0757 0761 0783 0829 0837 0870 0929 0933 1030 1040
HFY
 0910 0912
I2L
 0453 0475
IBE
 0431 0440 0460 0601 0604 0606 0617 0619 0672 0702 0727 0744
0960 0993 1017 1079 1122
IRM
 0371 0376 0383 0391
 0416
 0449
 0615
QAF
 0495
QTR
 0715 0740 0766 0798
SAA
 0410 0417 0426 0531 0534 0547 0557 0626 0630
TAM
 0445 0464
THA
 0624 0628 0677 0681 0689 0698 0710 0719 0775 0953
UAE
 0457 0471 0485 0520 0572 0608 0611 0685 0694
VIR
 0575 0639 0706 0723 0736 0753 0764 0765 0768 0787 0804
(4) Configuration by MSN
MSN
 CONFIGURATION
0371 0376 0391 0410 0417 0426 0431 0436 0440 0445 0453
0457 0460 0464 0468 0471 0475 0478 0485 0488 0492 0495
0499 0514 0520 0531 0534 0547 0557 0560 0563 0572 0575
0577 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622
0624 0626 0628 0630 0639 0672 0677 0681 0685 0689 0694
0698 0702 0706 0710 0715 0719 0723 0727 0736 0740 0744
0748 0753 0757 0761 0762 0763 0764 0765 0766 0767 0768
0771 0775 0779 0783 0787 0790 0794 0798 0804 0812 0829
0837 0846 0848 0870 0886 0894 0897 0902 0910 0912 0917
0924 0929 0933 0953 0972 0981
001 002
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340-500/600
SERVICE BULLETIN
MSN
 CONFIGURATION
0383 0416 0449 0482 0517 0523 0537 0540 0543 0566 0569
0580 0583 0960 0987 0993 1005 1017 1030 1040 1079 1091
1102 1122
002
(5) Configuration definition
**CONF 001
Config. 001 is valid for aircraft that have not accomplished Service Bulletin No.
A340-32-5102 and not embodied Modification No. 56849H16167.
NOTE
: Aircraft that have accomplished Service Bulletin No. A340-32-5102
should be considered as Config 002.
**CONF 002
Config 002 is valid for aircraft that have accomplished Service Bulleting No.
A340/500-32-5102 or embodied Modification No. 56849H16167.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable
 CMLB01
 1
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable
 CMLB01
 1
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Inspection of an A330 aircraft fitted with Basic Main Landing Gear (MLG) has shown that
the MLG Side Stay Upper Cardan Pin (UCP) can migrate from its original position and
that the UCP nut and retainer can become detached. The reported MLG sidestay UCP
migration event had been caused by corrosion, due to lack of jointing compound and
inadequate sealant application during MLG installation. Therefore, this issue affects any
MLG that has had a UCP replacement or re-installation, since Entry Into Service (EIS),
irrespective of MLG overhaul.
The loss of the side stay UCP locking function can lead to a complete migration of the
UCP and disconnection of the MLG side stay upper arm from the aircraft structure.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340-500/600
SERVICE BULLETIN
(2) Objective/Action
An inspection is considered necessary to capture any corrosion that may be present on
the UCP and associated nut threads. Corrosion may contribute to migration of the UCP.
The aim of this inspection Service Bulletin is to request operators to:
- do a Detailed Inspection (DET) of the Side Stay Upper Cardan Pin Locking
Assembly
- check for corrosion, pitting and/or damage to the threads on the UCP and UCP Nut
- if corrosion, pitting and/or damage is found on the UCP or UCP Nut, the damaged
parts are to be replaced before further flight.
(3) Advantages
Accomplishment of this Inspection Service Bulletin (ISB) will help in the early detection
of corrosion and/or damage to the UCP and nut retainer assembly. This minimizes the
possibility of a potential unsafe condition arising from the disconnection of the upper side
stay arm from the aircraft structure.
(4) Operational/Maintenance Consequences
In addition, to prevent any improper re-installation of an Upper Cardan Pin on a MLG,
Airbus amended the applicable Aircraft Maintenance Manual (AMM) on OCT 01/14.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 325115-832-895-001: Inspection
(1) Inspect the Upper Cardan Pin and Nut on the LH MLG
(2) Inspect the Upper Cardan Pin and Nut on the RH MLG
(3) Replace the Upper Cardan Pin on the LH MLG
(4) Replace the Upper Cardan Pin on the RH MLG
(5) Install the Upper Cardan Pin Nut on the LH MLG
(6) Install the Upper Cardan Pin Nut on the RH MLG
**CONF 002
Task 325115-832-895-001: Inspection
(1) Inspect the Upper Cardan Pin and Nut on the LH MLG
(2) Inspect the Upper Cardan Pin and Nut on the RH MLG
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340-500/600
SERVICE BULLETIN
(3) Replace the Upper Cardan Pin on the LH MLG
(4) Replace the Upper Cardan Pin on the RH MLG
(5) Install the Upper Cardan Pin Nut on the LH MLG
(6) Install the Upper Cardan Pin Nut on the RH MLG
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Table 01: Detailed Inspection (DET) of the Upper Cardan Pin (UCP) and nut retainer assembly
COMPLIANCE TIME
CONDITION
 ACTION
THRESHOLD
 GRACE PERIOD
REPETITIVE
INTERVAL
If an Upper Cardan
Pin on either LH or
RH MLG has been
replaced or re-
installed since
Entry Into Service
(EIS) at the time of
issue of this
Service Bulletin
AND if this action
was accomplished
using the
applicable Airbus
AMM at a revision
dated prior to 01
October 2014.
Inspect the Upper
Cardan Pin and
nut
8 years from
installation of the
MLG UCP
or
within 12 months
after the effective
date of AD
2015-0079
Whichever occurs
later
None
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approv al No. EASA. 21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340-500/600
SERVICE BULLETIN
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 325115-832-895-001: Inspection
Get Access
 1.00
On Aircraft
Inspect the Upper Cardan Pin and Nut on the LH MLG
 4.00
Inspect the Upper Cardan Pin and Nut on the RH MLG
 4.00
Replace the Upper Cardan Pin on the LH MLG
 4.00
Replace the Upper Cardan Pin on the RH MLG
 4.00
Install the Upper Cardan Pin Nut on the LH MLG
 2.00
Install the Upper Cardan Pin Nut on the RH MLG
 2.00
Tests
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 23.00
ELAPSED TIME (HOURS)
 13.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAA
 given in Appendix 01 - Elapsed Time Assumption .
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
**CONF 002
Task 325115-832-895-001: Inspection
Get Access
 1.00
On Aircraft
Inspect the Upper Cardan Pin and Nut on the LH MLG
 4.00
Inspect the Upper Cardan Pin and Nut on the RH MLG
 4.00
Replace the Upper Cardan Pin on the LH MLG
 4.00
Replace the Upper Cardan Pin on the RH MLG
 4.00
Install the Upper Cardan Pin Nut on the LH MLG
 2.00
Install the Upper Cardan Pin Nut on the RH MLG
 2.00
Tests
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 23.00
ELAPSED TIME (HOURS)
 13.00
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340-500/600
SERVICE BULLETIN
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAA
 given in Appendix 01 - Elapsed Time Assumption .
NOTE
: The minimum manhours necessary to accomplish this Service Bulletin are
those for the Inspection. Depending on the inspection result, additional
manhours can apply.
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-20-00 07-11-00 12-34-24
20-21-11 32-00-00 32-11-16
32-31-00 32-33-00
Consumable Material List (CML)
Component Maintenance Manual Manufacturer
(CMMm)
32-12-37
Elec. Std. Practices Manual (ESPM)
 20-55-00
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-20-00 07-11-00 12-34-24
20-21-11 32-00-00 32-11-16
32-31-00 32-33-00
Consumable Material List (CML)
Component Maintenance Manual Manufacturer
(CMMm)
32-12-74
Elec. Std. Practices Manual (ESPM)
 20-55-00
**CONF ALL
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340-500/600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
No Material Set
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
To accomplish this Service Bulletin it will be necessary to use the Consumable Materials
listed in the subs equent listed A MM Tasks:
- AMM Task 32-11-16-400-801.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant - General
Purpose Interfay
06AAC5
 As required
Non Hardening Jointing Putty-High
Temp
06LDG6
 As required
Non Aqueous Cleaner - General
 08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
(2) Components
To accomplish this Service Bulletin it will be necessary to use the Expendable
Components listed in the subsequent liste d AMM Tasks:
- AMM Task 32-11-16-400-801.
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340-500/600
SERVICE BULLETIN
F. TOOLING
(1) Tooling - Price and Availability
None
(2) Tools
To accomplish this Service Bulletin it will be necessary to use the Standard Tools listed
in the subsequent lis ted AMM Tasks:
- AMM Task 32-11-16-000-801
- AMM Task 32-11-16-400-801.
(3) Special Tools
None
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340-500/600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 325115-832-895-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE
IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR INJURE PERSONS.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340-500/600
SERVICE BULLETIN
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
**CONF 001
Zone
731 741
Modified FIN
5012GM 5013GM
Manpower
TOTAL MANHOURS
 23.00
ELAPSED TIME (HOURS)
 13.00
**CONF 002
Zone
731 741
Modified FIN
5012GM 5013GM
Manpower
TOTAL MANHOURS
 23.00
ELAPSED TIME (HOURS)
 13.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 325115-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
Task 07-11-00-581-801
Task 20-21-11-911-801
Consumable Material List (CML)
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340-500/600
SERVICE BULLETIN
(a) For the specification of materials (Mat. No.) given in this Service Bulletin refer to
Consumable Materials List (CML).
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(d) Obey the maintenance jacking procedures, refer to AMM Task 07-11-00-581-801.
(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(2) Subtask 325115-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 325115-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
Task 07-11-00-581-801
Task 20-21-11-911-801
Consumable Material List (CML)
(a) For the specification of materials (Mat. No.) given in this Service Bulletin refer to
Consumable Materials List (CML).
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(d) Obey the maintenance jacking procedures, refer to AMM Task 07-11-00-581-801.
(e) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(f) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340-500/600
SERVICE BULLETIN
(2) Subtask 325115-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 325115-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
731
741
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 07-11-00-581-801
Task 12-34-24-860-802
Task 32-00-00-481-801
Task 32-00-00-481-802
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340-500/600
SERVICE BULLETIN
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Do the installation of the Safety Devices on the Landing Gears, refer to AMM Task
32-00-00-481-801.
(c) Do the installation of the Safety Devices on the Landing Gear Doors, refer to AMM
Task 32-00-00-481-802.
(d) Lift the aircraft on jacks, re fer to AMM Task 07-11-00-581-801.
**CONF 002
(1) Subtask 325115-941-401-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
731
741
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 07-11-00-581-801
Task 12-34-24-860-802
Task 32-00-00-481-801
Task 32-00-00-481-802
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340-500/600
SERVICE BULLETIN
(b) Do the installation of the Safety Devices on the Landing Gears, refer to AMM Task
32-00-00-481-801.
(c) Do the installation of the Safety Devices on the Landing Gear Doors, refer to AMM
Task 32-00-00-481-802.
(d) Lift the aircraft on jacks, re fer to AMM Task 07-11-00-581-801.
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 325115-832-401-002 - Inspect the Upper Cardan Pin and Nut on the LH
MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Component Maintenance Manual
Manufacturer (CMMm)
32-12-37
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet 01
Sheet 02
Fig. A-UFAAA
Flow Chart
Sheet 01
Fig. A-UBBAA
Inspection of the Side Stay Upper
Cardan Pin Nut
Sheet 01
(a) At the Upper Cardan Pin (UCP), on the LH MLG Side Stay
 5012GM, remove the
UCP Nut, refer to CMMm 32-12-37.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340-500/600
SERVICE BULLETIN
(b) Clean the thread of the UCP Nut with:
Textile - Lint Free
Cotton
14SBA1 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9 As required
(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to
 Fig. A-
UFAAA Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP Nut.
2
 If damage, pitting or corrosion is found, discard the UCP Nut.
(d) Clean the thread of the UCP with:
Textile - Lint Free
Cotton
14SBA1 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9 As required
(e) Inspect the UCP threads for damage, pitting and corrosion, refer to
 Fig. A-UFAAA
Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP and go to
SUBTASK 325115-410-401 002 Install the Upper Cardan Pin Nut on the LH
MLG .
2
 If damage, pitting or corrosion is found go to
 SUBTASK 325115-833-401 002
Replace the Upper Cardan Pin on the LH MLG .
(2) Subtask 325115-832-402-001 - Inspect the Upper Cardan Pin and Nut on the RH
MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
 Work location
 RH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340-500/600
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Component Maintenance Manual
Manufacturer (CMMm)
32-12-37
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet 01
Sheet 02
Fig. A-UFAAA
Flow Chart
Sheet 01
Fig. A-UBBAA
Inspection of the Side Stay Upper
Cardan Pin Nut
Sheet 01
(a) At the Upper Cardan Pin (UCP) on the RH MLG Side Stay
 5013GM, remove the
UCP Nut, refer to CMMm 32-12-37.
(b) Clean the thread of the UCP Nut with:
Textile - Lint Free
Cotton
14SBA1 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9 As required
(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to
 Fig. A-
UFAAA Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP Nut.
2
 If damage, pitting or corrosion is found, discard the UCP Nut.
(d) Clean the thread of the UCP with:
Textile - Lint Free
Cotton
14SBA1 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340-500/600
SERVICE BULLETIN
(e) Inspect the UCP threads for damage, pitting and corrosion, refer to
 Fig. A-UFAAA
Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP and go to
SUBTASK 325115-410-402 001 Install the Upper Cardan Pin Nut on the RH
MLG .
2
 If damage, pitting or corrosion is found go to
 SUBTASK 325115-833-402 001
Replace the Upper Cardan Pin on the RH MLG .
(3) Subtask 325115-833-401-002 - Replace the Upper Cardan Pin on the LH MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-37
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet 01
Sheet 02
(a) At the Upper Cardan Pin joint on the LH MLG Side Stay 5012GM, remove and
discard the UCP, refer to
 AMM Task 32-11-16-000-801 and CMMm 32-12-37.
(b) At the Upper Cardan Pin joint on the LH MLG Side Stay
 5012GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-37
 and Fig. A-UBAAA
Sheet 02
 , to the surface of the threads on the Upper Cardan Pin, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340-500/600
SERVICE BULLETIN
(c) Go to SUBTASK 325115-410-401 002 Install the Upper Cardan Pin Nut on the LH
MLG .
(4) Subtask 325115-833-402-001 - Replace the Upper Cardan Pin on the RH MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
 Work location
 RH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-37
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet 01
Sheet 02
(a) At the Upper Cardan Pin joint on the RH MLG Side Stay 5013GM, remove and
discard the UCP, refer to
 AMM Task 32-11-16-000-801 and CMMm 32-12-37.
(b) At the Upper Cardan Pin joint on the RH MLG Side Stay
 5013GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-37
 and Fig. A-UBAAA
Sheet 02
 , to the surface of the threads on the Upper Cardan Pin, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
(c) Go to SUBTASK 325115-410-402 001 Install the Upper Cardan Pin Nut on the RH
MLG .
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340-500/600
SERVICE BULLETIN
(5) Subtask 325115-410-401-002 - Install the Upper Cardan Pin Nut on the LH MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant -
General Purpose Interfay
06AAC5
 As required
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-37
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet 01
Sheet 02
(a) Install the UCP Nut on the LH MLG:
1
 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-37, to the
threads of the UCP nut and the splines of the UCP, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
2
 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to
 AMM Task 32-11-16-400-801 and
CMMm 32-12-37, to the threads of the UCP nut and the splines of the UCP,
apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340-500/600
SERVICE BULLETIN
(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01
 and Fig. A-UBAAA
Sheet 02
 , apply:
Polysulfide Sealant
- General Purpose
Interfay
06AAC5 As required
(6) Subtask 325115-410-402-001 - Install the Upper Cardan Pin Nut on the RH MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
 Work location
 RH Main Landing Gear
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant -
General Purpose Interfay
06AAC5
 As required
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-37
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet 01
Sheet 02
(a) Install the UCP Nut on the RH MLG:
1
 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-37, to the
threads of the UCP nut and the splines of the UCP, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340-500/600
SERVICE BULLETIN
2
 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to
 AMM Task 32-11-16-400-801 and
CMMm 32-12-37, to the threads of the UCP nut and the splines of the UCP,
apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01
 and Fig. A-UBAAA
Sheet 02
 , apply:
Polysulfide Sealant
- General Purpose
Interfay
06AAC5 As required
**CONF 002
(1) Subtask 325115-832-401-004 - Inspect the Upper Cardan Pin and Nut on the LH
MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Component Maintenance Manual
Manufacturer (CMMm)
32-12-74
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet
 01
Sheet
 02
Fig. A-UBBAA
Inspection of the Side Stay Upper
Cardan Pin Nut
Sheet
 01
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340-500/600
SERVICE BULLETIN
References
Fig. A-UFAAA
Flow Chart
Sheet
 01
(a) At the Upper Cardan Pin (UCP), on the LH MLG Side Stay
 5012GM, remove the
UCP Nut, refer to CMMm 32-12-74.
(b) Clean the thread of the UCP Nut with:
Textile - Lint Free
Cotton
14SBA1
 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9
 As required
(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to Fig. A-
UFAAA Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP Nut.
2
 If damage, pitting or corrosion is found, discard the UCP Nut.
(d) Clean the thread of the UCP with:
Textile - Lint Free
Cotton
14SBA1
 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9
 As required
(e) Inspect the UCP threads for damage, pitting and corrosion, refer to Fig. A-UFAAA
Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP and go to
SUBTASK 325115-410-401 004 Install the Upper Cardan Pin Nut on the LH
MLG
 .
2
 If damage, pitting or corrosion is found go to SUBTASK 325115-833-401 004
Replace the Upper Cardan Pin on the LH MLG
 .
(2) Subtask 325115-832-402-003 - Inspect the Upper Cardan Pin and Nut on the RH
MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
 Work location
 RH Main Landing Gear
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340-500/600
SERVICE BULLETIN
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Component Maintenance Manual
Manufacturer (CMMm)
32-12-74
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet
 01
Sheet
 02
Fig. A-UBBAA
Inspection of the Side Stay Upper
Cardan Pin Nut
Sheet
 01
Fig. A-UFAAA
Flow Chart
Sheet
 01
(a) At the Upper Cardan Pin (UCP) on the RH MLG Side Stay
 5013GM, remove the
UCP Nut, refer to CMMm 32-12-74.
(b) Clean the thread of the UCP Nut with:
Textile - Lint Free
Cotton
14SBA1
 As required
made moist with
Non Aqueous
Cleaner - General
08BAA9
 As required
(c) Inspect the UCP Nut threads for damage, pitting and corrosion, refer to Fig. A-
UFAAA Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP Nut.
2
 If damage, pitting or corrosion is found, discard the UCP Nut.
(d) Clean the thread of the UCP with:
Textile - Lint Free
Cotton
14SBA1
 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340-500/600
SERVICE BULLETIN
made moist with
Non Aqueous
Cleaner - General
08BAA9
 As required
(e) Inspect the UCP threads for damage, pitting and corrosion, refer to Fig. A-UFAAA
Sheet 01
 and Fig. A-UBBAA Sheet 01
 .
1
 If no damage, pitting or corrosion is found, retain the UCP and go to
SUBTASK 325115-410-402 003 Install the Upper Cardan Pin Nut on the RH
MLG
 .
2
 If damage, pitting or corrosion is found go to SUBTASK 325115-833-402 003
Replace the Upper Cardan Pin on the RH MLG
 .
(3) Subtask 325115-833-401-004 - Replace the Upper Cardan Pin on the LH MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-74
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet
 01
Sheet
 02
(a) At the Upper Cardan Pin joint on the LH MLG Side Stay
 5012GM, remove and
discard the UCP, refer to AMM Task 32-11-16-000-801 and CMMm 32-12-74.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340-500/600
SERVICE BULLETIN
(b) At the Upper Cardan Pin joint on the LH MLG Side Stay
 5012GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-74 and Fig. A-UBAAA
Sheet 02
 , to the surface of the threads on the Upper Cardan Pin, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
(c) Go to SUBTASK 325115-410-401 004 Install the Upper Cardan Pin Nut on the LH
MLG
 .
(4) Subtask 325115-833-402-003 - Replace the Upper Cardan Pin on the RH MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
 Work location
 RH Main Landing Gear
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-000-801
Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-74
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet
 01
Sheet
 02
(a) At the Upper Cardan Pin joint on the RH MLG Side Stay
 5013GM, remove and
discard the UCP, refer to AMM Task 32-11-16-000-801 and CMMm 32-12-74.
(b) At the Upper Cardan Pin joint on the RH MLG Side Stay
 5013GM, install a new
UCP, refer to AMM Task 32-11-16-400-801, CMMm 32-12-74 and Fig. A-UBAAA
Sheet 02
 , to the surface of the threads on the Upper Cardan Pin, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340-500/600
SERVICE BULLETIN
(c) Go to SUBTASK 325115-410-402 003 Install the Upper Cardan Pin Nut on the RH
MLG
 .
(5) Subtask 325115-410-401-004 - Install the Upper Cardan Pin Nut on the LH MLG
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant -
General Purpose Interfay
06AAC5
 As required
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-74
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet
 01
Sheet
 02
(a) Install the UCP Nut on the LH MLG:
1
 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-74, to the
threads of the UCP nut and the splines of the UCP, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340-500/600
SERVICE BULLETIN
2
 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to AMM Task 32-11-16-400-801 and
CMMm 32-12-74, to the threads of the UCP nut and the splines of the UCP,
apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01
 and Fig. A-UBAAA
Sheet 02
 , apply:
Polysulfide Sealant
- General Purpose
Interfay
06AAC5
 As required
(6) Subtask 325115-410-402-003 - Install the Upper Cardan Pin Nut on the RH MLG
Work Zones and Access Panels
Zone
 Access/Work location
741
 Work location
 RH Main Landing Gear
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant -
General Purpose Interfay
06AAC5
 As required
Non Hardening Jointing
Putty-High Temp
06LDG6
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 32-11-16-400-801
Component Maintenance Manual
Manufacturer (CMMm)
32-12-74
Fig. A-UBAAA
Removal and Installation of the Side
Stay Upper Cardan Pin and Nut
Sheet
 01
Sheet
 02
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340-500/600
SERVICE BULLETIN
(a) Install the UCP Nut on the RH MLG:
1
 If NO damage, pitting or corrosion was found on the UCP Nut, install the
UCP Nut, refer to AMM Task 32-11-16-400-801 and CMMm 32-12-74, to the
threads of the UCP nut and the splines of the UCP, apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
2
 If damage, pitting or corrosion was found on the UCP Nut, discard the UCP
Nut and install a new UCP Nut, refer to AMM Task 32-11-16-400-801 and
CMMm 32-12-74, to the threads of the UCP nut and the splines of the UCP,
apply:
Non Hardening
Jointing Putty-High
Temp
06LDG6
 As required
(b) On the UCP Locking Assembly, refer to Fig. A-UBAAA Sheet 01
 and Fig. A-UBAAA
Sheet 02
 , apply:
Polysulfide Sealant
- General Purpose
Interfay
06AAC5
 As required
**CONF ALL
D. TEST
**CONF 001
(1) Subtask 325115-700-401-001 - Testing
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
741
 Work location
 RH Main Landing Gear
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 32-31-00-710-801
Task 32-31-00-740-801
Task 32-33-00-710-801
NOTE
: The worksteps that follow are only necessary if the Upper Cardan Pin
has been replaced.
(a) Do a BITE test of the Normal Extension and Retraction System, refer to AMM Task
32-31-00-740-801.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340-500/600
SERVICE BULLETIN
(b) Do a functional test of the Normal Extension and Retraction, refer to AMM Task
32-31-00-710-801.
(c) Do an operational test of the Free-Fall System, refer to AMM Task
32-33-00-710-801.
**CONF 002
(1) Subtask 325115-700-401-001 - Testing
Work Zones and Access Panels
Zone
 Access/Work location
731
 Work location
 LH Main Landing Gear
741
 Work location
 RH Main Landing Gear
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 32-31-00-710-801
Task 32-31-00-740-801
Task 32-33-00-710-801
NOTE
: The worksteps that follow are only necessary if the Upper Cardan Pin
has been replaced.
(a) Do a BITE test of the Normal Extension and Retraction System, refer to AMM Task
32-31-00-740-801.
(b) Do a functional test of the Normal Extension and Retraction, refer to AMM Task
32-31-00-710-801.
(c) Do an operational test of the Free-Fall System, refer to AMM Task
32-33-00-710-801.
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 325115-942-401-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 07-11-00-586-801
Task 32-11-16-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 31
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340-500/600
SERVICE BULLETIN
(b) Do the Close-up and Close Access procedures as specified in "Installation of the
MLG Side Stay Assembly", refer to AMM Task 32-11-16-400-801.
(c) Lower the aircraft off jacks, refer to AMM Task 07-11-00-586-801.
(d) Put the aircraft back to its initial configuration.
**CONF 002
(1) Subtask 325115-942-401-001 - Close-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 07-11-00-586-801
Task 32-11-16-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Close-up and Close Access procedures as specified in "Installation of the
MLG Side Stay Assembly", refer to AMM Task 32-11-16-400-801.
(c) Lower the aircraft off jacks, refer to AMM Task 07-11-00-586-801.
(d) Put the aircraft back to its initial configuration.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 32
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340-500/600
SERVICE BULLETIN
**CONF ALL
NOTE: THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
HAS THE LH OR RH
MAIN LANDING GEAR (MLG)
BEEN REPLACED POST ENTRY
YES
INTO SERVICE (EIS)?
REMOVE UPPER CARDAN NUT
WITHIN THE ACCOMPLISHMENT
TIMESCALES DEFINED IN PARA 1.E. (2),
CLEAN THE THREADS OF THE
UPPER CARDAN PIN AND NUT
IS CORROSION, 
PITTING, OR THREAD
DAMAGE OBSERVED ON THE THREADS
OF THE UPPER CARDAN NUT
REASSEMBLE UPPER
CARDAN JOINT
NO FURTHER
ACTION
YES
NEXT FLIGHT
REPLACE DAMAGED
PART(S) BEFORE
NO
NO
AND/OR THE UPPER
CARDAN PIN?
ON THE THREADS OF THE
UPPER CARDAN PIN AND NUT
DO A DETAILED INSPECTION
F_SB_325115_7_FAAA_01_03
Figure A-UFAAA - Sheet 01
Flow Chart
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 33
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340-500/600
SERVICE BULLETIN
**CONF ALL
A
A
A
A
SIDE STAY
LH SHOWN
RH SIMILAR
5012GM
(5013GM)
F_SB_325115_7_BAAA_01_02
Figure A-U BAAA - S heet 01
Removal and Installation of the Side Stay Upper Cardan Pin and Nut
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 34
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340-500/600
SERVICE BULLETIN
**CONF ALL
SEALANT
CARDAN NUT
SEALANT
UPPER CARDAN PIN LOCKING ASSEMBLY.
NOTE:
APPLY MAT NO. 06AAC5 TO COMPLETELY COVER01
01 01
A A
ASSEMBLY
ILLUSTRATION SHOWS THE COVERAGE OF THE SEALANT
AND IS TYPICAL FOR NUT AND LOCKING ASSEMBLIES
B
B
UPPER
CARDAN PIN
F_SB_325115_7_BAAA_02_03
Figure A-U BAAA - S heet 02
Removal and Installation of the Side Stay Upper Cardan Pin and Nut
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 35
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340-500/600
SERVICE BULLETIN
**CONF ALL
A
A
B
NOTE:
AREA OF INSPECTION
B
LH SHOWN
RH SIMILAR
SIDE STAY
5012GM
(5013GM)
UPPER
CARDAN PIN
UPPER
CARDAN PIN NUT
F_SB_325115_7_BBAA_01_02
Figure A-U BBAA - S heet 01
Inspection of the Side Stay Upper Cardan Pin Nut
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 36
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340-500/600
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A340−32−5115
SB ELAPSED TIME
(HOURS)
GET ACCESS
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
23.00
13.00
STEPS
1.00 1.00
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
1
:
:
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
2 468 1 0 1 2 1 40 16 18 20
INSPECT THE UPPER CARDAN PIN NUT ON THE LH MLG 4.00 4.001
INSPECT THE UPPER CARDAN PIN NUT ON THE RH MLG 4.00 4.001
REPLACE THE UPPER CARDAN PIN ON THE LH MLG
REPLACE THE UPPER CARDAN PIN ON THE RH MLG
INSTALL THE UPPER CARDAN PIN NUT ON THE LH MLG 2.00 2.001
INSTALL THE UPPER CARDAN PIN NUT ON THE RH MLG 2.00 2.001
1.00 1.00 1
1.00 1.00 1
4.00 4.001
4.00 4.001
TEST
CLOSE−UP
F_SB_325115_7_AAAA_01_01
Figure A-U AAAA - S heet 01
Gantt Chart
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340-500/600
SERVICE BULLETIN
REPORTING SHEET
TITLE: LANDING GEAR - MAIN GEAR - INSPECTION OF SIDE STAY UPPER
CARDAN PIN AND NUT
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340-500/600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Feb 17/15 SERVICE BULLETIN No.: A340-32-5115
REVISION No.: 01 - Dec 11/15 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
