# Airbus Service Bulletin A340-52-4118

Copy: No revision named ("A340-52-4118 R00"), 95 pages: PDF https://openairdocs.org/files/sha256/29/c4/29c429ad609a30c46f55e1297d0d1a75b9eba77c267786a706c778319540c424; text https://openairdocs.org/service-documents/airbus/a340-52-4118/file/29c429ad609a.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0713; AD 2018-02-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-52-4118
- Page: https://openairdocs.org/service-documents/airbus/a340-52-4118

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-02-17](https://openairdocs.org/ad/2018-02-17.md), effective Mar 16, 2018: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-52-4118/proposed.md).

## Text (95 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0713; AD 2018-02-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
ATA SYSTEM: 52
TITLE: DOORS - AFT CARGO COMPARTMENT DOOR - IMPROVE FATIGUE
LIFE BY COLD WORK OF AFT CARGO DOOR FRAME STRUCTURE
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 205671D52123
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Following structure analysis, it has been confirmed that FWD Cargo Compartment Door areas require
reinforcements before reaching the Design Service Goal (DSG).
The accomplishment of the Service Bulletin will introduce a fatigue improvement of the fastener holes in
the cargo door frame structure by cold working and changing fastener type and size.
The accomplishment of this Service Bulletin containing fatigue improvement by cold working of frame
fork fastener and frame structure holes and changing fasteners give operators the option to optimize
their maintenance planning for implementation of the mandatory structural reinforcement Service
Bulletin 52-4109/52-4115 by postponing the Structural Modification Point (SMP).
Pre Service Bulletin 52-4118 Structural Modification Point: 18500 FC
Post Service Bulletin 52-4118 Structural Modification Point: POE Cold working +18500 FC (POE = Point
Of Embodiment)
The related structure modification Service Bulletin is Service Bulletin 52-4109 and Service Bulletin
52-4115.
NOTE
: Service Bulletin 52-4118 (cold working) does not constitute terminating action for
inspection Service Bulletin 52-4101 (repetitive inspection).
This Service Bulletin is based on the aircraft configuration as known by AIRBUS (first aircraft delivery
configuration and modified by the reported incorporation of AIRBUS Service Bulletins).
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
SUMMARY
Prior to Service Bulletin embodiment, specific attention must be paid to structural damage which may
exist and to repairs which were performed on the aircraft because they may be affected by the Service
Bulletin. It must be verified that all allowable damage limits and repairs performed (both in accordance
with the SRM and outside of the SRM) are still applicable and effective to the new Service Bulletin
configuration. There may be additional or modified maintenance requirements, such as temporary limits
or additional inspections that apply with respect to the Service Bulletin configuration.
AIRBUS disclaims any liability for the effect which the Service Bulletin may have on repairs performed
on the aircraft before embodiment of the Service Bulletin. If the post Service Bulletin repair status
is not covered by the SRM and for repairs outside of the SRM covered by an RAS issued by
AIRBUS, AIRBUS Customer Services Repair Engineering Support department should be contacted.
Repair review will be done by AIRBUS at conditions of the Customer Services Catalogue.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 RECOMMENDED (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 NO
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 YES
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin recommended to be accomplished to prevent significant operational
disruptions.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 524118D01R01
 1
 1,100.00
 Nut, Bolt, Washer, Rivet
Standard tool TOOLD01
 1
 See SB
 Expendable Tool, Durable Tool, Capital
Tool
Standard tool TOOLD02
 1
 See SB
 Expendable Tool, Durable Tool, Capital
Tool
Component COMPD01
 1
 See SB
 Placard
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06Y 15R 31V 41N 74W 98W AFR AIB ALD ARG CPA D2F DGA
DLH F2I FIN HFM IBE IRC IRM KAC M3R MAU QAF S3R SFB
SLM SWR TAP THY UAE VCV
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 52.32.00.003
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
SUMMARY
OEB
 None
AOT
 None
SIL
 None
ISI
 51.48.00001
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 524118-831-848-001: Modification
TOTAL MANHOURS
 168.00
ELAPSED TIME (HOURS)
 168.0
APPENDICES
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
BEAM4
A
FR64A
FR64
FR63A
FR63
FR62A
FR62
FR61A
FR61
FR60A
FR60
AREA OF FASTENER REPLACEMENT
NOTE:
BEAM3
ADD PLACARD
Z822
A
F_SB_524118_6_SAAA_01_00
Figure A-GSAAA - Sheet 01
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 52
TITLE: DOORS - AFT CARGO COMPARTMENT DOOR - IMPROVE FATIGUE
LIFE BY COLD WORK OF AFT CARGO DOOR FRAME STRUCTURE
MODIFICATION No.: 205671D52123
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This modification is applicable by Service Bulletin only.
(1) Models
340-211 340-212 340-213 340-311 340-312 340-313
(2) Effectivity by MSN
0001-0002 0004 0009 0014 0016 0020 0022-0023 0025-0026 0029 0031 0038 0041
0043-0044 0046-0047 0049 0051 0056-0058 0061 0063 0074-0076 0078-0081
0084-0085 0089-0091 0093-0094 0101 0104 0114-0115 0117 0123 0125-0126 0128
0134-0137 0139 0142 0145-0147 0149-0152 0154 0156-0160 0163
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06Y
 0139 0149
15R
 0151
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
OPERATOR
 MSN
31V
 0093
41N
 0009
74W
 0047 0051
98W
 0014 0022
AFR
 0029 0078 0084
AIB
 0001
ALD
 0156 0159
ARG
 0063 0074 0080 0085 0094 0123 0126 0128
CPA
 0136 0137 0142 0147 0157 0160
D2F
 0016
DGA
 0075 0081
DLH
 0135 0158
F2I
 0038 0043 0114
FIN
 0058
HFM
 0117
IBE
 0125 0134 0145 0146
IRC
 0002
IRM
 0020 0056
KAC
 0089 0090 0101 0104
M3R
 0061
MAU
 0076 0152
QAF
 0026
S3R
 0004
SFB
 0046
SLM
 0049
SWR
 0150 0154
TAP
 0041 0044 0079 0091
THY
 0023 0025 0057 0115
UAE
 0163
VCV
 0031
(4) Configuration by MSN
MSN
 CONFIGURATION
0001 0002 0004 0009 0014 0016 0020 0022 0023 0025 0026
0029 0031 0038 0041 0043 0044 0046 0047 0049 0051 0056
0057 0058 0061 0063 0074 0075 0076 0078 0079 0080 0081
0084 0085 0089 0090 0091 0093 0094 0101 0104 0114 0115
0117 0123 0125 0126 0128 0134 0135 0136 0137 0139 0142
0145 0146 0147 0149 0150 0151 0152 0154 0156 0157 0158
0159 0160 0163
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLD01
 1
Kit 524118D01R01
 1
Standard tool TOOLD01
 1
Standard tool TOOLD02
 1
Component COMPD01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Following structure analysis, it has been confirmed that FWD Cargo Compartment Door
areas require reinforcements before reaching the Design Service Goal (DSG).
(2) Objective/Action
The accomplishment of the Service Bulletin will introduce a fatigue improvement of the
fastener holes in the cargo door frame structure by cold working and changing fastener
type and size.
(3) Advantages
The accomplishment of this Service Bulletin containing fatigue improvement by cold
working of frame fork fastener and frame structure holes and changing fasteners give
operators the option to optimize their maintenance planning for implementation of the
mandatory structural reinforcement Service Bulletin 52-4109/52-4115 by postponing the
Structural Modification Point (SMP).
Pre Service Bulletin 52-4118 Structural Modification Point: 18500 FC
Post Service Bulletin 52-4118 Structural Modification Point: POE Cold working +18500
FC (POE = Point Of Embodiment)
The related structure modification Service Bulletin is Service Bulletin 52-4109 and
Service Bulletin 52-4115.
NOTE
: Service Bulletin 52-4118 (cold working) does not constitute terminating
action for inspection Service Bulletin 52-4101 (repetitive inspection).
(4) Operational/Maintenance Consequences
This Service Bulletin is based on the aircraft configuration as known by AIRBUS (first
aircraft delivery configuration and modified by the reported incorporation of AIRBUS
Service Bulletins).
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
Prior to Service Bulletin embodiment, specific attention must be paid to structural
damage which may exist and to repairs which were performed on the aircraft
because they may be affected by the Service Bulletin. It must be verified that all
allowable damage limits and repairs performed (both in accordance with the SRM and
outside of the SRM) are still applicable and effective to the new Service Bulletin
configuration. There may be additional or modified maintenance requirements, such as
temporary limits or additional inspections that apply with respect to the Service Bulletin
configuration.
AIRBUS disclaims any liability for the effect which the Service Bulletin may have on
repairs performed on the aircraft before embodiment of the Service Bulletin. If the post
Service Bulletin repair status is not covered by the SRM and for repairs outside of
the SRM covered by an RAS issued by AIRBUS, AIRBUS Customer Services Repair
Engineering Support department should be contacted. Repair review will be done by
AIRBUS at conditions of the Customer Services Catalogue.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 524118-831-848-001: Modification
(1) Remove Items for Access
(2) Replace the Frame Fork Fasteners at Beam 4 FR64A
(3) Replace the Frame Fork Fasteners at Beam 4 FR64
(4) Replace the Frame Fork Fasteners at Beam 4 FR63A
(5) Replace the Frame Fork Fasteners at Beam 4 FR63
(6) Replace the Frame Fork Fasteners at Beam 4 FR62A
(7) Replace the Frame Fork Fasteners at Beam 4 FR62
(8) Replace the Frame Fork Fasteners at Beam 4 FR61A
(9) Replace the Frame Fork Fasteners at Beam 4 FR61
(10) Replace the Frame Fork Fasteners at Beam 4 FR60A
(11) Remove the Handle Brackets
(12) Replace the Joint Angle Fasteners at Mid Part FR60
(13) Install the Handle Brackets
(14) Replace the Fasteners Between Beam 3A and Beam 4 at FR60
(15) Install the Placard
(16) Install Items Removed for Access
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin is recommended in the embodiment window of
14500 FC and 18500 FC.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 524118-831-848-001: Modification
Get Access
 0.50
On Aircraft
Remove Items for Access
 8.00
Replace the Frame Fork Fasteners at Beam 4 FR64A
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR64
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR63A
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR63
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR62A
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR62
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR61A
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR61
 10.00
Replace the Frame Fork Fasteners at Beam 4 FR60A
 10.00
Remove the Handle Brackets
 9.00
Replace the Joint Angle Fasteners at Mid Part FR60
 4.50
Install the Handle Brackets
 13.50
Replace the Fasteners Between Beam 3A and Beam 4
at FR60
27.50
Install the Placard
 0.50
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
Task 524118-831-848-001: Modification
Install Items Removed for Access
 12.00
Tests
 2.00
Close-Up
 0.50
TOTAL MANHOURS
 168.00
ELAPSED TIME (HOURS)
 168.0
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
11-00-00 12-34-24 20-16-00
20-21-11 52-30-00 52-32-11
52-32-15 52-32-21 52-71-13
52-71-21
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-33-00 20-52-10 20-54-50
20-55-00
In Service Information (ISI)
 ISI 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-62-02
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-12 51-24-00 51-42-00
51-42-11 51-43-00 51-44-00
51-44-11 51-46-11 51-47-00
51-48-00 51-49-00 51-75-12
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 524118D01R01
 AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotlines:
A350/A380: +49 40 743 51775
A330/340, A300/310: +49 40 743 51616
A318/319/320/321: +49 40 743 51660
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Component COMPD01
 AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 4012
For ordering by E-mail:
ifd.spares@airbus.com
(2) Price and Availability
Kit 524118D01R01
Cost
 1,100.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
Component COMPD01
Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
T e l :( 3 3 )56 71 90 62 2
E-mail: monitored.retrofit@airbus.com
F a x :( 3 3 )56 19 32 74 5
C. LIST OF COMPONENTS
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
700
 NAS1149D0332K
 70
 WASHER
 (1)
832
 ASNA2657K3-4
 40
 BOLT
 (2)
833
 ASNA2657K3-5
 31
 BOLT
 (2)
834
 ASNA2657K3-6
 43
 BOLT
 (2)
835
 ASNA2657K3-7
 10
 BOLT
 (2)
904
 NAS1097KE5-9
 2
 RIVET
920
 LN9198-4017CF
 49
 RIVET
973
 EN6080KE5-08
 2
 RIVET
980
 LN9198-4814CF
 10
 RIVET
991
 ASNA2536-3
 7
 NUT
993
 ASNA2538-3
 117
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as necessary
to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane - Decorative
External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
662
 F5237211205800
 1
 PLACARD
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
(a) Procurement Addresses
Operators interested in obtaining the FTI tool kits should contact:
Standard tool TOOLD01
 Fatigue Technology Inc.
401 Andover Park East
Seattle, Washington 98188-7605
USA
Internet: www.fatiguetech.com
Phone: (206) 2462010
Fax: (206) 2449886
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
Operators interested in obtaining the WCI tool kits should contact:
Standard tool TOOLD02
 West Coast Industries Inc.
14900 Whitman Ave. N
Seattle, Washington 98133
Phone: (206) 365-7513
Fax: (206) 365-7483
Email: info@coldwork.com
Europe, Middle-East, Africa, India and
Russia:
T e l . :+ 3 356 19 20 49 1( F r a n c e )
Email: customer@capaero.com
(b) Price and Availability
Standard tool TOOLD01
Procurement to be negotiated directly with Fatigue Technology Inc. (FTI).
Standard tool TOOLD02
Procurement to be negotiated directly with West Coast Industries Inc. (WCI).
(2) Tools
NOTE
: To accomplish this Service Bulletin it will be necessary to use the tools
and equipment listed in the s ubsequent referenced tasks:
- refer to AMM Task 52-32-11-820-803
- refer to NTM Task 51-10-01-250-801
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
(3) Special Tools
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 524118-831-848-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
822
Access
Panel
 822AR 822BR 822CR 822DR
Manpower
TOTAL MANHOURS
 168.00
ELAPSED TIME (HOURS)
 168.0
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
A. GENERAL
(1) Subtask 524118-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53
11-00-00, Page Block 201
Task 20-16-00-912-801
Task 20-21-11-911-801
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-33-00
20-52-10
20-54-50
Structural Repair Manual (SRM)
 51-23-12
51-24-00
51-42-00
51-42-11
51-43-00
51-44-11
51-46-11
51-47-00
51-48-00
51-49-00
51-75-12
(a) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(b) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(c) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Materials List (CML).
(d) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(e) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(f) For the identification of access panels, refer to AMM 06-41-53.
(g) For the protection of the connectors , contacts and termi nals, refer to ESPM
20-54-50.
(h) For circuit breaker safety practices, refer to AMM Task 20-16-00-912-801.
(i) Remove and install fasteners in accordance with SRM 51-42-11.
(j) Obtain alternative and substitute fastener data in accordance with SRM 51-43-00.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
(k) Obtain fastener hole diameters and drill data in accordance with SRM 51-44-11.
(l) Torque and tighten Hi-Lite and Hi-lok fasteners in accordance with SRM 51-49-00
(m) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with ’Mating Part’ column.
(n) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(o) If necessary, cut the solid rivets to the correct length in accordance with SRM
51-42-00.
(p) Check all edges distances before drilling in accordance with SRM 51-47-00.
(q) Obtain countersinking data in accordance with SRM 51-46-11.
(r) Do the cold expansion of fastener holes in accordance with SRM 51-48-00.
(s) Apply sealant in accordance with SRM 51-24-00.
(t) Apply special coatings in accordance with SRM 51-23-12.
(u) Renew the protective finish in accordance with SRM 51-75-12.
(v) In case of special paint build up, the removal and installation procedure of this
special paint build up has to be taken into account.
(w) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(x) For the general installation of electr ical wire harnesses, re fer to ESPM 20-33-00.
(y) Do a check of the electr ical connectors before you connect them, r efer to ESPM
20-52-10.
(z) For the installation of placards, refer to AMM 11-00-00, Page Block 201.
(2) Subtask 524118-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 524118-941-201-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at Door 822
C. PROCEDURE
(1) Subtask 524118-010-201-001 - Remove Items for Access
Work Zones and Access Panels
Zone
 Access/Work location
822
Manpower Resources
Manhours
 8.00
Minimum number of person
 1
Subtask elapsed time
 8.00
Skills
 AIRFRAME
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 52-30-00-010-805
Task 52-32-15-000-801
Task 52-32-21-000-801
Task 52-32-21-000-802
Task 52-32-21-000-803
Task 52-32-21-000-804
Task 52-32-21-000-805
Task 52-32-21-000-806
Task 52-32-21-000-807
Task 52-71-13-000-801
Task 52-71-21-000-802
(a) Remove the access panels 822AR, 822BR, 822CR, 822DR, from the Aft Cargo
Compartment Door, refer to AMM Task 52-30-00-010-805.
(b) Remove the protection linings, refer to AMM Task 52-32-15-000-801.
(c) Remove the indicator light, refer to AMM Task 52-71-21-000-802.
(d) Remove the proximity sensor, refer to AMM Task 52-71-13-000-801.
(e) Remove the locking handle, refer to AMM Task 52-32-21-000-801.
(f) Remove the locking shaft, refer to AMM Task 52-32-21-000-802.
(g) Remove the latching handle, refer to AMM Task 52-32-21-000-803.
(h) Remove the latching shaft, refer to AMM Task 52-32-21-000-804.
(i) Remove the interlock mechanism, refer to AMM Task 52-32-21-000-805.
(j) Remove the target mechanism, refer to AMM Task 52-32-21-000-806.
(k) Remove the switch assembly, refer to AMM Task 52-32-21-000-807.
(2) Subtask 524118-831-201-001 - Replace the Frame Fork Fasteners at Beam 4 FR64A
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 64A
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 70
 WASHER
 (1)
832
 ASNA2657K3-4
 2
 BOLT
 (2)
833
 ASNA2657K3-5
 2
 BOLT
 (2)
834
 ASNA2657K3-6
 6
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
References
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 05
 ,V i e wK :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 05
,V i e wK .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 05
 ,V i e wL :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 05
 ,V i e wL :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
2 Bolt ASNA2657K3-4 Item 832
2 Bolt ASNA2657K3-5 Item 833
6 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
(3) Subtask 524118-831-202-001 - Replace the Frame Fork Fasteners at Beam 4 FR64
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 64
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 2
 BOLT
 (2)
833
 ASNA2657K3-5
 2
 BOLT
 (2)
834
 ASNA2657K3-6
 6
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 05
 ,V i e wK :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 05
,V i e wK .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 05
 ,V i e wL :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 05
 ,V i e wL :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
2 Bolt ASNA2657K3-4 Item 832
2 Bolt ASNA2657K3-5 Item 833
6 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(4) Subtask 524118-831-203-001 - Replace the Frame Fork Fasteners at Beam 4 FR63A
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 63A
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 4
 BOLT
 (2)
834
 ASNA2657K3-6
 6
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 04
 ,V i e wD :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 04
,V i e wD .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 04
 ,V i e wE :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 04
 ,V i e wE :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
4 Bolt ASNA2657K3-4 Item 832
6 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(5) Subtask 524118-831-204-001 - Replace the Frame Fork Fasteners at Beam 4 FR63
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 63
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 4
 BOLT
 (2)
833
 ASNA2657K3-5
 1
 BOLT
 (2)
834
 ASNA2657K3-6
 5
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 31
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340
SERVICE BULLETIN
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 05
 ,V i e wH :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 05
,V i e wH .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 32
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340
SERVICE BULLETIN
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 05
 ,V i e wJ :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 05
 ,V i e wJ :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
4 Bolt ASNA2657K3-4 Item 832
1 Bolt ASNA2657K3-5 Item 833
5 Bolt ASNA2657K3-6 Item 834
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 33
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340
SERVICE BULLETIN
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(6) Subtask 524118-831-205-001 - Replace the Frame Fork Fasteners at Beam 4 FR62A
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 62A
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 4
 BOLT
 (2)
833
 ASNA2657K3-5
 2
 BOLT
 (2)
834
 ASNA2657K3-6
 4
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 34
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340
SERVICE BULLETIN
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 35
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340
SERVICE BULLETIN
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 04
 ,V i e wF :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 04
,V i e wF .
1
 If cracks are detected, contact AIRBUS.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 36
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340
SERVICE BULLETIN
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 04
 ,V i e wG :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 04
 ,V i e wG :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
4 Bolt ASNA2657K3-4 Item 832
2 Bolt ASNA2657K3-5 Item 833
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 37
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340
SERVICE BULLETIN
4 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(7) Subtask 524118-831-206-001 - Replace the Frame Fork Fasteners at Beam 4 FR62
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 62
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 4
 BOLT
 (2)
833
 ASNA2657K3-5
 2
 BOLT
 (2)
834
 ASNA2657K3-6
 4
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 38
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340
SERVICE BULLETIN
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 39
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340
SERVICE BULLETIN
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 04
 ,V i e wF :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 40
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340
SERVICE BULLETIN
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 04
,V i e wF .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 04
 ,V i e wG :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 41
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340
SERVICE BULLETIN
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 04
 ,V i e wG :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
4 Bolt ASNA2657K3-4 Item 832
2 Bolt ASNA2657K3-5 Item 833
4 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(8) Subtask 524118-831-207-001 - Replace the Frame Fork Fasteners at Beam 4 FR61A
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 61A
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 42
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 4
 BOLT
 (2)
833
 ASNA2657K3-5
 2
 BOLT
 (2)
834
 ASNA2657K3-6
 4
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 43
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340
SERVICE BULLETIN
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 44
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340
SERVICE BULLETIN
References
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 04
 ,V i e wF :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 04
,V i e wF .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 04
 ,V i e wG :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 45
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340
SERVICE BULLETIN
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 04
 ,V i e wG :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
4 Bolt ASNA2657K3-4 Item 832
2 Bolt ASNA2657K3-5 Item 833
4 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 46
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340
SERVICE BULLETIN
(9) Subtask 524118-831-208-001 - Replace the Frame Fork Fasteners at Beam 4 FR61
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 61
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 4
 BOLT
 (2)
834
 ASNA2657K3-6
 6
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 47
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340
SERVICE BULLETIN
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 48
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340
SERVICE BULLETIN
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 04
 ,V i e wD :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 04
,V i e wD .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 04
 ,V i e wE :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 49
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A340
SERVICE BULLETIN
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 04
 ,V i e wE :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
4 Bolt ASNA2657K3-4 Item 832
6 Bolt ASNA2657K3-6 Item 834
10 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 50
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A340
SERVICE BULLETIN
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(10) Subtask 524118-831-209-001 - Replace the Frame Fork Fasteners at Beam 4 FR60A
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 60A
Manpower Resources
Manhours
 10.00
Minimum number of person
 1
Subtask elapsed time
 10.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 WASHER
 (1)
832
 ASNA2657K3-4
 2
 BOLT
 (2)
833
 ASNA2657K3-5
 2
 BOLT
 (2)
835
 ASNA2657K3-7
 6
 BOLT
 (2)
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 70 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt ASNA2657K.
NOTE
 (2)
: Refer to the table below for alternate fasteners without any restrictions.
Part Number
 Alternative Fasteners
ASNA2657K*-*
 HST11AG*-*
 HST11KM*-*
 HST11AP*-*
 HST11AZ*-*
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 51
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
FTIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524118-1
 Durable Tooling
 1
 (1)
EKA340524118-1
 Expendable Tooling
 1
 (2)
WCIA340524118-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the above tool kit numbers for cold expansion. For
the definition of capital, durable and expendable tools, refer to ISI
51.48.00001.
NOTE
 (1)
: The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 52
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A340
SERVICE BULLETIN
NOTE
 (2)
: The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-62-02
Structural Repair Manual (SRM)
 51-42-11
51-44-00
51-46-11
51-48-00
51-75-12
Fig. A-GBAAA
Replacement of Frame Fork Fasteners
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
(a) Remove, refer to Fig. A-GBAAA Sheet 02
 ,V i e wB :
10 Fastener Item (1) Discard
(b) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
(c) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener holes in accordance with NTM 51-62-02 and refer to Fig. A-
GBAAA Sheet 02
,V i e wB .
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(d) Drill the holes to the starting hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
NOTE
: In case the existing hole diameter is more than or equal to the
minimum starting hole diameter, please contact AIRBUS for further
instructions before next flight.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 53
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A340
SERVICE BULLETIN
(e) Do the cold expansion of the fastener holes in accordance with the SRM 51-48-00
and refer to Fig. A-GBAAA Sheet 03
 ,V i e wC :
Refer to FTI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
FTIA340524118-1 Capital Tooling 1
or
Refer to WCI tools No.:
EKA340524118-1 Expendable Tooling 1
DKA340524118-1 Durable Tooling 1
WCIA340524118-1 Capital Tooling 1
(f) Drill the holes to the final hole diameter, refer to Fig. A-GBAAA Sheet 06
 .
(g) Countersink holes in accordance with SRM 51-46-11.
(h) Deburr all holes in accordance with SRM 51-44-00.
(i) Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
(j) Install in accordance with SRM 51-42-11, refer to Fig. A-GBAAA Sheet 03
 ,V i e wC :
NOTE
: If necessary install the washer, Item 700, with bolt ASNA2657K, in
order to achieve the correct grip length.
70 Washer NAS1149D0332K Item 700
2 Bolt ASNA2657K3-4 Item 832
2 Bolt ASNA2657K3-5 Item 833
6 Bolt ASNA2657K3-7 Item 835
10 Nut ASNA2538-3 Item 993
with:
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 54
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A340
SERVICE BULLETIN
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
(k) Renew the protective finish in accordance with SRM 51-75-12 with:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane -
Decorative External
Struc
04JMD3 As required
(11) Subtask 524118-020-202-001 - Remove the Handle Brackets
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 from Frame 60 to Frame 60A
Manpower Resources
Manhours
 9.00
Minimum number of person
 1
Subtask elapsed time
 9.00
Skills
 AIRFRAME
References
Non Destructive Test Manual (NTM)
 51-62-02
Fig. A-GBBAA
Removal and Installation of Handle
Brackets
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
(a) Remove from the inner skin, refer to Fig. A-GBBAA Sheet 04
 ,V i e wE :
34 Fastener Item (1) Discard
(b) Remove from the handle brackets, refer to Fig. A-GBBAA Sheet 02
 ,V i e wC ,Fig. A-
GBBAA Sheet 05
 , Section A-A, Fig. A-GBBAA Sheet 06
 , Section C-C and Fig. A-
GBBAA Sheet 07
, Section E-E:
20 Fastener Item (1) Discard
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 55
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A340
SERVICE BULLETIN
(c) Remove from the Cargo Door, refer to Fig. A-GBBAA Sheet 02
 ,V i e wC :
2 Retaining Ring Item (2) Retain
1 Tube Item (3) Retain
1 Bracket Assy Item (4) Retain
1 Bracket Assy Item (5) Retain
(d) Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto Test
method, of the fastener hole in accordance with NTM 51-62-02 and refer to Fig. A-
GBBAA Sheet 05
, Section A-A.
1
 If cracks are detected, contact AIRBUS.
2
 If no cracks are detected, continue with the next work-step.
(12) Subtask 524118-831-212-001 - Replace the Joint Angle Fasteners at Mid Part FR60
Work Zones and Access Panels
Zone
 Access/Work location
822
 Access
 Panel 822AR, Panel 822BR, Panel 822CR,
Panel 822DR
Work location
 Frame 60
Manpower Resources
Manhours
 4.50
Minimum number of person
 1
Subtask elapsed time
 4.50
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524118D01R01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
980
 LN9198-4814CF
 9
 RIVET
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4118
REVISION No.: 00 - Apr 20/16 Page: 56
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a340-52-4118/file/29c429ad609a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
