# Airbus Service Bulletin A340-52-4120

Copy: No revision named ("A340-52-4120 R00"), 86 pages: PDF https://openairdocs.org/files/sha256/13/f9/13f93ef46dbd7c9e893450c6047e7070a1b04d34bfe4fdd026c6544c25cd7f54; text https://openairdocs.org/service-documents/airbus/a340-52-4120/file/13f93ef46dbd.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0713; AD 2018-02-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-52-4120
- Page: https://openairdocs.org/service-documents/airbus/a340-52-4120

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-02-17](https://openairdocs.org/ad/2018-02-17.md), effective Mar 16, 2018: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-52-4120/proposed.md).

## Text (86 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0713; AD 2018-02-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
ATA SYSTEM: 52
TITLE: DOORS - FWD CARGO COMPART MENT DOOR - IMPROVE FATIGUE
LIFE BY COLD WORK OF FWD CARGO DOOR FRAME STRUCTURE
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 205858D52152
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Following structure analysis, it has been confirmed that FWD Cargo Compartment Door areas require
reinforcements before reaching the Design Service Goal (DSG).
The accomplishment of the Service Bulletin will introduce a fatigue improvement of the fastener holes in
the cargo door frame structure by cold working and changing fastener type and size.
The accomplishment of this Service Bulletin containing fatigue improvement by cold working of frame
fork fastener and frame structure holes and changing fasteners give operators the option to optimize
their maintenance planning for implementation of the mandatory structural reinforcement SB 52-4113 by
postponing the Structural Modification Point (SMP).
Pre SB 52-4120 SMP: 18,500 FC
Post SB 52-4120 SMP: Point Of Embodiment (POE) Cold working +18,500 FC
The related structure modification SB is: SB 52-4113
NOTE
: SB 52-4120 (cold working) does not constitute terminating action for inspection SB
52-4095 (repetitive inspection).
This Service Bulletin is based on the aircraft configuration as known by AIRBUS (first aircraft delivery
configuration and modified by the reported incorporation of AIRBUS Service Bulletins).
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
SUMMARY
Prior to Service Bulletin embodiment, specific attention must be paid to structural damage which may
exist and to repairs which were performed on the aircraft because they may be affected by the Service
Bulletin. It must be verified that all allowable damage limits and repairs performed (both in accordance
with the SRM and outside of the SRM) are still applicable and effective to the new Service Bulletin
configuration.
There may be additional or modified maintenance requirements, such as temporary limits or additional
inspections that apply with respect to the Service Bulletin configuration.
AIRBUS disclaims any liability for the effect which the Service Bulletin may have on repairs performed
on the aircraft before embodiment of the Service Bulletin.
If the post Service Bulletin repair status is not covered by the SRM and for repairs outside of the SRM
covered by an RAS issued by AIRBUS, AIRBUS Customer Services Repair Engineering Support
department should be contacted. Repair review will be done by AIRBUS at conditions of the Customer
Services Catalogue.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 RECOMMENDED (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 NO
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 YES
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin recommended to be accomplished to prevent significant operational
disruptions.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 524120D01R00
 1
 540.00
 Bolt, nut, rivet, washer
Standard tool TOOLD01
 1
 See SB
 Expendable Tool Kit, Durable Tool Kit,
Capital Tool Kit
Standard tool TOOLD02
 1
 See SB
 Expendable Tool Kit, Durable Tool Kit,
Capital Tool Kit
Component COMPD01
 1
 See SB
 Placard
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
31V 83V 98X AFR AIB ALK ARG BOE CAL DLH GAF HFM IBE
IRM LAN MAU MDG MRJ O2X PAL QAF SAA SAS SWR THT THY
CONCURRENT REQUIREMENTS
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
SUMMARY
REFERENCES / REPERCUSSIONS
TFU
 52.31.00.007
OEB
 None
AOT
 None
SIL
 None
ISI
 51.48.00001
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 524120-831-848-001: Modification
TOTAL MANHOURS
 50.25
ELAPSED TIME (HOURS)
 46.25
APPENDICES
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
BEAM4
BEAM1
FR25
FR24A
FR24
FR23A
FR23
FR22A
FR22
FR21A
FR21
FR20B
A
FRAME FORK FASTENER HOLES ON              REINFORCED
BEAM3A 01
BEAM4
NOTE:
01
Z821
A
F_SB_524120_6_SAAA_01_00
Figure A-GSAAA - Sheet 01
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 52
TITLE: DOORS - FWD CARGO COMPART MENT DOOR - IMPROVE FATIGUE
LIFE BY COLD WORK OF FWD CARGO DOOR FRAME STRUCTURE
MODIFICATION No.: 205858D52152
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This modification is applicable by Service Bulletin only.
(1) Models
340-312 340-313
(2) Effectivity by MSN
0257 0260 0263-0264 0268 0270 0273-0274 0278 0280 0282 0292 0297 0302 0304
0307 0310 0318-0319 0321 0325 0327 0329 0331-0332 0335 0347 0352 0354-0355
0363 0367 0373-0374 0377-0379 0381 0385 0387 0390 0395 0399 0402 0406 0411
0413 0415 0424 0429-0430 0433-0435 0438 0446-0447 0450 0459 0467 0470 0474
0483 0528 0538 0541 0544-0546 0554
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
31V
 0381
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
OPERATOR
 MSN
83V
 0280 0292
98X
 0429
AFR
 0260 0307 0310 0377 0399
AIB
 0264
ALK
 0374
ARG
 0373
BOE
 0554
CAL
 0402 0406 0411 0415 0433 0541
DLH
 0297 0304 0321 0325 0327 0335 0347 0352 0354 0379 0390 0434
0447
GAF
 0274 0355
HFM
 0367
IBE
 0329 0483
IRM
 0282
LAN
 0363
MAU
 0268
MDG
 0319
MRJ
 0257
O2X
 0273 0278
PAL
 0302 0318 0332 0387 0459 0474
QAF
 0528
SAA
 0378 0544
SAS
 0413 0424 0430 0435 0450 0467 0470
SWR
 0263 0538 0545 0546
THT
 0385 0395 0438 0446
THY
 0270 0331
(4) Configuration by MSN
MSN
 CONFIGURATION
0257 0260 0263 0264 0268 0270 0273 0274 0278 0280 0282
0292 0297 0302 0304 0307 0310 0318 0319 0321 0325 0327
0329 0331 0332 0335 0347 0352 0354 0355 0363 0367 0373
0374 0377 0378 0379 0381 0385 0387 0390 0395 0399 0402
0406 0411 0413 0415 0424 0429 0430 0433 0434 0435 0438
0446 0447 0450 0459 0467 0470 0474 0483 0528 0538 0541
0544 0545 0546 0554
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 524120D01R00
 1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
MATERIAL
 QTY PER A/C
 SEE NOTES
Standard tool TOOLD01
 1
Standard tool TOOLD02
 1
Component COMPD01
 1
Consumable CMLD01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Following structure analysis, it has been confirmed that FWD Cargo Compartment Door
areas require reinforcements before reaching the Design Service Goal (DSG).
(2) Objective/Action
The accomplishment of the Service Bulletin will introduce a fatigue improvement of the
fastener holes in the cargo door frame structure by cold working and changing fastener
type and size.
(3) Advantages
The accomplishment of this Service Bulletin containing fatigue improvement by cold
working of frame fork fastener and frame structure holes and changing fasteners give
operators the option to optimize their maintenance planning for implementation of the
mandatory structural reinforcement SB 52-4113 by postponing the Structural Modification
Point (SMP).
Pre SB 52-4120 SMP: 18,500 FC
Post SB 52-4120 SMP: Point Of Embodiment (POE) Cold working +18,500 FC
The related structure modification SB is: SB 52-4113
NOTE
: SB 52-4120 (cold working) does not constitute terminating action for
inspection SB 52-4095 (repetitive inspection).
(4) Operational/Maintenance Consequences
This Service Bulletin is based on the aircraft configuration as known by AIRBUS (first
aircraft delivery configuration and modified by the reported incorporation of AIRBUS
Service Bulletins).
Prior to Service Bulletin embodiment, specific attention must be paid to structural
damage which may exist and to repairs which were performed on the aircraft because
they may be affected by the Service Bulletin. It must be verified that all allowable
damage limits and repairs performed (both in accordance with the SRM and outside of
the SRM) are still applicable and effective to the new Service Bulletin configuration.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
There may be additional or modified maintenance requirements, such as temporary
limits or additional inspections that apply with respect to the Service Bulletin
configuration.
AIRBUS disclaims any liability for the effect which the Service Bulletin may have on
repairs performed on the aircraft before embodiment of the Service Bulletin.
If the post Service Bulletin repair status is not covered by the SRM and for repairs
outside of the SRM covered by an RAS issued by AIRBUS, AIRBUS Customer Services
Repair Engineering Support department should be contacted. Repair review will be done
by AIRBUS at conditions of the Customer Services Catalogue.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 524120-831-848-001: Modification
(1) Remove Items for Access
(2) Replace the Frame Fork Fasteners at FR21, at Beam 4
(3) Replace the Frame Fork Fasteners at FR21A, at Beam 4
(4) Replace the Frame Fork Fasteners at FR22, at Beam 4
(5) Replace the Frame Fork Fasteners at FR22A, at Beam 4
(6) Replace the Frame Fork Fasteners at FR23, at Beam 4
(7) Replace the Frame Fork Fasteners at FR23A, at Beam 4
(8) Replace the Frame Fork Fasteners at FR24, at Beam 4
(9) Replace the Frame Fork Fasteners at FR24A, at Beam 4
(10) Replace the Frame Fork Fasteners at FR25, at Beam 4
(11) Install the Service Bulletin Identification Placard
(12) Install Items Removed for Access
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin is recommended in the window of embodiment
between 12500FC and 18500FC.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 524120-831-848-001: Modification
Get Access
 2.00
On Aircraft
Remove Items for Access
 1.00
Replace the Frame Fork Fasteners at FR21, at Beam
4
4.00
Replace the Frame Fork Fasteners at FR21A, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR22, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR22A, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR23, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR23A, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR24, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR24A, at Beam
4
5.00
Replace the Frame Fork Fasteners at FR25, at Beam
4
5.00
Install the Service Bulletin Identification Placard
 0.25
Install Items Removed for Access
 1.00
Close-Up
 2.00
TOTAL MANHOURS
 50.25
ELAPSED TIME (HOURS)
 46.25
H. WEIGHT AND BALANCE
Not Changed
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-00
11-00-00 12-34-24 20-16-00
20-21-11 24-42-00 52-30-00
52-31-15 52-71-13
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-33-00 20-52-10 20-54-50
20-55-00
In Service Information (ISI)
 ISI 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-23-12 51-24-00 51-40-00
51-42-00 51-42-11 51-43-00
51-44-00 51-44-11 51-46-11
51-47-00 51-48-00 51-49-00
51-75-12 51-76-11
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 524120D01R00
 AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotlines:
A350/A380: +49 40 743 51775
A330/A340, A300/A310: +49 40 743 51616
A318/A319/A320/A321: +49 40 743 51660
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Component COMPD01
 AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 4012
For ordering by E-mail:
ifd.spares@airbus.com
(2) Price and Availability
Kit 524120D01R00
Cost
 540.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
Component COMPD01
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
T e l:( 3 3 )56 71 90 62 2
E-mail : monitored.retrofit@airbus.com
F a x:( 3 3 )56 19 32 74 5
C. LIST OF COMPONENTS
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
700
 NAS1149D0332K
 As
required
WASHER
 (1)
820
 ASNA2532-3
 5
 NUT
821
 NSA5474-3K7
 13
 NUT
852
 EN6114K3-4
 85
 BOLT
853
 EN6114K3-5
 3
 BOLT
991
 ASNA2536-3
 61
 NUT
993
 ASNA2538-3
 27
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as necessary
to compensate the grip length of the bolt EN6114K.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane-- Decorative
External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
660
 F5237211205400
 1
 PLACARD
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
(a) Procurement Addresses
Operators interested in obtaining the Fatigue Technology Inc. (FTI) tool kits should
contact:
Standard tool TOOLD01
 Fatigue Technology Inc.
401 Andover Park East
SEATTLE,
WA 98188-7605
USA
Internet: http://www.fatiguetech.com
Phone: (206) 2462010
Fax: (206) 2449886
Operators interested in obtaining the West Coast industries Inc. (WCI) tool kits
should contact:
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
Standard tool TOOLD02
 West Coast Industries Inc.
14900 Whitman Ave. N
Seattle, Washington 98133
USA
Phone: (206) 365-7513
Fax: (206) 365-7483
Email: info@coldwork.com
Europe, Middle-east, Africa, India and Russia:
customer@capaero.com / +33 5 61 92 04 91
(France)
(b) Price and Availability
Standard tool TOOLD01
Procurement to be negotiated directly with Fatigue Technology Inc. (FTI).
Standard tool TOOLD02
Procurement to be negotiated directly with West Coast industries Inc. (WCI).
(2) Tools
NOTE
: To accomplish this Service Bulletin it is necessary to use the tools and
equipment listed in the subsequent referenced NTM Task:
- refer to NTM Task 51-10-01-250-801
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
(3) Special Tools
None
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 524120-831-848-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer’ to are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
Zone
821
Manpower
TOTAL MANHOURS
 50.25
ELAPSED TIME (HOURS)
 46.25
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
A. GENERAL
(1) Subtask 524120-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-00, Page Block 001
Task 20-16-00-912-801
Task 20-21-11-911-801
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-33-00
20-52-10
20-54-50
Structural Repair Manual (SRM)
 51-23-12
51-24-00
51-40-00
51-42-00
51-42-11
51-43-00
51-44-11
51-46-11
51-47-00
51-48-00
51-49-00
51-75-12
51-76-11
(a) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(b) Put all the retained hardware in identified plastic bags and attach the bags to the
related unit.
(c) For the specification of materials (Mat No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(d) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(e) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(f) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(g) For the protection of the connectors , contacts and termi nals, refer to ESPM
20-54-50.
(h) For circuit breaker safety practices, refer to AMM Task 20-16-00-912-801.
(i) Remove and install fasteners in accordance with SRM 51-42-11.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
(j) Obtain alternative and substitute fastener data in accordance with SRM 51-43-00.
(k) Obtain fastener hole diameters and drill data in accordance with SRM 51-44-11.
(l) Torque tighten Hi-lite and Hi-lok fasteners in accordance with SRM 51-49-00.
(m) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(n) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(o) If necessary, cut the solid rivets to the correct length in accordance with SRM
51-42-00.
(p) Transfer drill existing holes with a pilot drill and drill bush.
(q) Check all edge distances before drilling in accordance with SRM 51-47-00.
(r) Obtain countersinking data in accordance with SRM 51-46-11.
(s) Do the cold expansion of fastener holes in accordance with SRM 51-48-00.
(t) Apply sealant in accordance with SRM 51-24-00.
(u) Apply special coatings in accordance with SRM 51-23-12.
(v) Renew the protective finish in accordance with SRM 51-75-12.
(w) In case of special paint build up, the removal and installation procedure of this
special paint build up has to be taken into account.
(x) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(y) For the general installation of electr ical wire harnesses, re fer to ESPM 20-33-00.
(z) Do a check of the electr ical connectors before you connect them, r efer to ESPM
20-52-10.
(2) Subtask 524120-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
B. PREPARATION
(1) Subtask 524120-941-201-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 24-42-00-861-801
52-30-00, Page Block 201
Task 52-30-00-010-805
52-31-15, Page Block 401
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear).
- Engine shut down, thrust reversers closed and locked.
- Aircraft in clean configuration.
- Parking brake applied.
- Aircraft electrical network de-energized.
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position.
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position below the FWD Cargo Compartment Door.
(c) Energize the ground service network, refer to AMM Task 24-42-00-861-801.
(d) Open the FWD Cargo Compartment Door, refer to AMM 52-30-00, Page Block 201.
(e) Remove the access panels 821AR, 821BR, 821CR and 821DR from the FWD
Cargo Compartment Door, refer to AMM Task 52-30-00-010-805.
(f) Remove the protection linings from the FWD Cargo Compartment Door, refer to
AMM 52-31-15, Page Block 401.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
C. PROCEDURE
(1) Subtask 524120-010-201-001 - Remove Items for Access
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 52-71-13-000-801
(a) Remove the proximity sensor 38MJ, refer to AMM Task 52-71-13-000-801.
(2) Subtask 524120-831-201-001 - Replace the Frame Fork Fasteners at FR21, at Beam
4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 21
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
820
 ASNA2532-3
 2
 NUT
852
 EN6114K3-4
 5
 BOLT
853
 EN6114K3-5
 3
 BOLT
993
 ASNA2538-3
 8
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBAAA
Removal of the Frame Fork Fasteners at
FR21 at Beam 4
Sheet 01
Sheet 02
Fig. A-GBBAA
Installation of the New Frame Fork
Fasteners at FR21 at Beam 4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 21,
Refer to Fig. A-GBAAA
1
 Remove, as shown on Fig. A-GBAAA Sheet 01
 , View A and Fig. A-GBAAA
Sheet 02
,V i e wB :
8 Fastener Item (1) Discard
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
2
 Deburr all holes in accordance with SRM 51-44-00.
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBAAA Sheet 02
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 21,
Refer to Fig. A-GBBAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBBAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBBAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
3
 Deburr all holes in accordance with SRM 51-44-00.
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 21 as shown on Fig. A-GBBAA Sheet 01
 ,V i e wA , Fig. A-
GBBAA Sheet 02
,V i e wBa n dFig. A-GBBAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
2 BOLT EN6114K3-5 Item 853
2 Nut ASNA2538-3 Item 993
4 Bolt EN6114K3-4 Item 852
4 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBBAA Sheet 01
 ,V i e wA , Fig. A-
GBBAA Sheet 02
,V i e wBa n dFig. A-GBBAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
1 Bolt EN6114K3-4 Item 852
1 BOLT EN6114K3-5 Item 853
NOTE
: In case of intersection between collar, Item 993, and radius on
the frame fork, a nut, Item 820, must be installed alternative.
2 Nut ASNA2538-3 Item 993
or
2 Nut ASNA2532-3 Item 820
with:
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(3) Subtask 524120-831-202-001 - Replace the Frame Fork Fasteners at FR21A, at
Beam 4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 21A
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
820
 ASNA2532-3
 2
 NUT
852
 EN6114K3-4
 10
 BOLT
993
 ASNA2538-3
 10
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBDAA
Installation of the New Frame Fork
Fasteners at FR21A at Beam 4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 21A,
Refer to Fig. A-GBCAA
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 21A,
Refer to Fig. A-GBDAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBDAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBDAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 21A as shown on Fig. A-GBDAA Sheet 01
 ,V i e wA , Fig. A-
GBDAA Sheet 02
, View B and Fig. A-GBDAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
8 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBDAA Sheet 01
 ,V i e wA , Fig. A-
GBDAA Sheet 02
, View B and Fig. A-GBDAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 993, and radius on
the frame fork, a nut, Item 820, must be installed alternative.
2 Nut ASNA2538-3 Item 993
or
2 Nut ASNA2532-3 Item 820
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(4) Subtask 524120-831-203-001 - Replace the Frame Fork Fasteners at FR22, at Beam
4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 22
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
820
 ASNA2532-3
 1
 NUT
821
 NSA5474-3K7
 1
 NUT
852
 EN6114K3-4
 10
 BOLT
991
 ASNA2536-3
 1
 NUT
993
 ASNA2538-3
 9
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBEAA
Installation of the New Frame Fork
Fasteners at FR22 at Beam 4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 22,
Refer to Fig. A-GBCAA
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 22,
Refer to Fig. A-GBEAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBEAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBEAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 22 as shown on Fig. A-GBEAA Sheet 01
 ,V i e wA , Fig. A-
GBEAA Sheet 02
,V i e wBa n dFig. A-GBEAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
8 Nut ASNA2538-3 Item 993
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBEAA Sheet 01
 ,V i e wA , Fig. A-
GBEAA Sheet 02
,V i e wBa n dFig. A-GBEAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 993, and radius on
the frame fork, a nut, Item 820, must be installed alternative.
1 Nut ASNA2538-3 Item 993
or
1 Nut ASNA2532-3 Item 820
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
NOTE
: In case of intersection between collar, Item 991, and radius on
the frame fork, a nut, Item 821, must be installed alternative.
1 Nut ASNA2536-3 Item 991
or
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 31
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340
SERVICE BULLETIN
1 Nut NSA5474-3K7 Item 821
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(5) Subtask 524120-831-204-001 - Replace the Frame Fork Fasteners at FR22A, at
Beam 4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 22A
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
821
 NSA5474-3K7
 2
 NUT
852
 EN6114K3-4
 10
 BOLT
991
 ASNA2536-3
 10
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 32
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340
SERVICE BULLETIN
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 33
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340
SERVICE BULLETIN
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBFAA
Installation of the New Frame Fork
Fasteners at FR22A thru FR25 at Beam
4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 22A,
Refer to Fig. A-GBCAA
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 34
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340
SERVICE BULLETIN
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 22A,
Refer to Fig. A-GBFAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBFAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBFAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 35
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340
SERVICE BULLETIN
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 22A as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
8 Nut ASNA2536-3 Item 991
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 991, and radius on
the frame fork, a nut, Item 821, must be installed alternative.
2 Nut ASNA2536-3 Item 991
or
2 Nut NSA5474-3K7 Item 821
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 36
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340
SERVICE BULLETIN
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(6) Subtask 524120-831-205-001 - Replace the Frame Fork Fasteners at FR23, at Beam
4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 23
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
821
 NSA5474-3K7
 2
 NUT
852
 EN6114K3-4
 10
 BOLT
991
 ASNA2536-3
 10
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 37
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 38
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340
SERVICE BULLETIN
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBFAA
Installation of the New Frame Fork
Fasteners at FR22A thru FR25 at Beam
4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 23,
Refer to Fig. A-GBCAA
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 39
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340
SERVICE BULLETIN
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 23,
Refer to Fig. A-GBFAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBFAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBFAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 40
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340
SERVICE BULLETIN
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 23 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
8 Nut ASNA2536-3 Item 991
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 991, and radius on
the frame fork, a nut, Item 821, must be installed alternative.
2 Nut ASNA2536-3 Item 991
or
2 Nut NSA5474-3K7 Item 821
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 41
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340
SERVICE BULLETIN
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(7) Subtask 524120-831-206-001 - Replace the Frame Fork Fasteners at FR23A, at
Beam 4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 23A
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
821
 NSA5474-3K7
 2
 NUT
852
 EN6114K3-4
 10
 BOLT
991
 ASNA2536-3
 10
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 42
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340
SERVICE BULLETIN
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 43
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBFAA
Installation of the New Frame Fork
Fasteners at FR22A thru FR25 at Beam
4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 23A,
Refer to Fig. A-GBCAA
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 44
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340
SERVICE BULLETIN
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 23A,
Refer to Fig. A-GBFAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBFAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBFAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 45
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340
SERVICE BULLETIN
5
 Install on Frame 23A as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
8 Nut ASNA2536-3 Item 991
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 991, and radius on
the frame fork, a nut, Item 821, must be installed alternative.
2 Nut ASNA2536-3 Item 991
or
2 Nut NSA5474-3K7 Item 821
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 46
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340
SERVICE BULLETIN
(8) Subtask 524120-831-207-001 - Replace the Frame Fork Fasteners at FR24, at Beam
4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 24
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
821
 NSA5474-3K7
 2
 NUT
852
 EN6114K3-4
 10
 BOLT
991
 ASNA2536-3
 10
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 47
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340
SERVICE BULLETIN
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 48
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340
SERVICE BULLETIN
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBFAA
Installation of the New Frame Fork
Fasteners at FR22A thru FR25 at Beam
4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 24,
Refer to Fig. A-GBCAA
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 49
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A340
SERVICE BULLETIN
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 24,
Refer to Fig. A-GBFAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBFAA Sheet 03
 .
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBFAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 24 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 50
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A340
SERVICE BULLETIN
8 Nut ASNA2536-3 Item 991
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
6
 Install at beam 4 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 991, and radius on
the frame fork, a nut, Item 821, must be installed alternative.
2 Nut ASNA2536-3 Item 991
or
2 Nut NSA5474-3K7 Item 821
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(9) Subtask 524120-831-208-001 - Replace the Frame Fork Fasteners at FR24A, at
Beam 4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 24A
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 51
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 5.00
Minimum number of person
 1
Subtask elapsed time
 5.00
Skills
 AIRFRAME
NON DESTRUCTIVE
TESTING
Material necessary to do the job
Kit 524120D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
700
 NAS1149D0332K
 As required
 WASHER
 (1)
821
 NSA5474-3K7
 2
 NUT
852
 EN6114K3-4
 10
 BOLT
991
 ASNA2536-3
 10
 NUT
NOTE
 (1)
: A quantity of 83 of this washer is contained in the kit. Use only as
necessary to compensate the grip length of the bolt EN6114K.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane--
Decorative External Struc
04JMD3
 As required
Polysulfide Sealant-General
Purpose Interfay
06AAC1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLD01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
FTIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 52
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A340
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: FTI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLD02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340524120-1
 Durable Tooling
 1
 (1)
EKA340524120-1
 Expendable Tooling
 1
 (2)
WCIA340524120-1
 Capital Tooling
 1
 (3)
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools refer to ISI
51.48.00001.
NOTE
 (1)
: Durable tooling. Ref: DK-A340-52-4120-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling. Ref: EK-A340-52-4120-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling. Ref: WCI-A340-52-4120-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 53
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A340
SERVICE BULLETIN
References
Non Destructive Test Manual (NTM)
 51-10-01
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-75-12
Fig. A-GBCAA
Removal of the Frame Fork Fasteners at
FR21A thru FR25 at Beam 4
Sheet 01
Fig. A-GBFAA
Installation of the New Frame Fork
Fasteners at FR22A thru FR25 at Beam
4
Sheet 01
Sheet 02
Sheet 03
(a) Remove the old fasteners from the Frame Fork at beam 4 Frame 24A,
Refer to Fig. A-GBCAA
1
 Remove, as shown on Fig. A-GBCAA Sheet 01
 ,V i e wB :
10 Fastener Item (1) Discard
2
 Deburr all holes in accordance with SRM 51-44-00.
3
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
and, if necessary, a non metallic scraper.
4
 Do a Special Detailed Inspection (SDI), High Frequency Eddy Current Roto
Test method, of the fastener holes in accordance with NTM 51-10-01 and as
shown on Fig. A-GBCAA Sheet 01
 ,V i e wB .
a
 If cracks are detected:
<1> Contact AIRBUS.
b
 If no cracks are detected:
<1> Continue with the next workstep.
(b) Install the new fasteners on the Frame Fork at beam 4 Frame 24A,
Refer to Fig. A-GBFAA
1
 Open the holes to the correct diameter, as shown on Fig. A-GBFAA Sheet 03
 .
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 54
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A340
SERVICE BULLETIN
2
 Do the cold expansion of the fastener holes, in accordance with SRM
51-48-00 and as shown on Fig. A-GBFAA Sheet 02
 ,V i e wB .
Refer to FTI tool list No.:
FTIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
or
Refer to WCI tool No.:
WCIA340524120-1 Capital Tooling 1
DKA340524120-1 Durable Tooling 1
EKA340524120-1 Expendable Tooling 1
In case the existing hole diameter is more than the minimum starting hole
diameter, please contact AIRBUS for the further instructions before next flight.
3
 Deburr all holes in accordance with SRM 51-44-00.
4
 Clean the contact surfaces with:
Non Aqueous
Cleaner-General
08BAA9 As required
Textile-Lint Free
Cotton
14SBA1 As required
5
 Install on Frame 24A as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
As
required
Washer NAS1149D0332K Item 700
8 Bolt EN6114K3-4 Item 852
8 Nut ASNA2536-3 Item 991
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 55
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A340
SERVICE BULLETIN
6
 Install at beam 4 as shown on Fig. A-GBFAA Sheet 01
 ,V i e wA , Fig. A-
GBFAA Sheet 02
,V i e wBa n dFig. A-GBFAA Sheet 03
 :
NOTE
: If necessary install the washer, Item 700, with bolt EN6114K.
2 Bolt EN6114K3-4 Item 852
NOTE
: In case of intersection between collar, Item 991, and radius on
the frame fork, a nut, Item 821, must be installed alternative.
2 Nut ASNA2536-3 Item 991
or
2 Nut NSA5474-3K7 Item 821
with:
Polysulfide Sealant-
General Purpose
Interfay
06AAC1 As required
7
 In accordance with SRM 51-75-12, renew the protective finish on the installed
fasteners, with:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
Top Coat
Polyurethane--
Decorative External
Struc
04JMD3 As required
(10) Subtask 524120-831-209-001 - Replace the Frame Fork Fasteners at FR25, at Beam
4
Work Zones and Access Panels
Zone
 Access/Work location
821
 Work location
 Frame 25
DATE: Apr 20/16 SERVICE BULLETIN No.: A340-52-4120
REVISION No.: 00 - Apr 20/16 Page: 56
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a340-52-4120/file/13f93ef46dbd.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.