# Airbus Service Bulletin A340-55-5007

Copy: Revision 1 ("FAA-2014-0928 SB A340-55-5007 R01"), 107 pages: PDF https://openairdocs.org/files/sha256/7a/01/7a016350ff2a0961f6a77812a9814444fc0214eaa02332429c01c44acd7d4b6d; text https://openairdocs.org/service-documents/airbus/a340-55-5007/file/7a016350ff2a.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0928; AD 2015-24-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-55-5007
- Latest revision known: A340-55-5007, Revision 1, dated August 20, 2014 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/a340-55-5007

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2015-24-01](https://openairdocs.org/ad/2015-24-01.md), effective Jan 4, 2016: Revision 1

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-55-5007/proposed.md).

## Text (107 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2014-0928; AD 2015-24-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 55
TITLE: STABILIZERS - RUDDER S IDE SHELL SANDWICH REPAIR
INSPECTION
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A340-55-5007
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to embody the local sanding procedure.
CHANGES
SUMMARY
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
REFERENCES / REPERCUSSIONS
 REFERENCES/REPERCUSSIONS TABLE
UPDATED
R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
MATERIAL INFORMATION
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLD01
 CONSUMABLE MATERIAL SET UPDATED
CONSUMABLE UPDATED
R
TOOLING
Tools
 TOOLS UPDATED
 R
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
ACCOMPLISHMENT INSTRUCTIONS
TASK 555007- 832-848-001-Inspection
 TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 555007-910-201-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
MATERIAL LIST UPDATED
R
Subtask 555007-941-201-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 555007-832-201-001
 SUBTASK SOLUTION UPDATED
FIGURE REFERENCE UPDATED
R
Subtask 555007-832-202-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
MATERIAL LIST UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 555007-832-203-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
MATERIAL LIST UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
R
Subtask 555007-832-204-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
CONFIGURATION UPDATED
MATERIAL LIST UPDATED
R
Subtask 555007-832-205-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
MATERIAL LIST UPDATED
REFERENCED DOCUMENTATION UPDATED
FIGURE REFERENCE UPDATED
REFERENCES UPDATED
R
Subtask 555007-832-206-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
MATERIAL LIST UPDATED
R
Subtask 555007-832-207-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
MATERIAL LIST UPDATED
NOTE UPDATED
R
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 555007-833-201-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
MATERIAL LIST UPDATED
R
Subtask 555007-832-208-001
 SUBTASK SOLUTION ADDED
 N
Subtask 555007-942-201-001
 SUBTASK SOLUTION UPDATED
 R
Fig. A-GBFAA
Fig. A-GBFAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GBHAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBHAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GBHAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GBHAA Sheet 03
 SHEET UPDATED
 R
Fig. A-GBHAA Sheet 04
 SHEET ADDED
 N
Fig. A-GFAAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GFAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GFAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GFAAA Sheet 03
 SHEET UPDATED
 R
Fig. A-GFAAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GFAAA Sheet 05
 SHEET UPDATED
 R
Fig. A-GFAAA Sheet 06
 SHEET ADDED
 N
Fig. A-GAAAA
Fig. A-GAAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GABAA
Fig. A-GABAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GABAA Sheet 08
 SHEET UPDATED
 R
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Feb 07/13
REVISION No. : 01 - Aug 20/14
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340-500/600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 55
TITLE: STABILIZERS - RUDDER S IDE SHELL SANDWICH REPAIR
INSPECTION
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
On AIRBUS Single Aisle, Long Range and Wide Body family aircraft, the rudder side shell is a
sandwich structure made of Carbon Fiber Reinforced Plastic (CFRP) and Glass Fiber Reinforced Plastic
(GFRP) with a honeycomb core. A case of skin damage was reported on a composite side panel of a
rudder installed on an A310 aircraft. Investigations have shown that the damage started from a skin
panel area previously repaired in-service. This repair was performed as per A310 SRM 55-41-12 Fig.
204 procedure. The new damage has been identified as a damage between the core and the skin in
the repaired area. This new damage has developed during normal operations due to the variation of
pressure during ground-air-ground cycles.
Following the above mentioned damage scenario, it has been identified that SRM procedures need to
be improved to ensure an adequate repair quality. An improper bonding between skin and core during a
repair may lead to a damage initiation and propagation, which may not be detectable visually. A large
rudder damage, resulting from an undetected damage growth, could affect the handling quality of the
aircraft.
This Service Bulletin details the inspection procedure to inspect affected rudders fitted on A340 aircraft
for potential damage.
Different inspection procedures are necessary:
- Pulse thermography inspection
- Elasticity Laminate Checker (ELCH) inspection
- Ultrasonic Testing (UT) inspection.
- Tap test inspection.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340-500/600
SERVICE BULLETIN
SUMMARY
The accomplishment of this Service Bulletin will contribute to detect potential damage around in-service
repairs accomplished on rudders made of Carbon Fiber Reinforced Plastic (CFRP) and Glass Fiber
Reinforced Plastic (GFRP) with a honeycomb core.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
No Material
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06U 25R 36V 70U 72W AHY
 AIB
 CES CHH DLH ETD HFM
 HFY
IBE QAF QTR SAA SIA TAM THA UAE VIR
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 OIT 999.0017/10 OIT 999.0071/10 OIT 999.0130/06 OIT
999.0067/12 AD 2014-0033
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340-500/600
SERVICE BULLETIN
SUMMARY
MANPOWER
Task 555007-832-848-001: Inspection
TOTAL MANHOURS
 38.00
APPENDICES
None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF ALL
Z326
AA
RUDDER SHELL
TO BE INSPECTED
B
AB
LH SHOWNRH SHOWN
F_SB_555007_6_SAAA_01_01
Figure A-GSAAA - Sheet 01
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340-500/600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 55
TITLE: STABILIZERS - RUDDER S IDE SHELL SANDWICH REPAIR
INSPECTION
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is applicable to all rudders with the Serial Number (SN)
from TS-5001 to TS-5138.
NOTE
: The related SRM procedures do currently not exist for A340-500/600 aircraft,
but in case that repairs of rudder side shells which have been accomplished
in accordance with a SRM A340-200/300 procedure older than SRM April
2010 revision, must be inspected in accordance with this Service Bulletin.
NOTE
: In the case of a rudder originally fitted on one aircraft (refer to AIR delivery
document) that has been removed and installed on another aircraft, it is the
responsibility of the operator to apply the required instructions contained in
this Service Bulletin to the new aircraft.
NOTE
: In case of doubt, contact AIRBUS.
(1) Models
340-541 340-542 340-642
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340-500/600
SERVICE BULLETIN
(2) Effectivity by MSN
0371 0376 0383 0391 0394 0410 0416-0417 0426 0431 0436 0440 0445 0449 0453
0457 0460 0464 0468 0471 0475 0478 0482 0485 0488 0492 0495 0499 0514 0517
0520 0523 0531 0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572 0575
0577 0580 0583 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622 0624 0626
0628 0630 0639 0672 0677 0681 0685 0689 0694 0698 0702 0706 0710 0715 0719
0723 0727 0736 0740 0744 0748 0753 0757 0761-0768 0771 0775 0779 0783 0787
0790 0794 0798 0804 0812 0829 0837 0846 0848 0870 0897 0902 0910 0912 0917
0924 0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030 1040 1079 1091
1122
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06U
 1091
25R
 0924
36V
 0391 0416
70U
 0902
72W
 0917
AHY
 0779
AIB
 0478
 0492
 0499
 0560
CES
 0468 0488 0514 0577 0586
CHH
 0436 0453 0475
DLH
 0482 0517 0523 0537 0540 0543 0566 0569 0580 0583 0762 0763
0767 0771 0790 0794 0812 0846 0848 0897 0972 0981 0987 1005
ETD
 0748 0757 0761 0783 0829 0837 0870 0929 0933 1030 1040
HFM
 0383
HFY
 0910 0912
IBE
 0431 0440 0460 0601 0604 0606 0617 0619 0672 0702 0727 0744
0960 0993 1017 1079 1122
QAF
 0495
QTR
 0715 0740 0766 0798
SAA
 0410 0417 0426 0531 0534 0547 0557 0626 0630
SIA
 0563
TAM
 0445 0464
THA
 0624 0628 0677 0681 0689 0698 0710 0719 0775 0953
UAE
 0394 0457 0471 0485 0520 0572 0608 0611 0685 0694
VIR
 0371 0376 0449 0575 0615 0622 0639 0706 0723 0736 0753 0764
0765 0768 0787 0804
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340-500/600
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0371 0376 0383 0391 0394 0410 0416 0417 0426 0431 0436
0440 0445 0449 0453 0457 0460 0464 0468 0471 0475 0478
0482 0485 0488 0492 0495 0499 0514 0517 0520 0523 0531
0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572
0575 0577 0580 0583 0586 0601 0604 0606 0608 0611 0615
0617 0619 0622 0624 0626 0628 0630 0639 0672 0677 0681
0685 0689 0694 0698 0702 0706 0710 0715 0719 0723 0727
0736 0740 0744 0748 0753 0757 0761 0762 0763 0764 0765
0766 0767 0768 0771 0775 0779 0783 0787 0790 0794 0798
0804 0812 0829 0837 0846 0848 0870 0897 0902 0910 0912
0917 0924 0929 0933 0953 0960 0972 0981 0987 0993 1005
1017 1030 1040 1079 1091 1122
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLD01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
On AIRBUS Single Aisle, Long Range and Wide Body family aircraft, the rudder side
shell is a sandwich structure made of Carbon Fiber Reinforced Plastic (CFRP) and
Glass Fiber Reinforced Plastic (GFRP) with a honeycomb core. A case of skin damage
was reported on a composite side panel of a rudder installed on an A310 aircraft.
Investigations have shown that the damage started from a skin panel area previously
repaired in-service. This repair was performed as per A310 SRM 55-41-12 Fig. 204
procedure. The new damage has been identified as a damage between the core and the
skin in the repaired area. This new damage has developed during normal operations due
to the variation of pressure during ground-air-ground cycles.
Following the above mentioned damage scenario, it has been identified that SRM
procedures need to be improved to ensure an adequate repair quality. An improper
bonding between skin and core during a repair may lead to a damage initiation and
propagation, which may not be detectable visually. A large rudder damage, resulting
from an undetected damage growth, could affect the handling quality of the aircraft.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340-500/600
SERVICE BULLETIN
(2) Objective/Action
This Service Bulletin details the inspection procedure to inspect affected rudders fitted
on A340 aircraft for potential damage.
Different inspection procedures are necessary:
- Pulse thermography inspection
- Elasticity Laminate Checker (ELCH) inspection
- Ultrasonic Testing (UT) inspection.
- Tap test inspection.
(3) Advantages
The accomplishment of this Service Bulletin will contribute to detect potential damage
around in-service repairs accomplished on rudders made of Carbon Fiber Reinforced
Plastic (CFRP) and Glass Fiber Reinforced Plastic (GFRP) with a honeycomb core.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
NOTE
: The listed subtasks are not in sequence with the work steps.
To accomplish this Service Bulletin it is necessary to :
Task 555007-832-848-001: Inspection
(1) Check the rudder repair records
(2) Identify the type, location and size of in-service repairs on the rudder side shell
CFRP areas in case of complete repair records since rudder Entry Into Service (EIS) are
available
(3) Do a pulse thermography inspection on the complete rudder side shell CFRP areas
to identify possible rudder in-service repairs in case of repair records are not complete or
not available
(4) Do the corrective actions in case of fluid ingress detected
(5) Do the ELCH and/or UT inspection around identified repairs/fluid ingress
(6) Do terminating actions in case of no damage detected
(7) Inspect the rudder side shell upper GFRP areas
(8) Close the holes in case of drilling thru the outer skin during paint thickness
measurement
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340-500/600
SERVICE BULLETIN
(9) Identify the repair size by local sanding
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Table 1, Config. 001 - Rudder special detailed inspection for repair detection
Condition
 Action
 Compliance time
 Repetitive interval
All aircraft
 Identify the Serial
Number of the installed
rudder in accordance
with the accomplishment
instructions Subtask
555007-832-201-001
Within 4 months from
original Service Bulletin
issue date
None
All aircraft
 Check the completeness
of the rudder repair
records
Within 4 months from
original Service Bulletin
issue date
None
All aircraft
 Report information
about the repair records
to AIRBUS
Within 4 months from
original Service Bulletin
issue date
None
Repair records are not
complete or not
available
Continue with the
actions given in table 2A
for CFRP areas
Refer to table 2A
 Refer to table 2A
Repair records are not
complete or not
available
Continue with the
actions given in table 2B
for GFRP areas
Refer to table 2B
 Refer to table 2B
Complete repair records
since rudder Entry Into
Service (EIS) are
available
Continue with the
actions given in table
2C for CFRP areas
Refer to table 2C
 Refer to table 2C
Complete repair records
since rudder EIS are
available
Continue with the
actions given in table
2D for GFRP areas
Refer to table 2D
 Refer to table 2D
Table 2A, Config. 001 - Repair records are not complete or not available (CFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Repair records are not
complete or not
available
Report undocumented
rudder Serial Number
list to AIRBUS to get
related rudder
manufacturing rework
data
3 months in advance
before pulse
thermography inspection
is scheduled
None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340-500/600
SERVICE BULLETIN
Table 2A, Config. 001 - Repair records are not complete or not available (CFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Repair records are not
complete or not
available
Make sure that the paint
thickness in all areas to
be inspected does not
exceed the limits given
in the accomplishment
instructions Subtask
555007-832-203-001
Within 24 months from
original Service Bulletin
issue date, before the
pulse thermography
inspection
None
Repair records are not
complete or not
available
Do a pulse
thermography inspection
on the complete side
shells (LH/RH) to
identify repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-203-001
Within 24 months from
original Service Bulletin
issue date
None
No repair detected
 Report to AIRBUS
No further action
necessary in
accordance with this
Service Bulletin
Within 1 month from the
pulse thermography
inspection
None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
Report to AIRBUS
 Within 1 month from the
pulse thermography
inspection
None
Repairs in the booster
area > 55000 mm
2
(85.25 sq.in.) or not in
the booster area
detected during pulse
thermography inspection
Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Within 24 months from
original Service Bulletin
issue date
None
Fluid ingress detected
during pulse
thermography/UT
inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
Damage detected during
ELCH and/or UT
inspection
Provide a detailed
damage report and
report to AIRBUS and
follow their instructions
Before next flight
 None
No damage detected
during ELCH and/or UT
inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340-500/600
SERVICE BULLETIN
Table 2B, Config. 001 - Repair records are not complete or not available (GFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Repair records are not
complete or not
available
Make sure that the paint
thickness in all areas to
be inspected does not
exceed the limits given
in the accomplishment
instructions
555007-832-207-001
Within 24 months from
original Service Bulletin
issue date, before the
pulse thermography
inspection
None
Repair records are not
complete or not
available
Do a pulse
thermography inspection
on the complete GFRP
area in accordance with
the accomplishment
instructions Subtask
555007-832-207-001
Within 24 months from
original Service Bulletin
issue date
None
Repair records are not
complete or not
available
In case of findings, mark
the repairs which are
not manufacturing
reworks
Within 24 months from
original Service Bulletin
issue date
None
Repair records are not
complete or not
available
Do a Tap test inspection
on the complete GFRP
area to identify skin to
core disbonding in
accordance with the
accomplishment
instructions Subtask
555007-832-207-001
Within 24 months from
original Service Bulletin
issue date
None
N os k i nt oc o r e
disbonding but repairs
identified
Do an ELCH and/or UT
inspection on the
complete GFRP area in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Within 24 months from
original Service Bulletin
issue date
None
Fluid ingress detected
during pulse
thermography/UT
inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
Damage detected during
tap test/ELCH and/or
UT inspection
Provide a detailed
damage report and
report to AIRBUS and
follow their instructions
Before next flight
 None
No damage detected
during tap test/ELCH
and/or UT inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340-500/600
SERVICE BULLETIN
Table 2C, Config. 001 - Repair records since rudder EIS are complete (CFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
No repair performed or
repair not to be
inspected in accordance
with this Service Bulletin
Report to AIRBUS
No further action
necessary in
accordance with this
Service Bulletin
Within 24 months from
original Service Bulletin
issue date
None
Repair is performed
since rudder EIS
Identify the repair type
in accordance with the
accomplishment
instructions Subtask
555007-832-202-001
Within 24 months from
original Service Bulletin
issue date
None
Repair identified as type
to be inspected
Make sure that the paint
thickness in all areas to
be inspected does not
exceed the limits given
in the accomplishment
instructions Subtask
555007-832-202-001
Within 24 months from
original Service Bulletin
issue date, before the
pulse thermography
inspection
None
Repair identified as type
to be inspected
Do a pulse
thermography inspection
on repair location in
accordance with the
accomplishment
instructions Subtask
555007-832-202-001
or
Identify the repair size
by local sanding, refer
to Subtask
555007-832-208-001
Within 24 months from
original Service Bulletin
issue date
None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
during pulse
thermography inspection
or local sanding
Report to AIRBUS
 Within 1 month from
pulse thermography
inspection
None
Repairs in the booster
area > 55000 mm 2
(85.25 sq.in.) or not in
the booster area
detected during pulse
thermography inspection
or local sanding
Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Within 24 months from
original Service Bulletin
issue date
None
Fluid ingress detected
during pulse
thermography/UT
inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340-500/600
SERVICE BULLETIN
Table 2C, Config. 001 - Repair records since rudder EIS are complete (CFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Damage detected during
ELCH and/or UT
inspection
Provide a detailed
damage report, report to
AIRBUS and follow their
instructions
Before next flight
 None
No damage detected
during ELCH and/or UT
inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
Table 2D, Config. 001 - Repair records since rudder EIS are complete (GFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
No repair performed or
repair not to be
inspected in accordance
with this Service Bulletin
Report to AIRBUS
No further action
necessary in
accordance with this
Service Bulletin
Within 24 months from
original Service Bulletin
issue date
None
Repair performed and
identified as type to be
inspected
Make sure that the paint
thickness in all areas to
be inspected does not
exceed the limits given
in the accomplishment
instructions Subtask
555007-832-207-001
Within 24 months from
original Service Bulletin
issue date, before the
pulse thermography
inspection
None
Repair identified as type
to be inspected
Do a pulse
thermography inspection
on repair location in
accordance with the
accomplishment
instructions Subtask
555007-832-207-001
or
Identify the repair size
by local sanding, refer
to Subtask
555007-832-208-001
Within 24 months from
original Service Bulletin
issue date
None
Repair type A-A
identified
Do a Tap test inspection
on the repair in
accordance with the
accomplishment
instructions Subtask
555007-832-207-001
Within 24 months from
original Service Bulletin
issue date
None
All other repairs
 Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Within 24 months from
original Service Bulletin
issue date
None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340-500/600
SERVICE BULLETIN
Table 2D, Config. 001 - Repair records since rudder EIS are complete (GFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Fluid ingress detected
during pulse
thermography/UT
inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
Damage detected during
tap test/ELCH and/or
UT inspection
Provide a detailed
damage report and
report to AIRBUS and
follow their instructions
Before next flight
 None
No damage detected
during tap test/ELCH
and/or UT inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
Table 3, Config. 001 - Fluid ingress detected
Condition
 Action
 Compliance time
 Repetitive interval
Fluid ingress detected
 Do an ELCH and/or UT
inspection around the
identified fluid ingress in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Before next flight
 None
Damage detected
around the identified
fluid ingress
Report to AIRBUS and
follow their instructions
Before next flight
 None
Local single spot fluid
ingress =< 1500 mm 2
(2.33 sq.in.) detected (no
damage detected around
the identified fluid
ingress)
Report to AIRBUS
 Within 1 month from
pulse thermography
inspection
None
Maximum of 5 local
single spots fluid ingress
per side shell > 1500
mm2 (2.33 sq.in.) and =<
5000 mm2 (7.75 sq.in.)
detected (no damage
detected around the
identified fluid ingress)
Drain by core ventilation
in accordance with the
accomplishment
instructions Subtask
555007-832-204-001
Before next flight
 None
Core ventilation done
 Option 1:
Close the holes with
adhesive tape
Before next flight
 None
Holes closed with tape
 Option 1:
Do repetitive detailed
inspections of the
restored area for loose
or lost tape
Within 900 FH after
closing the holes
At intervals not
exceeding 900 FH
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340-500/600
SERVICE BULLETIN
Table 3, Config. 001 - Fluid ingress detected
Condition
 Action
 Compliance time
 Repetitive interval
Loose or lost tape found
 Option 1:
Close the holes again
with adhesive tape or
refer to Option 2
Before next flight
 None
Core ventilation done
 Option 2:
Close the holes with
GFRP plies
Before next flight
 None
Maximum of 5 local
single spots fluid ingress
per side shell > 1500
mm2 (2.33 sq.in.) and =<
5000 mm2 (7.75 sq.in.)
detected (no damage
detected around the
identified fluid ingress)
Option 1 and 2:
Repetitive thermography
inspections in
accordance with the
accomplishment
instructions Subtask
555007-832-204-001
Within 1000 FC after
closing the holes
Within intervals of 1000
FC until repair
Maximum of 5 local
single spots fluid ingress
per side shell > 1500
mm2 (2.33 sq.in.) and =<
5000 mm2 (7.75 sq.in.)
detected (no damage
detected around the
identified fluid ingress)
Do the repair
 Within 4500 FC, but not
exceeding 24 months
from the first inspection
None
Maximum of 5 local
single spots fluid ingress
per side shell > 1500
mm2 (2.33 sq.in.) and =<
5000 mm2 (7.75 sq.in.)
detected (no damage
detected around the
identified fluid ingress)
Report to AIRBUS
 Within 1 month from the
repair
None
More than 5 local single
spots fluid ingress per
side shell > 1500 mm 2
(2.33 sq.in.) and =<
5000 mm2 (7.75 sq.in.)
detected (no damage
detected around the
identified fluid ingress)
Report to AIRBUS and
follow their instructions
Before next flight
 None
Local single spot fluid
ingress > 5000 mm 2
(7.75 sq.in.) detected (no
damage detected around
the identified fluid
ingress)
Report to AIRBUS and
follow their instructions
Before next flight
 None
Tables 4.A thru 4.D, Config. 001: No damage detected during ELCH/UT inspection:
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340-500/600
SERVICE BULLETIN
For an identified repair size of a maximum of 10000 mm
2
(15.50 sq.in.), continue with
table 4.A.
For an identified repair size larger than 10000 mm 2 (15.50 sq.in.) and up to 20000 mm 2
(31.00 sq.in.), continue with table 4.B.
For an identified repair size larger than 20000 mm
2
(31.00 sq.in.) and up to 80000 mm
2
(124 sq.in.), continue with table 4.C.
For an identified repair size larger than 80000 mm 2 (124 sq.in.), continue with table 4.D.
Table 4.A, Config. 001 - Identified repair size of a maximum of 10000 mm 2 (15.50 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Repair size =< 10000
mm2 (15.50 sq.in.)
Provide detailed
information about the
identified repair and
report to AIRBUS
Within 1 month from
ELCH/UT inspection
None
Table 4.B, Config. 001 - Identified repair size larger than 10000 mm
2
(15.50 sq.in.) and up to 20000
mm
2
(31.00 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Repair size > 10000
mm
2
(15.50 sq.in.) and
=< 20000 mm
2
(31.00
sq.in.)
Option 1:
Do the core ventilation
thru the inner skin in
accordance with the
accomplishment
instructions Subtask
555007-832-206-001
Before next flight
 None
Core ventilation done
 Option 1:
Hole closing option 1:
Close the holes with
adhesive tape
Before next flight
 None
Holes closed with tape
 Option 1:
Hole closing option 1:
Do repetitive detailed
inspections of the
restored area for loose
or lost tape
Within 900 FH after
closing the holes
At intervals not
exceeding 900 FH
Loose or lost tape found
 Option 1:
Hole closing option 1:
Close the holes again
with adhesive tape or
refer to hole closing
option 2
Before next flight
 None
Core ventilation done
 Option 1:
Hole closing option 2:
Close the holes with
GFRP plies
Before next flight
 None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340-500/600
SERVICE BULLETIN
Table 4.B, Config. 001 - Identified repair size larger than 10000 mm
2
(15.50 sq.in.) and up to 20000
mm
2
(31.00 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Core ventilation done
 Option 1:
Report detailed
information about the
identified repair and the
planned terminating
action to AIRBUS
Within 1 month from first
ELCH/UT inspection
None
Core ventilation done
 Option 1:
Do the repair in
accordance with the
SRM at the identified
repair location
Within 4500 FC, not
exceeding 24 months,
from the first inspection
date
None
Repair size > 10000
mm2 (15.50 sq.in.) and
=< 20000 mm2 (31.00
sq.in.)
Option 2:
Do repetitive ELCH/UT
inspections around the
identified repair area in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Within 900 FH from first
ELCH/UT inspection
Every 900 FH from last
ELCH/UT inspection
Findings during
repetitive ELCH/UT
inspections
Option 2:
Report to AIRBUS and
follow their instructions
Before next flight
 None
No findings during
repetitive ELCH/UT
inspections
Option 2:
Report detailed
information about the
identified repair and the
planned terminating
action to AIRBUS
Within 1 month from
ELCH/UT inspection
None
No findings during
repetitive ELCH/UT
inspections
Option 2:
Do the repair in
accordance with the
SRM at the identified
repair location
Within 4500 FC, not
exceeding 24 months,
from the first inspection
date
None
Table 4.C, Config. 001 - Identified repair size larger than 20000 mm
2
(31.00 sq.in.) and up to 80000
mm
2
(124 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Repair size > 20000
mm
2
(31.00 sq.in.) and
=< 80000 mm
2
(124
sq.in.)
Do the core ventilation
thru inner skin in
accordance with the
accomplishment
instructions Subtask
555007-832-206-001
Before next flight
 None
Core ventilation done
 Option 1:
Close the holes with
adhesive tape
Before next flight
 None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340-500/600
SERVICE BULLETIN
Table 4.C, Config. 001 - Identified repair size larger than 20000 mm
2
(31.00 sq.in.) and up to 80000
mm
2
(124 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Holes closed with tape
 Option 1:
Do repetitive detailed
inspections of the
restored area for loose
or lost tape
Within 900 FH after
closing the holes
At intervals not
exceeding 900 FH
Loose or lost tape found
 Option 1:
Close the holes again
with adhesive tape or
refer to Option 2
Before next flight
 None
Core ventilation done
 Option 2:
Close the holes with
GFRP plies
Before next flight
 None
Repair size > 20000
mm2 (31.00 sq.in.) and
=< 80000 mm2 (124
sq.in.)
Report detailed
information about the
identified repair and the
planned terminating
action to AIRBUS
Within 1 month from first
ELCH/UT inspection
None
Core ventilation done
and repair size =<
30000 mm2 (46.50
sq.in.)
Do the repair in
accordance with the
SRM at the identified
repair location
Within 4500 FC, not
exceeding 24 months,
from the first inspection
date
None
Core ventilation done
and repair size > 30000
mm2 (46.50 sq.in.) and
=< 80000 mm2 (124
sq.in.)
Do the repair in
accordance with the
SRM and additional
instructions from
AIRBUS
Within 4500 FC, not
exceeding 24 months,
from the first inspection
date
None
Table 4.D, Config. 001 - Identified repair size larger than 80000 mm 2 (124 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Repair size > 80000
mm2 (124 sq.in.)
Do the core ventilation
thru inner skin in
accordance with the
accomplishment
instructions Subtask
555007-832-206-001
Before next flight
 None
Core ventilation done
 Option 1:
Close the holes with
adhesive tape
Before next flight
 None
Holes closed with tape
 Option 1:
Do repetitive detailed
inspections of the
restored area for loose
or lost tape
Within 900 FH after
closing the holes
At intervals not
exceeding 900 FH
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340-500/600
SERVICE BULLETIN
Table 4.D, Config. 001 - Identified repair size larger than 80000 mm
2
(124 sq.in.)
Condition
 Action
 Compliance time
 Repetitive interval
Loose or lost tape found
 Option 1:
Close the holes again
with adhesive tape or
refer to Option 2
Before next flight
 None
Core ventilation done
 Option 2:
Close the holes with
GFRP plies
Before next flight
 None
Repair size > 80000
mm
2
(124 sq.in.)
Report detailed
information about the
identified repair and the
planned terminating
action to AIRBUS
Within 1 month from first
ELCH/UT inspection
None
Repair size > 80000
mm2 (124 sq.in.)
Replace the affected
rudder shell
OR
Replace the rudder
No further action
necessary in
accordance with this
Service Bulletin
Within 4500 FC, not
exceeding 24 months,
from the first inspection
date
None
Table 5, Config. 001 - Hole closing in case of damaged outer skin during paint thickness
measurement
Condition
 Action
 Compliance time
 Repetitive interval
Sandwich structure
damaged
Option 1:
Close the holes with
resin and adhesive tape
Before next flight
 None
Holes closed
 Option 1:
Restore the surface
protection
Within 4500 FC from the
pulse thermography
inspection
None
Sandwich structure
damaged
Option 2:
Do the permanent
restoration procedure
Before next flight
 None
Table 6.A, Config. 001 - Identify the repair size by local sanding
Condition
 Action
 Compliance time
 Repetitive interval
Repair performed and
identified as type to be
inspected
Identify paint thickness
and primer
Within 24 months from
original Service Bulletin
issue date
None
Repair performed and
identified as type to be
inspected
Do local sanding on top
and around the repair
up to the initial basic
primer
Within 24 months from
original Service Bulletin
issue date
None
Largest repair ply is not
visible
Continue with the
actions given in table
6.B
Before next flight
 None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340-500/600
SERVICE BULLETIN
Table 6.A, Config. 001 - Identify the repair size by local sanding
Condition
 Action
 Compliance time
 Repetitive interval
Largest repair ply is
visible
Remove the dust and
dry the area
Before next flight
 None
Largest repair ply is
visible
Inspect the sanded area
for damage
Before next flight
 None
Damage found
 Do the damage
assessment
Before next flight
 None
No damage found
 Mark the repair on the
rudder surface
Before next flight
 None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
Restore the surface
protection
Before next flight
 None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
Report to AIRBUS
 Within 1 month
 None
Repairs in the booster
area > 55000 mm 2
(85.25 sq.in.) or not in
the booster area
detected
Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Before next flight
 None
Fluid ingress detected
during UT inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
Damage detected during
ELCH and/or UT
inspection
Provide a detailed
damage report, report to
AIRBUS and follow their
instructions
Before next flight
 None
No damage detected
during ELCH and/or UT
inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
Table 6.B, Config. 001 - Identify the repair size by local sanding - largest repair ply not visible
Condition
 Action
 Compliance time
 Repetitive interval
Largest repair ply is not
visible
Continue local sanding
up to the pore
filler/adhesive
Before next flight
 None
Largest repair ply is
visible now
Remove the dust and
dry the area
Before next flight
 None
Largest repair ply is still
not visible
Continue with the
actions given in table
6.C for CFRP areas and
table 6.D for GFRP
areas
Before next flight
 None
Largest repair ply is
visible now
Inspect the sanded area
for damage
Before next flight
 None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340-500/600
SERVICE BULLETIN
Table 6.B, Config. 001 - Identify the repair size by local sanding - largest repair ply not visible
Condition
 Action
 Compliance time
 Repetitive interval
Damage found
 Do the damage
assessment
Before next flight
 None
No damage found
 Mark the repair on the
rudder surface
Before next flight
 None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
Restore the surface
protection
Before next flight
 None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
Report to AIRBUS
 Within 1 month
 None
Repairs in the booster
area > 55000 mm 2
(85.25 sq.in.) or not in
the booster area
detected
Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Before next flight
 None
Fluid ingress detected
during UT inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
Damage detected during
ELCH and/or UT
inspection
Provide a detailed
damage report, report to
AIRBUS and follow their
instructions
Before next flight
 None
No damage detected
during ELCH and/or UT
inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
Table 6.C, Config. 001 - Do the pulse thermography inspection (CFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Largest repair ply is still
not visible
Do a pulse
thermography inspection
on repair location in
accordance with the
accomplishment
instructions Subtask
555007-832-202-001
Before next flight
 None
Repairs in the booster
area =< 55000 mm 2
(85.25 sq.in.) detected
during pulse
thermography inspection
Restore the surface
protection
Before next flight
 None
Repairs in the booster
area =< 55000 mm
2
(85.25 sq.in.) detected
during pulse
thermography inspection
Report to AIRBUS
 Within 1 month
 None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340-500/600
SERVICE BULLETIN
Table 6.C, Config. 001 - Do the pulse thermography inspection (CFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Repairs in the booster
area > 55000 mm 2
(85.25 sq.in.) or not in
the booster area
detected during pulse
thermography inspection
Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Before next flight
 None
Fluid ingress detected
during pulse
thermography/UT
inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
Damage detected during
ELCH and/or UT
inspection
Provide a detailed
damage report, report to
AIRBUS and follow their
instructions
Before next flight
 None
No damage detected
during ELCH and/or UT
inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
Table 6.D, Config. 001 - Do the pulse thermography inspection (GFRP areas)
Condition
 Action
 Compliance time
 Repetitive interval
Repair identified as type
to be inspected
Do a pulse
thermography inspection
on repair location in
accordance with the
accomplishment
instructions Subtask
555007-832-207-001
Before next flight
 None
Repair type A-A
identified
Do a Tap test inspection
on the identified repair
in accordance with the
accomplishment
instructions Subtask
555007-832-207-001
Before next flight
 None
All other repairs
 Do an ELCH and/or UT
inspection around the
identified repairs in
accordance with the
accomplishment
instructions Subtask
555007-832-205-001
Before next flight
 None
Fluid ingress detected
during pulse
thermography/UT
inspection
Continue with the
actions given in table 3
Refer to table 3
 Refer to table 3
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340-500/600
SERVICE BULLETIN
Damage detected during
Tap test/ELCH and/or
UT inspection
Provide a detailed
damage report, report to
AIRBUS and follow their
instructions
Before next flight
 None
No damage detected
during ELCH and/or UT
inspection
Continue with the
actions given in table 4
Refer to table 4
 Refer to table 4
F. APPROVAL
The technical content of this document is approved under authority of Design Organization
Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 555007-832-848-001: Inspection
Get Access
 1.00
On Aircraft
Check the rudder repair records
 4.00
Identify the type, location and size of in-service repairs
on the rudder side shell CFRP areas in case of
complete repair records since rudder Entry Into Service
(EIS) are available
0
Do a pulse thermography inspection on the complete
rudder side shell CFRP areas to identify possible
rudder in-service repairs in case of repair records are
not complete or not available
32.00
Do the corrective actions in case of fluid ingress
detected
0
Do the ELCH and/or UT inspection around identified
repairs/fluid ingress
0
Do terminating actions in case of no damage detected
 0
Inspect the rudder side shell upper GFRP areas
 0
Close the holes in case of drilling thru the outer skin
during paint thickness measurement
0
Identify the repair size by local sanding
 0
Close-Up
 1.00
TOTAL MANHOURS
 38.00
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340-500/600
SERVICE BULLETIN
NOTE
: Manhours and elapsed time depend on the size of the area to be inspected.
Find below a table with the information for the manhours, elapsed time
and number of persons per 1 m 2 (1550 sq.in.) for the different inspection
procedures:
Steps
 Manhours
 Elapsed time
 Number of
persons
Get access
 1.00
 0.75
 2
Rudder SN
identification
0.25
 0.25
 1
Pulse
thermography
inspection
1.00
 0.50
 2
UT inspection
 1.25
 1.25
 1
ELCH inspection
 1.50
 0.75
 1
Tap test inspection
 0.25
 0.25
 1
Local sanding
 1.00
 1.00
 1
Close-up
 1.00
 0.75
 2
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-41-55 12-34-24 20-16-00
29-00-00 55-40-00
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-55-00
Non Destructive Test Manual (NTM)
 51-10-03 51-10-19 51-10-24
51-10-25 51-10-26 55-40-09
55-40-50
Structural Repair Manual (SRM)
 51-23-11
 51-75-11 51-75-12
51-77-10 51-77-11
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340-500/600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
None
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
(2) Price and Availability
None
B. INDUSTRY SUPPORT INFORMATION
For the organisation of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
E-mail : monitored.retrofit@airbus.com
T e l:( 3 3 )56 71 90 62 2
F a x:( 3 3 )56 19 32 74 5
AIRBUS will provide specific industry support for inspection Service Bulletin completion. For
detailed information, please contact your AIRBUS Customer Support Director.
C. LIST OF COMPONENTS
No Kit
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Adhesive Film Tape- Aluminium Foil
 05RAB9
 As required
Pressure Sensitive Tape
 05RFB1
 As required
Self-Adhes. Disks
 05TNB1
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Methyl-Ethyl-Ketone
 08BBF1
 As required
Trichloroethane Legacy
 08BBU9
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340-500/600
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Laminating Resin-Epoxy Srm Type
2-
13EBC1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
Not Applicable
(2) Tools
To find the correct tool-PN for the different inspection tools, refer to the subsequent
table:
Inspection
 tool
 PN
UT inspection
 UT-equipment
 Refer to NTM 51-10-24
Tap test inspection
 Tap test inspection tool
 Refer to NTM 51-10-03
Tap test inspection (with
Woodpecker)
Function test block
and
Woodpecker
Refer to NTM 51-10-19
ELCH inspection
 Elasticity Laminate Checker Kit
 Refer to NTM 51-10-26
Pulse thermography inspection
 Pulse thermography kit
 99A55407324000
Thermography inspection
 Thermography kit
 Refer to NTM 51-10-25
Paint thickness measurement
 Paint Borer Kit
 Model 518 or 518S or 518MC
with drill measuring range 10 to
1000 and 20 to 2000 microns
To order the pulse thermography kit and the paint borer kit, contact:
For tools on loan:
AIRBUS Material, Logistics and Suppliers
Lease Tool Service
Weg beim Jaeger 150
D-22335 HAMBURG
Germany
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340-500/600
SERVICE BULLETIN
For ordering by internet : http.//spares.airbus.com
For ordering by E-mail: tool.lease@airbus.com
For ordering by fax: +49 40 5076 3225
For tools to buy:
AIRBUS Material, Logistics and Suppliers
IFD- In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
Germany
For ordering by internet : http.//spares.airbus.com
For ordering by E-mail: ifd.spares@airbus.com
For ordering by fax: +49 40 5076 4012
(3) Special Tools
None
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 23
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 24
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340-500/600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 555007-832-848-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE CLEANING
AGENTS, ADHESIVES, SEALANTS AND PAINTS. THESE MATERIALS ARE
DANGEROUS.
WARNING
: WEAR THE CORRECT PROTECTIVE GLOVES, GOGGLES AND FILTER MASKS
WHEN YOU USE CLEANING AGENTS, A DHESIVES, SEALANTS AND PAINTS.
THESE MATERIALS ARE DANGEROUS.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND OTHER
CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IN CASE OF CONTAMINATION REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin refer to procedures
included in other AIRBUS documents. When the words ’refer to’ are used and the
operator has an accepted alternative procedure, the accepted alternative procedure
can be used. When the words ’in accordance with’ are included in the instruction,
the procedure in the AIRBUS document must be used.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 25
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340-500/600
SERVICE BULLETIN
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
Task Associated Data
Manpower
TOTAL MANHOURS
 38.00
A. GENERAL
(1) Subtask 555007-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-55, Page Block 001
Task 20-16-00-912-801
Consumable Material List (CML)
(a) For location of the access panels refer to
 AMM 06-41-55, Page Block 001.
(b) For the specification of consumable materials (Mat. No.) given in this Service
Bulletin refer to
 Consumable Material List (CML).
(c) For circuit breaker safety practices refer to
 AMM Task 20-16-00-912-801.
(d) The purpose of flow charts are for information only to show the vario/Repair phases
described in this Service Bulletin.
(2) Subtask 555007-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 555007-941-201-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 26
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340-500/600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 29-00-00-864-801
Task 29-00-00-864-802
Task 29-00-00-864-803
55-40-00, Page Block 601
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear).
- Engine shut down, thrust reversers closed and locked.
- Aircraft in clean configuration.
- Parking brake applied.
- Aircraft electrical network de-energized.
- Hydraulic systems depressurized.
- Access to the cockpit and cabin is available.
- All circuit breakers are in closed position.
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) In the cockpit, put warning notices in position to tell persons not to operate the flight
controls.
(c) Open, safety and tag the circuit breakers as given in the rudder inspection/check
Job Set-up procedure, refer to
 AMM 55-40-00, Page Block 601.
(d) Depressurize the Green Hydraulic System, refer to
 AMM Task 29-00-00-864-801.
(e) Depressurize the Blue Hydraulic System, refer to
 AMM Task 29-00-00-864-802.
(f) Depressurize the Yellow Hydraulic System, refer to
 AMM Task 29-00-00-864-803.
(g) Put a warning notice in the cockpit to tell persons not to pressurize the hydraulic
systems.
(h) Put access platform(s) in position at the rudder.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 27
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340-500/600
SERVICE BULLETIN
C. PROCEDURE
(1) Subtask 555007-832-201- 001 - Check the rudder repair records
Manpower Resources
Manhours
 4.00
Minimum number of person
 1
Subtask elapsed time
 4.00
Skills
 NON DESTRUCTIVE
TESTING
References
Fig. A-GBAAA
Rudder SN identification
Sheet 01
Fig. A-GBCAA
Repair type identification
Sheet 01 - SRM list
Fig. A-GBHAA
Report sheet and sketches
Sheet 01 -
 Pulse thermography report sheet
Sheet 02 -
 Repair records report sheet
Sheet 03
Sheet 04
Fig. A-GBJAA
GFRP area location
Sheet 01
Sheet 02
(a) Identify the Serial Number (SN) and the Part Number (PN) of the installed rudder.
1
 Check the Aircraft Inspection Report and the maintenance records to verify the
rudder identification and a potential rudder swap since EIS.
2
 In case of doubts, check the rudder identification plate on the aircraft, as
shown on Fig. A-GBAAA Sheet 01
 .
3
 If you do not find a SN/PN placard on the rudder, contact AIRBUS for further
instructions.
(b) Check the completeness of the rudder records and report the result to AIRBUS.
Use the report sheet Fig. A-GBHAA Sheet 02
 .
NOTE
: This action is not necessary, if the information has been already
sent to AIRBUS in accordance with the OIT 999.0071/10 and the
situation did not change since then.
(c) Check the rudder records if repairs are recorded since rudder EIS.
1
 Repairs not affected by this Service Bulletin are those which:
- have been covered by AIRBUS Repair Design Approval Sheet (RDAS)
after April 2010,
- have been accomplished in accordance with the SRM A340 200/300 as
listed in
 Fig. A-GBCAA Sheet 01
 ,
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 28
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340-500/600
SERVICE BULLETIN
- have been done in accordance with the SRM A340 200/300 revision April
2010 or later.
2
 Report the result to AIRBUS. Use the report sheet Fig. A-GBHAA Sheet 02
 .
NOTE
: This action is not necessary, if the information has been
already sent to AIRBUS in accordance with the OIT
999.0071/10 and the situation did not change since then.
3
 If repairs are recorded and the repair records are complete, refer to:
- Subtask 555007-832-201-001 of this Service Bulletin for the rudder side
shell areas made of CFRP.
- Subtask 555007-832-207-001 of this Service Bulletin for the upper rudder
side shell areas made of GFRP.
NOTE
: The outer skin ply of the upper area of the rudders is made
of GFRP. GFRP areas require different pulse thermography
inspection parameter than CFRP areas and additionally
Tap test inspection or Woodpecker inspection have to be
performed. For the identification of the GFRP areas, refer to
Fig. A-GBJAA Sheet 02
 .
4
 If no repairs have been duly recorded, report the result to AIRBUS. Use the
report sheet Fig. A-GBHAA Sheet 02
 .
No further action is necessary in accordance with this Service Bulletin.
5
 In case of any doubts about the accomplishment of repairs, refer to:
- Subtask 555007-832-203-001 of this Service Bulletin for the rudder side
shell areas made of CFRP.
- Subtask 555007-832-207-001 of this Service Bulletin for the upper rudder
side shell areas made of GFRP.
6
 If the repair records are not complete or not available, refer to:
- Subtask 555007-832-203-001 of this Service Bulletin for the rudder side
shell areas made of CFRP.
- Subtask 555007-832-207-001 of this Service Bulletin for the upper rudder
side shell areas made of GFRP.
NOTE
: The outer skin ply of the upper area of the rudders is made
of GFRP. GFRP areas require different pulse thermography
inspection parameter than CFRP areas and additionally
Tap test inspection or Woodpecker inspection have to be
performed. For the identification of the GFRP areas, refer to
Fig. A-GBJAA Sheet 02
 .
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 29
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340-500/600
SERVICE BULLETIN
(2) Subtask 555007-832-202-001 - Identify the type, location and size of in-service
repairs on the rudder side shell CFRP ar eas in case of complete repair records
since rudder Entry Into Service (EIS) are available
Manpower Resources
Manhours
 0
Minimum number of person
 2
Subtask elapsed time
 0
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 Task 55-40-50-290-801
Structural Repair Manual (SRM)
 51-75-11
51-75-12
Fig. A-GBBAA
Repair type identification
Sheet 01
Sheet 02
Fig. A-GBDAA
Booster area definition
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBEAA
Typical pulse thermography and
ELCH/UT inspection
Sheet 01
Sheet 02 - Repair size assessment
Sheet 03 - Repair size assessment
Sheet 04 - Boundary and grid of ELCH/UT
inspections
Sheet 05 - ELCH inspection grid
Fig. A-GBHAA
Report sheet and sketches
Sheet 01 -
 Pulse thermography report sheet
Sheet 02 -
 Repair records report sheet
Sheet 03
Sheet 04
Fig. A-GFAAA
Flow Chart
Sheet 01 - Flow Chart 1
Sheet 02 - Flow Chart 2
Sheet 03 - Flow Chart 3
Sheet 04 - Flow Chart 4
Sheet 05 - Flow Chart 5
Sheet 06
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 30
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340-500/600
SERVICE BULLETIN
References
Fig. A-GABAA
Paint borer instructions
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
Sheet 08
(a) If no repair has been done or the recorded repair is not to be inspected in
accordance with this Service Bulletin, report to AIRBUS. Use the report sheet Fig.
A-GBHAA Sheet 02
.
NOTE
: This action is not necessary, if the information has been already
sent to AIRBUS in accordance with the OIT 999.0071/10 and the
situation did not change since then.
No further action is necessary in accordance with this Service Bulletin.
(b) If a repair must be inspected in accordance with this Service Bulletin, do the
subsequent work steps in accordance with the Flow Chart Fig. A-GFAAA Sheet 01
 :
1
 Identify the repair type, refer to Fig. A-GBBAA Sheet 01
 and Fig. A-GBBAA
Sheet 02
.
2
 Make sure that the paint thickness in the areas to be inspected by pulse
thermography does not exceed:
- 800 microns.
- 400 microns below the decal foil if a decal foil is installed.
NOTE
: It is the responsibility of the operator to ensure that the paint
thickness in all areas to be inspected is below or equal to the
limits given above.
a
 If the paint coating and/or logo application is too thick, abrade the paint in
accordance with the
 SRM 51-75-11 to a thickness below or equal to the
limits given above.
NOTE
: Chemical paint stripping is not allowed.
b
 In case of doubts about the paint thickness, measure the thickness using
a Paint Borer Kit, refer to the Figure Fig. A-GABAA Sheet 01
 thru Fig. A-
GABAA Sheet 08
.
<1>
CAUTION
: DO NOT DRILL DEEPLY INTO THE BASE
MATERIAL (CFRP OR GFRP). DRILLING TOO
DEEP LEADS TO DAMAGE IN THE OUTER SKIN
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 31
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340-500/600
SERVICE BULLETIN
If you damage the outer skin with the paint borer, refer to the
Subtask 555007-833-201-001 for repair instructions.
3
 Clean the areas to be inspected with:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
4
 Do a pulse thermography inspection to get the precise location and the size of
the repair, refer to NTM Task 55-40-50-290-801.
NOTE
: As an alternative for the pulse thermography inspection, you
can identify the repair size by local sanding, refer to Subtask
555007-832-208-001.
NOTE
: The pulse thermography inspection indicates the outer skin
repair ply geometry. The largest repair ply defines the
boundary of the repair area.
NOTE
: In case of any findings (repair, damage, fluid ingress) during
the pulse thermography inspection, save the images and send
it together with the report sheet to AIRBUS.
5
 Mark the boundary of the repair area, refer to Fig. A-GBEAA Sheet 02
 and
Fig. A-GBEAA Sheet 03
 .
6
 If fluid ingress has been detected during the pulse thermography inspection,
refer to Subtask 555007-832-204-001 of this Service Bulletin.
7
 Identify the booster areas in accordance with Fig. A-GBDAA Sheet 02
 and Fig.
A-GBDAA Sheet 03
.
8
 If repairs in the booster areas up to 55000 mm 2 (85.25 sq.in.) have been
detected, report the findings to AIRBUS. Use the report sheet Fig. A-GBHAA
Sheet 01
 and the rudder related sketches, refer to Fig. A-GBHAA Sheet 03
and Fig. A-GBHAA Sheet 04
 .
No further actions on these repairs in accordance with this Service Bulletin.
9
 If repairs in the booster areas larger than 55000 mm 2 (85.25 sq.in.) have been
detected, do the UT inspection around the repair in accordance with Subtask
555007-832-205-001 of this Service Bulletin.
10
 If repairs not in the booster area have been detected, do the ELCH and/or UT
inspection in accordance with Subtask 555007-832-205-001 of this Service
Bulletin.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 32
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340-500/600
SERVICE BULLETIN
11
 After the inspection, restore the paint coating in accordance with the
 SRM
51-75-12.
NOTE
: Refer to OIT 999.0130/06 ’pai nt system - best practices’.
(3) Subtask 555007-832-203-001 - Do a pulse thermography inspection on the
complete rudder side shell CFRP areas to identify possible rudder in-service
repairs in case of repair records are not complete or not available
Manpower Resources
Manhours
 32.00
Minimum number of person
 2
Subtask elapsed time
 16
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 Task 55-40-50-290-801
Structural Repair Manual (SRM)
 51-75-11
51-75-12
Fig. A-GFAAA
Flow Chart
Sheet 01 - Flow Chart 1
Sheet 02 - Flow Chart 2
Sheet 03 - Flow Chart 3
Sheet 04 - Flow Chart 4
Sheet 05 - Flow Chart 5
Sheet 06
Fig. A-GBDAA
Booster area definition
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBHAA
Report sheet and sketches
Sheet 01 -
 Pulse thermography report sheet
Sheet 02 -
 Repair records report sheet
Sheet 03
Sheet 04
Fig. A-GABAA
Paint borer instructions
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
Sheet 08
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 33
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340-500/600
SERVICE BULLETIN
(a) Do the subsequent work steps in accordance with the Flow Chart Fig. A-GFAAA
Sheet 01
:
1
 Report undocumented rudder S/N list to AIRBUS.
a
 To get related rudder manufacturing rework data, provide AIRBUS
with the rudder P/N, S/N and aircraft MSN in accordance with the
accomplishment timescale instructions, refer to Para 1.E table 2A of this
Service Bulletin.
The manufacturing rework data will be provided through drawings
covered by Mod. 202490.
2
 Make sure that the paint thickness in the areas to be inspected by pulse
thermography does not exceed:
- 800 microns.
- 400 microns below the decal foil if a decal foil is installed.
NOTE
: It is the responsibility of the operator to ensure that the paint
thickness in all areas to be inspected is below or equal to the
limits given above.
a
 If the paint coating and/or logo application is too thick, abrade the paint in
accordance with the
 SRM 51-75-11 to a thickness below or equal to the
limits given above.
NOTE
: Chemical paint stripping is not allowed.
b
 In case of doubts about the paint thickness, measure the thickness using
a Paint Borer Kit, refer to the Figure Fig. A-GABAA Sheet 01
 thru Fig. A-
GABAA Sheet 08
.
<1>
CAUTION
: DO NOT DRILL DEEPLY INTO THE BASE
MATERIAL (CFRP OR GFRP). DRILLING TOO
DEEP LEADS TO DAMAGE IN THE OUTER SKIN
If you damage the outer skin with the paint borer, refer to the
Subtask 555007-833-201-001 for repair instructions.
3
 Clean the areas to be inspected with:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 34
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340-500/600
SERVICE BULLETIN
4
 Do a pulse thermography inspection on the complete side shell CFRP areas
(LH/RH) to identify repairs, refer to NTM Task 55-40-50-290-801.
NOTE
: The pulse thermography inspection indicates the outer skin
repair ply geometry. The largest repair ply defines the
boundary of the repair area.
NOTE
: In case of any findings (repair, damage, fluid ingress) during
the pulse thermography inspection, save the images and send
it together with the report sheet to AIRBUS.
5
 If no repair has been detected during the pulse thermography inspection,
report the result to AIRBUS. Use the report sheet Fig. A-GBHAA Sheet 01
 .
No further action is necessary in accordance with this Service Bulletin.
6
 If fluid ingress has been detected during the thermograhy inspection, refer to
Subtask 555007-832-204-001 of this Service Bulletin.
7
 Identify the booster areas in accordance with Fig. A-GBDAA Sheet 02
 and Fig.
A-GBDAA Sheet 03
.
8
 If repairs in the booster areas up to 55000 mm 2 (85.25 sq.in.) have been
detected which are not manufacturing rework, report the findings to AIRBUS.
Use the report sheet Fig. A-GBHAA Sheet 01
 and the rudder related sketches,
refer to Fig. A-GBHAA Sheet 03
 and Fig. A-GBHAA Sheet 04
 .
No further actions on these repairs in accordance with this Service Bulletin.
9
 If repairs in the booster areas larger than 55000 mm 2 (85.25 sq.in.) have been
detected which are not manufacturing rework, do the UT inspection around the
repairs in accordance with the Subtask 555007-832-205-001 of this Service
Bulletin.
10
 If repairs have been detected during the pulse thermography inspection which
are not manufacturing rework and not in the booster areas, do the ELCH
and/or UT inspection around the repairs in accordance with the Subtask
555007-832-205-001 of this Service Bulletin.
11
 After the inspection, restore the paint coating in accordance with the
 SRM
51-75-12.
NOTE
: Refer to OIT 999.0130/06 ’pai nt system - best practices’.
(4) Subtask 555007-832-204-001 - Do the corrective actions in case of fluid ingress
detected
Manpower Resources
Manhours
 0
Minimum number of person
 1
Subtask elapsed time
 0
Skills
 NON DESTRUCTIVE
TESTING
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 35
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340-500/600
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Adhesive Film Tape-
Aluminium Foil
05RAB9
 As required
Pressure Sensitive Tape
 05RFB1
 As required
Self-Adhes. Disks
 05TNB1
 As required
Methyl-Ethyl-Ketone
 08BBF1
 As required
Trichloroethane Legacy
 08BBU9
 As required
Laminating Resin-Epoxy
S r mT y p e2-
13EBC1
 As required
References
Non Destructive Test Manual (NTM)
 51-10-25
Task 55-40-50-290-801
Fig. A-GFAAA
Flow Chart
Sheet 01 - Flow Chart 1
Sheet 02 - Flow Chart 2
Sheet 03 - Flow Chart 3
Sheet 04 - Flow Chart 4
Sheet 05 - Flow Chart 5
Sheet 06
Fig. A-GBHAA
Report sheet and sketches
Sheet 01 -
 Pulse thermography report sheet
Sheet 02 -
 Repair records report sheet
Sheet 03
Sheet 04
Fig. A-GBFAA
Core ventilation procedure
Sheet 01
Sheet 02
Sheet 03
Fig. A-GAAAA
Closing of ventilation holes
Sheet 01
Sheet 02
(a) If fluid ingress has been detected, continue with the subsequent work steps in
accordance with the Flow Chart Fig. A-GFAAA Sheet 03
 :
1
 Around the identified fluid ingress, do the ELCH and/or UT inspection in
accordance with the Subtask 555007-832-205-001 of this Service Bulletin.
2
 If a damage has been detected during the ELCH and/or UT inspection, contact
AIRBUS and follow their instructions. Use the report sheet Fig. A-GBHAA
Sheet 01
.
3
 If local single spots up to 1500 mm 2 (2.33 sq.in.) with fluid ingress have been
detected, report the findings to AIRBUS. Use the report sheet Fig. A-GBHAA
Sheet 01
 and the rudder related sketches, refer to Fig. A-GBHAA Sheet 03
and Fig. A-GBHAA Sheet 04
 .
No further actions on these local single spots of fluid ingress in accordance
with this Service Bulletin.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 36
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340-500/600
SERVICE BULLETIN
4
 If a maximum of 5 local single spots per side shell larger than 1500 mm
2
(2.33
sq.in.) and up to 5000 mm
2
(7.75 sq.in.) have been detected, do the ventilation
of the rudder core:
a
CAUTION
: TO DRILL THE HOLES APPLY MODERATE
PRESSURE TO PREVENT DAMAGE TO THE SKIN, AT
THE END OF THE DRILLING OPERATION. DO NOT
DRILL THE OPPOSITE SHELL.
Drill the holes to a DIA of 3.0 mm (0.12 in.) through the outer and inner
skin in accordance with the dimensions shown on Fig. A-GBFAA Sheet
02
 and Fig. A-GBFAA Sheet 03
 .
NOTE
: Spots of fluid ingress behind the trailing edge screw line
must not be vented.
b
 Temporary restoration of the drain holes option 1:
<1> Close the drain holes with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
<2> Do repetitive detailed inspections of the restored area for loose or
lost adhesive disks or tape until the repair of the affected area has
been done.
<3> In case of loose or lost tape or disks, close the holes again with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
c
 Temporary restoration of the drain holes option 2:
<1> Close the drain holes in accordance with the instructions given in
the Figure Fig. A-GAAAA Sheet 01
 and Fig. A-GAAAA Sheet 02
 .
<a> Consumable Material necessary to close the drain holes:
Pressure Sensitive
Tape
05RFB1
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 37
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340-500/600
SERVICE BULLETIN
Laminating Resin-
Epoxy Srm Type 2 -
13EBC1
 As required
Methyl-Ethyl-Ketone 08BBF1
 As required
Trichloroethane
Legacy
08BBU9
 As required
5
 Do repetitive thermography inspections until the repair of the affected area
has been done, refer to
 NTM 51-10-25 (preferred) or refer to
 NTM Task
55-40-50-290-801.
NOTE
: In case of any findings during the pulse thermography
inspection, save the images and send it together with the
report sheet to AIRBUS.
6
 Do the repair in accordance with the SRM.
Due to the pending availability of the SRM improved repair, contact AIRBUS
for detailed repair instructions.
7
 Report the repair to AIRBUS. Use the report sheet Fig. A-GBHAA Sheet 02
 .
8
 If more than 5 local single spots per side shell larger than 1500 mm 2 (2.33
sq.in.) and up to 5000 mm 2 (7.75 sq.in.) have been detected, report to
AIRBUS and follow their instructions. Use the report sheet Fig. A-GBHAA
Sheet 01
.
9
 If local single spots larger than 5000 mm 2 (7.75 sq.in.) with fluid ingress have
been detected, report the findings to AIRBUS and follow their instructions. Use
the report sheet Fig. A-GBHAA Sheet 01
 .
(5) Subtask 555007-832-205-001 - Do the ELCH and/ or UT inspection around identified
repairs/fluid ingress
Manpower Resources
Manhours
 0
Minimum number of person
 1
Subtask elapsed time
 0
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 38
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340-500/600
SERVICE BULLETIN
References
Non Destructive Test Manual (NTM)
 51-10-24
51-10-26
55-40-09 Para 2.C
Fig. A-GBEAA
Typical pulse thermography and
ELCH/UT inspection
Sheet 01
Sheet 02 - Repair size assessment
Sheet 03 - Repair size assessment
Sheet 04 - Boundary and grid of ELCH/UT
inspections
Sheet 05 - ELCH inspection grid
Fig. A-GBGAA
Rudder skin thickness identification
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBHAA
Report sheet and sketches
Sheet 01 -
 Pulse thermography report sheet
Sheet 02 -
 Repair records report sheet
Sheet 03
Sheet 04
(a) If necessary, clean the areas to be inspected with:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
(b) Identify the skin thickness of the areas to be inspected, refer to Fig. A-GBGAA
Sheet 02
 and Fig. A-GBGAA Sheet 03
 .
(c) If the skin thickness of the affected areas does not exceed 1.5 mm (0.06 in.), do an
ELCH inspection around the marked repair areas, refer to
 NTM 51-10-26.
1
 For the ELCH inspection, use a grid of 75 mm x 75 mm from the boundary of
the largest repair ply up to 200 mm around the largest repair ply, refer to Fig.
A-GBEAA Sheet 04
.
a
 For the adjustment of the ELCH, refer to NTM 51-10-26.
b
 For the assessment criteria (yellow and red values) for the ELCH
inspection, refer to NTM 55-40-09 Para 2.C.
(d) If the skin of the affected areas is thicker than 1.5 mm (0.06 in.), do an UT
inspection around the marked repair areas, refer to NTM 51-10-24.
1
 Do the UT inspection in an area between the boundary of the largest repair
ply up to 75 mm around the largest repair ply, refer to Fig. A-GBEAA Sheet
04
.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 39
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340-500/600
SERVICE BULLETIN
(e) If a damage has been detected during the ELCH/UT inspection, provide detailed
information of the identified repair, report to AIRBUS and follow their instructions.
Use the report sheet Fig. A-GBHAA Sheet 02
 and the rudder related sketches,
refer to Fig. A-GBHAA Sheet 03
 and Fig. A-GBHAA Sheet 04
 .
(f) If no damage has been detected during the ELCH/UT inspection, continue with the
steps given in the Subtask 555007-832-206-001 of this Service Bulletin.
(6) Subtask 555007-832-206-001 - Do terminating actions in case of no damage
detected
Manpower Resources
Manhours
 0
Minimum number of person
 1
Subtask elapsed time
 0
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Adhesive Film Tape-
Aluminium Foil
05RAB9
 As required
Pressure Sensitive Tape
 05RFB1
 As required
Self-Adhes. Disks
 05TNB1
 As required
Methyl-Ethyl-Ketone
 08BBF1
 As required
Trichloroethane Legacy
 08BBU9
 As required
Laminating Resin-Epoxy
S r mT y p e2-
13EBC1
 As required
References
Fig. A-GBFAA
Core ventilation procedure
Sheet 01
Sheet 02
Sheet 03
Fig. A-GBHAA
Report sheet and sketches
Sheet 01 -
 Pulse thermography report sheet
Sheet 02 -
 Repair records report sheet
Sheet 03
Sheet 04
Fig. A-GFAAA
Flow Chart
Sheet 01 - Flow Chart 1
Sheet 02 - Flow Chart 2
Sheet 03 - Flow Chart 3
Sheet 04 - Flow Chart 4
Sheet 05 - Flow Chart 5
Sheet 06
Fig. A-GAAAA
Closing of ventilation holes
Sheet 01
Sheet 02
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 40
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340-500/600
SERVICE BULLETIN
(a) If no damage has been detected, continue with the subsequent work steps in
accordance with the Flow Chart Fig. A-GFAAA Sheet 02
 :
1
 If a repair up to 10000 mm 2 (15.50 sq.in.) has been detected, provide detailed
information about the repair and report to AIRBUS. Use the report sheet Fig.
A-GBHAA Sheet 02
 and the rudder related sketches, refer to Fig. A-GBHAA
Sheet 03
 and Fig. A-GBHAA Sheet 04
 .
2
 If a repair larger than 10000 mm 2 (15.50 sq.in.) and up to 20000 mm 2 (31.00
sq.in.) has been detected, do the ventilation of the core:
NOTE
: Instead of the core ventilation procedure, you can do repetitive
ELCH and/or UT inspections around the repair areas until the
repair has been done, refer to Subtask 555007-832-205-001.
a
CAUTION
: TO DRILL THE HOLES APPLY MODERATE
PRESSURE TO PREVENT DAMAGE TO THE SKIN, AT
THE END OF THE DRILLING OPERATION. DO NOT
DRILL THE OPPOSITE SHELL.
Drill the holes to a DIA of 3.0 mm (0.12 in.) through the outer and inner
skin in accordance with the dimensions shown on Fig. A-GBFAA Sheet
02
 and Fig. A-GBFAA Sheet 03
 .
NOTE
: Repairs behind the trailing edge screw line must not be
vented.
b
 Temporary restoration of the drain holes option 1:
<1> Close the drain holes with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
<2> Do repetitive detailed inspections of the restored area for loose or
lost adhesive disks or tape until the repair of the affected area has
been done.
<3> In case of loose or lost tape or disks, close the holes again with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 41
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340-500/600
SERVICE BULLETIN
c
 Temporary restoration of the drain holes option 2:
<1> Close the drain holes in accordance with the instructions given in
the Figure Fig. A-GAAAA Sheet 01
 and Fig. A-GAAAA Sheet 02
 .
<a> Consumable Material necessary to close the drain holes:
Pressure Sensitive
Tape
05RFB1
 As required
Laminating Resin-
Epoxy Srm Type 2 -
13EBC1
 As required
Methyl-Ethyl-Ketone 08BBF1
 As required
Trichloroethane
Legacy
08BBU9
 As required
d
 Report the results and the planned terminating action to AIRBUS. Use
the report sheet Fig. A-GBHAA Sheet 02
 .
e
 Do the terminating action in accordance with the SRM.
Due to the pending availability of the SRM improved repair, contact
AIRBUS for detailed repair instructions.
NOTE
: The new repair cutout is equal to the largest outer skin
repair ply.
3
 If a repair larger than 20000 mm 2 (31.00 sq.in.) and up to 80000 mm 2 (124
sq.in.) has been detected, do the ventilation of the core:
a
CAUTION
: TO DRILL THE HOLES APPLY MODERATE
PRESSURE TO PREVENT DAMAGE TO THE SKIN, AT
THE END OF THE DRILLING OPERATION. DO NOT
DRILL THE OPPOSITE SHELL.
Drill the holes to a DIA of 3.0 mm (0.12 in.) through the outer and inner
skin in accordance with the dimensions shown on Fig. A-GBFAA Sheet
02
 and Fig. A-GBFAA Sheet 03
 .
b
 Temporary restoration of the drain holes option 1:
<1> Close the drain holes with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 42
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340-500/600
SERVICE BULLETIN
Self-Adhes. Disks 05TNB1
 As required
<2> Do repetitive detailed inspections of the restored area for loose or
lost adhesive disks or tape until the repair of the affected area has
been done.
<3> In case of loose or lost tape or disks, close the holes again with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
c
 Temporary restoration of the drain holes option 2:
<1> Close the drain holes in accordance with the instructions given in
the Figure Fig. A-GAAAA Sheet 01
 and Fig. A-GAAAA Sheet 02
 .
<a> Consumable Material necessary to close the drain holes:
Pressure Sensitive
Tape
05RFB1
 As required
Laminating Resin-
Epoxy Srm Type 2 -
13EBC1
 As required
Methyl-Ethyl-Ketone 08BBF1
 As required
Trichloroethane
Legacy
08BBU9
 As required
d
 Report the results and the planned terminating action to AIRBUS. Use
the report sheet Fig. A-GBHAA Sheet 02
 .
e
 Do the terminating action in accordance with the SRM.
NOTE
: The new repair cutout is equal to the largest outer skin
repair ply.
NOTE
: If the repair is larger than 30000 mm
2
(46.50 sq.in.),
contact AIRBUS for additional instructions.
4
 If a repair larger than 80000 mm 2 (124 sq.in.) has been detected, do the
ventilation of the core:
a
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 43
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340-500/600
SERVICE BULLETIN
CAUTION
: TO DRILL THE HOLES APPLY MODERATE
PRESSURE TO PREVENT DAMAGE TO THE SKIN, AT
THE END OF THE DRILLING OPERATION. DO NOT
DRILL THE OPPOSITE SHELL.
Drill the holes to a DIA of 3.0 mm (0.12 in.) through the outer and inner
skin in accordance with the dimensions shown on Fig. A-GBFAA Sheet
02
 and Fig. A-GBFAA Sheet 03
 .
b
 Temporary restoration of the drain holes option 1:
<1> Close the drain holes with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
<2> Do repetitive detailed inspections of the restored area for loose or
lost adhesive disks or tape until the repair of the affected area has
been done.
<3> In case of loose or lost tape or disks, close the holes again with:
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
c
 Temporary restoration of the drain holes option 2:
<1> Close the drain holes in accordance with the instructions given in
the Figure Fig. A-GAAAA Sheet 01
 and Fig. A-GAAAA Sheet 02
 .
<a> Consumable Material necessary to close the drain holes:
Pressure Sensitive
Tape
05RFB1
 As required
Laminating Resin-
Epoxy Srm Type 2 -
13EBC1
 As required
Methyl-Ethyl-Ketone 08BBF1
 As required
Trichloroethane
Legacy
08BBU9
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 44
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340-500/600
SERVICE BULLETIN
d
 Report the results and the planned terminating action to AIRBUS. Use
the report sheet Fig. A-GBHAA Sheet 02
 .
e
 Do the terminating action:
Replace the rudder in accordance with the grace period given in the
accomplishment timescale table
or
replace the affected rudder shell.
NOTE
: The rudder shell replacement can be done only at
the AIRBUS Stade facility. Before sending the rudder,
contact:
AIRBUS
Department SBO5 Monitored Retrofit Campaign Account
MONITORED.RETROFIT@airbus.com
to validate the feasibility of the rudder shell replacement.
No further action is necessary in accordance with this Service Bulletin.
(7) Subtask 555007-832-207- 001 - Inspect the rudder side shell upper GFRP areas
Manpower Resources
Manhours
 0
Minimum number of person
 1
Subtask elapsed time
 0
Skills
 NON DESTRUCTIVE
TESTING
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Non Destructive Test Manual (NTM)
 Task 51-10-03-280-801
Task 51-10-19-280-801
Task 55-40-50-290-801
Structural Repair Manual (SRM)
 51-75-11
51-75-12
Fig. A-GBBAA
Repair type identification
Sheet 01
Sheet 02
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 45
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A340-500/600
SERVICE BULLETIN
References
Fig. A-GFAAA
Flow Chart
Sheet 01 - Flow Chart 1
Sheet 02 - Flow Chart 2
Sheet 03 - Flow Chart 3
Sheet 04 - Flow Chart 4
Sheet 05 - Flow Chart 5
Sheet 06
Fig. A-GBEAA
Typical pulse thermography and
ELCH/UT inspection
Sheet 01
Sheet 02 - Repair size assessment
Sheet 03 - Repair size assessment
Sheet 04 - Boundary and grid of ELCH/UT
inspections
Sheet 05 - ELCH inspection grid
Fig. A-GABAA
Paint borer instructions
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
Sheet 08
(a) If repairs in the rudder side shell upper GFRP area are recorded, do the
subsequent inspections in accordance with the Flow Chart Fig. A-GFAAA Sheet 04
 :
1
 Make sure that the paint thickness in the areas to be inspected by pulse
thermography does not exceed:
- 400 microns.
- 400 microns below the decal foil if a decal foil is installed.
NOTE
: It is the responsibility of the operator to ensure that the paint
thickness in all areas to be inspected is below or equal to the
limit of 400 microns.
a
 If the paint coating and/or logo application is too thick, abrade the paint in
accordance with the
 SRM 51-75-11 to a thickness below or equal to the
limit of 400 microns.
NOTE
: Chemical paint stripping is not allowed.
b
 In case of doubts about the paint thickness, measure the thickness using
a Paint Borer Kit, refer to the Figure Fig. A-GABAA Sheet 01
 thru Fig. A-
GABAA Sheet 08
.
<1>
CAUTION
: DO NOT DRILL DEEPLY INTO THE BASE
MATERIAL (CFRP OR GFRP). DRILLING TOO
DEEP LEADS TO DAMAGE IN THE OUTER SKIN
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 46
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A340-500/600
SERVICE BULLETIN
If you damage the outer skin with the paint borer, refer to the
Subtask 555007-833-201-001 for repair instructions.
2
 Clean the areas to be inspected with:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
3
 Do a pulse thermography inspection to get the precise location and size of the
repair, refer to NTM Task 55-40-50-290-801.
NOTE
: As an alternative for the pulse thermography inspection, you
can identify the repair size by local sanding, refer to Subtask
555007-832-208-001.
NOTE
: The pulse thermography inspection indicates the outer skin
repair ply geometry. The largest repair ply defines the
boundary of the repair area.
NOTE
: Make sure that you use the pulse thermography inspection
parameters for GFRP, refer to
 NTM Task 55-40-50-290-801.
4
 Mark the boundary of the repair area, refer to Fig. A-GBEAA Sheet 02
 and
Fig. A-GBEAA Sheet 03
 .
5
 If a repair type A-A, refer to
 Fig. A-GBBAA Sheet 02
 , has been identified, do a
Tap test inspection on the repair, refer to
 NTM Task 51-10-03-280-801 or
NTM Task 51-10-19-280-801, to identify a skin to core disbonding.
6
 For all other repair types, do the ELCH and/or UT inspection around the
repair, refer to the Subtask 555007-832-205-001 of this Service Bulletin.
7
 If fluid ingress has been detected, refer to Subtask 555007-832-204-001 of
this Service Bulletin.
8
 For further actions continue with the instructions given in the Subtask
555007-832-206-001 and the actions in the Flow Chart Fig. A-GFAAA Sheet
02
 of this Service Bulletin.
9
 After the inspection, restore the paint coating in accordance with the
 SRM
51-75-12.
NOTE
: Refer to OIT 999.0130/06 ’pai nt system - best practices’.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 47
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A340-500/600
SERVICE BULLETIN
(b) If there is no information about repairs in the rudder side shell upper GFRP area,
do the subsequent inspections in accordance with the Flow Chart Fig. A-GFAAA
Sheet 04
:
1
 Make sure that the paint thickness in the areas to be inspected by pulse
thermography does not exceed:
- 400 microns.
- 400 microns below the decal foil if a decal foil is installed.
NOTE
: It is the responsibility of the operator to ensure that the paint
thickness in all areas to be inspected is below or equal to the
limit of 400 microns.
a
 If the paint coating and/or logo application is too thick, abrade the paint in
accordance with the
 SRM 51-75-11 to a thickness below or equal to the
limit of 400 microns.
NOTE
: Chemical paint stripping is not allowed.
b
 In case of doubts about the paint thickness, measure the thickness using
a Paint Borer Kit, refer to the Figure Fig. A-GABAA Sheet 01
 thru Fig. A-
GABAA Sheet 08
.
<1>
CAUTION
: DO NOT DRILL DEEPLY INTO THE BASE
MATERIAL (CFRP OR GFRP). DRILLING TOO
DEEP LEADS TO DAMAGE IN THE OUTER SKIN
If you damage the outer skin with the paint borer, refer to the
Subtask 555007-833-201-001 for repair instructions.
2
 Clean the areas to be inspected with:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
3
 Do a pulse thermography inspection on the complete GFRP area to identify
repairs, refer to NTM Task 55-40-50-290-801.
NOTE
: The pulse thermography inspection indicates the outer skin
repair ply geometry. The largest repair ply defines the
boundary of the repair area.
NOTE
: Make sure that you use the pulse thermography inspection
parameters for GFRP, refer to
 NTM Task 55-40-50-290-801.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 48
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A340-500/600
SERVICE BULLETIN
4
 If repairs which are not manufacturing rework have been identified, mark the
boundary of the repair area, refer to Fig. A-GBEAA Sheet 02
 and Fig. A-
GBEAA Sheet 03
.
5
 Do a Tap test inspection, refer to
 NTM Task 51-10-03-280-801 or NTM Task
51-10-19-280-801, on the complete GFRP area to identify a skin to core
disbonding.
6
 Do the ELCH and/or UT inspection around the repair, refer to the Subtask
555007-832-205-001 of this Service Bulletin.
7
 If fluid ingress has been detected, refer to Subtask 555007-832-204-001 of
this Service Bulletin.
8
 For further actions continue with the instructions given in the Subtask
555007-832-206-001 and the actions in Flow Chart Fig. A-GFAAA Sheet 02
 of
this Service Bulletin.
9
 After the inspection, restore the paint coating in accordance with the
 SRM
51-75-12.
NOTE
: Refer to OIT 999.0130/06 ’pai nt system - best practices’.
(8) Subtask 555007-833-201-001 - Close the holes in case of drilling thru the outer
skin during paint thickness measurement
Manpower Resources
Manhours
 0
Minimum number of person
 1
Subtask elapsed time
 0
Skills
 NON SPECIFIC
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Adhesive Film Tape-
Aluminium Foil
05RAB9
 As required
Self-Adhes. Disks
 05TNB1
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Laminating Resin-Epoxy
S r mT y p e2-
13EBC1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 49
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A340-500/600
SERVICE BULLETIN
References
Structural Repair Manual (SRM)
 51-75-12
51-77-10 Para 5
51-77-11 Para 4.M.(2)
51-77-11 Para 4.A.(3)
51-77-11 Para 4.E
51-77-11 Para 5.D
51-77-11 Figure 14
(a) Hole closing procedure option 1:
1
WARNING
: OBEY THE MANUFACTURER’S INSTRUCTIONS WHEN
YOU USE CLEANING AGENTS, ADHESIVES, SEALANTS
AND PAINTS: THESE MATERIALS ARE DANGEROUS.
WARNING
: WEAR THE CORRECT PROTECTIVE GLOVES, GOGGLES
AND FILTER MASKS WHEN YOU USE CLEANING AGENTS,
ADHESIVES, SEALANTS AND PAINTS: THESE MATERIALS
ARE DANGEROUS.
Prepare and dry the restoration area in accordance with the
 SRM 51-77-11
Para 4.M.(2).
2
 Prepare in accordance with the SRM 51-77-11 Para 4.A.(3):
Laminating Resin-
Epoxy Srm Type 2 -
13EBC1
 As required
NOTE
: The data sheets for each adhesive, resin or low density
compound states the maximum quantity that can be safely
mixed at one time without causing an exotherm reaction.
Always refer to the appropriate data sheet before mixing the
chosen material.
3
 Warm up the mixed resin to a maximum temperature of 45˚C (113 F).
4
 Put the resin in a syringe volume 10 ml with a needle DIA 1.0 mm (0.04 in.)
and inject the resin through the hole into the cells of the honeycomb core.
Start the injection at the cell bottom and finish when the resin is leaking out of
the hole.
5
 Close the filled holes with
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 50
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A340-500/600
SERVICE BULLETIN
6
 Let the resin cure for a minimum of 6 hours at room temperature.
If the room temperature is below 18˚C (64F), extend the curing time and
perform a gelation test outside the restoration area. After resin gelation plus 2
h, the aircraft can be released to operations again.
OR
Cure the resin at 60˚C (140F) for 45 minutes. Install a heating blanket with a
vacuum bag on the rudder surface in accordance with the
 SRM 51-77-11 Para
5.D, and control the temperature by means of thermocouples in accordance
with the
 SRM 51-77-11 Figure 14.
7
 Do the final surface restoration in accordance with the compliance time given
in Para 1.E.(2), table 5:
a
 Remove the self adhesive tape from the restoration areas.
b
 Inspect the restoration in accordance with the
 SRM 51-77-10 Para 5.
c
 Remove any surplus resin from the border area of the restoration. Use
abrasive cloth. Start with 280 grade and finish with 400 grade.
d
 Clean the restoration areas in accordance with the SRM 51-77-11 Para
4.E. Use:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
e
 Restore the surface protection in accordance with the
 SRM 51-75-12.
(b) Hole closing procedure option 2:
1
WARNING
: OBEY THE MANUFACTURER’S INSTRUCTIONS WHEN
YOU USE CLEANING AGENTS, ADHESIVES, SEALANTS
AND PAINTS: THESE MATERIALS ARE DANGEROUS.
WARNING
: WEAR THE CORRECT PROTECTIVE GLOVES, GOGGLES
AND FILTER MASKS WHEN YOU USE CLEANING AGENTS,
ADHESIVES, SEALANTS AND PAINTS: THESE MATERIALS
ARE DANGEROUS.
Prepare and dry the restoration area in accordance with the
 SRM 51-77-11
Para 4.M.(2).
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 51
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A340-500/600
SERVICE BULLETIN
2
 Prepare in accordance with the SRM 51-77-11 Para 4.A.(3):
Laminating Resin-
Epoxy Srm Type 2 -
13EBC1
 As required
NOTE
: The data sheets for each adhesive, resin or low density
compound states the maximum quantity that can be safely
mixed at one time without causing an exotherm reaction.
Always refer to the appropriate data sheet before mixing the
chosen material.
3
 Warm up the mixed resin to a maximum temperature of 45˚C (113 F).
4
 Put the resin in a syringe volume 10 ml with a needle DIA 1.0 mm (0.04 in.)
and inject the resin through the hole into the cells of the honeycomb core.
Start the injection at the cell bottom and finish when the resin is leaking out of
the hole.
5
 Close the filled holes with
Adhesive Film
Tape- Aluminium
Foil
05RAB9
 As required
or
Self-Adhes. Disks 05TNB1
 As required
6
 Let the resin cure for a minimum of 12 hours at room temperature.
If the room temperature is below 18˚C (64F), extend the curing time and
perform a gelation test outside the restoration area.
After resin gelation plus 4 h, continue with the subsequent steps:
a
 Remove the self adhesive tape from the restoration areas.
b
 Inspect the restoration in accordance with the
 SRM 51-77-10 Para 5.
c
 Remove any surplus resin from the border area of the restoration. Use
abrasive cloth. Start with 280 grade and finish with 400 grade.
d
 Clean the restoration areas in accordance with the SRM 51-77-11 Para
4.E. Use:
Non Aqueous
Cleaner-General
08BAA9
 As required
and
Textile-Lint Free
Cotton
14SBA1
 As required
e
 Restore the surface protection in accordance with the
 SRM 51-75-12.
DATE: Feb 07/13 SERVICE BULLETIN No.: A340-55-5007
REVISION No.: 01 - Aug 20/14 Page: 52
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a340-55-5007/file/7a016350ff2a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
