# Airbus Service Bulletin A340-57-4137

Copy: No revision named ("A340-57-4137 R01"), 87 pages: PDF https://openairdocs.org/files/sha256/15/8f/158fdc697618179b3cf49a1fc51642eb028363c7853330d1694dc780c16d77bb; text https://openairdocs.org/service-documents/airbus/a340-57-4137/file/158fdc697618.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0113, the docket of AD 2019-16-07. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-57-4137
- Page: https://openairdocs.org/service-documents/airbus/a340-57-4137

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-57-4137/proposed.md).

## Text (87 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2018-0113, the docket of AD 2019-16-07. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER FUSELAGE - MODIFICATION OF FASTENER
HOLE NO. 260 AT FRAME 40
MODIFICATION No.: 206050S33790
This page transmits Revision No.01 of Service Bulletin No.A340-57-4137
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to:
- Update the EFFECTIVITY paragraph
- Modify the Service Bulletin structure further to validation on A330 aircraft with Manufacturer Serial
Number (MSN) 0422.
CHANGES
The main changes of this revision are:
- GENERAL EVALUATION table has been updated
- EFFECTIVITY paragraph has been updated
- REASON paragr aph has been updated
- COMPLIANCE paragraph has been updated
- MANPOWER table has been updated
- REFERENCES paragraph has been updated
- MATERIAL INFORMATION paragraph has been updated:
. Procurement address for Kit 573130A01R00 and Kit 573130A02R00 has been updated
. Price and Availability note has been updated
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
. INDUSTRY SUPPORT INFORMATION paragraph has been updated
. Consumable Materials List (CML) has been updated.
- ACCOMPLISHMENT INSTRUCTIONS paragraph has been updated and modified:
. Warning has been added
. Note has been added
. STANDARD PRACTICES paragraph has been updated
. PREPARATION par agraph has been updated
. PROCEDURE paragraph has been updated
. TEST paragraph has been updated
. CLOSE-UP paragraph has been updated.
- Figure A-FBEAA has been created
- Figure A-FBDAA and A-FBDAB has been updated
- Manpower Gantt Chart has been updated.
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
GENERAL EVALUATION
 GENERAL EVALUATION TABLE UPDATED
 R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
NATURE OF THE WORK
 NATURE OF WORK TABLE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
CONF 002
 CONFIGURATION DEFINITION UPDATED
 R
REASON
Operational/Maintenance
Consequences
OPERATIONAL/MAINTENANCE CONSEQUENCES
UPDATED
R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
 R
MANPOWER UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
REFERENCED DOCUMENTATION UPDATED
 R
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
 R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
 R
INDUSTRY SUPPORT INFORMATION
 INDUSTRY SUPPORT INFORMATION UPDATED
 R
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLA01
 CONSUMABLE MATERIAL SET UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
R
TOOLING
Tooling - Price and Availability
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
 R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
MATERIAL SET UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
TASK 574137- 831-801-001-Modification
 TASK SOLUTION UPDATED
WARNING UPDATED
NOTE UPDATED
CAUTION UPDATED
R
Task associated data - 001
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Task associated data - 002
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Subtask 574137-910-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 574137-910-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 574137-941-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
NOTE UPDATED
R
Subtask 574137-865-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 574137-941-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 574137-010-001-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PANEL UPDATED
REFERENCED DOCUMENTATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
REFERENCES UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 574137-941-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
NOTE UPDATED
R
Subtask 574137-865-001-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 574137-941-002-001
 SUBTASK SOLUTION DELETED FOR
APPLICABLE MSN
D
Subtask 574137-010-001-001
 SUBTASK SOLUTION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
PANEL UPDATED
REFERENCED DOCUMENTATION UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
REFERENCES UPDATED
R
Subtask 574137-020-001-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-250-001-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-831-001-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-420-001-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-020-002-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-250-002-001
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-831-002-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 574137-420-002-001
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-020-001-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-250-001-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-831-001-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-420-001-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-020-002-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-250-002-002
 SUBTASK SOLUTION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 574137-831-002-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-420-002-002
 SUBTASK SOLUTION UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 574137-700-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIN UPDATED
PANEL UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 574137-790-001-001
 SUBTASK SOLUTION ADDED
 N
Subtask 574137-700-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIN UPDATED
PANEL UPDATED
REFERENCES UPDATED
NOTE UPDATED
R
Subtask 574137-790-001-001
 SUBTASK SOLUTION ADDED
 N
Subtask 574137-410-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
PANEL UPDATED
REFERENCES UPDATED
R
Subtask 574137-942-003-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 574137-410-001-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
ITEM NUMBER UPDATED
PART NUMBER DESCRIPTION UPDATED
QUANTITY UPDATED
PANEL UPDATED
REFERENCES UPDATED
R
Subtask 574137-942-003-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Fig. A-FBDAA
Fig. A-FBDAA Sheet 01
 SHEET UPDATED
 R
Fig. A-FBDAA Sheet 02
 SHEET UPDATED
 R
Fig. A-FBDAB
Fig. A-FBDAB Sheet 01
 SHEET UPDATED
 R
Fig. A-FBDAB Sheet 02
 SHEET UPDATED
 R
Fig. A-FBEAA
 FIGURE SOLUTION ADDED
 N
Fig. A-FBEAA Sheet 01
 SHEET ADDED
 N
Appendix 01 - Manpower Gantt Chart
Fig. A-FAAAA
Fig. A-FAAAA Sheet 01
 SHEET UPDATED
 R
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Nov 23/16
REVISION No. : 01 - Feb 16/18
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER FUSELAGE - MODIFICATION OF FASTENER
HOLE NO. 260 AT FRAME 40
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 206050S33790
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The area at Frame (FR) 40 is subjected to a specific maintenance program. A new campaign of
modifications has been launched to improve the maintenance program, decrease the number of
maintenance actions and to improve the structural potential of the aircraft to meet the Extended Service
Goal (ESG) / Design Service Goal (DSG).
This Service Bulletin recommends the cold expansion of hole 260 at FR40 to improve the fatigue
behaviour.
Depending on the configuration, this reinforcement consists in doing a second or third cold expansion of
fastener hole 260 and installing oversized fastener with high interference.
Accomplishment of this Service Bulletin will prevent cracks and will increase the fatigue life on the area
of FR40.
Accomplishment of this Service Bulletin cancels the requirements of Inspection Service Bulletin No.
A340-57-4124 for hole item 260, if accomplished after the lower bound described in the PLANNING
INFORMATION paragraph 1.E.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 RECOMMENDED (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 NO
 A/C OPERATION AFFECTED
 NO
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
 VALIDATION ON AIRCRAFT
 YES
NOTE
 (1)
: Service Bulletin recommended to be accomplished to prevent significant operational
disruptions.
NOTE
: Depending on aircraft configuration, defuelling of the center fuel tank may be required
before performing the cold working procedure.
NOTE
: The equivalent of this Service Bulletin has been validated on A330 aircraft with
Manufacturer Serial Number (MSN) 0422.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 574137A01R00
 1
 50.00
 Bolts, nuts
Standard tool TOOLA01
 1
 See SB
 FTI cold working tools
Standard tool TOOLA02
 1
 See SB
 WCI cold working tools
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 574137A02R00
 1
 50.00
 Bolts, nuts
Standard tool TOOLA01
 1
 See SB
 FTI cold working tools
Standard tool TOOLA02
 1
 See SB
 WCI cold working tools
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
09M 78U
 83V 85Z
 ABD AFR AIB ALD ARG AXY CAL CPA DLH
F2I GAF HFM HFY IBE IRM KMF
 MAU MDG MRJ PAL PUE ROI
S3R SAA SAS SLM SYR
 THT THY
CONCURRENT REQUIREMENTS
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
SUMMARY
REFERENCES / REPERCUSSIONS
TFU
 57.11.00.007
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
MANPOWER
**CONF 001
Task 574137-831-801-001: Modification
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
**CONF 002
Task 574137-831-801-001: Modification
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
APPENDICES
**CONF ALL
Appendix 01 - Manpower Gantt Chart
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
FR40
FR47
VIEW LOOKING AFT
RH SHOWN
LH SYMMETRICAL
BU
P
INBD
CENTER WING BOX
LOWER PANEL REFERENCE
COLD WORKING OF
THE FASTENER HOLE
STGR38RH
STGR39RH
FR40
B
C
Z141
Z142
LH
RH
A
H260
F_SB_574137_5_SAAA_01_02
Figure A-FSAAA - Sheet 01
Cold Working of the Fastener Hole 260 at FR40 on the Left Hand (LH) and the Right Hand (RH) Side
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
DATUMFR40
STGR1
LH SHOWN
RH SYMMETRICAL
Y1959
C
COLD WORKING OF
THE FASTENER HOLE
H260
F_SB_574137_5_SAAA_02_00
Figure A-FSAAA - Sheet 02
Cold Working of the Fastener Hole 260 at FR40 on the Left Hand (LH) and the Right Hand (RH) Side
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 57
TITLE: FUSELAGE - CENTER FUSELAGE - MODIFICATION OF FASTENER
HOLE NO. 260 AT FRAME 40
MODIFICATION No.: 206050S33790
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: This Service Bulletin is only applicable to aircraft on which modification
No. 44360S13013, modification No. 44360S13482 are embodied, Service
Bulletin No. A340-57-4138 is accomplished and on which modification No.
49202S16307 is not embodied.
(1) Models
340-212 340-213 340-312 340-313
(2) Effectivity by MSN
0178-0180 0185-0186 0190 0192-0194 0197 0199 0201-0202 0204 0207-0208 0210
0212-0215 0217-0218 0221
 0227
 0233 0236-0237 0242-0243 0245-0246 0252 0257
0260 0263-0264 0268 0270 0274
 0278 0280 0282 0292 0297 0302 0304 0307 0310
0318-0319 0321 0325 0327 0329 0331-0332 0335 0347 0352 0354-0355 0367
0373-0374 0377-0379 0381 0385 0387 0390 0395 0399 0402 0406 0411 0413 0415
0424 0430 0433-0435 0438 0446-0447 0450 0459 0467 0470 0474 0483
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 1
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
09M
 0483
78U
 0179
83V
 0280 0292
85Z
 0263
ABD
 0210
AFR
 0186 0207 0237 0245 0246 0260 0307 0310 0377
AIB
 0192 0243 0264
ALD
 0178
ARG
 0193 0373
AXY
 0374
CAL
 0402 0406 0411 0415 0433
CPA
 0208 0218 0227
DLH
 0213 0233 0252 0297 0304 0321 0325 0327 0335 0347 0352 0354
0379 0390 0434 0447
F2I
 0214
GAF
 0274 0355
HFM
 0185
 0236
 0367
HFY
 0190 0202
IBE
 0217 0221 0329
IRM
 0282
KMF
 0278
MAU
 0194 0268
MDG
 0319
MRJ
 0257
PAL
 0302 0318 0332 0387 0459 0474
PUE
 0212 0215 0399
ROI
 0199 0201
S3R
 0204
SAA
 0197 0378
SAS
 0413 0424 0430 0435 0450 0467 0470
SLM
 0242
SYR
 0381
THT
 0385 0395 0438 0446
THY
 0180 0270 0331
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 2
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0178 0180 0185 0190 0192 0199 0201 0202 0204 0212 0214
0215 0236 0242 0243 0257 0264 0270 0278 0280 0282 0292
0318 0319 0331 0373 0378 0385 0395 0413 0424 0430 0435
0438 0446 0450 0467 0470
001 002
0179 0186 0193 0194 0197 0207 0208 0210 0213 0217 0218
0221 0227 0233 0237 0245 0246 0252 0260 0263 0268 0274
0297 0302 0304 0307 0310 0321 0325 0327 0329 0332 0335
0347 0352 0354 0355 0367 0374 0377 0379 0381 0387 0390
0399 0402 0406 0411 0415 0433 0434 0447 0459 0474 0483
002
(5) Configuration definition
**CONF 001
Config. 001 is valid for aircraft on which modification No. 44360S13013, modification No.
44360S13482 are embodied, Service Bulletin No. A340-57-4138 is accomplished and
modification No. 49202S16307 is not embodied and on which Service Bulletin No.
A340-57-4090 is not accomplished.
**CONF 002
Config. 002 is valid for aircraft on which modification No. 44360S13013, modification No.
44360S13482 are embodied, Service Bulletin No. A340-57-4138 is accomplished and
modification No. 49202S16307 is not embodied and on which Service Bulletin No.
A340-57-4090 is accomplished.
(6) Material Effectivity
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 574137A01R00
 1
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 574137A02R00
 1
Consumable CMLA01
 1
Standard tool TOOLA01
 1
Standard tool TOOLA02
 1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 3
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The area at Frame (FR) 40 is subjected to a specific maintenance program. A new
campaign of modifications has been launched to improve the maintenance program,
decrease the number of maintenance actions and to improve the structural potential of
the aircraft to meet the Extended Service Goal (ESG) / Design Service Goal (DSG).
(2) Objective/Action
This Service Bulletin recommends the cold expansion of hole 260 at FR40 to improve
the fatigue behaviour.
Depending on the configuration, this reinforcement consists in doing a second or
third cold expansion of fastener hole 260 and installing oversized fastener with high
interference.
(3) Advantages
Accomplishment of this Service Bulletin will prevent cracks and will increase the fatigue
life on the area of FR40.
(4) Operational/Maintenance Consequences
Accomplishment of this Service Bulletin cancels the requirements of Inspection Service
Bulletin No. A340-57-4124 for hole item 260, if accomplished after the lower bound
described in the PLANNING INFORMATION paragraph 1.E.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 574137-831-801-001: Modification
(1) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the LH Side
(2) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the LH Side
(3) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the LH Side
(4) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
LH Side
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 4
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
(5) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the RH Side
(6) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the RH side
(7) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the RH Side
(8) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
RH Side
**CONF 002
Task 574137-831-801-001: Modification
(1) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the LH Side
(2) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the LH Side
(3) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the LH Side
(4) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
LH Side
(5) Remove the Fastener from the Hole 260 between STGR37 and STGR38 at FR40, on
the RH Side
(6) Do an Inspection of the Fastener Hole 260 between STGR37 and STGR38 at FR40,
on the RH side
(7) Do a Cold Working of the Fastener Hole 260 between STGR37 and STGR38 at
FR40, on the RH Side
(8) Install the Fastener in the Hole 260 between STGR37 and STGR38 at FR40, on the
RH Side
**CONF ALL
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
AIRBUS recommends not to perform modification before the Flight Cycles (FC)/Flight
Hours (FH) values given in the table below. In case of early embodiment, additional
inspection of the Center Wing Box (CWB) lower panel might be required before ESG.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 5
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
Lower bound counted
from first flight
Aircraft Series
 Aircraft
Standard
Weight
Variant
(WV)
WV Groups
 Configuration
FC
 FH
A340-300
 ST4
 020 series
except WV
027
Group 43B
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
19427
 97789
A340-300
 ST4
 020 series
except WV
027
Group 43B
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
18888
 95075
A340-300
 ST4
 027
 Group 43C
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
19427
 97789
A340-300
 ST4
 027
 Group 43C
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
18888
 95075
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 6
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
A340-200
 ST2
 000 series
 Group 42A
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
15362
 72178
A340-200
 ST2
 000 series
 Group 42A
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
14632
 68269
A340-200
 ST5
 21
 Group 42B
 POST MOD
No. 44360 PRE
MOD No.
49202 PRE
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
18405
 88493
A340-200
 ST5
 21
 Group 42B
 POST MOD
No. 44360 PRE
MOD No.
49202 POST
Service Bulletin
No.
A340-57-4090
and POST
Service Bulletin
No.
A340-57-4138
17818
 85345
Lower bound table
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 7
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 574137-831-801-001: Modification
Get Access
 18.50
On Aircraft
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
1.00
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
1.00
Tests
 2.00
Close-Up
 18.50
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart,
 Fig. A-FAAAA
 given in Appendix 01 - Manpower Gantt Chart .
**CONF 002
Task 574137-831-801-001: Modification
Get Access
 18.50
On Aircraft
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 8
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
Task 574137-831-801-001: Modification
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
1.00
Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
0.50
Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
0.50
Do a Cold Working of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
3.00
Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
1.00
Tests
 2.00
Close-Up
 18.50
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
NOTE
: For an explanation of the man-hours and elapsed time, refer to the Gantt
Chart,
 Fig. A-FAAAA
 given in Appendix 01 - Manpower Gantt Chart .
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-21-11 21-20-00
21-21-41 21-21-51 25-52-00
25-80-00 28-00-00 28-10-00
28-11-00
 28-25-00 32-12-00
38-41-00
 52-30-00 52-32-11
57-17-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-10-08
Service Bulletin (SB)
 A340-57-4090
A340-57-4138
Standards Manual (SM)
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 9
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-48-00 51-70-20
51-75-12 51-76-12
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
12-34-24 20-21-11 21-20-00
21-21-41 21-21-51 25-52-00
25-80-00 28-00-00 28-10-00
28-11-00
 28-25-00 32-12-00
38-41-00
 52-30-00 52-32-11
57-17-11
Elec. Std. Practices Manual (ESPM)
 20-55-00
In Service Information (ISI)
 51.48.00001
Non Destructive Test Manual (NTM)
 51-10-01 51-10-08
Service Bulletin (SB)
 A340-57-4090
A340-57-4138
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00 51-42-00 51-43-00
51-44-00 51-48-00 51-70-20
51-75-12 51-76-12
**CONF ALL
K. PUBLICATION AFFECTED
Maintenance Planning Document (MPD)
 571135-01-1
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 10
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 574137A01R00
Kit 574137A02R00
AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by E-mail: airbus.kit@airbus.com
Telephone Hotline: +49 40 743 51616
(2) Price and Availability
Kit 574137A01R00
Cost
 50.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
Airbus Spares portal or through a request for quotation to airbus.kit@airbus.com.
Kit 574137A02R00
Cost
 50.00 USD
Availability
 180 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
Airbus Spares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 11
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department.
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
France
E-mail: monitored.retrofit@airbus.com
C. LIST OF COMPONENTS
Kit 574137A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
7
 EN6115K8-16
 2
 BOLT
8
 ASNA2531-8
 2
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 574137A02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
9
 EN6115K9-16
 2
 BOLT
10
 ASNA2531-9
 2
 NUT
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Wash Primer - Structure
 04CMA2
 As required
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Polyurethane Coating - Fuel Vapour
Barrier Struct
04PAG2
 As required
Polysulfide Sealant - Fuel Tank
Brushable
06ABA1
 As required
Coating Sealant - Fuel Tank
Brushable
06HAA1
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 12
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Adhesion Promoter - For Sealant
 06PAG1
 As required
Non Aqueous Cleaner - General
 08BAA9
 As required
Corrosion Preventive Compound -
Water Displacing
12ADB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
(1) Tooling - Price and Availability
(a) Procurement Addresses
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
Operators interested in obtaining the Fatigue Technology Inc. (FTI) tool kit should
contact:
Standard tool TOOLA01
 Fatigue Technology Inc.
401 Andover Park East
SEATTLE, WA 98188-7605
USA
Internet: http://www.fatiguetech.com
Phone: (206) 2462010
Fax: (206) 2449886
Operators interested in obtaining the West Coast Industries (WCI) tool kit should
contact:
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 13
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
Standard tool TOOLA02
 West Coast Industries Inc.
14900 Whitman Ave. N
Seattle, Washington 98133
Tel: (206) 365-7513
Fax: (206) 365-7483
Email: info@coldwork.com
Europe, Middle-East, Africa, India and
Russia:
T e l . :+ 3 356 19 20 49 1( F r a n c e )
Email: customer@capaero.com
(b) Price and Availability
Standard tool
 TOOLA01
Procurement to be negotiated directly with FTI.
Standard tool
 TOOLA02
Procurement to be negotiated directly with WCI.
(2) Tools
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
To accomplish this Service Bulletin it is necessary to use the tools and equipment listed
in:
- AMM Task 52-32-11-820-803
- NTM Task 51-10-01-250-801
- NTM Task 51-10-08.
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
FTIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 14
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. FTI-A340-57-4137-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
WCIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. WCI-A340-57-4137-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 15
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
(3) Special Tools
None
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 16
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 574137-831-801-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION
(CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE THE SOURCE OF A
POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL CDCCL ITEMS IN
THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A
CDCCL ITEM CAN CAUSE A POSSIBLE TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact AIRBUS for further
instructions and approval.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 17
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
NOTE
: Discarded parts must be managed at the operator’s discretion.
Task Associated Data
**CONF 001
Zone
131 132
Manpower
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
**CONF 002
Zone
131 132
Manpower
TOTAL MANHOURS
 49.00
ELAPSED TIME (HOURS)
 23.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 574137-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-21-11-911-801
Task 21-20-00-010-801
Task 21-20-00-410-801
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-48-00
51-70-20
51-75-12
(a) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 18
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the general removal of air-conditioning distribution ducts, refer to AMM Task
21-20-00-010-801.
(f) For the general installation of air-conditioning distribution ducts, refer to AMM Task
21-20-00-410-801.
(g) Remove and install fasteners in accordance with SRM 51-42-00.
(h) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(i) Get fastener hole diameters and drill data in accordance with SRM 51-44-00.
(j) Do the spot facing of the fastener in accordance with SRM 51-70-20.
(k) Get alternative and substitute fastener data in accordance with SRM 51-43-00.
(l) Do a cold working of the fastener holes in accordance with SRM 51-48-00.
(m) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(n) Apply sealant in accordance with SRM 51-24-00.
(o) Renew the protective finish in accordance with SRM 51-75-12.
(p) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 "Mating
Part" column.
(q) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 574137-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 574137-910-001-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 19
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
Task 20-21-11-911-801
Task 21-20-00-010-801
Task 21-20-00-410-801
Structural Repair Manual (SRM)
 51-24-00
51-42-00
51-43-00
51-44-00
51-48-00
51-70-20
51-75-12
(a) For the specification of Material Numbers (Mat. No.) given in this Service Bulletin,
refer to the Consumable Materials List (CML).
(b) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(c) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(d) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(e) For the general removal of air-conditioning distribution ducts, refer to AMM Task
21-20-00-010-801.
(f) For the general installation of air-conditioning distribution ducts, refer to AMM Task
21-20-00-410-801.
(g) Remove and install fasteners in accordance with SRM 51-42-00.
(h) Tag all the parts you must remove and retain to make the subsequent installation
easier.
(i) Get fastener hole diameters and drill data in accordance with SRM 51-44-00.
(j) Do the spot facing of the fastener in accordance with SRM 51-70-20.
(k) Get alternative and substitute fastener data in accordance with SRM 51-43-00.
(l) Do a cold working of the fastener holes in accordance with SRM 51-48-00.
(m) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(n) Apply sealant in accordance with SRM 51-24-00.
(o) Renew the protective finish in accordance with SRM 51-75-12.
(p) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 "Mating
Part" column.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 20
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
(q) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 574137-839-001-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 574137-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 28-00-00-610-801
Task 28-10-00-910-805
Task 28-25-00-650-801
Task 32-12-00-010-801
Task 52-30-00-010-801
Task 57-17-11-000-801
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at the cargo door 821.
(c) Open the Main Landing Gear (MLG) doors, refer to AMM Task 32-12-00-010-801.
(d) Open the 821 FWD cargo-compartment door, refer to AMM Task
52-30-00-010-801.
(e) Defuel the center fuel tank, refer to AMM Task 28-25-00-650-801.
(f) Degas and ventilate the center fuel tank, refer to AMM Task 28-00-00-610-801 and
AMM Task 28-10-00-910-805.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 21
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340
SERVICE BULLETIN
(g) Remove the access covers 147AZ and 148AZ, refer to AMM Task
57-17-11-000-801.
(2) Subtask 574137-010-001-001 - Remove/Open for Access in the FWD Cargo-
Compartment
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 21-20-00-010-801
Task 21-21-41-000-801
Task 21-21-51-000-801
Task 25-52-00-000-801
Task 25-80-00-000-801
Fig. A-FBAAA
Removal/Installation of the Air
Conditioning Ducts between FR39.1 and
FR40 (FWD Cargo - Compartment)
Sheet 01
Fig. A-FBEAA
Removal/Installation of the Air Supply
Pipe Assembly
Sheet
 01
CAUTION
: DO NOT STEP ON THE DUCTS BECAUSE THEY ARE FRAGILE.
(a) Remove the partition panels in the FWD cargo compartment 131BX,
 131CX,
131DX, 132CX and 132DX, refer to AMM Task 25-52-00-000-801.
(b) Remove between
 Frame 39.1 and Frame 40 on the LH and RH sides as shown on
Fig. A-FBAAA
 and refer to AMM Task 21-20-00-010-801:
2 Duct Item (1) Retain
2 Duct Item (2) Retain
(c) Remove as shown on Fig. A-FBAAA
 and refer to AMM Task 21-21-51-000-801 and
AMM Task 21-21-41-000-801:
2 Recirculation Filter Item (3) Retain
2 Recirculation Fan Item (4) Retain
(d) Remove as shown on Fig. A-FBEAA
:
3
 Bolt
 Item (6
) Retain
3
 Washer
 Item (7
) Retain
1
 Strip-Bonding
 Item (9
) Retain
3
 Clamp
 Item (8
) Retain
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 22
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A340
SERVICE BULLETIN
1
 Air Supply Pipe Assy
 Item (5
) Retain
(e) Remove the necessary insulation blankets to access the work area, refer to AMM
Task 25-80-00-000-801.
**CONF 002
(1) Subtask 574137-941-001-001 - Job Set-up
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 28-00-00-610-801
Task 28-10-00-910-805
Task 28-25-00-650-801
Task 32-12-00-010-801
Task 52-30-00-010-801
Task 57-17-11-000-801
NOTE
: For the basic Aircraft configuration, refer to AMM Chapter "Introduction -
Aircraft status for maintenance" in Manual Front Matter section.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) Put an access platform in position at the cargo door 821.
(c) Open the Main Landing Gear (MLG) doors, refer to AMM Task 32-12-00-010-801.
(d) Open the 821 FWD cargo-compartment door, refer to AMM Task
52-30-00-010-801.
(e) Defuel the center fuel tank, refer to AMM Task 28-25-00-650-801.
(f) Degas and ventilate the center fuel tank, refer to AMM Task 28-00-00-610-801 and
AMM Task 28-10-00-910-805.
(g) Remove the access covers 147AZ and 148AZ, refer to AMM Task
57-17-11-000-801.
(2) Subtask 574137-010-001-001 - Remove/Open for Access in the FWD Cargo-
Compartment
Manpower Resources
Skills
 NON SPECIFIC
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 23
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A340
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 21-20-00-010-801
Task 21-21-41-000-801
Task 21-21-51-000-801
Task 25-52-00-000-801
Task 25-80-00-000-801
Fig. A-FBAAA
Removal/Installation of the Air
Conditioning Ducts between FR39.1 and
FR40 (FWD Cargo - Compartment)
Sheet 01
Fig. A-FBEAA
Removal/Installation of the Air Supply
Pipe Assembly
Sheet
 01
CAUTION
: DO NOT STEP ON THE DUCTS BECAUSE THEY ARE FRAGILE.
(a) Remove the partition panels in the FWD cargo compartment 131BX,
 131CX,
131DX, 132CX and 132DX, refer to AMM Task 25-52-00-000-801.
(b) Remove between
 Frame 39.1 and Frame 40 on the LH and RH sides as shown on
Fig. A-FBAAA
 and refer to AMM Task 21-20-00-010-801:
2 Duct Item (1) Retain
2 Duct Item (2) Retain
(c) Remove as shown on Fig. A-FBAAA
 and refer to AMM Task 21-21-51-000-801 and
AMM Task 21-21-41-000-801:
2 Recirculation Filter Item (3) Retain
2 Recirculation Fan Item (4) Retain
(d) Remove as shown on Fig. A-FBEAA
:
3
 Bolt
 Item (6
) Retain
3
 Washer
 Item (7
) Retain
1
 Strip-Bonding
 Item (9
) Retain
3
 Clamp
 Item (8
) Retain
1
 Air Supply Pipe Assy
 Item (5
) Retain
(e) Remove the necessary insulation blankets to access the work area, refer to AMM
Task 25-80-00-000-801.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 24
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A340
SERVICE BULLETIN
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 574137-020-001-001 - Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
Textile - Lint Free Cotton
 14SBA1
References
Structural Repair Manual (SRM)
 51-42-00
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Remove as shown on Fig. A-FBDAA
 and in accordance with SRM 51-42-00:
1 Screw Item (7) Discard
1 Nut Item (8) Discard
(b) Remove the old sealant with a non metallic spatula.
(c) Clean the work area with:
Textile - Lint Free
Cotton
14SBA1 As required
and
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 25
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A340
SERVICE BULLETIN
Non Aqueous
Cleaner - General
08BAA9 As required
(2) Subtask 574137-250-001-001 - Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 51-10-01
(a) Do a rotating probe test of the fastener hole 260 in accordance with
 NTM 51-10-01.
1
 In case of crack findings in the fastener hole, contact AIRBUS before next
flight and follow their instructions.
2
 In case of no crack findings, do a cold working of the fastener holes in
accordance with SUBTASK 574137-831-001 001 Do a Cold Working of the
Fastener Hole 260 between STGR37 and STGR38 at FR40, on the LH Side .
(3) Subtask 574137-831-001-001 - Do a Cold Working of the Fastener Hole 260
between STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 3.00
Minimum number of person
 2
Subtask elapsed time
 1.50
Skills
 AIRFRAME
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 26
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A340
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Wash Primer - Structure
 04CMA2
 As required
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
FTIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. FTI-A340-57-4137-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 27
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340
SERVICE BULLETIN
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
WCIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. WCI-A340-57-4137-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-70-20
51-75-12
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 28
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340
SERVICE BULLETIN
(a) Do a check of the existing hole diameter and compare with the values as shown on
Fig. A-FBDAA
.
1
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions before
next flight.
2
 In case the hole diameter is less than the minimum starting hole diameter, do
the next step.
(b) Drill and ream the fastener hole to the correct starting hole diameter as shown on
Fig. A-FBDAA
 and in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA340574137-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA340574137-1 Durable Tooling 1
(c) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(d) If necessary, perform spot facing to the related fastener head depth, in accordance
with SRM 51-70-20.
(e) Renew the protective finish in accordance with SRM 51-75-12:
Wash Primer -
Structure
04CMA2
 As required
and
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
(f) Do the cold working of the fastener hole 260.
1
 Install split sleeve as shown on Fig. A-FBDAA
.
Refer to FTI Tool list No.:
EKA340574137-1 Expendable Tooling 1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 29
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340
SERVICE BULLETIN
or
Refer to WCI Tool list No.:
EKA340574137-1 Expendable Tooling 1
2
 Do the cold working of the fastener hole 260 in accordance with
 SRM
51-48-00.
Refer to FTI Tool list No.:
FTIA340574137-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA340574137-1 Capital Tooling 1
3
 Remove the split sleeve.
(g) Ream the fastener hole to the final hole diameter, as shown on Fig. A-FBDAA
 and
in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA340574137-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA340574137-1 Durable Tooling 1
(h) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(4) Subtask 574137-420-001-001 - Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 30
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Kit 574137A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
7
 EN6115K8-16
 1
 BOLT
8
 ASNA2531-8
 1
 NUT
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Polyurethane Coating - Fuel
Vapour Barrier Struct
04PAG2
 As required
Polysulfide Sealant - Fuel
Tank Brushable
06ABA1
 As required
Coating Sealant - Fuel Tank
Brushable
06HAA1
 As required
Adhesion Promoter - For
Sealant
06PAG1
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Corrosion Preventive
Compound - Water
Displacing
12ADB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Structural Repair Manual (SRM)
 51-42-00
51-75-12
51-76-12
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 31
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340
SERVICE BULLETIN
(a) Install the fastener to the aircraft structure.
1
 Wet install in accordance with SRM 51-42-00, refer to Fig. A-FBDAA
 and
AMM Task 20-21-11-911-801.
1 Bolt EN6115K8-16 Item 7
1 Nut ASNA2531-8 Item 8
with
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1
 As required
2
 Clean the work area with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(b) Apply protective finish on the fastener, refer to
 Fig. A-FBDAA
.
1
 Apply to the bolt head outside the center fuel tank in accordance with
 SRM
51-75-12:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
Polyurethane
Coating - Fuel
Vapour Barrier
Struct
04PAG2
 As required
Corrosion
Preventive
Compound - Water
Displacing
12ADB1
 As required
2
 Apply to the nut inside the center fuel tank in accordance with SRM 51-76-12:
Adhesion Promoter
- For Sealant
06PAG1 As required
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 32
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340
SERVICE BULLETIN
Coating Sealant -
Fuel Tank
Brushable
06HAA1
 As required
(5) Subtask 574137-020-002-001 - Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Structural Repair Manual (SRM)
 51-42-00
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Remove as shown on Fig. A-FBDAA
 and in accordance with SRM 51-42-00:
1 Screw Item (7) Discard
1 Nut Item (8) Discard
(b) Remove the old sealant with a non metallic spatula.
(c) Clean the work area with:
Textile - Lint Free
Cotton
14SBA1 As required
and
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 33
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340
SERVICE BULLETIN
Non Aqueous
Cleaner - General
08BAA9 As required
NOTE
: Do a check of the actual diameter and compare with the dimension
given in Fig. A-FBDAA
.
If the values are not correct, contact AIRBUS.
(6) Subtask 574137-250-002-001 - Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the RH side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 51-10-01
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Do a rotating probe test of the fastener hole 260 in accordance with
 NTM 51-10-01.
1
 In case of crack findings in the fastener hole, contact AIRBUS before next
flight and follow their instructions.
2
 In case of no crack findings, do a cold working of the fastener holes in
accordance with SUBTASK 574137-831-002 001 Do a Cold Working of the
Fastener Hole 260 between STGR37 and STGR38 at FR40, on the RH Side .
(7) Subtask 574137-831-002-001 - Do a Cold Working of the Fastener Hole 260
between STGR37 and STGR38 at FR40, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 34
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 3.00
Minimum number of person
 2
Subtask elapsed time
 1.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Wash Primer - Structure
 04CMA2
 As required
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
FTIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. FTI-A340-57-4137-1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 35
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340
SERVICE BULLETIN
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
WCIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. WCI-A340-57-4137-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-70-20
51-75-12
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 36
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340
SERVICE BULLETIN
(a) Do a check of the existing hole diameter and compare with the values as shown on
Fig. A-FBDAA
.
1
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions before
next flight.
2
 In case the hole diameter is less than the minimum starting hole diameter, do
the next step.
(b) Drill and ream the fastener hole to the correct starting hole diameter as shown on
Fig. A-FBDAA
 and in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA340574137-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA340574137-1 Durable Tooling 1
(c) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(d) If necessary, perform spot facing to the related fastener head depth, in accordance
with SRM 51-70-20.
(e) Renew the protective finish in accordance with SRM 51-75-12:
Wash Primer -
Structure
04CMA2
 As required
and
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
(f) Do the cold working of the fastener hole 260.
1
 Install split sleeve as shown on Fig. A-FBDAA
.
Refer to FTI Tool list No.:
EKA340574137-1 Expendable Tooling 1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 37
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A340
SERVICE BULLETIN
or
Refer to WCI Tool list No.:
EKA340574137-1 Expendable Tooling 1
2
 Do the cold working of the fastener hole 260 in accordance with
 SRM
51-48-00.
Refer to FTI Tool list No.:
FTIA340574137-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA340574137-1 Capital Tooling 1
3
 Remove the split sleeve.
(g) Ream the fastener hole to the final hole diameter, as shown on Fig. A-FBDAA
 and
in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA340574137-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA340574137-1 Durable Tooling 1
(h) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(8) Subtask 574137-420-002-001 - Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the RH Side
Work Zones and Access Panels
Zone
 Access/Work location
132
 Work location
 Frame 40
from Stringer 37 to Stringer 38
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 38
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A340
SERVICE BULLETIN
Manpower Resources
Manhours
 1.00
Minimum number of person
 2
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Kit 574137A01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
7
 EN6115K8-16
 1
 BOLT
8
 ASNA2531-8
 1
 NUT
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Polyurethane Coating - Fuel
Vapour Barrier Struct
04PAG2
 As required
Polysulfide Sealant - Fuel
Tank Brushable
06ABA1
 As required
Coating Sealant - Fuel Tank
Brushable
06HAA1
 As required
Adhesion Promoter - For
Sealant
06PAG1
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Corrosion Preventive
Compound - Water
Displacing
12ADB1
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 20-21-11-911-801
Structural Repair Manual (SRM)
 51-42-00
51-75-12
51-76-12
Fig. A-FBDAA
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 39
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A340
SERVICE BULLETIN
(a) Install the fastener to the aircraft structure.
1
 Wet install in accordance with SRM 51-42-00, refer to Fig. A-FBDAA
 and
AMM Task 20-21-11-911-801.
1 Bolt EN6115K8-16 Item 7
1 Nut ASNA2531-8 Item 8
with
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1
 As required
2
 Clean the work area with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(b) Apply protective finish on the fastener, refer to
 Fig. A-FBDAA
.
1
 Apply to the bolt head outside the center fuel tank in accordance with
 SRM
51-75-12:
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
Polyurethane
Coating - Fuel
Vapour Barrier
Struct
04PAG2
 As required
Corrosion
Preventive
Compound - Water
Displacing
12ADB1
 As required
2
 Apply to the nut inside the center fuel tank in accordance with SRM 51-76-12:
Adhesion Promoter
- For Sealant
06PAG1 As required
Polysulfide Sealant
- Fuel Tank
Brushable
06ABA1
 As required
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 40
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A340
SERVICE BULLETIN
Coating Sealant -
Fuel Tank
Brushable
06HAA1
 As required
**CONF 002
(1) Subtask 574137-020-001-002 - Remove the Fastener from the Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
References
Structural Repair Manual (SRM)
 51-42-00
Fig. A-FBDAB
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
(a) Remove as shown on Fig. A-FBDAB
 and in accordance with SRM 51-42-00:
1 Screw Item (9) Discard
1 Nut Item (10) Discard
(b) Remove the old sealant with a non metallic spatula.
(c) Clean the work area with:
Textile - Lint Free
Cotton
14SBA1 As required
and
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 41
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A340
SERVICE BULLETIN
Non Aqueous
Cleaner - General
08BAA9 As required
(2) Subtask 574137-250-001-002 - Do an Inspection of the Fastener Hole 260 between
STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 0.50
Minimum number of person
 2
Subtask elapsed time
 0.25
Skills
 NON DESTRUCTIVE
TESTING
References
Non Destructive Test Manual (NTM)
 51-10-01
(a) Do a rotating probe test of the fastener hole 260 in accordance with
 NTM 51-10-01.
1
 In case of crack findings in the fastener hole, contact AIRBUS before next
flight and follow their instructions.
2
 In case of no crack findings, do a cold working of the fastener holes in
accordance with SUBTASK 574137-831-001 002 Do a Cold Working of the
Fastener Hole 260 between STGR37 and STGR38 at FR40, on the LH Side .
(3) Subtask 574137-831-001-002 - Do a Cold Working of the Fastener Hole 260
between STGR37 and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
Manpower Resources
Manhours
 3.00
Minimum number of person
 2
Subtask elapsed time
 1.50
Skills
 AIRFRAME
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 42
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A340
SERVICE BULLETIN
Material necessary to do the job
Consumable CMLA01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Wash Primer - Structure
 04CMA2
 As required
Primer Polyurethane Paint -
Corrosion Inhibiting
04EAC2
 As required
Non Aqueous Cleaner -
General
08BAA9
 As required
Textile - Lint Free Cotton
 14SBA1
 As required
Standard tool TOOLA01
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
FTIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: FTI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. FTI-A340-57-4137-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from FTI.
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 43
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A340
SERVICE BULLETIN
Standard tool TOOLA02
ITEM
 TOOL N˚
 TOOL NAME
 QTY
 SEE
NOTES
DKA340574137-1
 Durable Tooling
 1
 (1)
EKA340574137-1
 Expendable Tooling
 1
 (2)
WCIA340574137-1
 Capital Tooling
 1
 (3)
NOTE
: WCI has allocated the following tool kit numbers for cold expansion:
For the definition of capital, durable and expendable tools, refer to ISI
51.48.00001
NOTE
: Only 1 TOOL Kit is necessary to perform the Cold Working, either
TOOLA01 or TOOLA02 depending on the supplier chosen.
NOTE
 (1)
: Durable tooling: Ref. DK-A340-57-4137-1
The durable tool kit contains the minimum quantity of durable tools
necessary to accomplish the Service Bulletin on one aircraft. If the
Service Bulletin is to be accomplished on more than one aircraft, the
number of durable kits required can be established by reference to ISI
51.48.00001.
NOTE
 (2)
: Expendable tooling: Ref. EK-A340-57-4137-1
The expendable tool kit contains the quantity of expendable tools
required to accomplish the Service Bulletin on one aircraft. Order one
expendable tool kit for every aircraft on which this Service Bulletin is to
be accomplished.
NOTE
 (3)
: Capital tooling: Ref. WCI-A340-57-4137-1
The capital tools provided in this kit are not specific to this Service
Bulletin and are normally already available in operators’ stock as a long-
term investment or can be loaned from WCI.
References
Structural Repair Manual (SRM)
 51-44-00
51-48-00
51-70-20
51-75-12
Fig. A-FBDAB
Removal/Installation of the Fasteners at
Holes 260 between STGR37 and
STGR38 at FR40 on the LH and the RH
Side
Sheet 01
Sheet 02
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 44
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A340
SERVICE BULLETIN
(a) Do a check of the existing hole diameter and compare with the values as shown on
Fig. A-FBDAB
.
1
 In case the existing hole diameter is more than or equal to the minimum
starting hole diameter, please contact AIRBUS for further instructions before
next flight.
2
 In case the hole diameter is less than the minimum starting hole diameter, do
the next step.
(b) Drill and ream the fastener hole to the correct starting hole diameter as shown on
Fig. A-FBDAB
 and in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA340574137-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA340574137-1 Durable Tooling 1
(c) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(d) If necessary, perform spot facing to the related fastener head depth, in accordance
with SRM 51-70-20.
(e) Renew the protective finish in accordance with SRM 51-75-12:
Wash Primer -
Structure
04CMA2
 As required
and
Primer
Polyurethane Paint
- Corrosion
Inhibiting
04EAC2
 As required
(f) Do the cold working of the fastener hole 260.
1
 Install split sleeve as shown on Fig. A-FBDAB
.
Refer to FTI Tool list No.:
EKA340574137-1 Expendable Tooling 1
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 45
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A340
SERVICE BULLETIN
or
Refer to WCI Tool list No.:
EKA340574137-1 Expendable Tooling 1
2
 Do the cold working of the fastener hole 260 in accordance with
 SRM
51-48-00.
Refer to FTI Tool list No.:
FTIA340574137-1 Capital Tooling 1
or
Refer to WCI Tool list No.:
WCIA340574137-1 Capital Tooling 1
3
 Remove the split sleeve.
(g) Ream the fastener hole to the final hole diameter, as shown on Fig. A-FBDAB
 and
in accordance with SRM 51-44-00 and SRM 51-48-00.
Refer to FTI Tool list No.:
DKA340574137-1 Durable Tooling 1
or
Refer to WCI Tool list No.:
DKA340574137-1 Durable Tooling 1
(h) Clean the drilled holes with:
Textile - Lint Free
Cotton
14SBA1
 As required
and
Non Aqueous
Cleaner - General
08BAA9
 As required
(4) Subtask 574137-420-001-002 - Install the Fastener in the Hole 260 between STGR37
and STGR38 at FR40, on the LH Side
Work Zones and Access Panels
Zone
 Access/Work location
131
 Work location
 Frame 40
from Stringer 37 to Stringer 38
DATE: Nov 23/16 SERVICE BULLETIN No.: A340-57-4137
REVISION No.: 01 - Feb 16/18 Page: 46
5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/a340-57-4137/file/158fdc697618.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
