# Airbus Service Bulletin A340-57-5036

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- No revision named ("A340-57-5036 R01"), 51 pages: PDF https://openairdocs.org/files/sha256/29/f7/29f7f84ceb2fef47c1644d666b6c96e278fe0e8bb804c22b22eb6e95df5ec73b; text https://openairdocs.org/service-documents/airbus/a340-57-5036/file/29f7f84ceb2f.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2023-0428, the docket of AD 2023-10-06. Not covered by OpenAirDocs’ CC0 dedication.
- No revision named ("FAA-2016-8851_SB A340-57-5036"), 39 pages: PDF https://openairdocs.org/files/sha256/d0/c9/d0c929adc319ac38f43297dfa4855b0956c64905bcd569064dc4163093302c8c; text https://openairdocs.org/service-documents/airbus/a340-57-5036/file/d0c929adc319.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-8851; AD 2017-06-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-57-5036
- Page: https://openairdocs.org/service-documents/airbus/a340-57-5036

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-06-07](https://openairdocs.org/ad/2017-06-07.md), effective May 15, 2017: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-57-5036/proposed.md).

## Text (51 pages)

No revision named, the newest copy. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2023-0428, the docket of AD 2023-10-06. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WING - FLAP - INSPECTION OF FLAP PARTS FOLLOWING MATERIAL
NON CONFORMITY
MODIFICATION No.: None
This page transmits Revision No.01 of Service Bulletin No.A340-57-5036
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft inspected by any previous issue.
REASON
Revision No. 01 issued to:
- Split the work of the LH and RH wings
- Replace the consumable material reference 04JMF1 by 04JME4.
CHANGES
The main changes of this revision are:
- General evaluation table updated
- INDUSTRY SUPPORT INFORMATION paragraph updated
- MANPOWER paragraph updated
- Consumable material reference 04JMF1 replaced by 04JME4
- New subtasks created to split the work on the LH and RH wings
- Appendix 03 - Manpower Gantt Chart added
- Appendix 04 - Inspection Report added
- Figures updated
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
- Minor changes applied.
SUMMARY
GENERAL EVALUATION
 GENERAL EVALUATION TABLE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
 R
APPENDICES
 APPENDICES UPDATED
 R
PLANNING INFORMATION
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
 R
MANPOWER
 MANPOWER UPDATED
CONFIGURATION UPDATED
R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
MATERIAL SET UPDATED
R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
 R
INDUSTRY SUPPORT INFORMATION
 INDUSTRY SUPPORT INFORMATION UPDATED
 R
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLD01
 CONSUMABLE MATERIAL SET UPDATED
CONSUMABLE UPDATED
R
Components
Component COMPD01
 PART MATERIAL SET UPDATED
 R
Component COMPD02
 PART MATERIAL SET UPDATED
 R
ACCOMPLISHMENT INSTRUCTIONS
TASK 575036- 832-848-001-Inspection
 TASK SOLUTION UPDATED
NOTE UPDATED
CAUTION UPDATED
R
Task associated data - 001
 MAN HOURS UPDATED
ELAPSED TIME UPDATED
R
Subtask 575036-941-201-001
 SUBTASK SOLUTION UPDATED
 R
Subtask 575036-831-201-001
 SUBTASK SOLUTION UPDATED
ZONE UPDATED
CONSUMABLE UPDATED
NOTE UPDATED
LOCATION UPDATED
MANPOWER RESSOURCE UPDATED
MATERIAL LIST UPDATED
R
Subtask 575036-831-202-001
 SUBTASK SOLUTION ADDED
 N
Subtask 575036-832-202-001
 SUBTASK SOLUTION UPDATED
ZONE UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
NOTE UPDATED
LOCATION UPDATED
MANPOWER RESSOURCE UPDATED
R
Subtask 575036-832-204-001
 SUBTASK SOLUTION ADDED
 N
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 575036-942-201-001
 SUBTASK SOLUTION UPDATED
MATERIAL LIST UPDATED
R
Fig. A-GFAAA
Fig. A-GFAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GFAAA Sheet 02
 SHEET UPDATED
 R
Fig. A-GDAAA
Fig. A-GDAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GRA
 FIGURE DELETED FOR APPLICABLE MSN
 D
Appendix 01 - Assessment for Heat Treatment us ing Eddy Current Conductivity Measurement
(COT) on Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
APPENDIX CONTENT
 APPENDIX CONTENT ADDED
 N
Fig. A-GAAAA
Fig. A-GAAAA Sheet 04
 SHEET UPDATED
 R
Fig. A-GAAAA Sheet 06
 SHEET UPDATED
 R
Fig. A-GAAAA Sheet 09
 SHEET UPDATED
 R
Appendix 02 - Effectivity by Part Number/MSN//Serial Number
APPENDIX CONTENT
 APPENDIX CONTENT ADDED
 N
Fig. A-GABAA
Fig. A-GABAA Sheet 01
 SHEET UPDATED
 R
Appendix 03 - Manpower Gantt Chart
APPENDIX CONTENT
 APPENDIX CONTENT ADDED
 N
Fig. A-GADAA
 FIGURE SOLUTION ADDED
 N
Fig. A-GADAA Sheet 01
 SHEET ADDED
 N
Appendix 04 - Inspection Report
APPENDIX CONTENT
 APPENDIX CONTENT ADDED
 N
Fig. A-GAEAA
 FIGURE SOLUTION ADDED
 N
Fig. A-GAEAA Sheet 01
 SHEET ADDED
 N
Fig. A-GAEAA Sheet 02
 SHEET ADDED
 N
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Sep 18/15
REVISION No. : 01 - Jun 05/17
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340-500/600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340-500/600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WING - FLAP - INSPECTION OF FLAP PARTS FOLLOWING MATERIAL
NON CONFORMITY
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
AIRBUS quality control identified that items manufactured with wrong aluminium alloy or without heat
treatment have entered the supply chain. Detailed assessment of the impact on aircraft structure of
suspected and/or actual non conformance to design definition has been performed. For the Long Range
program this is 11 Part Numbers (PNs) for 460 aircraft that are potentially affected.
The Inspection detailed in this Service Bulletin is focused on potentially affected structural parts located
on the flaps. The inspection identifies material 2024-0 (material without heat treatment).
This Service Bulletin introduces a one time inspection of the affected PNs. Refer to OIT 999.0053/14.
NOTE
: A Service Bulletin (SB) for the inspection of parts in the cargo compartment (SB
A340-53-5072) will also be issued.
Accomplishment of this Service Bulletin will allow detection of the affected parts.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
VALIDATION ON AIRCRAFT
 YES
 BOOKLET AVAILABLE
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340-500/600
SERVICE BULLETIN
SUMMARY
NOTE
: The equivalent of this Service Bulletin has been validated at original issue on A330
aircraft with Manufacturer Serial Number (MSN) 1077.
NOTE
: A booklet including photographs taken during the validation of this Service Bulletin is
available on AIRBUS|World - Maintenance and Engineering - AirN@v engineering (in
the concerned SB file).
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Component COMPD01
 1
 See SB
 Covers
Component COMPD02
 1
 See SB
 Covers
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06U ETD IBE
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 OIT 999.0053/14
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 575036-832-848-001: Inspection
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.50
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340-500/600
SERVICE BULLETIN
SUMMARY
APPENDICES
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
Appendix 02 - Effectivity by Part Number/MSN//Serial Number
Appendix 03 - Manpower Gantt Chart
Appendix 04 - Inspection Report
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF ALL
NOTE:
AREA OF INSPECTION
A
A
LH SHOWN
RH SYMMETRICAL
INBOARD
FLAP
A
F_SB_575036_6_SAAA_01_00
Figure A-GSAAA - Sheet 01
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340-500/600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 57
TITLE: WING - FLAP - INSPECTION OF FLAP PARTS FOLLOWING MATERIAL
NON CONFORMITY
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-541 340-642
(2) Effectivity by MSN
1030 1040 1079 1091 1102 1122
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06U
 1091 1102
ETD
 1030 1040
IBE
 1079 1122
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340-500/600
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
1030 1040 1079 1091 1102 1122
 001
(5) Configuration definition
**CONF 001
Config. 001 is applicable to all A340-500/-600 aircraft listed in the effectivity of this
Service Bulletin. For the specific Part Numbers/Serial Numbers to inspect for each MSN,
refer to Appendix 02 - Effectivity by Part Number/MSN//Serial Number .
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Consumable CMLD01
 1
Component COMPD01
 1
Component COMPD02
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
AIRBUS quality control identified that items manufactured with wrong aluminium alloy
or without heat treatment have entered the supply chain. Detailed assessment of the
impact on aircraft structure of suspected and/or actual non conformance to design
definition has been performed. For the Long Range program this is 11 Part Numbers
(PNs) for 460 aircraft that are potentially affected.
(2) Objective/Action
The Inspection detailed in this Service Bulletin is focused on potentially affected
structural parts located on the flaps. The inspection identifies material 2024-0 (material
without heat treatment).
This Service Bulletin introduces a one time inspection of the affected PNs. Refer to OIT
999.0053/14.
NOTE
: A Service Bulletin (SB) for the inspection of parts in the cargo
compartment (SB A340-53-5072) will also be issued.
(3) Advantages
Accomplishment of this Service Bulletin will allow detection of the affected parts.
(4) Operational/Maintenance Consequences
None
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340-500/600
SERVICE BULLETIN
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 575036-832-848-001: Inspection
(1) Make New Inspection Holes on the LH Wing
(2) Make New Inspection Holes on the RH Wing
(3) Do an Eddy Current Conductivity Measurement of the Inboard Flap Stringer Coupling
11 - 19 Between Rib 6 and Rib 7 on the LH Wing
(4) Do an Eddy Current Conductivity Measurement of the Inboard Flap Stringer Coupling
11 - 19 Between Rib 6 and Rib 7 on the RH Wing
(5) Marking
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 575036-832-848-001: Inspection
Get Access
 1.00
On Aircraft
Make New Inspection Holes on the LH Wing
 0.50
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340-500/600
SERVICE BULLETIN
Task 575036-832-848-001: Inspection
Make New Inspection Holes on the RH Wing
 0.50
Do an Eddy Current Conductivity Measurement of the
Inboard Flap Stringer Coupling 11 - 19 Between Rib 6
and Rib 7 on the LH Wing
2.00
Do an Eddy Current Conductivity Measurement of the
Inboard Flap Stringer Coupling 11 - 19 Between Rib 6
and Rib 7 on the RH Wing
2.00
Marking
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.50
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-GADAA
 given in Appendix 03 - Manpower Gantt Chart
 .
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 12-34-24 27-50-00
51-75-12
Elec. Std. Practices Manual (ESPM)
 20-55-00
Process and Material Specification (PMS)
 Process and Material Specification
(PMS) 01-06-12
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340-500/600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Component
 COMPD01
Component
 COMPD02
AIRBUS Material, Logistics and Suppliers
IFD - In Flight Desk
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 40 12
For ordering by E-mail:
ifd.spares@airbus.com
(2) Price and Availability
No AIRBUS kit will be provided.
Operator supplied AIRBUS parts required to accomplish this Service Bulletin are to be
purchased by a spares purchase order.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will share the costs of accomplishment of this Service Bulletin by crediting the
operator supplied AIRBUS parts for orders placed before Dec 31/20. Claims for this
allowance should be received no later than 90 days after completion of the last affected
aircraft of your fleet.
AIRBUS will credit the man hours indicated in this Service Bulletin at the agreed in-house
warranty labor rate for claims received no later than 90 days after completion of the last
affected aircraft of your fleet, for the accomplishment of this Service Bulletin before Dec
31/20.
C. LIST OF COMPONENTS
No Kit
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340-500/600
SERVICE BULLETIN
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane - Grey
Internal Structure
04JME4
 As required
Non Aqueous Cleaner-General
 08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
G5757123020000
 10
 Cover
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Component COMPD02
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
G5757123020200
 10
 Cover
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
NOTE
: After inspection and completion of all actions write the Service Bulletin
number adjacent to the existing identification label on the flap, refer to
Process and Material Specification (PMS) 01-06-12. Go to SUBTASK
575036-930-201 001 Marking .
F. TOOLING
(1) Tooling - Price and Availability
None
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340-500/600
SERVICE BULLETIN
(2) Tools
To accomplish this Service Bulletin it is necessary to use the tools listed in Appendix 01
- Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT)
on Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH .
(3) Special Tools
None
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340-500/600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 575036-832-848-001 - Inspection
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
NOTE
: The purpose of flowcharts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340-500/600
SERVICE BULLETIN
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact AIRBUS for further
instructions and approval.
Task Associated Data
Zone
581 681
Manpower
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.50
A. GENERAL
(1) Subtask 575036-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(2) Subtask 575036-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 575036-941-201-001 - Job Set-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-860-802
Task 27-50-00-866-802
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340-500/600
SERVICE BULLETIN
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Put an access platform in position below the inboard flap LH and RH.
(b) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(c) Fully retract the flaps, refer to AMM Task 27-50-00-866-802.
(d) Put the warning notices in position on the flap levers to tell persons not to operate
the flap/slat controls.
(e) Remove and discard the existing covers from the inspection holes in the LH and
RH inboard flap.
C. PROCEDURE
(1) Subtask 575036-831-201-001 - Make New Inspection Holes on the LH Wing
Work Zones and Access Panels
Zone
 Access/Work location
581
 Work location
 from Rib 6 to Rib 7
from Stringer 11 to Stringer 19
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Grey Internal Structure
04JME4
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340-500/600
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 51-75-12-300-801
Task 51-75-12-300-802
Task 51-75-12-300-803
Fig. A-GDAAA
New Inspection Holes
Sheet 01
(a) In order to allow access for the inspection it is necessary to make new inspection
holes.
CAUTION
: TAKE CARE WHEN DRILLING THE NEW HOLE THAT YOU DO
NOT DAMAGE OTHER PARTS OF THE STRUCTURE.
1
 Between Ribs 6 and 7 LH carefully drill three holes 11.00 mm to 11.20 mm
(0.433 in. to 0.441 in.) diameter in the Flap Lower Skin, as shown on figure
Fig. A-GDAAA Sheet 01
 .
2
 Deburr both sides of the holes.
3
 Remove all swarf/drilling chips from inside the flap.
4
 Clean the work area.
Use:
Textile-Lint Free
Cotton
14SBA1 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9 As required
5
 If necessary, repair the paint finish. Repair top coat only, refer to AMM Task
51-75-12-300-803.
Use:
Top Coat
Polyurethane - Grey
Internal Structure
04JME4
 As required
6
 If necessary, repair the paint finish. Repair top coat and primer, refer to AMM
Task 51-75-12-300-801 or AMM Task 51-75-12-300-802.
Use:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2 As required
and
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340-500/600
SERVICE BULLETIN
Top Coat
Polyurethane - Grey
Internal Structure
04JME4
 As required
(2) Subtask 575036-831-202-001 - Make New Inspection Holes on the RH Wing
Work Zones and Access Panels
Zone
 Access/Work location
681
 Work location
 from
 Rib 6 to
 Rib 7
from
 Stringer 11 to
 Rib 19
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Primer Polyurethane Paint--
Corrosion Inhibiting
04EAC2
 As required
Top Coat Polyurethane -
Grey Internal Structure
04JME4
 As required
Non Aqueous Cleaner-
General
08BAA9
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 Task 51-75-12-300-801
Task 51-75-12-300-802
Task 51-75-12-300-803
Fig. A-GDAAA
New Inspection Holes
Sheet
 01
(a) In order to allow access for the inspection it is necessary to make new inspection
holes.
CAUTION
: TAKE CARE WHEN DRILLING THE NEW HOLE THAT YOU DO
NOT DAMAGE OTHER PARTS OF THE STRUCTURE.
1
 Between Ribs 6 and 7 RH carefully drill three holes 11.00 mm to 11.20 mm
(0.433 in. to 0.441 in.) diameter in the Flap Lower Skin, as shown on figure
Fig. A-GDAAA Sheet 01
 .
2
 Deburr both sides of the holes.
3
 Remove all swarf/drilling chips from inside the flap.
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340-500/600
SERVICE BULLETIN
4
 Clean the work area.
Use:
Textile-Lint Free
Cotton
14SBA1
 As required
Made moist with:
Non Aqueous
Cleaner-General
08BAA9
 As required
5
 If necessary, repair the paint finish. Repair top coat only, refer to AMM Task
51-75-12-300-803.
Use:
Top Coat
Polyurethane - Grey
Internal Structure
04JME4
 As required
6
 If necessary, repair the paint finish. Repair top coat and primer, refer to AMM
Task 51-75-12-300-801 or AMM Task 51-75-12-300-802.
Use:
Primer
Polyurethane Paint-
- Corrosion
Inhibiting
04EAC2
 As required
and
Top Coat
Polyurethane - Grey
Internal Structure
04JME4
 As required
(3) Subtask 575036-832-202-001 - Do an Eddy Cu rrent Conductivity Measurement of
the Inboard Flap Stringer Coupling 11 - 19 Between Rib 6 and Rib 7 on the LH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
581
 Work location
 from Rib 6 to Rib 7
from Stringer 11 to Stringer 19
Manpower Resources
Manhours
 2.00
Minimum number of person
 2
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340-500/600
SERVICE BULLETIN
References
Fig. A-GFAAA
Inspection Flowchart
Sheet 01
Sheet 02
Fig. A-GBAAA
Eddy Current Conductivity Measurement
of the Inboard Flap
Sheet 01
(a) Do the Eddy Current Conductivity Measurement of the installed structural parts in
the affected areas, refer to Fig. A-GFAAA Sheet 01
 , Fig. A-GFAAA Sheet 02
 , Fig.
A-GBAAA Sheet 01
 , Appendix 01 - Assessment for Heat Treatment using Eddy
Current Conductivity Measurement (COT) on Stringer Coupling Between Rib 6 and
Rib 7, Inboard Flap, LH/RH ,
 Appendix 02 - Effectivity by Part Number/MSN//Serial
Number and Appendix 04 - Inspection Report
 .
NOTE
: The inspection requires direct access to a flat area of the part with
a probe.
1
 If you have no findings:
a
 Upload the inspection report in AirbusWorld, refer to Appendix 04 -
Inspection Report
 .
b
 No further action.
2
 If you have findings:
a
 Contact AIRBUS for further instructions.
b
 Upload the inspection report in AirbusWorld, refer to Appendix 04 -
Inspection Report
 .
c
 No further action.
(4) Subtask 575036-832-204-001 - Do an Eddy Cu rrent Conductivity Measurement of
the Inboard Flap Stringer Coupling 11 - 19 Between Rib 6 and Rib 7 on the RH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
681
 Work location
 from
 Rib 6 to
 Rib 7
from
 Stringer 11 to
 Stringer 19
Manpower Resources
Manhours
 2.00
Minimum number of person
 2
Subtask elapsed time
 1.00
Skills
 NON DESTRUCTIVE
TESTING
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340-500/600
SERVICE BULLETIN
References
Fig. A-GBAAA
Eddy Current Conductivity Measurement
of the Inboard Flap
Sheet
 01
Fig. A-GFAAA
Inspection Flowchart
Sheet
 01
Sheet
 02
(a) Do the Eddy Current Conductivity Measurement of the installed structural parts in
the affected areas, refer to Fig. A-GFAAA Sheet 01
 , Fig. A-GFAAA Sheet 02
 , Fig.
A-GBAAA Sheet 01
 , Appendix 01 - Assessment for Heat Treatment using Eddy
Current Conductivity Measurement (COT) on Stringer Coupling Between Rib 6 and
Rib 7, Inboard Flap, LH/RH
 , Appendix 02 - Effectivity by Part Number/MSN//Serial
Number
 and Appendix 04 - Inspection Report
 .
NOTE
: The inspection requires direct access to a flat area of the part with
a probe.
1
 If you have no findings:
a
 Upload the inspection report in AirbusWorld, refer to Appendix 04 -
Inspection Report
 .
b
 No further action.
2
 If you have findings:
a
 Contact AIRBUS for further instructions.
b
 Upload the inspection report in AirbusWorld, refer to Appendix 04 -
Inspection Report
 .
c
 No further action.
(5) Subtask 575036-930-201-001 - Marking
Work Zones and Access Panels
Zone
 Access/Work location
581
681
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340-500/600
SERVICE BULLETIN
(a) After inspection and completion of all actions write this Service Bulletin number
adjacent to the existing identification label on the flap, refer to Process and Material
Specification (PMS) 01-06-12. Use:
Indelible Ink Marker
D. TEST
None
E. CLOSE-UP
(1) Subtask 575036-942-201-001 - Close-up
Manpower Resources
Skills
 AIRFRAME
Material necessary to do the job
Component COMPD01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
G5757123020000
 10
 Cover
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Component COMPD02
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
G5757123020200
 10
 Cover
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Cover the existing and new inspection holes. Install:
10 Cover (Grey) G5757123020000
or
10 Cover (White) G5757123020200
(c) Remove the access platforms.
(d) Remove the warning notices.
(e) Put the aircraft back to its initial configuration.
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340-500/600
SERVICE BULLETIN
**CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES.
CONTACT AIRBUS FOR
FURTHER INSTRUCTIONS
UPLOAD THE INSPECTION
REPORT IN
NO FURTHER ACTION
IN ACCORDANCE WITH
THIS SERVICE BULLETIN
AIRBUSWORLD
NO FURTHER ACTION
GAIN ACCESS AND INSPECT THE
APPLICABLE PART NUMBERS FOR THE FLAP SN
TO BE INSPECTED ON A SPECIFIC MSN,
REFER TO APPENDIX 02 − EFFECTIVITY BY MSN/SN/PN
YES NO
CLOSE UP AREA
INSTALL COVERS AND
IS THE MATERIAL
CORRECT AS PER
APPENDIX 01?
DO THE CONDUCTIVITY MEASUREMENT
(REFER TO APPENDIX 01) 01
RE−IDENTIFY THE FLAPS
IDENTIFY THE PART NUMBERS
SEE SHEET 2 FOR INSPECTION METHOD AND DETAILS.01
F_SB_575036_6_FAAA_01_07
Figure A-GFAAA - Sheet 01
Inspection Flowchart
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340-500/600
SERVICE BULLETIN
**CONF ALL
YESNO
ACCORDING TO APPENDIX 01
DO THE CONDUCTIVITY ( ) MEASUREMENT WITH 60kHz
> 26 Ms/m
MATERIAL NOT CORRECTMATERIAL CORRECT
MS/m OR= % IACS
> 44.8% IACS?
OR
F_SB_575036_6_FAAA_02_06
Figure A-GFAAA - Sheet 02
Inspection Flowchart
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340-500/600
SERVICE BULLETIN
**CONF ALL
A
A
REAR SPAR
FRONT SPAR
RIB6
RIB7
RIB13
RIB1
A
B
LH SHOWN
RH SYMMETRICAL
RIB6
RIB7
RIB8
RIB9
RIB10
RIB11
RIB12
RIB13
FRONT SPAR
REAR SPAR
STGR19
STGR18
STGR17
STGR16
STGR15
STGR14
STGR13
STGR12
STGR11
B
1
2
3
4
5
6
7
8
9
F_SB_575036_6_BAAA_01_02
Figure A-GBAAA - Sheet 01
Eddy Current Conductivity Measurement of the Inboard Flap
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340-500/600
SERVICE BULLETIN
**CONF ALL
RIB7 RIB6
STGR11
STGR12
STGR13
STGR14
STGR15
STGR16
STGR17
STGR18
STGR19
A
RH SHOWN
LH SYMMETRICAL
FRONT SPAR
RIB6
RIB13
RIB1
REAR SPAR
RIB7
B
THROUGH THIS NEW
HOLE INSPECT STGR
COUPLING 11
THROUGH THIS EXISTING
HOLE INSPECT STGR
COUPLING 12 AND 13
THROUGH THIS NEW
HOLE INSPECT STGR
COUPLING 14 AND 15
THROUGH THIS EXISTING
HOLE INSPECT STGR
COUPLING 16 AND 17
THROUGH THIS NEW
HOLE INSPECT STGR
COUPLING 18 AND 19
BAREA OF INSPECTION
NOTE:
REAR SPAR
FRONT SPAR
40 mm
(1.575 in)
40 mm
(1.575 in)
60 mm
(2.362 in)
F
W
D
JOINT
Z681A
A
Z581
C
FWD
RIB7
STGR11 STGR19
FRONT SPAR
REAR SPAR
STGR17STGR15STGR13
C
JOINT
NOSE
CAP
STGR1
STGR3 STGR5
STGR7
STGR9
F_SB_575036_6_DAAA_01_02
Figure A-GDAAA - Sheet 01
New Inspection Holes
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 21
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 22
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
**CONF ALL
F_SB_575036_6_AAAA_01_01
Figure A-GAAAA - Sheet 01
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33 (OCR)

© A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
0. INTRODUCTION
A. This procedure contains the technical information for electrical
conductivity testing of aluminum alloy materials on the STGR couplings
between RIB6 and 7, inboard flap, LH/RH.
1. AREA OF APPLICABILITY
A. The stringer coupling 11 thru 19 between RIB6 and RIB7, inboard flap,
LH/RH (Refer to Figure 1).
2. DESCRIPTION OF POSSIBLE DAMAGE
A. Incorrect heat treatment condition.
3. RELATED DOCUMENTS
A. NTM, Chapter 51-60-00, Page Block 601, Eddy Current - General
B. NTM, Chapter 51-10-17, Page Block 601, General Procedure for the
Assessment of Heat Treatment using Eddy Current Conductivity Measurement
on Aluminum Alloys
4. EQUIPMENT AND MATERIALS
A. The equipment used in the development of this procedure was as follows:
(1) Instrument  : SIGMATEST D2-069 from
MAGNETISCHE PRUEFANLAGEN GMBH
(2) Instrument  : Flexible Endoscope from Local Procurement
(3) Probe  : 2-069-69-0002, shielded, flexible,
8mm (0.315 in)  from MAGNETISCHE
PRUEFANLAGEN GMBH (Refer to Figure 2)
(4) Calibration Block Set: The a conster of f  (4) Calibration Block Set : The set consists of a 4.4 MS/m (7.6 % IACS)
and a 58.5 MS/m (100.8 % IACS) block
from MAGNETISCHE PRUEFANLAGEN GMBH
NOTE:  Any conductivity measurement equipment and probe may be used
provided that they meet the requirements of this procedure, but
preference is given to the above stated probe (Reason is the
limited access inside the flap thru the inspection holes).
F_SB_575036_6_AAAA_02_01
Figure A-GAAAA - Sheet 02
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 3
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34 (OCR)

© A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
RIB1
RIB6
REAR SPAR
FRONT SPAR
RIB13
THROUGH THIS HOLE INSPECT
RIB7  (1.575 in)  40 mm  STGR COUPLING 11  JOINT  RIB6
STGR11
"HROUGH THIS HOLE INSPEC  STGR 12
TGR COUPLING 12 AND 13
STGR13
40 mm  FRONT SPAR
THROUGH THIS HOLE INSPECT  1.575 in
STGR COUPLING 14 AND 15
STGR14
STGR15
STGR COUPLING 16 AND 17  THROUGH THIS HOLE INSPECT  STGR 16
STGR17
THROUGH THIS HOLE INSPECT
STGR COUPLING 18 AND 19
STGR 18
GN6 57 31 20 6 AAMO 1 00  NOTE:  STGR19
RIVETS
60 mm  REAR SPAR
(2.362 in)
INSPECTION AREA STGR
COUPLING 11-19 INSIDE THE FLAP
VIEW FROM
LOWER SIDE
FOR DETAIL C SEE FIGURE 1 SHEET 2
Inspection Area
Figure 1 (Sheet 1)  F_SB_575036_6_AAAA_03_01
Figure A-GAAAA - Sheet 03
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 4
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35 (OCR)

© A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
RIB7
STGR3  STGR4  STORE STORE STORY STORE STORO
STGR2  INSPECTION HOLE
/ 03)
STGR1  03>
INSPECTION HOLE  INSPECTION HOLE  / STGR10
NOSE  CAP  [04 >  03
R/S
STGR11  /STGR13  STGR 14/  STGR16  STGR17/ STGR18
STGR12  STGR15  STGR19
GN6 57 31 20 6 AEMO 1 00  NOTE:
R/S = REAR SPAR
F/S = FRONT SPAR
EXISTING INSPECTION HOLE ON THE LOWER SIDE OF THE FLAP
ADDITIONAL INSPECTION HOLE ON THE LOWER SIDE OF THE FLAP
DIA 11.0 mm TO 11.2 mm (0.433 in TO 0.441 in)
Inspection Area
Figure 1 (Sheet 2)
F_SB_575036_6_AAAA_04_02
Figure A-GAAAA - Sheet 04
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 5
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
F_SB_575036_6_AAAA_05_01
Figure A-GAAAA - Sheet 05
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37 (OCR)

© A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
5. PREPARATION FOR INSPECTION
WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN
POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND CAN
CAUSE DAMAGE.
WARNING:  MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
CLEAR. MOVEMENT OF THE FLIGHT CONTROL SURFACES CAN CAUSE INJURY TO
PERSONS AND DAMAGE TO THE AIRCRAFT OR EQUIPMENT.
WARNING:  BEFORE YOU START WORK, YOU MUST PUT ON SAFETY HARNESS AND ATTACH IT
TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL.
THIS CAN KILL YOU OR CAUSE YOU INJURY.
A. Make sure that the additional inspection holes are drilled
(Refer to Figure 1).
B. Make sure that the inspection hole covers are removed between RIB6 and 7.
C. Make sure that the calibration blocks, the probe and the materials to be
inspected are at the same temperature to within ‡ 5°C (19°F).
D. Make sure all surfaces to be tested are clean and free from sealant,
oxide, grease, oil etc.
E. Make sure that there are no conditions in the area to be inspected, which
may affect the conductivity measurement (e.g.: panel edges, fastener
countersinks, etc.).
NOTE: Surface curvature, edge effect, variations of the material
thickness, and other conditions may affect conductivity readings.
Their influences are generally identified and described in the
equipment manufacturer's operating instructions.
F_SB_575036_6_AAAA_06_04
Figure A-GAAAA - Sheet 06
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38 (OCR)

© A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
6. INSTRUMENT ADJUSTMENT
A. Connect the probe with the conductivity testing device.
B. Use high and low calibration blocks traceable to a national standard.
NOTE: The conductivity range of the calibration blocks must be within the
range of the instrument and cover the range of conductivity to be
measured preferably in the range of 14.5 to 31 MS/m
(25% to 53.5% IACS).
C. Select a frequency of 60 KHz.
D. Calibrate the instrument in accordance with the manufacturers
instructions using a calibration block set.
E. The conductivity testing device may be calibrated in MS/m (Mega Siemens
per meter) or % IACS (International Annealed Copper Standard)
(Refer to Table 1 and 2).
7. INSPECTION
A. Calibrate the conductivity testing device in accordance with Paragraph 6.
B. Position the probe on the inspection area. For correct values the probe
must be in direct contact with the inspection surface (Refer to
Figure 3). Select the 'Touch' Mode with the SIGMATEST 2.069 Instrument.
In touch mode,  the instrument senses the test piece as the probe
approaches the measurement point and automatically executes the
measurement (Refer to the equipment manufacturer's operating
instructions).
NOTE: Use an endoscope for the inspection. The access is thru the nearby
inspection hole.
C. Take approximately 3 measurements on each aluminum alloy part to be
tested.
D. Record the measured values in MS/m or % IACS, ambient temperature and the
operating frequency 60 kHz.
8. ACCEPTANCE CRITERIA
A. Report all results from Paragraph 7.
B. Apply protective treatment to the new drilled inspection holes and cover
all open inspection holes with a plug or plate (Refer to the related
Inspection Service Bulletin Task).
F_SB_575036_6_AAAA_07_01
Figure A-GAAAA - Sheet 07
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 8
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39 (OCR)

©A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
MS/m (% IACS)  MS/m (% IACS)  MS/m (% IACS)  MS/m (% IACS)
14(24.1)  18 (31.0)  22(37.9)  26(44.8)
14.5 (25.0)  18.5 (31.9)  22.5 (38.8)  26.5 (45.7)
15(25.8)  19(32.7)  23(39.6)  27(46.5)
15.5 (26.7)  19.5 (33.6)  23.5 (40.5)  27.5 (47.4)
16(27.6)  20(34.5)  24(41.4)  28(48.3)
16.5 (28.5)  20.5 (35.3)  24.5 (42.2)  28.5 (49.1)
17(29.3)  21(36.2)  25 (43.1)  29(50.0)
17.5 (30.2)  21.5 (37.0)  25.5 (44.0)
Conversion of Conductivity Values - MS/m (% IACS)
Table 1
% IACS (MS/m)  % IACS (MS/m)  % IACS (MS/m)  % IACS (MS/m)
25(14.5)  31.5 (18.3)  38(22.0)  44.5 (25.8)
25.5 (14.8)  32(18.6)  38.5 (22.3)  45(26.1)
26(15.1)  32.5 (18.9)  39(22.6)  45.5 (26.4)
26.5 (15.4)  33(19.1)  39.5 (22.9)  46(26.7)
27 (15.7)  33.5 (19.4)  40(23.2)  46.5 (27.0)
27.5 (16.0)  34(19.7)  40.5 (23.5)  47(27.3)
28  (16.2)  34.5 (20.0)  41(23.8)  47.5 (27.6)
28.5 (16.5)  35(20.3)  41.5 (24.1)  48 (27.8)
29(16.8)  35.5 (20.6)  42(24.4)  48.5 (28.1)
29.5 (17.1)  36(20.9)  42.5 (24.7)  49(28.4)
30 (17.4)  36.5 (21.2)  43(24.9)  49.5 (28.7)
30.5 (17.7)  37(21.5)  43.5 (25.2)  50(29.0)
31(18.0)  37.5 (21.8)  44(25.5)
Conversion of Conductivity Values - % IACS (MS/m)
Table 2  F_SB_575036_6_AAAA_08_01
Figure A-GAAAA - Sheet 08
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 9
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40 (OCR)

© A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
RIB7
STGR4
STGR5
STGR3  STGR6
STGR2  STGR7  INSPECTION HOLE
STGR&
STGR1  STGR9
NOSE  04  INSPECTION HOLE  INSPECTION HOLE  [03>  DA 04  STGR 10
CAP
Jor  R/S
STGR11/  STGR13  STGR14  STGR16  STGR17  STGR18
STGR12  STGR15  STGR19
RIB7
STGR
COUPLING13
[02)
STGR
COUPLING11
STGR11
STGR12  STGR  STGR13
NOTE:  COUPLING12
R/S = REAR SPAR
GN6 57 31 20 6 AGMO 0 00  F/S = FRONT SPAR  PROBE 2-069-69-0002  EXAMPLE  FWD
FLEXIBLE ENDOSCOPE
EXISTING INSPECTION HOLE ON THE LOWER SIDE OF THE FLAP
ADDITIONAL INSPECTION HOLE ON THE LOWER SIDE OF THE FLAP
DIA 11.0 mm TO 11.2 mm (0.433 in TO 0.441 in)
FOR DETAIL A-A, VIEW B AND C SEE FIGURE 3 SHEET 2
Probe Movement
Figure 3 (Sheet 1)
F_SB_575036_6_AAAA_09_03
Figure A-GAAAA - Sheet 09
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 10
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41 (OCR)

©A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
**CONF ALL
ASSESSMENT FOR WRONG HEAT TREATMENT USING EDDY CURRENT
CONDUCTIVITY MEASUREMENT (COT) ON LR STRINGER COUPLING
BETWEEN RIB6 AND RIB7, INBOARD FLAP, LH/RH
LOWER SIDE OF THE FLAP
INSPECTION
HOLE
A-A
RIB7
101
STGR
COUPLING13
STGR11
STGR
COUPLING12  STGR12  STGR13
EXAMPLE
RIB7
STGR13
STGR11
FWD
GN6 57 31 20 6 AJMO 0 00  STGR
COUPLING12  STGR 12
NOTE:
R/S = REAR SPAR  EXAMPLE
F/S = FRONT SPAR
› PROBE 2-069-69-0002
FLEXIBLE ENDOSCOPE
Probe Movement
Figure 3 (Sheet 2)
F_SB_575036_6_AAAA_10_02
Figure A-GAAAA - Sheet 10
Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on Stringer
Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
6  DATE: Sep 18/15  SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17  Page: 11
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A340-500/600
SERVICE BULLETIN
Appendix 01 - Assessment for Heat Treatment using Eddy Current Conductivity Measurement (COT) on
Stringer Coupling Between Rib 6 and Rib 7, Inboard Flap, LH/RH
This Page Intentionally Left Blank
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A340-500/600
SERVICE BULLETIN
Appendix 02 - Effectivity by Part Number/MSN//Serial Number
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A340-500/600
SERVICE BULLETIN
Appendix 02 - Effectivity by Part Number/MSN//Serial Number
**CONF ALL
**CONF ALL
MSN CUSTOMER VERSION EIS G5757052020000 S/N LH S/N RH
1030
1040
ETD
ETD
A340
A340
17/08/09
23/09/09
X
X
11034
11040
11002
11040
1079
1091
IBE
06U
A340
A340
26/03/10
11/06/10
X
X
11080
11091
11080
11091
1102 06U A340 07/12/10 X 11102 11130
1122 IBE A340 16/07/10 X 11122 11122
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
F_SB_575036_6_ABAA_01_01
Figure A-GABAA - Sheet 01
Effectivity by Part Number/MSN//Serial Number
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A340-500/600
SERVICE BULLETIN
Appendix 03 - Manpower Gantt Chart
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A340-500/600
SERVICE BULLETIN
Appendix 03 - Manpower Gantt Chart
**CONF ALL
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A345−57−5036
GET ACCESS 1.00 1.00
MAKE NEW INSPECTION HOLES 0.50 0.50
MAKE NEW INSPECTION HOLES 0.50 0.50
2.00 1.00
2.00 1.00
CLOSE−UP 1.00 1.00
1
1
1
2
2
1
MARKING 1.00 1.00 1
DO AN EDDY CURRENT CONDUCTIVITY
MEASUREMENT OF THE INBOARD FLAP
STRINGER COUPLING 11−19 BETWEEN
RIB 6 AND 7 ON THE LH WING
ON THE LH WING
ON THE RH WING
DO AN EDDY CURRENT CONDUCTIVITY
MEASUREMENT OF THE INBOARD FLAP
STRINGER COUPLING 11−19 BETWEEN
RIB 6 AND 7 ON THE RH WING
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
8.00
4.50
STEPS
0
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
:
:
SB ELAPSED TIME
(HOURS)
1234
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
5
F_SB_575036_6_ADAA_01_01
Figure A-GADAA - Sheet 01
Manpower Gantt Chart
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A340-500/600
SERVICE BULLETIN
Appendix 04 - Inspection Report
**CONF ALL
The results of the inspection, including no findings, must be uploaded in accordance with ISI
00.00.00179 using the online reporting application in AirbusWorld.
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A340-500/600
SERVICE BULLETIN
Appendix 04 - Inspection Report
**CONF ALL
ITEM
YESFINDINGS:
FLIGHT HOURS:
NO
SERVICE BULLETIN No:
A/C MSN:
INSPECTION REPORT
FLIGHT CYCLES:
PART NUMBER ZONE/LOCATION
1 INBOARD FLAP RIB 6 TO RIB 7 − STGR 11
INSPECTOR:
LH/RH (REFER TO FIG A−GBAAA)
PLACE OF INSPECTION:
AMBIENT TEMPERATURE:
DATE OF INSPECTION:
2 INBOARD FLAP RIB 6 TO RIB 7 − STGR 12LH/RH (REFER TO FIG A−GBAAA)
3 INBOARD FLAP RIB 6 TO RIB 7 − STGR 13LH/RH (REFER TO FIG A−GBAAA)
4 INBOARD FLAP RIB 6 TO RIB 7 − STGR 14LH/RH (REFER TO FIG A−GBAAA)
5 INBOARD FLAP RIB 6 TO RIB 7 − STGR 15581/681 LH/RH (REFER TO FIG A−GBAAA)G5757052020000
6 INBOARD FLAP RIB 6 TO RIB 7 − STGR 16LH/RH (REFER TO FIG A−GBAAA)
7 INBOARD FLAP RIB 6 TO RIB 7 − STGR 17LH/RH (REFER TO FIG A−GBAAA)
8 INBOARD FLAP RIB 6 TO RIB 7 − STGR 18LH/RH (REFER TO FIG A−GBAAA)
9 INBOARD FLAP RIB 6 TO RIB 7 − STGR 19LH/RH (REFER TO FIG A−GBAAA)
MATERIAL CORRECTMEASURED VALUE
>26 MS/m (44.8% IACS)
MATERIAL NOT CORRECT.
% IACSMS/mVALUE FOR LH SIDE
(60 kHz)
CONDUCTIVITY
MEASUREMENT
 A340−57−5036
VALUE FOR RH SIDE
(60 kHz)
CONDUCTIVITY
MEASUREMENT
LH FLAP SERIAL No:
RH FLAP SERIAL No:
UPLOAD THIS INSPECTION REPORT
IN ACCORDANCE WITH ISI 00.00.00179
USING THE ONLINE REPORTING APPLICATION
IN AIRBUSWORLD
F_SB_575036_6_AEAA_01_00
Figure A-GAEAA - Sheet 01
Inspection Report
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A340-500/600
SERVICE BULLETIN
Appendix 04 - Inspection Report
**CONF ALL
ITEM
SERVICE BULLETIN No:
A/C MSN:
EXAMPLE OF A COMPLETED INSPECTION REPORT
PART NUMBER ZONE/LOCATION
1
2
MATERIAL CORRECTMEASURED VALUE
>26 MS/m (44.8% IACS)
MATERIAL NOT CORRECT.
% IACSMS/mVALUE FOR LH SIDE
(60 kHz)
CONDUCTIVITY
MEASUREMENT
 A340−57−5036
VALUE FOR RH SIDE
(60 kHz)
CONDUCTIVITY
MEASUREMENT
INBOARD FLAP RIB 6 TO RIB 7 − STGR 11581/681 LH/RH (REFER TO FIG A−GBAAA)G5757052020000
INBOARD FLAP RIB 6 TO RIB 7 − STGR 12581/681 LH/RH (REFER TO FIG A−GBAAA)G5757052020000 X
XX
X
29.4
18.4
29.4
18.4
5326
YESFINDINGS:
FLIGHT HOURS:
NO
FLIGHT CYCLES:
INSPECTOR:
PLACE OF INSPECTION:
AMBIENT TEMPERATURE:
DATE OF INSPECTION:
5020
620
BREMEN
JOHN TEST
11−11−2014
22°C
X
LH FLAP SERIAL No:
RH FLAP SERIAL No:
11460
11460
UPLOAD THIS INSPECTION REPORT
IN ACCORDANCE WITH ISI 00.00.00179
USING THE ONLINE REPORTING APPLICATION
IN AIRBUSWORLD
R01
F_SB_575036_6_AEAA_02_00
Figure A-GAEAA - Sheet 02
Inspection Report
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A340-500/600
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: WING - FLAP - INSPECTION OF FLAP PARTS FOLLOWING MATERIAL
NON CONFORMITY
MODIFICATION No.: None
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A340-500/600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Sep 18/15 SERVICE BULLETIN No.: A340-57-5036
REVISION No.: 01 - Jun 05/17 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.