# Airbus Service Bulletin A340-92-4100: Revision 01

- Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-3988; AD 2016-11-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Airbus Service Bulletin A340-92-4100](https://openairdocs.org/service-documents/airbus/a340-92-4100.md)
- Title as filed: A340-92-4100 R01
- Pages: 35
- PDF: https://openairdocs.org/files/sha256/5b/bc/5bbcdae7c7b838acdf019178cd271d63cca27ad418df75c1365703aaaa6aa617
- Page: https://openairdocs.org/service-documents/airbus/a340-92-4100/file/5bbcdae7c7b8

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 92
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
MODIFICATION No.: 203672D50692
This page transmits Revision No.01 of Service Bulletin No.A340-92-4100
ADDITIONAL WORK
**CONF ALL
No additional work is required by this revision for aircraft modified by any previous issue.
REASON
Revision No. 01 issued to:
- replace the consumable material 08ADB1 with consumable 08BPA1
- add the correct ESPM references
- add work steps in Para 3.C. to rework the holes in bracket, Item 3, if necessary
- correct figure A-GBAAA
- add Appendix 02
- update the Service Bulletin effectivity.
CHANGES
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
MATERIAL PRICE INFORMATION
 MATERIAL PRICE INFORMATION TABLE
UPDATED
R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
APPENDICES
 APPENDICES UPDATED
 R
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
Configuration definition
CONF 001
 CONFIGURATION DEFINITION UPDATED
 R
Material Effectivity
 MATERIAL EFFECTIVITY UPDATED
MATERIAL SET UPDATED
MATERIAL SET QUANTITY UPDATED
R
REASON
Objective/Action
 OBJECTIVE/ACTION UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
Procurement Addresses
 PROCUREMENT ADDRESSES UPDATED
MATERIAL SET UPDATED
R
Price and Availability
 PRICE AND AVAILABILITY UPDATED
MATERIAL SET UPDATED
R
LIST OF COMPONENTS
Kit 924100D01R03
 PART MATERIAL SET UPDATED
MATERIAL SET LABEL UPDATED
QUANTITY UPDATED
NOTE UPDATED
R
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLD01
 CONSUMABLE MATERIAL SET UPDATED
CONSUMABLE UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
TASK 924100- 831-848-001-Modification
Subtask 924100-910-201-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 924100-831-201-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
CONSUMABLE UPDATED
QUANTITY UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
Subtask 924100-831-202-001
 SUBTASK SOLUTION UPDATED
NOTE UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 924100-942-201-001
 SUBTASK SOLUTION UPDATED
 R
Fig. A-GBAAA
 FIGURE SOLUTION UPDATED
 R
Fig. A-GBAAA Sheet 01
 SHEET UPDATED
 R
Fig. A-GBAAA Sheet 02
 SHEET ADDED
 N
Appendix 02 - Post SB Installation Details
APPENDIX CONTENT
 APPENDIX CONTENT ADDED
 N
Fig. A-GABAA
 FIGURE SOLUTION ADDED
 N
Fig. A-GABAA Sheet 01
 SHEET ADDED
 N
Fig. A-GABAA Sheet 02
 SHEET ADDED
 N
FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
No previous revision
REVISION SEQUENCE
ORIGINAL: Jun 19/14
REVISION No. : 01 - May 21/15
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 92
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 203672D50692
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The G-route wiring looms 7701VB and 7702VB are fixed with plastic brackets and metallic clamps at
the first attachment point in the wing after each inboard pylon in the LH and RH wings. Due to vibration,
cracks have been found to occur in the bracket and the metallic strap has been found to be missing.
This can cause chafing of the wiring loom on the aircraft structure.
This modification installs a new metallic bracket with electrical bonding, reinforced clamp and grommet
to replace the existing parts at the first attachment point in the wing after each inboard pylon in the LH
and RH wings.
Accomplishment of this Service Bulletin will improve the wiring installation in the wing/pylon area to
prevent chafing, possible short circuits and damage to systems. This will prevent potential system
misbehavior, improve reliability and avoid unscheduled maintenance action.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 YES
 PAX COMFORT AFFECTED
 NO
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit
 924100D01R03
 1
 900.00
 Grommets, Brackets and Attaching Parts
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06Y 15R 15T 22O
 31V 56W
 74W 83V
 98W
 98X ABD AFR AIB
ALD
 ALK ARG BOE
 CAL CCA CPA DGA DLH F2I
 FIN G8E GAF
HFM
 IBE IRC IRM KAC LAN M3R MAU MDG MHK
 PAL PUE
 QAF
S3R SAA SAS SFB SLM SVW SWR TAP THT THY UAE VCV VIR
XAX
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 924100-831-848-001: Modification
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.00
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340
SERVICE BULLETIN
SUMMARY
APPENDICES
Appendix 01 - Elapsed Time Assumption
Appendix 02 - Post SB Installation Details
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
LH SHOWN
RH SIMILAR
B
RIB11A
B
NOTE:
AREA OF MODIFICATION
A
A
,  Z462 Z521
,  Z472 Z621
F_SB_924100_6_SAAA_01_01
Figure A-GSAAA - Sheet 01
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 92
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
MODIFICATION No.: 203672D50692
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-211 340-212 340-213 340-311 340-312 340-313
(2) Effectivity by MSN
0002 0004 0006 0009 0014 0020 0022-0023
 0025-0026
 0029 0031-0034
 0038 0041
0043-0044 0046-0047
 0049
 0051
 0053
 0056-0058 0061 0063 0074-0076 0078-0081
0084-0085 0089-0091
 0093-0094 0101 0104 0114-0115 0117 0123 0125-0126 0128
0131 0134-0137 0139 0141-0142 0145-0147 0149-0152 0154 0156-0161 0163-0164
0166-0170 0173-0175
 0178-0180 0182 0185-0187 0190 0192-0194 0196-0197 0199
0201-0202 0204 0207-0208 0210 0212-0218 0220-0221 0227-0228 0233 0236-0237
0242-0243 0245-0246 0252 0257 0260 0263-0264 0268 0270 0273-0274 0278 0280
0282 0292 0297 0302 0304 0307 0310 0318-0319 0321 0325 0327 0329 0331-0332
0335 0347 0352 0354-0355 0359 0363 0367 0373-0374 0377-0379 0381 0385 0387
0390 0395 0399 0402 0406 0411 0413
 0415
 0424 0429-0430 0433-0435 0438 0442
0446-0447 0450 0459 0467 0470 0474 0483 0528 0538 0541 0544-0546 0554 0556
0559 0561-0562 0582 0585 0590 0598 0643 0646 0651 0668 0793 0800 0835 0844
0921 0938 0955
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06Y
 0139 0149
15R
 0151
15T
 0009
22O
 0257
31V
 0093
56W
 0006
74W
 0047
 0051
83V
 0216
 0280
 0292
98W
 0014
 0022
98X
 0429
ABD
 0210
AFR
 0029 0078 0084 0186 0207 0237 0245 0246 0260 0307 0310 0377
0399
AIB
 0131 0141 0161 0182 0192
 0199
ALD
 0156
 0159
 0178
ALK
 0032 0033 0034 0367 0374 0381
ARG
 0085 0094 0123 0126 0128 0170 0193 0373
BOE
 0554
CAL
 0402 0406 0411 0415 0433 0541
CCA
 0201 0242 0243 0264
CPA
 0136 0137 0142 0147 0157 0160 0208 0218 0220 0227 0228
DGA
 0075 0081
DLH
 0053 0135 0158 0213 0233 0252 0297 0304 0321 0325 0327 0335
0347 0352 0354 0379 0390 0434 0447
F2I
 0038
 0043
 0063
 0074
 0080
FIN
 0058 0168 0174 0835 0844 0921 0938
G8E
 0173
 0187
 0196
GAF
 0274 0355
HFM
 0117 0190 0202
IBE
 0125 0134 0145 0146 0217 0221 0329 0483
IRC
 0002
IRM
 0020 0056 0282
KAC
 0089 0090 0101 0104
LAN
 0359 0363 0442
M3R
 0061
MAU
 0076 0152 0194 0268 0793 0800
MDG
 0319
MHK
 0164
PAL
 0302 0318 0332 0387 0459 0474
PUE
 0212
 0215
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340
SERVICE BULLETIN
OPERATOR
 MSN
QAF
 0026
 0528
S3R
 0004
 0204
SAA
 0197 0378 0544 0582 0590 0643 0646 0651
SAS
 0167 0413 0424 0430 0435 0450 0467 0470
SFB
 0046
SLM
 0049
SVW
 0955
SWR
 0150 0154 0169 0175 0179 0263 0538 0545 0546 0556 0559 0561
0562 0585 0598
TAP
 0041 0044 0079 0091
THT
 0385 0395 0438 0446 0668
THY
 0023 0025 0057 0115 0180 0270 0331
UAE
 0163 0166 0185 0236
VCV
 0031
VIR
 0114 0214
XAX
 0273 0278
(4) Configuration by MSN
MSN
 CONFIGURATION
0002 0004 0006 0009 0014 0020 0022 0023 0025 0026 0029
0031 0032 0033 0034 0038 0041 0043 0044 0046 0047 0049
0051 0053 0056 0057 0058 0061 0063 0074 0075 0076 0078
0079 0080 0081 0084 0085 0089 0090 0091 0093 0094 0101
0104 0114 0115 0117 0123 0125 0126 0128 0131 0134 0135
0136 0137 0139 0141 0142 0145 0146 0147 0149 0150 0151
0152 0154 0156 0157 0158 0159 0160 0161 0163 0164 0166
0167 0168 0169 0170 0173 0174 0175 0178 0179 0180 0182
0185 0186 0187 0190 0192 0193 0194 0196 0197 0199 0201
0202 0204 0207 0208 0210 0212 0213 0214 0215 0216 0217
0218 0220 0221 0227 0228 0233 0236 0237 0242 0243 0245
0246 0252 0257 0260 0263 0264 0268 0270 0273 0274 0278
0280 0282 0292 0297 0302 0304 0307 0310 0318 0319 0321
0325 0327 0329 0331 0332 0335 0347 0352 0354 0355 0359
0363 0367 0373 0374 0377 0378 0379 0381 0385 0387 0390
0395 0399 0402 0406 0411 0413 0415 0424 0429 0430 0433
0434 0435 0438 0442 0446 0447 0450 0459 0467 0470 0474
0483 0528 0538 0541 0544 0545 0546 0554 0556 0559 0561
0562 0582 0585 0590 0598 0643 0646 0651 0668 0793 0800
0835 0844 0921 0938 0955
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340
SERVICE BULLETIN
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit
 924100D01R03
 1
Consumable CMLD01
 1
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The G-route wiring looms 7701VB and 7702VB are fixed with plastic brackets and
metallic clamps at the first attachment point in the wing after each inboard pylon in the
LH and RH wings. Due to vibration, cracks have been found to occur in the bracket and
the metallic strap has been found to be missing. This can cause chafing of the wiring
loom on the aircraft structure.
(2) Objective/Action
This modification installs a new metallic bracket with electrical bonding, reinforced clamp
and grommet to replace the existing parts at the first attachment point in the wing after
each inboard pylon in the LH and RH wings.
(3) Advantages
Accomplishment of this Service Bulletin will improve the wiring installation in the
wing/pylon area to prevent chafing, possible short circuits and damage to systems. This
will prevent potential system mis behavior, improve reliab ility and avoid unscheduled
maintenance action.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 924100-831-848-001: Modification
(1) Modify the Cable Loom Support Bracket of the G-route 7701VB LH
(2) Modify the Cable Loom Support Bracket of the G-route 7702VB RH
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340
SERVICE BULLETIN
(2) Accomplishment Timescale
This Service Bulletin must be accomplished before Oct 31/16.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the date given
above but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 924100-831-848-001: Modification
Get Access
 2.00
On Aircraft
Modify the Cable Loom Support Bracket of the G-route
7701VB LH
2.00
Modify the Cable Loom Support Bracket of the G-route
7702VB RH
2.00
Close-Up
 2.00
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-GAAAA
 given in Appendix 01 - Elapsed Time Assumption .
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340
SERVICE BULLETIN
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
11-00-00 12-34-24 20-21-11
20-28-00 57-41-37 57-42-37
Elec. Std. Practices Manual (ESPM)
 20-33-00 20-33-11 20-33-41
20-51-20 20-51-22 20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-21-00
 51-23-11
 51-40-00
51-42-00 51-44-00
K. PUBLICATION AFFECTED
Elec. Std. Practices Manual (ESPM)
 20-33-11 20-33-41
Illustrated Parts Catalog (IPC)
 57-26-05
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit
 924100D01R03
 AIRBUS Material, Logistics and Suppliers
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 2590
For ordering by E-mail: airbus.kit@airbus.com
(2) Price and Availability
Kit
 924100D01R03
Cost
 900.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will share the costs of accomplishment of this Service Bulletin by providing the kits at
no charge for orders placed before Dec 31/17.
For aircraft under warranty at Jan 01/13, AIRBUS will credit the manhours indicated in this
Service Bulletin at the agreed in-house warranty labor rate for claims received not later than
90 days after completion of the last affected aircraft of your fleet.
C. LIST OF COMPONENTS
Kit 924100D01R03
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 MS21042L3
 4
 NUT
2
 NAS1149D0363H
 8
 WASHER
3
 F9249296220000
 2
 BRACKET
4
 ASNA0032-060
 2
 CLAMP
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
5
 NAS1801-3-12
 4
 SCREW
6
 ABS0678B02
 2
 SUPPORT
8
 NSA939510CN
 0.578
 STRIP
9
 F9239026810200
 1
 PLCRDSET
 (1
)
11
 NSA935401-03
 2
 TIE
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
NOTE
 (1)
: This placard set contains Service Bulletin accomplishment placards for both
LH and RH wings.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish-- Electrical Bonding
Structure
04TMB2
 As required
Coating Sealant-Fuel Tank
Brushable
06HAA1
 As required
Non Aqueous Cleaner - Non
Structural Use
08BPA1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 924100-831-848-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
Task Associated Data
Zone
452 462 472 521 522 621 622
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340
SERVICE BULLETIN
Manpower
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.00
A. GENERAL
(1) Subtask 924100-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
11-00-00, Page Block 201
Task 20-21-11-911-801
Task 20-28-00-912-802
Elec. Std. Practices Manual (ESPM)
 20-33-00
20-51-20
Structural Repair Manual (SRM)
 51-21-00
51-23-11
51-40-00
51-42-00
51-44-00
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(d) Remove and install fasteners in accordance with SRM 51-42-00.
(e) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(f) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(g) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(h) For the general installation of elec trical harnesses, refer to ESPM 20-33-00.
(i) For the electrical bonding, refe r to ESPM 20-51- 20 and refer to AMM Task
20-28-00-912-802.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340
SERVICE BULLETIN
(j) For the installation of placards, refer to AMM 11-00-00, Page Block 201.
(k) Apply protective treatment in accordance with SRM 51-21-00.
(l) Apply paint coatings in accordance with SRM 51-23-11.
(m) Obtain fastener hole diameters and drill and de-burr data in accordance with SRM
51-44-00.
(2) Subtask 924100-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 924100-941-201-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
452
462
522
622
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-53, Page Block 001
Task 12-34-24-860-802
Task 57-41-37-000-801
Task 57-42-37-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340
SERVICE BULLETIN
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
(b) To get access for the LH Wing:
1
 Remove the fixed leading edge access panels 522AB and 522BB, refer to
AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801.
2
 Remove the inboard pylon access panels 462GL and 462HR, refer to AMM
06-41-53, Page Block 001.
(c) To get access for the RH Wing:
1
 Remove the fixed leading edge access panels 622AB and 622BB, refer to
AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801.
2
 Remove the inboard pylon access panels 472JR and 472HL, refer to AMM
06-41-53, Page Block 001.
C. PROCEDURE
(1) Subtask 924100-831-201- 001 - Modify the Cable Loom Support Bracket of the G-
route 7701VB LH
Work Zones and Access Panels
Zone
 Access/Work location
462
472
521
621
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 924100D01R03
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 MS21042L3
 2
 NUT
2
 NAS1149D0363H
 4
 WASHER
3
 F9249296220000
 1
 BRACKET
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
4
 ASNA0032-060
 1
 CLAMP
5
 NAS1801-3-12
 2
 SCREW
6
 ABS0678B02
 1
 SUPPORT
8
 NSA939510CN
 0.29
 STRIP
9
 F9239026810200
 1
 PLCRDSET
 (1
)
11
 NSA935401-03
 1
 TIE
NOTE
 (1)
: This placard set contains Service Bulletin accomplishment placards for
both LH and RH wings.
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish-- Electrical Bonding
Structure
04TMB2
 As required
Coating Sealant-Fuel Tank
Brushable
06HAA1
 As required
Non Aqueous Cleaner -
Non Structural Use
08BPA1
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 11-00-00, Page Block 001
Task 20-28-00-912-802
Elec. Std. Practices Manual (ESPM)
 20-33-11
20-33-41
20-51-22
Structural Repair Manual (SRM)
 51-44-00
Fig. A-GBAAA
Modification of the Cable Loom Support
Bracket, LH and RH
Sheet 01
Sheet 02
(a) At the attachment point in the LH wing after the inboard pylon, remove from the
wiring loom 7701VB, Item (7), refer to Fig. A-GBAAA Sheet 01
 ,V i e wC :
2 Nut MS21042L3 Item (1) Discard
2 Screw NAS1096-3-8 Item (5) Discard
4 Washer NAS1149D0316H Item (2) Discard
1 Bracket ABS0679-01 Item (3) Discard
1 Clamp ASNA0033-060 Item (4) Discard
1 Tie-Cable NSA935401-03 Item (11) Discard
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340
SERVICE BULLETIN
2 Support ABS0678B01 Item (6) Discard
NOTE
: Item (6) is removed as 2 parts.
(b) At the bracket attachment point in the LH wing after the inboard pylon, clean the
bonding point contact surface, refer to Fig. A-GBAAA Sheet 01
 ,V i e wD ,w i t h :
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner - Non
Structural Use
08BPA1
 As required
(c) If necessary, rework the holes in the bracket, Item 3 in accordance with SRM
51-44-00 and refer to Fig. A-GBAAA Sheet 01
 and Fig. A-GBAAA Sheet 02
 ,V i e w
D, View E and View F.
NOTE
: If holes are reworked apply protective treatment as necessary.
(d) Install the new cable loom support bracket and fasteners, refer to Fig. A-GBAAA
Sheet 01
 and Fig. A-GBAAA Sheet 02
 ,V i e wD ,V i e wEa n dV i e wF :
1 Bracket F9249296220000 Item 3
2 Screw NAS1801-3-12 Item 5
4 Washer NAS1149D0363H Item 2
2 Nut MS21042L3 Item 1
NOTE
: The bracket, Item 3, is installed inside the wing, refer to Appendix
02 - Post SB Installation Details
 .
(e) Apply a layer of:
Coating Sealant-
Fuel Tank
Brushable
06HAA1 As required
and
Varnish-- Electrical
Bonding Structure
04TMB2 As required
over the nut, Item 1, in accordance w ith ESPM 20-51- 22 and refer to AMM Task
20-28-00-912-802.
(f) Install, refer to ESPM 20-33-11
 and Fig. A-GBAAA Sheet 01
 ,V i e wD :
0.289 Grommet NSA939510CN Item 8
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340
SERVICE BULLETIN
(g) Install the wiring loom 7701VB, Item (7), refer to
 ESPM 20-33-11, ESPM 20-33-41
and Fig. A-GBAAA Sheet 01
 , View D, on:
1 Support ABS0678B02 Item 6
Attach the E-route cables, Item (10), to the support, Item 6, with:
1 Tie-Cable NSA935401-03 Item 11
On the new bracket, Item 3, install:
1 Clamp ASNA0032-060 Item 4
(h) Install, refer to AMM 11-00-00, Page Block 001 and Fig. A-GBAAA Sheet 01
 ,V i e w
D:
1 Placard F9239026810200 Item 9
(2) Subtask 924100-831-202- 001 - Modify the Cable Loom Support Bracket of the G-
route 7702VB RH
Work Zones and Access Panels
Zone
 Access/Work location
462
472
521
621
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 924100D01R03
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 MS21042L3
 2
 NUT
2
 NAS1149D0363H
 4
 WASHER
3
 F9249296220000
 1
 BRACKET
4
 ASNA0032-060
 1
 CLAMP
5
 NAS1801-3-12
 2
 SCREW
6
 ABS0678B02
 1
 SUPPORT
8
 NSA939510CN
 0.29
 STRIP
9
 F9239026810200
 1
 PLCRDSET
 (1
)
11
 NSA935401-03
 1
 TIE
NOTE
 (1)
: This placard set contains Service Bulletin accomplishment placards for
both LH and RH wings.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340
SERVICE BULLETIN
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish-- Electrical Bonding
Structure
04TMB2
 As required
Coating Sealant-Fuel Tank
Brushable
06HAA1
 As required
Non Aqueous Cleaner -
Non Structural Use
08BPA1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 11-00-00, Page Block 001
Task 20-28-00-912-802
Elec. Std. Practices Manual (ESPM)
 20-33-11
20-33-41
20-51-22
Structural Repair Manual (SRM)
 51-44-00
Fig. A-GBAAA
Modification of the Cable Loom Support
Bracket, LH and RH
Sheet 01
Sheet 02
(a) At the bracket attachment point in the RH wing after the inboard pylon, remove the
support bracket from the wiring loom 7702VB, Item (7), refer to Fig. A-GBAAA
Sheet 01
,V i e wC :
2 Nut MS21042L3 Item (1) Discard
2 Screw NAS1096-3-8 Item (5) Discard
4 Washer NAS1149D0316H Item (2) Discard
1 Bracket ABS0679-01 Item (3) Discard
1 Clamp ASNA0033-060 Item (4) Discard
1 Tie-Cable NSA935401-03 Item (11) Discard
2 Support ABS0678B01 Item (6) Discard
NOTE
: Item (6) is removed as 2 parts.
(b) At the bracket attachment point in the RH wing after the inboard pylon, clean the
bonding point contact surface, refer to Fig. A-GBAAA Sheet 01
 ,V i e wD ,w i t h :
Textile-Lint Free
Cotton
14SBA1 As required
and
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340
SERVICE BULLETIN
Non Aqueous
Cleaner - Non
Structural Use
08BPA1
 As required
(c) If necessary, rework the holes in the bracket, Item 3 in accordance with SRM
51-44-00 and refer to Fig. A-GBAAA Sheet 01
 and Fig. A-GBAAA Sheet 02
 ,V i e w
D and View E.
NOTE
: If holes are reworked apply protective treatment as necessary.
(d) Install the new cable loom support bracket and fasteners, refer to Fig. A-GBAAA
Sheet 01
 and Fig. A-GBAAA Sheet 02
 ,V i e wD ,V i e wEa n dV i e wF :
1 Bracket F9249296220000 Item 3
2 Screw NAS1801-3-12 Item 5
4 Washer NAS1149D0363H Item 2
2 Nut MS21042L3 Item 1
NOTE
: The bracket, Item 3, is installed inside the wing, refer to Appendix
02 - Post SB Installation Details
 .
(e) Apply a layer of:
Coating Sealant-
Fuel Tank
Brushable
06HAA1 As required
and
Varnish-- Electrical
Bonding Structure
04TMB2 As required
over the nut, Item 1, in accordance w ith ESPM 20-51- 22 and refer to AMM Task
20-28-00-912-802.
(f) Install, refer to Refer to ESPM 20-33-11
 and Fig. A-GBAAA Sheet 01
 ,V i e wD :
0.289 Grommet NSA939510CN Item 8
(g) Install the wiring loom 7702VB, Item ( 7), refer to ESPM 20-33-11, ESPM 20-33-41
and Fig. A-GBAAA Sheet 01
 , View D, on:
1 Support ABS0678B02 Item 6
Attach the E-route cables, Item (10), to the support, Item 6, with:
1 Tie-Cable NSA935401-03 Item 11
On the new bracket, Item 3, install:
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340
SERVICE BULLETIN
1 Clamp ASNA0032-060 Item 4
(h) Install, refer to AMM 11-00-00, Page Block 001 and Fig. A-GBAAA Sheet 01
 ,V i e w
D:
1 Placard F9239026810200 Item 9
D. TEST
None
E. CLOSE-UP
(1) Subtask 924100-942-201-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
462
472
521
621
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-53, Page Block 001
Task 57-41-37-400-801
Task 57-42-37-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Install the access panels for the LH wing:
1
 Install the fixed leading edge access panels 522AB and 522BB, refer to AMM
Task 57-41-37-400-801 and AMM Task 57-42-37-400-801.
2
 Install the inboard pylon access panels 462GL and 462HR, refer to AMM
06-41-53, Page Block 001.
(c) Install the access panels for the RH wing:
1
 Install the fixed leading edge access panels 622AB and 622BB, refer to AMM
Task 57-41-37-400-801 and AMM Task 57-42-37-400-801.
2
 Install the inboard pylon access panels 472JR and 472HL, refer to AMM
06-41-53, Page Block 001.
(d) Put the aircraft back to its original configuration.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340
SERVICE BULLETIN
**CONF ALL
E
A
LH SHOWN
RH SIMILAR
B
RIB11A
A
A
Z462 Z521
,  Z472 Z621
(5)
(2)
(4)
(6)
(1)
(2)
(3)
C
AFTER
SB92−4100
7701VB
9
(7)
D
4
6
1
2
3
8
5
2
(11)
11
(10)
(7702VB)
C D
B
BEFORE
(7)
(10)
VIEW FROM OUTSIDE
THE WING
VIEW FROM OUTSIDE
THE WING
VIEW FROM INSIDE
THE WING
7701VB
(7702VB)
F_SB_924100_6_BAAA_01_05
Figure A-GBAAA - Sheet 01
Modification of the Cable Loom Support Bracket, LH and RH
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A340
SERVICE BULLETIN
**CONF ALL
0101
30 mm (1.81 in) ± 0.1 mm (0.0039 in)
FOR THE INSTALLATION OF BRACKET ITEM 3, THE HOLES CAN
NOTE:
01
BE REWORKED ECCENTRICALLY TO A MAXIMUM OF 1 mm (0.039 in)
3
TO GET AN INCREASED HOLE PITCH OF 31 mm (1.220 in).
HOLES OF THE BRACKET ENLARGED TO A MAXIMUM OF 1 mm (0.039 in).02
INITIAL HOLES OF THE BRACKET BEFORE REWORK.03
HOLES ON THE WING SUPPORT.04
02 04
30 mm (1.181 in) DISTANCE BETWEEN 
THE HOLES ON THE BRACKET
UP TO 31.4 mm (1.236 in) − 31.7 mm (1.248 in) DISTANCE
BETWEEN THE HOLES ON THE WING SUPPORT
F
E
02
F
03
03
04
F_SB_924100_6_BAAA_02_03
Figure A-GBAAA - Sheet 02
Modification of the Cable Loom Support Bracket, LH and RH
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A340
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A340−92−4100 0102
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
:
: IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
TOTAL MANHOURS
SB ELAPSED TIME
8.00
4.00
0 12 3
JOB SET−UP
MH ET/SSTEPS
2.00 1.00
MODIFY THE LH CABLE LOOM 2.00 2.00
2.00 2.00
PER
2
1
1
CLOSE−UP 2.00 1.002
SB ELAPSED TIME
(HOURS)
4
SUPPORT BRACKET OF THE
G ROUTE 7701VB LH
MODIFY THE RH CABLE LOOM
SUPPORT BRACKET OF THE
G ROUTE 7702VB RH
F_SB_924100_6_AAAA_01_04
Figure A-GAAAA - Sheet 01
Gantt Chart
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A340
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption
This Page Intentionally Left Blank
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A340
SERVICE BULLETIN
Appendix 02 - Post SB Installation Details
**CONF ALL
(1) The following photographs illustrate the correct installation.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A340
SERVICE BULLETIN
Appendix 02 - Post SB Installation Details
**CONF ALL
FRONT VIEW (OUTSIDE)
FRONT VIEW (OUTSIDE)
F_SB_924100_6_ABAA_01_00
Figure A-GABAA - Sheet 01
Post SB Installation Details
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A340
SERVICE BULLETIN
Appendix 02 - Post SB Installation Details
**CONF ALL
VIEW FOR THE POSITION OF THE CLAMP, ITEM 4
VIEW IN THE WING (INSIDE)
GROMMET,
ITEM 8
BRACKET,
ITEM 3
F_SB_924100_6_ABAA_02_00
Figure A-GABAA - Sheet 02
Post SB Installation Details
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A340
SERVICE BULLETIN
REPORTING SHEET
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
MODIFICATION No.: 203672D50692
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A340
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jun 19/14 SERVICE BULLETIN No.: A340-92-4100
REVISION No.: 01 - May 21/15 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
