# Airbus Service Bulletin A340-92-5066

Copy: No revision named ("A340-92-5066 R00"), 27 pages: PDF https://openairdocs.org/files/sha256/9b/0e/9b0ec334f04419c593ad06f1c98a0863643efab0d8f66b819819867b29615d59; text https://openairdocs.org/service-documents/airbus/a340-92-5066/file/9b0ec334f044.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-3988; AD 2016-11-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A340-92-5066
- Page: https://openairdocs.org/service-documents/airbus/a340-92-5066

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-11-19](https://openairdocs.org/ad/2016-11-19.md), effective Jul 22, 2016: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a340-92-5066/proposed.md).

## Text (27 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-3988; AD 2016-11-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A340-500/600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 92
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 203672D50692
MINOR
 None
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The G-route wiring looms 7701VB and 7702VB are fixed with plastic brackets and metallic clamps at
the first attachment point in the wing after each inboard pylon in the LH and RH wings. Due to vibration,
cracks have been found to occur in the bracket and the metallic strap has been found to be missing.
This can cause chafing of the wiring loom on the aircraft structure.
This modification installs a new metallic bracket with electrical bonding, reinforced clamp and strap to
replace the existing parts at the first attachment point in the wing after each inboard pylon in the LH
and RH wings.
Accomplishment of this Service Bulletin will improve the wiring installation in the inboard wing/pylon
area to prevent chafing, possible short circuits and damage to systems. This will prevent potential
system misbehavior, improve reliability and avoid unschedul ed maintenance action.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 YES
 PAX COMFORT AFFECTED
 NO
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A340-500/600
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
COST SAVING
 NO
 LROPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 925066D01R00
 1
 900.00
 Grommets, Brackets and Attaching Parts
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
06U 25R 36V 70U 72W AHY AIB CES CHH DLH ETD HFM HFY
IBE QAF QTR SAA SIA TAM THA UAE VIR
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 925066-831-848-001: Modification
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.00
APPENDICES
Appendix 01 - Elapsed Time Assumption
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A340-500/600
SERVICE BULLETIN
SUMMARY
**CONF ALL
A
LH SHOWN
RH SIMILAR
B
RIB11A
B
NOTE:
AREA OF MODIFICATION
A
A
,  Z462 Z521
,  Z472 Z621
F_SB_925066_6_SAAA_01_01
Figure A-GSAAA - Sheet 01
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A340-500/600
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A340-500/600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 92
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
MODIFICATION No.: 203672D50692
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
340-541 340-542 340-642
(2) Effectivity by MSN
0371 0376 0383 0391 0394 0410 0416-0417 0426 0431 0436 0440 0445 0449 0453
0457 0460 0464 0468 0471 0475 0478 0482 0485 0488 0492 0495 0499 0514 0517
0520 0523 0531 0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572 0575
0577 0580 0583 0586 0601 0604 0606 0608 0611 0615 0617 0619 0622 0624 0626
0628 0630 0639 0672 0677 0681 0685 0689 0694 0698 0702 0706 0710 0715 0719
0723 0727 0736 0740 0744 0748 0753 0757 0761-0768 0771 0775 0779 0783 0787
0790 0794 0798 0804 0812 0829 0837 0846 0848 0870 0886 0894 0897 0902 0910
0912 0917 0924 0929 0933 0953 0960 0972 0981 0987 0993 1005 1017 1030 1040
1079 1091 1102 1122
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A340-500/600
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
06U
 1091 1102
25R
 0924
36V
 0391 0416
70U
 0902
72W
 0917
AHY
 0779 0886 0894
AIB
 0478 0492 0499 0560
CES
 0468 0488 0514 0577 0586
CHH
 0436 0453 0475
DLH
 0482 0517 0523 0537 0540 0543 0566 0569 0580 0583 0762 0763
0767 0771 0790 0794 0812 0846 0848 0897 0972 0981 0987 1005
ETD
 0748 0757 0761 0783 0829 0837 0870 0929 0933 1030 1040
HFM
 0383
HFY
 0910 0912
IBE
 0431 0440 0460 0601 0604 0606 0617 0619 0672 0702 0727 0744
0960 0993 1017 1079 1122
QAF
 0495
QTR
 0715 0740 0766 0798
SAA
 0410 0417 0426 0531 0534 0547 0557 0626 0630
SIA
 0563
TAM
 0445 0464
THA
 0624 0628 0677 0681 0689 0698 0710 0719 0775 0953
UAE
 0394 0457 0471 0485 0520 0572 0608 0611 0685 0694
VIR
 0371 0376 0449 0575 0615 0622 0639 0706 0723 0736 0753 0764
0765 0768 0787 0804
(4) Configuration by MSN
MSN
 CONFIGURATION
0371 0376 0383 0391 0394 0410 0416 0417 0426 0431 0436
0440 0445 0449 0453 0457 0460 0464 0468 0471 0475 0478
0482 0485 0488 0492 0495 0499 0514 0517 0520 0523 0531
0534 0537 0540 0543 0547 0557 0560 0563 0566 0569 0572
0575 0577 0580 0583 0586 0601 0604 0606 0608 0611 0615
0617 0619 0622 0624 0626 0628 0630 0639 0672 0677 0681
0685 0689 0694 0698 0702 0706 0710 0715 0719 0723 0727
0736 0740 0744 0748 0753 0757 0761 0762 0763 0764 0765
0766 0767 0768 0771 0775 0779 0783 0787 0790 0794 0798
0804 0812 0829 0837 0846 0848 0870 0886 0894 0897 0902
0910 0912 0917 0924 0929 0933 0953 0960 0972 0981 0987
0993 1005 1017 1030 1040 1079 1091 1102 1122
001
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 2
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A340-500/600
SERVICE BULLETIN
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 925066D01R00
 1
Consumable CMLD01
 As required
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The G-route wiring looms 7701VB and 7702VB are fixed with plastic brackets and
metallic clamps at the first attachment point in the wing after each inboard pylon in the
LH and RH wings. Due to vibration, cracks have been found to occur in the bracket and
the metallic strap has been found to be missing. This can cause chafing of the wiring
loom on the aircraft structure.
(2) Objective/Action
This modification installs a new metallic bracket with electrical bonding, reinforced clamp
and strap to replace the existing parts at the first attachment point in the wing after each
inboard pylon in the LH and RH wings.
(3) Advantages
Accomplishment of this Service Bulletin will improve the wiring installation in the inboard
wing/pylon area to prevent chafing, possible short circuits and damage to systems. This
will prevent potential system mis behavior, improve reliab ility and avoid unscheduled
maintenance action.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 925066-831-848-001: Modification
(1) Modify the Cable Loom Support Bracket of the G-route 7701VB LH
(2) Modify the Cable Loom Support Bracket of the G-route 7702VB RH
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 3
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A340-500/600
SERVICE BULLETIN
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin must be accomplished before Oct 31/16.
This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued
to confirm this classification. It is anticipated that the AD will confirm the date given
above but reference should be made to the AD for confirmation of the mandated
accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 925066-831-848-001: Modification
Get Access
 2.00
On Aircraft
Modify the Cable Loom Support Bracket of the G-route
7701VB LH
2.00
Modify the Cable Loom Support Bracket of the G-route
7702VB RH
2.00
Close-Up
 2.00
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.00
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-GAAAA
 given in Appendix 01 - Elapsed Time Assumption .
H. WEIGHT AND BALANCE
Not Changed
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 4
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A340-500/600
SERVICE BULLETIN
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 06-31-53 06-41-53
11-00-00 12-34-24 20-21-11
20-28-00 57-41-37 57-42-37
Elec. Std. Practices Manual (ESPM)
 20-33-00 20-33-11 20-33-30
20-33-41 20-51-20 20-51-22
20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-40-00 51-42-00
K. PUBLICATION AFFECTED
Elec. Std. Practices Manual (ESPM)
 20-33-11 20-33-41
Illustrated Parts Catalog (IPC)
 57-26-05
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 5
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 6
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A340-500/600
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Customers with aircraft shown in the effectivity of this Service Bulletin should send a
purchase order to AIRBUS. Quote the number of this Service Bulletin. The address is:
Kit 925066D01R00
 AIRBUS Material, Logistics and Suppliers
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 2590
For ordering by E-mail: airbus.kit@airbus.com
(2) Price and Availability
Kit 925066D01R00
Cost
 900.00 USD
Availability
 90 calendar days from receipt of order
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning schedule
with your order so that we can try to comply with your requirements.
The sales terms (costs and availability) are estimated in relation to economic conditions.
The latest valid price and lead time for ordering purposes shall be obtained through the
AirbusSpares portal or through a request for quotation to airbus.kit@airbus.com.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will share the costs of accomplishment of this Service Bulletin by providing the kits at
no charge for orders placed before Dec 31/17.
For aircraft under warranty at Jan 01/13, AIRBUS will credit the manhours indicated in this
Service Bulletin at the agreed in-house warranty labor rate for claims received not later than
90 days after completion of the last affected aircraft of your fleet.
C. LIST OF COMPONENTS
Kit 925066D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 MS21042L3
 4
 NUT
2
 NAS1149D0363H
 8
 WASHER
3
 F9249296220000
 2
 BRACKET
4
 ASNA0032-060
 2
 CLAMP
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 7
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A340-500/600
SERVICE BULLETIN
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
5
 NAS1801-3-12
 4
 SCREW
6
 ABS0678B02
 2
 SUPPORT
8
 NSA939510CN
 0.578
 STRIP
9
 F9239026810400
 2
 PLCRDSET
11
 NSA935401-03
 2
 TIE
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish-- Electrical Bonding
Structure
04TMB2
 As required
Coating Sealant-Fuel Tank
Brushable
06HAA1
 As required
Aqueous Cleaner-General Citric
Base
08ADB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 8
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A340-500/600
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 925066-831-848-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
Task Associated Data
Zone
452 462 472 521 522 621 622
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 9
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A340-500/600
SERVICE BULLETIN
Manpower
TOTAL MANHOURS
 8.00
ELAPSED TIME (HOURS)
 4.00
A. GENERAL
(1) Subtask 925066-910-201-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
06-31-53, Page Block 001
06-41-53, Page Block 001
11-00-00, Page Block 201
Task 20-21-11-911-801
Task 20-28-00-912-802
Elec. Std. Practices Manual (ESPM)
 20-33-00
20-51-20
Structural Repair Manual (SRM)
 51-40-00
51-42-00
(a) For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.
(b) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(c) For the identification of access panels, refer to AMM 06-41-53, Page Block 001.
(d) Remove and install fasteners in accordance with SRM 51-42-00.
(e) To torque tighten the standard threaded fasteners, refer to AMM Task
20-21-11-911-801.
(f) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(g) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(h) For the general installation of elec trical harnesses, refer to ESPM 20-33-00.
(i) For the electrical bonding, refe r to ESPM 20-51- 20 and refer to AMM Task
20-28-00-912-802.
(j) For the installation of placards, refer to AMM 11-00-00, Page Block 201.
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 10
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A340-500/600
SERVICE BULLETIN
(2) Subtask 925066-839-201-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 925066-941-201-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
452
462
522
622
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-53, Page Block 001
Task 12-34-24-860-802
Task 57-41-37-000-801
Task 57-42-37-000-801
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-860-802.
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 11
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A340-500/600
SERVICE BULLETIN
(b) To get access for the LH Wing:
1
 Remove the fixed leading edge access panels 522AB and 522BB, refer to
AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801.
2
 Remove the inboard pylon access panels 462GL and 462HR, refer to AMM
06-41-53, Page Block 001.
(c) To get access for the RH Wing:
1
 Remove the fixed leading edge access panels 622AB and 622BB, refer to
AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801.
2
 Remove the inboard pylon access panels 472JR and 472HL, refer to AMM
06-41-53, Page Block 001.
C. PROCEDURE
(1) Subtask 925066-831-201- 001 - Modify the Cable Loom Support Bracket of the G-
route 7701VB LH
Work Zones and Access Panels
Zone
 Access/Work location
462
472
521
621
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 925066D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 MS21042L3
 2
 NUT
2
 NAS1149D0363H
 4
 WASHER
3
 F9249296220000
 1
 BRACKET
4
 ASNA0032-060
 1
 CLAMP
5
 NAS1801-3-12
 2
 SCREW
6
 ABS0678B02
 1
 SUPPORT
8
 NSA939510CN
 0.29
 STRIP
9
 F9239026810400
 1
 PLCRDSET
11
 NSA935401-03
 1
 TIE
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 12
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A340-500/600
SERVICE BULLETIN
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish-- Electrical Bonding
Structure
04TMB2
 As required
Coating Sealant-Fuel Tank
Brushable
06HAA1
 As required
Aqueous Cleaner-General
Citric Base
08ADB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 11-00-00, Page Block 001
Task 20-28-00-912-802
Elec. Std. Practices Manual (ESPM)
 20-33-11
20-33-30
20-33-41
20-51-22
Fig. A-GBAAA
Modification of the Cable Loom Support
Bracket, LH and RH
Sheet 01
(a) At the attachment point in the LH wing after the inboard pylon, remove from the
wiring loom 7701VB, Item (7), refer to Fig. A-GBAAA Sheet 01
 ,V i e wC :
2 Nut MS21042L3 Item (1) Discard
2 Screw NAS1096-3-8 Item (5) Discard
4 Washer NAS1149D0316H Item (2) Discard
1 Bracket ABS0679-01 Item (3) Discard
1 Clamp ASNA0033-060 Item (4) Discard
1 Tie-Cable NSA935401-03 Item (11) Discard
2 Support ABS0678B01 Item (6) Discard
NOTE
: Item (6) is removed as 2 parts.
(b) At the bracket attachment point in the LH wing after the inboard pylon, clean the
bonding point contact surface, refer to Fig. A-GBAAA Sheet 01
 ,V i e wD ,w i t h :
Textile-Lint Free
Cotton
14SBA1 As required
and
Aqueous Cleaner-
General Citric Base
08ADB1 As required
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 13
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A340-500/600
SERVICE BULLETIN
(c) Install the new cable loom support bracket and fasteners, refer to Fig. A-GBAAA
Sheet 01
,V i e wD :
1 Bracket F9249296220000 Item 3
2 Screw NAS1801-3-12 Item 5
4 Washer NAS1149D0363H Item 2
2 Nut MS21042L3 Item 1
(d) Apply a layer of:
Coating Sealant-
Fuel Tank
Brushable
06HAA1 As required
and
Varnish-- Electrical
Bonding Structure
04TMB2 As required
over the nut, Item 1, in accordance w ith ESPM 20-51- 22 and refer to AMM Task
20-28-00-912-802.
(e) Install, refer to ESPM 20-33-30 and Fig. A-GBAAA Sheet 01
 ,V i e wD :
0.289 Grommet NSA939510CN Item 8
(f) Install the wiring loom 7701VB, Item ( 7), refer to ESPM 20-33-11, ESPM 20-33-41
and Fig. A-GBAAA Sheet 01
 , View D, on:
1 Support ABS0678B02 Item 6
Attach the E-route cables, Item (10), to the support, Item 6, with:
1 Tie-Cable NSA935401-03 Item 11
On the new bracket, Item 3, install:
1 Clamp ASNA0032-060 Item 4
(g) Install, refer to AMM 11-00-00, Page Block 001 and Fig. A-GBAAA Sheet 01
 ,V i e w
D:
1 Placard F9239026810400 Item 9
(2) Subtask 925066-831-202- 001 - Modify the Cable Loom Support Bracket of the G-
route 7702VB RH
Work Zones and Access Panels
Zone
 Access/Work location
462
472
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 14
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A340-500/600
SERVICE BULLETIN
521
621
Manpower Resources
Manhours
 2.00
Minimum number of person
 1
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Kit 925066D01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 MS21042L3
 2
 NUT
2
 NAS1149D0363H
 4
 WASHER
3
 F9249296220000
 1
 BRACKET
4
 ASNA0032-060
 1
 CLAMP
5
 NAS1801-3-12
 2
 SCREW
6
 ABS0678B02
 1
 SUPPORT
8
 NSA939510CN
 0.29
 STRIP
9
 F9239026810400
 1
 PLCRDSET
11
 NSA935401-03
 1
 TIE
Consumable CMLD01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Varnish-- Electrical Bonding
Structure
04TMB2
 As required
Coating Sealant-Fuel Tank
Brushable
06HAA1
 As required
Aqueous Cleaner-General
Citric Base
08ADB1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Aircraft Maintenance Manual (AMM)
 11-00-00, Page Block 001
Task 20-28-00-912-802
Elec. Std. Practices Manual (ESPM)
 20-33-11
20-33-30
20-33-41
20-51-22
Fig. A-GBAAA
Modification of the Cable Loom Support
Bracket, LH and RH
Sheet 01
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 15
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A340-500/600
SERVICE BULLETIN
(a) At the attachment point in the RH wing after the inboard pylon, remove the support
bracket from the wiring loom 7702VB, Item (7), refer to Fig. A-GBAAA Sheet 01
 ,
View C:
2 Nut MS21042L3 Item (1) Discard
2 Screw NAS1096-3-8 Item (5) Discard
4 Washer NAS1149D0316H Item (2) Discard
1 Bracket ABS0679-01 Item (3) Discard
1 Clamp ASNA0033-060 Item (4) Discard
1 Tie-Cable NSA935401-03 Item (11) Discard
2 Support ABS0678B01 Item (6) Discard
NOTE
: Item (6) is removed as 2 parts.
(b) At the attachment point in the RH wing after the inboard pylon, clean the bonding
point contact surface, refer to Fig. A-GBAAA Sheet 01
 ,V i e wD ,w i t h :
Textile-Lint Free
Cotton
14SBA1 As required
and
Aqueous Cleaner-
General Citric Base
08ADB1 As required
(c) Install the new cable loom support bracket and fasteners, refer to Fig. A-GBAAA
Sheet 01
,V i e wD :
1 Bracket F9249296220000 Item 3
2 Screw NAS1801-3-12 Item 5
4 Washer NAS1149D0363H Item 2
2 Nut MS21042L3 Item 1
(d) Apply a layer of:
Coating Sealant-
Fuel Tank
Brushable
06HAA1 As required
and
Varnish-- Electrical
Bonding Structure
04TMB2 As required
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 16
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A340-500/600
SERVICE BULLETIN
on the head of the nut, Item 1, in acco rdance with ESPM 20- 51-22 and refer to
AMM Task 20-28-00-912-802.
(e) Install, refer to ESPM 20-33-30 and Fig. A-GBAAA Sheet 01
 ,V i e wD :
0.289 Grommet NSA939510CN Item 8
(f) Install the wiring loom 7702VB, Item ( 7), refer to ESPM 20-33-11, ESPM 20-33-41
and Fig. A-GBAAA Sheet 01
 View D, on:
1 Support ABS0678B02 Item 6
Attach the E-route cables, Item (10), to the support, Item 6, with:
1 Tie-Cable NSA935401-03 Item 11
On the new bracket, Item 3, install:
1 Clamp ASNA0032-060 Item 4
(g) Install, refer to AMM 11-00-00, Page Block 001 and Fig. A-GBAAA Sheet 01
 ,V i e w
D:
1 Placard F9239026810400 Item 9
D. TEST
None
E. CLOSE-UP
(1) Subtask 925066-942-201-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
462
472
521
621
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-41-53, Page Block 001
Task 57-41-37-400-801
Task 57-42-37-400-801
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 17
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A340-500/600
SERVICE BULLETIN
(b) Install the access panels for the LH wing:
1
 Install the fixed leading edge access panels 522AB and 522BB, refer to AMM
Task 57-41-37-400-801 and AMM Task 57-42-37-400-801.
2
 Install the inboard pylon access panels 462GL and 462HR, refer to AMM
06-41-53, Page Block 001.
(c) Install the access panels for the RH wing:
1
 Install the fixed leading edge access panels 622AB and 622BB, refer to AMM
Task 57-41-37-400-801 and AMM Task 57-42-37-400-801.
2
 Install the inboard pylon access panels 472JR and 472HL, refer to AMM
06-41-53, Page Block 001.
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 18
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A340-500/600
SERVICE BULLETIN
**CONF ALL
A
LH SHOWN
RH SIMILAR
B
RIB11A
C D
B
A
A
,  Z462 Z521
,  Z472 Z621
BEFORE
(5)
(2)
(4)
(6)
(1)
(2)
(3)
C
AFTER
SB92−5066
9
D
4
6
1
2
3
8
5
2
(11)
(10)
11
(10)
(7) 7701VB
7701VB(7)
(7702VB)
(7702VB)
F_SB_925066_6_BAAA_01_02
Figure A-GBAAA - Sheet 01
Modification of the Cable Loom Support Bracket, LH and RH
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 19
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A340-500/600
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 20
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A340-500/600
SERVICE BULLETIN
Appendix 01 - Elapsed Time Assumption
**CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A340−92−5066 0102
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
:
: IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
TOTAL MANHOURS
SB ELAPSED TIME
8.00
4.00
0 12 3
JOB SET−UP
MH ET/SSTEPS
2.00 1.00
MODIFY THE LH CABLE LOOM 2.00 2.00
2.00 2.00
PER
2
1
1
CLOSE−UP 2.00 1.002
SB ELAPSED TIME
(HOURS)
4
SUPPORT BRACKET OF THE
G ROUTE 7701VB LH
MODIFY THE RH CABLE LOOM
SUPPORT BRACKET OF THE
G ROUTE 7702VB RH
F_SB_925066_6_AAAA_01_04
Figure A-GAAAA - Sheet 01
Gantt Chart
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A340-500/600
SERVICE BULLETIN
REPORTING SHEET
TITLE: ELECTRIC AND ELECTRONIC COMMON INSTALLATION-CABLE LOOM
INSTALLATION DRAWINGS-IMP ROVEMENT OF FEEDER ROUTING
ATTACHMENT IN WING/PYLON
MODIFICATION No.: 203672D50692
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A340-500/600
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jun 25/14 SERVICE BULLETIN No.: A340-92-5066
REVISION No.: 00 - Jun 25/14 Page: 1
6
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
