# Airbus Service Bulletin A350-21-P031

Copy: No revision named ("A350-21-P031"), 233 pages: PDF https://openairdocs.org/files/sha256/a6/4e/a64e4fc4b65537af72015ae8a92a8379a78f5b6b8fe7ca5ab2b1a601d3e33993; text https://openairdocs.org/service-documents/airbus/a350-21-p031/file/a64e4fc4b655.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2022-1580, the docket of AD 2023-04-07. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-21-P031
- Page: https://openairdocs.org/service-documents/airbus/a350-21-p031

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2023-04-07](https://openairdocs.org/ad/2023-04-07.md), effective Apr 10, 2023: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a350-21-p031/proposed.md).

## Text (233 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2022-1580, the docket of AD 2023-04-07. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
ATA SYSTEM: 21
TITLE: AIR CONDITIONING - COCKPIT AIR DISTRIBUTION, CONTROL AND
MONITORING - REDUCE COCKPIT NOISE
MODIFICATION No.:
109229L92201
113512L20762
116393L32219

### Page 2

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 2
ATA SYSTEM: 21
TITLE: AIR CONDITIONING - COCKPIT AIR DISTRIBUTION, CONTROL AND
MONITORING - REDUCE COCKPIT NOISE
REVISION TRANSMITTAL SHEET
This page transmits Revision No. 01 of Service Bulletin No. A350-21-P031.
A. ADDITIONAL WORK
Additional work is required by this revision for aircraft modified by the original issue of this
Service Bulletin.
The additional work describes the work necessary to do the surface protection on the
bracket in the FWD cargo compartment, Frame 22 as per Modification No. 116393L32219
requirements.
Unless otherwise stated by an Airworthiness Directive, AIRBUS recommends the additional
work to be accomplished within one year after the Rev. 01 of this Service Bulletin.
B. REASON
Revision No. 01 issued to:
- Incorporate changes found necessary and carried out during the accomplishment of
this Service Bulletin on aircraft with Manufacturer Serial Number (MSN) 0088, 0102,
0110, 0125 and 0141
- Add Modification No.116393L32219 to introduce the surface protection between an
aluminum bracket and a struct
- Replace the bracket assy PN V2121256200100 to duct assy PN V2121262100100.
NOTE: This revision satisfies the requirements of the subsequent Repair and Design
Approval Form (RDAF) and/or T echnical Adaptation (TA) issued for the related
Manufacturer Serial Number (MSN)s.
RDAF/TA MSNs
80924932/004/2021 0088, 0102, 0110, 0125, 0141
80925434/011/2021 0088, 0102, 0110, 0125, 0141
C. CHANGES
CONF 001
SERVICE BULLETIN
General Sentence updated.
SUMMARY
MODIFICATIONS Modification No. 116393L32219 added and all
associated data.
MATERIAL PRICE INFORMATION
T ask set A350-A-21-XX-P031-
01000-93AA-A Replace the
Cockpit and Avionics Air
Distribution Ducts
Paragraph updated.
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Paragraph updated.

### Page 3

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 3
Modified by the Original Issue
of this Service Bulletin
NATURE OF THE WORK
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
MANPOWER
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
PLANNING INFORMATION
APPLICABILITY Note added.
Configuration definition Configuration definition updated.
Modification retrofitted sentence updated due to
automatic update without any technical impact.
APPROVAL Sentence updated.
MANPOWER
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
WEIGHT AND BALANCE Sentence updated.
REFERENCES
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
ASR reference added.
ESP reference added.
INTRO reference added.
MP reference added.
SD reference added.
MATERIAL INFORMATION
MATERIAL APPLICABILITY Material set D01, D02 and D03 are revised.
Material set D05 added.
Referenced Consumables added.
Referenced parts added.
Material for task set A350-A-
21-XX-P031-02000-93AA-A
Modification - Additional Work
for Aircraft Modified by the
Original Issue of this Service
Bulletin
T ask set added.
TOOLING
Referenced tools for task set
A350-A-21-XX-P031-01000-
Sentence updated.

### Page 4

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 4
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
MP reference A350-A-24-42-XX-00ZZZ-561Z-A, A350-
A-24-42-XX-00ZZZ-761Z-A and A350-A-50-1X-XX-
01ZZZ-170Z-A are added.
CONSUMABLES
Consumables for task set
A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
Consumable updated.
Consumables for task set
A350-A-21-XX-P031-02000-
93AA-A Modification -
Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
Referenced consumables
for task set A350-A-21-XX-
P031-01000-93AA-A Replace
the Cockpit and Avionics Air
Distribution Ducts
Sentence added.
MP reference A350-A-21-2X-XX-00ZZZ-720Z-A, A350-
A-25-81-61-00ZZZ-720Z-A, A350-A-50-18-61-00ZZZ-
720Z-A, A350-A-50-13-61-00ZZZ-720Z-A, A350-A-50-
23-63-00ZZZ-720Z-A and A350-A-53-XX-XX-03ZZZ-
720Z-A are added.
Referenced consumables for
task set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
Sentence added.
MP references A350-A-50-18-61-00ZZZ-720Z-A and
A350-A-50-23-63-00ZZZ-720Z-A are added.
LIST OF NEW PARTS
Part kit 21P031D01R02 Note updated.
Address updated.
Quantity for PN EN6081D5 updated.
Cost added.
Part kit 21P031D02R02 Note updated.
Address updated.
Cost updated.
PN EN6081AD4 replaced by PN EN6081AD4-06.
Part kit 21P031D03R04 Note updated.
Address updated.
PN V2121256200100 is removed.
PN V2121262100100 is added.
Cost added.
PN ABS0785D177C is removed.
PN V5393330600000 is added.
PN EN6081AD4 replaced by PN EN6081AD4-06.
Referenced parts for task set
A350-A-21-XX-P031-01000-
Sentence added.

### Page 5

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 5
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
MP reference A350-A-50-23-63-00ZZZ-720Z-A is
added.
LIST OF EXISTING PARTS
Interchangeable parts for task
set A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
PN added.
Note added to the blanket PN.
ACCOMPLISHMENT INSTRUCTIONS
T ask set A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit and
Avionics Air Distribution Ducts
Caution updated.
Note updated.
PREPARATION
A350-A-21-XX-P031-
01001-540A-A Job Set-up
T ask updated to:
- Remove zone and skills information
- Note updated.
A350-A-21-XX-P031-
08001-520A-A Remove the
Rigid Corner Sheet
T ask updated to:
- Modify the quantity and item number of the rivet
- Modify the CML PN description.
A350-A-21-XX-P031-
01001-520A-A Remove
the Frame 23 Cargo Floor
Beam
T ask updated to modify the CML PN description.
PROCEDURE
A350-A-21-XX-P031-
02001-520A-A Remove
the Ducts in the Cargo
Compartment
T ask updated to modify the CML PN description.
A350-A-21-XX-P031-
02001-720A-A Install
the Ducts in the Cargo
Compartment
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Add CML references 06AAC1, 04QAB2, 04QAC5 and
04DAB2.
Fig.BF Sol.AA Install the
Ducts in the FWD Cargo
Compartment
Figure updated to add flag notes.
A350-A-21-XX-P031-
03001-520A-A Remove the
Ducts in the LH Cockpit
and LH Avionics Bay
T ask updated to modify the CML PN description.
T ask A350-A-21-XX-P031-04001-520A-A Remove the Fixed Attachments in the LH
Cockpit and LH Avionics Bay
Fig.BH Sol.AA Remove the
Fixed Attachments in the
LH Cockpit and LH Avionics
Bay
Figure updated to replace STGR28RH with STGR28LH.

### Page 6

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 6
A350-A-21-XX-P031-
05001-520A-A Remove
the Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
T ask updated to modify the CML PN description.
Fig.BI Sol.AA Remove the
Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
Figure updated to replace STGR28RH with STGR28LH.
A350-A-21-XX-P031-
03001-720A-A Install the
Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
Fig.BJ Sol.AA Install the
Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
Figure updated to replace STGR29RH with STGR29LH.
A350-A-21-XX-P031-
04001-720A-A Install the
Fixed Attachments in the
LH Cockpit and LH Avionics
Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description
- Add drill information.
Fig.BK Sol.AA Install the
Fixed Attachments in the
LH Cockpit and LH Avionics
Bay
Figure updated to add dimensions in the structure.
A350-A-21-XX-P031-
05001-720A-A Install the
Ducts in the LH Cockpit
and LH Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
A350-A-21-XX-P031-
06001-520A-A Remove the
Ducts in the RH Cockpit
and RH Avionics Bay
T ask updated to modify the CML PN description.
T ask A350-A-21-XX-P031-07001-520A-A Remove the Fixed Attachments in the RH
Cockpit and RH Avionics Bay
Fig.BN Sol.AA Remove
the Fixed Attachments in
the RH Cockpit and RH
Avionics Bay
Figure updated to replace item number 74 with 71.
A350-A-21-XX-P031-
06001-720A-A Install the
Fixed Attachments in
the RH Cockpit and RH
Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
Fig.BO Sol.AA Install the
Fixed Attachments in
the RH Cockpit and RH
Avionics Bay
Figure updated to replace item number 74 with 71.

### Page 7

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 7
A350-A-21-XX-P031-
07001-720A-A Install the
Ducts in the RH Cockpit
and RH Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description
- Replace bracket assy PN V2121256200100 to duct
assy PN V2121262100100.
TEST
A350-A-21-XX-P031-
01001-343A-A BITE T est
T ask updated to remove zone and skills information.
CLOSE-UP
A350-A-21-XX-P031-
01001-740A-A Close
Access to the Air
Distribution System in the
Cockpit and Avionics Bay
T ask updated to remove zone and skills information.
A350-A-21-XX-P031-
01001-720A-A Install the
Frame 23 Cargo Floor
Beam
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
A350-A-21-XX-P031-
08001-720A-A Install the
Rigid Corner Sheet
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description
- Modify the quantity of the PN EN6081D5.
A350-A-21-XX-P031-
02001-740A-A Close
Access to the Frame 23
Cargo Floor Beam
T ask updated to correct MP reference from A350-A-
20-51-20-01ZZZ-25BZ-A to A350-A-20-51-50-01ZZZ-
25BZ-A.
T ask set A350-A-21-XX-P031-02000-
93AA-A Modification - Additional
Work for Aircraft Modified by
the Original Issue of this Service
Bulletin
Additional work added.
CONF 002
SERVICE BULLETIN
General Sentence updated.
SUMMARY
MODIFICATIONS Modification No. 116393L32219 added and all
associated data.
MATERIAL PRICE INFORMATION
T ask set A350-A-21-XX-P031-
01000-93AA-A Replace the
Cockpit and Avionics Air
Distribution Ducts
Paragraph updated.
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
Paragraph updated.

### Page 8

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 8
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
NATURE OF THE WORK
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
MANPOWER
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
PLANNING INFORMATION
APPLICABILITY Note added.
Configuration definition Configuration definition updated.
Modification retrofitted sentence updated due to
automatic update without any technical impact.
APPROVAL Sentence updated.
MANPOWER
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
WEIGHT AND BALANCE Sentence updated.
REFERENCES
T ask set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
ASR reference added.
ESP reference added.
INTRO reference added.
MP reference added.
SD reference added.
MATERIAL INFORMATION
MATERIAL APPLICABILITY Material set D01, D02 and D03 are revised.
Material set D05 added.
Referenced Consumables added.
Referenced parts added.
Material for task set A350-A-
21-XX-P031-02000-93AA-A
Modification - Additional Work
for Aircraft Modified by the
Original Issue of this Service
Bulletin
T ask set added.
TOOLING

### Page 9

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 9
Referenced tools for task set
A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
Sentence updated.
MP reference A350-A-24-42-XX-00ZZZ-561Z-A, A350-
A-24-42-XX-00ZZZ-761Z-A and A350-A-50-1X-XX-
01ZZZ-170Z-A are added.
CONSUMABLES
Consumables for task set
A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
Consumable updated.
Consumables for task set
A350-A-21-XX-P031-02000-
93AA-A Modification -
Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
T ask added.
Referenced consumables
for task set A350-A-21-XX-
P031-01000-93AA-A Replace
the Cockpit and Avionics Air
Distribution Ducts
Sentence added.
MP reference A350-A-21-2X-XX-00ZZZ-720Z-A, A350-
A-25-81-61-00ZZZ-720Z-A, A350-A-50-18-61-00ZZZ-
720Z-A, A350-A-50-13-61-00ZZZ-720Z-A, A350-A-50-
23-63-00ZZZ-720Z-A and A350-A-53-XX-XX-03ZZZ-
720Z-A are added.
Referenced consumables for
task set A350-A-21-XX-P031-
02000-93AA-A Modification
- Additional Work for Aircraft
Modified by the Original Issue
of this Service Bulletin
Sentence added.
MP references A350-A-50-18-61-00ZZZ-720Z-A and
A350-A-50-23-63-00ZZZ-720Z-A are added.
LIST OF NEW PARTS
Part kit 21P031D01R02 Note updated.
Address updated.
Quantity for PN EN6081D5 updated.
Cost added.
Part kit 21P031D02R02 Note updated.
Address updated.
Cost updated.
PN EN6081AD4 replaced by PN EN6081AD4-06.
Part kit 21P031D03R04 Note updated.
Address updated.
PN V2121256200100 is removed.
PN V2121262100100 is added.
Cost added.
PN ABS0785D177C is removed.
PN V5393330600000 is added.
PN EN6081AD4 replaced by PN EN6081AD4-06.

### Page 10

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 10
Referenced parts for task set
A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
Sentence added.
MP reference A350-A-50-23-63-00ZZZ-720Z-A is
added.
LIST OF EXISTING PARTS
Interchangeable parts for task
set A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit
and Avionics Air Distribution
Ducts
PN added.
Note added to the blanket PN.
ACCOMPLISHMENT INSTRUCTIONS
T ask set A350-A-21-XX-P031-01000-
93AA-A Replace the Cockpit and
Avionics Air Distribution Ducts
Caution updated.
Note updated.
PREPARATION
A350-A-21-XX-P031-
01001-540A-A Job Set-up
T ask updated to:
- Remove zone and skills information
- Note updated.
A350-A-21-XX-P031-
08001-520A-A Remove the
Rigid Corner Sheet
T ask updated to:
- Modify the quantity and item number of the rivet
- Modify the CML PN description.
A350-A-21-XX-P031-
01001-520A-A Remove
the Frame 23 Cargo Floor
Beam
T ask updated to modify the CML PN description.
PROCEDURE
A350-A-21-XX-P031-
02001-520A-A Remove
the Ducts in the Cargo
Compartment
T ask updated to modify the CML PN description.
A350-A-21-XX-P031-
02001-720A-A Install
the Ducts in the Cargo
Compartment
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Add CML references 06AAC1, 04QAB2, 04QAC5 and
04DAB2.
Fig.BF Sol.AA Install the
Ducts in the FWD Cargo
Compartment
Figure updated to add flag notes.
A350-A-21-XX-P031-
03001-520A-A Remove the
Ducts in the LH Cockpit
and LH Avionics Bay
T ask updated to modify the CML PN description.
T ask A350-A-21-XX-P031-04001-520A-A Remove the Fixed Attachments in the LH
Cockpit and LH Avionics Bay
Fig.BH Sol.AA Remove the
Fixed Attachments in the
Figure updated to replace STGR28RH with STGR28LH.

### Page 11

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 11
LH Cockpit and LH Avionics
Bay
A350-A-21-XX-P031-
05001-520A-A Remove
the Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
T ask updated to modify the CML PN description.
Fig.BI Sol.AA Remove the
Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
Figure updated to replace STGR28RH with STGR28LH.
A350-A-21-XX-P031-
03001-720A-A Install the
Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
Fig.BJ Sol.AA Install the
Electrical Attachments
in the LH Cockpit and LH
Avionics Bay
Figure updated to replace STGR29RH with STGR29LH.
A350-A-21-XX-P031-
04001-720A-A Install the
Fixed Attachments in the
LH Cockpit and LH Avionics
Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description
- Add drill information.
Fig.BK Sol.AA Install the
Fixed Attachments in the
LH Cockpit and LH Avionics
Bay
Figure updated to add dimensions in the structure.
A350-A-21-XX-P031-
05001-720A-A Install the
Ducts in the LH Cockpit
and LH Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
A350-A-21-XX-P031-
06001-520A-A Remove the
Ducts in the RH Cockpit
and RH Avionics Bay
T ask updated to modify the CML PN description.
T ask A350-A-21-XX-P031-07001-520A-A Remove the Fixed Attachments in the RH
Cockpit and RH Avionics Bay
Fig.BN Sol.AA Remove
the Fixed Attachments in
the RH Cockpit and RH
Avionics Bay
Figure updated to replace item number 74 with 71.
A350-A-21-XX-P031-
06001-720A-A Install the
Fixed Attachments in
the RH Cockpit and RH
Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
Fig.BO Sol.AA Install the
Fixed Attachments in
Figure updated to replace item number 74 with 71.

### Page 12

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 12
the RH Cockpit and RH
Avionics Bay
A350-A-21-XX-P031-
07001-720A-A Install the
Ducts in the RH Cockpit
and RH Avionics Bay
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description
- Replace bracket assy PN V2121256200100 to duct
assy PN V2121262100100.
TEST
A350-A-21-XX-P031-
01001-343A-A BITE T est
T ask updated to remove zone and skills information.
CLOSE-UP
A350-A-21-XX-P031-
01001-740A-A Close
Access to the Air
Distribution System in the
Cockpit and Avionics Bay
T ask updated to remove zone and skills information.
A350-A-21-XX-P031-
01002-720A-A Install the
Frame 23 Cargo Floor
Beam
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description.
A350-A-21-XX-P031-
08001-720A-A Install the
Rigid Corner Sheet
T ask updated to:
- Correct MP reference from A350-A-20-51-20-01ZZZ-
25BZ-A to A350-A-20-51-50-01ZZZ-25BZ-A
- Modify the CML PN description
- Modify the quantity of the PN EN6081D5.
A350-A-21-XX-P031-
02001-740A-A Close
Access to the Frame 23
Cargo Floor Beam
T ask updated to correct MP reference from A350-A-
20-51-20-01ZZZ-25BZ-A to A350-A-20-51-50-01ZZZ-
25BZ-A.
T ask set A350-A-21-XX-P031-02000-
93AA-A Modification - Additional
Work for Aircraft Modified by
the Original Issue of this Service
Bulletin
Additional work added.
CONF ALL
D. FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete
document. Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
E. HISTORY OF PREVIOUS REVISIONS
No previous revision
F. REVISION SEQUENCE
ORIGINAL: Dec 13/18
REVISION No. : 01 - Feb 15/22

### Page 13

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 13
ATA SYSTEM: 21
TITLE: AIR CONDITIONING - COCKPIT AIR DISTRIBUTION, CONTROL AND
MONITORING - REDUCE COCKPIT NOISE
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
CONF 001
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 109229L92201 113512L20762 116393L32219
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF 002
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 109229L92201 113512L20762 116393L32219
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
CONF ALL
B. REASON
(1) History
During routine flights it was found that the noise level in the cockpit is high.
(2) Objective/Action
In order to meet the customer noise requirements changes on Ventilation System
and Avionics Equipment Ventilation System are introduced to reduce the noise in the
Cockpit.
(3) Advantages
Accomplishment of the SB will improve the communication and the working conditions
in the cockpit.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE DESIRABLE COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO

### Page 14

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 14
EVALUATION TABLE
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD NO
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin to introduce improvements.
D. MAINTENANCE CONFIGURATION
CONF 001
No specific aircraft maintenance configuration required.
CONF 002
No specific aircraft maintenance configuration required.
CONF ALL
E. MATERIAL PRICE INFORMATION
CONF 001
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 21P031D01R02 1 23500.00 USD Rivet, Nut, Bolt, Washer, Duct,
Bracket, Tie
Part kit 21P031D02R02 1 20500.00 USD Rivet, Nut, Bolt, Washer, Duct,
Bracket, Tie, Ramp, Blanket
Part kit 21P031D03R04 1 10500.00 USD Rivet, Nut, Bolt, Washer, Duct,
Bracket, Tie, Blanket
TOTAL   54500.00 USD  
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 21P031D05R00 1 660.00 USD Bracket, fasteners
CONF 002
(1) Replace the Cockpit and Avionics Air Distribution Ducts

### Page 15

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 15
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 21P031D01R02 1 23500.00 USD Rivet, Nut, Bolt, Washer, Duct,
Bracket, Tie
Part kit 21P031D02R02 1 20500.00 USD Rivet, Nut, Bolt, Washer, Duct,
Bracket, Tie, Ramp, Blanket
Part kit 21P031D03R04 1 10500.00 USD Rivet, Nut, Bolt, Washer, Duct,
Bracket, Tie, Blanket
TOTAL   54500.00 USD  
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 21P031D05R00 1 660.00 USD Bracket, fasteners
CONF ALL
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
CPA QTR
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
CONF 001
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
AIRCRAFT YES
EQUIPMENT NO
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
AIRCRAFT YES
EQUIPMENT NO
CONF 002
(1) Replace the Cockpit and Avionics Air Distribution Ducts

### Page 16

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 16
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
AIRCRAFT YES
EQUIPMENT NO
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
AIRCRAFT YES
EQUIPMENT NO
CONF ALL
I. MANPOWER
CONF 001
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
MANPOWER
TOTAL MAN-HOURS 103.25
h
ELAPSED TIME (HOURS) 18.75 h
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
MANPOWER
TOTAL MAN-HOURS 7.50 h
ELAPSED TIME (HOURS) 4.00 h
CONF 002
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
MANPOWER
TOTAL MAN-HOURS 103.25
h
ELAPSED TIME (HOURS) 18.75 h
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
MANPOWER
TOTAL MAN-HOURS 7.50 h

### Page 17

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 17
MANPOWER
ELAPSED TIME (HOURS) 4.00 h

### Page 18

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-21XXP031-A-FAPE3-049ZE-A-001-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
General overview
Page 18
CONF ALL
J. GENERAL OVERVIEW
CONF ALL
A B
Z210
Z220
C
Z130
Z120
REPLACE THE DUCTS IN THE
FWD CARGO COMPARTMENTFR20
FR18
FR44
FR40
FWD CARGO
COMPARTMENT DOOR
C
FR1
FR18
FR8
FR11
Z120
Z210
B
REPLACE THE DUCTS IN THE
LH COCKPIT AND LH AVIONICS BAY
A
FR1
FR18
FR8
FR11
Z120
Z210
REPLACE THE DUCTS IN THE
RH COCKPIT AND RH AVIONICS BAY
ICN-A350-A-21XXP031-A-FAPE3-049ZE-A-001-01

### Page 19

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 19
ATA SYSTEM: 21
TITLE: AIR CONDITIONING - COCKPIT AIR DISTRIBUTION, CONTROL AND
MONITORING - REDUCE COCKPIT NOISE
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: MOD No. 109229L92201 is embodied before delivery on aircraft with Manufacturer
Serial Number (MSN) 0161 and subsequent.
NOTE: MOD No. 113512L20762 is applicable by Service Bulletin only.
NOTE: MOD No. 116393L32219 is embodied before delivery on aircraft with MSN 0450 and
subsequent.
(1) Models
ON A/C 0088, 0102, 0110, 0118, 0125, 0141
350-1041
CONF ALL
(2) Applicability by MSN
0088 0102 0110 0118 0125 0141
(3) MSN by configuration
CONF 001
MSN CONFIGURATION
0088 0102 0110 001
CONF 002
MSN CONFIGURATION
0118 0125 0141 002
CONF ALL
(4) Configuration definition
CONF 001
Configuration 001
CONF 001 is applicable for all A350-1000 aircraft which do not have MOD No.
111137L31806 embodied.
CONF 001 retrofits following modifications: 109229L92201, 113512L20762,
116393L32219.
CONF 002
Configuration 002
CONF 002 is applicable for all A350-1000 aircraft which have MOD No.
111137L31806 embodied.
CONF 002 retrofits following modifications: 109229L92201, 113512L20762,
116393L32219.
CONF ALL
B. CONCURRENT REQUIREMENTS

### Page 20

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 20
None
C. REASON
(1) History
During routine flights it was found that the noise level in the cockpit is high.
(2) Objective/Action
In order to meet the customer noise requirements changes on Ventilation System
and Avionics Equipment Ventilation System are introduced to reduce the noise in the
Cockpit.
(3) Advantages
Accomplishment of the SB will improve the communication and the working conditions
in the cockpit.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
1 Remove the Ducts in the Cargo Compartment
2 Install the Ducts in the Cargo Compartment
3 Remove the Ducts in the LH Cockpit and LH Avionics Bay
4 Remove the Fixed Attachments in the LH Cockpit and LH Avionics Bay
5 Remove the Electrical Attachments in the LH Cockpit and LH Avionics Bay
6 Install the Electrical Attachments in the LH Cockpit and LH Avionics Bay
7 Install the Fixed Attachments in the LH Cockpit and LH Avionics Bay
8 Install the Ducts in the LH Cockpit and LH Avionics Bay
9 Remove the Ducts in the RH Cockpit and RH Avionics Bay
10 Remove the Fixed Attachments in the RH Cockpit and RH Avionics Bay
11 Install the Fixed Attachments in the RH Cockpit and RH Avionics Bay
12 Install the Ducts in the RH Cockpit and RH Avionics Bay
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
1 Remove the Bracket from the FWD Cargo Compartment
2 Install the Bracket in the FWD Cargo Compartment
E. COMPLIANCE
(1) Classification
DESIRABLE: Service Bulletin to introduce improvements.

### Page 21

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 21
(2) Accomplishment Timescale
In accordance with operators' maintenance schedule.
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
CONF 001
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
PREPARATION
Job Set-up 0.75 h
Get Access to the Frame 23 Cargo Floor Beam 33.00 h
Remove the Rigid Corner Sheet 0.75 h
Remove the Frame 23 Cargo Floor Beam 3.75 h
Get Access to the Air Distribution System in the Cockpit
and Avionics Bay
4.75 h
PROCEDURE
Remove the Ducts in the Cargo Compartment 1.00 h
Install the Ducts in the Cargo Compartment 1.00 h
Remove the Ducts in the LH Cockpit and LH Avionics Bay 2.00 h
Remove the Fixed Attachments in the LH Cockpit and LH
Avionics Bay
0.50 h
Remove the Electrical Attachments in the LH Cockpit and
LH Avionics Bay
0.75 h
Install the Electrical Attachments in the LH Cockpit and LH
Avionics Bay
0.75 h
Install the Fixed Attachments in the LH Cockpit and LH
Avionics Bay
1.00 h
Install the Ducts in the LH Cockpit and LH Avionics Bay 2.00 h
Remove the Ducts in the RH Cockpit and RH Avionics Bay 1.00 h
Remove the Fixed Attachments in the RH Cockpit and RH
Avionics Bay
0.50 h
Install the Fixed Attachments in the RH Cockpit and RH
Avionics Bay
0.50 h
Install the Ducts in the RH Cockpit and RH Avionics Bay 1.00 h

### Page 22

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 22
PREPARATION FOR TEST
None
TEST
BITE T est 1.00 h
Eddy Current T est of the Frame 23 Cargo Floor Beam
Fastener Holes on Bench
1.00 h BENCH
Eddy Current T est of the Frame 23 Fastener Holes 1.00 h
CLOSE-UP
Close Access to the Air Distribution System in the Cockpit
and Avionics Bay
4.75 h
Install the Frame 23 Cargo Floor Beam 6.00 h
Install the Rigid Corner Sheet 0.75 h
Close Access to the Frame 23 Cargo Floor Beam 33.00 h
Close-up 0.75 h
TOTAL MAN-HOURS 103.25 h
ELAPSED TIME (HOURS) 18.75 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix 01.
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
PREPARATION
Job Set-up 3.00 h
PROCEDURE
Remove the Bracket from the FWD Cargo Compartment 0.50 h
Install the Bracket in the FWD Cargo Compartment 1.00 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 3.00 h
TOTAL MAN-HOURS 7.50 h
ELAPSED TIME (HOURS) 4.00 h
CONF 002
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Replace the Cockpit and Avionics Air Distribution Ducts

### Page 23

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 23
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
PREPARATION
Job Set-up 0.75 h
Get Access to the Frame 23 Cargo Floor Beam 33.00 h
Remove the Rigid Corner Sheet 0.75 h
Remove the Frame 23 Cargo Floor Beam 3.75 h
Get Access to the Air Distribution System in the Cockpit
and Avionics Bay
4.75 h
PROCEDURE
Remove the Ducts in the Cargo Compartment 1.00 h
Install the Ducts in the Cargo Compartment 1.00 h
Remove the Ducts in the LH Cockpit and LH Avionics Bay 2.00 h
Remove the Fixed Attachments in the LH Cockpit and LH
Avionics Bay
0.50 h
Remove the Electrical Attachments in the LH Cockpit and
LH Avionics Bay
0.75 h
Install the Electrical Attachments in the LH Cockpit and LH
Avionics Bay
0.75 h
Install the Fixed Attachments in the LH Cockpit and LH
Avionics Bay
1.00 h
Install the Ducts in the LH Cockpit and LH Avionics Bay 2.00 h
Remove the Ducts in the RH Cockpit and RH Avionics Bay 1.00 h
Remove the Fixed Attachments in the RH Cockpit and RH
Avionics Bay
0.50 h
Install the Fixed Attachments in the RH Cockpit and RH
Avionics Bay
0.50 h
Install the Ducts in the RH Cockpit and RH Avionics Bay 1.00 h
PREPARATION FOR TEST
None
TEST
BITE T est 1.00 h
Eddy Current T est of the Frame 23 Cargo Floor Beam
Fastener Holes on Bench
1.00 h BENCH
Eddy Current T est of the Frame 23 Fastener Holes 1.00 h
CLOSE-UP
Close Access to the Air Distribution System in the Cockpit
and Avionics Bay
4.75 h
Install the Frame 23 Cargo Floor Beam 6.00 h
Install the Rigid Corner Sheet 0.75 h
Close Access to the Frame 23 Cargo Floor Beam 33.00 h
Close-up 0.75 h
TOTAL MAN-HOURS 103.25 h
ELAPSED TIME (HOURS) 18.75 h

### Page 24

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 24
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix 01.
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
PREPARATION
Job Set-up 3.00 h
PROCEDURE
Remove the Bracket from the FWD Cargo Compartment 0.50 h
Install the Bracket in the FWD Cargo Compartment 1.00 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 3.00 h
TOTAL MAN-HOURS 7.50 h
ELAPSED TIME (HOURS) 4.00 h
CONF ALL
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +2.50 kg (+5.512 lb)
Effect on Balance +31.875 kg.m (+230.552 lb.ft)
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONF 001
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-24-XX-01ZZZ-667Z-A A350-A-51-4X-XX-01ZZZ-667Z-A
A350-A-51-42-XX-01ZZZ-667Z-A A350-A-51-43-XX-01ZZZ-667Z-A
A350-A-51-44-11-01ZZZ-667Z-A A350-A-51-75-12-00ZZZ-660Z-A
A350-A-51-77-11-00ZZZ-660Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A

### Page 25

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 25
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-00ZZZ-170Z-A A350-A-20-51-50-01ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-21-22-XX-00ZZZ-343Z-A
A350-A-21-26-XX-01ZZZ-343Z-A A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-42-XX-00ZZZ-561Z-A
A350-A-24-42-XX-00ZZZ-761Z-A
A350-A-25-13-69-00ZZZ-520Z-A
A350-A-25-13-69-00ZZZ-720Z-A
A350-A-25-13-69-01ZZZ-520Z-A
A350-A-25-13-69-01ZZZ-720Z-A
A350-A-25-13-82-00ZZZ-520Z-A
A350-A-25-13-82-00ZZZ-720Z-A
A350-A-25-81-61-00ZZZ-520Z-A
A350-A-25-81-61-00ZZZ-720Z-A
A350-A-25-81-71-00ZZZ-520Z-A
A350-A-25-81-71-00ZZZ-720Z-A
A350-A-50-1X-XX-01ZZZ-170Z-A
A350-A-50-13-61-00ZZZ-520Z-A
A350-A-50-13-61-00ZZZ-720Z-A
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-18-61-00ZZZ-720Z-A
A350-A-50-23-61-01ZZZ-520Z-A
A350-A-50-23-61-01ZZZ-720Z-A
A350-A-50-23-63-00ZZZ-520Z-A
A350-A-50-23-63-00ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
A350-A-53-12-73-00ZZZ-520Z-A
A350-A-53-12-73-00ZZZ-720Z-A
NON DESTRUCTIVE TEST (NDT)
A350-A-51-96-XX-01ZZZ-040Z-A
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-07-117
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-21-11-00ZZZ-660Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-42-XX-01ZZZ-667Z-A A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A

### Page 26

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 26
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-18-61-00ZZZ-720Z-A
A350-A-50-23-63-00ZZZ-520Z-A
A350-A-50-23-63-00ZZZ-720Z-A
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF 002
(1) Replace the Cockpit and Avionics Air Distribution Ducts
(a) T ask set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and Avionics Air
Distribution Ducts
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-24-XX-01ZZZ-667Z-A A350-A-51-4X-XX-01ZZZ-667Z-A
A350-A-51-42-XX-01ZZZ-667Z-A A350-A-51-43-XX-01ZZZ-667Z-A
A350-A-51-44-11-01ZZZ-667Z-A A350-A-51-75-12-00ZZZ-660Z-A
A350-A-51-77-11-00ZZZ-660Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-00ZZZ-170Z-A A350-A-20-51-50-01ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-21-22-XX-00ZZZ-343Z-A
A350-A-21-26-XX-01ZZZ-343Z-A A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-42-XX-00ZZZ-561Z-A
A350-A-24-42-XX-00ZZZ-761Z-A
A350-A-25-13-69-00ZZZ-520Z-A
A350-A-25-13-69-00ZZZ-720Z-A
A350-A-25-13-69-01ZZZ-520Z-A
A350-A-25-13-69-01ZZZ-720Z-A
A350-A-25-13-82-00ZZZ-520Z-A
A350-A-25-13-82-00ZZZ-720Z-A
A350-A-25-81-61-00ZZZ-520Z-A
A350-A-25-81-61-00ZZZ-720Z-A
A350-A-25-81-71-00ZZZ-520Z-A
A350-A-25-81-71-00ZZZ-720Z-A
A350-A-50-1X-XX-01ZZZ-170Z-A
A350-A-50-13-61-00ZZZ-520Z-A
A350-A-50-13-61-00ZZZ-720Z-A
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-18-61-00ZZZ-720Z-A
A350-A-50-23-61-01ZZZ-520Z-A A350-A-50-23-63-00ZZZ-520Z-A

### Page 27

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 27
MAINTENANCE PROCEDURE (MP)
A350-A-50-23-61-01ZZZ-720Z-A A350-A-50-23-63-00ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
A350-A-53-12-73-00ZZZ-520Z-A
A350-A-53-12-73-00ZZZ-720Z-A
NON DESTRUCTIVE TEST (NDT)
A350-A-51-96-XX-01ZZZ-040Z-A
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-07-117
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
(2) Modification - Additional Work for Aircraft Modified by the Original Issue of
this Service Bulletin
(a) T ask set A350-A-21-XX-P031-02000-93AA-A Modification - Additional Work for
Aircraft Modified by the Original Issue of this Service Bulletin
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-21-11-00ZZZ-660Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-42-XX-01ZZZ-667Z-A A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-18-61-00ZZZ-720Z-A
A350-A-50-23-63-00ZZZ-520Z-A
A350-A-50-23-63-00ZZZ-720Z-A
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF ALL
K. PUBLICATION AFFECTED
MAINTENANCE ILLUSTRATED PART DATA (MIPD)
L. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.

### Page 28

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 28
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
CONF 001
Material for task set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and
Avionics Air Distribution Ducts
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Part kit 21P031D01R02 1
Part kit 21P031D02R02 1
Part kit 21P031D03R04 1
Referenced parts See SB
Interchangeable parts See SB
Material for task set A350-A-21-XX-P031-02000-93AA-A Modification - Additional
Work for Aircraft Modified by the Original Issue of this Service Bulletin
MATERIAL QTY SEE NOTES
Consumables See SB
Referenced consumables See SB
Part kit 21P031D05R00 1
CONF 002
Material for task set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit and
Avionics Air Distribution Ducts
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Part kit 21P031D01R02 1
Part kit 21P031D02R02 1
Part kit 21P031D03R04 1
Referenced parts See SB
Interchangeable parts See SB
Material for task set A350-A-21-XX-P031-02000-93AA-A Modification - Additional
Work for Aircraft Modified by the Original Issue of this Service Bulletin
MATERIAL QTY SEE NOTES
Consumables See SB
Referenced consumables See SB
Part kit 21P031D05R00 1
CONF ALL
B. TOOLING

### Page 29

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 29
CONF 001
Referenced tools for task set A350-A-21-XX-P031-01000-93AA-A Replace the
Cockpit and Avionics Air Distribution Ducts
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-50-1X-XX-01ZZZ-170Z-A
Ref. MP A350-A-24-42-XX-00ZZZ-561Z-A
Ref. MP A350-A-24-42-XX-00ZZZ-761Z-A
Ref. NDT A350-A-51-96-XX-01ZZZ-040Z-A
CONF 002
Referenced tools for task set A350-A-21-XX-P031-01000-93AA-A Replace the
Cockpit and Avionics Air Distribution Ducts
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-50-1X-XX-01ZZZ-170Z-A
Ref. MP A350-A-24-42-XX-00ZZZ-561Z-A
Ref. MP A350-A-24-42-XX-00ZZZ-761Z-A
Ref. NDT A350-A-51-96-XX-01ZZZ-040Z-A
CONF ALL
C. CONSUMABLES
CONF 001
Consumables for task set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit
and Avionics Air Distribution Ducts
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
Corrosion Inhibiting
Structure
04FEC2
Primer Paint - Polysulfide
Corrosion Inhibiting
Structure
04QAB2 Coating - Flexible Structure
04QAC5
Coating - Corrosion
Inhibiting FastenerHead
Protection
04SAB2 Varnish Polyurethane -Marking Structure
06AAC1 Polysulfide Sealant -General Purpose Interfay
06ACA1
Polysulfide Sealant - Low
Density MultiPurpose
Brushable
06LCG9 Non Hardening JointingPutty - Medium T emp. Area
08BAA9 Non Aqueous Cleaner -General

### Page 30

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 30
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BBF1 Non Aqueous Cleaner -Methyl-Ethyl-Ketone
14SBA1 T extile - Lint free Cotton
Consumables for task set A350-A-21-XX-P031-02000-93AA-A Modification -
Additional Work for Aircraft Modified by the Original Issue of this Service Bulletin
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
Corrosion Inhibiting
Structure
04QAB2 Coating - Flexible Structure
04QAC5
Coating - Corrosion
Inhibiting FastenerHead
Protection
06AAC1 Polysulfide Sealant -General Purpose Interfay
06LCG9 Non Hardening JointingPutty - Medium T emp. Area
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
CONF 002
Consumables for task set A350-A-21-XX-P031-01000-93AA-A Replace the Cockpit
and Avionics Air Distribution Ducts
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
Corrosion Inhibiting
Structure
04FEC2
Primer Paint - Polysulfide
Corrosion Inhibiting
Structure
04QAB2 Coating - Flexible Structure
04QAC5
Coating - Corrosion
Inhibiting FastenerHead
Protection
04SAB2 Varnish Polyurethane -Marking Structure
06AAC1 Polysulfide Sealant -General Purpose Interfay
06ACA1
Polysulfide Sealant - Low
Density MultiPurpose
Brushable
06LCG9 Non Hardening JointingPutty - Medium T emp. Area
08BAA9 Non Aqueous Cleaner -General

### Page 31

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 31
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BBF1 Non Aqueous Cleaner -Methyl-Ethyl-Ketone
14SBA1 T extile - Lint free Cotton
Consumables for task set A350-A-21-XX-P031-02000-93AA-A Modification -
Additional Work for Aircraft Modified by the Original Issue of this Service Bulletin
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04DAB2
Primer Epoxy Paint -
Corrosion Inhibiting
Structure
04QAB2 Coating - Flexible Structure
04QAC5
Coating - Corrosion
Inhibiting FastenerHead
Protection
06AAC1 Polysulfide Sealant -General Purpose Interfay
06LCG9 Non Hardening JointingPutty - Medium T emp. Area
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
CONF 001
Referenced consumables for task set A350-A-21-XX-P031-01000-93AA-A Replace
the Cockpit and Avionics Air Distribution Ducts
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A
Ref. MP A350-A-25-81-61-00ZZZ-720Z-A
Ref. MP A350-A-50-13-61-00ZZZ-720Z-A
Ref. MP A350-A-50-18-61-00ZZZ-720Z-A
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
Referenced consumables for task set A350-A-21-XX-P031-02000-93AA-A
Modification - Additional Work for Aircraft Modified by the Original Issue of this
Service Bulletin
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-50-18-61-00ZZZ-720Z-A
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
CONF 002
Referenced consumables for task set A350-A-21-XX-P031-01000-93AA-A Replace
the Cockpit and Avionics Air Distribution Ducts
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A
Ref. MP A350-A-25-81-61-00ZZZ-720Z-A

### Page 32

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 32
Ref. MP A350-A-50-13-61-00ZZZ-720Z-A
Ref. MP A350-A-50-18-61-00ZZZ-720Z-A
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
Referenced consumables for task set A350-A-21-XX-P031-02000-93AA-A
Modification - Additional Work for Aircraft Modified by the Original Issue of this
Service Bulletin
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-50-18-61-00ZZZ-720Z-A
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
CONF ALL
D. LIST OF NEW PARTS
Part kit 21P031D01R02
Cost 23500.00 USD
Availability 240 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
7 EN6081D5 26 RIVET
19 NAS1149C0332R 4 WASHER
28 ABS1738K3A 4 NUT
29 ABS1738K3 30 NUT
30 ASNA2536P3 5 NUT
31 ASNA2536-3 12 NUT
32 EN6115B3AE6 4 BOLT
33 EN6115B3E4 26 BOLT

### Page 33

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 33
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
34 EN6115B3E3 4 BOLT
35 EN6115V3-3 8 BOLT
36 EN6115V3-6 3 BOLT
37 EN6115V3-5 1 BOLT
38 EN6115B3E5 5 BOLT
39 NSA935401-05 2 TIE
41 ABS1914A01 3 TIE
43 V2121264900000 1 DUCT
44 V2121264800000 1 DUCT
45 V2127240600200 1 DUCT
46 ABS0114T3-3 2 BOLT
47 V2127243400000 1 BRACKET
91 ABS0114T3-2 2 BOLT
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
Part kit 21P031D02R02
Cost 20500.00 USD
Availability 240 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
17 NAS1149E0332P 10 WASHER
41 ABS1914A01 7 TIE
48 ABS0901R050 1 CLAMP

### Page 34

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 34
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
49 V2121258300000 1 DUCT
51 V2121261900000 1 DUCT
52 V2121263220000 1 BRACKET
53 NSA5191-3V6 8 BOLT
55 V2121346400000 1 DUCT
56 V2121352300000 1 BRACKET
57 V2121263420000 1 BRACKET
58 V2121343500000 1 DUCT
59 V2121262100000 1 DUCT
60 V2121263320000 1 BRACKET
61 ABS0901R070 2 CLAMP
62 V2121262400000 1 DUCT
63 V2121263100000 1 DUCT
64 ABS2195-22 2 CLAMP
65 NSA5527-03-13D 1 SPACER
66 NSA5191-3V22 1 BOLT
67 V2121262600000 1 DUCT
69 NSA5191-3V8 1 BOLT
70 ASNA0033-022 1 CLAMP
72 EN6081AD4-06 6 RIVET
73 ABS0785D04C 1 BRACKET
74 ABS0785D177C 1 BRACKET
75 ABS0785D06C 1 BRACKET
80 ABS1339D03L 1 CLAMP
83 V9241863900000 1 RAMP
85 ABS1850B05 2 SPACER
92 V2581390200400 1 BLANKET
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
Part kit 21P031D03R04
Cost 10500.00 USD
Availability 240 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.

### Page 35

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 35
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
17 NAS1149E0332P 4 WASHER
41 ABS1914A01 4 TIE
52 V2121263220000 1 BRACKET
53 NSA5191-3V6 4 BOLT
61 ABS0901R070 2 CLAMP
71 V5393330600000 1 BRACKET
72 EN6081AD4-06 2 RIVET
86 V2121261900100 1 DUCT
88 V2121262100100 1 DUCT
89 V2121263320100 1 BRACKET
90 V2121262400100 1 DUCT
93 V2581388600400 1 BLANKET
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
Part kit 21P031D05R00
Cost 660.00 USD
Availability 240 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com

### Page 36

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 36
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
19 NAS1149C0332R 4 WASHER
46 ABS0114T3-3 2 BOLT
47 V2127243400000 1 BRACKET
91 ABS0114T3-2 2 BOLT
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
CONF 001
Referenced parts for task set A350-A-21-XX-P031-01000-93AA-A Replace the
Cockpit and Avionics Air Distribution Ducts
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
CONF 002
Referenced parts for task set A350-A-21-XX-P031-01000-93AA-A Replace the
Cockpit and Avionics Air Distribution Ducts
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
CONF ALL
E. LIST OF EXISTING PARTS
CONF 001
Interchangeable parts for task set A350-A-21-XX-P031-01000-93AA-A Replace the
Cockpit and Avionics Air Distribution Ducts
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
DUCT ASSY V2121257000400 V2121261900000 03 (1)
DUCT ASSY V2121257100400 V2121258300000 03 (1)
BRACKET V2121258120000 V2121263220000 03 (1)
DUCT ASSY V2121258900400 V2121261900100 03 (1)
DUCT ASSY V2121259200200 V2121262400000 03 (1)
DUCT ASSY V2121259200300 V2121262400100 03 (1)
DUCT ASSY V2121259300200 V2121263100000 03 (1)
DUCT ASSY V2121259700200 V2121262100000 03 (1)
DUCT ASSY V2121259700300 V2121262100100 03 (1)
BRACKET V2121260120000 V2121263320000 03 (1)
BRACKET V2121260120100 V2121263320100 03 (1)
DUCT ASSY V2121262300000 V2121264800000 03 (1)

### Page 37

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 37
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
DUCT ASSY V2121342600400 V2121343500000 03 (1)
BRACKET V2121343020200 V2121263420000 03 (1)
DUCT ASSY V2121345000200 V2121346400000 03 (1)
DUCT ASSY V2127240700000 V2121264900000 03 (1)
DUCT ASSY V2127240900400 V2127240600200 03 (1)
BLANKET-
INSULATION V2581388600200 V2581388600400 03 (1)
BLANKET-
INSULATION V2581390200200 V2581390200400 03 (1)
RAMP ASSY V9241762300000 V9241863900000 03 (1)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 002
Interchangeable parts for task set A350-A-21-XX-P031-01000-93AA-A Replace the
Cockpit and Avionics Air Distribution Ducts
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
DUCT ASSY V2121257000400 V2121261900000 03 (1)
DUCT ASSY V2121257100400 V2121258300000 03 (1)
BRACKET V2121258120000 V2121263220000 03 (1)
DUCT ASSY V2121258900400 V2121261900100 03 (1)
DUCT ASSY V2121259200200 V2121262400000 03 (1)
DUCT ASSY V2121259200300 V2121262400100 03 (1)
DUCT ASSY V2121259300200 V2121263100000 03 (1)
DUCT ASSY V2121259700200 V2121262100000 03 (1)
DUCT ASSY V2121259700300 V2121262100100 03 (1)
BRACKET V2121260120000 V2121263320000 03 (1)
BRACKET V2121260120100 V2121263320100 03 (1)
DUCT ASSY V2121262300000 V2121264800000 03 (1)
DUCT ASSY V2121342600400 V2121343500000 03 (1)
BRACKET V2121343020200 V2121263420000 03 (1)
DUCT ASSY V2121345000200 V2121346400000 03 (1)
DUCT ASSY V2127240700000 V2121264900000 03 (1)
DUCT ASSY V2127240900400 V2127240600200 03 (1)
BLANKET-
INSULATION V2581388600200 V2581388600400 03 (1)
BLANKET-
INSULATION V2581390200200 V2581390200400 03 (1)

### Page 38

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 38
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
RAMP ASSY V9241762300000 V9241863900000 03 (1)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.

### Page 39

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 39
CONF ALL
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-21-XX-P031-01000-93AA-A (A350-A-21-XX-P031-01ZZZ-93AZ-A)
Replace the Cockpit and Avionics Air Distribution Ducts
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, contact AIRBUS for further instructions and
approval.
NOTE: Discarded parts must be managed at the operator's discretion.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
CONF 001
TOTAL MAN-HOURS 103.25 h
CONF 002
TOTAL MAN-HOURS 103.25 h
CONF 001
ELAPSED TIME (HOURS) 18.75 h
CONF 002
ELAPSED TIME (HOURS) 18.75 h

### Page 40

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 40
CONF ALL
B. PREPARATION
(1) Task A350-A-21-XX-P031-01001-540A-A (A350-A-21-XX-P031-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.75 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP
A350-A-12-XX-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-42-XX-00ZZZ-761Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Put an access platform in position below Door 211JF .
(c) Get Access to the Avionics Compartment, refer to Ref. MP A350-A-12-XX-XX-
00ZZZ-170Z-A.
(d) Energize the Ground Service Network with the GND SVCE CTL 1 Switch in the
Cabin, refer to Ref. MP A350-A-24-42-XX-00ZZZ-761Z-A.
(2) Task A350-A-21-XX-P031-02001-540A-A (A350-A-21-XX-P031-02ZZZ-540Z-A)
Get Access to the Frame 23 Cargo Floor Beam
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
130
Manpower/Resources/Skills
Man-hours 33.00 h
Minimum Number of person 12
Elapsed Time 4.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-AA350-A-51-77-11-00ZZZ-660Z-A

### Page 41

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 41
Manuals/Drawings References/Sheets
MP
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-23-61-01ZZZ-520Z-A
A350-A-50-23-63-00ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
Procedure
(a) Standard Practices given in this procedure:
1 T ag all the parts you must remove and retain to make the subsequent
installation easier.
2 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
3 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
4 Obtain cleaning process in accordance with Ref. ASR A350-A-51-77-11-
00ZZZ-660Z-A.
(b) Do the Removal of the Cargo Floor Panels from Frame 19 to Frame 22 and from
Frame 27 to Frame 30, refer to Ref. MP A350-A-53-XX-XX-03ZZZ-520Z-A.
(c) Remove the Frame 20 Drainage Pipe, refer to Ref. Fig.BB Remove and Install the
Frame 20 Drainage Pipe SHEET 02.
2 Tie-Cable   Item (39) Discard
1 Pipe   Item (40) Retain
(d) Do the Removal of the Ball Mat Assemblies in the Forward Cargo Compartment,
refer to Ref. MP A350-A-50-23-63-00ZZZ-520Z-A.
(e) Do the Removal of the Drain Pan Assemblies of the Ball Mat Assemblies, refer to
Ref. MP A350-A-50-18-61-00ZZZ-520Z-A.
(f) Do the Removal of the Roller Track Assemblies from Frame 21 to Frame 28, refer
to Ref. MP A350-A-50-23-61-01ZZZ-520Z-A.
(g) Remove the Drainage Pipe Clamps from the Frame 23 Cargo Floor Beam, refer to
Ref. Fig.BC Remove and Install the Frame 23 Drainage Pipe Clamps.
6 Bolt   Item (10) Retain
6 Washer   Item (9) Retain

### Page 42

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YQ-A-001-01 Fig.BB Sol.AA SHEET 1/1
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 20 Drainage Pipe
Page 42
CONF ALL
A
Z130
FR18
FR19
FR29
,  Z133 Z134
FR20
FWD CARGO
COMPARTMENT DOOR
B A
(39)
39
(40)
TYPICAL
C
C
B
C
ICN-A350-A-21XXP031-A-FAPE3-049YQ-A-001-01

### Page 43

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YR-A-001-01 Fig.BC Sol.AA SHEET 1/1
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Drainage Pipe Clamps
Page 43
CONF ALL
(9)
(10)
A
Z130
FR18
FR30
FR23
FR29
,  Z133 Z134
FWD CARGO
COMPARTMENT DOOR
C
C
C
C
C
(8)
B
A
B
TYPICAL
C
ICN-A350-A-21XXP031-A-FAPE3-049YR-A-001-01

### Page 44

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 44
(3) Task A350-A-21-XX-P031-08001-520A-A (A350-A-21-XX-P031-08ZZZ-520Z-A)
Remove the Rigid Corner Sheet
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
130
Manpower/Resources/Skills
Man-hours 0.75 h
Minimum Number of person 1
Elapsed Time 0.75 h
Skills Cabin
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BBF1 Non Aqueous Cleaner -Methyl-Ethyl-Ketone
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-AA350-A-51-77-11-00ZZZ-660Z-A
MP A350-A-50-13-61-00ZZZ-520Z-A
Procedure
(a) Standard Practices given in this procedure:
1 T ag all the parts you must remove and retain to make the subsequent
installation easier.
2 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
3 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
4 Obtain cleaning process in accordance with Ref. ASR A350-A-51-77-11-
00ZZZ-660Z-A.
(b) Remove the LH Inclined Sidewall Panel Lining from Frame 19 to Frame 27 as
specified in the Removal of the Linings in the Forward Cargo Compartment, refer
to Ref. MP A350-A-50-13-61-00ZZZ-520Z-A.
(c) Remove the Frame 21 to Frame 24 Rigid Corner Sheet, refer to Ref. Fig.BA
Remove and Install the Rigid Corner Sheet.
1 Remove the Frame 20 to Frame 21 Beam, refer to Ref. Fig.BA Remove and
Install the Rigid Corner Sheet SHEET 01, View B.
1 Beam   Item (2) Retain

### Page 45

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 45
2 Remove the Frame 21 to Frame 22 Beam, refer to Ref. Fig.BA Remove and
Install the Rigid Corner Sheet SHEET 01, View B.
1 Beam   Item (2) Retain
3 Remove the Frame 21 Bracket, refer to Ref. Fig.BA Remove and Install the
Rigid Corner Sheet SHEET 02.
6 Bolt   Item (4) Retain
6 Washer   Item (5) Retain
1 Bracket   Item (3) Retain
4 Remove the Frame 22 to Frame 23 Beam-Bracket, refer to Ref. Fig.BA
Remove and Install the Rigid Corner Sheet SHEET 01, View B and SHEET
03.
6 Bolt   Item (4) Retain
6 Washer   Item (5) Retain
1 Beam-Bracket   Item (6) Retain
5 Remove the Frame 23 to Frame 24 Beam-Bracket, refer to Ref. Fig.BA
Remove and Install the Rigid Corner Sheet SHEET 01, View B and SHEET
03.
6 Bolt   Item (4) Retain
6 Washer   Item (5) Retain
1 Beam-Bracket   Item (6) Retain
6 Remove the Rivets from the Rigid Corner Sheet, refer to Ref. Fig.BA
Remove and Install the Rigid Corner Sheet SHEET 04.
26 Rivet   Item (7) Discard
7 Remove the Frame 21 to Frame 24 Rigid Corner Sheet, refer to Ref. Fig.BA
Remove and Install the Rigid Corner Sheet SHEET 01.
1 Sheet   Item (1) Retain
8 Clean all retained parts with:
  T extile - Lint free Cotton14SBA1  
Soaked with:
  Non Aqueous Cleaner -
Methyl-Ethyl-Ketone
08BBF1

### Page 46

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YM-A-002-01 Fig.BA Sol.AA SHEET 1/4
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Rigid Corner Sheet
Page 46
CONF ALL
A
Z130
FR19
FR44
FWD CARGO
COMPARTMENT DOOR
FR21
FR24
FR27
FR31
FR34
FR37
A
B
FR21
C
FR22FR23FR24 (1) (2)(2)(6)(6)
VIEW LOOKING OUTBD
BFWD
DDE
G G
NOTE:
APPLY MATERIAL No 06AAC1 TO MATING SURFACES.01
01 01F
FITTING FITTING FITTING
02 APPLY MATERIAL No 06ACA1 TO THE EDGES OF THE MATING SURFACES.
02 02
ICN-A350-A-21XXP031-A-FAPE3-049YM-A-002-01

### Page 47

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YN-A-002-01 Fig.BA Sol.AA SHEET 2/4
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Rigid Corner Sheet
Page 47
CONF ALL
(3)
(5)
(1)
C
FR21
NOTE:
APPLY MATERIAL No 06AAC1 TO MATING SURFACES.01
WET INSTALL FASTENERS WITH MATERIAL No 06AAC1.03
APPLY MATERIAL No 04FEC2 AND 04QAC5 TO FASTENERS.04
04
01
0403
02
(4) x6
x6
APPLY MATERIAL No 06ACA1 TO THE EDGES OF THE MATING SURFACES.02
ICN-A350-A-21XXP031-A-FAPE3-049YN-A-002-01

### Page 48

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YO-A-002-01 Fig.BA Sol.AA SHEET 3/4
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Rigid Corner Sheet
Page 48
CONF ALL
(6)
(5)
(4) x6
x6
(1)
FR22
FR23
D
TYPICAL
NOTE:
APPLY MATERIAL No 06AAC1 TO MATING SURFACES.01
WET INSTALL FASTENERS WITH MATERIAL No 06AAC1.03
APPLY MATERIAL No 04FEC2 AND 04QAC5 TO FASTENERS.04
APPLY MATERIAL No 06ACA1 TO THE EDGES OF THE MATING SURFACES.02
04
01
0403
02
ICN-A350-A-21XXP031-A-FAPE3-049YO-A-002-01

### Page 49

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YP-A-002-01 Fig.BA Sol.AA SHEET 4/4
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Rigid Corner Sheet
Page 49
CONF ALL
HOLE 
SYMBOL
NEW PART NUMBER DESCRIPTION
EN6081D5 RIVET7
OLD
ITEMITEM
(7)
SIZE / FIT TYPE
NOMINAL SIZE
TRANSITION FIT
REMARKS
03 04
WET INSTALL FASTENERS WITH MATERIAL 06AAC1.
APPLY MATERIAL No 04FEC2 AND 04QAC5 TO FASTENERS.
USE EXISTING HOLES FOR THE INSTALLATION.
ALIGN THE EDGES OF THE PARTS DURING ASSEMBLY.06
NOTE:
03
04
05
VIEW LOOKING OUTBD
F G
VIEW LOOKING OUTBD
EFWD 05
FWD
TYPICAL
VIEW LOOKING OUTBD
FR21
FR22
FR23
06 06
(1)
(1) (1) FWD
ICN-A350-A-21XXP031-A-FAPE3-049YP-A-002-01

### Page 50

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 50
(4) Task A350-A-21-XX-P031-01001-520A-A (A350-A-21-XX-P031-01ZZZ-520Z-A)
Remove the Frame 23 Cargo Floor Beam
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
130
Manpower/Resources/Skills
Man-hours 3.75 h
Minimum Number of person 6
Elapsed Time 1.50 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BBF1 Non Aqueous Cleaner -Methyl-Ethyl-Ketone
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-AA350-A-51-77-11-00ZZZ-660Z-A
Procedure
(a) Standard Practices given in this procedure:
1 T ag all the parts you must remove and retain to make the subsequent
installation easier.
2 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
3 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
4 Obtain cleaning process in accordance with Ref. ASR A350-A-51-77-11-
00ZZZ-660Z-A.
(b) Disconnect the electrical assemblies from the Frame 23 Cargo Floor Beam, refer
to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor Beam.
1 Remove the Grounding Bolt from the grounding wire on the Frame 23
Cargo Floor Beam, refer to Ref. Fig.BD Remove and Install the Frame 23
Cargo Floor Beam SHEET 02, View C.
1 Grounding Bolt   Item (14) Retain
2 Remove the Wiring Clip fasteners from the Frame 23 Cargo Floor Beam
bracket, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor
Beam SHEET 02, View C.
2 Washer   Item (13) Retain

### Page 51

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 51
1 Stud   Item (12) Retain
3 Remove the Metallic Ramp Assembly Bolt from the Frame 23 Cargo Floor
Beam, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor
Beam SHEET 02, View E.
1 Bolt   Item (15) Retain
4 Remove he Duct Bracket fasteners from the Frame 23 Cargo Floor Beam
bracket, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor
Beam SHEET 02, View D.
2 Bolt   Item (16) Retain
2 Washer   Item (17) Retain
5 Remove the INBD Traverse fasteners from the Frame 23 Cargo Floor Beam,
refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor Beam
SHEET 03.
1 Bolt   Item (18) Retain
1 Washer   Item (19) Retain
6 Remove the Heat T ube fasteners from Strut CF 2 LH, refer to Ref. Fig.BD
Remove and Install the Frame 23 Cargo Floor Beam SHEET 03.
1 Bolt   Item (20) Retain
1 Spacer   Item (21) Retain
7 Remove the Traverse fasteners from Strut CF 2 LH, refer to Ref. Fig.BD
Remove and Install the Frame 23 Cargo Floor Beam SHEET 03.
1 Bolt   Item (22) Retain
1 Spacer   Item (23) Retain
8 Remove the OUTBD Traverse Bolt from the Frame 23 Cargo Floor Beam,
refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor Beam
SHEET 04, View G.
1 Bolt   Item (24) Retain
9 Remove the Wiring Clamp Bolt from the Frame 23 Cargo Floor Beam, refer
to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor Beam SHEET
04, View G.
1 Bolt   Item (25) Retain
10 Remove the Cable Bracket Bolts from the Frame 23 Cargo Floor Beam
bracket, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor
Beam SHEET 04, View G and View H.
4 Bolt   Item (26) Retain
11 Remove the Wiring Clamp Bolt from Strut CF 2 LH, refer to Ref. Fig.BD
Remove and Install the Frame 23 Cargo Floor Beam SHEET 06, View M.
1 Bolt   Item (27) Retain
(c) Remove the Frame 23 Cargo Floor Beam Assembly, refer to Ref. Fig.BD Remove
and Install the Frame 23 Cargo Floor Beam.

### Page 52

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 52
1 Remove the fasteners connecting Strut CF 2 LH to Frame 23, refer to Ref.
Fig.BD Remove and Install the Frame 23 Cargo Floor Beam SHEET 07, View
N.
4 Bolt   Item (32) Discard
4 Nut   Item (28) Discard
2 Remove the fasteners connecting Strut CF 2 RH to the Frame 23 Cargo
Floor Beam, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo
Floor Beam SHEET 05, View K.
4 Bolt   Item (34) Discard
4 Nut   Item (29) Discard
3 Remove the fasteners connecting Strut CF 1 RH to the Frame 23 Cargo
Floor Beam, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo
Floor Beam SHEET 06, View L.
4 Bolt   Item (35) Discard
4 Nut   Item (31) Discard
4 Remove the fasteners connecting Strut CF 1 LH to the Frame 23 Cargo
Floor Beam, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo
Floor Beam SHEET 06, View L.
4 Bolt   Item (35) Discard
4 Nut   Item (31) Discard
5 Remove the fasteners connecting the Frame 23 Cargo Floor Beam to the
RH Plate, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor
Beam SHEET 05, View J.
19 Bolt   Item (33) Discard
14 Nut   Item (29) Discard
5 Nut   Item (30) Discard
6 Remove the fasteners connecting the Frame 23 Cargo Floor Beam to the
LH Corner Fitting, refer to Ref. Fig.BD Remove and Install the Frame 23
Cargo Floor Beam SHEET 07, View P .
3 Bolt   Item (36) Discard
1 Bolt   Item (37) Discard
4 Nut   Item (31) Discard
5 Bolt   Item (38) Discard
7 Bolt   Item (33) Discard
12 Nut   Item (29) Discard
7 Remove, refer to Ref. Fig.BD Remove and Install the Frame 23 Cargo Floor
Beam SHEET 01, View B:
NOTE: Strut CF 2 LH is connected to the Frame 23 Cargo Floor Beam.

### Page 53

A350
SERVICE BULLETIN
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22 Page 53
1 Cargo Floor Beam
Assembly
  Item (11) Retain
(d) Cleaned the retained parts with:
  T extile - Lint free Cotton14SBA1  
Soaked with:
  Non Aqueous Cleaner -
Methyl-Ethyl-Ketone
08BBF1

### Page 54

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YS-A-001-01 Fig.BD Sol.AA SHEET 1/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 54
CONF 001
A
FR28
FR20
B
B
C
D
F
G
J
K
L
H
FR23
A
Z130
P
M
(11)
ICN-A350-A-21XXP031-A-FAPE3-049YS-A-001-01

### Page 55

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YT-A-002-01 Fig.BD Sol.AA SHEET 2/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 55
CONF 001
01
PROTECT FASTENERS WITH MATERIAL No 04SAB2.02
WET INSTALL FASTENERS WITH MATERIAL No 06LCG9.03
NOTE:
TORQUE TO MIN 3.7 Nm (32.748 lbf.in) AND MAX 4.8 Nm (42.483 lbf.in).
(13)
(12)
(13)
(14)
WIRING CLIP
GROUNDING
WIRE
BRACKET
C
D
(16)
(17)
(15)
METALLIC
RAMP ASSY
E
DUCT
BRACKET01
01 02
01 02
02
02
(17)
0103
BEAM23 E
BEAM23
BEAM23
ICN-A350-A-21XXP031-A-FAPE3-049YT-A-002-01

### Page 56

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YU-A-002-01 Fig.BD Sol.AA SHEET 3/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 56
CONF 001
NOTE:
PROTECT FASTENERS WITH MATERIAL No 04SAB2.02
(18)
(19)
(20)
(21)
(22)
(23)
02
02
02
02
02
02
F
BEAM23
INBD TRAVERSE
TRAVERSE
HEAT TUBE
STRUT CF 2 LH
ICN-A350-A-21XXP031-A-FAPE3-049YU-A-002-01

### Page 57

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YV-A-002-01 Fig.BD Sol.AA SHEET 4/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 57
CONF 001
HWIRING
CLAMP
CABLE
BRACKET
(24)02
(25)
(26)
G
(26)
H
CABLE
BRACKET
BEAM23
BEAM23
OUTBD
TRAVERSE
NOTE:
PROTECT FASTENERS WITH MATERIAL No 04SAB2.02
ICN-A350-A-21XXP031-A-FAPE3-049YV-A-002-01

### Page 58

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YW-A-002-01 Fig.BD Sol.AA SHEET 5/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 58
CONF 001
RH PLATE
J
VIEW LOOKING FWD
INBD
K
VIEW LOOKING FWD
INBD
STRUT CF 2 RH
APPLY PROTECTION WITH MATERIAL No 06AAC1.
APPLY MATERIAL No 06AAC1 TO THE MATING SURFACES.
NOTE:
04
05
ELECTRICAL BONDING
BEAM23
BEAM23
04
0405
REFER TO SHEET 8 FOR THE APPLICABLE FASTENERS AND NOTES.
_3A4M6
TRANSPARENT PART
TRANSPARENT PART
ICN-A350-A-21XXP031-A-FAPE3-049YW-A-002-01

### Page 59

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YX-A-002-01 Fig.BD Sol.AA SHEET 6/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 59
CONF 001
L
06_3B2M2 05
VIEW LOOKING FWD
STRUT CF 1 LH STRUT CF 1 RH
BEAM23
FR23
(27)
M
N
WIRING
CLAMP
STRUT CF 2 LH
NOTE:
ELECTRICAL BONDING
REFER TO SHEET 8 FOR THE APPLICABLE FASTENERS AND NOTES.
TRANSPARENT PART
APPLY MATERIAL No 06AAC1 TO THE MATING SURFACES.
APPLY MATERIAL No 04QAB2 TO THE EDGES OF THE MATING SURFACES.
05
06
ICN-A350-A-21XXP031-A-FAPE3-049YX-A-002-01

### Page 60

A350
SERVICE BULLETIN
Figure ICN-A350-A-21XXP031-A-FAPE3-049YY-A-002-01 Fig.BD Sol.AA SHEET 7/8
REV 00 Dec 13/18 A350-21-P031
REV 01 Feb 15/22
Remove and Install the Frame 23 Cargo Floor Beam
Page 60
CONF 001
APPLY MATERIAL No 06AAC1 TO THE MATING SURFACES.
APPLY MATERIAL No 04QAB2 TO THE EDGES OF THE MATING SURFACES.
05
06
APPLY PROTECTION WITH MATERIAL No 06AAC1.04
P
VIEW LOOKING FWD
INBD
_3A4M6 06
LH CORNER
FITTING
BEAM23
FR23
VIEW LOOKING AFT
INBD N
05
STRUT CF 2 LH
ELECTRICAL BONDING
REFER TO SHEET 8 FOR THE APPLICABLE FASTENERS AND NOTES.
04
TRANSPARENT PART
NOTE:
ICN-A350-A-21XXP031-A-FAPE3-049YY-A-002-01

The text continues at https://openairdocs.org/service-documents/airbus/a350-21-p031/file/a64e4fc4b655.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
