# Airbus Service Bulletin A350-25-P151

Copy: No revision named ("SB A350-25-P151"), 24 pages: PDF https://openairdocs.org/files/sha256/9f/b6/9fb6c920d1f3a6885588a8fa07a9721fcf9660ba4129313b70673fe2d848b0b8; text https://openairdocs.org/service-documents/airbus/a350-25-p151/file/9fb6c920d1f3.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0338, the docket of AD 2020-18-03. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-25-P151
- Page: https://openairdocs.org/service-documents/airbus/a350-25-p151

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2020-18-03](https://openairdocs.org/ad/2020-18-03.md), effective Oct 8, 2020: No revision named

## Text (24 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0338, the docket of AD 2020-18-03. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 25
TITLE: EQUIPMENT/FURNISHINGS - EMERGENCY LOCATOR TRANSMITTER
(ELT) SYSTEM - DEFINE AND INSTALL WIRING DIODE FOR ELT ELTA
CLASSIC
MODIFICATION No.:
114805L65663

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jan 10/20 A350-25-P151
Page 2
ATA SYSTEM: 25
TITLE: EQUIPMENT/FURNISHINGS - EMERGENCY LOCATOR TRANSMITTER
(ELT) SYSTEM - DEFINE AND INSTALL WIRING DIODE FOR ELT ELTA
CLASSIC
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 114805L65663
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
B. REASON
(1) History
A possibility of chafing inside the wire harness 5611VB was identified and could lead
to current injection into the lithium battery of the Emergency Locator Transmitter (ELT)
Part Number (PN) 01N65900.
(2) Objective/Action
This Service Bulletin is published to describe the modification of the wire harness
5611VB by the installation of a diode to protect the lithium batteries of the ELT.
(3) Advantages
The accomplishment of this Service Bulletin will prevent the possibility of current
injection leading to thermal runaway into the lithium battery of the ELT PN 01N65900.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jan 10/20 A350-25-P151
Page 3
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Modification
(a) T ask set A350-A-25-XX-P151-01000-93AA-A Modification
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 25P151D01R00 1 400.00 USD Bundle, placard set, diode,
cable ties
Components See SB See Note T ape
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
FIN HVN QTR
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Modification
(a) T ask set A350-A-25-XX-P151-01000-93AA-A Modification
AIRCRAFT YES
EQUIPMENT NO
I. MANPOWER
(1) Modification
(a) T ask set A350-A-25-XX-P151-01000-93AA-A Modification
MANPOWER
TOTAL MAN-HOURS 3.15 h
ELAPSED TIME (HOURS) 2.65 h

### Page 4

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-25XXP151-A-FAPE3-056EH-A-001-01 SHEET 1/1
REV 00 Jan 10/20 A350-25-P151General overview
Page 4
J. GENERAL OVERVIEW
CONF ALL
A
Z270
A
FR93
FR88
FR87
FR86
STGR1RH
PAX DOOR 4
STGR4RH
STGR1RH
STGR2RH
STGR3RH
STGR4RH
FR87
FR88
B
INSTALLATION OF DIODE 5787VD002
BETWEEN EMERGENCY LOCATOR
TRANSMITTER             AND TERMINAL BLOCK110MV
ON HARNESS5787VT030 5611VB
B
ICN-A350-A-25XXP151-A-FAPE3-056EH-A-001-01

### Page 5

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 5
ATA SYSTEM: 25
TITLE: EQUIPMENT/FURNISHINGS - EMERGENCY LOCATOR TRANSMITTER
(ELT) SYSTEM - DEFINE AND INSTALL WIRING DIODE FOR ELT ELTA
CLASSIC
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This modification is applicable by Service Bulletin only.
NOTE: This Service Bulletin is only applicable to aircraft on which MOD No. 107461L62966
(EQUIPEMENT/FURNISHINGS - EMERGENCY LOCATOR TRANSMITTER (ELT) SYSTEM -
ADAPT PROVISIONS FOR CLASSIC ELT) is not embodied.
(1) Models
ON A/C 0006-0020
350-941
CONF ALL
(2) Applicability by MSN
0006-0020
(3) MSN by configuration
MSN CONFIGURATION
0006 0007 0008 0009 0010 0011 0012 0013 0014 0015 0016
0017 0018 0019 0020
001
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
CONF 001 retrofits following modifications: 114805L65663.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
A possibility of chafing inside the wire harness 5611VB was identified and could lead
to current injection into the lithium battery of the Emergency Locator Transmitter (ELT)
Part Number (PN) 01N65900.
(2) Objective/Action
This Service Bulletin is published to describe the modification of the wire harness
5611VB by the installation of a diode to protect the lithium batteries of the ELT.
(3) Advantages
The accomplishment of this Service Bulletin will prevent the possibility of current
injection leading to thermal runaway into the lithium battery of the ELT PN 01N65900.

### Page 6

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 6
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Modification
(a) T ask set A350-A-25-XX-P151-01000-93AA-A Modification
1 Modify the Wiring between the ELT 110MV and the T erminal Block
5787VT030
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Aviation Safety Agency (EASA)
will be issued to confirm this classification. The accomplishment timescale, which has
not yet been defined, will be given in the AD.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification
(a) T ask set A350-A-25-XX-P151-01000-93AA-A Modification
PREPARATION
Job Set-up 0.50 h
PROCEDURE
Modify the Wiring between the ELT 110MV and the T erminal
Block 5787VT030
1.00 h
PREPARATION FOR TEST
Preparation for T est 0.15 h
TEST
T esting 1.00 h
CLOSE-UP
Close-up 0.50 h

### Page 7

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 7
TOTAL MAN-HOURS 3.15 h
ELAPSED TIME (HOURS) 2.65 h
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +0.1 kg (+0.220 lb)
Effect on Balance +5.4 kg.m (+39.058 lb.ft)
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Modification
(a) T ask set A350-A-25-XX-P151-01000-93AA-A Modification
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-XX-01ZZZ-042Z-A A350-A-20-33-44-01ZZZ-041Z-A
A350-A-20-52-10-01ZZZ-042Z-A A350-A-20-52-21-00ZZZ-36AZ-A
A350-A-20-54-50-01ZZZ-042Z-A A350-A-20-55-XX-01ZZZ-042Z-A
A350-A-20-56-51-01ZZZ-04DZ-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A A350-A-25-69-XX-00ZZZ-343Z-A
A350-A-25-69-33-00ZZZ-520Z-A
A350-A-25-69-33-00ZZZ-720Z-A
TECHNICAL FOLLOW UP (TFU)
25.65.00040
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
K. PUBLICATION AFFECTED
AIRCRAFT SCHEMATIC DIAGRAM (ASD)
AIRCRAFT WIRING DIAGRAM (AWD)
MAINTENANCE ILLUSTRATED PART DATA (MIPD)
L. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 8

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 8
AIRBUS will share the costs of accomplishment of this Service Bulletin by providing the kits
at no charge for orders placed within 24 months after the initial issue date of the Service
Bulletin.
AIRBUS will credit the man-hours indicated in this Service Bulletin at the agreed in-house
warranty labor rate for claims received no later than 90 days after completion of the last
affected aircraft of your fleet, for the accomplishment of this Service Bulletin within 24
months after the initial issue date of the Service Bulletin.

### Page 9

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 9
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-25-XX-P151-01000-93AA-A Modification
MATERIAL QTY SEE NOTES
Referenced tools See SB
Part kit 25P151D01R00 1
Components See SB
B. TOOLING
Referenced tools for task set A350-A-25-XX-P151-01000-93AA-A Modification
NOTE: T o accomplish this Service Bulletin it is necessary to use the tools listed in the
subsequent referenced tasks:
Ref. ESP A350-A-20-52-21-00ZZZ-36AZ-A
C. CONSUMABLES
No consumables
D. LIST OF NEW PARTS
Part kit 25P151D01R00
Cost 400.00 USD
Availability 210 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
3 NSA934120-01 1 DIODE
5 NSA935401-03 26 TIE
5 NSA935401-04 26 TIE
5 NSA935401-05 28 TIE
V9000095203195 1 BUNDLE

### Page 10

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 10
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
V9100095200995 1 PLCRDSET
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
Components for task set A350-A-25-XX-P151-01000-93AA-A Modification
Procurement address D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
For standard hardware the purchase order must be addressed to AIRBUS at the
address given above. Quote the number of this Service Bulletin, the MSN and, if
applicable the Retrofit Information Letter (RIL) reference.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
9 ASNA51072503(D4296) 1 (m) TAPE (1) (2) (3)
NOTE(S)
(1): Operator supplied standard hardware parts, required to accomplish this Service
Bulletin, are to be supplied from the operator's stock.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
(3): This item has a Shelf Life of less than or equal to 24 months and must be ordered
when you intend to accomplish the Service Bulletin.
E. LIST OF EXISTING PARTS
No parts

### Page 11

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 11
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-25-XX-P151-01000-93AA-A
Modification
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-
XX-01ZZZ-042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein, contact
AIRBUS for further instructions and approval.
NOTE: Discarded parts must be managed at the operator's discretion.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 3.15 h
ELAPSED TIME (HOURS) 2.65 h

### Page 12

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 12
B. PREPARATION
(1) Task A350-A-25-XX-P151-01001-540A-A - Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-00ZZZ-170Z-AA350-A-25-69-33-00ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-
A-00-61-04-11ZZZ-018Z-D "Maintenance Procedure - Introduction".
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-
A-24-41-XX-00ZZZ-170Z-A.
(b) Do the job set-up procedure as specified in the removal of the ELT, refer to Ref.
MP A350-A-25-69-33-00ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-25-XX-P151-01001-920A-A - Modify the Wiring between the ELT
110MV and the Terminal Block 5787VT030
CAUTION: DO NOT SET THE ELT CONTROL SWITCH TO ON. THIS IS TO
PREVENT UNWANTED SEARCH AND RESCUE OPERATIONS.
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
270 Work location From Frame 87 to Frame 88From Stringer 1 to Stringer 4
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Skills Electrical
Material necessary to do the job
Part kit 25P151D01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
3 NSA934120-01 1 DIODE
5 NSA935401-03 26 TIE
5 NSA935401-04 26 TIE

### Page 13

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 13
Part kit 25P151D01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
5 NSA935401-05 28 TIE
V9000095203195 1 BUNDLE
V9100095200995 1 PLCRDSET
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
9 ASNA51072503 1 (m) TAPE (1)
NOTE(S)
(1): This item has a Shelf Life of less than or equal to 24 months and must be ordered
when you intend to accomplish the Service Bulletin.
Referenced Information
Manuals/Drawings References/Sheets
ESP
A350-A-20-33-44-01ZZZ-041Z-A
A350-A-20-33-XX-01ZZZ-042Z-A
A350-A-20-52-10-01ZZZ-042Z-A
A350-A-20-52-21-00ZZZ-36AZ-A
A350-A-20-54-50-01ZZZ-042Z-A
A350-A-20-56-51-01ZZZ-04DZ-A
Procedure
(a) Standard practices given in this procedure:
1 For the general installation of electrical wire harnesses, refer to Ref. ESP
A350-A-20-33-XX-01ZZZ-042Z-A.
2 Do a check of the electrical connectors before you connect them, refer to
Ref. ESP A350-A-20-52-10-01ZZZ-042Z-A.
3 For the cable tie application and tooling, refer to Ref. ESP A350-
A-20-33-44-01ZZZ-041Z-A and Ref. ESP A350-A-20-56-51-01ZZZ-04DZ-A.
4 For the protection of the connectors, contacts and terminals, refer to Ref.
ESP A350-A-20-54-50-01ZZZ-042Z-A.
5 T o install new wires, cut them to the necessary length, attach the terminals
and connect them.
(b) Set the control switch, item (8), to the OFF position, refer to Ref. Fig. Installation
of Diode 5787VD002 between the ELT 110MV and the T erminal Block
5787VT030.
(c) Release the harness 5611VB, item (6), from the clamps, refer to Ref. Fig.
Installation of Diode 5787VD002 between the ELT 110MV and the T erminal Block
5787VT030.
1 Remove cable ties from the clamps:
2 TIE-CABLE   Item (5) Discard
2 Disconnect and retain the remote control connector FIN 110MVA, item (1).
(d) Modify the wiring:
Refer to Ref. Fig. Installation of Diode 5787VD002 between the ELT 110MV and
the T erminal Block 5787VT030

### Page 14

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 14
1 Modify the connection of the wire as shown on this (these) wiring
diagram(s) and the related hook-up chart(s):
- Refer to Ref. Fig. Modification of the Wiring and Ref. Fig. Hook-up
Chart.
2 Install the diode:
FIN 5787VD002
1 DIODE NSA934120-01 Item 3
3 Install the new wire, item 2, with diode FIN 5787VD002, item 3, as shown
on this (these) wiring diagram(s) and the related hook-up chart(s):
- Refer to Ref. Fig. Modification of the Wiring and Ref. Fig. Hook-up
Chart, supplied in:
1 BUNDLE V9000095203195  
4 Protect the wire(s) with:
1(m) TAPE-REINFORCED
SILICONE
ASNA51072503 Item 9
5 Attach the wire(s) with:
20 TIE-CABLE NSA935401-03 Item 5
20 TIE-CABLE NSA935401-04 Item 5
20 TIE-CABLE NSA935401-05 Item 5
6 Do a continuity test of the new and/or modified electrical wires, refer to
Ref. ESP A350-A-20-52-21-00ZZZ-36AZ-A.
7 Near the diode, install the placard identified FIN 5787VD002, supplied in:
1 PLACARD SET V9100095200995  
8 Install the SB placards, supplied in:
1 PLACARD SET V9100095200995  
9 Attach the placards with:
6 TIE-CABLE NSA935401-03 Item 5
6 TIE-CABLE NSA935401-04 Item 5
6 TIE-CABLE NSA935401-05 Item 5
(e) Put the harness 5611VB, item (6), on position in the clamps, refer to Ref. Fig.
Installation of Diode 5787VD002 between the ELT 110MV and the T erminal Block
5787VT030.
1 Connect the remote control connector FIN 110MVA, item (1).
2 Install cables ties on the clamps:
2 TIE-CABLE NSA935401-05 Item 5
(f) Set the control switch, item (8), to the ARMED position, refer to Ref. Fig.
Installation of Diode 5787VD002 between the ELT 110MV and the T erminal Block
5787VT030.

### Page 15

A350
SERVICE BULLETIN
Figure ICN-A350-A-25XXP151-A-FAPE3-056ED-A-001-01 SHEET 1/4
REV 00 Jan 10/20 A350-25-P151Installation of Diode 5787VD002 between the ELT 110MV and the T erminal Block 5787VT030
Page 15
CONF ALL
A
Z270
A
FR93
FR88
FR87
FR86
STGR1RH
PAX DOOR 4
STGR4RH
STGR1RH
STGR2RH
STGR3RH
STGR4RH
D
F G
FR87
FR88
110MV
5787VT030
5611VB
(6)
B
J
C
B
ICN-A350-A-25XXP151-A-FAPE3-056ED-A-001-01

### Page 16

A350
SERVICE BULLETIN
Figure ICN-A350-A-25XXP151-A-FAPE3-056EE-A-002-01 SHEET 2/4
REV 00 Jan 10/20 A350-25-P151Installation of Diode 5787VD002 between the
ELT 110MV and the T erminal Block 5787VT030 Page 16
CONF ALL
U
P
CABLE TIE
TYPICAL VIEW
D
E
(1)
110MV
5611VB
110MVA
C
E
(8)
(6)
(5)
5
ICN-A350-A-25XXP151-A-FAPE3-056EE-A-002-01

### Page 17

A350
SERVICE BULLETIN
Figure ICN-A350-A-25XXP151-A-FAPE3-056EF-A-001-01 SHEET 3/4
REV 00 Jan 10/20 A350-25-P151Installation of Diode 5787VD002 between the
ELT 110MV and the T erminal Block 5787VT030 Page 17
CONF ALL
NOTE:
ATTACH THE WIRES WITH CABLE TIES, ITEM 5.
USE TAPE, ITEM 9, TO PREVENT ANY DAMAGE TO THE WIRES.
CONTACT
CONTACT
5
PIN 1
PIN 2
3
01
TO
TO 110MVA
5 01
5 01
9 02
5787VD002
5611VB /1M
(6)
2
5787VT030
01
02
F
G
PLACARD
TYPICAL INSTALLATION OF DIODE 5787VD002
CABLE TIE
DIODE
H
5787VD002
ICN-A350-A-25XXP151-A-FAPE3-056EF-A-001-01

### Page 18

A350
SERVICE BULLETIN
Figure ICN-A350-A-25XXP151-A-FAPE3-056EG-A-001-01 SHEET 4/4
REV 00 Jan 10/20 A350-25-P151Installation of Diode 5787VD002 between the
ELT 110MV and the T erminal Block 5787VT030 Page 18
CONF ALL
5
03
TYPICAL VIEW
PLACARD INSTALLATION
5 J
H
INSTALL THE PLACARD NEAR DIODE 5787VD002.03
NOTE:
SB25-P151
5787VD002
PLACARD
PLACARD
ICN-A350-A-25XXP151-A-FAPE3-056EG-A-001-01

### Page 19

A350
SERVICE BULLETIN
Figure ICN-A350-A-25XXP151-A-FAPE3-0569B-A-001-01 SHEET 1/1
REV 00 Jan 10/20 A350-25-P151Modification of the Wiring
Page 19
CONF ALL
UNLESS OTHERWISE SPECIFIED ALL WIRES ARE DR22 GAUGE
UNLESS OTHERWISE SPECIFIED ALL ROUTES ARE 1M 
NOTE : UNLESS OTHERWISE SPECIFIED PREFIX ALL WIRE IDENTIFICATION WITH ATA 2569
ICN-A350-A-25XXP151-A-FAPE3-0569B-A-001-01
item 2
F.R.
F.R.
5047
1MC
5025
5025 F.R.
F.R.
110MV
274
ELT
110MV
274
ELT
13
-
13
-
A
A
NEW WIRE
NEW HOOK-UP
BEFORE
AFTER
1 2
5787VD002
274
DIODE
OLD HOOK-UP
F.R. FOR REFERENCE
274
1
5787VT030
274
1
5787VT030
K
E
K
E

### Page 20

A350
SERVICE BULLETIN
Figure ICN-A350-A-25XXP151-A-FAPE3-056CH-A-001-01 SHEET 1/1
REV 00 Jan 10/20 A350-25-P151Hook-up Chart
Page 20
CONF ALL
END1 LEAD END2
InstructionsZone or
Panel Elec.Ident. Term Terminal P/N
Wire
Ident. Co Rte Gauge
Length
mm Inch
Zone or
Panel Elec.Ident. Term Terminal P/N
L
i
n
e
 1  274     110MV-A     13 2569-5025   1M  DR22  274    5787VT030     1K     M1O
 2  274    5787VD002      2 EN3155-016M2018 2569-5025   1M  DR22  274    5787VT030     1K     M1N     (1)
 3
 4
 5
 6  274     110MV-A     13 EN3155-008M2222 2569-5047  1MC  DR22  1500    60  274    5787VD002      1 EN3155-016M2018 (a) A
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
 (a)    = BUNDLE V9000095203195           M1N    = NEW HOOK-UP ON END 1
 A      = ADDED WIRE                      (1)    = TERMINAL SUPPLIED IN BUNDLE
 M1O    = OLD HOOK-UP ON END 1                     V9000095203195

### Page 21

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 21
D. PREPARATION FOR TEST
(1) Task A350-A-25-XX-P151-01001-92AA-A - Preparation for Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.15 h
Minimum Number of person 1
Elapsed Time 0.15 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-25-69-33-00ZZZ-720Z-A
Procedure
(a) Remove the safety clip(s) and/or tag(s) and close/unlock the circuit
breaker(s) as specified in the installation of the ELT, refer to Ref. MP A350-
A-25-69-33-00ZZZ-720Z-A.
E. TEST
(1) Task A350-A-25-XX-P151-01001-343A-A - Testing
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-25-69-XX-00ZZZ-343Z-A
Procedure
(a) Do the Built-In T est Equipment (BITE) test of the ELT system, refer to Ref. MP
A350-A-25-69-XX-00ZZZ-343Z-A.
F. CLOSE-UP
(1) Task A350-A-25-XX-P151-01001-740A-A - Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-25-69-33-00ZZZ-720Z-A
Procedure

### Page 22

A350
SERVICE BULLETIN
REV 00 Jan 10/20 A350-25-P151
Page 22
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close-up procedure as specified in the installation of the ELT, refer to Ref.
MP A350-A-25-69-33-00ZZZ-720Z-A.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-25-XX-P151-01001-90AA-A - Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 23

A350
SERVICE BULLETIN
APPENDIX
REV 00 Jan 10/20 A350-25-P151
Page 23
APPENDIX
A. REPORTING SHEET
TITLE: EQUIPMENT/FURNISHINGS - EMERGENCY LOCATOR TRANSMITTER
(ELT) SYSTEM - DEFINE AND INSTALL WIRING DIODE FOR ELT ELTA
CLASSIC
MODIFICATION No.: 114805L65663
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 24

A350
SERVICE BULLETIN
APPENDIX
REV 00 Jan 10/20 A350-25-P151
Page 24
B. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
