# Airbus Service Bulletin A350-27-P054

Copy: No revision named ("SB_27-P054_r00"), 41 pages: PDF https://openairdocs.org/files/sha256/cd/8a/cd8a30d4021db33059f9661524acd19a7ae8012391818e192c93f78e60ecdf3e; text https://openairdocs.org/service-documents/airbus/a350-27-p054/file/cd8a30d4021d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0827, the docket of AD 2021-24-20. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-27-P054
- Page: https://openairdocs.org/service-documents/airbus/a350-27-p054

## Text (41 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0827, the docket of AD 2021-24-20. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION
- SLAT GEARED ROTARY ACTUATOR REPETITIVE WATER DRAINAGE &
PLUG CLEANING
MODIFICATION No.:
None

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Mar 30/21 A350-27-P054
Page 2
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION
- SLAT GEARED ROTARY ACTUATOR REPETITIVE WATER DRAINAGE &
PLUG CLEANING
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
From early 2019, an increasing number of Slat System Jam events on A350 fleet were
reported and confirmed to be due to water ingress within the housing of Slat Geared
Rotary Actuator (SGRA). Insufficient water drainage can lead to water freezing during
cruise and can jam the transmission as detected during the slat extension command
in descent.
Airbus identified that subject occurrences are mainly affecting Slat 5 / Track 12: FIN
5045CW (LH) & FIN 5145CW (RH).
(2) Objective/Action
This Inspection Service Bulletin (ISB) introduces water drainage & plug cleaning
actions at Slat 5 track 12 FIN 5045CW (LH) & 5145CW (RH).
These actions have to be performed every 6 months or 500FC (whichever comes first)
(3) Advantages
This repetitive task will allow to open the drain plug to remove excessive water and to
clean subject slat GRA vented plug for better housing breathability, hence mitigating
the potential for having a Slat 5 jam.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Mar 30/21 A350-27-P054
Page 3
EVALUATION TABLE
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
(a) T ask set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary Actuator Water
Drainage and Plug Cleaning
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Components See SB See Note NYLON PINS
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
81K 96U AAR AFL AFR AIB AZU BAW CAL CCA CES CHH CPA CRK CSC CSN DAL DLH ETD
ETH EVE FBU FIN FJI FWI GAF HVN IBE JAL KAY LHT MAS MAU PAL QTR SAA SAS SIA TAM THA
THY VIR WFL
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
(a) T ask set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary Actuator Water
Drainage and Plug Cleaning
AIRCRAFT NO
EQUIPMENT YES
I. MANPOWER
(1) Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
(a) T ask set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary Actuator Water
Drainage and Plug Cleaning
MANPOWER
TOTAL MAN-HOURS 3.25 h
ELAPSED TIME (HOURS) 1.75 h

### Page 4

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEG-A-001-01 SHEET 1/1
REV 00 Mar 30/21 A350-27-P054General overview
Page 4
J. GENERAL OVERVIEW
CONF ALL
Z523
Z623A
RIB11
RIB12
RIB14
RIB15
RIB17
TRACK
TRACK
RIB13TRACK TRACK
TRACK
TRACK
FRONT SPAR
B
5045CW
5145CW
LH
RH
LH
RH
A
B
RIB12TRACK 
LH
RH
5045CW
5145CW
SLAT GEARED
ROTARY ACTUATOR
(SGRA) TO BE INSPECTED
LH SHOWN
RH SYMMETRICAL
LH SHOWN
RH SYMMETRICAL
ICN-A350-A-27XXP054-A-FAPE3-05YEG-A-001-01

### Page 5

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 5
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION
- SLAT GEARED ROTARY ACTUATOR REPETITIVE WATER DRAINAGE &
PLUG CLEANING
1. PLANNING INFORMATION
A. APPLICABILITY
(1) Models
ON A/C 0065, 0071, 0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215,
0225, 0229, 0233, 0241, 0252, 0258, 0262, 0266, 0274, 0286, 0290, 0296, 0298, 0306,
0315, 0319, 0326, 0330, 0332, 0336, 0340, 0342, 0346, 0350, 0356, 0362, 0368, 0372,
0374, 0380, 0382, 0386, 0388, 0399, 0402, 0409, 0415, 0420, 0424, 0426, 0430, 0432,
0434, 0438, 0440, 0444, 0446, 0450, 0456, 0461, 0467, 0473, 0477, 0482, 0486, 0490,
0492, 0495, 0501, 0503, 0507
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089-0101, 0103-0107, 0109, 0111-
0117, 0119-0124, 0126-0130, 0132-0138, 0140, 0142-0151, 0153-0155, 0157-0160, 0162-
0165, 0167, 0168, 0170, 0172-0187, 0189-0193, 0195-0205, 0207-0214, 0216-0221, 0223,
0224, 0226-0228, 0230-0232, 0234-0240, 0243-0251, 0254-0257, 0259-0261, 0263-0265,
0267-0273, 0276-0285, 0287, 0289, 0291-0295, 0297, 0299-0303, 0305, 0307-0314, 0316,
0318, 0320-0325, 0327-0329, 0331, 0333-0335, 0337-0339, 0341, 0343-0345, 0347-0349,
0351, 0352, 0354, 0355, 0357-0359, 0363-0366, 0369-0371, 0373, 0375, 0376, 0378, 0379,
0381, 0383, 0385, 0387, 0389-0398, 0400, 0401, 0403-0408, 0410-0414, 0416-0419, 0421-
0423, 0425, 0427-0429, 0431, 0433, 0435-0437, 0439, 0441-0443, 0445, 0447-0449, 0451-
0455, 0457-0459, 0462-0466, 0468-0472, 0474-0476, 0478, 0479, 0481, 0483-0485, 0487-
0489, 0491, 0493, 0494, 0496-0500, 0502, 0504-0506
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0107 0109-0130 0132-0138 0140-0151 0153-0155 0157-0165 0167-
0170 0172-0193 0195-0221 0223-0241 0243-0252 0254-0274 0276-0287 0289-0303
0305-0316 0318-0352 0354-0359 0362-0366 0368-0376 0378-0383 0385-0459 0461-
0479 0481-0507
(3) MSN by configuration
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0065 0066 0067 0068 0069 0070 0071
0072 0073 0074 0075 0076 0077 0078 0079 0080 0081 0082
0083 0084 0085 0086 0087 0088 0089 0090 0091 0092 0093
0094 0095 0096 0097 0098 0099 0100 0101 0102 0103 0104
0105 0106 0107 0109 0110 0111 0112 0113 0114 0115 0116
0117 0118 0119 0120 0121 0122 0123 0124 0125 0126 0127
0128 0129 0130 0132 0133 0134 0135 0136 0137 0138 0140
0141 0142 0143 0144 0145 0146 0147 0148 0149 0150 0151
0153 0154 0155 0157 0158 0159 0160 0161 0162 0163 0164
0165 0167 0168 0169 0170 0172 0173 0174 0175 0176 0177
001

### Page 6

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 6
MSN CONFIGURATION
0178 0179 0180 0181 0182 0183 0184 0185 0186 0187 0188
0189 0190 0191 0192 0193 0195 0196 0197 0198 0199 0200
0201 0202 0203 0204 0205 0206 0207 0208 0209 0210 0211
0212 0213 0214 0215 0216 0217 0218 0219 0220 0221 0223
0224 0225 0226 0227 0228 0229 0230 0231 0232 0233 0234
0235 0236 0237 0238 0239 0240 0241 0243 0244 0245 0246
0247 0248 0249 0250 0251 0252 0254 0255 0256 0257 0258
0259 0260 0261 0262 0263 0264 0265 0266 0267 0268 0269
0270 0271 0272 0273 0274 0276 0277 0278 0279 0280 0281
0282 0283 0284 0285 0286 0287 0289 0290 0291 0292 0293
0294 0295 0296 0297 0298 0299 0300 0301 0302 0303 0305
0306 0307 0308 0309 0310 0311 0312 0313 0314 0315 0316
0318 0319 0320 0321 0322 0323 0324 0325 0326 0327 0328
0329 0330 0331 0332 0333 0334 0335 0336 0337 0338 0339
0340 0341 0342 0343 0344 0345 0346 0347 0348 0349 0350
0351 0352 0354 0355 0356 0357 0358 0359 0362 0363 0364
0365 0366 0368 0369 0370 0371 0372 0373 0374 0375 0376
0378 0379 0380 0381 0382 0383 0385 0386 0387 0388 0389
0390 0391 0392 0393 0394 0395 0396 0397 0398 0399 0400
0401 0402 0403 0404 0405 0406 0407 0408 0409 0410 0411
0412 0413 0414 0415 0416 0417 0418 0419 0420 0421 0422
0423 0424 0425 0426 0427 0428 0429 0430 0431 0432 0433
0434 0435 0436 0437 0438 0439 0440 0441 0442 0443 0444
0445 0446 0447 0448 0449 0450 0451 0452 0453 0454 0455
0456 0457 0458 0459 0461 0462 0463 0464 0465 0466 0467
0468 0469 0470 0471 0472 0473 0474 0475 0476 0477 0478
0479 0481 0482 0483 0484 0485 0486 0487 0488 0489 0490
0491 0492 0493 0494 0495 0496 0497 0498 0499 0500 0501
0502 0503 0504 0505 0506 0507
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
From early 2019, an increasing number of Slat System Jam events on A350 fleet were
reported and confirmed to be due to water ingress within the housing of Slat Geared
Rotary Actuator (SGRA). Insufficient water drainage can lead to water freezing during
cruise and can jam the transmission as detected during the slat extension command
in descent.
Airbus identified that subject occurrences are mainly affecting Slat 5 / Track 12: FIN
5045CW (LH) & FIN 5145CW (RH).
(2) Objective/Action
This Inspection Service Bulletin (ISB) introduces water drainage & plug cleaning
actions at Slat 5 track 12 FIN 5045CW (LH) & 5145CW (RH).
These actions have to be performed every 6 months or 500FC (whichever comes first)

### Page 7

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 7
(3) Advantages
This repetitive task will allow to open the drain plug to remove excessive water and to
clean subject slat GRA vented plug for better housing breathability, hence mitigating
the potential for having a Slat 5 jam.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
(a) T ask set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary Actuator Water
Drainage and Plug Cleaning
1 Do a Detailed Inspection on the LH Track 12 SGRA (FIN 5045CW)
2 Do a Detailed Inspection on the RH Track 12 SGRA (FIN 5145CW)
3 Complete The Inspection Report Sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done in accordance with the
compliance table below.
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the (thresholds and/or intervals) given but reference should be made to the
AD for confirmation of the mandated accomplishment timescale.
T able 01: Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All Aircraft Do a visual check
of the drain plug
position on LH &
RH SGRA at Track
12 in accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
from SB Issuance Before 6
month(s) or
before 500
Flight Cycle(s)
Whichever
comes first
Before 6
month(s) or
before 500
Flight Cycle(s)
Whichever
comes first
The SGRA drain
plug is in the
correct position
Remove
Drain Plug in
accordance
with Ref. T ask
A350-A-27-XX-
None None None

### Page 8

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 8
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
  AND
  Do a Detailed
Inspection
of the water
drained from
the SGRA holes
in accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Do the checks
and cleaning of
the drain plug
and SGRA holes
in accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Re-install the
drain plug in
accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Report the
results to AIRBUS
in accordance
with Ref. T ask
A350-A-27-
XX-P054-
02ZZZ-90AZ-A
Upon completion
of the first
inspection only
None None

### Page 9

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 9
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
The SGRA drain
plug is in the
incorrect position
Remove Drain
and Blank Plugs
in accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Install Blank
Plug in correct
position in
accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Do a Detailed
Inspection
of the water
drained from
the SGRA holes
in accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Do the checks
and cleaning of
the drain plug
and SGRA holes
in accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND

### Page 10

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 10
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
  Re-install the
drain plug in
accordance
with Ref. T ask
A350-A-27-XX-
P054-01ZZZ-
900Z-A and Ref.
T ask A350-A-
27-XX-P054-
02ZZZ-900Z-A
None None None
  AND
  Report the
results to AIRBUS
in accordance
with Ref. T ask
A350-A-27-
XX-P054-
02ZZZ-90AZ-A
Upon completion
of the first
inspection only
None None
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
(a) T ask set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary Actuator Water
Drainage and Plug Cleaning
PREPARATION
Job Set-Up 0.50 h
Get Access to the LH Track 12 SGRA (FIN 5045CW) 0.25 h
Get Access to the RH Track 12 SGRA (FIN 5145CW) 0.25 h
PROCEDURE
Do a Detailed Inspection on the LH Track 12 SGRA (FIN
5045CW)
0.50 h
Do a Detailed Inspection on the RH Track 12 SGRA (FIN
5145CW)
0.50 h
Complete The Inspection Report Sheet 0.25 h

### Page 11

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 11
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Do The Close-Up for the LH Track 12 SGRA (FIN 5045CW) 0.25 h
Do The Close-Up for the RH Track 12 SGRA (FIN 5145CW) 0.25 h
Close-Up 0.50 h
TOTAL MAN-HOURS 3.25 h
ELAPSED TIME (HOURS) 1.75 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix Appendix A - Manpower Gantt Chart.
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
(a) T ask set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary Actuator Water
Drainage and Plug Cleaning
ALL OPERATORS TRANSMISSION (AOT)
A27P015-20-01
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
00.00.00179
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-01ZZZ-170Z-A A350-A-27-8X-XX-05ZZZ-170Z-A
A350-A-27-8X-XX-06ZZZ-170Z-A
A350-A-27-84-XX-00ZZZ-310Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-3X-XX-01ZZZ-04CZ-A A350-A-06-4X-XX-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
27.80.00024
CONSUMABLE MATERIAL LIST (CML)

### Page 12

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 12
K. PUBLICATION AFFECTED
None
L. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
Industry support terms for the equipment must be negotiated with the equipment supplier.

### Page 13

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 13
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary
Actuator Water Drainage and Plug Cleaning
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Components See SB
B. TOOLING
Referenced tools for task set A350-A-27-XX-P054-01000-93BA-A Slat Geared
Rotary Actuator Water Drainage and Plug Cleaning
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-27-84-XX-00ZZZ-310Z-A
C. CONSUMABLES
Consumables for task set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary
Actuator Water Drainage and Plug Cleaning
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
D. LIST OF NEW PARTS
Components for task set A350-A-27-XX-P054-01000-93BA-A Slat Geared Rotary
Actuator Water Drainage and Plug Cleaning
Procurement address D4296
AIRBUS Material, Logistics and Suppliers Standard
Parts
Customer Order Fulfilment
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com or via SPEC2000
NOTE(S)
Vendor parts are to be procured from the address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 926-0602 (D4296) 2 PIN (1) (2) (3)
NOTE(S)
(1): The components listed above are only necessary if the existing NYLON Pins are
missing or in bad condition. The quantity of these items is to be ordered as required.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
(3): Procurement terms for the equipment must be negotiated with the equipment
supplier.
E. LIST OF EXISTING PARTS
No parts

### Page 14

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 14
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-27-XX-P054-01000-93BA-A (A350-A-27-XX-P054-01ZZZ-93BZ-A)
Slat Geared Rotary Actuator Water Drainage and Plug Cleaning
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESP Ref. ESP A350-A-20-55-XX-
01ZZZ-042Z-A).
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: Discarded parts must be managed at the operator's discretion.

### Page 15

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 15
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 3.25 h
ELAPSED TIME (HOURS) 1.75 h
B. PREPARATION
(1) Task A350-A-27-XX-P054-03001-540A-A (A350-A-27-XX-P054-03ZZZ-540Z-A)
Job Set-Up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-01ZZZ-170Z-AA350-A-27-84-XX-00ZZZ-310Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-01ZZZ-170Z-A.
(b) Do the Job Set-up for the “Detailed Inspection of the Slat Transmission System”
from the beginning to the Safety Precautions, refer to Ref. MP A350-A-27-84-XX-
00ZZZ-310Z-A.
(2) Task A350-A-27-XX-P054-01001-540A-A (A350-A-27-XX-P054-01ZZZ-540Z-A)
Get Access to the LH Track 12 SGRA (FIN 5045CW)
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-XX-00ZZZ-310Z-A
Procedure

### Page 16

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 16
(a) Do the Job Set-up Procedure as specified in the Detailed Inspection of the Slat
Transmission System for (FIN 5045CW), refer to Ref. MP A350-A-27-84-XX-00ZZZ-
310Z-A.
(3) Task A350-A-27-XX-P054-02001-540A-A (A350-A-27-XX-P054-02ZZZ-540Z-A)
Get Access to the RH Track 12 SGRA (FIN 5145CW)
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-XX-00ZZZ-310Z-A
Procedure
(a) Do the Job Set-up Procedure as specified in the Detailed Inspection of the Slat
Transmission System for (FIN 5145CW), refer to Ref. MP A350-A-27-84-XX-00ZZZ-
310Z-A.
C. PROCEDURE
(1) Task A350-A-27-XX-P054-01001-900A-A (A350-A-27-XX-P054-01ZZZ-900Z-A)
Do a Detailed Inspection on the LH Track 12 SGRA (FIN 5045CW)
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
523 Access Panel 523KB
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 926-0602 2 PIN

### Page 17

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 17
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-8X-XX-05ZZZ-170Z-AA350-A-27-8X-XX-06ZZZ-170Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-AA350-A-06-4X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
(a) Standard practices referenced in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the identification of access panels, refer to Ref. SD A350-A-06-4X-XX-
01ZZZ-04CZ-A.
3 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
4 T ag all the parts you must remove and retain to make the subsequent
installation easier.
5 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Do the water drainage and plug cleaning for the SGRA (FIN 5045CW), refer to
Ref. Fig. Drain Plug Position Check, Ref. Fig. Drain Plug Check and Cleaning, and
Ref. Fig. Flow Chart.
1 Put a small measuring container below the drain plug assembly, item 1,
refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 01, VIEW B.
2 Do a visual check of the drain plug assembly, item 1, position, refer to Ref.
Fig. Drain Plug Position Check, SHEET 01, VIEW B.
NOTE: The drain plug assembly, item 1, is noticeable with its vented
hole on the side and its green or grey color while the blank plug
assembly, item 3, has a gold color and NO vented hole on the side.
a If the drain plug is in the correct, bottom, position:
<1> Continue to step 3 (Drain plug removal).
b If the drain plug assembly is in the incorrect, top, position:
<1> Remove the drain plug assembly, item (1), and the blank plug
assembly, item (3), refer to Ref. Fig. Drain Plug Position Check,
SHEET 01, VIEW B, and SHEET 02, VIEW C.
1 DRAIN PLUG ASSEMBLY   Item (1) Retain
1 BLANK PLUG ASSEMBLY   Item (3) Retain
<2> Observe whether water drains or drops of water fall out of the
drain plug hole in the SGRA (FIN 5045CW).
<3> Record the amount of water drained.
<a> After completion of all inspections, complete and send
the Inspection Report sheet in accordance with Ref. T ask
A350-A-27-XX-P054-02ZZZ-90AZ-A.

### Page 18

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 18
<4> Install the blank plug assembly, item (3), in the top position,
refer to Ref. Fig. Drain Plug Position Check, SHEET 02, VIEW D.
1 BLANK PLUG ASSEMBLY   Item (3) Retained
<5> T orque the blank plug assembly, item 3, to between 0.4 and
0.6 m.daN (35.40 and 53.10 lbf.in), refer to Ref. Fig. Drain Plug
Position Check, SHEET 02, VIEW D.
<6> Remove the NYLON Pins, item (2), from the drain plug, item
(4), refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 01,
VIEW B.
1 DRAIN PLUG   Item (4) Retain
2 NYLON PINS   Item (2) Retain
<7> Continue step 6 (Internal check of the SGRA).
3 Remove the drain plug, item (4), and NYLON Pins, item (2), refer to Ref. Fig.
Drain Plug Check and Cleaning, SHEET 01, VIEW B.
1 DRAIN PLUG   Item (4) Retain
2 NYLON PINS   Item (2) Retain
4 Observe whether water drains or drops of water fall out of the SGRA (FIN
5045CW) drain plug hole, refer to Ref. Fig. Drain Plug Check and Cleaning,
SHEET 01, VIEW B.
5 Record the amount of water drained.
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-27-XX-P054-02ZZZ-
90AZ-A.
6 Check the internal part of the SGRA (FIN 5045CW) drain plug hole to see
whether grease has accumulated and the drain hole is clogged, refer to
Ref. Fig. Drain Plug Check and Cleaning, SHEET 01, VIEW B.
7 Clean the drain plug hole in the SGRA (FIN 5045CW) until the internal
planetary gear is visible, refer to Ref. Fig. Drain Plug Check and Cleaning,
SHEET 01, VIEW B, using a screwdriver covered with:
  T extile - Lint free Cotton14SBA1  
NOTE: Be careful not to damage or scratch the internal planetary gear.
8 With the drain plug, item 4, removed, fully Extend and Retract the LH Wing
Slat System twice, refer to Ref. MP A350-A-27-8X-XX-05ZZZ-170Z-A and
Ref. MP A350-A-27-8X-XX-06ZZZ-170Z-A.
9 Clean the drain plug hole in the SGRA (FIN 5045CW) until the internal
planetary gear is visible, refer to Ref. Fig. Drain Plug Check and Cleaning,
SHEET 01, VIEW B, using a screwdriver covered with:
  T extile - Lint free Cotton14SBA1  
NOTE: Be careful not to damage or scratch the internal planetary gear.
10 Clean the drain plug, item (4), and NYLON Pins, item (2), refer to Ref. Fig.
Drain Plug Check and Cleaning, SHEET 01, VIEW B, using:
  T extile - Lint free Cotton14SBA1

### Page 19

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 19
made moist with:
  Non Aqueous Cleaner -
General
08BAA9  
11 Clean the drain hole on the drain plug, item (4), using low pressure
compressed air not exceeding 2 bars (14.5 lbf.in²) to clear out all dirt or
grease, refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 01, VIEW B.
12 Do a check of the NYLON Pins, item (2):
a If the NYLON Pins, item (2), are damaged or missing:
<1> Discard the removed the NYLON Pins, item (2):
2 NYLON PINS   Item (2) Discard
<2> Install new NYLON Pins, item 2, and drain plug, item (4), refer to
Ref. Fig. Drain Plug Check and Cleaning, SHEET 02, VIEW C:
1 DRAIN PLUG   Item (4) Retained
2 PIN 926-0602 Item 2
b If the NYLON Pins, item (2) are in good condition:
<1> Install the NYLON Pins, item (2), and drain plug, item (4), refer
to Ref. Fig. Drain Plug Check and Cleaning, SHEET 02, VIEW C:
1 DRAIN PLUG   Item (4) Retained
2 NYLON PINS   Item (2) Retained
13 T orque the drain plug, item 4, to between 0.4 and 0.6 m.daN (35.40 and
53.10 lbf.in), refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 02,
VIEW C.

### Page 20

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEH-A-001-01 SHEET 1/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Position Check
Page 20
CONF ALL
Z523
Z623A
RIB11
RIB12
RIB14
RIB15
RIB17
TRACK
TRACK
RIB13TRACK TRACK
TRACK
TRACK
FRONT SPAR
5045CW
5145CW
LH
RH
LH
RH
A
B D
BEFORE
LH
RH
5045CW
5145CW
C
(1)
(1)
DRAIN PLUG IDENTIFIABLE BY DRAIN HOLE01
NOTE:
01
TRACK RIB12
B
LH SHOWN
RH SYMMETRICAL
LH SHOWN
RH SYMMETRICAL
ICN-A350-A-27XXP054-A-FAPE3-05YEH-A-001-01

### Page 21

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEI-A-001-01 SHEET 2/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Position Check
Page 21
CONF ALL
RIB12TRACK 
LH
RH
5045CW
5145CW
C
LH SHOWN
RH SYMMETRICAL
(3) AFTER
LH
RH
(3)
TRACK RIB12
LH SHOWN
RH SYMMETRICAL
D
5045CW
5145CW
TORQUE BLANK PLUG TO BETWEEN 0.4 AND02
NOTE:
0.6 m.daN (35.40 AND 53.10 lbf.in)
02
ICN-A350-A-27XXP054-A-FAPE3-05YEI-A-001-01

### Page 22

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEB-A-001-01 SHEET 1/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Check and Cleaning
Page 22
CONF ALL
Z523
Z623A
RIB11
RIB12
RIB14
RIB15
RIB17
TRACK
TRACK
RIB13TRACK TRACK
TRACK
TRACK
FRONT SPAR
5045CW
5145CW
LH
RH
LH
RH
A
BEFORE
CLEAN USING MATERIAL No 14SBA101
NOTE:
B
LH SHOWN
RH SYMMETRICAL
LH SHOWN
RH SYMMETRICAL
RIB12TRACK 
LH
RH
5045CW
5145CW
(4)
B C
(4)
(2) x 2
CLEAN USING MATERIAL No 14SBA102
MADE MOIST WITH MATERIAL No 08BAA9
CLEAN HOLE USING COMPRESSED AIR NOT03
02
03
EXCEEDING 2 BARS (14.5 lbf./in  )2
01
ICN-A350-A-27XXP054-A-FAPE3-05YEB-A-001-01

### Page 23

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEC-A-001-01 SHEET 2/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Check and Cleaning
Page 23
CONF ALL
AFTER
LH SHOWN
RH SYMMETRICAL
RIB12TRACK 
LH
RH
5045CW
5145CW
(4)
(4)
(2) x 2
04
C
TORQUE ITEM (4) (DRAIN PLUG) TO BETWEEN04
NOTE:
0.4 AND 0.6 m.daN (35.40 AND 53.10 lbf.in)
ICN-A350-A-27XXP054-A-FAPE3-05YEC-A-001-01

### Page 24

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEE-A-003-01 SHEET 1/1
REV 00 Mar 30/21 A350-27-P054Flow Chart
Page 24
CONF ALL
NO YES
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT
THE INFORMATION GIVEN IN THE PROCEDURE AND 
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS
THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THE SERVICE BULLETIN.
DO A VISUAL CHECK OF THE DRAIN PLUG POSITION WITHIN
IS THE 
DRAIN PLUG IN
THE THRESHOLDS GIVEN IN PLANNING INFORMATION
PARAGRAPH E.(2)
THE CORRECT
POSITION?
REMOVE THE DRAIN
AND BLANK PLUGS
DO A DETAILED INSPECTION OF THE WATER DRAINED FROM THE
SGRA (SLAT GEARED ROTARY ACTUATOR)
DO THE CHECK AND CLEANING OF THE SGRA HOLE
REPEAT THE INSPECTION WITHIN THE REPETITIVE
INTERVAL GIVEN IN PLANNING INFORMATION
PARAGRAPH E.(2)
REPORT RESULTS
TO AIRBUS
REMOVE THE
DRAIN PLUGINSTALL THE BLANK PLUG
IN ITS CORRECT POSITION
RE-INSTALL THE
DRAIN PLUG
FULLY EXTEND / RETRACT THE SLAT SYSTEM TWICE
AND DO THE CLEANING OF THE SGRA HOLE
DO THE CHECK AND CLEANING OF THE DRAIN PLUG
ICN-A350-A-27XXP054-A-FAPE3-05YEE-A-003-01

### Page 25

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 25
(2) Task A350-A-27-XX-P054-02001-900A-A (A350-A-27-XX-P054-02ZZZ-900Z-A)
Do a Detailed Inspection on the RH Track 12 SGRA (FIN 5145CW)
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
623 Access Panel 623KB
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Components
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 926-0602 2 PIN
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-8X-XX-05ZZZ-170Z-AA350-A-27-8X-XX-06ZZZ-170Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-AA350-A-06-4X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
(a) Standard practices referenced in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the identification of access panels, refer to Ref. SD A350-A-06-4X-XX-
01ZZZ-04CZ-A.
3 For the specification of Material application codes given in this Service
Bulletin, refer to the Ref. CML.
4 T ag all the parts you must remove and retain to make the subsequent
installation easier.
5 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Do the water drainage and plug cleaning for the SGRA (FIN 5145CW), refer to
Ref. Fig. Drain Plug Position Check, Ref. Fig. Drain Plug Check and Cleaning, and
Ref. Fig. Flow Chart.

### Page 26

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 26
1 Put a small measuring container below the drain plug assembly, item 1,
refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 01, VIEW B.
2 Do a visual check of the drain plug assembly, item 1, position, refer to Ref.
Fig. Drain Plug Position Check, SHEET 01, VIEW B.
NOTE: The drain plug assembly, item 1, is noticeable with its vented
hole on the side and its green or grey color while the blank plug
assembly, item 3, has a gold color and NO vented hole on the side.
a If the drain plug, item 1, is in the correct, bottom, position:
<1> Continue to step 3 (Drain plug removal).
b If the drain plug assembly is in the incorrect, top, position:
<1> Remove the drain plug assembly, item (1), and the blank plug
assembly, item (3), refer to Ref. Fig. Drain Plug Position Check,
SHEET 01, VIEW B, and SHEET 02, VIEW C.
1 DRAIN PLUG ASSEMBLY   Item (1) Retain
1 BLANK PLUG ASSEMBLY   Item (3) Retain
<2> Observe whether water drains or drops of water fall out of the
drain plug hole in the SGRA (FIN 5145CW).
<3> Record the amount of water drained.
<a> After completion of all inspections, complete and send
the Inspection Report sheet in accordance with Ref. T ask
A350-A-27-XX-P054-02ZZZ-90AZ-A.
<4> Install the blank plug assembly, item (3), in the top position,
refer to Ref. Fig. Drain Plug Position Check, SHEET 02, VIEW D.
1 BLANK PLUG ASSEMBLY   Item (3) Retained
<5> T orque the blank plug assembly, item 3, to between 0.4 and
0.6 m.daN (35.40 and 53.10 lbf.in), refer to Ref. Fig. Drain Plug
Position Check, SHEET 02, VIEW D.
<6> Remove the NYLON Pins, item (2), from the drain plug, item
(4), refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 01,
VIEW B.
1 DRAIN PLUG   Item (4) Retain
2 NYLON PINS   Item (2) Retain
<7> Continue step 6 (Internal check of the SGRA).
3 Remove the drain plug, item (4), and NYLON Pins, item (2), refer to Ref. Fig.
Drain Plug Check and Cleaning, SHEET 01, VIEW B.
1 DRAIN PLUG   Item (4) Retain
2 NYLON PINS   Item (2) Retain
4 Observe whether water drains or drops of water fall out of the SGRA (FIN
5145CW) drain plug hole, refer to Ref. Fig. Drain Plug Check and Cleaning,
SHEET 01, VIEW B.
5 Record the amount of water drained.

### Page 27

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 27
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-27-XX-P054-02ZZZ-
90AZ-A.
6 Check the internal part of the SGRA (FIN 5145CW) drain plug hole to see
whether grease has accumulated and the drain hole is clogged, refer to
Ref. Fig. Drain Plug Check and Cleaning, SHEET 01, VIEW B.
7 Clean the drain plug hole in the SGRA (FIN 5145CW) until the internal
planetary gear is visible, refer to Ref. Fig. Drain Plug Check and Cleaning,
SHEET 01, VIEW B, using a screwdriver covered with:
  T extile - Lint free Cotton14SBA1  
NOTE: Be careful not to damage or scratch the internal planetary gear.
8 With the drain plug, item 4, removed, fully Extend and Retract the RH Wing
Slat System twice, refer to Ref. MP A350-A-27-8X-XX-05ZZZ-170Z-A and
Ref. MP A350-A-27-8X-XX-06ZZZ-170Z-A.
9 Clean the drain plug hole in the SGRA (FIN 5145CW) until the internal
planetary gear is visible, refer to Ref. Fig. Drain Plug Check and Cleaning,
SHEET 01, VIEW B, using a screwdriver covered with:
  T extile - Lint free Cotton14SBA1  
NOTE: Be careful not to damage or scratch the internal planetary gear.
10 Clean the drain plug, item (4), and NYLON Pins, item (2), refer to Ref. Fig.
Drain Plug Check and Cleaning, SHEET 01, VIEW B, using:
  T extile - Lint free Cotton14SBA1  
made moist with:
  Non Aqueous Cleaner -
General
08BAA9  
11 Clean the drain hole on the drain plug, item (4), using low pressure
compressed air not exceeding 2 bars (14.5 lbf.in²) to clear out all dirt or
grease, refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 01, VIEW B.
12 Do a check of the NYLON Pins, item (2):
a If the NYLON Pins, item (2), are damaged or missing:
<1> Discard the removed the NYLON Pins, item (2):
2 NYLON PINS   Item (2) Discard
<2> Install new NYLON Pins, item 2, and drain plug, item (4), refer to
Ref. Fig. Drain Plug Check and Cleaning, SHEET 02, VIEW C:
1 DRAIN PLUG   Item (4) Retained
2 PIN 926-0602 Item 2
b If the NYLON Pins, item (2) are in good condition:
<1> Install the NYLON Pins, item (2), and drain plug, item (4), refer
to Ref. Fig. Drain Plug Check and Cleaning, SHEET 02, VIEW C:
1 DRAIN PLUG   Item (4) Retained
2 NYLON PINS   Item (2) Retained

### Page 28

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 28
13 T orque the drain plug, item 4, to between 0.4 and 0.6 m.daN (35.40 and
53.10 lbf.in), refer to Ref. Fig. Drain Plug Check and Cleaning, SHEET 02,
VIEW C.

### Page 29

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEH-A-001-01 SHEET 1/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Position Check
Page 29
CONF ALL
Z523
Z623A
RIB11
RIB12
RIB14
RIB15
RIB17
TRACK
TRACK
RIB13TRACK TRACK
TRACK
TRACK
FRONT SPAR
5045CW
5145CW
LH
RH
LH
RH
A
B D
BEFORE
LH
RH
5045CW
5145CW
C
(1)
(1)
DRAIN PLUG IDENTIFIABLE BY DRAIN HOLE01
NOTE:
01
TRACK RIB12
B
LH SHOWN
RH SYMMETRICAL
LH SHOWN
RH SYMMETRICAL
ICN-A350-A-27XXP054-A-FAPE3-05YEH-A-001-01

### Page 30

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEI-A-001-01 SHEET 2/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Position Check
Page 30
CONF ALL
RIB12TRACK 
LH
RH
5045CW
5145CW
C
LH SHOWN
RH SYMMETRICAL
(3) AFTER
LH
RH
(3)
TRACK RIB12
LH SHOWN
RH SYMMETRICAL
D
5045CW
5145CW
TORQUE BLANK PLUG TO BETWEEN 0.4 AND02
NOTE:
0.6 m.daN (35.40 AND 53.10 lbf.in)
02
ICN-A350-A-27XXP054-A-FAPE3-05YEI-A-001-01

### Page 31

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEB-A-001-01 SHEET 1/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Check and Cleaning
Page 31
CONF ALL
Z523
Z623A
RIB11
RIB12
RIB14
RIB15
RIB17
TRACK
TRACK
RIB13TRACK TRACK
TRACK
TRACK
FRONT SPAR
5045CW
5145CW
LH
RH
LH
RH
A
BEFORE
CLEAN USING MATERIAL No 14SBA101
NOTE:
B
LH SHOWN
RH SYMMETRICAL
LH SHOWN
RH SYMMETRICAL
RIB12TRACK 
LH
RH
5045CW
5145CW
(4)
B C
(4)
(2) x 2
CLEAN USING MATERIAL No 14SBA102
MADE MOIST WITH MATERIAL No 08BAA9
CLEAN HOLE USING COMPRESSED AIR NOT03
02
03
EXCEEDING 2 BARS (14.5 lbf./in  )2
01
ICN-A350-A-27XXP054-A-FAPE3-05YEB-A-001-01

### Page 32

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEC-A-001-01 SHEET 2/2
REV 00 Mar 30/21 A350-27-P054Drain Plug Check and Cleaning
Page 32
CONF ALL
AFTER
LH SHOWN
RH SYMMETRICAL
RIB12TRACK 
LH
RH
5045CW
5145CW
(4)
(4)
(2) x 2
04
C
TORQUE ITEM (4) (DRAIN PLUG) TO BETWEEN04
NOTE:
0.4 AND 0.6 m.daN (35.40 AND 53.10 lbf.in)
ICN-A350-A-27XXP054-A-FAPE3-05YEC-A-001-01

### Page 33

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEE-A-003-01 SHEET 1/1
REV 00 Mar 30/21 A350-27-P054Flow Chart
Page 33
CONF ALL
NO YES
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT
THE INFORMATION GIVEN IN THE PROCEDURE AND 
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS
THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THE SERVICE BULLETIN.
DO A VISUAL CHECK OF THE DRAIN PLUG POSITION WITHIN
IS THE 
DRAIN PLUG IN
THE THRESHOLDS GIVEN IN PLANNING INFORMATION
PARAGRAPH E.(2)
THE CORRECT
POSITION?
REMOVE THE DRAIN
AND BLANK PLUGS
DO A DETAILED INSPECTION OF THE WATER DRAINED FROM THE
SGRA (SLAT GEARED ROTARY ACTUATOR)
DO THE CHECK AND CLEANING OF THE SGRA HOLE
REPEAT THE INSPECTION WITHIN THE REPETITIVE
INTERVAL GIVEN IN PLANNING INFORMATION
PARAGRAPH E.(2)
REPORT RESULTS
TO AIRBUS
REMOVE THE
DRAIN PLUGINSTALL THE BLANK PLUG
IN ITS CORRECT POSITION
RE-INSTALL THE
DRAIN PLUG
FULLY EXTEND / RETRACT THE SLAT SYSTEM TWICE
AND DO THE CLEANING OF THE SGRA HOLE
DO THE CHECK AND CLEANING OF THE DRAIN PLUG
ICN-A350-A-27XXP054-A-FAPE3-05YEE-A-003-01

### Page 34

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 34
(3) Task A350-A-27-XX-P054-02001-90AA-A (A350-A-27-XX-P054-02ZZZ-90AZ-A)
Complete The Inspection Report Sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig. Inspection report.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.

### Page 35

A350
SERVICE BULLETIN
Figure ICN-A350-A-27XXP054-A-FAPE3-05YEF-A-001-01 SHEET 1/1
REV 00 Mar 30/21 A350-27-P054Inspection report
Page 35
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A350-27-P054
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
LH SLAT GEARED ROTARY ACTUATOR FIN 5045CW:
UNITS:
QUANTITY OF DRAINED WATER:
RH SLAT GEARED ROTARY ACTUATOR FIN 5145CW:
UNITS:
QUANTITY OF DRAINED WATER:
ICN-A350-A-27XXP054-A-FAPE3-05YEF-A-001-01

### Page 36

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 36
D. PREPARATION FOR TEST
None
E. TEST
None
F. CLOSE-UP
(1) Task A350-A-27-XX-P054-01001-740A-A (A350-A-27-XX-P054-01ZZZ-740Z-A)
Do The Close-Up for the LH Track 12 SGRA (FIN 5045CW)
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-XX-00ZZZ-310Z-A
Procedure
(a) Do the Job Close-up for the “Detailed Inspection of the Slat Transmission System”
for the SGRA (FIN 5045CW), refer to Ref. MP A350-A-27-84-XX-00ZZZ-310Z-A.
(2) Task A350-A-27-XX-P054-02001-740A-A (A350-A-27-XX-P054-02ZZZ-740Z-A)
Do The Close-Up for the RH Track 12 SGRA (FIN 5145CW)
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-XX-00ZZZ-310Z-A
Procedure
(a) Do the Job Close-up for the “Detailed Inspection of the Slat Transmission System”
for the SGRA (FIN 5145CW), refer to Ref. MP A350-A-27-84-XX-00ZZZ-310Z-A.
(3) Task A350-A-27-XX-P054-03001-740A-A (A350-A-27-XX-P054-03ZZZ-740Z-A)
Close-Up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h

### Page 37

A350
SERVICE BULLETIN
REV 00 Mar 30/21 A350-27-P054
Page 37
Skills Airframe
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-27-XX-P054-01001-90AA-A (A350-A-27-XX-P054-01ZZZ-90AZ-A)
ADMINISTRATIVE
Procedure

### Page 38

A350
SERVICE BULLETIN
APPENDIX
REV 00 Mar 30/21 A350-27-P054
Page 38
APPENDIX
A. Appendix A - Manpower Gantt Chart
Manpower Gantt Chart
For an explanation of the manhours and elapsed time, refer to the next page(s).

### Page 39

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-27XXP054-A-FAPE3-05YED-A-002-01 SHEET 1/1
REV 00 Mar 30/21 A350-27-P054Manpower Gantt Chart
Page 39
CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A350-74-P054
GET ACCESS TO THE LH TRACK
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
3.25
2.25
STEPS
0.25 0.25
0
0.25 0.25
0.50 0.50
0.50 0.50
0.25 0.25
0.25 0.25
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
1
1
1
1
1
1
0.25 0.251
:
:
SB ELAPSED TIME
(HOURS)
1
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
12 SGRA (FIN 5045CW)
0.5 21.5
GET ACCESS TO THE RH TRACK
12 SGRA (FIN 5145CW)
DO A DETAILED INSPECTION ON
THE LH TRACK 12 SGRA 
DO A DETAILED INSPECTION ON
THE RH TRACK 12 SGRA
COMPLETE THE INSPECTION
REPORT SHEET
DO THE CLOSE-UP FOR THE LH
TRACK 12 SGRA (FIN 5045CW)
DO THE CLOSE-UP FOR THE RH
TRACK 12 SGRA (FIN 5145CW)
JOB SET-UP 0.50 0.501
0.50 0.501CLOSE-UP
(FIN 5045CW)
(FIN 5145CW)
ICN-A350-A-27XXP054-A-FAPE3-05YED-A-002-01

### Page 40

A350
SERVICE BULLETIN
APPENDIX
REV 00 Mar 30/21 A350-27-P054
Page 40
B. REPORTING SHEET
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION -
SLAT GEARED ROTARY ACTUATOR REPETITIVE WATER DRAINAGE &
PLUG CLEANING
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 41

A350
SERVICE BULLETIN
APPENDIX
REV 00 Mar 30/21 A350-27-P054
Page 41
C. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
