# Airbus Service Bulletin A350-27-P055

Copy: No revision named ("SB_27-P055_r00"), 25 pages: PDF https://openairdocs.org/files/sha256/77/a0/77a03da4c28b9f99c65664dc617340498219bc86ddd7f3f5e07e8e9ea3bc1fbf; text https://openairdocs.org/service-documents/airbus/a350-27-p055/file/77a03da4c28b.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0833, the docket of AD 2022-25-02. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-27-P055
- Page: https://openairdocs.org/service-documents/airbus/a350-27-p055

## Text (25 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0833, the docket of AD 2022-25-02. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION -
INTRODUCE NEW SLAT PCU TO SOLVE ISSUE WITH TORQUE SENSING
UNIT
MODIFICATION No.:
116484L44420

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Aug 06/21 A350-27-P055
Page 2
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION -
INTRODUCE NEW SLAT PCU TO SOLVE ISSUE WITH TORQUE SENSING
UNIT
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR 116484L44420
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
A slat system jam event was reported early 2020 during landing phase at slat
extension. Post flight troubleshooting revealed a double slat transmission shaft
disconnection. Subject sequence of events was due to a combination of:
- A slat system jamming attributed to temporary jamming of the Left-Hand (LH)
slat Geared Rotary Actuator (GRA) at track 12.
- A malfunction of the slat system control and monitoring loop due to lack of
response from the slat Power Control Unit (PCU) T orque Sensor Unit (TSU)
attributed to excessive wear in the ball guide mechanism.
Supplier LIEBHERR inspected several returned in-service slat PCU TSUs and found
similar wear in the ball guide mechanism.
(2) Objective/Action
This Service Bulletin is published to advise all operators of A350 aircraft of the issue of
LIEBHERR–AEROSPACE Service Bulletin No. 4785A-27–04 which requires the change of
a hardware Part Number (PN) of the slat PCU, introducing new parts of the integrated
TSU in order to improve the TSU wear behaviour.
The Pre-MOD slat PCU PN 4785A0000-05 are affected by this TSU wear behaviour.
(3) Advantages
This Service Bulletin terminates the A27P016-20 (CHECK OF THE SLAT POWER
CONTROL UNIT (PCU) TORQUE SENSOR UNIT (TSU) CORRECT OPERATION) which is
covered by the European Union Aviation Safety Agency (EASA) Airworthiness Directive
(AD) 2021-0053.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Aug 06/21 A350-27-P055
Page 3
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB YES
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Modification of the Slat PCU
(a) T ask set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of the Slat PCU
in accordance with VSB
No material
(b) T ask set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of the Slat
PCU
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note Slat PCU
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
36V 81K 82W 96U A1L AAR AFL AFR AZU BAW CAL CCA CES CHH CPA CRK CSC CSN DAL
DLH ETD ETH EVE F2I FBU FIN FJI FWI GAF HVN IBE JAL KAY LHT MAS MAU PAL QTR SAS SIA
TAM THA THY VIR WFL
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Modification of the Slat PCU
(a) T ask set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of the Slat PCU
in accordance with VSB
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of the Slat
PCU
AIRCRAFT NO

### Page 4

A350
SERVICE BULLETIN
SUMMARY
REV 00 Aug 06/21 A350-27-P055
Page 4
EQUIPMENT YES
I. MANPOWER
(1) Modification of the Slat PCU
(a) T ask set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of the Slat PCU
in accordance with VSB
MANPOWER
TOTAL MAN-HOURS 6.75 h
ELAPSED TIME (HOURS) 3.75 h
Additional man-hours related to Vendor SB; refer to:
Modify the Slat PCU in accordance with
VSB
Ref. LIEBHERR-AEROSPACE
LINDENBERG (D9893) VSB 4785A-
27-04
BENCH
(b) T ask set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of the Slat
PCU
MANPOWER
TOTAL MAN-HOURS 6.75 h
ELAPSED TIME (HOURS) 3.75 h

### Page 5

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-27XXP055-A-FAPE3-062AN-A-001-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Aug 06/21 A350-27-P055General Overview
Page 5
J. GENERAL OVERVIEW
CONF ALL
A
B
B
A
MODIFY THE SLAT PCU
FR74
FR35
FR46
FR44
Z193
ICN-A350-A-27XXP055-A-FAPE3-062AN-A-001-01

### Page 6

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 6
ATA SYSTEM: 27
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION -
INTRODUCE NEW SLAT PCU TO SOLVE ISSUE WITH TORQUE SENSING
UNIT
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This modification is embodied before delivery on:
- A350-941 aircraft with Manufacturer Serial Number (MSN) 0270, 0283, 0393,
0437, 0441, 0453, 0457, 0459 thru 0463, 0466, 0470, 0471, 0478, 0480,
0483, 0485 thru 0487, 0489, 0493 thru 0496, 0498, 0504 and subsequent.
- A350-1041 aircraft with MSN 0409, 0430, 0438 thru 0444, 0450 thru 0477,
0486 and subsequent.
(1) Models
ON A/C 0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215, 0225, 0229,
0233, 0241, 0252, 0258, 0262, 0266, 0274, 0286, 0290, 0296, 0298, 0306, 0315, 0319,
0326, 0330, 0332, 0336, 0340, 0342, 0346, 0350, 0356, 0362, 0368, 0372, 0374, 0380,
0382, 0386, 0388, 0399, 0402, 0415, 0420, 0424, 0426, 0432, 0434, 0446, 0482
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089-0101, 0103-0107, 0109, 0111-
0117, 0119-0124, 0126-0130, 0132-0138, 0140, 0142-0151, 0153-0155, 0157-0160, 0162-
0165, 0167, 0168, 0170, 0172-0187, 0189-0193, 0195-0205, 0207-0214, 0216-0221, 0223,
0224, 0226-0228, 0230-0232, 0234-0240, 0243-0251, 0254-0257, 0259-0261, 0263-0265,
0267-0269, 0271-0273, 0276-0282, 0284, 0285, 0287, 0289, 0291-0295, 0297, 0299-0303,
0305, 0307-0314, 0316, 0318, 0320-0325, 0327-0329, 0331, 0333-0335, 0337-0339, 0341,
0343-0345, 0347-0349, 0351, 0352, 0354, 0355, 0357-0359, 0363-0366, 0369-0371, 0373,
0375, 0376, 0378, 0379, 0381, 0383, 0385, 0387, 0389-0392, 0394-0398, 0400, 0401, 0403-
0408, 0410-0414, 0416-0419, 0421-0423, 0425, 0427, 0428, 0431, 0433, 0435, 0436, 0439,
0442, 0443, 0445, 0447-0449, 0451, 0452, 0454, 0455, 0458, 0464, 0465, 0468, 0469, 0472,
0474-0476, 0479, 0481, 0484, 0488, 0491, 0497, 0499, 0500, 0502
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0064 0066-0070 0072-0107 0109-0130 0132-0138 0140-0151 0153-
0155 0157-0165 0167-0170 0172-0193 0195-0221 0223-0241 0243-0252 0254-0269
0271-0274 0276-0282 0284-0287 0289-0303 0305-0316 0318-0352 0354-0359 0362-
0366 0368-0376 0378-0383 0385-0392 0394-0408 0410-0428 0431-0436 0439 0442
0443 0445-0449 0451 0452 0454 0455 0458 0464 0465 0468 0469 0472 0474-0476
0479 0481 0482 0484 0488 0491 0497 0499 0500 0502
(3) MSN by configuration
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0066 0067 0068 0069 0070 0072 0073
0074 0075 0076 0077 0078 0079 0080 0081 0082 0083 0084
001

### Page 7

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 7
MSN CONFIGURATION
0085 0086 0087 0088 0089 0090 0091 0092 0093 0094 0095
0096 0097 0098 0099 0100 0101 0102 0103 0104 0105 0106
0107 0109 0110 0111 0112 0113 0114 0115 0116 0117 0118
0119 0120 0121 0122 0123 0124 0125 0126 0127 0128 0129
0130 0132 0133 0134 0135 0136 0137 0138 0140 0141 0142
0143 0144 0145 0146 0147 0148 0149 0150 0151 0153 0154
0155 0157 0158 0159 0160 0161 0162 0163 0164 0165 0167
0168 0169 0170 0172 0173 0174 0175 0176 0177 0178 0179
0180 0181 0182 0183 0184 0185 0186 0187 0188 0189 0190
0191 0192 0193 0195 0196 0197 0198 0199 0200 0201 0202
0203 0204 0205 0206 0207 0208 0209 0210 0211 0212 0213
0214 0215 0216 0217 0218 0219 0220 0221 0223 0224 0225
0226 0227 0228 0229 0230 0231 0232 0233 0234 0235 0236
0237 0238 0239 0240 0241 0243 0244 0245 0246 0247 0248
0249 0250 0251 0252 0254 0255 0256 0257 0258 0259 0260
0261 0262 0263 0264 0265 0266 0267 0268 0269 0271 0272
0273 0274 0276 0277 0278 0279 0280 0281 0282 0284 0285
0286 0287 0289 0290 0291 0292 0293 0294 0295 0296 0297
0298 0299 0300 0301 0302 0303 0305 0306 0307 0308 0309
0310 0311 0312 0313 0314 0315 0316 0318 0319 0320 0321
0322 0323 0324 0325 0326 0327 0328 0329 0330 0331 0332
0333 0334 0335 0336 0337 0338 0339 0340 0341 0342 0343
0344 0345 0346 0347 0348 0349 0350 0351 0352 0354 0355
0356 0357 0358 0359 0362 0363 0364 0365 0366 0368 0369
0370 0371 0372 0373 0374 0375 0376 0378 0379 0380 0381
0382 0383 0385 0386 0387 0388 0389 0390 0391 0392 0394
0395 0396 0397 0398 0399 0400 0401 0402 0403 0404 0405
0406 0407 0408 0410 0411 0412 0413 0414 0415 0416 0417
0418 0419 0420 0421 0422 0423 0424 0425 0426 0427 0428
0431 0432 0433 0434 0435 0436 0439 0442 0443 0445 0446
0447 0448 0449 0451 0452 0454 0455 0458 0464 0465 0468
0469 0472 0474 0475 0476 0479 0481 0482 0484 0488 0491
0497 0499 0500 0502
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
CONF 001 retrofits following modifications: 116484L44420.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
A slat system jam event was reported early 2020 during landing phase at slat
extension. Post flight troubleshooting revealed a double slat transmission shaft
disconnection. Subject sequence of events was due to a combination of:
- A slat system jamming attributed to temporary jamming of the Left-Hand (LH)
slat Geared Rotary Actuator (GRA) at track 12.

### Page 8

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 8
- A malfunction of the slat system control and monitoring loop due to lack of
response from the slat Power Control Unit (PCU) T orque Sensor Unit (TSU)
attributed to excessive wear in the ball guide mechanism.
Supplier LIEBHERR inspected several returned in-service slat PCU TSUs and found
similar wear in the ball guide mechanism.
(2) Objective/Action
This Service Bulletin is published to advise all operators of A350 aircraft of the issue of
LIEBHERR–AEROSPACE Service Bulletin No. 4785A-27–04 which requires the change of
a hardware Part Number (PN) of the slat PCU, introducing new parts of the integrated
TSU in order to improve the TSU wear behaviour.
The Pre-MOD slat PCU PN 4785A0000-05 are affected by this TSU wear behaviour.
(3) Advantages
This Service Bulletin terminates the A27P016-20 (CHECK OF THE SLAT POWER
CONTROL UNIT (PCU) TORQUE SENSOR UNIT (TSU) CORRECT OPERATION) which is
covered by the European Union Aviation Safety Agency (EASA) Airworthiness Directive
(AD) 2021-0053.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
NOTE: T o accomplish this Service Bulletin, you have two options.
T o accomplish this Service Bulletin it is necessary to:
(1) Modification of the Slat PCU
(a) T ask set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of the Slat PCU
in accordance with VSB
1 Remove the Slat PCU
2 Modify the Slat PCU in accordance with VSB
3 Install the Slat PCU
(b) T ask set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of the Slat
PCU
1 Replace the Slat PCU
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Union Aviation Safety Agency (EASA). The
AD must be used as the reference document for the mandated accomplishment
timescale.
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.

### Page 9

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 9
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification of the Slat PCU
(a) T ask set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of the Slat PCU
in accordance with VSB
PREPARATION
Job Set-up 1.00 h
PROCEDURE
Remove the Slat PCU 2.00 h
Install the Slat PCU 2.00 h
PREPARATION FOR TEST
Preparation for T est 0.25 h
TEST
T est 0.50 h
CLOSE-UP
Close-up 1.00 h
TOTAL MAN-HOURS 6.75 h
ELAPSED TIME (HOURS) 3.75 h
Additional man-hours related to Vendor SB; refer to:
Modify the Slat PCU in accordance with
VSB
Ref. LIEBHERR-AEROSPACE
LINDENBERG (D9893) VSB 4785A-
27-04
BENCH
(b) T ask set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of the Slat
PCU
PREPARATION
Job Set-up 1.00 h
PROCEDURE
Replace the Slat PCU 4.00 h
PREPARATION FOR TEST
Preparation for T est 0.25 h
TEST
T est 0.50 h
CLOSE-UP
Close-up 1.00 h
TOTAL MAN-HOURS 6.75 h

### Page 10

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 10
ELAPSED TIME (HOURS) 3.75 h
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Modification of the Slat PCU
(a) T ask set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of the Slat PCU
in accordance with VSB
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A A350-A-27-84-51-00ZZZ-520Z-A
A350-A-27-84-51-00ZZZ-720Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-3X-XX-01ZZZ-04CZ-A A350-A-06-4X-XX-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
27.80.00024 27.81.00008
27.84.00019
VENDOR SERVICE BULLETIN (VSB)
LIEBHERR-AEROSPACE LINDENBERG (D9893) VSB 4785A-27-04
(b) T ask set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of the Slat
PCU
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A A350-A-27-84-51-00ZZZ-520Z-A
A350-A-27-84-51-00ZZZ-720Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-3X-XX-01ZZZ-04CZ-A A350-A-06-4X-XX-01ZZZ-04CZ-A

### Page 11

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 11
TECHNICAL FOLLOW UP (TFU)
27.80.00024 27.81.00008
27.84.00019
K. PUBLICATION AFFECTED
MAINTENANCE ILLUSTRATED PART DATA (MIPD)
L. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
Option 1: Modification of the Slat PCU in accordance with VSB.
Industry support terms for the equipment must be negotiated with the equipment supplier.
Option 2: Replacement of the Slat PCU.
Modification of removed equipment should be negotiated directly with the Vendor as per
instructions given in Vendor Service Bulletin No. 4785A-27-04.
Refer to Vendor Service Bulletin No. 4785A-27-04 for the industry support terms of the
Vendor Service Bulletin parts and labor.

### Page 12

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 12
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-27-XX-P055-01000-93AA-A Option 1: Modification of
the Slat PCU in accordance with VSB
MATERIAL QTY SEE NOTES
Referenced tools See SB
Referenced consumables See SB
Referenced parts See SB
Re-identified parts See SB
Interchangeable parts See SB
Material for task set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement of
the Slat PCU
MATERIAL QTY SEE NOTES
Referenced tools See SB
Referenced consumables See SB
Equipment See SB
Referenced parts See SB
Interchangeable parts See SB
Spare parts See SB
B. TOOLING
Referenced tools for task set A350-A-27-XX-P055-01000-93AA-A Option 1:
Modification of the Slat PCU in accordance with VSB
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A
Ref. MP A350-A-27-84-51-00ZZZ-520Z-A
Ref. LIEBHERR-AEROSPACE LINDENBERG (D9893) VSB 4785A-27-04
Referenced tools for task set A350-A-27-XX-P055-01000-93AB-A Option 2:
Replacement of the Slat PCU
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A
Ref. MP A350-A-27-84-51-00ZZZ-520Z-A
C. CONSUMABLES
Referenced consumables for task set A350-A-27-XX-P055-01000-93AA-A Option 1:
Modification of the Slat PCU in accordance with VSB
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A
Ref. LIEBHERR-AEROSPACE LINDENBERG (D9893) VSB 4785A-27-04
Referenced consumables for task set A350-A-27-XX-P055-01000-93AB-A Option 2:
Replacement of the Slat PCU
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A

### Page 13

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 13
D. LIST OF NEW PARTS
Equipment for task set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement
of the Slat PCU
Procurement address D9893
LIEBHERR-AEROSPACE LINDENBERG GmbH
CUSTOMER SERVICE
Pfaenderstrasse 50-52
88161
LINDENBERG
GERMANY
Phone: +49 (0) 8381460
Fax: +49 (0) 8381464103
NOTE(S)
Vendor parts are to be procured from the address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
4785A0000-06
(D9893) 1 PCU (1) (2)
NOTE(S)
(1): Procurement terms for the equipment must be negotiated with the equipment
supplier.
(2): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
Referenced parts for task set A350-A-27-XX-P055-01000-93AA-A Option 1:
Modification of the Slat PCU in accordance with VSB
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A
Ref. LIEBHERR-AEROSPACE LINDENBERG (D9893) VSB 4785A-27-04
Referenced parts for task set A350-A-27-XX-P055-01000-93AB-A Option 2:
Replacement of the Slat PCU
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A
E. LIST OF EXISTING PARTS
Re-identified parts for task set A350-A-27-XX-P055-01000-93AA-A Option 1:
Modification of the Slat PCU in accordance with VSB
ITEM NEW PART No. KEYWORD ITEM OLD PART No. SEE NOTES
4785A0000-06 PCU 4785A0000-05 (1) (2)
NOTE(S)
(1): Refer to the Vendor Service Bulletin No. 4785A-27–04 for the equipment modification
sales terms.
(2): Parts are re-identified in accordance with Vendor Service Bulletin No. 4785A-27–04.
Interchangeable parts for task set A350-A-27-XX-P055-01000-93AA-A Option 1:
Modification of the Slat PCU in accordance with VSB

### Page 14

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 14
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
PCU-POWER
CONTROL UNIT,SLAT 4785A0000-05 4785A0000-06 01 (1)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
Interchangeable parts for task set A350-A-27-XX-P055-01000-93AB-A Option 2:
Replacement of the Slat PCU
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
PCU-POWER
CONTROL UNIT,SLAT 4785A0000-05 4785A0000-06 01 (1)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
Spare parts for task set A350-A-27-XX-P055-01000-93AB-A Option 2: Replacement
of the Slat PCU
DESCRIPTION OLD PART No. SEE NOTES
PCU-POWER CONTROL UNIT,SLAT 4785A0000-05 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.

### Page 15

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 15
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-27-XX-P055-01000-93AA-A (A350-A-27-XX-P055-01ZZZ-93AZ-A)
Option 1: Modification of the Slat PCU in accordance with VSB
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 6.75 h
ELAPSED TIME (HOURS) 3.75 h
Additional man-hours related to Vendor SB; refer to:
LIEBHERR-AEROSPACE LINDENBERG (D9893) VSB 4785A-27-04

### Page 16

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 16
B. PREPARATION
(1) Task A350-A-27-XX-P055-01001-540A-A (A350-A-27-XX-P055-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-00ZZZ-170Z-AA350-A-27-84-51-00ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Do the job set-up as specified in the removal of the slat PCU (FIN 5000CW), refer
to Ref. MP A350-A-27-84-51-00ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-27-XX-P055-01001-520A-A (A350-A-27-XX-P055-01ZZZ-520Z-A)
Remove the Slat PCU
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
193 Access Panel 193FB
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-520Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-AA350-A-06-4X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard practices given in this procedure:

### Page 17

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 17
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the identification of access panels, refer to Ref. SD A350-A-06-4X-XX-
01ZZZ-04CZ-A.
(b) Remove the slat PCU (FIN 5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-
520Z-A.
NOTE: Retained for modification.
(2) Task A350-A-27-XX-P055-01001-920A-C (A350-A-27-XX-P055-01ZZZ-920Z-C)
Modify the Slat PCU in accordance with VSB
Job Set-Up Information
Material necessary to do the job
Re-identified Part Set
ITEM NEW PART No. KEYWORD ITEM OLD PART No. SEE NOTES
4785A0000-06 PCU 4785A0000-05 (1)
NOTE(S)
(1): Parts are re-identified in accordance with Vendor Service Bulletin No. 4785A-27–04.
Referenced Information
Manuals/Drawings References/Sheets
VSB LIEBHERR-AEROSPACE LINDENBERG (D9893)VSB 4785A-27-04
Procedure
(a) Modify the slat PCU (FIN 5000CW) in accordance with Ref. LIEBHERR-AEROSPACE
LINDENBERG (D9893) VSB 4785A-27-04.
(b) After modification:
FIN 5000CW
1 PCU-POWER CONTROL
UNIT,SLAT
4785A0000-05    
becomes
FIN 5000CW
1 PCU-POWER CONTROL
UNIT, SLAT
4785A0000-06  
(3) Task A350-A-27-XX-P055-01001-720A-A (A350-A-27-XX-P055-01ZZZ-720Z-A)
Install the Slat PCU
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
193 Access Panel 193FB
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe

### Page 18

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 18
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-AA350-A-06-4X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the identification of access panels, refer to Ref. SD A350-A-06-4X-XX-
01ZZZ-04CZ-A.
(b) Install the modified slat PCU (FIN 5000CW), refer to Ref. MP A350-A-27-84-51-
00ZZZ-720Z-A.
D. PREPARATION FOR TEST
(1) Task A350-A-27-XX-P055-04001-300A-A (A350-A-27-XX-P055-04ZZZ-300Z-A)
Preparation for Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
Procedure
(a) Do the preparation test as specified in the installation of the slat PCU, refer to
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
(b) Remove the safety clip(s) and/or tag(s) and close/unlock the circuit breaker(s),
refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
(c) Put the aircraft in the correct aircraft maintenance configuration as specified
before the test procedure, refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
E. TEST
(1) Task A350-A-27-XX-P055-01001-300A-A (A350-A-27-XX-P055-01ZZZ-300Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe

### Page 19

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 19
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
Procedure
(a) Do the test procedure as specified after the installation of the slat PCU (FIN
5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
F. CLOSE-UP
(1) Task A350-A-27-XX-P055-01001-740A-A (A350-A-27-XX-P055-01ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close-up procedure as specified after the installation of the slat PCU (FIN
5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-27-XX-P055-01001-90AA-A (A350-A-27-XX-P055-01ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 20

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 20
Task set A350-A-27-XX-P055-01000-93AB-A (A350-A-27-XX-P055-01ZZZ-93AZ-A)
Option 2: Replacement of the Slat PCU
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: Discarded parts must be managed at the operator's discretion.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 6.75 h
ELAPSED TIME (HOURS) 3.75 h

### Page 21

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 21
B. PREPARATION
(1) Task A350-A-27-XX-P055-02001-540A-A (A350-A-27-XX-P055-02ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-00ZZZ-170Z-AA350-A-27-84-51-00ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Do the job set-up as specified in the removal of the slat PCU (FIN 5000CW), refer
to Ref. MP A350-A-27-84-51-00ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-27-XX-P055-02001-920A-A (A350-A-27-XX-P055-02ZZZ-920Z-A)
Replace the Slat PCU
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
193 Access Panel 193FB
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 2
Elapsed Time 2.00 h
Skills Airframe
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
4785A0000-06 1 PCU
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-520Z-AA350-A-27-84-51-00ZZZ-720Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A

### Page 22

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 22
Manuals/Drawings References/Sheets
A350-A-06-4X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the identification of access panels, refer to Ref. SD A350-A-06-4X-XX-
01ZZZ-04CZ-A.
(b) Remove the slat PCU (FIN 5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-
520Z-A.
FIN 5000CW
1 PCU-POWER CONTROL
UNIT,SLAT
4785A0000-05   Discard
(c) Install the new slat PCU (FIN 5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-
720Z-A.
FIN 5000CW
1 PCU-POWER CONTROL
UNIT, SLAT
4785A0000-06  
D. PREPARATION FOR TEST
(1) Task A350-A-27-XX-P055-03001-300A-A (A350-A-27-XX-P055-03ZZZ-300Z-A)
Preparation for Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
Procedure
(a) Do the preparation test as specified in the installation of the slat PCU, refer to
Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
(b) Remove the safety clip(s) and/or tag(s) and close/unlock the circuit breaker(s),
refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
(c) Put the aircraft in the correct aircraft maintenance configuration as specified
before the test procedure, refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
E. TEST
(1) Task A350-A-27-XX-P055-02001-300A-A (A350-A-27-XX-P055-02ZZZ-300Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h

### Page 23

A350
SERVICE BULLETIN
REV 00 Aug 06/21 A350-27-P055
Page 23
Minimum Number of person 1
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
Procedure
(a) Do the test procedure as specified after the installation of the slat PCU (FIN
5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
F. CLOSE-UP
(1) Task A350-A-27-XX-P055-02001-740A-A (A350-A-27-XX-P055-02ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-27-84-51-00ZZZ-720Z-A
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the close-up procedure as specified after the installation of the slat PCU (FIN
5000CW), refer to Ref. MP A350-A-27-84-51-00ZZZ-720Z-A.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-27-XX-P055-02001-90AA-A (A350-A-27-XX-P055-02ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 24

A350
SERVICE BULLETIN
APPENDIX
REV 00 Aug 06/21 A350-27-P055
Page 24
APPENDIX
A. REPORTING SHEET
TITLE: FLIGHT CONTROLS - SLAT ACTUATION AND POWER TRANSMISSION -
INTRODUCE NEW SLAT PCU TO SOLVE ISSUE WITH TORQUE SENSING
UNIT
MODIFICATION No.: 116484L44420
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 25

A350
SERVICE BULLETIN
APPENDIX
REV 00 Aug 06/21 A350-27-P055
Page 25
B. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.