# Airbus Service Bulletin A350-28-P013

Copy: No revision named ("A350-28-P013"), 65 pages: PDF https://openairdocs.org/files/sha256/51/d2/51d28fcaa56e1dfe31f20b9c2edc7253d004f9e281f3fbe9da044cecae713462; text https://openairdocs.org/service-documents/airbus/a350-28-p013/file/51d28fcaa56e.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2022-1407, the docket of AD 2023-02-14. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-28-P013
- Page: https://openairdocs.org/service-documents/airbus/a350-28-p013

## Text (65 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2022-1407, the docket of AD 2023-02-14. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - ENGINE LP FUEL SHUT OFF AND APU FUEL SYSTEM -
INSPECTION FOR ENGINE LP SHUT-OFF AND APU ISOLATION VALVES
LEAKAGE AND APU LP SHUT-OFF VALVE REPLACEMENT
MODIFICATION No.:
None

### Page 2

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 2
ATA SYSTEM: 28
TITLE: FUEL - ENGINE LP FUEL SHUT OFF AND APU FUEL SYSTEM -
INSPECTION FOR ENGINE LP SHUT-OFF AND APU ISOLATION VALVES
LEAKAGE AND APU LP SHUT-OFF VALVE REPLACEMENT
REVISION TRANSMITTAL SHEET
This page transmits Revision No. 01 of Service Bulletin No. A350-28-P013.
A. ADDITIONAL WORK
Additional work is required by revision No. 01 of this Service Bulletin, even if aircraft have
been already inspected with the revision No. 00.
Additional work includes:
- Appendix of the Service Bulletin was updated to add missing Part Number (PN) and
Serial Number (SN) list for aftermarket units, to correct wrong SN and to remove
duplicated SN.
If fleet was already inspected using the information of revision No. 00 of this Service
Bulletin, AIRBUS recommends the additional work to be accomplished within one year after
issue date of revision No. 01, unless otherwise stated by an Airworthiness Directive.
B. REASON
Revision No. 01 issued to:
- Update applicability
- Add note in applicability
- Update threshold value from 72 months to 78 months in accomplishment timescale
table
- Update flowchart “Fig.FA Sol.AA SHEET 1/1”
- Update appendix SN list, add missing SN list, aftermarket list and deleted duplicated
affected PN and SN list.
C. CHANGES
SUMMARY
REASON PN 2080022-101 added in history and sentence
updated in advantages.
APPLICABILITY Applicability updated.
PLANNING INFORMATION
APPLICABILITY NOTE added to inform operator to ensure that spare
stock also to be checked for any impacted SN.
REASON PN 2080022-101 added in history and sentence
updated in advantages.
COMPLIANCE
Accomplishment Timescale 1) Threshold value changed from 72 months to 78
months.
2) Scrap unit information added in action.
3) Sentence updated.
ACCOMPLISHMENT INSTRUCTIONS

### Page 3

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 3
T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
PROCEDURE
A350-A-28-XX-P013-
01001-300A-A Do a Check
of the PNs and SNs
NOTE added and procedure updated to add the scrap
unit information.
Fig.FA Sol.AA Flowchart Figure updated to add information regarding scrap
unit.
A350-A-28-XX-P013-
07001-364A-A Do an SDI
of the APU Isolation Valve
(FIN 5204QA)
Procedure updated to add the scrap unit information.
Fig.FA Sol.AA Flowchart Figure updated to add information regarding scrap
unit.
A350-A-28-XX-P013-
05001-364A-A Do an SDI
of the Engine LP Shut-Off
Valve (FIN 5400QA1) on LH
Engine
Procedure updated to add the scrap unit information.
Fig.FA Sol.AA Flowchart Figure updated to add information regarding scrap
unit.
A350-A-28-XX-P013-
06001-364A-A Do an SDI
of the Engine LP Shut-Off
Valve (FIN 5400QA2) on
RH Engine
Procedure updated to add the scrap unit information.
Fig.FA Sol.AA Flowchart Figure updated to add information regarding scrap
unit.
A350-A-28-XX-P013-
05001-920A-A Replace the
APU LP Shut-Off Valve (FIN
5200QA)
FIN 5204QA becomes FIN 5200QA.
APPENDIX
AFFECTED PN AND SN LIST
Fig.AA Sol.AA Affected PN and
SN List of the APU Isolation
Valve (FIN 5204QA)
1) Fig.AA Sol.AA SHEET 2/4 for MSN 0155 SN AAP8134
becomes AAP8135.
2) Fig.AA Sol.AA SHEET 3/4 affected PN and SN list
deleted for duplicated MSNs.
3) Fig.AA Sol.AA SHEET 4/4 for MSNs 0342, 0381,
0390 and 0396, SNs ACA4773, ACC5030, ACC5032
and ACC8131 becomes ACA0695, ACC8132, ACC4435
and ACC5031.
4) Fig.AA Sol.AA SHEET 4/4 aftermarket PNs and SNs
added.
Fig.AB Sol.AA Affected PN and
SN List of the Engine LP-Fuel
Valve (FIN 5400QA1)
1) Fig.AB Sol.AA SHEET 2/3 for MSNs 0212 and 0291,
SN AAN2364 and ACA4709 becomes AAU0004 and
AAY7521.
2) Fig.AB Sol.AA SHEET 3/3 aftermarket PNs and SNs
added.

### Page 4

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 4
Fig.AC Sol.AA Affected PN and
SN List of the Engine LP-Fuel
Valve (FIN 5400QA2)
1) Fig.AC Sol.AA SHEET 2/3 for MSN 0180, SN AAT6003
becomes AAT6002.
2) Fig.AC Sol.AA SHEET 3/3 aftermarket PNs and SNs
added.
Fig.AD Sol.AA Affected PN and
SN List of the APU LP Fuel-Valve
(FIN 5200QA)
Fig.AD Sol.AA SHEET 4/4 for MSN 0349, SN AAW7851
becomes ACC8428 and aftermarket PNs and SNs
added.
D. FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete
document. Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
E. HISTORY OF PREVIOUS REVISIONS
No previous revision
F. REVISION SEQUENCE
ORIGINAL: Nov 15/21
REVISION No. : 01 - Jun 22/22

### Page 5

A350
SERVICE BULLETIN
SUMMARY
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 5
ATA SYSTEM: 28
TITLE: FUEL - ENGINE LP FUEL SHUT OFF AND APU FUEL SYSTEM -
INSPECTION FOR ENGINE LP SHUT-OFF AND APU ISOLATION VALVES
LEAKAGE AND APU LP SHUT-OFF VALVE REPLACEMENT
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
PARKER HANNIFIN CORPORATION notified AIRBUS of a quality escape on A350
aircraft impacting the Auxiliary Power Unit (APU) isolation valve (FIN 5204QA) Part
Number (PN) 2080023-102, the APU Low Pressure (LP) shut-off valve (FIN 5200QA) PN
2080022-101 or PN 2080022-102 and the engine LP shut-off valves (FIN 5400QA1 and
FIN 5400QA2) PN 2140083-101 produced prior to July 2019.
These ball-type valves provide the main means of shut-off to prevent fluid passing
through the main valve flow path. In addition, an alternate path around the ball valve
through a thermal relief valve provides a pressure equalization mechanism from fuel
expanding in pipes. The thermal relief valve is sealed by a spring activated ball plug.
The spring is calibrated to open at specified pressure differential and the sealing is
provided by contact surface between the ball and the seat. Proper reseating is critical
for sealing. The thermal relief valve is activated every time the APU or engine is shut
down.
PARKER HANNIFIN CORPORATION reported potential foreign objects debris
contamination due to the manufacturing assembly process which may lead to the
inability for the thermal relief valve to reseat properly, leading to a leakage in excess
of the equipment design requirement, combined with an engine or APU fire, this could
lead to an unsafe condition.
(2) Objective/Action
This Service Bulletin provides a procedure to:
- Confirm the thermal relief valve reseats properly and test the fuel isolation
from the APU isolation valve (FIN 5204QA) and the engine LP shut-off valves
(FIN 5400QA1 and FIN 5400QA2). If fuel isolation is not confirmed, then the
applicable valve(s) shall be replaced
- Replace the APU LP shut-off valve (FIN 5200QA) – no test is required,
replacement is mandatory.

### Page 6

A350
SERVICE BULLETIN
SUMMARY
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 6
(3) Advantages
Accomplishment of this Service Bulletin will ensure the ball valve of the thermal relief
valve re-seats properly and prevent a potential fuel leak.
It is expected that an Airworthiness Directive (AD) published by the European Union
Aviation Agency (EASA) will be issued.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Inspection
(a) T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Equipment See SB See Note Valves
NOTE: Price information to be obtained from the given supplier.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
36V 82W 96U A1L AAR AFL AFR AZU BAW CAL CCA CES CHH CPA CRK CSC CSN DAL DLH
ETD ETH EVE FBU FIN FJI FWI GAF HVN IBE ITY JAL KAY MAS MAU PAL QTR SAS SIA SJX THA
THY VIR WFL
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Inspection
(a) T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
AIRCRAFT NO

### Page 7

A350
SERVICE BULLETIN
SUMMARY
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 7
EQUIPMENT YES
I. MANPOWER
(1) Inspection
(a) T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
MANPOWER
TOTAL MAN-HOURS 23.75 h
ELAPSED TIME (HOURS) 15.25 h

### Page 8

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-28XXP013-A-FAPE3-068C1-A-001-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
General Overview
Page 8
J. GENERAL OVERVIEW
CONF ALL
B
FR54
FR46 B
A
A
Z140
INSPECTION AND REPLACEMENT
OF APU ISOLATION VALVE
5204QA
ICN-A350-A-28XXP013-A-FAPE3-068C1-A-001-01

### Page 9

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-28XXP013-A-FAPE3-068C0-A-001-01 Fig.SB Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
General Overview
Page 9
CONF ALL
Z542
Z642
A
LH
RH
RIB11 RIB12
A
B
B
LH SHOWN
RH SYMMETRICAL
LH
RH
INSPECTION AND REPLACEMENT
OF ENGINE LP SHUT-OFF  VALVES
5400QA1
5400QA2
ICN-A350-A-28XXP013-A-FAPE3-068C0-A-001-01

### Page 10

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-28XXP013-A-FAPE3-068BY-A-001-01 Fig.SC Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
General Overview
Page 10
CONF ALL
A
A
,  Z311 Z312
FR93
FR102
B
B
REPLACEMENT OF
APU LP SHUT-OFF VALVE
5200QA
ICN-A350-A-28XXP013-A-FAPE3-068BY-A-001-01

### Page 11

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 11
ATA SYSTEM: 28
TITLE: FUEL - ENGINE LP FUEL SHUT OFF AND APU FUEL SYSTEM -
INSPECTION FOR ENGINE LP SHUT-OFF AND APU ISOLATION VALVES
LEAKAGE AND APU LP SHUT-OFF VALVE REPLACEMENT
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This SB applicability is a batch of Manufacturer Serial Number (MSN)s potentially
having the defective Serial Number (SN) installed. However, the operators
are invited to check the potential impact on their fleet based on the valve SN
list provided in Ref. Appendix AFFECTED PN AND SN LIST and their internal
maintenance records.
NOTE: The operators shall ensure that their spare stock is also checked for any impact. In
case a unit is identified, no test or repair is possible and the unit shall be scrapped.
NOTE: At any time, if an impacted valve is removed from the aircraft, then it cannot be
installed again on aircraft and it shall be scrapped. This is true even if the valve was
successfully tested on aircraft before the removal. The unit shall be scrapped on-
site and a certificate has to be provided to PARKER or the unit can be sent back to
PARKER for scrapping. This should be reported to Airbus via the online reporting
application in Airbus World.
NOTE: This Service Bulletin is subject to an open-end applicability, meaning that
subsequent aircraft from those in the current applicability are also impacted.
A revision will be ordered only on operator request if they intend to embody
this Service Bulletin on their MSN not yet included in the current applicability.
Depending on the request date, an RDAF could be provided while waiting for SB
revision. Please refer to Ref. ISI 00.00.00258.
(1) Models
ON A/C 0065, 0071, 0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215,
0225, 0229, 0233, 0241, 0252, 0258, 0262, 0266, 0274, 0286, 0290, 0296, 0298, 0306,
0315, 0319, 0326, 0330, 0332, 0336, 0340, 0342, 0346, 0350, 0356, 0362, 0368, 0372,
0374, 0380, 0382, 0386, 0388, 0399, 0402, 0409, 0415, 0420, 0424, 0426, 0430, 0432,
0434, 0438, 0440, 0444, 0446, 0473, 0482, 0490, 0492, 0495, 0503, 0507, 0509, 0533,
0539, 0547, 0560, 0563, 0584, 0600, 0605, 0609
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089-0101, 0103-0107, 0109, 0111-
0117, 0119-0124, 0126-0130, 0132-0138, 0140, 0142-0151, 0153-0155, 0157-0160, 0162-
0165, 0167, 0168, 0170, 0172-0187, 0189-0193, 0195-0205, 0207-0214, 0216-0221, 0223,
0224, 0226-0228, 0230-0232, 0234-0240, 0243-0251, 0254-0257, 0259-0261, 0263-0265,
0267-0273, 0276-0285, 0287, 0289, 0291-0295, 0297, 0299-0303, 0305, 0307-0314, 0316,
0318, 0320-0325, 0327-0329, 0331, 0333-0335, 0337-0339, 0341, 0343-0345, 0347-0349,
0351, 0352, 0354, 0355, 0357-0359, 0363-0366, 0369-0371, 0373, 0375, 0376, 0378, 0379,
0381, 0383, 0385, 0387, 0389-0398, 0400, 0401, 0403-0408, 0410-0414, 0416-0419, 0421-
0423, 0425, 0427-0429, 0431, 0433, 0435-0437, 0439, 0441-0443, 0445, 0447-0449, 0451-
0455, 0457-0460, 0462-0466, 0468-0472, 0474-0476, 0478-0481, 0483-0485, 0487-0489,
0491, 0493, 0494, 0496, 0497, 0499, 0500, 0502, 0504-0506, 0510, 0512, 0516, 0517, 0520,
0524, 0526, 0528, 0530, 0531, 0535-0538, 0540-0546, 0548-0552, 0554, 0556-0559, 0561,
0562, 0564, 0565, 0567-0583, 0585, 0587-0589, 0591-0599, 0602, 0603, 0607, 0611, 0613,
0618
350-941

### Page 12

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 12
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0107 0109-0130 0132-0138 0140-0151 0153-0155 0157-0165 0167-
0170 0172-0193 0195-0221 0223-0241 0243-0252 0254-0274 0276-0287 0289-0303
0305-0316 0318-0352 0354-0359 0362-0366 0368-0376 0378-0383 0385-0449 0451-
0455 0457-0460 0462-0466 0468-0476 0478-0485 0487-0497 0499 0500 0502-0507
0509 0510 0512 0516 0517 0520 0524 0526 0528 0530 0531 0533 0535-0552 0554
0556-0565 0567-0585 0587-0589 0591-0600 0602 0603 0605 0607 0609 0611 0613
0618
(3) MSN by configuration
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0065 0066 0067 0068 0069 0070 0071
0072 0073 0074 0075 0076 0077 0078 0079 0080 0081 0082
0083 0084 0085 0086 0087 0088 0089 0090 0091 0092 0093
0094 0095 0096 0097 0098 0099 0100 0101 0102 0103 0104
0105 0106 0107 0109 0110 0111 0112 0113 0114 0115 0116
0117 0118 0119 0120 0121 0122 0123 0124 0125 0126 0127
0128 0129 0130 0132 0133 0134 0135 0136 0137 0138 0140
0141 0142 0143 0144 0145 0146 0147 0148 0149 0150 0151
0153 0154 0155 0157 0158 0159 0160 0161 0162 0163 0164
0165 0167 0168 0169 0170 0172 0173 0174 0175 0176 0177
0178 0179 0180 0181 0182 0183 0184 0185 0186 0187 0188
0189 0190 0191 0192 0193 0195 0196 0197 0198 0199 0200
0201 0202 0203 0204 0205 0206 0207 0208 0209 0210 0211
0212 0213 0214 0215 0216 0217 0218 0219 0220 0221 0223
0224 0225 0226 0227 0228 0229 0230 0231 0232 0233 0234
0235 0236 0237 0238 0239 0240 0241 0243 0244 0245 0246
0247 0248 0249 0250 0251 0252 0254 0255 0256 0257 0258
0259 0260 0261 0262 0263 0264 0265 0266 0267 0268 0269
0270 0271 0272 0273 0274 0276 0277 0278 0279 0280 0281
0282 0283 0284 0285 0286 0287 0289 0290 0291 0292 0293
0294 0295 0296 0297 0298 0299 0300 0301 0302 0303 0305
0306 0307 0308 0309 0310 0311 0312 0313 0314 0315 0316
0318 0319 0320 0321 0322 0323 0324 0325 0326 0327 0328
0329 0330 0331 0332 0333 0334 0335 0336 0337 0338 0339
0340 0341 0342 0343 0344 0345 0346 0347 0348 0349 0350
0351 0352 0354 0355 0356 0357 0358 0359 0362 0363 0364
0365 0366 0368 0369 0370 0371 0372 0373 0374 0375 0376
0378 0379 0380 0381 0382 0383 0385 0386 0387 0388 0389
0390 0391 0392 0393 0394 0395 0396 0397 0398 0399 0400
0401 0402 0403 0404 0405 0406 0407 0408 0409 0410 0411
0412 0413 0414 0415 0416 0417 0418 0419 0420 0421 0422
0423 0424 0425 0426 0427 0428 0429 0430 0431 0432 0433
0434 0435 0436 0437 0438 0439 0440 0441 0442 0443 0444
0445 0446 0447 0448 0449 0451 0452 0453 0454 0455 0457
0458 0459 0460 0462 0463 0464 0465 0466 0468 0469 0470
0471 0472 0473 0474 0475 0476 0478 0479 0480 0481 0482
0483 0484 0485 0487 0488 0489 0490 0491 0492 0493 0494
001

### Page 13

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 13
MSN CONFIGURATION
0495 0496 0497 0499 0500 0502 0503 0504 0505 0506 0507
0509 0510 0512 0516 0517 0520 0524 0526 0528 0530 0531
0533 0535 0536 0537 0538 0539 0540 0541 0542 0543 0544
0545 0546 0547 0548 0549 0550 0551 0552 0554 0556 0557
0558 0559 0560 0561 0562 0563 0564 0565 0567 0568 0569
0570 0571 0572 0573 0574 0575 0576 0577 0578 0579 0580
0581 0582 0583 0584 0585 0587 0588 0589 0591 0592 0593
0594 0595 0596 0597 0598 0599 0600 0602 0603 0605 0607
0609 0611 0613 0618
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
PARKER HANNIFIN CORPORATION notified AIRBUS of a quality escape on A350
aircraft impacting the Auxiliary Power Unit (APU) isolation valve (FIN 5204QA) Part
Number (PN) 2080023-102, the APU Low Pressure (LP) shut-off valve (FIN 5200QA) PN
2080022-101 or PN 2080022-102 and the engine LP shut-off valves (FIN 5400QA1 and
FIN 5400QA2) PN 2140083-101 produced prior to July 2019.
These ball-type valves provide the main means of shut-off to prevent fluid passing
through the main valve flow path. In addition, an alternate path around the ball valve
through a thermal relief valve provides a pressure equalization mechanism from fuel
expanding in pipes. The thermal relief valve is sealed by a spring activated ball plug.
The spring is calibrated to open at specified pressure differential and the sealing is
provided by contact surface between the ball and the seat. Proper reseating is critical
for sealing. The thermal relief valve is activated every time the APU or engine is shut
down.
PARKER HANNIFIN CORPORATION reported potential foreign objects debris
contamination due to the manufacturing assembly process which may lead to the
inability for the thermal relief valve to reseat properly, leading to a leakage in excess
of the equipment design requirement, combined with an engine or APU fire, this could
lead to an unsafe condition.
(2) Objective/Action
This Service Bulletin provides a procedure to:
- Confirm the thermal relief valve reseats properly and test the fuel isolation
from the APU isolation valve (FIN 5204QA) and the engine LP shut-off valves
(FIN 5400QA1 and FIN 5400QA2). If fuel isolation is not confirmed, then the
applicable valve(s) shall be replaced
- Replace the APU LP shut-off valve (FIN 5200QA) – no test is required,
replacement is mandatory.
(3) Advantages
Accomplishment of this Service Bulletin will ensure the ball valve of the thermal relief
valve re-seats properly and prevent a potential fuel leak.

### Page 14

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 14
It is expected that an Airworthiness Directive (AD) published by the European Union
Aviation Agency (EASA) will be issued.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Inspection
(a) T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
1 Do a Check of the PNs and SNs
2 Do an SDI of the APU Isolation Valve (FIN 5204QA)
3 Do an SDI of the Engine LP Shut-Off Valve (FIN 5400QA1) on LH Engine
4 Do an SDI of the Engine LP Shut-Off Valve (FIN 5400QA2) on RH Engine
5 Replace the APU LP Shut-Off Valve (FIN 5200QA)
6 Depending on the Inspection Result, Replace the APU Isolation Valve (FIN
5204QA)
7 Depending on the Inspection Result, Replace the Engine LP Shut-Off Valve
(FIN 5400QA1) on LH Engine
8 Depending on the Inspection Result, Replace the Engine LP Shut-Off Valve
(FIN 5400QA2) on RH Engine
9 Complete and Send the Inspection Report Sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds given but reference should be made to the AD for confirmation
of the mandated accomplishment timescale.
Accomplishment of this Service Bulletin must be done within the timescale given in
the compliance table below.
T able 1, CONF 001 - Check the PNs and SNs
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do the check
of the PNs and
SNs for the APU
isolation valve
(FIN 5204QA),
engine LP shut-
off valves (FIN
5400QA1 and
FIN 5400QA2)
Before 78
months from
the issuance
of the AD
None None

### Page 15

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 15
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
and APU LP
shut-off valve
(FIN 5200QA)
If the SN(s)
is/are listed
Do a Special
Detailed
Inspection (SDI)
of the APU
isolation valve
(FIN 5204QA)
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-364Z-A
Refer to T able 2 Refer to T able 2 Refer to T able 2
Do an SDI of the
engine LP shut-
off valves (FIN
5400QA1) in
accordance with
Ref. T ask A350-
A-28-XX-P013-
05ZZZ-364Z-A
Refer to T able 3 Refer to T able 3 Refer to T able 3
Do an SDI of the
engine LP shut-
off valves (FIN
5400QA2) in
accordance with
Ref. T ask A350-
A-28-XX-P013-
06ZZZ-364Z-A
Refer to T able 3 Refer to T able 3 Refer to T able 3
Replace the APU
LP shut-off valve
(FIN 5200QA) in
accordance with
Ref. T ask A350-
A-28-XX-P013-
05ZZZ-920Z-A
Refer to T able 4 Refer to T able 4 Refer to T able 4
If the SN(s)
are not listed
Do the check
of the PNs and
SNs for the APU
isolation valve
(FIN 5204QA),
engine LP shutoff
valves (FIN
5400QA1 and FIN
5400QA2) and
APU LP shut-
off valve (FIN
5200QA) in the
spare stock
Before 78
months from
the issuance
of the AD
None None
If the SN(s) are
not identified
in stock spare
Complete
and send the
Inspection
None None None

### Page 16

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 16
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
Report sheet in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
If the SN(s)
are identified
in stock spare
Scrap unit on-
site and provide
scrap certificate
to PARKER or
send back unit
to PARKER
for scrapping
and complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
None None None
T able 2, CONF 001 - SDI of the APU Isolation Valve (FIN 5204QA) for leak
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do an SDI of the
APU isolation
valve (FIN
5204QA) in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-364Z-A
Before 78
months from
the issuance
of the AD
None None
If the leak
test failed
Replace the APU
isolation valve
(FIN 5204QA) in
accordance with
Ref. T ask A350-
A-28-XX-P013-
06ZZZ-920Z-A
Before next flight None None
  Scrap unit on-
site and provide
scrap certificate
to PARKER or
send back unit
to PARKER
for scrapping
None None None
Complete
and send the
Inspection
Report sheet in
accordance with
None None None

### Page 17

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 17
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
If the leak
test passed
Complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
None None None
T able 3, CONF 001 - SDI of the Engine LP Shut-Off Valve (FIN 5400QA1 and FIN
5400QA2) for leak
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do an SDI of
the Left Hand
(LH) engine and
Right Hand (RH)
engine LP shut-
off valves (FIN
5400QA1 and
FIN 5400QA2)
in accordance
with Ref. T ask
A350-A-28-XX-
P013-05ZZZ-
364Z-A and Ref.
T ask A350-A-
28-XX-P013-
06ZZZ-364Z-A
Before 78
months from
the issuance
of the AD
None None
If the leak
test failed
Replace the LH
engine and/or RH
engine LP shut-
off valve(s) (FIN
5400QA1 and
FIN 5400QA2)
in accordance
with Ref. T ask
A350-A-28-XX-
P013-07ZZZ-
920Z-A and Ref.
T ask A350-A-
28-XX-P013-
08ZZZ-920Z-A
Before next flight None None
Scrap unit on-
site and provide
scrap certificate
to PARKER or
send back unit
None None None

### Page 18

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 18
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
to PARKER
for scrapping
Complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
None None None
If the leak
test passed
Complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
None None None
T able 4, CONF 001 - Replacement of the APU LP Shut-Off Valve (FIN 5200QA) for leak
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Replace the APU
LP shut-off valve
(FIN 5200QA) in
accordance with
Ref. T ask A350-
A-28-XX-P013-
05ZZZ-920Z-A
Before 78
months from
the issuance
of the AD
None None
Scrap unit on-
site and provide
scrap certificate
to PARKER or
send back unit
to PARKER
for scrapping
None None None
  Complete
and send the
Inspection
Report sheet in
accordance with
Ref. T ask A350-
A-28-XX-P013-
07ZZZ-90AZ-A
None None None
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator

### Page 19

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 19
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Inspection
(a) T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
PREPARATION
Job Set-up 5.25 h
PROCEDURE
Do a Check of the PNs and SNs 0.50 h
Do an SDI of the APU Isolation Valve (FIN 5204QA) 3.00 h
Do an SDI of the Engine LP Shut-Off Valve (FIN 5400QA1)
on LH Engine
1.50 h
Do an SDI of the Engine LP Shut-Off Valve (FIN 5400QA2)
on RH Engine
1.50 h
Replace the APU LP Shut-Off Valve (FIN 5200QA) 2.00 h
Depending on the Inspection Result, Replace the APU
Isolation Valve (FIN 5204QA)
2.00 h
Depending on the Inspection Result, Replace the Engine LP
Shut-Off Valve (FIN 5400QA1) on LH Engine
2.00 h
Depending on the Inspection Result, Replace the Engine LP
Shut-Off Valve (FIN 5400QA2) on RH Engine
2.00 h
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
T est 1.00 h
CLOSE-UP
Close-up 2.75 h
TOTAL MAN-HOURS 23.75 h
ELAPSED TIME (HOURS) 15.25 h
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection and replacement of the APU LP shut-off
valve (FIN 5200QA). Depending on the inspection result, additional man-
hours can apply.
H. WEIGHT AND BALANCE
None
I. ELECTRICAL LOAD DATA
None

### Page 20

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 20
J. REFERENCES
(1) Inspection
(a) T ask set A350-A-28-XX-P013-02000-93BA-A Inspection
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
00.00.00179 00.00.00258
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-02ZZZ-170Z-A A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-28-22-71-00ZZZ-520Z-A
A350-A-28-22-71-00ZZZ-720Z-A
A350-A-28-22-72-00ZZZ-520Z-A
A350-A-28-22-72-00ZZZ-720Z-A
A350-A-28-24-XX-01ZZZ-320Z-A A350-A-28-24-71-01ZZZ-520Z-A
A350-A-28-24-71-01ZZZ-720Z-A
A350-A-49-31-51-00ZZZ-720Z-A A350-A-52-41-74-00ZZZ-132Z-A
A350-A-52-41-74-00ZZZ-133Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-2X-XX-01ZZZ-04CZ-A A350-A-06-3X-XX-01ZZZ-04CZ-A
K. PUBLICATION AFFECTED
None
L. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment and labour must be negotiated with the
equipment supplier.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 21

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 21
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-28-XX-P013-02000-93BA-A Inspection
MATERIAL QTY SEE NOTES
Referenced tools See SB
Referenced consumables See SB
Equipment See SB
Referenced parts See SB
B. TOOLING
Referenced tools for task set A350-A-28-XX-P013-02000-93BA-A Inspection
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-12-XX-XX-02ZZZ-170Z-A
Ref. MP A350-A-24-41-XX-00ZZZ-561Z-A
Ref. MP A350-A-52-41-74-00ZZZ-132Z-A
Ref. MP A350-A-52-41-74-00ZZZ-133Z-A
Ref. MP A350-A-28-22-72-00ZZZ-520Z-A
Ref. MP A350-A-28-22-72-00ZZZ-720Z-A
C. CONSUMABLES
Referenced consumables for task set A350-A-28-XX-P013-02000-93BA-A
Inspection
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-49-31-51-00ZZZ-720Z-A
Ref. MP A350-A-28-22-72-00ZZZ-720Z-A
Ref. MP A350-A-28-22-71-00ZZZ-720Z-A
Ref. MP A350-A-28-24-71-01ZZZ-720Z-A
D. LIST OF NEW PARTS
Equipment for task set A350-A-28-XX-P013-02000-93BA-A Inspection
Procurement address 24499
PARKER HANNIFIN CORPORATION
FLUID SYSTEMS DIVISION
16666 VON KARMAN AVENUE
IRVINE CA 92606-4917
USA
NOTE(S)
Vendor parts are to be procured from the address given above.
Procurement terms for the equipment must be negotiated with the equipment
supplier.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 2080023-102(24499) 1 VALVE (1) (2) (3)
2 2140083-101(24499) 1 VALVE (1) (2) (3)

### Page 22

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 22
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
3 2080022-102(24499) 1 VALVE (1) (3)
NOTE(S)
(1): The components listed above are not an AIRBUS Kit, the required parts must be
ordered as necessary through the given channel.
(2): The components listed above are only necessary if leak test is failed. The quantity of
these items is to be ordered as required.
(3): Make sure that the SN to be installed is not in the impacted SN list, refer to Ref.
Appendix AFFECTED PN AND SN LIST.
Referenced parts for task set A350-A-28-XX-P013-02000-93BA-A Inspection
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. MP A350-A-49-31-51-00ZZZ-720Z-A
Ref. MP A350-A-28-22-72-00ZZZ-720Z-A
Ref. MP A350-A-28-22-71-00ZZZ-720Z-A
Ref. MP A350-A-28-24-71-01ZZZ-720Z-A
E. LIST OF EXISTING PARTS
No parts

### Page 23

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 23
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-28-XX-P013-02000-93BA-A (A350-A-28-XX-P013-02ZZZ-93BZ-A)
Inspection
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: Discarded parts must be managed at the operator's discretion.

### Page 24

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 24
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 23.75 h
ELAPSED TIME (HOURS) 15.25 h
B. PREPARATION
(1) Task A350-A-28-XX-P013-08001-540A-A (A350-A-28-XX-P013-08ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 5.25 h
Minimum Number of person 2
Elapsed Time 3.25 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-28-22-71-00ZZZ-520Z-A
A350-A-28-22-72-00ZZZ-520Z-A
A350-A-28-24-71-01ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D "Maintenance Procedure - Introduction".
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Do the Job set-up procedure as specified in the removal of the APU LP shut-off
valve (FIN 5200QA), refer to Ref. MP A350-A-28-22-72-00ZZZ-520Z-A.
(c) Do the Job set-up procedure as specified in the removal of the APU isolation
valve (FIN 5204QA), refer to Ref. MP A350-A-28-22-71-00ZZZ-520Z-A.
(d) Do the Job set-up procedure as specified in the removal of the engine LP shut-off
valve (FIN 5400QA1 and FIN 5400QA2), refer to Ref. MP A350-A-28-24-71-01ZZZ-
520Z-A.
C. PROCEDURE
(1) Task A350-A-28-XX-P013-01001-300A-A (A350-A-28-XX-P013-01ZZZ-300Z-A)
Do a Check of the PNs and SNs
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Procedure

### Page 25

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 25
(a) Do the check of the APU isolation valve (FIN 5204QA), engine LP shut-off valves
(FIN 5400QA1 and FIN 5400QA2) and APU LP shut-off valve (FIN 5200QA), refer
to Ref. Appendix AFFECTED PN AND SN LIST and Ref. Fig.FA Flowchart.
NOTE: This SB applicability is a batch of MSNs potentially having the defective
SN installed. However, the operators are invited to check the potential
impact on their fleet based on the valve SN list provided in Ref.
Appendix AFFECTED PN AND SN LIST and their internal maintenance
records.
1 If the SN(s) is/are listed:
a For APU isolation valve (FIN 5204QA), do an SDI in accordance with
Ref. T ask A350-A-28-XX-P013-07ZZZ-364Z-A.
b For engine LP shut-off valve on LH engine (FIN 5400QA1), do an SDI
in accordance with Ref. T ask A350-A-28-XX-P013-05ZZZ-364Z-A.
c For engine LP shut-off valve on RH engine (FIN 5400QA2), do an SDI
in accordance with Ref. T ask A350-A-28-XX-P013-06ZZZ-364Z-A.
d For APU LP shut-off valve (FIN 5200QA), replace the valve in
accordance with Ref. T ask A350-A-28-XX-P013-05ZZZ-920Z-A.
2 If the SNs are not listed:
a Do a check of SNs in spare stock
<1> If SNs are identified in spare stock:
<a> Scrap the unit on-site and provide scrap certificate to
PARKER.
or
Send back the unit to PARKER for scrapping.
<b> Complete and send the Inspection Report sheet in
accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-
90AZ-A.
<2> If SNs are not identified in spare stock:
<a> Complete and send the Inspection Report sheet in
accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-
90AZ-A.

### Page 26

A350
SERVICE BULLETIN
Figure ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Flowchart
Page 26
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
REFER TO "APPENDIX - AFFECTED PN AND SN LIST".02
IMPACTED VALVE IDENTIFIED IN THE SPARE STOCK03
OR
IMPACTED VALVE REMOVED FROM A/C REGARDLESS OF REASON.
SN LISTED?
IS THE NOYES
REPLACE THE IMPACTED
APU LP SHUT-OFF VALVE
NO YES
DO THE LEAK TEST OF
THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
REPLACE THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
NO
YES
IS THE
LEAK TEST
PASSED?
SNs LISTED FOR
THE APU ISOLATION
VALVE AND/OR FOR THE
ENGINE LP SHUT-OFF
ARE THE
VALVE(S)?
SEND INSPECTION
REPORT TO AIRBUS
DO A CHECK OF
THE APU VALVE
SN IDENTIFIED?
IS THE
YES NO
SEND INSPECTION
REPORT TO AIRBUS
SN IN THE SPARE
STOCK 03
01 02VALVE (FIN 5200QA) SN
DO THE CHECK OF THE APU LP SHUT-OFF
01 02VALVE(S) (FIN 5400QA1 AND FIN 5400QA2) SN
DO THE CHECK OF THE APU ISOLATION VALVE
(FIN 5204QA) SN AND ENGINE LP SHUT-OFF
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01

### Page 27

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 27
(2) Task A350-A-28-XX-P013-07001-364A-A (A350-A-28-XX-P013-07ZZZ-364Z-A)
Do an SDI of the APU Isolation Valve (FIN 5204QA)
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Manpower/Resources/Skills
Man-hours 3.00 h
Minimum Number of person 2
Elapsed Time 1.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
Refer to Ref. Fig.FA Flowchart.
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
(b) Do an SDI of the APU isolation valve (FIN 5204QA) for leak in accordance
with Ref. Appendix PROCEDURE FOR LEAK TESTING OF APU ISOLATION VALVE
(5204QA).
(c) If the leak test is passed:
1 After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-90AZ-
A.
(d) If the leak test is not passed:
1 Replace the APU isolation valve (FIN 5204QA) in accordance with Ref. T ask
A350-A-28-XX-P013-06ZZZ-920Z-A.
2 Scrap the removed unit on-site and provide scrap certificate to PARKER.
or
Send back the removed unit to PARKER for scrapping.
3 After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-90AZ-
A.

### Page 28

A350
SERVICE BULLETIN
Figure ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Flowchart
Page 28
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
REFER TO "APPENDIX - AFFECTED PN AND SN LIST".02
IMPACTED VALVE IDENTIFIED IN THE SPARE STOCK03
OR
IMPACTED VALVE REMOVED FROM A/C REGARDLESS OF REASON.
SN LISTED?
IS THE NOYES
REPLACE THE IMPACTED
APU LP SHUT-OFF VALVE
NO YES
DO THE LEAK TEST OF
THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
REPLACE THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
NO
YES
IS THE
LEAK TEST
PASSED?
SNs LISTED FOR
THE APU ISOLATION
VALVE AND/OR FOR THE
ENGINE LP SHUT-OFF
ARE THE
VALVE(S)?
SEND INSPECTION
REPORT TO AIRBUS
DO A CHECK OF
THE APU VALVE
SN IDENTIFIED?
IS THE
YES NO
SEND INSPECTION
REPORT TO AIRBUS
SN IN THE SPARE
STOCK 03
01 02VALVE (FIN 5200QA) SN
DO THE CHECK OF THE APU LP SHUT-OFF
01 02VALVE(S) (FIN 5400QA1 AND FIN 5400QA2) SN
DO THE CHECK OF THE APU ISOLATION VALVE
(FIN 5204QA) SN AND ENGINE LP SHUT-OFF
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01

### Page 29

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 29
(3) Task A350-A-28-XX-P013-05001-364A-A (A350-A-28-XX-P013-05ZZZ-364Z-A)
Do an SDI of the Engine LP Shut-Off Valve (FIN 5400QA1) on LH Engine
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
210
415
Manpower/Resources/Skills
Man-hours 1.50 h
Minimum Number of person 1
Elapsed Time 1.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-28-24-XX-01ZZZ-320Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
Refer to Ref. Fig.FA Flowchart.
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the FR identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-04CZ-A.
(b) Do an SDI of the engine LP shut-off valve (FIN 5400QA1) on LH engine (FIN
5400QA1) for leak as specified in the operational check to confirm the LPSOV
isolates the fuel supply to the related engine, refer to Ref. MP A350-A-28-24-XX-
01ZZZ-320Z-A.
(c) If the leak test is passed:
1 After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-90AZ-
A.
(d) If the leak test is not passed:
1 Replace the engine LP shut-off valve (FIN 5400QA1) on LH engine in
accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-920Z-A.
2 Scrap the removed unit on-site and provide scrap certificate to PARKER.
or
Send back the removed unit to PARKER for scrapping.
3 After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-90AZ-
A.

### Page 30

A350
SERVICE BULLETIN
Figure ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Flowchart
Page 30
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
REFER TO "APPENDIX - AFFECTED PN AND SN LIST".02
IMPACTED VALVE IDENTIFIED IN THE SPARE STOCK03
OR
IMPACTED VALVE REMOVED FROM A/C REGARDLESS OF REASON.
SN LISTED?
IS THE NOYES
REPLACE THE IMPACTED
APU LP SHUT-OFF VALVE
NO YES
DO THE LEAK TEST OF
THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
REPLACE THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
NO
YES
IS THE
LEAK TEST
PASSED?
SNs LISTED FOR
THE APU ISOLATION
VALVE AND/OR FOR THE
ENGINE LP SHUT-OFF
ARE THE
VALVE(S)?
SEND INSPECTION
REPORT TO AIRBUS
DO A CHECK OF
THE APU VALVE
SN IDENTIFIED?
IS THE
YES NO
SEND INSPECTION
REPORT TO AIRBUS
SN IN THE SPARE
STOCK 03
01 02VALVE (FIN 5200QA) SN
DO THE CHECK OF THE APU LP SHUT-OFF
01 02VALVE(S) (FIN 5400QA1 AND FIN 5400QA2) SN
DO THE CHECK OF THE APU ISOLATION VALVE
(FIN 5204QA) SN AND ENGINE LP SHUT-OFF
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01

### Page 31

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 31
(4) Task A350-A-28-XX-P013-06001-364A-A (A350-A-28-XX-P013-06ZZZ-364Z-A)
Do an SDI of the Engine LP Shut-Off Valve (FIN 5400QA2) on RH Engine
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
210
425
Manpower/Resources/Skills
Man-hours 1.50 h
Minimum Number of person 1
Elapsed Time 1.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-28-24-XX-01ZZZ-320Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
Refer to Ref. Fig.FA Flowchart.
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the FR identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-04CZ-A.
(b) Do an SDI of the engine LP shut-off valve (FIN 5400QA2) on RH engine (FIN
5400QA2) for leak as specified in the operational check to confirm the LPSOV
isolates the fuel supply to the related engine, refer to Ref. MP A350-A-28-24-XX-
01ZZZ-320Z-A.
(c) If the leak test is passed:
1 After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-90AZ-
A.
(d) If the leak test is not passed:
1 Replace the engine LP shut-off valve (FIN 5400QA2) on RH engine in
accordance with Ref. T ask A350-A-28-XX-P013-08ZZZ-920Z-A.
2 Scrap the removed unit on-site and provide scrap certificate to PARKER.
or
Send back the removed unit to PARKER for scrapping.
3 After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-28-XX-P013-07ZZZ-90AZ-
A.

### Page 32

A350
SERVICE BULLETIN
Figure ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Flowchart
Page 32
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION GIVEN IN THE PROCEDURE AND
COMPLIANCE PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE
TIMES GIVEN IN THIS SERVICE BULLETIN.
FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).01
REFER TO "APPENDIX - AFFECTED PN AND SN LIST".02
IMPACTED VALVE IDENTIFIED IN THE SPARE STOCK03
OR
IMPACTED VALVE REMOVED FROM A/C REGARDLESS OF REASON.
SN LISTED?
IS THE NOYES
REPLACE THE IMPACTED
APU LP SHUT-OFF VALVE
NO YES
DO THE LEAK TEST OF
THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
REPLACE THE IMPACTED APU
ISOLATION VALVE AND/OR
ENGINE LP SHUT-OFF VALVE(S)
NO
YES
IS THE
LEAK TEST
PASSED?
SNs LISTED FOR
THE APU ISOLATION
VALVE AND/OR FOR THE
ENGINE LP SHUT-OFF
ARE THE
VALVE(S)?
SEND INSPECTION
REPORT TO AIRBUS
DO A CHECK OF
THE APU VALVE
SN IDENTIFIED?
IS THE
YES NO
SEND INSPECTION
REPORT TO AIRBUS
SN IN THE SPARE
STOCK 03
01 02VALVE (FIN 5200QA) SN
DO THE CHECK OF THE APU LP SHUT-OFF
01 02VALVE(S) (FIN 5400QA1 AND FIN 5400QA2) SN
DO THE CHECK OF THE APU ISOLATION VALVE
(FIN 5204QA) SN AND ENGINE LP SHUT-OFF
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
SEND INSPECTION
REPORT TO AIRBUS
SCRAP UNIT ON-SITE
AND PROVIDE SCRAP
CERTIFICATE TO PARKER
OR
SEND BACK UNIT TO
PARKER FOR SCRAPPING
ICN-A350-A-28XXP013-A-FAPE3-068BX-A-002-01

### Page 33

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 33
(5) Task A350-A-28-XX-P013-05001-920A-A (A350-A-28-XX-P013-05ZZZ-920Z-A)
Replace the APU LP Shut-Off Valve (FIN 5200QA)
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
310
Access Panel 314AR314
Work location From Frame 102 to Frame 104
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
3 2080022-102 1 VALVE (1)
NOTE(S)
(1): Make sure that the SN to be installed is not in the impacted SN list, refer to Ref.
Appendix AFFECTED PN AND SN LIST.
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-28-22-72-00ZZZ-520Z-AA350-A-28-22-72-00ZZZ-720Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the FR identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-04CZ-A.
(b) Remove the APU LP shut-off valve (FIN 5200QA), refer to Ref. MP A350-A-28-22-
72-00ZZZ-520Z-A:
FIN 5200QA
1 APU LP Valve   Item (3) Discard
(c) Install the APU LP shut-off valve (FIN 5200QA), refer to Ref. MP A350-A-28-22-72-
00ZZZ-720Z-A:
FIN 5200QA
1 VALVE-LP, 0,75 INCH 2080022-102 Item 3
(d) Scrap the removed unit on-site and provide scrap certificate to PARKER.
or
Send back the removed unit to PARKER for scrapping.

### Page 34

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 34
(e) Complete and send the Inspection Report sheet in accordance with Ref. T ask
A350-A-28-XX-P013-07ZZZ-90AZ-A.
(6) Task A350-A-28-XX-P013-06001-920A-A (A350-A-28-XX-P013-06ZZZ-920Z-A)
Depending on the Inspection Result, Replace the APU Isolation Valve (FIN
5204QA)
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 142AZ140
Work location From Frame 46 to Frame 54
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 2080023-102 1 VALVE (1) (2)
NOTE(S)
(1): The components listed above are only necessary if leak test is failed. The quantity of
these items is to be ordered as required.
(2): Make sure that the SN to be installed is not in the impacted SN list, refer to Ref.
Appendix AFFECTED PN AND SN LIST.
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-28-22-71-00ZZZ-520Z-AA350-A-28-22-71-00ZZZ-720Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the FR identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-04CZ-A.
(b) Remove the APU Isolation Valve (FIN 5204QA), refer to Ref. MP A350-A-28-22-71-
00ZZZ-520Z-A:
FIN 5204QA
1 APU Isolation Valve   Item (1) Discard
(c) Install the APU Isolation Valve (FIN 5204QA), refer to Ref. MP A350-A-28-22-71-
00ZZZ-720Z-A:
FIN 5204QA

### Page 35

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 35
1 VALVE-ISOLATION,LP
0.75IN
2080023-102 Item 1
(7) Task A350-A-28-XX-P013-07001-920A-A (A350-A-28-XX-P013-07ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Engine LP Shut-Off Valve
(FIN 5400QA1) on LH Engine
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 542CB542
Work location From Rib 11 to Rib 12
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 2140083-101 1 VALVE (1) (2)
NOTE(S)
(1): The components listed above are only necessary if leak test is failed. The quantity of
these items is to be ordered as required.
(2): Make sure that the SN to be installed is not in the impacted SN list, refer to Ref.
Appendix AFFECTED PN AND SN LIST.
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-28-24-71-01ZZZ-520Z-AA350-A-28-24-71-01ZZZ-720Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the FR identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-04CZ-A.
(b) Remove the engine LP shut-off valve (FIN 5400QA1) on LH engine, refer to Ref.
MP A350-A-28-24-71-01ZZZ-520Z-A:
FIN 5400QA1
1 Engine LP-Fuel Valve   Item (2) Discard
(c) Install the engine LP shut-off valve (FIN 5400QA1) on LH engine, refer to Ref. MP
A350-A-28-24-71-01ZZZ-720Z-A:
FIN 5400QA1
1 VALVE-ENGINE LP 2140083-101 Item 2

### Page 36

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 36
(8) Task A350-A-28-XX-P013-08001-920A-A (A350-A-28-XX-P013-08ZZZ-920Z-A)
Depending on the Inspection Result, Replace the Engine LP Shut-Off Valve
(FIN 5400QA2) on RH Engine
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Panel 624CB642
Work location From Rib 11 to Rib 12
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Material necessary to do the job
Equipment
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
2 2140083-101 1 VALVE (1) (2)
NOTE(S)
(1): The components listed above are only necessary if leak test is failed. The quantity of
these items is to be ordered as required.
(2): Make sure that the SN to be installed is not in the impacted SN list, refer to Ref.
Appendix AFFECTED PN AND SN LIST.
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-28-24-71-01ZZZ-520Z-AA350-A-28-24-71-01ZZZ-720Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the FR identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-04CZ-A.
(b) Remove the engine LP shut-off valve (FIN 5400QA2) on RH engine, refer to Ref.
MP A350-A-28-24-71-01ZZZ-520Z-A:
FIN 5400QA2
1 Engine LP-Fuel Valve   Item (2) Discard
(c) Install the engine LP shut-off valve (FIN 5400QA2) on RH engine, refer to Ref. MP
A350-A-28-24-71-01ZZZ-720Z-A:
FIN 5400QA2
1 VALVE-ENGINE LP 2140083-101 Item 2
(9) Task A350-A-28-XX-P013-07001-90AA-A (A350-A-28-XX-P013-07ZZZ-90AZ-A)
Complete and Send the Inspection Report Sheet

### Page 37

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 37
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig.RA Inspection Report
Sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.

### Page 38

A350
SERVICE BULLETIN
Figure ICN-A350-A-28XXP013-A-FAPE3-068BZ-A-002-01 Fig.RA Sol.AA SHEET 1/1
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Inspection Report Sheet
Page 38
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A350-28-P013
DATE OF INSPECTION :
INSPECTION METHOD : DETAILED
INSPECTION
LH ENGINE LP SHUT-OFF VALVE (FIN 5400QA1) TO BE TESTED
IF YES
TEST PASSED?
IF TEST FAILED, UNIT REPLACED?
PN:
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
SN:
NO
NO
RH ENGINE LP SHUT-OFF VALVE (FIN 5400QA2) TO BE TESTED
IF YES
TEST PASSED?
IF TEST FAILED, UNIT REPLACED?
PN:
NO
SN:
NO
NO
APU ISOLATION VALVE (FIN 5204QA) TO BE TESTED
IF YES
TEST PASSED?
IF TEST FAILED, UNIT REPLACED?
PN:
NO
SN:
NO
NO
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
APU LP SHUT-OFF VALVE (FIN 5200QA) TO BE REPLACED
IF YES
UNIT REPLACED?
PN:
NO
SN:
NO
ICN-A350-A-28XXP013-A-FAPE3-068BZ-A-002-01

### Page 39

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 39
D. PREPARATION FOR TEST
None
E. TEST
(1) Task A350-A-28-XX-P013-04001-390A-A (A350-A-28-XX-P013-04ZZZ-390Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-28-22-71-00ZZZ-720Z-A
A350-A-28-22-72-00ZZZ-720Z-A
A350-A-28-24-71-01ZZZ-720Z-A
Procedure
(a) This Service Bulletin requires the accomplishment of T ests given in other topics
which are referenced in the table below:
Task MP Task
Ref. T ask A350-A-28-XX-P013-05ZZZ-920Z-A Ref. MP A350-A-28-22-72-00ZZZ-720Z-A
Ref. T ask A350-A-28-XX-P013-06ZZZ-920Z-A Ref. MP A350-A-28-22-71-00ZZZ-720Z-A
Ref. T ask A350-A-28-XX-P013-07ZZZ-920Z-A
Ref. T ask A350-A-28-XX-P013-08ZZZ-920Z-A
Ref. MP A350-A-28-24-71-01ZZZ-720Z-A
F. CLOSE-UP
(1) Task A350-A-28-XX-P013-07001-740A-A (A350-A-28-XX-P013-07ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 2.75 h
Minimum Number of person 2
Elapsed Time 1.75 h
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-28-22-71-00ZZZ-720Z-A
A350-A-28-22-72-00ZZZ-720Z-A
A350-A-28-24-71-01ZZZ-720Z-A
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.

### Page 40

A350
SERVICE BULLETIN
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 40
(b) Do the Close-up procedure as specified in the installation of the APU LP shut-off
valve (FIN 5200QA), refer to Ref. MP A350-A-28-22-72-00ZZZ-720Z-A.
(c) Do the Close-up procedure as specified in the installation of the APU isolation
valve (FIN 5204QA), refer to Ref. MP A350-A-28-22-71-00ZZZ-720Z-A.
(d) Do the Close-up procedure as specified in the installation of the engine LP shut-
off valve (FIN 5400QA1 and FIN 5400QA2), refer to Ref. MP A350-A-28-24-71-
01ZZZ-720Z-A.
(e) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-28-XX-P013-06001-90AA-A (A350-A-28-XX-P013-06ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 41

A350
SERVICE BULLETIN
APPENDIX
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 41
APPENDIX
A. PROCEDURE FOR LEAK TESTING OF APU ISOLATION VALVE (5204QA)
PROCEDURE FOR LEAK TESTING OF APU ISOLATION VALVE (5204QA)
For further information concerning the procedure for leak test of APU isolation valve (FIN
5204QA), refer to the next page(s).

### Page 42

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068HN-A-002-01 Fig.AF Sol.AA SHEET 1/6
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Procedure for Leak T esting of APU Isolation Valve (5204QA)
Page 42
CONF ALL
LEAK TEST OF THE APU ISOLATION VALVE FIN : 5204QA
1. Reason for the job
To check fuel isolation of fuel supply to the APU from the APU Isolation Valve (5204QA).
2. Job Set-Up
A. Safety Precautions
WARNING: BEFORE YOU DO WORK ON THE FUEL SYSTEM, MAKE SURE THAT YOU
OBEY THE FUEL SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS
AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures when you do work on the fuel system
Ref. MP A350-A-28-XX-XX-00ZZZ-200Z-A
(2) As necessary, use the applicable SAFETY BARRIER(S) specified in the operator
instructions and your local regulations.
(3) In the cockpit (zone 210), on the overhead panel:
(a) Put a WARNING NOTICE(S) in these position:
1 On the overhead panel, on the APU section of panel 215VM, START pushbutton switch to
tell persons not to start the APU.
2 On the FUEL section of panel 235VM to tell persons not to operate the fuel system unless
specified by this procedure.
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
Ref. MP A350-A-24-41-XX-00ZZZ-761Z-A
(2) In the cockpit (zone 210):
(a) On the overhead panel, on the FUEL section of panel 235VM, make sure that the
pushbutton switches are released (out) (the OFF legends are on) for:
-   CENTER (CTR) TANK (TK) LEFT (L) pushbutton switch
-   CTR TK RIGHT (R) pushbutton switch
-   L TK MAIN and STANDBY (STBY) pushbutton switches
-   R TK MAIN and STBY pushbutton switches
(b) On the overhead panel, on the FUEL section of panel 235VM, make sure that the
pushbutton switches are released (out) (the OPEN and ON legends are off) for:
-   CROSSFEED A pushbutton switch
-   CROSSFEED B pushbutton switch
(c) On the overhead panel, on the APU section of panel 215VM, make sure that the
START pushbutton switch is released (the ON legend is off).
(3) Make sure that the Control and Display System (CDS) is in operation
Ref. MP A350-A-31-63-XX-00ZZZ-132Z-A
(4) On the centre pedestal, on panel 135VM, push (in) the FUEL pushbutton switch. Make
sure that the Electronic Centralized Aircraft Monitoring (ECAM) System Display (SD) shows the FUEL page.
(5) Make sure that there is a minimum fuel quantity of 200 kg (440 lb) in the left wing tank. If
necessary, do a ground fuel transfer Ref. MP A350-A-28-25-XX-03ZZZ-200Z-A or a manual
refuel Ref. MP A350-A-28-25-XX-01ZZZ-211Z-A
ICN-A350-A-28XXP013-A-FAPE3-068HN-A-002-01

### Page 43

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068HO-A-002-01 Fig.AF Sol.AA SHEET 2/6
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Procedure for Leak T esting of APU Isolation Valve (5204QA)
Page 43
CONF ALL
(6) On the rear belly fairing (zone 190):
(a) Open the access door 197KB.
(b) On the IRP 11QU, make sure that the MODE SELECT selector switch is set to the
OFF position.
(c) Put a warning notice on the IRP 11QU, to tell persons not to operate the fuel system.
(7) On a maintenance terminal, get access to the "MAINTENANCE HOME PAGE"
Ref. MP A350-A-45-XX-XX-00ZZZ-132Z-A.
(8) On the "MAINTENANCE HOME PAGE", select "C/B Management"
Ref. MP A350-A-24-71-XX-00ZZZ-170Z-A.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANEL DESIGNATION FIN LOCATION
CBP2 C/B-APU FUEL LP V 3200QC 6AF06
CBP2 C/B-APU ISOL V 3202QC 6AK14
CBP2 C/B-APU FUEL PUMP 3204QC 6AG07
CBP2 C/B-APU FUEL V RLY 3206QC 6AG12
D. Open, safety/lock and tag this(these) circuit breaker(s): Use SAFETY CLIP -
CIRCUIT BREAKER as necessary.
PANEL DESIGNATION FIN LOCATION
CBP2 C/B-APU START CTL 3202KD 6AH05
CBP2 C/B-SGCU BKUP SPLY 3200KA 6AD06
E. Bleeding of the APU Fuel Pipe
(1) Put an ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position below the APU
compartment.
(2) Open APU access doors 315AL and 316AR and safety them in the open position
Ref. MP A350-A-52-41-74-00ZZZ-132Z-A.
(3) In the APU compartment, set SERVICE LIGHT (LT) switch 3LJ3 to on.
(4) Remove the cap from the APU drain and vent valve.
(5) Install the ADAPTER-VENT AND DRAIN VALVE, APU (98A28007570000) on the APU
drain and vent valve.
(6) Put a fuel resistant CONTAINER 20L (5 USGAL) in position below the outlet of the APU
drain and vent valve adapter.
(7) Push and hold the APU Fuel-Vent pushbutton.
NOTE: This opens the valves along the APU fuel line and keeps the APU fuel pump on.
(8) When the fuel flows out of the APU drain and vent valve without air, release the APU
Fuel-Vent pushbutton.
(9) Remove the APU drain and vent valve adapter from the APU drain and vent valve, when
there is no fuel drops.
(10) Install the cap on the APU drain and vent valve and tighten it with your hand.
ICN-A350-A-28XXP013-A-FAPE3-068HO-A-002-01

### Page 44

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068HP-A-001-01 Fig.AF Sol.AA SHEET 3/6
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Procedure for Leak T esting of APU Isolation Valve (5204QA)
Page 44
CONF ALL
(11) Remove the container and discard the fuel. To discard the unwanted fuel, refer to local
regulations.
WARNING: MAKE SURE THAT NO PERSONS OR OBJECTS ARE NEAR THE APU AIR
INTAKE FLAP. THE APU AIR-INTAKE FLAP WILL MOVE DURING THE PROCEDURE
F. Secure APU-Fuel Low Pressure Valve Open
(1) In the cockpit (zone 210):
(b) On the ECAM FUEL SD page, make sure that the APU legend (white) with a
horizontal arrow (green) are shown.
(a) On the overhead panel, on the APU section of panel 215VM, push (in) the APU
MASTER SWITCH (SW) (the ON legend is on).
NOTE: In zone 310, you will hear a click sound momentarily from the APU igniters because
of the APU self-test.
(2) On a maintenance terminal, get access to the "MAINTENANCE HOME PAGE"
Ref. MP A350-A-45-XX-XX-00ZZZ-132Z-A.
(3) On the "MAINTENANCE HOME PAGE", select "C/B Management"
Ref. MP A350-A-24-71-XX-00ZZZ-170Z-A.
(4) Open 3200QC.
(5) In the cockpit (zone 210):
(a) On the overhead panel, on the APU section of panel 215VM, release (out) the APU
MASTER SW (the ON legend is off).
(6) Wait for 30 seconds.
(7) Make sure that:
(a) On the ECAM DISPATCH page, the FUEL APU FEED LP VALVE (VLV) dispatch message is
shown.
(b) On the ECAM FUEL SD page, the APU legend (white) with a horizontal arrow (green)
are not shown.
G. Get Access
(1) In zone 314
(a) Put the ACCESS PLATFORM 6M (20 FT) in position below access door 314AR.
(b) Open access door 314AR and safety it in the open position.
(i) In the rear fuselage, set SERVICE LT switch 3LJ4 to on.
(ii) Be careful not to put your foot on a closed access door.
(c) Make sure that the mechanical indicator of the APU LP valve actuator is in the
open position.
ICN-A350-A-28XXP013-A-FAPE3-068HP-A-001-01

### Page 45

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068HQ-A-001-01 Fig.AF Sol.AA SHEET 4/6
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Procedure for Leak T esting of APU Isolation Valve (5204QA)
Page 45
CONF ALL
(2) In zone 310:
(a) Make sure that the access platform is in position below the APU compartment.
WARNING: YOU MUST PUT ON AND ATTACH A SAFETY HARNESS BEFORE YOU
START WORK:
- IN THE NLG OR MLG BAYS
- ON THE THS OR IN THE REAR FUSELAGE
- ON TOP OF THE WINGS OR PYLONS.
WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR
CAUSE YOU INJURY.
(b) Put on and attach a SAFETY HARNESS before you start work in the work area.
Ref. MP A350-A-12-XX-XX-02ZZZ-170Z-A.
(c) Make sure that APU access doors 315AL and 316AR are open and safe tied in the open
position
Ref. MP A350-A-52-41-74-00ZZZ-132Z-A.
(d) In the APU compartment, make sure that SERVICE LT switch
3LJ3 is set to on.
3. Procedure
A. Operational test to confirm the Isolation of Fuel Supply to APU
(1) In zone 310, remove the cap from the APU drain and vent valve.
(2) Put the fuel-resistant container in position below the APU drain and vent valve.
(3) Install the APU drain and vent valve adapter on the APU drain and vent valve.
(4) Pressurize the APU fuel-feed-pipe:
(a) On the overhead panel, on the FUEL section of panel 235VM, push (in) the L TK
MAIN pushbutton switch.
(b) On the ECAM FUEL SD page, make sure that the L TK MAIN pump is indicated
green in line.
(5) Do a fuel leak check at the drain and vent valve adapter on the APU drain and vent valve.
(a) Make sure that the rate of leakage is not more than 40 drops per minute.
(6) On the FUEL section of panel 235VM, release (out) the L TK MAIN pushbutton switch.
(a) On the ECAM FUEL SD page, make sure that the L TK MAIN pump is indicated
amber not in line.
(7) If you find the rate of leakage is more than 40 drops per minute, replace the APU Fuel
Isolation Valve Ref. MP A350-A-28-22-71-00001-520A-A and Ref. MP A350-A-28-22-71-
00001-720A-A.
(8) Remove the APU drain and vent valve adapter from the APU drain and vent valve.
(9) Close circuit breaker 3200QC.
ICN-A350-A-28XXP013-A-FAPE3-068HQ-A-001-01

### Page 46

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068HR-A-001-01 Fig.AF Sol.AA SHEET 5/6
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Procedure for Leak T esting of APU Isolation Valve (5204QA)
Page 46
CONF ALL
(10) Do the operational test of the APU isolation valve and the APU LP valve that follows:
ACTION RESULT
1. On the overhead panel
215VM, push (in) the APU
MASTER SW pushbutton
switch.
On the overhead panel 215VM, on the APU MASTER SW
pushbutton switch:
- The ON light comes on
- The FAULT light stays off.
On the SD, on the FUEL page:
- The APU legend (white) with a horizontal arrow (green)
is shown.
NOTE: This gives an indication that the APU isolation
valve and the APU LP valve are in the OPEN position.
2. On the overhead panel, on
the
FUEL section of panel
235VM, push (in) the L TK
MAIN pushbutton switch.
On the ECAM FUEL SD page, make sure that the L TK
MAIN pump is indicated green in line.
3. Do a leak check at the APU
drain and vent valve.
Monitor for leaks over a period of 1 minute. Leaks are not
permitted. If there is a leak, replace the APU drain and
vent valve Ref. A350-A-49-31-51- 00ZZZ-520Z-A and
Ref. A350-A-49-31-51-00ZZZ-720Z-A.
4. On the FUEL section of
panel 235VM, release (out)
the L TK MAIN pushbutton
switch.
On the ECAM FUEL SD page, make sure that the L TK
MAIN pump is indicated amber not in line.
5. On the overhead panel
215VM, release (out) the APU
MASTER SW pushbutton
switch.
On the overhead panel 215VM, on the APU MASTER SW
pushbutton switch:
- The ON light goes off
- The FAULT light stays off.
On the SD, on the FUEL page:
- The APU legend (white) with a horizontal arrow (green)
are not shown.
NOTE: This gives an indication that the APU isolation
valve and the APU LP valve are in the CLOSED position.
6. On the ECAM control panel
135VM, push (in) the
DISPATCH pushbutton
switch.
On the SD, on the DISPATCH page:
- Make sure that there are no dispatch messages for a
failed open APU LP Valve or an APU Isolation Valve.
(11) Install the cap on the APU drain and vent valve and tighten it with your hand.
(12) Remove the container and discard the fuel. To discard the unwanted fuel, refer to local
regulations.
ICN-A350-A-28XXP013-A-FAPE3-068HR-A-001-01

### Page 47

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068HS-A-001-01 Fig.AF Sol.AA SHEET 6/6
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Procedure for Leak T esting of APU Isolation Valve (5204QA)
Page 47
CONF ALL
B. Remove the tag(s) and/or the CIRCUIT-BREAKER SAFETY CLIP(S) and close/unlock
this (these) circuit breaker(s):
PANEL DESIGNATION FIN LOCATION
CBP2 C/B-APU START CTL 3202KD 6AH05
CBP2 C/B-SGCU BKUP SPLY 3200KA 6AD06
4. Close-Up
A. Close Access
(1) In zone 310:
(a) Make sure that the work area is clean and clear of tools and other items.
(b) In the APU compartment, set SERVICE LT switch 3LJ3 to off.
(c) Close access doors 315AL and 316AR
Ref. MP A350-A-52-41-74-00ZZZ-133Z-A.
(2) In zone 314:
(a) Make sure that the work area is clean and clear of tools and other items.
(b) In the rear fuselage, set SERVICE LT switch 3LJ4 to off.
(c) Remove the safety device and close access door 314AR.
(d) Remove the ACCESS PLATFORM(S).
B. Aircraft Maintenance Configuration
(1) Close the maintenance session
Ref. MP A350-A-45-XX-XX-00ZZZ-133Z-A.
(2) De-energize the aircraft electrical circuits
Ref. MP A350-A-24-41-XX-00ZZZ-561Z-A.
C. Removal of Equipment
(1) On the rear belly fairing (zone 190):
(a) Remove warning notice from the IRP 11QU.
(b) In the rear fuselage, set SERVICE LT switch 3LJ4 to off.
(2) If used, remove the SAFETY BARRIERS.
(3) Remove all the fixtures, tools, test and support equipment used during this procedure.
ICN-A350-A-28XXP013-A-FAPE3-068HS-A-001-01

### Page 48

A350
SERVICE BULLETIN
APPENDIX
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22 Page 48
B. AFFECTED PN AND SN LIST
AFFECTED PN AND SN LIST
For further information concerning the affected PNs and SNs, refer to the next page(s).

### Page 49

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BG-A-002-01 Fig.AA Sol.AA SHEET 1/5
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the APU Isolation Valve (FIN 5204QA)
Page 49
CONF ALL
PRODUCTION MSN 01 PN SN
0005 2080023-102 AAF2065
0006 2080023-102 AAF2066
0007 2080023-102 AAF2068
0008 2080023-102 AAF2167
0009 2080023-102 AAF2063
0010 2080023-102 AAF2069
0011 2080023-102 AAF2067
0012 2080023-102 AAF2071
0013 2080023-102 AAF2070
0014 2080023-102 AAF2166
0015 2080023-102 AAF2168
0016 2080023-102 AAG1316
0017 2080023-102 AAJ0301
0018 2080023-102 AAG1439
0019 2080023-102 AAJ2181
0020 2080023-102 AAJ2180
0021 2080023-102 AAG1315
0022 2080023-102 AAG1438
0023 2080023-102 AAG1435
0024 2080023-102 AAG1440
0025 2080023-102 AAJ2182
0026 2080023-102 AAJ2184
0027 2080023-102 AAJ2183
0028 2080023-102 AAJ2185
0029 2080023-102 AAJ4226
0030 2080023-102 AAJ4228
0031 2080023-102 AAJ4227
0032 2080023-102 AAJ2186
0033 2080023-102 AAJ5515
0034 2080023-102 AAK0362
0035 2080023-102 AAK0361
0036 2080023-102 AAK5446
0037 2080023-102 AAK5445
0038 2080023-102 AAK5444
0039 2080023-102 AAK5642
0040 2080023-102 AAK5447
PRODUCTION MSN 01 PN SN
0041 2080023-102 AAK5987
0042 2080023-102 AAK5986
0043 2080023-102 AAK6340
0044 2080023-102 AAG1436
0045 2080023-102 AAK6339
0046 2080023-102 AAK7289
0047 2080023-102 AAK7290
0048 2080023-102 AAK7304
0049 2080023-102 AAG1437
0050 2080023-102 AAK8656
0051 2080023-102 AAK8655
0052 2080023-102 AAL2798
0053 2080023-102 AAL2799
0054 2080023-102 AAL3038
0055 2080023-102 AAL3037
0056 2080023-102 AAK8942
0057 2080023-102 AAL3671
0058 2080023-102 AAL3672
0060 2080023-102 AAL3673
0061 2080023-102 AAL3674
0062 2080023-102 AAL6257
0063 2080023-102 AAL6258
0064 2080023-102 AAL7308
0065 2080023-102 AAL1747
0066 2080023-102 AAL4708
0067 2080023-102 AAL7310
0068 2080023-102 AAL7309
0069 2080023-102 AAL6964
0070 2080023-102 AAL6962
0071 2080023-102 AAL4709
0072 2080023-102 AAL6963
0073 2080023-102 AAL9431
0074 2080023-102 AAL9433
0075 2080023-102 AAL9430
0076 2080023-102 AAL9432
0077 2080023-102 AAL9528
PN SN
0078 2080023-102 AAL9529
0079 2080023-102 AAM0099
0080 2080023-102 AAM0098
0081 2080023-102 AAM0101
0082 2080023-102 AAM3633
0083 2080023-102 AAM1239
0084 2080023-102 AAM1237
0085 2080023-102 AAM1238
0086 2080023-102 AAM3634
0087 2080023-102 AAM4387
0088 2080023-102 AAL9530
0089 2080023-102 AAM3918
0090 2080023-102 AAM0100
0091 2080023-102 AAM4388
0092 2080023-102 AAM3919
0093 2080023-102 AAM6064
0094 2080023-102 AAM6065
0095 2080023-102 AAM8259
0096 2080023-102 AAM8260
0097 2080023-102 AAM9342
0098 2080023-102 AAM9343
0099 2080023-102 AAM3916
0100 2080023-102 AAM3631
0101 2080023-102 AAM3632
0102 2080023-102 AAM4389
0103 2080023-102 AAM6067
0104 2080023-102 AAN0867
0105 2080023-102 AAN0868
0106 2080023-102 AAN0866
0107 2080023-102 AAN0869
0109 2080023-102 AAN2178
0110 2080023-102 AAM6066
0111 2080023-102 AAN1931
0112 2080023-102 AAN2177
0113 2080023-102 AAN3501
0114 2080023-102 AAN0870
PRODUCTION MSN 01
01
NOTE:
1. AFFECTED PN AND SN LIST OF THE APU ISOLATION VALVE (FIN 5204QA):
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION. ICN-A350-A-28XXP013-A-FAPE3-068BG-A-002-01

### Page 50

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BH-A-003-01 Fig.AA Sol.AA SHEET 2/5
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the APU Isolation Valve (FIN 5204QA)
Page 50
CONF ALL
PN SN
0115 2080023-102 AAN3503
0116 2080023-102 AAN3502
0117 2080023-102 AAN8588
0118 2080023-102 AAP8136
0119 2080023-102 AAN8587
0120 2080023-102 AAN2179
0121 2080023-102 AAN2176
0122 2080023-102 AAN8590
0123 2080023-102 AAN1930
0124 2080023-102 AAP0381
0125 2080023-102 AAN0842
0126 2080023-102 AAN7097
0127 2080023-102 AAN7096
0128 2080023-102 AAN8594
0129 2080023-102 AAN8596
0130 2080023-102 AAN8595
0132 2080023-102 AAP0486
0133 2080023-102 AAN7099
0134 2080023-102 AAP0484
0135 2080023-102 AAP0485
0136 2080023-102 AAP0378
0137 2080023-102 AAP0379
0138 2080023-102 AAM8262
0140 2080023-102 AAM8261
0141 2080023-102 AAP0487
0142 2080023-102 AAP5372
0143 2080023-102 AAP5645
0144 2080023-102 AAP5646
0145 2080023-102 AAP3378
0146 2080023-102 AAP5647
0147 2080023-102 AAP5373
0148 2080023-102 AAP3377
0149 2080023-102 AAP8140
0150 2080023-102 AAP8138
0151 2080023-102 AAP8139
0153 2080023-102 AAP8137
PN SN
0154 2080023-102 AAP8134
0155 2080023-102 AAP8135
0157 2080023-102 AAP9827
0158 2080023-102 AAP9828
0159 2080023-102 AAP9826
0160 2080023-102 AAP9825
0161 2080023-102 AAS4425
0162 2080023-102 AAS0366
0163 2080023-102 AAS6717
0164 2080023-102 AAS3340
0165 2080023-102 AAS3342
0167 2080023-102 AAS0362
0168 2080023-102 AAN8593
0169 2080023-102 AAS6122
0170 2080023-102 AAS0365
0172 2080023-102 AAS4532
0173 2080023-102 AAP1881
0174 2080023-102 AAS0363
0175 2080023-102 AAP2946
0176 2080023-102 AAS0364
0177 2080023-102 AAS4426
0178 2080023-102 AAS4427
0179 2080023-102 AAS3343
0180 2080023-102 AAS6714
0181 2080023-102 AAS4424
0182 2080023-102 AAS6716
0183 2080023-102 AAS4533
0184 2080023-102 AAS4535
0185 2080023-102 AAS6715
0186 2080023-102 AAS6123
0187 2080023-102 AAS4534
0188 2080023-102 AAS8089
0189 2080023-102 AAS8091
0190 2080023-102 AAS6124
0191 2080023-102 AAS8090
0192 2080023-102 AAS3341
PN SN
0193 2080023-102 AAS8088
0195 2080023-102 AAS6125
0196 2080023-102 AAT0957
0197 2080023-102 AAS8092
0198 2080023-102 AAT2040
0199 2080023-102 AAT2038
0200 2080023-102 AAT2409
0201 2080023-102 AAT2410
0202 2080023-102 AAT2408
0203 2080023-102 AAT0956
0204 2080023-102 AAT5511
0205 2080023-102 AAT5512
0206 2080023-102 AAT0958
0207 2080023-102 AAG0957
0208 2080023-102 AAT2037
0209 2080023-102 AAT8163
0210 2080023-102 AAT8160
0211 2080023-102 AAT8162
0212 2080023-102 AAT7858
0213 2080023-102 AAT2411
0214 2080023-102 AAT8161
0215 2080023-102 AAT7857
0216 2080023-102 AAT7855
0217 2080023-102 AAU1477
0218 2080023-102 AAU1478
0219 2080023-102 AAU1479
0220 2080023-102 AAT7856
0221 2080023-102 AAU1476
0223 2080023-102 AAN8589
0224 2080023-102 AAN9933
0225 2080023-102 AAT5510
0226 2080023-102 AAN9936
0227 2080023-102 AAN9935
0228 2080023-102 AAU2105
0229 2080023-102 AAT9823
0230 2080023-102 AAT9821
01
NOTE:
PRODUCTION MSN 01
1. AFFECTED PN AND SN LIST OF THE APU ISOLATION VALVE (FIN 5204QA):
PRODUCTION MSN 01 PRODUCTION MSN 01
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION. ICN-A350-A-28XXP013-A-FAPE3-068BH-A-003-01

### Page 51

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BI-A-003-01 Fig.AA Sol.AA SHEET 3/5
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the APU Isolation Valve (FIN 5204QA)
Page 51
CONF ALL
PN SN
0257 2080023-102 AAW3205
0258 2080023-102 AAW2452
0259 2080023-102 AAW2449
0260 2080023-102 AAW2454
0261 2080023-102 AAW3466
0262 2080023-102 AAW2451
0263 2080023-102 AAW1831
0264 2080023-102 AAW1833
0265 2080023-102 AAW1834
0266 2080023-102 AAW2453
0267 2080023-102 AAW2455
0268 2080023-102 AAW3208
PN SN
0269 2080023-102 AAW3206
0271 2080023-102 AAW3207
0272 2080023-102 AAW5006
0273 2080023-102 AAW5007
0274 2080023-102 AAW3469
0276 2080023-102 AAW3468
0277 2080023-102 AAW3467
0278 2080023-102 AAW6839
0279 2080023-102 AAV3273
0280 2080023-102 AAW7647
0281 2080023-102 AAW6838
0282 2080023-102 AAW6836
0284 2080023-102 AAU9698
0286 2080023-102 AAW9964
0287 2080023-102 AAW6837
0289 2080023-102 AAW9966
0290 2080023-102 AAY1689
0291 2080023-102 AAV3274
0292 2080023-102 AAW5009
0293 2080023-102 AAW9963
0294 2080023-102 AAW7646
0295 2080023-102 AAY1434
0296 2080023-102 AAW7651
0297 2080023-102 AAY1433
0298 2080023-102 AAY1436
0299 2080023-102 AAY1435
0300 2080023-102 AAW7648
0301 2080023-102 AAW7650
0302 2080023-102 AAW7652
0303 2080023-102 AAW7649
0305 2080023-102 AAW7645
0306 2080023-102 AAY1690
0307 2080023-102 AAY1691
0309 2080023-102 AAY1692
0310 2080023-102 AAY1686
0311 2080023-102 AAY1693
0231 2080023-102 AAU7734
0232 2080023-102 AAU9699
0233 2080023-102 AAT2039
0234 2080023-102 AAU7735
0235 2080023-102 AAU2104
0236 2080023-102 AAU7736
0237 2080023-102 AAU2106
0238 2080023-102 AAV3271
0239 2080023-102 AAT9824
0240 2080023-102 AAT9822
0241 2080023-102 AAU2103
0243 2080023-102 AAU7737
0244 2080023-102 AAW2450
0245 2080023-102 AAU5893
0246 2080023-102 AAU7740
0247 2080023-102 AAU7733
0248 2080023-102 AAU9697
0249 2080023-102 AAU5894
0250 2080023-102 AAU5895
0251 2080023-102 AAU7738
0252 2080023-102 AAV3272
0254 2080023-102 AAW1832
0255 2080023-102 AAU7739
0256 2080023-102 AAW1830
PRODUCTION MSN 01
01
NOTE:
1. AFFECTED PN AND SN LIST OF THE APU ISOLATION VALVE (FIN 5204QA):
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION.
PRODUCTION MSN 01
ICN-A350-A-28XXP013-A-FAPE3-068BI-A-003-01

### Page 52

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BJ-A-004-01 Fig.AA Sol.AA SHEET 4/5
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the APU Isolation Valve (FIN 5204QA)
Page 52
CONF ALL
PRODUCTION MSN 01 PN SN PN SN
0370 2080023-102 ACC5029
0371 2080023-102 ACC5028
0372 2080023-102 ACC6309
0373 2080023-102 ACC5027
0374 2080023-102 ACC6307
0375 2080023-102 ACA9978
0376 2080023-102 ACC4157
0378 2080023-102 ACC6306
0379 2080023-102 ACC5030
0381 2080023-102 ACC8132
0383 2080023-102 ACC4438
0385 2080023-102 ACC4154
0386 2080023-102 ACC4437
0387 2080023-102 ACC6308
0388 2080023-102 ACC5032
0390 2080023-102 ACC4435
0391 2080023-102 ACC1268
0392 2080023-102 ACC4436
0394 2080023-102 ACC8133
0395 2080023-102 ACC8131
0396 2080023-102 ACC5031
0397 2080023-102 ACC8135
PN SN
0400 2080023-102 ACD0074
0402 2080023-102 ACD2547
0404 2080023-102 ACD2546
0405 2080023-102 ACD8467
0406 2080023-102 ACD2548
0407 2080023-102 ACD2552
0410 2080023-102 ACD8464
0415 2080023-102 ACE0501
0416 2080023-102 ACE0503
0418 2080023-102 ACE0921
0419 2080023-102 ACG4173
0420 2080023-102 ACG4171
0421 2080023-102 ACG4172
0422 2080023-102 ACG4168
0425 2080023-102 ACG4163
0427 2080023-102 ACG4166
0434 2080023-102 ACE7021
0435 2080023-102 ACE7020
0436 2080023-102 ACE7022
0439 2080023-102 ACF2425
0442 2080023-102 ACF6461
0443 2080023-102 ACF6798
0445 2080023-102 ACF6462
0446 2080023-102 ACF6797
0447 2080023-102 ACF6800
0451 2080023-102 ACF8149
0455 2080023-102 ACF8153
0458 2080023-102 ACF8160
0465 2080023-102 ACF8154
0312 2080023-102 AAY7837
0313 2080023-102 AAY6192
0314 2080023-102 AAY7836
0315 2080023-102 AAY7838
0316 2080023-102 AAT5825
0318 2080023-102 ACA0690
0319 2080023-102 ACA0692
0320 2080023-102 AAY1687
0321 2080023-102 AAY6194
0322 2080023-102 AAY6193
0324 2080023-102 AAY5671
0325 2080023-102 AAY5673
0326 2080023-102 ACA0689
0327 2080023-102 ACA2678
0328 2080023-102 ACA0688
0329 2080023-102 ACA2675
0330 2080023-102 ACA2838
0331 2080023-102 ACA2677
0332 2080023-102 ACA2676
0333 2080023-102 ACA2840
0334 2080023-102 ACA2837
0335 2080023-102 ACA2839
0336 2080023-102 ACA4772
0337 2080023-102 ACA4770
0339 2080023-102 ACA8331
0340 2080023-102 ACA0693
0341 2080023-102 ACA4773
0342 2080023-102 ACA0695
0343 2080023-102 ACA6916
0344 2080023-102 ACA0691
0345 2080023-102 ACA9070
0346 2080023-102 ACA8332
0347 2080023-102 ACA8333
0348 2080023-102 ACA6914
0349 2080023-102 ACA6913
0350 2080023-102 ACC0313
0351 2080023-102 ACA0694
0352 2080023-102 ACA8334
0354 2080023-102 ACA9069
0355 2080023-102 ACA6915
0356 2080023-102 ACA9068
0357 2080023-102 ACA9071
0358 2080023-102 ACC0311
0359 2080023-102 ACC0310
0362 2080023-102 ACC1265
0363 2080023-102 ACC1266
0364 2080023-102 ACC0312
0365 2080023-102 ACC1267
0366 2080023-102 ACA9976
0369 2080023-102 ACA9979
01
NOTE:
1. AFFECTED PN AND SN LIST OF THE APU ISOLATION VALVE (FIN 5204QA):
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION.
PRODUCTION MSN 01 PRODUCTION MSN 01
2080023-102 AAP3379
2080023-102 AAP1879
2080023-102 AAN0840
2080023-102 AAS8093
2080023-102 AAM1240
2080023-102 AAM3917
AFTERMARKET 2080023-102 AAN0841
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
ICN-A350-A-28XXP013-A-FAPE3-068BJ-A-004-01

### Page 53

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-06LGD-A-001-01 Fig.AA Sol.AA SHEET 5/5
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the
APU Isolation Valve (FIN 5204QA) Page 53
CONF ALL
2080023-102 AAN0839
2080023-102 AAN9934
2080023-102 AAK8941
2080023-102 AAN0838
2080023-102 AAP1880
2080023-102 AAL9531
2080023-102 AAK5644
2080023-102 AAK5643
2080023-102 AAL1748
2080023-102 AAN7098
1. AFFECTED PN AND SN LIST OF THE APU ISOLATION VALVE (FIN 5204QA):
01 THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE 
SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
THIS COLUMN IS PROVIDED FOR INFORMATION.
NOTE:
PRODUCTION MSN 01 PN SN
ICN-A350-A-28XXP013-A-FAPE3-06LGD-A-001-01

### Page 54

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BL-A-002-01 Fig.AB Sol.AA SHEET 1/3
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the Engine LP-Fuel Valve (FIN 5400QA1)
Page 54
CONF ALL
PN SN
0005 2140083-101 AAN7142
0064 2140083-101 AAM3625
0065 2140083-101 ACC0814
0066 2140083-101 AAM3627
0067 AAM3409
0068 AAM1339
0069 AAM0827
0070 AAM3410
0071 AAN1919
0072 AAM8550
0073 AAM8549
0074 AAM8553
0075 AAM4348
0076 AAL6777
0077 AAM0824
0078 AAM0826
0079 AAM8552
0081 AAM1402
0082 AAN1923
0083 AAN0979
0084 AAN0836
0085 AAM1341
0086 AAN1922
0087 AAN2643
0088 AAN3026
0089 AAN3030
0090 AAN2641
0091 AAN2640
0092 AAN2363
0093 AAN1920
0094 AAN7147
0095 AAN7144
0096 AAN7139
0097 AAN2364
0098 AAN8879
0099 AAN8882
PN SN
0100 AAN7143
0101 AAN8919
0102 AAP1949
0103 AAN7136
0104 AAN8916
0105 AAN8914
0106 AAN3029
0107 AAP1950
0109 AAP3680
0110 AAP0392
0111 AAP3675
0112 AAP1948
0113 AAN8920
0114 AAP3681
0115 AAP5941
0116 AAP5940
0117 AAP0389
0118 AAT0809
0119 AAP8106
0120 AAP8105
0121 AAP7982
0122 AAP8964
0123 AAN8921
0124 AAS0431
0125 AAP9986
0126 AAP9973
0127 AAS0314
0128 AAP9972
0129 AAN0837
0130 AAP8966
0132 AAS3336
0132 AAL9431
0133 AAS3259
0134 AAS3258
0135 AAS3261
0136 AAS3260
PN SN
0137 AAP9983
0138 AAS0316
0140 AAS4900
0141 AAS3745
0142 AAS3740
0143 AAS4975
0144 AAP8963
0145 AAS0320
0146 AAS5216
0147 AAP9987
0148 AAS6696
0149 AAS0318
0150 AAS6693
0151 AAS3338
0153 AAS8096
0154 AAS8098
0155 AAS3586
0157 AAS6692
0158 AAS3583
0159 AAT0812
0160 AAS4898
0161 AAT8086
0162 AAT0814
0163 AAT6011
0164 AAT0813
0165 AAT0815
0167 AAS3742
0168 AAS5218
0169 AAU1837
0170 AAT1224
0172 AAN7141
0173 AAT4843
0174 AAT1222
0175 AAT1223
0176 AAT6007
0177 AAT6004
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
PRODUCTION MSN 01 PRODUCTION MSN 01 PRODUCTION MSN 01
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION.
2. AFFECTED PN AND SN LIST OF THE ENGINE LP-FUEL VALVE (FIN 5400QA1):
ICN-A350-A-28XXP013-A-FAPE3-068BL-A-002-01

### Page 55

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BM-A-003-01 Fig.AB Sol.AA SHEET 2/3
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the Engine LP-Fuel Valve (FIN 5400QA1)
Page 55
CONF ALL
PN SN
0178 2140083-101 AAT6010
0179 2140083-101 AAT4841
0180 2140083-101 AAT6003
0181 2140083-101 AAS3584
0182 AAT8085
0183 AAT8088
0184 AAS3581
0185 AAS8100
0186 AAT8091
0187 AAT9178
0188 AAU2613
0189 AAT9179
0190 AAU0007
0191 AAU1835
0192 AAU1834
0193 AAP9984
0195 AAU1841
0196 AAU2609
0197 AAN8917
0198 AAU2607
0199 AAT6000
0200 AAU4325
0201 AAU1827
0202 AAT9177
0203 AAU7639
0204 AAU1830
0205 AAU7646
0206 AAS4901
0207 AAU2747
0208 AAU2612
0209 AAU7642
0210 AAU7728
0211 AAU7725
0212 AAU0004
0213 AAV0917
0214 AAV0920
PN SN
0215 AAW1887
0216 AAV0914
0217 AAV4213
0218 AAV4216
0219 AAU7723
0220 AAW1843
0221 AAU1832
0223 AAW1885
0224 AAW1888
0225 AAU0003
0226 AAV4218
0227 AAW2819
0228 AAW2868
0229 AAU0011
0230 AAW3291
0231 AAW2871
0232 AAW3371
0233 AAW1890
0234 AAT9176
0235 AAU7645
0236 AAW3474
0237 AAW3287
0238 AAW9138
0239 AAW3362
0240 AAW3369
0241 AAW3534
0243 AAW3293
0244 AAW9387
0245 AAW3539
0246 AAU0012
0247 AAW2872
0248 AAW9141
0249 AAT9180
0250 AAW3363
0251 AAW9142
0252 AAW9144
PN SN
0254 AAW3477
0255 AAU0013
0256 AAW9140
0257 AAY0150
0258 AAW9382
0259 AAW9384
0260 AAW4483
0261 AAW4486
0262 AAW9388
0263 AAW4487
0264 AAW3370
0265 AAY4008
0266 AAY4002
0267 AAY4006
0268 AAY0154
0269 AAY4004
0271 AAW4479
0272 AAW4480
0273 AAY6215
0274 AAY6217
0276 AAY6216
0277 AAW9386
0278 AAY8266
0279 AAY8260
0280 AAY8258
0281 AAY7520
0282 AAY7518
0284 AAY8264
0286 AAY7527
0287 AAY8268
0289 AAY8270
0290 ACA4709
0291 AAY7521
0292 AAY7526
0293 AAY7530
0294 ACA4704
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
PRODUCTION MSN 01
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION.
2. AFFECTED PN AND SN LIST OF THE ENGINE LP-FUEL VALVE (FIN 5400QA1):
PRODUCTION MSN 01 PRODUCTION MSN 01
ICN-A350-A-28XXP013-A-FAPE3-068BM-A-003-01

### Page 56

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BN-A-003-01 Fig.AB Sol.AA SHEET 3/3
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the Engine LP-Fuel Valve (FIN 5400QA1)
Page 56
CONF ALL
PN SN
0295 2140083-101 ACA4710
0296 2140083-101 AAY8464
0297 2140083-101 ACA4801
0298 2140083-101 ACA4799
0299 ACA4804
0300 ACA4806
0301 ACA4706
0302 ACA4708
0303 ACA4803
0305 AAP5944
0306 ACA5449
0307 ACA5398
0309 AAW3478
0310 ACA9357
0311 ACA8578
0312 ACA8573
0313 ACC0718
0314 ACC0715
0315 ACC0815
0316 ACA9359
0318 ACC0816
0319 ACA8579
0320 ACC0818
0321 ACA5447
0322 ACA8574
0324 ACA8576
0325 ACC0813
0326 ACC4225
0327 ACC5143
0328 AAY8460
0329 ACC5138
0330 ACC5846
0331 ACC5140
0332 ACC4511
0333 ACC5849
0334 ACC6293
PN SN
0335 AAW3364
0336 ACC5141
0337 ACC6290
0339 ACC1398
0340 ACA5444
0341 ACC8461
0342 ACC8438
0343 ACC9411
0344 ACC9403
0345 ACD2607
0346 ACC9404
0347 ACC9406
0348 ACC8457
0349 ACD2604
0350 ACC9409
0351 ACC9407
0352 ACC9413
0354 ACD6106
0355 ACD5457
0356 ACD5455
0357 ACD6103
0358 ACD5461
0359 ACC8463
0362 ACD2603
0363 ACA5399
0364 ACD2601
0365 ACD2605
0366 ACC0810
0369 ACC8462
0370 ACD9550
0371 ACD5454
0372 ACE0329
0373 ACD9557
0374 ACE0332
0375 ACE0317
0376 ACE0328
PN SN
0378 ACE0327
0379 ACC5145
0381 ACE0323
0383 ACE0427
0385 ACE0322
0386 ACE9030
0387 ACE0318
0388 ACE9032
0390 ACE5639
0391 ACD9555
0392 ACE9028
0394 ACE9029
0395 ACF0277
0396 ACF0274
0397 ACE0313
0400 ACE9035
0402 ACF2756
0404 ACF0272
0405 ACE9033
0406 ACF2759
0407 ACD8670
0410 ACE5993
0411 ACF7010
0412 ACF7009
0415 ACF7005
0416 ACF7007
0427 ACF7008
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
PRODUCTION MSN 01 PRODUCTION MSN 01 PRODUCTION MSN 01
2. AFFECTED PN AND SN LIST OF THE ENGINE LP-FUEL VALVE (FIN 5400QA1):
AAP9990
ACD2609
AAN2638
AAW1846
AFTERMARKET AAU1964
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
AAT4845
ACC5136
2140083-101
2140083-101
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO
THE AIRBUS PRODUCTION RECORDS.THIS COLUMN IS PROVIDED FOR INFORMATION.
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
ICN-A350-A-28XXP013-A-FAPE3-068BN-A-003-01

### Page 57

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BP-A-002-01 Fig.AC Sol.AA SHEET 1/3
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the Engine LP-Fuel Valve (FIN 5400QA2)
Page 57
CONF ALL
PN SN
0005 2140083-101 AAN8878
0064 2140083-101 AAM1403
0065 2140083-101 ACC0811
0066 2140083-101 AAM4346
0067 AAM3629
0068 AAM3628
0069 AAM3411
0070 AAL6778
0071 AAN1921
0072 AAM8551
0073 AAM4349
0074 AAM3626
0075 AAM1340
0076 AAM4347
0077 AAM8554
0078 AAM1404
0079 AAM1342
0080 AAN0835
0081 AAM0825
0082 AAN1924
0083 AAN0978
0084 AAM1405
0085 AAN0833
0086 AAN0834
0087 AAN2642
0088 AAN2644
0089 AAN3024
0090 AAN2366
0091 AAN2365
0092 AAN2645
0093 AAN7146
0094 AAN7145
0095 AAN2639
0096 AAN8883
0097 AAN7137
0098 AAN8880
PN SN
0099 AAN8915
0100 AAN8881
0101 AAN7138
0102 AAP1951
0103 AAN3031
0104 AAP0388
0105 AAN3028
0106 AAN3025
0107 AAP1952
0109 AAP3676
0110 AAP0390
0111 AAP3679
0112 AAP3677
0113 AAN3027
0114 AAP3678
0115 AAP5939
0116 AAP5942
0117 AAP8107
0118 AAS4902
0119 AAP8108
0120 AAN8918
0121 AAP8968
0122 AAP8962
0123 AAP8969
0124 AAP8965
0125 AAP9985
0126 AAS0432
0127 AAP8967
0128 AAS0433
0129 AAS0315
0130 AAS0317
0132 AAS3337
0133 AAS0434
0134 AAP5943
0135 AAS3334
0136 AAP9971
PN SN
0137 AAS3335
0138 AAS4899
0140 AAS4976
0141 AAS6695
0142 AAS4974
0143 AAS0430
0144 AAS3744
0145 AAS3339
0146 AAS5219
0147 AAS3741
0148 AAS6694
0149 AAS3743
0150 AAS3739
0151 AAS0319
0153 AAS8097
0154 AAS6691
0155 AAS8099
0157 AAS3585
0158 AAS5217
0159 AAT0810
0160 AAS4895
0161 AAS5220
0162 AAS4897
0163 AAT8092
0164 AAT0816
0165 AAS4896
0167 AAP0393
0168 AAT1221
0169 AAU1838
0170 AAP0391
0172 AAT1253
0173 AAT6009
0174 AAT1219
0175 AAT4844
0176 AAT1220
0177 AAT6005
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
PRODUCTION MSN 01 PRODUCTION MSN 01 PRODUCTION MSN 01
3. AFFECTED PN AND SN LIST OF THE ENGINE LP-FUEL VALVE (FIN 5400QA2):
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION. ICN-A350-A-28XXP013-A-FAPE3-068BP-A-002-01

### Page 58

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BQ-A-003-01 Fig.AC Sol.AA SHEET 2/3
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the Engine LP-Fuel Valve (FIN 5400QA2)
Page 58
CONF ALL
PN SN
0178 2140083-101 AAT4842
0179 2140083-101 AAT6008
0180 2140083-101 AAT6002
0181 2140083-101 AAT8089
0182 AAT8087
0183 AAS3582
0184 AAT8090
0185 AAT0811
0186 AAU0009
0187 AAU0010
0188 AAU2610
0189 AAT6001
0190 AAU1829
0191 AAU1826
0192 AAU0008
0193 AAU1840
0195 AAU2611
0196 AAU2606
0197 AAU2608
0198 AAU1839
0199 AAU1963
0200 AAU4326
0201 AAU1828
0202 AAU4328
0203 AAU7638
0204 AAU1831
0205 AAU7643
0206 AAS3262
0207 AAU7722
0208 AAU7724
0209 AAU7644
0210 AAU7727
0211 AAT6006
0212 AAV0916
0213 AAV0915
0214 AAV0913
PN SN
0215 AAU7647
0216 AAV4215
0217 AAU2748
0218 AAU7726
0219 AAU1833
0220 AAW1844
0221 AAV0919
0223 AAV4214
0224 AAW1845
0225 AAU0006
0226 AAW1891
0227 AAU7641
0228 AAW2818
0229 AAU1836
0230 AAW2870
0231 AAW2820
0232 AAU7721
0233 AAW2869
0234 AAU0005
0235 AAV0918
0236 AAW1886
0237 AAW3288
0238 AAU4327
0239 AAW1889
0240 AAW3365
0241 AAW3538
0243 AAW3368
0244 AAY0149
0245 AAW3537
0246 AAW6825
0247 AAW6822
0248 AAW6821
0249 AAW3472
0250 AAW2817
0251 AAW6823
0252 AAW9143
PN SN
0254 AAW9139
0255 AAW3473
0256 AAW9137
0257 AAW9383
0258 AAW4485
0259 AAW9381
0260 AAW9145
0261 AAW4484
0262 AAY4007
0263 AAW4488
0264 AAW9385
0265 AAY4005
0266 AAY0151
0267 AAY0152
0268 AAY0153
0269 AAY4003
0271 AAW4482
0272 AAW6824
0273 AAV4217
0274 AAY8259
0276 AAW6826
0277 AAW1847
0278 AAY8269
0279 AAY8261
0280 AAY8265
0281 AAY7517
0282 AAY8267
0284 AAY7523
0286 AAY7519
0287 AAY8272
0289 AAY7531
0290 AAY8461
0291 AAY7528
0292 AAY7529
0293 AAY7524
0294 ACA2418
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
PRODUCTION MSN 01 PRODUCTION MSN 01 PRODUCTION MSN 01
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION.
3. AFFECTED PN AND SN LIST OF THE ENGINE LP-FUEL VALVE (FIN 5400QA2):
ICN-A350-A-28XXP013-A-FAPE3-068BQ-A-003-01

### Page 59

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BR-A-003-01 Fig.AC Sol.AA SHEET 3/3
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the Engine LP-Fuel Valve (FIN 5400QA2)
Page 59
CONF ALL
PN SN
0295 2140083-101 ACA4711
0296 2140083-101 AAY8463
0297 2140083-101 ACA4800
0298 2140083-101 ACA4705
0299 ACA4707
0300 AAY8462
0301 ACA4805
0302 ACA4802
0303 ACA5397
0305 ACA5401
0306 ACA5402
0307 ACA5400
0309 ACA5445
0310 ACA9358
0311 ACA5404
0312 ACC0714
0313 ACC0713
0314 ACC0712
0315 ACC0719
0316 ACA8580
0318 ACC0817
0319 ACA8577
0320 ACC0812
0321 ACC0716
0322 ACC0717
0324 ACA5450
0325 ACA5448
0326 ACC4226
0327 ACC5137
0328 ACC4513
0329 ACC5142
0330 ACC5847
0331 ACC5144
0332 ACC4223
0333 ACC5848
PN SN
0335 ACC6289
0336 ACC6292
0337 ACC4512
0339 ACC8464
0340 ACC5850
0341 ACC8458
0342 ACC8437
0343 ACC8465
0344 ACC9405
0345 ACC8459
0346 ACC9410
0347 ACC9415
0348 ACC8460
0349 ACC9416
0350 AAW6827
0351 ACC9414
0352 ACC9399
0354 ACD6105
0355 ACD6104
0356 ACD5459
0357 ACD5458
0358 ACC9412
0359 ACD5460
0362 ACC8466
0363 ACD2600
0364 ACC9402
0365 ACD2602
0366 ACC9401
0369 ACC9400
0370 ACD9553
0371 ACD2606
0372 ACC6295
0373 ACA5403
0374 ACE0324
0375 ACE0330
0376 ACE0430
PN SN
0378 ACC8436
0379 ACE0426
0381 ACE0431
0383 ACD6107
0385 ACE0429
0386 ACE0428
0387 ACE0331
0388 ACF0276
0390 ACE0315
0391 ACE5991
0392 ACE0314
0394 ACE5988
0395 ACE5992
0396 ACF0278
0397 ACF0271
0400 ACE0319
0402 ACF2755
0404 ACF2763
0405 ACD9549
0406 ACF5049
0407 ACF2631
0410 ACF0273
0411 ACF7011
0415 ACF7006
0416 ACF5051
0418 ACE0434
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
PRODUCTION MSN 01 PRODUCTION MSN 01 PRODUCTION MSN 01
3. AFFECTED PN AND SN LIST OF THE ENGINE LP-FUEL VALVE (FIN 5400QA2):
AAP9990
ACD2609
AAN2638
AAW1846
AFTERMARKET AAU1964
2140083-101
2140083-101
2140083-101
2140083-101
2140083-101
AAT4845
ACC5136
2140083-101
2140083-101
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
AFTERMARKET
0334 ACC51392140083-101
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO
THE AIRBUS PRODUCTION RECORDS.THIS COLUMN IS PROVIDED FOR INFORMATION. ICN-A350-A-28XXP013-A-FAPE3-068BR-A-003-01

### Page 60

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-28XXP013-A-FAPE3-068BS-A-002-01 Fig.AD Sol.AA SHEET 1/4
REV 00 Nov 15/21 A350-28-P013
REV 01 Jun 22/22
Affected PN and SN List of the APU LP Fuel-Valve (FIN 5200QA)
Page 60
CONF ALL
PN SN PN SN PN SNPRODUCTION MSN 01
0005 2080022-102 AAP0113
0006 2080022-101 AAF2164
0007 2080022-101 AAF1738
0008 2080022-101 AAG0580
0009 2080022-101 AAG0578
0010 2080022-101 AAG0581
0011 2080022-101 AAG1304
0012 AAG1314
0013 AAG1303
0014 AAG6927
0015 AAH8980
0016 AAH8982
0017 AAH8981
0018 AAJ0263
0019 AAH8979
0020 AAJ2343
0021 AAJ6977
0022 2080022-102 AAJ6976
0023 2080022-102 AAL3746
0024 2080022-102 AAJ6991
0025 2080022-102 AAJ6990
0026 2080022-102 AAJ6988
0027 2080022-102 AAJ8615
0028 AAJ8616
0029 AAK0297
0030 AAK0299
0031 AAK0300
0032 AAK0294
0033 AAK0295
0034 AAK0293
0035 AAK6926
0036 AAK8030
0037 AAK7349
0038 AAK8031
0039 AAK8948
0040 AAK8947
0041 AAL0237
0042 AAL0627
0043 AAL0628
0044 AAL2856
0045 AAL2855
0046 AAL3745
0047 AAL4608
0048 AAL4609
0049 AAL6088
0050 AAL2696
0051 AAL6917
0052 AAL6918
0053 AAL7005
0054 AAL7003
0055 AAL7004
0056 AAL7370
0057 AAL8982
0058 AAL9610
0060 AAL9611
0061 AAL8984
0062 AAL9570
0063 AAL9572
0064 AAL9571
0065 AAL9569
0066 AAP3648
0067 AAM1609
0068 AAM1674
0069 AAM4638
0070 AAM4639
0071 AAM4640
0072 AAM4637
0073 AAM1673
0074 AAL6089
0075 AAM4515
2080022-101
2080022-101
2080022-101
2080022-101
2080022-101
2080022-101
2080022-101
2080022-101
2080022-101
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
0076 AAM4516
0077 AAM1606
0078 AAM4517
0079 AAM1607
0080 AAL9612
0081 AAK0296
0082 AAL8985
0084 AAL8981
0085 AAM6872
0086 AAM6871
0087 AAN3061
0088 AAN3060
0089 AAN1841
0090 AAN1842
0091 AAN1843
0092 AAN3404
0093 AAN7179
0094 AAN7178
0095 AAN3208
0096 AAN3207
0097 AAN9951
0098 AAN9950
0099 AAP0148
0100 AAP0149
0101 AAP2609
0102 AAN9174
0103 AAP2608
0104 AAP2607
0105 AAP3650
0106 AAN9176
0107 AAP3651
0109 AAN7148
0110 AAN7177
0111 AAN7150
0112 AAN7149
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
2080022-102
PRODUCTION MSN 01 PRODUCTION MSN 01
01
NOTE:
THE PRODUCTION MSNs ARE THE AIRCRAFTS ON WHICH THE DEFECTIVE PARTS ARE SUSPECTED TO BE INSTALLED ACCORDING TO THE AIRBUS PRODUCTION RECORDS.
THIS COLUMN IS PROVIDED FOR INFORMATION.
4. AFFECTED PN AND SN LIST OF THE APU LP-FUEL VALVE (FIN 5200QA):
ICN-A350-A-28XXP013-A-FAPE3-068BS-A-002-01

The text continues at https://openairdocs.org/service-documents/airbus/a350-28-p013/file/51d28fcaa56e.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
