# Airbus Service Bulletin A350-29-P023

Copy: No revision named ("A350-29-P023"), 67 pages: PDF https://openairdocs.org/files/sha256/40/a2/40a26fa8535dea39c41ace912449c6aecc69a5e3c1fa5baf026191058d2840d8; text https://openairdocs.org/service-documents/airbus/a350-29-p023/file/40a26fa8535d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2023-0656, the docket of AD 2023-13-13. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-29-P023
- Page: https://openairdocs.org/service-documents/airbus/a350-29-p023

## Text (67 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2023-0656, the docket of AD 2023-13-13. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S13-14 FOR A350-1000
MODIFICATION No.:
115550L44351

### Page 2

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 2
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S13-14 FOR A350-1000
REVISION TRANSMITTAL SHEET
This page transmits Revision No. 01 of Service Bulletin No. A350-29-P023.
A. ADDITIONAL WORK
No additional work is required by this revision.
B. REASON
Revision No. 01 issued to solve the issue with the swaged union in the frame between nose
fuselage and the cargo compartment.
C. CHANGES
SUMMARY
REASON Note added in the advantages section to cover the
concessions.
Some wording and sentences changed.
CONCURRENT REQUIREMENTS SB A350-29-P022 (MOD 113984L44227) added.
GENERAL OVERVIEW
Fig.SA Sol.AA General Overview Illustration updated to add the pipe between Frame 19
and Frame 21.
PLANNING INFORMATION
CONCURRENT REQUIREMENTS SB A350-29-P022 (MOD 113984L44227) added.
REASON Note added in the advantages section to cover the
concessions.
Some wording and sentences changed.
MANPOWER
T ask set A350-A-29-XX-P023-
01000-93AA-A Modification of
Low Pressure Pipe Standard
Between FR19 and FR30
T otal man-hours updated from 103h to 106.5h.
Elapsed time updated from 58.50h to 59h.
WEIGHT AND BALANCE Weight and balance added.
REFERENCES
T ask set A350-A-29-XX-P023-
01000-93AA-A Modification of
Low Pressure Pipe Standard
Between FR19 and FR30
ASR A350-A-51-23-12-01ZZZ-667Z-A added.
MP A350-A-20-51-61-08ZZZ-25BZ-A, A350-A-29-13-
XX-00ZZZ-320Z-A, MP A350-A-20-51-61-08ZZZ-25BZ-
A, A350-A-21-2X-XX-00ZZZ-520Z-A, A350-A-21-2X-XX-
00ZZZ-720Z-A and A350-A-29-13-XX-00ZZZ-320Z-A
added.
PMS 01-06-12 added.
SD A350-A-06-2X-XX-01ZZZ-04CZ-A and A350-A-06-
3X-XX-01ZZZ-04CZ-A added.
Weight and balance manual added.
PUBLICATION AFFECTED List of manuals updated.
INDUSTRY SUPPORT INFORMATION Industry support information updated.

### Page 3

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 3
MATERIAL INFORMATION
TOOLING
Referenced tools for task
set A350-A-29-XX-P023-
01000-93AA-A Modification of
Low Pressure Pipe Standard
Between FR19 and FR30
Paragraph created.
MP A350-A-20-51-61-08ZZZ-25BZ-A added.
CONSUMABLES
Consumables for task set
A350-A-29-XX-P023-01000-
93AA-A Modification of Low
Pressure Pipe Standard
Between FR19 and FR30
CML 04TMM9, 06AAB1, 08BAA9, 12ABC1 and 14SBA1
added.
Referenced consumables for
task set A350-A-29-XX-P023-
01000-93AA-A Modification of
Low Pressure Pipe Standard
Between FR19 and FR30
Paragraph created.
MP A350-A-20-51-61-00ZZZ-25BZ-A, A350-A-20-51-
61-08ZZZ-25BZ-A, A350-A-21-2X-XX-01ZZZ-720Z-
A, A350-A-29-XX-XX-02ZZZ-170Z-A, A350-A-50-13-
61-00ZZZ-720Z-A, A350-A-50-18-61-00ZZZ-720Z-A,
A350-A-50-23-63-00ZZZ-720Z-A and A350-A-53-XX-XX-
03ZZZ-720Z-A added.
LIST OF NEW PARTS
Part kit 29P023D01R03 Kit revised:
- Item 8 V29110157000 added.
- Item 10 V29110162000 added.
- Item 11 V29190132000 added.
- Item 22 NAS1149E0332P added.
- Item 24 NAS1149D0332K updated from qty 6 to qty
8.
- Item 33 NAS1726C3E added.
- Item 38 NSA5191-3V9 added.
- Item 45 NSA855007-10 added.
- Item 46 NSA855006-10 updated from qty 1 to qty 3.
- Item 3 updated from V29190103000 to
V29190131000.
- V2919012800000 updated from item 7 to item 12.
- Price updated.
LIST OF EXISTING PARTS
Interchangeable parts for
task set A350-A-29-XX-P023-
01000-93AA-A Modification of
Low Pressure Pipe Standard
Between FR19 and FR30
Interchangeable parts updated to add pipe, item (9),
between Frame 19 and Frame 20.
Interchangeable parts updated to add pipe, item (11),
between Frame 21 and Frame 22.
Spare parts for task set A350-
A-29-XX-P023-01000-93AA-A
Modification of Low Pressure
Spare parts updated to add pipe, item (9), between
Frame 10 and Frame 20.
Spare parts updated to add pipe, item (11), between
Frame 21 and Frame 22.

### Page 4

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 4
Pipe Standard Between FR19
and FR30
ACCOMPLISHMENT INSTRUCTIONS
T ask set A350-A-29-XX-P023-
01000-93AA-A Modification of Low
Pressure Pipe Standard Between
FR19 and FR30
Title updated to change Frame 21 to Frame 19.
PREPARATION
A350-A-29-XX-P023-
01001-540A-A Job Set-up
Standard practice added.
PROCEDURE
A350-A-29-XX-P023-
01001-520A-A Remove the
Hydraulic T ubes from FR19
to FR22
Title updated to change Frame 21 to Frame 19.
Working area updated.
Manpower updated.
Standard practices updated.
Step (g) updated to be more specific in the removal of
the hydraulic tubes, item (1) and item (2).
Step (i) added to remove the clamp, item (39).
Step (l) added to remove the clamp, item (50).
Step (m) added to do a pre-cut of item (9).
Step (n) updated to disconnect tubes, item (8), item
(9) and item (11), union (49) and elbow (45).
Step (o) added to perform the cleaning of the item
(19).
Fig.BA Sol.AA Removal of
the Hydraulic T ubes from
FR19 to FR22
Title updated to change Frame 21 to Frame 19.
Sheet 01 revised to show tube item (9) between
Frame 19 and Frame 20, tube (8) between Frame 20
and Frame 21, tube (11) between Frame 21 and Frame
22, and detail P, Q, R, S and T.
Sheet 04 revised to show view P .
Sheet 05 created to show view Q, R and S.
Sheet 06 created to show view T.
A350-A-29-XX-P023-
02001-520A-A Remove
Hydraulic T ubes from FR22
to FR30
Standard practices updated.
Step (g) updated to add a note.
Fig.BB Sol.AA Removal of
the Hydraulic T ubes from
FR22 to FR30
Sheet 02 revised to modify pre-cut distance and flag
note 04.
A350-A-29-XX-P023-
01001-720A-A Install the
Hydraulic T ubes from FR19
to FR22
Title updated to change Frame 21 to Frame 19.
Working area updated.
Manpower updated.
Standard practices updated.
Procedure restructured.

### Page 5

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 5
Step (b) updated to connect and mark the tubes, item
(1) and item (2), and add a note.
Step (c) updated to group the installation of all block-
clampings and clamps, add a note and perform a
bonding test.
Step (h) updated to connect tubes in the floor area.
Steps from (l) to (s) added.
Fig.BE Sol.AA Installation
of the Hydraulic T ubes
from FR19 to FR22
Title updated to change Frame 21 to Frame 19.
Sheet 01 revised to show tubes item (9) and item 10
between Frame 19 and Frame 20, tube 8 between
Frame 20 and Frame 21, and detail P, Q, R and S,
change tube, item 3, to tubes, item 3 and 11 and the
union, item 46, and add a flag note.
Sheet 02 revised to update flag note references and
torque values.
Sheet 03 revised to update flag note references.
Sheet 04 revised to show view P and Q, change the
CML of flag note and update flag note references and
torque values.
Sheet 05 created to show view R and S.
Sheet 06 created to show view T, U and V.
A350-A-29-XX-P023-
02001-720A-A Install the
Hydraulic T ubes from FR22
to FR30
Standard practices updated.
Step (b) updated to connect only the tube, item 5.
Step (c) updated to group the installation of blocks-
clampings and clamps from Frame 23 to Frame 25 and
add a note.
Steps from (d) to (p) added.
Fig.BF Sol.AA Installation
of the Hydraulic T ubes
from FR22 to FR30
Sheet 01 revised to update view E and F references,
show view J and add a flag note.
Sheet 02 revised to update flag note references and
torque values.
Sheet 03 revised to show view E, F and G.
Sheet 04 created to show view H and J.
PREPARATION FOR TEST
A350-A-29-XX-P023-
01001-762A-A Preparation
for T est
Paragraph added.
TEST
A350-A-29-XX-P023-
01001-320A-A T est
Paragraph added.
CLOSE-UP
A350-A-29-XX-P023-
01001-740A-A Close-up
Manpower updated.
Standard practice added.
Steps (c) and (e) updated according to the preparation
for test and test paragraphs.

### Page 6

A350
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 6
APPENDIX
ELECTRICAL BONDING/GROUNDING CODE EXPLANATION
ELECTRICAL BONDING/
GROUNDING CODE
EXPLANATION
Clarifying sentence added.
LIST OF CONCESSIONS New appendix created.
LIST OF CONCESSIONS Appendix created to show the list of concessions for
the applicable MSNs.
Fig.AB Sol.AA List of
Concessions
New illustration created.
D. FILING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete
document. Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
E. HISTORY OF PREVIOUS REVISIONS
No previous revision
F. REVISION SEQUENCE
ORIGINAL: Dec 17/21
REVISION No. : 01 - Sep 15/22

### Page 7

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 7
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S13-14 FOR A350-1000
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 115550L44351
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification is related to an airworthiness issue and has been re-classified and
confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this is
handled by Airbus under the Design Organisation Approval ref. EASA.21J.031.
B. REASON
(1) History
This Service Bulletin has been issued to advise operators about spots and stains
discovered on tubes made from aluminium 6061 T6 after alodine process. As
consequence, micrographs show a reduction of wall thickness up to 15%. Additionally,
the process applied by the supplier for the determination of maximum ovality was
not in accordance with the manufacturer pipes specification. The effective pipes are
installed in the return line of yellow hydraulic system only. Only the sections 11 to 12,
13 to 14 and 15 are affected.
The consequence of these findings may affect the pipe and introduces a risk of
premature failure.
(2) Objective/Action
This Service Bulletin gives instructions to replace all applicable aluminium pipes by
titanium pipes.
(3) Advantages
The accomplishment of this Service Bulletin will prevent the risk of premature failure.
NOTE: The accomplishment of this Service Bulletin will supersede the concessions
for the applicable Manufacturer Serial Number (MSN)s, refer to Appendix LIST
OF CONCESSIONS.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO

### Page 8

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 8
EVALUATION TABLE
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Modification of Low Pressure Pipe Standard Between FR19 and FR30
(a) T ask set A350-A-29-XX-P023-01000-93AA-A Modification of Low Pressure Pipe
Standard Between FR19 and FR30
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 29P023D01R03 1 16500.00 USD T ubes, unions, bolts, washers,
nuts, clamps and tie-cables.
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
QTR
G. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior or simultaneous accomplishment
of this/these Service Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-29-P022 113984L44227
NOTE: Service Bulletin No. A350-29-P022 (GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S11-12 FOR A350-1000 (6 YEARS)).
H. NATURE OF THE WORK
(1) Modification of Low Pressure Pipe Standard Between FR19 and FR30
(a) T ask set A350-A-29-XX-P023-01000-93AA-A Modification of Low Pressure Pipe
Standard Between FR19 and FR30
AIRCRAFT YES
EQUIPMENT NO
I. MANPOWER
(1) Modification of Low Pressure Pipe Standard Between FR19 and FR30

### Page 9

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 9
(a) T ask set A350-A-29-XX-P023-01000-93AA-A Modification of Low Pressure Pipe
Standard Between FR19 and FR30
MANPOWER
TOTAL MAN-HOURS 106.50
h
ELAPSED TIME (HOURS) 59.00 h

### Page 10

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-29XXP023-A-FAPE3-04P73-A-003-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
General Overview
Page 10
J. GENERAL OVERVIEW
CONF ALL
FWD CARGO DOOR
FR18
FR19
FR21
FR28
TUBES TO BE REPLACED
FR30
ICN-A350-A-29XXP023-A-FAPE3-04P73-A-003-01

### Page 11

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 11
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S13-14 FOR A350-1000
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This modification is applicable by Service Bulletin only.
(1) Models
ON A/C 0141, 0161, 0215
350-1041
CONF ALL
(2) Applicability by MSN
0141 0161 0215
(3) MSN by configuration
MSN CONFIGURATION
0141 0161 0215 001
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
CONF 001 retrofits following modifications: 115550L44351.
B. CONCURRENT REQUIREMENTS
Accomplishment of this Service Bulletin requires the prior or simultaneous accomplishment
of this/these Service Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-29-P022 113984L44227
NOTE: Service Bulletin No. A350-29-P022 (GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S11-12 FOR A350-1000 (6 YEARS)).
C. REASON
(1) History
This Service Bulletin has been issued to advise operators about spots and stains
discovered on tubes made from aluminium 6061 T6 after alodine process. As
consequence, micrographs show a reduction of wall thickness up to 15%. Additionally,
the process applied by the supplier for the determination of maximum ovality was
not in accordance with the manufacturer pipes specification. The effective pipes are
installed in the return line of yellow hydraulic system only. Only the sections 11 to 12,
13 to 14 and 15 are affected.
The consequence of these findings may affect the pipe and introduces a risk of
premature failure.

### Page 12

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 12
(2) Objective/Action
This Service Bulletin gives instructions to replace all applicable aluminium pipes by
titanium pipes.
(3) Advantages
The accomplishment of this Service Bulletin will prevent the risk of premature failure.
NOTE: The accomplishment of this Service Bulletin will supersede the concessions
for the applicable Manufacturer Serial Number (MSN)s, refer to Appendix LIST
OF CONCESSIONS.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Modification of Low Pressure Pipe Standard Between FR19 and FR30
(a) T ask set A350-A-29-XX-P023-01000-93AA-A Modification of Low Pressure Pipe
Standard Between FR19 and FR30
1 Remove the Hydraulic T ubes from FR19 to FR22
2 Remove Hydraulic T ubes from FR22 to FR30
3 Install the Hydraulic T ubes from FR19 to FR22
4 Install the Hydraulic T ubes from FR22 to FR30
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. The accomplishment timescale,
which has not yet been defined, will be given in the AD.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification of Low Pressure Pipe Standard Between FR19 and FR30

### Page 13

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 13
(a) T ask set A350-A-29-XX-P023-01000-93AA-A Modification of Low Pressure Pipe
Standard Between FR19 and FR30
PREPARATION
Job Set-up 23.00 h
PROCEDURE
Remove the Hydraulic T ubes from FR19 to FR22 2.75 h
Remove Hydraulic T ubes from FR22 to FR30 8.00 h
Install the Hydraulic T ubes from FR19 to FR22 7.50 h
Install the Hydraulic T ubes from FR22 to FR30 19.00 h
PREPARATION FOR TEST
Preparation for T est 4.00 h
TEST
T est 1.25 h
CLOSE-UP
Close-up 41.00 h
TOTAL MAN-HOURS 106.50 h
ELAPSED TIME (HOURS) 59.00 h
H. WEIGHT AND BALANCE
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +0.469 kg (+1.034 lb)
Effect on Balance +6.198 kg.m (+44.830 lb.ft)
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONCURRENT SERVICE BULLETIN (SB)
A350-29-P022
(1) Modification of Low Pressure Pipe Standard Between FR19 and FR30
(a) T ask set A350-A-29-XX-P023-01000-93AA-A Modification of Low Pressure Pipe
Standard Between FR19 and FR30
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-23-12-01ZZZ-667Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-42-01ZZZ-041Z-A A350-A-20-51-50-01ZZZ-042Z-A
A350-A-20-55-XX-01ZZZ-042Z-A

### Page 14

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 14
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A A350-A-29-13-XX-00ZZZ-320Z-A
A350-A-50-13-61-00ZZZ-520Z-A
A350-A-50-13-61-00ZZZ-720Z-A
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-18-61-00ZZZ-720Z-A
A350-A-50-23-63-00ZZZ-520Z-A
A350-A-50-23-63-00ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-06-12
01-07-117
SYSTEM DESCRIPTION (SD)
A350-A-06-2X-XX-01ZZZ-04CZ-A A350-A-06-3X-XX-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
29.00.00.090
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
K. PUBLICATION AFFECTED
MAINTENANCE ILLUSTRATED PART DATA (MIPD)
MAINTENANCE PROCEDURE (MP)
L. INDUSTRY SUPPORT INFORMATION
AIRBUS will share the costs of accomplishment of this Service Bulletin by providing the kits
at no charge for orders placed before Jun 30/25.
For the accomplishment of this Service Bulletin before Jun 30/25, AIRBUS will credit the
man-hours indicated in this Service Bulletin at the agreed in-house warranty labor rate.
Claims for this allowance shall be received no later than 90 days after completion of the last
affected aircraft of your fleet fulfilling above timeframe conditions.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 15

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 15
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-29-XX-P023-01000-93AA-A Modification of Low
Pressure Pipe Standard Between FR19 and FR30
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Part kit 29P023D01R03 1
Referenced parts See SB
Interchangeable parts See SB
Spare parts See SB
B. TOOLING
Referenced tools for task set A350-A-29-XX-P023-01000-93AA-A Modification of
Low Pressure Pipe Standard Between FR19 and FR30
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
C. CONSUMABLES
Consumables for task set A350-A-29-XX-P023-01000-93AA-A Modification of Low
Pressure Pipe Standard Between FR19 and FR30
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAB2 Coating - - FlexibleStructure
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
06AAB1 Polysulfide Sealant -General Purpose Fillet
06AAC1 Polysulfide Sealant -General Purpose Interfay
06LCB1
Non Hardening Jointing
Putty - Medium T emp. Area
Chromate Free
08BAA9 Non Aqueous Cleaner -General
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
14SBA1 T extile - Lint free Cotton
Referenced consumables for task set A350-A-29-XX-P023-01000-93AA-A
Modification of Low Pressure Pipe Standard Between FR19 and FR30
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:

### Page 16

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 16
Ref. MP A350-A-20-51-61-00ZZZ-25BZ-A
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A
Ref. MP A350-A-50-13-61-00ZZZ-720Z-A
Ref. MP A350-A-50-18-61-00ZZZ-720Z-A
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
D. LIST OF NEW PARTS
Part kit 29P023D01R03
Cost 16500.00 USD
Availability 280 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS Material, Logistics and Suppliers
ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 V2919010200000 1 TUBE
2 V2919010100000 1 TUBE
3 V2919013100000 1 TUBE
4 V2919010400000 1 TUBE
5 V2919010500000 1 TUBE
6 V2919010600000 1 TUBE
8 V2911015700000 1 TUBE
10 V2911016200000 1 TUBE
11 V2919013200000 1 TUBE
12 V2919012800000 1 TUBE
18 ASNA3752-101006 1 TEE
19 ABS1462-10 1 UNION

### Page 17

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 17
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
20 ABS0478-0606 1 UNION
21 ABS0478-1010 3 UNION
22 NAS1149E0332P 2 WASHER
24 NAS1149D0332K 8 WASHER
27 NAS1149C0332R 44 WASHER
29 NAS1726C3PE 22 NUT
33 NAS1726C3E 2 NUT
35 NSA5575-4A 1 CLAMP
36 NSA5575-8A 2 CLAMP
37 NSA5191-3-8 3 BOLT
38 NSA5191-3V9 2 BOLT
42 ABS0114T3-4 3 BOLT
43 NSA855020-6 1 ELBOW
45 NSA855007-10 1 ELBOW
46 NSA855006-10 3 UNION
48 NSA935401-05 2 TIE
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
Referenced parts for task set A350-A-29-XX-P023-01000-93AA-A Modification of
Low Pressure Pipe Standard Between FR19 and FR30
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. MP A350-A-50-23-63-00ZZZ-720Z-A
E. LIST OF EXISTING PARTS
Interchangeable parts for task set A350-A-29-XX-P023-01000-93AA-A Modification
of Low Pressure Pipe Standard Between FR19 and FR30
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911015000000 V2911016200000 03 (1) (2)
TUBE V2919005000000 V2919010200000 03 (1) (2)
TUBE V2919005100000 V2919010100000 03 (1) (2)
TUBE V2919007000000 V2919013100000 03 (1) (2)
TUBE V2919007100000 V2919010400000 03 (1) (2)
TUBE V2919007200000 V2919010500000 03 (1) (2)
TUBE V2919007300000 V2919010600000 03 (1) (2)
TUBE V2919007400000 V2919012800000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): One-way interchangeable with conditions:

### Page 18

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 18
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
- The Post MOD ABS numbers can replace Pre MOD ABS numbers as a set in one
aircraft section
- The Pre MOD ABS numbers cannot replace Post MOD ABS numbers.
(2): The interchageability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
Spare parts for task set A350-A-29-XX-P023-01000-93AA-A Modification of Low
Pressure Pipe Standard Between FR19 and FR30
DESCRIPTION OLD PART No. SEE NOTES
TUBE V2911015000000 (1)
TUBE V2919005000000 (1)
TUBE V2919005100000 (1)
TUBE V2919007000000 (1)
TUBE V2919007100000 (1)
TUBE V2919007200000 (1)
TUBE V2919007300000 (1)
TUBE V2919007400000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.

### Page 19

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 19
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-29-XX-P023-01000-93AA-A (A350-A-29-XX-P023-01ZZZ-93AZ-A)
Modification of Low Pressure Pipe Standard Between FR19 and FR30
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: Discarded parts must be managed at the operator's discretion.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 106.50 h
ELAPSED TIME (HOURS) 59.00 h

### Page 20

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 20
B. PREPARATION
(1) Task A350-A-29-XX-P023-01001-540A-A (A350-A-29-XX-P023-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 23.00 h
Minimum Number of person 2
Elapsed Time 11.50 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-50-13-61-00ZZZ-520Z-A
A350-A-50-18-61-00ZZZ-520Z-A
A350-A-50-23-63-00ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D "Maintenance Procedure - Introduction".
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Remove the sidewall panel, Panel 132DAW, and the inclined panel, Panel
132CAW, refer to Ref. MP A350-A-50-13-61-00ZZZ-520Z-A.
(c) Remove the floor panels, Panel 132DBF, Panel 132GBF, Panel 132EBF and Panel
132HBF, as necessary:
1 Remove the ball mat assemblies, refer to Ref. MP A350-A-50-23-63-00ZZZ-
520Z-A,
2 Remove the drain pan assemblies, refer to Ref. MP A350-A-50-18-61-
00ZZZ-520Z-A.
(d) Remove the floor panels, Panel 132CAF, Panel 132DAF, Panel 132KBF, Panel
132LBF, Panel 132NBF and Panel 132PBF, as necessary, refer to Ref. MP A350-A-
53-XX-XX-03ZZZ-520Z-A.
(e) If necessary, remove the air-conditioning ducts for access, refer to Ref. MP A350-
A-21-2X-XX-00ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-29-XX-P023-01001-520A-A (A350-A-29-XX-P023-01ZZZ-520Z-A)
Remove the Hydraulic Tubes from FR19 to FR22
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Door 821130
Work location From Frame 19 to Frame 22

### Page 21

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 21
Manpower/Resources/Skills
Man-hours 2.75 h
Minimum Number of person 1
Elapsed Time 2.75 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-A
MP A350-A-29-XX-XX-02ZZZ-170Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
4 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
5 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
6 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
7 Put a container in position below the component to collect the hydraulic
fluid.
(b) T ake measurement of the exact position of the clamp, item (35), near Stringer
33.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 4 Removal of the Hydraulic T ubes from FR19
to FR22 view L.
(c) Remove the clamp, item (35), near Stringer 33.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 4 Removal of the Hydraulic T ubes from FR19
to FR22 view L.
1 CLAMP   Item (35) Discard

### Page 22

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 22
1 BOLT   Item (34) Discard
1 WASHER   Item (24) Discard
1 NUT   Item (33) Discard
(d) Remove the blocks-clamping, item (25), attached to the fittings in Stringer 33,
Stringer 35 and Stringer 37.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR19
to FR22 view D.
3 BLOCK-CLAMPING   Item (25) Retain
6 BOLT-HEXAGON HEAD   Item (23) Retain
6 WASHER   Item (24) Discard
(e) Remove the blocks-clamping, item (25), attached to the fittings in Stringer 39
and Stringer 41.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR19
to FR22 view E.
2 BLOCK-CLAMPING   Item (25) Retain
4 BOLT-HEXAGON HEAD   Item (26) Retain
4 WASHER   Item (27) Discard
(f) Remove the block-clamping, item (25), near Stringer 40.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 3 Removal of the Hydraulic T ubes from FR19
to FR22 view F .
1 BLOCK-CLAMPING   Item (25) Retain
2 BOLT-HEXAGON HEAD   Item (28) Retain
2 WASHER   Item (27) Discard
2 NUT   Item (29) Discard
(g) Remove the hydraulic tubes from the side area and their unions.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19
to FR22, Ref. Fig.BA Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR19
to FR22 view C, and Ref. Fig.BA Sol.AA SHEET 3 Removal of the Hydraulic T ubes
from FR19 to FR22 view J.
1 Disconnect the hydraulic tube, item (1), on the upper side.
1 ELBOW 90DEG   Item (43) Discard
1 COVER-SPRAY   Item (47) Retain
2 TIE-CABLE   Item (48) Discard
2 Cut the hydraulic tube, item (2), just before the tee junction, item (18).
3 Remove the hydraulic tubes, item (1) and item (2), and the union, item
(20):
1 TUBE V2919005000000 Item (1) Discard

### Page 23

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 23
1 TUBE V2919005100000 Item (2) Discard
1 UNION   Item (20) Discard
(h) Remove the clamp, item (39), attached to the fitting in Frame 21.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 4 Removal of the Hydraulic T ubes from FR19
to FR22 view N.
1 CLAMP   Item (39) Retain
2 BOLT   Item (37) Retain
2 WASHER   Item (27) Discard
(i) Remove the clamp, item (39), attached to the fitting in Frame 20.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 5 Removal of the Hydraulic T ubes from FR19
to FR22 view R.
1 CLAMP   Item (39) Retain
2 BOLT   Item (38) Discard
2 WASHER   Item (22) Discard
(j) Remove the block-clamping, item (31), attached to the fitting in Frame 22.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 3 Removal of the Hydraulic T ubes from FR19
to FR22 view G.
1 BLOCK-CLAMPING   Item (31) Retain
2 BOLT-HEXAGON HEAD   Item (30) Retain
2 WASHER   Item (27) Discard
(k) Remove the block-clamping, item (31), between Frame 21 and Frame 22.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 3 Removal of the Hydraulic T ubes from FR19
to FR22 view H.
1 BLOCK-CLAMPING   Item (31) Retain
2 BOLT-HEXAGON HEAD   Item (30) Retain
2 WASHER   Item (27) Discard
2 NUT   Item (29) Discard
(l) Remove the block-clamping, item (50), between Frame 20 and Frame 21.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 5 Removal of the Hydraulic T ubes from FR19
to FR22 view Q.
1 BLOCK-CLAMPING   Item (50) Retain
2 BOLT-HEXAGON HEAD   Item (32) Retain
2 WASHER   Item (24) Discard
2 NUT   Item (33) Discard

### Page 24

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 24
(m) Do a pre-cut of the hydraulic tube, item (9), to the rough needed length.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 6 Removal of the Hydraulic T ubes from FR19
to FR22 view T.
NOTE: The cutting is necessary to make the installation of the tube, item
10, possible. The accurate needed length is obtained later during the
procedure.
(n) Remove the hydraulic tubes from the floor area and their unions.
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19
to FR22, Ref. Fig.BA Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR19
to FR22 view B, Ref. Fig.BA Sol.AA SHEET 3 Removal of the Hydraulic T ubes from
FR19 to FR22 view K, and Ref. Fig.BA Sol.AA SHEET 4 Removal of the Hydraulic
T ubes from FR19 to FR22 view P, Ref. Fig.BA Sol.AA SHEET 5 Removal of the
Hydraulic T ubes from FR19 to FR22 view S.
NOTE: If necessary, use a cutting tool in order to remove any hydraulic tube.
NOTE: Discard the tube, item (9), from the cut position to the aft.
1 TUBE V2919007000000 Item (3) Discard
1 TUBE V2919007100000 Item (4) Discard
1 TUBE V2911015700000 Item (8) Discard
1 TUBE V2911015000000 Item (9) Retain
1 TUBE ASSY V2919013200000 Item (11) Discard
1 UNION   Item (21) Discard
1 TEE   Item (18) Discard
1 ELBOW   Item (45) Discard
1 UNION   Item (46) Discard
(o) Remove the union, item (19), between the Frame 22 and Frame 23:
Refer to Ref. Fig.BA Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR19 to
FR22 and Ref. Fig.BA Sol.AA SHEET 4 Removal of the Hydraulic T ubes from FR19
to FR22 view M.
1 Remove the union, item (19), using a cutting tool in order to remove any
hydraulic tube:
1 UNION   Item (19) Discard
3 BOLT   Item (41) Discard
3 WASHER   Item (24) Discard
3 NUT   Item (29) Discard
2 Clean the area with:
  Non Aqueous Cleaner -
General
08BAA9  
And
  T extile - Lint free Cotton14SBA1

### Page 25

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6A-A-003-01 Fig.BA Sol.AA SHEET 1/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR19 to FR22
Page 25
CONF ALL
T B
C
L
D
J
D
E
F
E
H G M
A
(4)
(3)
FR22
(2)
STGR39
STGR37
STGR35
(1)
FR21
STGR33
FWD CARGO DOOR
FR18
FR19
FR21
Z130
A
FR30
(11)
SK
(9)
P
R
NQ
FR19
(8)
ICN-A350-A-29XXP023-A-FAPE3-04P6A-A-003-01

### Page 26

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6H-A-001-01 Fig.BA Sol.AA SHEET 2/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR19 to FR22
Page 26
CONF ALL
TYPICAL VIEW
D E
B
C
(18)
(25)
(23)
(26)
(24)
(27)
D
E
D
E
(48)(47)
(43)
ICN-A350-A-29XXP023-A-FAPE3-04P6H-A-001-01

### Page 27

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6I-A-001-01 Fig.BA Sol.AA SHEET 3/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR19 to FR22
Page 27
CONF ALL
TYPICAL VIEW
J K
F
(30)
(27)
(31)
G
(30)
(27)
(31)
H
(29)
(25)
(29)
(27)
(28)
(20)
(21)
J
K
ICN-A350-A-29XXP023-A-FAPE3-04P6I-A-001-01

### Page 28

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6J-A-002-01 Fig.BA Sol.AA SHEET 4/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR19 to FR22
Page 28
CONF ALL
(29)
(19)
(24)
(41)
(34)
(24)
(35)
(33)
M
N
L
(37)
(27)
(39)
(45)
P
ICN-A350-A-29XXP023-A-FAPE3-04P6J-A-002-01

### Page 29

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-06NH1-A-002-01 Fig.BA Sol.AA SHEET 5/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR19 to FR22
Page 29
CONF ALL
Q
(38)
(22)
(39)
R
(46)
TYPICAL VIEW
S
(50)
(24)
(32)
(33)
ICN-A350-A-29XXP023-A-FAPE3-06NH1-A-002-01

### Page 30

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-06NH2-A-002-01 Fig.BA Sol.AA SHEET 6/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR19 to FR22
Page 30
CONF ALL
NOTE:
01
01
CUTLINE
100 mm
(3.937 in) (9)
TFWD
CUT ITEM (9) ROUGHLY AT THIS POINT TO MAKE THE
INSTALLATION POSSIBLE.
FR20
ICN-A350-A-29XXP023-A-FAPE3-06NH2-A-002-01

### Page 31

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 31
(2) Task A350-A-29-XX-P023-02001-520A-A (A350-A-29-XX-P023-02ZZZ-520Z-A)
Remove Hydraulic Tubes from FR22 to FR30
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Door 821130
Work location From Frame 22 to Frame 30
Manpower/Resources/Skills
Man-hours 8.00 h
Minimum Number of person 2
Elapsed Time 4.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-A
MP A350-A-29-XX-XX-02ZZZ-170Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
4 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
5 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
6 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
7 Put a container in position below the component to collect the hydraulic
fluid.
(b) Cut the hydraulic tube, item (7):
Refer to Ref. Fig.BB Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR22 to
FR30 and Ref. Fig.BB Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR22
to FR30 view F .

### Page 32

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 32
(c) T ake measurement of the exact position of the clamps, item (36) near Frame 23
and Frame 28, in order to keep the position during the installation of the new
clamps.
Refer to Ref. Fig.BB Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR22 to
FR30 and Ref. Fig.BB Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR22
to FR30 view D.
(d) Remove the clamps, item (36), near Frame 23 and Frame 28.
Refer to Ref. Fig.BB Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR22 to
FR30 and Ref. Fig.BB Sol.AA SHEET 2 Removal of the Hydraulic T ubes from FR22
to FR30 view D.
2 CLAMP   Item (36) Discard
2 BOLT   Item (34) Discard
2 WASHER   Item (24) Discard
2 NUT   Item (33) Discard
(e) Remove the blocks-clamping, item (31), attached to the fittings in every frame
from Frame 23 to Frame 30.
Refer to Ref. Fig.BB Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR22 to
FR30 view C.
7 BLOCK-CLAMPING   Item (31) Retain
14 BOLT-HEXAGON HEAD   Item (30) Retain
14 WASHER   Item (27) Discard
(f) Remove the blocks-clamping, item (31), between frames from Frame 23 to
Frame 30.
Refer to Ref. Fig.BB Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR22 to
FR30 view B.
6 BLOCK-CLAMPING   Item (31) Retain
12 BOLT-HEXAGON HEAD   Item (30) Retain
12 WASHER   Item (27) Discard
12 NUT   Item (29) Discard
(g) Remove the hydraulic tubes and their unions.
Refer to Ref. Fig.BB Sol.AA SHEET 1 Removal of the Hydraulic T ubes from FR22 to
FR30 view A and Ref. Fig.BB Sol.AA SHEET 2 Removal of the Hydraulic T ubes from
FR22 to FR30 view E.
NOTE: If necessary, use a cutting tool in order to remove any hydraulic tube.
NOTE: Discard the tube, item (7), from the cut position to the forward.
1 TUBE V2919007200000 Item (5) Discard
1 TUBE V2919007300000 Item (6) Discard
1 TUBE V2919007400000 Item (7) Retain
2 UNION   Item (21) Discard

### Page 33

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6U-A-002-01 Fig.BB Sol.AA SHEET 1/2
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR22 to FR30
Page 33
CONF ALL
FWD CARGO DOOR
FR18
FR19
FR21
A
(5)
FR24
FR23
FR25
FR26
FR27
FR28
(6)
B
B
B
B
C
C
C
C
C
D
E
E
(30)
(27)
(31)
(30)
(27)
(31)
(29)
TYPICAL VIEW TYPICAL VIEW
B C
A
D
BFR30
F
C
B
C
(7)
FR29
ICN-A350-A-29XXP023-A-FAPE3-04P6U-A-002-01

### Page 34

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6V-A-003-01 Fig.BB Sol.AA SHEET 2/2
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Removal of the Hydraulic T ubes from FR22 to FR30
Page 34
CONF ALL
(21)
TYPICAL VIEW
(33)
(24)
(34)
(36)
TYPICAL VIEW
(7)
FR29
FWD
01
NOTE:
01 CUT ITEM (7) ROUGHLY AT THIS POINT TO MAKE THE INSTALLATION POSSIBLE.
E
D
F
100 mm
(3.937 in)
CUTLINE
ICN-A350-A-29XXP023-A-FAPE3-04P6V-A-003-01

### Page 35

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 35
(3) Task A350-A-29-XX-P023-01001-720A-A (A350-A-29-XX-P023-01ZZZ-720Z-A)
Install the Hydraulic Tubes from FR19 to FR22
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Door 821130
Work location From Frame 19 to Frame 22
Manpower/Resources/Skills
Man-hours 7.50 h
Minimum Number of person 1
Elapsed Time 7.50 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAB2 Coating - - FlexibleStructure
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
06AAB1 Polysulfide Sealant -General Purpose Fillet
06AAC1 Polysulfide Sealant -General Purpose Interfay
06LCB1
Non Hardening Jointing
Putty - Medium T emp. Area
Chromate Free
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
Part kit 29P023D01R03
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 V2919010200000 1 TUBE
2 V2919010100000 1 TUBE
3 V2919013100000 1 TUBE
4 V2919010400000 1 TUBE
8 V2911015700000 1 TUBE
10 V2911016200000 1 TUBE
11 V2919013200000 1 TUBE
18 ASNA3752-101006 1 TEE
19 ABS1462-10 1 UNION

### Page 36

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 36
Part kit 29P023D01R03
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
20 ABS0478-0606 1 UNION
21 ABS0478-1010 1 UNION
22 NAS1149E0332P 2 WASHER
24 NAS1149D0332K 8 WASHER
27 NAS1149C0332R 16 WASHER
29 NAS1726C3PE 8 NUT
33 NAS1726C3E 2 NUT
35 NSA5575-4A 1 CLAMP
37 NSA5191-3-8 1 BOLT
38 NSA5191-3V9 2 BOLT
42 ABS0114T3-4 3 BOLT
43 NSA855020-6 1 ELBOW
45 NSA855007-10 1 ELBOW
46 NSA855006-10 2 UNION
48 NSA935401-05 2 TIE
Referenced Information
Manuals/Drawings References/Sheets
ASR
A350-A-51-23-12-01ZZZ-667Z-A
A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A
ESP A350-A-20-33-42-01ZZZ-041Z-AA350-A-20-51-50-01ZZZ-042Z-A
MP
A350-A-20-51-50-01ZZZ-25BZ-A
A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A
A350-A-29-XX-XX-02ZZZ-170Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
PMS
01-04-58
01-06-12
01-07-117
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 For the specification of material application codes given in this Service
Bulletin, refer to the Ref. CML.

### Page 37

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 37
4 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
5 Get alternative and substitute fastener data in accordance with Ref. ASR
A350-A-51-43-XX-01ZZZ-667Z-A
6 If alternative and substitute fasteners have to be used, you must make
sure that the associated nut/collar are compatible in accordance with Ref.
ASR A350-A-51-4X-XX-01ZZZ-667Z-A
7 If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in ASR Data Module 51-4, then a fastener of
the same specification, or an approved substitute, with a length which
meets the installation standards given in ASR Data Module 51-4 may be
used. In addition, washers may be installed for fastener grip length in
accordance with ASR Data Module 51-4.
8 T o torque tighten the electrical and mechanical connections, refer to Ref.
ESP A350-A-20-51-50-01ZZZ-042Z-A
9 Adapt the clamp size as necessary, refer to Ref. ESP A350-A-20-33-42-
01ZZZ-041Z-A.
10 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
11 For Standard Mechanical T orques, refer to Ref. MP A350-A-20-51-50-01ZZZ-
25BZ-A.
12 Apply sealant in accordance with Ref. ASR A350-A-51-24-XX-01ZZZ-667Z-A.
13 Apply the preventive corrosion compound material in accordance with Ref.
ASR A350-A-51-23-12-01ZZZ-667Z-A.
14 For the electrical bonding, refer to Ref. PMS 01-04-58 and Ref. PMS 01-07-
117.
15 Obey the general rules for installation of the hydraulic lines, refer to Ref.
MP A350-A-20-51-61-00ZZZ-25BZ-A.
16 For the swage installation of the hydraulic lines, refer to Ref. MP A350-A-20-
51-61-08ZZZ-25BZ-A.
(b) Connect the tubes, item 1 and item 2, and their unions in the side area:
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22 and Ref. Fig.BE Sol.AA SHEET 3 Installation of the Hydraulic T ubes from
FR19 to FR22 view J and view K.
NOTE: The installation of the tubes and unions start from the top and progress
towards the bottom.
CAUTION: TO ENSURE THE CORRECT POSITION OF THE HYDRAULIC
TUBES, DO NOT SWAGE ANY CONNECTIONS UNTIL THE
INSTALLATION IS COMPLETED.
1 Put temporarily in position to identify the visible side of the tubes.
1 TUBE ASSY V2919010200000 Item 1
1 TUBE ASSY V2919010100000 Item 2

### Page 38

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 38
2 Mark the end of the hydraulic tubes with the marking gage so that the
markings are visible when in position.
NOTE: These markings are to make sure the swagging of the tubes are
done correctly.
3 Connect the tube, item 1, with the union, item 43.
1 ELBOW NSA855020-6 Item 43
NOTE: Do not tighten the tube.
4 Connect the tubes, item 1 and item 2, with the union, item 20.
1 UNION-SWAGED ABS0478-0606 Item 20
(c) Install the blocks-clamping and the clamps from the side area.
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22, Ref. Fig.BE Sol.AA SHEET 2 Installation of the Hydraulic T ubes from FR19
to FR22 view B, view C and view D, and Ref. Fig.BE Sol.AA SHEET 3 Installation of
the Hydraulic T ubes from FR19 to FR22 view G.
NOTE: The installation of the blocks-clamping and the clamps start from the
top and progress towards the bottom to make sure everything stays
aligned and without tension before swaging the tubes.
1 Install the blocks-clamping and the clamps.
6 BLOCK-CLAMPING   Item (25) Retained
1 CLAMP NSA5575-4A Item 35
6 BOLT-HEXAGON HEAD   Item (23) Retained
6 WASHER NAS1149D0332K Item 24
4 BOLT-HEXAGON HEAD   Item (26) Retained
7 WASHER NAS1149C0332R Item 27
2 BOLT-HEXAGON HEAD   Item (28) Retained
3 NUT NAS1726C3PE Item 29
1 BOLT NSA5191-3-8 Item 37
NOTE: Do not tighten the bolts to final torque value except for the clamp,
item 35.
2 Do the bonding test, refer to Ref. Appendix ELECTRICAL BONDING/
GROUNDING CODE EXPLANATION.
3 Do the electrical bonding for the clamp, item 35, refer to Ref. Appendix
ELECTRICAL BONDING/GROUNDING CODE EXPLANATION, use:
  Coating - - Corrosion
Inhibiting Fastener Head
Protection
04QAC5

### Page 39

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 39
(d) Install the union-flanged, item 19, between Frame 22 and Frame 23.
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22 and Ref. Fig.BE Sol.AA SHEET 4 Installation of the Hydraulic T ubes from
FR19 to FR22 view N.
1 Apply interfay sealant on the union-flanged, item 19, using:
  Polysulfide Sealant
- General Purpose
Interfay
06AAC1  
2 Install the union-flanged, item 19:
1 UNION-FLANGED ABS1462-10 Item 19
3 BOLT-HEXAGON HEAD ABS0114T3-4 Item 42
3 WASHER NAS1149C0332R Item 27
3 NUT NAS1726C3PE Item 29
Wet-install the fastener, except the electrical bonding point, using:
  Non Hardening Jointing
Putty - Medium T emp.
Area Chromate Free
06LCB1  
3 Apply sealant bead material around the edge of the union, item 19, using:
  Polysulfide Sealant -
General Purpose Fillet
06AAB1  
4 Apply protection to the union, item 19, using:
  Coating - - Flexible
Structure
04QAB2  
(e) Connect the tube, item 4, with the union, item 19:
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22.
CAUTION: TO ENSURE THE CORRECT POSITION OF THE HYDRAULIC
TUBES, DO NOT SWAGE ANY CONNECTIONS UNTIL THE
INSTALLATION IS COMPLETED.
1 Put temporarily in position to identify the visible side of the tube.
1 TUBE ASSY V2919010400000 Item 4
2 Mark the end of the hydraulic tube with the marking gage so that the
markings are visible when in position.
NOTE: These markings are to make sure the swagging of the tubes are
done correctly.
3 Connect the tube, item 4.
(f) Install the blocks-clamping between Frame 21 and Frame 22.
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22 and Ref. Fig.BE Sol.AA SHEET 2 Installation of the Hydraulic T ubes from
FR19 to FR22 view E and view F .
NOTE: The installation of the blocks-clamping and the clamps start from the aft
and progress towards the forward to make sure everything stays aligned
and without tension before swaging the tubes.

### Page 40

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 40
2 BLOCK-CLAMPING   Item (31) Retained
4 BOLT-HEXAGON HEAD   Item (30) Retained
4 WASHER NAS1149C0332R Item 27
2 NUT NAS1726C3PE Item 29
NOTE: Do not tighten the bolts to final torque value.
(g) Connect the tee connection, item 18, to the tubes, item 2 and item 4:
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22 and Ref. Fig.BE Sol.AA SHEET 4 Installation of the Hydraulic T ubes from
FR19 to FR22 view M.
1 TEE ASNA3752-101006 Item 18
(h) Connect the tubes, item 3, item 8, item 10 and item 11, and their unions in the
floor area:
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22, Ref. Fig.BE Sol.AA SHEET 3 Installation of the Hydraulic T ubes from FR19
to FR22 view L, and Ref. Fig.BE Sol.AA SHEET 4 Installation of the Hydraulic T ubes
from FR19 to FR22 view M and view P .
NOTE: The installation of the tubes and unions start from the aft and progress
towards the front.
CAUTION: TO ENSURE THE CORRECT POSITION OF THE HYDRAULIC
TUBES, DO NOT SWAGE ANY CONNECTIONS UNTIL THE
INSTALLATION IS COMPLETED.
1 Put temporarily in position to identify the visible side of the tube.
1 TUBE ASSY V2919013200000 Item 11
1 TUBE ASSY V2919013100000 Item 3
1 TUBE V2911015700000 Item 8
1 TUBE V2911016200000 Item 10
2 Mark the end of the hydraulic tubes with the marking gage so that the
markings are visible when in position.
NOTE: These markings are to make sure the swagging of the tubes are
done correctly.
3 Connect the tube, item 3, with the tee connection, item 18.
4 Connect the tubes, item 3 and item 11, with the union, item 46:
1 UNION NSA855006-10 Item 46
5 Connect the tubes, item 11 and item 8, with the union, item 21:
1 UNION-SWAGED ABS0478-1010 Item 21
6 Connect the tubes, item 8 and item 10, with the elbow union, item 45:
1 ELBOW NSA855007-10 Item 45

### Page 41

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 41
(i) Install the blocks-clamping and the clamps between Frame 20 and Frame 21.
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22, Ref. Fig.BE Sol.AA SHEET 3 Installation of the Hydraulic T ubes from FR19
to FR22 view H, Ref. Fig.BE Sol.AA SHEET 4 Installation of the Hydraulic T ubes
from FR19 to FR22 view Q and Ref. Fig.BE Sol.AA SHEET 5 Installation of the
Hydraulic T ubes from FR19 to FR22 view R.
NOTE: The installation of the blocks-clamping and the clamps start from the aft
and progress towards the forward to make sure everything stays aligned
and without tension before swaging the tubes.
2 CLAMP   Item (39) Retained
2 BOLT   Item (37) Retained
2 WASHER NAS1149C0332R Item 27
1 BLOCK-CLAMPING   Item (50) Retained
2 BOLT   Item (32) Retained
2 WASHER NAS1149D0332K Item 24
2 NUT NAS1726C3E Item 33
2 BOLT NSA5191-3V9 Item 38
2 WASHER NAS1149E0332P Item 22
Wet-install the bolts, item (37) and item 38, using:
  Non Hardening Jointing
Putty - Medium T emp.
Area Chromate Free
06LCB1  
NOTE: Do not tighten the bolts to final torque value.
(j) Connect the tube, item 10, and the old tube, item (9), with the union, item 46.
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22.
CAUTION: TO ENSURE THE CORRECT POSITION OF THE HYDRAULIC
TUBES, DO NOT SWAGE ANY CONNECTIONS UNTIL THE
INSTALLATION IS COMPLETED.
1 Cut the hydraulic tube, item 10, to the rough needed length.
Refer to Ref. Fig.BE Sol.AA SHEET 5 Installation of the Hydraulic T ubes from
FR19 to FR22 view S.
NOTE: The cutting is necessary to make the installation of the tubes
possible. The accurate needed length is obtained later during the
procedure.
2 Put to the correct length and mark the cutline at the hydraulic tubes, item
(9) and item 10.
Refer to Ref. Fig.BE Sol.AA SHEET 6 Installation of the Hydraulic T ubes from
FR19 to FR22 view T.
NOTE: Make sure that you find an accurate overlap point to ensure a
tension free installation.

### Page 42

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 42
NOTE: Make sure that the straight length from the end of the tube,
item 10, to the bend end is greater than the minimum distance
permitted.
3 Cut the hydraulic tube, item (9).
1 TUBE V2911015000000 Item (9) Retained
4 Deburr the hydraulic tube, item (9).
5 Mark the end of the hydraulic tube, item (9), with the marking gage.
6 Cut the hydraulic tube, item 10.
7 Deburr the hydraulic tube, item 10.
8 Mark the end of the hydraulic tube, item 10, with the marking gage.
9 Insert the hydraulic tubes, item (9) and item 10, refer to Ref. MP A350-A-
20-51-61-08ZZZ-25BZ-A, into:
Refer to Ref. Fig.BE Sol.AA SHEET 6 Installation of the Hydraulic T ubes from
FR19 to FR22 view V.
1 UNION NSA855006-10 Item 46
(k) Check that all the assembly is stress free and aligned.
NOTE: Make sure that tubes and clamps are correctly installed.
(l) Install the cover-spray, item (47).
Refer to Ref. Fig.BE Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR19
to FR22 and Ref. Fig.BE Sol.AA SHEET 2 Installation of the Hydraulic T ubes from
FR19 to FR22 view J.
1 COVER-SPRAY   Item (47) Retained
Attach with:
2 TIE-CABLE NSA935401-05 Item 48
(m) Final torque all block-clamping and clamp bolts starting from the back to the
front on the floor area and from the top to the bottom on the side area.
(n) Swage all the connections from Frame 19 to Frame 23.
NOTE: The swage of the connections starts from the aft and progress towards
the front on the floor area and from the top to the bottom on the side
area.
(o) Check that there is no damage to the unions.
(p) Check that swaging marks are visible and correct.
(q) Do the bonding test when everything is swaged, refer to Ref. Appendix
ELECTRICAL BONDING/GROUNDING CODE EXPLANATION.
(r) Write the Service Bulletin number on the hydraulic tube, item (9), with a
permanent marker, refer to Ref. PMS 01-06-12, and protect with colorless top
coat, using:
  Varnish Polyurethane
- Low VOC - External
Structure
04SBA3

### Page 43

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 43
(s) Apply the corrosion preventive compound material to the exposed surfaces:
  Corrosion Preventive
Compound - Water
Displacing Soft Film
12ABC1

### Page 44

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6B-A-004-01 Fig.BE Sol.AA SHEET 1/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR19 to FR22
Page 44
CONF ALL
S U
L
E
M
J
G
B
K
B
C
D
C
F N
A
4
3
FR22
2
STGR39
STGR37
STGR35
1
FR21
STGR33
FWD CARGO DOOR
FR18
FR19
FR21
Z130
A
FR30
P
HQ
FR19 (9)
10 R
8
11
V
NOTE:
01 APPLY CORROSION PREVENTIVE COMPOUND MATERIAL
No 12ABC1 TO THE EXPOSED SURFACES.
01
ICN-A350-A-29XXP023-A-FAPE3-04P6B-A-004-01

### Page 45

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6K-A-002-01 Fig.BE Sol.AA SHEET 2/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR19 to FR22
Page 45
CONF ALL
(30)
27
(31)
(30)
27
(31)
29
(25)
29
27
(28)
TYPICAL VIEW
(25)
(23)
(26)
24
27
B
C
NOTE:
02
TORQUE TO BETWEEN 0.19 AND 0.23 m.daN (1.400 AND 1.696 lbf.ft).03
CLAMP POSITION INDICATED BY RED TAPE ON TUBE.
B
C
B C
03
03
02
D
E
F
03
03
02
ICN-A350-A-29XXP023-A-FAPE3-04P6K-A-002-01

### Page 46

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6L-A-003-01 Fig.BE Sol.AA SHEET 3/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR19 to FR22
Page 46
CONF ALL
37
27
35
29
_9C2M2
04
(37)
27
(39)
_6C2M2
G
05
04 NO PROTECTION TO BE APPLIED ON INSTALLATION.
05 WET-INSTALL WITH MATERIAL No 06LCB1.
ELECTRICAL BONDING.
NOTE:
48(47)
43
J
TYPICAL VIEW
20
21
K L
K
L
H
06 PROTECT WITH MATERIAL No 04QAC5.
06
06
ICN-A350-A-29XXP023-A-FAPE3-04P6L-A-003-01

### Page 47

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6M-A-003-01 Fig.BE Sol.AA SHEET 4/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR19 to FR22
Page 47
CONF ALL
08 APPLY SEALANT BEAD MATERIAL No 06AAB1 AROUND THE EDGE.
NOTE:
09 PROTECT WITH MATERIAL No 04QAB2.
07 APPLY INTERFAY SEALANT MATERIAL No 06AAC1.
02
WET-INSTALL WITH MATERIAL No 06LCB1.
(50)
24
(32)
Q
33
02
03
18
M
45
P
05
03 TORQUE TO BETWEEN 0.19 AND 0.23 m.daN (1.400 AND 1.696 Ibf.ft).
CLAMP POSITION INDICATED BY RED TAPE ON TUBE.
29
19
27
42
N
07 08 09
05
ICN-A350-A-29XXP023-A-FAPE3-04P6M-A-003-01

### Page 48

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-06NHP-A-002-01 Fig.BE Sol.AA SHEET 5/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR19 to FR22
Page 48
CONF ALL
(9)
10
CUTLINE
CUT TO THE ROUGH NEEDED LENGTH, TO MAKE THE INSTALLATION POSSIBLE.10
MAKE SURE THAT YOU FIND AN ACCURATE OVERLAP POINT TO11
ENSURE A TENSION FREE INSTALLATION.
SFWD
11
38
22
(39)
R
10
FR19
10
05
NOTE:
05 WET-INSTALL WITH MATERIAL No 06LCB1.
T
ICN-A350-A-29XXP023-A-FAPE3-06NHP-A-002-01

### Page 49

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-06NHQ-A-003-01 Fig.BE Sol.AA SHEET 6/6
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR19 to FR22
Page 49
CONF ALL
V
46
V
NOTE:
12
FWD U
(9)
10
ENSURE A GAP OF 5 mm (0.197 in) BETWEEN ITEM (9)
AND ITEM 10 AFTER CUTTING TO ENABLE SWAGGING.
FR19
TYPICAL VIEW
TFWD 13
13 BEFORE CUTTING, MAKE SURE THAT THE MINIMUM STRAIGHT LENGTH FROM THE END OF
THE TUBE, ITEM 10, TO THE BEND END IS MORE THAN 46 mm (1.811 in).
CUTLINE
10
(9)
121272 ± 1 mm 
(2.835 ± 0.039 in)
BEND END
ICN-A350-A-29XXP023-A-FAPE3-06NHQ-A-003-01

### Page 50

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 50
(4) Task A350-A-29-XX-P023-02001-720A-A (A350-A-29-XX-P023-02ZZZ-720Z-A)
Install the Hydraulic Tubes from FR22 to FR30
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access Door 821130
Work location From Frame 22 to Frame 30
Manpower/Resources/Skills
Man-hours 19.00 h
Minimum Number of person 2
Elapsed Time 9.50 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
Part kit 29P023D01R03
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
5 V2919010500000 1 TUBE
6 V2919010600000 1 TUBE
12 V2919012800000 1 TUBE
21 ABS0478-1010 2 UNION
27 NAS1149C0332R 28 WASHER
29 NAS1726C3PE 14 NUT
36 NSA5575-8A 2 CLAMP
37 NSA5191-3-8 2 BOLT
46 NSA855006-10 1 UNION
Referenced Information
Manuals/Drawings References/Sheets
ASR
A350-A-51-23-12-01ZZZ-667Z-A
A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A
ESP A350-A-20-33-42-01ZZZ-041Z-AA350-A-20-51-50-01ZZZ-042Z-A

### Page 51

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 51
Manuals/Drawings References/Sheets
MP
A350-A-20-51-50-01ZZZ-25BZ-A
A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A
A350-A-29-XX-XX-02ZZZ-170Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
PMS
01-04-58
01-06-12
01-07-117
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 For the specification of material application codes given in this Service
Bulletin, refer to the Ref. CML.
4 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
5 Get alternative and substitute fastener data in accordance with Ref. ASR
A350-A-51-43-XX-01ZZZ-667Z-A
6 If alternative and substitute fasteners have to be used, you must make
sure that the associated nut/collar are compatible in accordance with Ref.
ASR A350-A-51-4X-XX-01ZZZ-667Z-A
7 If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in ASR Data Module 51-4, then a fastener of
the same specification, or an approved substitute, with a length which
meets the installation standards given in ASR Data Module 51-4 may be
used. In addition, washers may be installed for fastener grip length in
accordance with ASR Data Module 51-4.
8 T o torque tighten the electrical and mechanical connections, refer to Ref.
ESP A350-A-20-51-50-01ZZZ-042Z-A
9 Adapt the clamp size as necessary, refer to Ref. ESP A350-A-20-33-42-
01ZZZ-041Z-A.
10 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
11 For Standard Mechanical T orques, refer to Ref. MP A350-A-20-51-50-01ZZZ-
25BZ-A.
12 Apply sealant in accordance with Ref. ASR A350-A-51-24-XX-01ZZZ-667Z-A.
13 Apply the preventive corrosion compound material in accordance with Ref.
ASR A350-A-51-23-12-01ZZZ-667Z-A.
14 For the electrical bonding, refer to Ref. PMS 01-04-58 and Ref. PMS 01-07-
117.
15 Obey the general rules for installation of the hydraulic lines, refer to Ref.
MP A350-A-20-51-61-00ZZZ-25BZ-A.

### Page 52

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 52
16 For the swage installation of the hydraulic lines, refer to Ref. MP A350-A-20-
51-61-08ZZZ-25BZ-A.
(b) Connect the hydraulic tube, item 5.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30.
CAUTION: MAKE SURE THE POSITION OF THE HYDRAULIC TUBES IS
CORRECT. THUS, DO NOT SWAGE ANY CONNECTIONS UNTIL
THE INSTALLATION IS COMPLETED.
1 Put temporarily in position item 5 to identify the visible side of the tube.
1 TUBE ASSY V2919010500000 Item 5
2 Mark the end of the hydraulic tubes with the marking gage so that the
markings are visible when in position.
NOTE: These markings are to make sure the swagging of the tubes are
done correctly.
3 Connect the hydraulic tube, item 5, in the union-flanged.
Refer to Ref. Fig.BF Sol.AA SHEET 3 Installation of the Hydraulic T ubes from
FR22 to FR30 view E.
(c) Install the block-clampings and the clamps from Frame 23 to Frame 25.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30 and Ref. Fig.BF Sol.AA SHEET 2 Installation of the Hydraulic T ubes from
FR22 to FR30.
NOTE: The installation of the blocks-clamping and the clamps start from
the front and progress towards the aft to make sure everything stays
aligned and without tension before swaging the tubes.
1 Install the clamp, item 36 and the block-clampings, item (31):
5 BLOCK-CLAMPING   Item (31) Retained
10 BOLT-HEXAGON HEAD   Item (30) Retained
11 WASHER NAS1149C0332R Item 27
5 NUT NAS1726C3PE Item 29
1 CLAMP NSA5575-8A Item 36
1 BOLT NSA5191-3-8 Item 37
NOTE: Do not tighten the bolts to final torque value except for the clamp,
item 36.
2 Do the bonding test, refer to Ref. Appendix ELECTRICAL BONDING/
GROUNDING CODE EXPLANATION.
3 Do the electrical bonding for the clamp, item 36, refer to Ref. Appendix
ELECTRICAL BONDING/GROUNDING CODE EXPLANATION, use:
  Coating - - Corrosion
Inhibiting Fastener Head
Protection
04QAC5

### Page 53

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 53
(d) Connect the tube, item 6, and the tube, item 5, with the union, item 21.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30 and Ref. Fig.BF Sol.AA SHEET 4 Installation of the Hydraulic T ubes from
FR22 to FR30 view J.
NOTE: The installation of the tubes and unions start from the front and
progress towards the aft.
CAUTION: MAKE SURE THE POSITION OF THE HYDRAULIC TUBES IS
CORRECT. THUS, DO NOT SWAGE ANY CONNECTIONS UNTIL
THE INSTALLATION IS COMPLETED.
1 Put temporarily in position item 6 to identify the visible side of the tube.
1 TUBE ASSY V2919010600000 Item 6
2 Mark the end of the hydraulic tubes with the marking gage so that the
markings are visible when in position.
NOTE: These markings are to make sure the swagging of the tubes are
done correctly.
3 Connect the hydraulic tube item 6, and the tube, item 5, with the union.
1 UNION-SWAGED ABS0478-1010 Item 21
(e) Install the block-clampings and the clamps from Frame 25 to Frame 28.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30 and Ref. Fig.BF Sol.AA SHEET 2 Installation of the Hydraulic T ubes from
FR22 to FR30.
NOTE: The installation of the blocks-clamping and the clamps start from
the front and progress towards the aft to make sure everything stays
aligned and without tension before swaging the tubes.
1 Install the clamp, item 36 and the block-clampings, item (31):
6 BLOCK-CLAMPING   Item (31) Retained
12 BOLT-HEXAGON HEAD   Item (30) Retained
13 WASHER NAS1149C0332R Item 27
7 NUT NAS1726C3PE Item 29
1 CLAMP NSA5575-8A Item 36
1 BOLT NSA5191-3-8 Item 37
NOTE: Do not tighten the bolts to final torque value except for the clamp,
item 36.
2 Do the bonding test, refer to Ref. Appendix ELECTRICAL BONDING/
GROUNDING CODE EXPLANATION.
3 Do the electrical bonding for the clamp, item 36, refer to Ref. Appendix
ELECTRICAL BONDING/GROUNDING CODE EXPLANATION, use:
  Coating - - Corrosion
Inhibiting Fastener Head
Protection
04QAC5

### Page 54

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 54
(f) Connect the hydraulic tube, item 12, and the tube, item 6, with the union, item
21.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30 and Ref. Fig.BF Sol.AA SHEET 4 Installation of the Hydraulic T ubes from
FR22 to FR30 view J.
NOTE: The installation of the tubes and unions start from the front and
progress towards the aft.
CAUTION: MAKE SURE THE POSITION OF THE HYDRAULIC TUBES IS
CORRECT. THUS, DO NOT SWAGE ANY CONNECTIONS UNTIL
THE INSTALLATION IS COMPLETED.
1 Put temporarily in position item 12 to identify the visible side of the tube.
1 TUBE ASSY V2919012800000 Item 12
2 Mark the end of the hydraulic tubes with the marking gage so that the
markings are visible when in position.
NOTE: These markings are to make sure the swagging of the tubes are
done correctly.
3 Connect the hydraulic tube, item 12, and the tube, item 6, with the union.
1 UNION-SWAGED ABS0478-1010 Item 21
(g) Install the block-clampings from Frame 28 to Frame 29.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30 and Ref. Fig.BF Sol.AA SHEET 2 Installation of the Hydraulic T ubes from
FR22 to FR30 view B and view C.
NOTE: The installation of the blocks-clamping start from the front and progress
towards the aft to make sure everything stays aligned and without
tension before swaging the tubes.
2 BLOCK-CLAMPING   Item (31) Retained
4 BOLT-HEXAGON HEAD   Item (30) Retained
4 WASHER NAS1149C0332R Item 27
2 NUT NAS1726C3PE Item 29
NOTE: Do not tighten the bolts to final torque value.
(h) Connect the tube, item 12, and the old tube, item (7), with the union, item 46.
Refer to Ref. Fig.BF Sol.AA SHEET 1 Installation of the Hydraulic T ubes from FR22
to FR30 and Ref. Fig.BF Sol.AA SHEET 4 Installation of the Hydraulic T ubes from
FR22 to FR30 view H.
1 Cut the hydraulic tube, item 12, to the rough needed length.
Refer to Ref. Fig.BF Sol.AA SHEET 3 Installation of the Hydraulic T ubes from
FR22 to FR30 view F and view G.
NOTE: The cutting is necessary to make the installation of the tubes
possible. The accurate needed length is obtained later during the
procedure.

### Page 55

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 55
2 Put to the correct length and mark the cutline at the hydraulic tubes, item
(7) and item 12.
Refer to Ref. Fig.BF Sol.AA SHEET 3 Installation of the Hydraulic T ubes from
FR22 to FR30 view F .
NOTE: Make sure that you find an accurate overlap point to ensure a
tension free installation.
3 Cut the hydraulic tube, item (7).
1 TUBE V2919007400000 Item (7) Retained
4 Deburr the hydraulic tube, item (7).
5 Mark the end of the hydraulic tube, item (7), with the marking gage.
6 Cut the hydraulic tube, item 12.
7 Deburr the hydraulic tube, item 12.
8 Mark the end of the hydraulic tube, item 12, with the marking gage.
9 Insert the hydraulic tubes, item (7) and item 12, refer to Ref. MP A350-A-
20-51-61-08ZZZ-25BZ-A, into:
Refer to Ref. Fig.BF Sol.AA SHEET 4 Installation of the Hydraulic T ubes from
FR22 to FR30 view K.
1 UNION NSA855006-10 Item 46
10 T orque tighten the block-clamping at Frame 28.
(i) Check that all the tubes and unions are stress free and aligned.
NOTE: Make sure that tubes and clamps are correctly installed.
(j) Final torque all block-clamping and clamp bolts starting from the front to the
back.
(k) Swage all the connections from Frame 23 to Frame 29.
NOTE: The swage of the connections start from the front and progress towards
the back.
(l) Check that there is no damage to the unions.
(m) Check that swaging marks are visible and correct.
(n) Write the Service Bulletin number on the hydraulic tube, item (7), with a
permanent marker, refer to Ref. PMS 01-06-12, and protect with colorless top
coat, using:
  Varnish Polyurethane
- Low VOC - External
Structure
04SBA3  
(o) Apply the corrosion preventive compound material to the exposed surfaces:
  Corrosion Preventive
Compound - Water
Displacing Soft Film
12ABC1

### Page 56

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6R-A-004-01 Fig.BF Sol.AA SHEET 1/4
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR22 to FR30
Page 56
CONF ALL
F
E
C
C
B
B
C
B
D
A
5
FR24
FR23
J
B
D
C
C
B
J
FR25
FR26
FR27
FR28
6
B
FWD CARGO DOOR
FR18
FR19
FR21
A
FR30
C
B
FR29
12
(7)
NOTE:
01 APPLY CORROSION PREVENTIVE COMPOUND MATERIAL
No 12ABC1 TO THE EXPOSED SURFACES.
01
ICN-A350-A-29XXP023-A-FAPE3-04P6R-A-004-01

### Page 57

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6S-A-003-01 Fig.BF Sol.AA SHEET 2/4
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR22 to FR30
Page 57
CONF ALL
(30)
27
(31)
(30)
27
(31)
29
29
27
37
36
B C
D
03
03
02
02
03
ELECTRICAL BONDING.
NOTE:
04 NO PROTECTION TO BE APPLIED ON INSTALLATION.
TORQUE TO BETWEEN 0.19 AND 0.23 m.daN (1.400 AND 1.696 lbf.ft).
CLAMP POSITION INDICATED BY RED TAPE ON TUBE.
_6C3M1
_9C3M1
04
TYPICAL VIEW
TYPICAL VIEW TYPICAL VIEW
ICN-A350-A-29XXP023-A-FAPE3-04P6S-A-003-01

### Page 58

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-04P6T-A-004-01 Fig.BF Sol.AA SHEET 3/4
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR22 to FR30
Page 58
CONF ALL
E
5
UNION-FLANGED
G H
(7)
CUTLINE
F
05
06FR28
12
05 MAKE SURE THAT YOU FIND AN ACCURATE OVERLAP POINT TO ENSURE
06
07
CUT TO THE ROUGH NEEDED LENGTH, TO MAKE THE INSTALLATION POSSIBLE.
NOTE:
A TENSION FREE INSTALLATION.
ENSURE A GAP OF 5 mm (0.197 in) BETWEEN ITEM (7) AND THE ITEM 12 AFTER
CUTTING TO ENABLE SWAGING.
FR28
CUTLINE12
(7)
153 ± 1 mm
(6.024 ± 0.039 in) 07
FWD G
ICN-A350-A-29XXP023-A-FAPE3-04P6T-A-004-01

### Page 59

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP023-A-FAPE3-06OA0-A-001-01 Fig.BF Sol.AA SHEET 4/4
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22
Installation of the Hydraulic T ubes from FR22 to FR30
Page 59
CONF ALL
J
TYPICAL VIEW
21
K
FR28
12
(7)
FWD H
46
J K
K
ICN-A350-A-29XXP023-A-FAPE3-06OA0-A-001-01

### Page 60

A350
SERVICE BULLETIN
REV 00 Dec 17/21 A350-29-P023
REV 01 Sep 15/22 Page 60
D. PREPARATION FOR TEST
(1) Task A350-A-29-XX-P023-01001-762A-A (A350-A-29-XX-P023-01ZZZ-762Z-A)
Preparation for Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 4.00 h
Minimum Number of person 2
Elapsed Time 2.00 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-21-2X-XX-00ZZZ-720Z-AA350-A-50-23-63-00ZZZ-720Z-A
Procedure
(a) If removed, install the air-conditioning ducts, refer to Ref. MP A350-A-21-2X-XX-
00ZZZ-720Z-A.
(b) Install the ball mat assemblies, refer to Ref. MP A350-A-50-23-63-00ZZZ-720Z-A.
E. TEST
(1) Task A350-A-29-XX-P023-01001-320A-A (A350-A-29-XX-P023-01ZZZ-320Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.25 h
Minimum Number of person 1
Elapsed Time 1.25 h
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-29-13-XX-00ZZZ-320Z-A
A350-A-50-23-63-00ZZZ-720Z-A
Procedure
(a) Do the leak test after the installation of the hydraulic lines, refer to Ref. MP
A350-A-20-51-61-00ZZZ-25BZ-A.
(b) Do an operational test of the yellow hydraulic system, refer to Ref. MP A350-A-
29-13-XX-00ZZZ-320Z-A.
(c) If necessary, do the test after the installation of the air-conditioning ducts, refer
to Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A.
(d) Do the test after the installation of the ball mat assemblies, refer to Ref. MP
A350-A-50-23-63-00ZZZ-720Z-A.
F. CLOSE-UP
(1) Task A350-A-29-XX-P023-01001-740A-A (A350-A-29-XX-P023-01ZZZ-740Z-A)
Close-up

The text continues at https://openairdocs.org/service-documents/airbus/a350-29-p023/file/40a26fa8535d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.