# Airbus Service Bulletin A350-29-P038

Copy: No revision named ("A350-29-P038"), 116 pages: PDF https://openairdocs.org/files/sha256/f9/17/f917a673949a3f22ddbd319fb77d467c8050a22cc01d1c96d1ac092ed2ee3d24; text https://openairdocs.org/service-documents/airbus/a350-29-p038/file/f917a673949a.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2023-0656, the docket of AD 2023-13-13. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-29-P038
- Page: https://openairdocs.org/service-documents/airbus/a350-29-p038

## Text (116 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2023-0656, the docket of AD 2023-13-13. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S11-12 FOR A350-900 (12 YEARS)
MODIFICATION No.:
113982L44225

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Sep 16/22 A350-29-P038
Page 2
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S11-12 FOR A350-900 (12 YEARS)
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
CONF 001
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 113982L44225
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification is related to an airworthiness issue and has been re-classified and
confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this is
handled by Airbus under the Design Organisation Approval ref. EASA.21J.031.
CONF 002
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 113982L44225
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification is related to an airworthiness issue and has been re-classified and
confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this is
handled by Airbus under the Design Organisation Approval ref. EASA.21J.031.
CONF 003
MODIFICATION CLASSIFICATION
MAJOR None
MINOR 113982L44225
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification is related to an airworthiness issue and has been re-classified and
confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this is
handled by Airbus under the Design Organisation Approval ref. EASA.21J.031.
CONF 004
MODIFICATION CLASSIFICATION
MAJOR None

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Sep 16/22 A350-29-P038
Page 3
MODIFICATION CLASSIFICATION
MINOR 113982L44225
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification is related to an airworthiness issue and has been re-classified and
confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this is
handled by Airbus under the Design Organisation Approval ref. EASA.21J.031.
CONF ALL
B. REASON
(1) History
This Service Bulletin has been issued to advise operators of spots and stains
discovered on tubes made from aluminium 6061 T6 after alodine process. As
consequence, micrographs show a reduction of wall thickness up to 15%. Additionally,
the process applied by the supplier for the determination of maximum ovality was
not in accordance with the manufacturer pipes specification. The effective pipes are
installed in the return line of yellow hydraulic system only. Only the sections 11 to 12,
13 to 14 and 15 are affected.
The consequence of these findings may affect the pipe and introduces a risk of
premature failure.
(2) Objective/Action
This Service Bulletin gives instructions to replace all applicable aluminium pipes by
titanium pipes.
(3) Advantages
The accomplishment of this Service Bulletin will prevent the risk of premature failure.
NOTE: The accomplishment of this Service Bulletin will supersede the concessions
for the applicable Manufacturer Serial Number (MSN)s, refer to Appendix LIST
OF CONCESSIONS.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.

### Page 4

A350
SERVICE BULLETIN
SUMMARY
REV 00 Sep 16/22 A350-29-P038
Page 4
D. MAINTENANCE CONFIGURATION
CONF 001
No specific aircraft maintenance configuration required.
CONF 002
No specific aircraft maintenance configuration required.
CONF 003
No specific aircraft maintenance configuration required.
CONF 004
No specific aircraft maintenance configuration required.
CONF ALL
E. MATERIAL PRICE INFORMATION
CONF 001
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 29P038D03R02 1 11000.00 USD Bolts, nuts, clamps, washers,
unions, tubes and elbow
Part kit 29P038D04R01 1 50.00 USD Nuts, washers
TOTAL   11050.00 USD  
CONF 002
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 29P038D03R02 1 11000.00 USD Bolts, nuts, clamps, washers,
unions, tubes and elbow
Part kit 29P038D04R01 1 50.00 USD Nuts, washers
TOTAL   11050.00 USD  
CONF 003
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 29P038D03R02 1 11000.00 USD Bolts, nuts, clamps, washers,
unions, tubes and elbow

### Page 5

A350
SERVICE BULLETIN
SUMMARY
REV 00 Sep 16/22 A350-29-P038
Page 5
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 29P038D04R01 1 50.00 USD Nuts, washers
TOTAL   11050.00 USD  
CONF 004
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 29P038D01R01 1 11000.00 USD Bolts, nuts, clamps, washers,
unions, tubes and elbow
Part kit 29P038D04R01 1 50.00 USD Nuts, washers
TOTAL   11050.00 USD  
CONF ALL
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
36V 96U AAR CAL CCA CES CHH CPA CRK CSC DAL DLH ETH EVE FBU FIN FJI FWI HVN IBE
ITY MAS PAL QTR SIA THA
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
CONF 001
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT YES
EQUIPMENT NO
CONF 002
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT YES
EQUIPMENT NO
CONF 003
(1) Modification of Low Pressure Tubes S11-12

### Page 6

A350
SERVICE BULLETIN
SUMMARY
REV 00 Sep 16/22 A350-29-P038
Page 6
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT YES
EQUIPMENT NO
CONF 004
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT YES
EQUIPMENT NO
CONF ALL
I. MANPOWER
CONF 001
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MANPOWER
TOTAL MAN-HOURS 129.75
h
ELAPSED TIME (HOURS) 65.00 h
CONF 002
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MANPOWER
TOTAL MAN-HOURS 129.75
h
ELAPSED TIME (HOURS) 65.00 h
CONF 003
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MANPOWER
TOTAL MAN-HOURS 129.75
h
ELAPSED TIME (HOURS) 65.00 h
CONF 004
(1) Modification of Low Pressure Tubes S11-12

### Page 7

A350
SERVICE BULLETIN
SUMMARY
REV 00 Sep 16/22 A350-29-P038
Page 7
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
MANPOWER
TOTAL MAN-HOURS 129.75
h
ELAPSED TIME (HOURS) 65.00 h

### Page 8

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSP-A-003-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Sep 16/22 A350-29-P038General Overview
Page 8
CONF ALL
J. GENERAL OVERVIEW
CONF 004
A
FWD CARGO DOOR
Z120
Z130
FR12
FR21
FR27
A
FR12
FR13
FR14
FR16
FR17
FR19
FR18
HYDRAULIC TUBE
TO BE REPLACED
HYDRAULIC TUBE
TO BE REPLACED
FR20
HYDRAULIC TUBE
TO BE REPLACED
T-CONNECTION
FR21
HYDRAULIC TUBE
TO BE CUT AND REPLACED
ICN-A350-A-29XXP038-A-FAPE3-06CSP-A-003-01

### Page 9

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSO-A-003-01 Fig.SA Sol.AB SHEET 1/1
REV 00 Sep 16/22 A350-29-P038General Overview
Page 9
CONF 001-003
A
FWD CARGO DOOR
Z120
Z130
FR12
FR21
FR27
A
T-CONNECTION
FR21
HYDRAULIC TUBE
TO BE CUT AND REPLACED
FR12
FR13
FR14
FR16
FR17
FR19
FR18
FR20
HYDRAULIC TUBE
TO BE REPLACED
HYDRAULIC TUBE
TO BE REPLACED
HYDRAULIC TUBE
TO BE REPLACED
HYDRAULIC TUBE
TO BE REPLACED
ICN-A350-A-29XXP038-A-FAPE3-06CSO-A-003-01

### Page 10

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 10
ATA SYSTEM: 29
TITLE: HYDRAULIC POWER - GENERAL - UPGRADE LOW PRESSURE PIPE
STANDARD S11-12 FOR A350-900 (12 YEARS)
CONF ALL
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This modification is applicable by Service Bulletin only.
(1) Models
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0082, 0103-0106, 0121-0123, 0126, 0127,
0213, 0214, 0216-0221, 0223, 0226-0228, 0230-0232, 0234-0240, 0243, 0244, 0246-0251,
0254-0257, 0259-0261, 0263-0265, 0267-0273, 0276-0285, 0287, 0289, 0291-0295, 0297,
0299-0303, 0305, 0307-0312, 0316
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0064 0066-0070 0072-0082 0103-0106 0121-0123 0126 0127 0213
0214 0216-0221 0223 0226-0228 0230-0232 0234-0240 0243 0244 0246-0251 0254-
0257 0259-0261 0263-0265 0267-0273 0276-0285 0287 0289 0291-0295 0297 0299-
0303 0305 0307-0312 0316
(3) MSN by configuration
CONF 001
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020
001
CONF 002
MSN CONFIGURATION
0021 0022 0023 0024 0025 0026 0027 0028 0029 0030 0031
0032 0033 0034 0035 0036 0037 0038 0039
002
CONF 003
MSN CONFIGURATION
0040 0041 0042 0043 0044 0049 003
CONF 004
MSN CONFIGURATION
0045 0046 0047 0048 0050 0051 0052 0053 0054 0055 0056
0057 0058 0060 0061 0062 0063 0064 0066 0067 0068 0069
0070 0072 0073 0074 0075 0076 0077 0078 0079 0080 0081
0082 0103 0104 0105 0106 0121 0122 0123 0126 0127 0213
0214 0216 0217 0218 0219 0220 0221 0223 0226 0227 0228
0230 0231 0232 0234 0235 0236 0237 0238 0239 0240 0243
0244 0246 0247 0248 0249 0250 0251 0254 0255 0256 0257
0259 0260 0261 0263 0264 0265 0267 0268 0269 0270 0271
0272 0273 0276 0277 0278 0279 0280 0281 0282 0283 0284
004

### Page 11

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 11
MSN CONFIGURATION
0285 0287 0289 0291 0292 0293 0294 0295 0297 0299 0300
0301 0302 0303 0305 0307 0308 0309 0310 0311 0312 0316
CONF ALL
(4) Configuration definition
CONF 001
Configuration 001
CONF 001 is applicable for aircraft on which:
- MOD No. 104446L20319 is not embodied
- MOD No. 107585L20490 is not embodied
- MOD No. 102689L20361 is not embodied.
CONF 001 retrofits following modifications: 113982L44225.
CONF 002
Configuration 002
CONF 002 is applicable for aircraft on which:
- MOD No. 104446L20319 is embodied
- MOD No. 107585L20490 is not embodied
- MOD No. 102689L20361 is not embodied.
CONF 002 retrofits following modifications: 113982L44225.
CONF 003
Configuration 003
CONF 003 is applicable for aircraft on which:
- MOD No. 104446L20319 is embodied
- MOD No. 107585L20490 is not embodied
- MOD No. 102689L20361 is embodied.
CONF 003 retrofits following modifications: 113982L44225.
CONF 004
Configuration 004
CONF 004 is applicable for aircraft on which:
- MOD No. 104446L20319 is embodied
- MOD No. 107585L20490 is embodied
- MOD No. 102689L20361 is embodied.
CONF 004 retrofits following modifications: 113982L44225.
CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON

### Page 12

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 12
(1) History
This Service Bulletin has been issued to advise operators of spots and stains
discovered on tubes made from aluminium 6061 T6 after alodine process. As
consequence, micrographs show a reduction of wall thickness up to 15%. Additionally,
the process applied by the supplier for the determination of maximum ovality was
not in accordance with the manufacturer pipes specification. The effective pipes are
installed in the return line of yellow hydraulic system only. Only the sections 11 to 12,
13 to 14 and 15 are affected.
The consequence of these findings may affect the pipe and introduces a risk of
premature failure.
(2) Objective/Action
This Service Bulletin gives instructions to replace all applicable aluminium pipes by
titanium pipes.
(3) Advantages
The accomplishment of this Service Bulletin will prevent the risk of premature failure.
NOTE: The accomplishment of this Service Bulletin will supersede the concessions
for the applicable Manufacturer Serial Number (MSN)s, refer to Appendix LIST
OF CONCESSIONS.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
CONF 001
1 Remove the Yellow Hydraulic T ubes between Frame 12 and Frame 22
CONF 002 003
1 Remove the Yellow Hydraulic T ubes between Frame 12 and Frame 22
CONF 004
1 Remove the Yellow Hydraulic T ubes between Frame 12 and Frame 22
CONF 001-003
2 Install the Yellow Hydraulic T ubes between Frame 12 and Frame 22
CONF 004
2 Install the Yellow Hydraulic T ubes between Frame 12 and Frame 22
CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency

### Page 13

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 13
(EASA) will be issued to confirm this classification. The accomplishment timescale,
which has not yet been defined, will be given in the AD.
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
CONF 001
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
PREPARATION
Job Set-Up 29.00 h
PROCEDURE
Remove the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
16.00 h
Install the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
38.00 h
PREPARATION FOR TEST
Preparation for T est 0.25 h
TEST
T est 1.50 h
CLOSE-UP
Close-up 45.00 h
TOTAL MAN-HOURS 129.75 h
ELAPSED TIME (HOURS) 65.00 h
CONF 002
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
PREPARATION

### Page 14

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 14
Job Set-Up 29.00 h
PROCEDURE
Remove the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
16.00 h
Install the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
38.00 h
PREPARATION FOR TEST
Preparation for T est 0.25 h
TEST
T est 1.50 h
CLOSE-UP
Close-up 45.00 h
TOTAL MAN-HOURS 129.75 h
ELAPSED TIME (HOURS) 65.00 h
CONF 003
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
PREPARATION
Job Set-Up 29.00 h
PROCEDURE
Remove the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
16.00 h
Install the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
38.00 h
PREPARATION FOR TEST
Preparation for T est 0.25 h
TEST
T est 1.50 h
CLOSE-UP
Close-up 45.00 h
TOTAL MAN-HOURS 129.75 h
ELAPSED TIME (HOURS) 65.00 h
CONF 004
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.

### Page 15

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 15
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
PREPARATION
Job Set-Up 29.00 h
PROCEDURE
Remove the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
16.00 h
Install the Yellow Hydraulic T ubes between Frame 12 and
Frame 22
38.00 h
PREPARATION FOR TEST
Preparation for T est 0.25 h
TEST
T est 1.50 h
CLOSE-UP
Close-up 45.00 h
TOTAL MAN-HOURS 129.75 h
ELAPSED TIME (HOURS) 65.00 h
CONF ALL
H. WEIGHT AND BALANCE
CONF 001
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +0.192 kg (+0.423 lb)
Effect on Balance +2.434 kg.m (+17.605 lb.ft)
CONF 002 003
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +0.193 kg (+0.425 lb)
Effect on Balance +2.446 kg.m (+17.692 lb.ft)
CONF 004
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +0.267 kg (+0.589 lb)
Effect on Balance +3.387 kg.m (+24.498 lb.ft)
CONF ALL
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONF 001

### Page 16

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 16
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-23-12-01ZZZ-667Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-42-01ZZZ-041Z-A A350-A-20-51-XX-01ZZZ-042Z-A
A350-A-20-51-20-01ZZZ-042Z-A A350-A-20-51-21-01ZZZ-600Z-A
A350-A-20-51-22-00ZZZ-600Z-A A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-00ZZZ-170Z-A A350-A-20-51-20-04ZZZ-250Z-A
A350-A-20-51-20-06ZZZ-250Z-A
A350-A-20-51-20-0EZZZ-34BZ-A
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-00ZZZ-360Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A
A350-A-29-13-XX-00ZZZ-320Z-A
A350-A-29-13-75-00ZZZ-720Z-A A350-A-32-22-XX-00ZZZ-397Z-A
A350-A-32-22-XX-01ZZZ-397Z-A
A350-A-32-5X-XX-00ZZZ-345Z-A
A350-A-32-5X-XX-00ZZZ-398Z-A
A350-A-49-42-XX-00ZZZ-320Z-A
A350-A-49-42-54-01ZZZ-520Z-A
A350-A-49-42-54-01ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
A350-A-53-12-75-00ZZZ-520Z-A
A350-A-53-12-75-00ZZZ-720Z-A
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-06-12
01-07-117
SYSTEM DESCRIPTION (SD)
A350-A-06-2X-XX-01ZZZ-04CZ-A A350-A-06-3X-XX-01ZZZ-04CZ-A
A350-A-20-51-20-01ZZZ-04CZ-A

### Page 17

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 17
TECHNICAL FOLLOW UP (TFU)
29.00.00.090
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF 002
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-23-12-01ZZZ-667Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-42-01ZZZ-041Z-A A350-A-20-51-XX-01ZZZ-042Z-A
A350-A-20-51-20-01ZZZ-042Z-A A350-A-20-51-21-01ZZZ-600Z-A
A350-A-20-51-22-00ZZZ-600Z-A A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-00ZZZ-170Z-A A350-A-20-51-20-04ZZZ-250Z-A
A350-A-20-51-20-06ZZZ-250Z-A
A350-A-20-51-20-0EZZZ-34BZ-A
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-00ZZZ-360Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A
A350-A-29-13-XX-00ZZZ-320Z-A
A350-A-29-13-75-00ZZZ-720Z-A A350-A-32-22-XX-00ZZZ-397Z-A
A350-A-32-22-XX-01ZZZ-397Z-A
A350-A-32-5X-XX-00ZZZ-345Z-A
A350-A-32-5X-XX-00ZZZ-398Z-A
A350-A-49-42-XX-00ZZZ-320Z-A
A350-A-49-42-54-01ZZZ-520Z-A
A350-A-49-42-54-01ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
A350-A-53-12-75-00ZZZ-520Z-A
A350-A-53-12-75-00ZZZ-720Z-A

### Page 18

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 18
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-06-12
01-07-117
SYSTEM DESCRIPTION (SD)
A350-A-06-2X-XX-01ZZZ-04CZ-A A350-A-06-3X-XX-01ZZZ-04CZ-A
A350-A-20-51-20-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
29.00.00.090
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF 003
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-23-12-01ZZZ-667Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-42-01ZZZ-041Z-A A350-A-20-51-XX-01ZZZ-042Z-A
A350-A-20-51-20-01ZZZ-042Z-A A350-A-20-51-21-01ZZZ-600Z-A
A350-A-20-51-22-00ZZZ-600Z-A A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-00ZZZ-170Z-A A350-A-20-51-20-04ZZZ-250Z-A
A350-A-20-51-20-06ZZZ-250Z-A
A350-A-20-51-20-0EZZZ-34BZ-A
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-00ZZZ-360Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A
A350-A-29-13-XX-00ZZZ-320Z-A
A350-A-29-13-75-00ZZZ-720Z-A A350-A-32-22-XX-00ZZZ-397Z-A
A350-A-32-22-XX-01ZZZ-397Z-A
A350-A-32-5X-XX-00ZZZ-345Z-A A350-A-49-42-XX-00ZZZ-320Z-A

### Page 19

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 19
MAINTENANCE PROCEDURE (MP)
A350-A-32-5X-XX-00ZZZ-398Z-A
A350-A-49-42-54-01ZZZ-520Z-A
A350-A-49-42-54-01ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
A350-A-53-12-75-00ZZZ-520Z-A
A350-A-53-12-75-00ZZZ-720Z-A
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-06-12
01-07-117
SYSTEM DESCRIPTION (SD)
A350-A-06-2X-XX-01ZZZ-04CZ-A A350-A-06-3X-XX-01ZZZ-04CZ-A
A350-A-20-51-20-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
29.00.00.090
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF 004
(1) Modification of Low Pressure Tubes S11-12
(a) T ask set A350-A-29-XX-P038-01000-93AA-A Modification of Low Pressure T ubes
S11-12
AIRCRAFT STRUCTURAL REPAIR (ASR)
A350-A-51-23-12-01ZZZ-667Z-A A350-A-51-24-XX-01ZZZ-667Z-A
A350-A-51-4X-XX-01ZZZ-667Z-A A350-A-51-42-XX-01ZZZ-667Z-A
A350-A-51-43-XX-01ZZZ-667Z-A
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-42-01ZZZ-041Z-A A350-A-20-51-XX-01ZZZ-042Z-A
A350-A-20-51-20-01ZZZ-042Z-A A350-A-20-51-21-01ZZZ-600Z-A
A350-A-20-51-22-00ZZZ-600Z-A A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
MAINTENANCE PROCEDURE (MP)
A350-A-12-XX-XX-00ZZZ-170Z-A A350-A-20-51-20-04ZZZ-250Z-A
A350-A-20-51-20-06ZZZ-250Z-A
A350-A-20-51-20-0EZZZ-34BZ-A
A350-A-20-51-50-01ZZZ-25BZ-A A350-A-20-51-61-00ZZZ-25BZ-A
A350-A-20-51-61-08ZZZ-25BZ-A

### Page 20

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 20
MAINTENANCE PROCEDURE (MP)
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-21-2X-XX-00ZZZ-720Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-00ZZZ-360Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A
A350-A-29-13-XX-00ZZZ-320Z-A
A350-A-29-13-75-00ZZZ-720Z-A A350-A-32-22-XX-00ZZZ-397Z-A
A350-A-32-22-XX-01ZZZ-397Z-A
A350-A-32-5X-XX-00ZZZ-345Z-A
A350-A-32-5X-XX-00ZZZ-398Z-A
A350-A-49-42-XX-00ZZZ-320Z-A
A350-A-49-42-54-01ZZZ-520Z-A
A350-A-49-42-54-01ZZZ-720Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-720Z-A
A350-A-53-12-75-00ZZZ-520Z-A
A350-A-53-12-75-00ZZZ-720Z-A
PROCESS AND MATERIAL SPECIFICATION (PMS)
01-04-58 01-06-12
01-07-117
SYSTEM DESCRIPTION (SD)
A350-A-06-2X-XX-01ZZZ-04CZ-A A350-A-06-3X-XX-01ZZZ-04CZ-A
A350-A-20-51-20-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
29.00.00.090
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONSUMABLE MATERIAL LIST (CML)
CONF ALL
K. PUBLICATION AFFECTED
MAINTENANCE ILLUSTRATED PART DATA (MIPD)
MAINTENANCE PROCEDURE (MP)
L. INDUSTRY SUPPORT INFORMATION
AIRBUS will share the costs of accomplishment of this Service Bulletin by providing the kits
at no charge for orders placed before Dec 31/31.
For the accomplishment of this Service Bulletin before Dec 31/31, AIRBUS will credit the
man-hours indicated in this Service Bulletin at the agreed in-house warranty labor rate.
Claims for this allowance shall be received no later than 90 days after completion of the last
affected aircraft of your fleet fulfilling above timeframe conditions.
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 21

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 21
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
CONF 001
Material for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Part kit 29P038D03R02 1
Part kit 29P038D04R01 1
Interchangeable parts See SB
Spare parts See SB
CONF 002
Material for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Part kit 29P038D03R02 1
Part kit 29P038D04R01 1
Interchangeable parts See SB
Spare parts See SB
CONF 003
Material for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
Part kit 29P038D03R02 1
Part kit 29P038D04R01 1
Interchangeable parts See SB
Spare parts See SB
CONF 004
Material for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
MATERIAL QTY SEE NOTES
Referenced tools See SB
Consumables See SB

### Page 22

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 22
MATERIAL QTY SEE NOTES
Referenced consumables See SB
Part kit 29P038D01R01 1
Part kit 29P038D04R01 1
Interchangeable parts See SB
Spare parts See SB
CONF ALL
B. TOOLING
CONF 001
Referenced tools for task set A350-A-29-XX-P038-01000-93AA-A Modification of
Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-32-22-XX-00ZZZ-397Z-A
Ref. MP A350-A-32-22-XX-01ZZZ-397Z-A
Ref. MP A350-A-32-5X-XX-00ZZZ-398Z-A
CONF 002
Referenced tools for task set A350-A-29-XX-P038-01000-93AA-A Modification of
Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-32-22-XX-00ZZZ-397Z-A
Ref. MP A350-A-32-22-XX-01ZZZ-397Z-A
Ref. MP A350-A-32-5X-XX-00ZZZ-398Z-A
CONF 003
Referenced tools for task set A350-A-29-XX-P038-01000-93AA-A Modification of
Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-32-22-XX-00ZZZ-397Z-A
Ref. MP A350-A-32-22-XX-01ZZZ-397Z-A
Ref. MP A350-A-32-5X-XX-00ZZZ-398Z-A
CONF 004
Referenced tools for task set A350-A-29-XX-P038-01000-93AA-A Modification of
Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-32-22-XX-00ZZZ-397Z-A
Ref. MP A350-A-32-22-XX-01ZZZ-397Z-A
Ref. MP A350-A-32-5X-XX-00ZZZ-398Z-A

### Page 23

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 23
CONF ALL
C. CONSUMABLES
CONF 001
Consumables for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
06AAB1 Polysulfide Sealant -General Purpose Fillet
06AAC1 Polysulfide Sealant -General Purpose Interfay
06ACA1
Polysulfide Sealant - Low
Density MultiPurpose
Brushable
06LCB1
Non Hardening Jointing
Putty - Medium T emp. Area
Chromate Free
08BAA9 Non Aqueous Cleaner -General
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
14SBA1 T extile - Lint free Cotton
CONF 002
Consumables for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
06AAB1 Polysulfide Sealant -General Purpose Fillet
06AAC1 Polysulfide Sealant -General Purpose Interfay
06ACA1
Polysulfide Sealant - Low
Density MultiPurpose
Brushable
06LCB1
Non Hardening Jointing
Putty - Medium T emp. Area
Chromate Free
08BAA9 Non Aqueous Cleaner -General

### Page 24

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 24
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
14SBA1 T extile - Lint free Cotton
CONF 003
Consumables for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
06AAB1 Polysulfide Sealant -General Purpose Fillet
06AAC1 Polysulfide Sealant -General Purpose Interfay
06ACA1
Polysulfide Sealant - Low
Density MultiPurpose
Brushable
06LCB1
Non Hardening Jointing
Putty - Medium T emp. Area
Chromate Free
08BAA9 Non Aqueous Cleaner -General
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
14SBA1 T extile - Lint free Cotton
CONF 004
Consumables for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
04QAC5
Coating - - Corrosion
Inhibiting Fastener Head
Protection
04SBA3 Varnish Polyurethane - LowVOC - External Structure
06AAB1 Polysulfide Sealant -General Purpose Fillet
06AAC1 Polysulfide Sealant -General Purpose Interfay
06ACA1
Polysulfide Sealant - Low
Density MultiPurpose
Brushable

### Page 25

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 25
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
06LCB1
Non Hardening Jointing
Putty - Medium T emp. Area
Chromate Free
08BAA9 Non Aqueous Cleaner -General
12ABC1
Corrosion Preventive
Compound - Water
Displacing Soft Film
14SBA1 T extile - Lint free Cotton
CONF 001
Referenced consumables for task set A350-A-29-XX-P038-01000-93AA-A
Modification of Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the consumables listed in:
Ref. MP A350-A-20-51-61-00ZZZ-25BZ-A
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A
Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A
Ref. MP A350-A-49-42-54-01ZZZ-720Z-A
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
Ref. MP A350-A-53-12-75-00ZZZ-720Z-A
CONF 002
Referenced consumables for task set A350-A-29-XX-P038-01000-93AA-A
Modification of Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the consumables listed in:
Ref. MP A350-A-20-51-61-00ZZZ-25BZ-A
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A
Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A
Ref. MP A350-A-49-42-54-01ZZZ-720Z-A
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
Ref. MP A350-A-53-12-75-00ZZZ-720Z-A
CONF 003
Referenced consumables for task set A350-A-29-XX-P038-01000-93AA-A
Modification of Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the consumables listed in:
Ref. MP A350-A-20-51-61-00ZZZ-25BZ-A
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A
Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A
Ref. MP A350-A-49-42-54-01ZZZ-720Z-A

### Page 26

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 26
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
Ref. MP A350-A-53-12-75-00ZZZ-720Z-A
CONF 004
Referenced consumables for task set A350-A-29-XX-P038-01000-93AA-A
Modification of Low Pressure Tubes S11-12
T o accomplish this Service Bulletin it is necessary to use the consumables listed in:
Ref. MP A350-A-20-51-61-00ZZZ-25BZ-A
Ref. MP A350-A-20-51-61-08ZZZ-25BZ-A
Ref. MP A350-A-21-2X-XX-00ZZZ-720Z-A
Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A
Ref. MP A350-A-49-42-54-01ZZZ-720Z-A
Ref. MP A350-A-53-XX-XX-03ZZZ-720Z-A
Ref. MP A350-A-53-12-75-00ZZZ-720Z-A
CONF ALL
D. LIST OF NEW PARTS
CONF 004
Part kit 29P038D01R01
Cost 11000.00 USD
Availability 280 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 V2911015100000 1 TUBE
2 V2911015200000 1 TUBE
3 V2911015300000 1 TUBE
4 V2911015400000 1 TUBE

### Page 27

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 27
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
5 V2911015500000 1 TUBE
6 V2911015600000 1 TUBE
7 ABS1125-10 1 UNION
8 ABS0478-1010 5 UNION
9 NSA855007-10 1 ELBOW
12 NSA5575-8A 1 CLAMP
15 NSA5191-3-10 1 BOLT
16 ABS0114T3-9 3 BOLT
17 NAS1149C0332R 5 WASHER
18 NAS1726C3PE 3 NUT
19 NAS509-3C 1 NUT
20 ABS0114V3-26 10 BOLT
21 NSA5191-3V9 8 BOLT
22 NAS1149D0332K 18 WASHER
23 NAS1149E0332P 8 WASHER
24 NAS1726C3E 8 NUT
51 V2919013000000 1 TUBE
52 NSA855006-10 1 UNION
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
CONF 001-003
Part kit 29P038D03R02
Cost 11000.00 USD
Availability 260 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com
NOTE(S)

### Page 28

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 28
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
1 V2911015100000 1 TUBE
2 V2911015200000 1 TUBE
3 V2911015300000 1 TUBE
4 V2911015400000 1 TUBE
5 V2911015500000 1 TUBE
6 V2911015600000 1 TUBE
7 ABS1125-10 1 UNION
8 ABS0478-1010 5 UNION
9 NSA855007-10 1 ELBOW
12 NSA5575-8A 1 CLAMP
15 NSA5191-3-10 1 BOLT
16 ABS0114T3-9 3 BOLT
17 NAS1149C0332R 31 WASHER
18 NAS1726C3PE 11 NUT
19 NAS509-3C 1 NUT
51 V2919013000000 1 TUBE
52 NSA855006-10 1 UNION
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
CONF ALL
Part kit 29P038D04R01
Cost 50.00 USD
Availability 230 d (calendar days from receipt of order)
NOTE(S)
The sales terms (costs and availability) are estimated in relation to economic
conditions. The latest valid price and lead time for ordering purposes shall be
obtained through the AIRBUS Spares portal or through a request for quotation to
airbus.kit@airbus.com.
The availability given above is the standard lead time from the date of your purchase
order. If items are required before this time, please include a retrofit planning
schedule with your order so that we can try to comply with your requirements.
Procurement address D4296
AIRBUS
Material, Logistics and Suppliers ATP II B,
Hein-Sass-Weg 24
21129 HAMBURG
GERMANY
Phone: +49 40 743 51775
E-mail: airbus.kit@airbus.com
Internet: http://spares.airbus.com

### Page 29

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 29
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
17 NAS1149C0332R 15 WASHER
18 NAS1726C3PE 1 NUT
33 NSA5067-3-1 2 NUT
NOTE(S)
Refer to the AIRBUS Ref. SM if you find part numbers of hardware components which
you cannot identify. The SM will give you the correct part number to part number
relationship.
E. LIST OF EXISTING PARTS
CONF 001
Interchangeable parts for task set A350-A-29-XX-P038-01000-93AA-A Modification
of Low Pressure Tubes S11-12
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911008000000 V2911015100000 03 (1) (2)
TUBE V2911009100000 V2911015300000 03 (1) (2)
TUBE V2911009200000 V2911015400000 03 (1) (2)
TUBE V2911009300000 V2911015200000 03 (1) (2)
TUBE V2911009400000 V2911015500000 03 (1) (2)
TUBE V2911014200000 V2911015500000 03 (1) (2)
TUBE V2911014300000 V2911015600000 03 (1) (2)
TUBE V2919002500000 V2919013000000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): One-way interchangeable with conditions:
- The Post-MOD part numbers listed above can replace Pre-MOD part numbers
listed above as a set in one aircraft section
- The Pre-MOD part numbers listed above cannot replace Post-MOD part
numbers listed above.
(2): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 002
Interchangeable parts for task set A350-A-29-XX-P038-01000-93AA-A Modification
of Low Pressure Tubes S11-12
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911009100000 V2911015300000 03 (1) (2)
TUBE V2911009200000 V2911015400000 03 (1) (2)
TUBE V2911009400000 V2911015500000 03 (1) (2)
TUBE V2911009600000 V2911015200000 03 (1) (2)

### Page 30

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 30
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911009700000 V2911015100000 03 (1) (2)
TUBE V2911014200000 V2911015500000 03 (1) (2)
TUBE V2911014300000 V2911015600000 03 (1) (2)
TUBE V2919002500000 V2919013000000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): One-way interchangeable with conditions:
- The Post-MOD part numbers listed above can replace Pre-MOD part numbers
listed above as a set in one aircraft section
- The Pre-MOD part numbers listed above cannot replace Post-MOD part
numbers listed above.
(2): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 003
Interchangeable parts for task set A350-A-29-XX-P038-01000-93AA-A Modification
of Low Pressure Tubes S11-12
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911009100000 V2911015300000 03 (1) (2)
TUBE V2911009200000 V2911015400000 03 (1) (2)
TUBE V2911009400000 V2911015500000 03 (1) (2)
TUBE V2911009600000 V2911015200000 03 (1) (2)
TUBE V2911009700000 V2911015100000 03 (1) (2)
TUBE V2911014200000 V2911015500000 03 (1) (2)
TUBE V2911014300000 V2911015600000 03 (1) (2)
TUBE V2919002500000 V2919013000000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): One-way interchangeable with conditions:
- The Post-MOD part numbers listed above can replace Pre-MOD part numbers
listed above as a set in one aircraft section
- The Pre-MOD part numbers listed above cannot replace Post-MOD part
numbers listed above.
(2): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 004
Interchangeable parts for task set A350-A-29-XX-P038-01000-93AA-A Modification
of Low Pressure Tubes S11-12
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911009100000 V2911015300000 03 (1) (2)

### Page 31

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 31
DESCRIPTION OLD PART No. NEW PART No. INT SEE NOTES
TUBE V2911009200000 V2911015400000 03 (1) (2)
TUBE V2911009600000 V2911015200000 03 (1) (2)
TUBE V2911009700000 V2911015100000 03 (1) (2)
TUBE V2911014300000 V2911015600000 03 (1) (2)
TUBE V2911014800000 V2911015500000 03 (1) (2)
TUBE V2919002500000 V2919013000000 03 (1) (2)
NOTE(S)
For definitions of interchangeability codes in column INT. refer to ATA (CSDD Chapter
2).
(1): One-way interchangeable with conditions:
- The Post-MOD part numbers listed above can replace Pre-MOD part numbers
listed above as a set in one aircraft section
- The Pre-MOD part numbers listed above cannot replace Post-MOD part
numbers listed above.
(2): The interchangeability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
CONF 001
Spare parts for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
DESCRIPTION OLD PART No. SEE NOTES
TUBE V2911008000000 (1)
TUBE V2911009100000 (1)
TUBE V2911009200000 (1)
TUBE V2911009300000 (1)
TUBE V2911009400000 (1)
TUBE V2911014200000 (1)
TUBE V2911014300000 (1)
TUBE V2919002500000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.
CONF 002
Spare parts for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
DESCRIPTION OLD PART No. SEE NOTES
TUBE V2911009100000 (1)
TUBE V2911009200000 (1)
TUBE V2911009400000 (1)
TUBE V2911009600000 (1)
TUBE V2911009700000 (1)

### Page 32

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 32
DESCRIPTION OLD PART No. SEE NOTES
TUBE V2911014200000 (1)
TUBE V2911014300000 (1)
TUBE V2919002500000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.
CONF 003
Spare parts for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
DESCRIPTION OLD PART No. SEE NOTES
TUBE V2911009100000 (1)
TUBE V2911009200000 (1)
TUBE V2911009400000 (1)
TUBE V2911009600000 (1)
TUBE V2911009700000 (1)
TUBE V2911014200000 (1)
TUBE V2911014300000 (1)
TUBE V2919002500000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.
CONF 004
Spare parts for task set A350-A-29-XX-P038-01000-93AA-A Modification of Low
Pressure Tubes S11-12
DESCRIPTION OLD PART No. SEE NOTES
TUBE V2911009100000 (1)
TUBE V2911009200000 (1)
TUBE V2911009600000 (1)
TUBE V2911009700000 (1)
TUBE V2911014300000 (1)
TUBE V2911014800000 (1)
TUBE V2919002500000 (1)
NOTE(S)
(1): The parts listed here must not be installed anymore on aircraft which have
accomplished this Service Bulletin or which have the equivalent production
modification embodied.

### Page 33

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 33
CONF ALL
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-29-XX-P038-01000-93AA-A (A350-A-29-XX-P038-01ZZZ-93AZ-A)
Modification of Low Pressure T ubes S11-12
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: Discarded parts must be managed at the operator's discretion.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
CONF 001
TOTAL MAN-HOURS 129.75 h

### Page 34

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 34
CONF 002
TOTAL MAN-HOURS 129.75 h
CONF 003
TOTAL MAN-HOURS 129.75 h
CONF 004
TOTAL MAN-HOURS 129.75 h
CONF 001
ELAPSED TIME (HOURS) 65.00 h
CONF 002
ELAPSED TIME (HOURS) 65.00 h
CONF 003
ELAPSED TIME (HOURS) 65.00 h
CONF 004
ELAPSED TIME (HOURS) 65.00 h
CONF ALL
B. PREPARATION
CONF 001 002
(1) Task A350-A-29-XX-P038-01001-540A-A (A350-A-29-XX-P038-01ZZZ-540Z-A)
Job Set-Up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 29.00 h
Minimum Number of person 2
Elapsed Time 14.50 h
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-A
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP
A350-A-12-XX-XX-00ZZZ-170Z-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A
A350-A-32-22-XX-00ZZZ-397Z-A
A350-A-32-5X-XX-00ZZZ-398Z-A
A350-A-49-42-54-01ZZZ-520Z-A
A350-A-53-12-75-00ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D "Maintenance Procedure - Introduction".
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.

### Page 35

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 35
3 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
4 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(c) Get access to the avionics compartment, refer to Ref. MP A350-A-12-XX-XX-
00ZZZ-170Z-A.
(d) Loose the studs to remove the protective panels of the equipment bay 1000VU,
refer to Ref. Fig.BI Removal of the Protective Panels of the Equipment Bay
1000VU:
1 PANEL   Item (43) Retain
1 PANEL   Item (44) Retain
3 PANEL   Item (45) Retain
1 PANEL   Item (46) Retain
(e) Loose the studs to remove the protective panels of the equipment bay 1200VU,
refer to Ref. Fig.BJ Removal of the Protective Panels of the Equipment Bay
1200VU:
1 PANEL   Item (38) Retain
(f) Remove the avionics compartment floor panels as necessary between Frame 12
and Frame 18, refer to Ref. MP A350-A-53-12-75-00ZZZ-520Z-A.
(g) Remove the cargo-compartment floor Panel 132CAF and floor Panel 132DAF for
access, refer to Ref. MP A350-A-53-XX-XX-03ZZZ-520Z-A.
(h) If necessary, remove the air-conditioning ducts for access, refer to Ref. MP A350-
A-21-2X-XX-00ZZZ-520Z-A.
(i) If necessary, remove any ramp and their attached electrical wiring for access
between Frame 12 and Frame 22.
(j) Remove the Starter Generator Control Unit (SGCU) for access, refer to Ref. MP
A350-A-49-42-54-01ZZZ-520Z-A.
(k) Remove the tube covers and their electrical bonding connections, refer to Ref.
Fig.BA Removal of the T ube Covers.
1 Remove the tube covers item (25), item (26), item (27), item (28) and item
(29):
1 COVER ASSY   Item (25) Retain
1 COVER ASSY   Item (26) Retain
1 BRACKET   Item (27) Retain
1 COVER ASSY   Item (28) Retain
1 BRACKET   Item (29) Retain

### Page 36

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 36
attached with
2 BOLT   Item (31) Retain
10 BOLT   Item (32) Retain
12 WASHER   Item (17) Discard
2 NUT-CLIP   Item (33) Discard
2 Remove the electrical bondings as shown in Ref. Fig.BA Removal of the
T ube Covers SHEET 2 view C and view D:
1 BOLT   Item (31) Retain
1 WASHER   Item (17) Discard
1 NUT SELF-LOCKING   Item (18) Discard
3 Remove the cover assy, item (30):
1 COVER ASSY   Item (30) Retain
attached with
2 BOLT   Item (32) Retain
2 WASHER   Item (17) Discard
(l) Get access to the Nose Landing Gear (NLG) bay:
1 Put an access platform in position below the NLG bay.
2 If necessary, open the NLG door for access, refer to Ref. MP A350-A-32-22-
XX-00ZZZ-397Z-A.
3 Deactivate the Nose Wheel Steering (NWS) system, refer to Ref. MP A350-
A-32-5X-XX-00ZZZ-398Z-A.

### Page 37

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSI-A-001-01 Fig.BI Sol.AA SHEET 1/1
REV 00 Sep 16/22 A350-29-P038Removal of the Protective Panels
of the Equipment Bay 1000VU Page 37
CONF 001 002
Z120
FR19
FR0
FWD AVIONICS
COMPARTMENT DOORA
A
1000VU
(43)
(44)
(45)
(46)
ICN-A350-A-29XXP038-A-FAPE3-06CSI-A-001-01

### Page 38

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSR-A-001-01 Fig.BJ Sol.AA SHEET 1/1
REV 00 Sep 16/22 A350-29-P038Removal of the Protective Panels
of the Equipment Bay 1200VU Page 38
CONF 001 002
Z120
A
FR19
FR0
FWD AVIONICS
COMPARTMENT DOOR
A
1200VU
(38)
ICN-A350-A-29XXP038-A-FAPE3-06CSR-A-001-01

### Page 39

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSD-A-001-01 Fig.BA Sol.AA SHEET 1/2
REV 00 Sep 16/22 A350-29-P038Removal of the T ube Covers
Page 39
CONF 001 002
C
FR0
FR20
A
FR13
FR18
A
B
(32)
(17)(29)
(27)
(26)
(25)
(28)
B
(32)
(17)
(32)
(17)
(32)
(17)(32)
(17)(31)
(17)
FR18
FR17
FR16
FR14
FR13(33)
(33)
PAX DOOR 1
ICN-A350-A-29XXP038-A-FAPE3-06CSD-A-001-01

### Page 40

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSE-A-001-01 Fig.BA Sol.AA SHEET 2/2
REV 00 Sep 16/22 A350-29-P038Removal of the T ube Covers
Page 40
CONF 001 002
D
(30)
(32)
(17)
C
(17)
(31)
D
(18)
ICN-A350-A-29XXP038-A-FAPE3-06CSE-A-001-01

### Page 41

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 41
CONF 003 004
(1) Task A350-A-29-XX-P038-01002-540A-A (A350-A-29-XX-P038-01ZZZ-540Z-A)
Job Set-Up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 29.00 h
Minimum Number of person 2
Elapsed Time 14.50 h
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-A
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP
A350-A-12-XX-XX-00ZZZ-170Z-A
A350-A-21-2X-XX-00ZZZ-520Z-A
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-29-XX-XX-02ZZZ-170Z-A
A350-A-32-22-XX-00ZZZ-397Z-A
A350-A-32-5X-XX-00ZZZ-398Z-A
A350-A-49-42-54-01ZZZ-520Z-A
A350-A-53-12-75-00ZZZ-520Z-A
A350-A-53-XX-XX-03ZZZ-520Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D "Maintenance Procedure - Introduction".
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
4 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
5 T ag all the parts you must remove and retain to make the subsequent
installation easier.
6 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
(b) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(c) Get access to the avionics compartment, refer to Ref. MP A350-A-12-XX-XX-
00ZZZ-170Z-A.

### Page 42

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 42
(d) Loose the studs to remove the protective panels of the equipment bay 1000VU,
refer to Ref. Fig.BI Removal of the Protective Panels of the Equipment Bay
1000VU:
1 PANEL   Item (43) Retain
1 PANEL   Item (47) Retain
3 PANEL   Item (48) Retain
1 PANEL   Item (49) Retain
(e) Loose the studs to remove the protective panels of the equipment bay 1200VU,
refer to Ref. Fig.BJ Removal of the Protective Panels of the Equipment Bay
1200VU:
1 PANEL   Item (38) Retain
(f) Remove the avionics compartment floor panels as necessary between Frame 12
and Frame 18, refer to Ref. MP A350-A-53-12-75-00ZZZ-520Z-A.
(g) Remove the cargo-compartment floor Panel 132CAF and floor Panel 132DAF for
access, refer to Ref. MP A350-A-53-XX-XX-03ZZZ-520Z-A.
(h) If necessary, remove the air-conditioning ducts for access, refer to Ref. MP A350-
A-21-2X-XX-00ZZZ-520Z-A.
(i) If necessary, remove any ramp and their attached electrical wiring for access
between Frame 12 and Frame 22.
(j) Remove the Starter Generator Control Unit (SGCU) for access, refer to Ref. MP
A350-A-49-42-54-01ZZZ-520Z-A.
(k) Remove the tube covers and their electrical bonding connections, refer to Ref.
Fig.BA Removal of the T ube Covers.
1 Remove the tube covers item (25), item (26), item (27), item (28) and item
(29):
1 COVER ASSY   Item (25) Retain
1 COVER ASSY   Item (26) Retain
1 BRACKET   Item (27) Retain
1 COVER ASSY   Item (28) Retain
1 BRACKET   Item (29) Retain
attached with
2 BOLT   Item (31) Retain
10 BOLT   Item (32) Retain
12 WASHER   Item (17) Discard
2 NUT-CLIP   Item (33) Discard
2 Remove the electrical bondings as shown in Ref. Fig.BA Removal of the
T ube Covers SHEET 2 view C and view D:
1 BOLT   Item (31) Retain
1 WASHER   Item (17) Discard

### Page 43

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 43
1 NUT SELF-LOCKING   Item (18) Discard
3 Remove the cover assy, item (30):
1 COVER ASSY   Item (30) Retain
attached with
2 BOLT   Item (32) Retain
2 WASHER   Item (17) Discard
(l) Get access to the Nose Landing Gear (NLG) bay:
1 Put an access platform in position below the NLG bay.
2 If necessary, open the NLG door for access, refer to Ref. MP A350-A-32-22-
XX-00ZZZ-397Z-A.
3 Deactivate the Nose Wheel Steering (NWS) system, refer to Ref. MP A350-
A-32-5X-XX-00ZZZ-398Z-A.

### Page 44

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CS0-A-001-01 Fig.BI Sol.AB SHEET 1/1
REV 00 Sep 16/22 A350-29-P038Removal of the Protective Panels
of the Equipment Bay 1000VU Page 44
CONF 003 004
Z120
FR19
FR0
FWD AVIONICS
COMPARTMENT DOOR
A
A
1000VU
(43)
(47)
(48)
(49)
ICN-A350-A-29XXP038-A-FAPE3-06CS0-A-001-01

### Page 45

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSR-A-001-01 Fig.BJ Sol.AA SHEET 1/1
REV 00 Sep 16/22 A350-29-P038Removal of the Protective Panels
of the Equipment Bay 1200VU Page 45
CONF 003 004
Z120
A
FR19
FR0
FWD AVIONICS
COMPARTMENT DOOR
A
1200VU
(38)
ICN-A350-A-29XXP038-A-FAPE3-06CSR-A-001-01

### Page 46

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSD-A-001-01 Fig.BA Sol.AA SHEET 1/2
REV 00 Sep 16/22 A350-29-P038Removal of the T ube Covers
Page 46
CONF 003 004
C
FR0
FR20
A
FR13
FR18
A
B
(32)
(17)(29)
(27)
(26)
(25)
(28)
B
(32)
(17)
(32)
(17)
(32)
(17)(32)
(17)(31)
(17)
FR18
FR17
FR16
FR14
FR13(33)
(33)
PAX DOOR 1
ICN-A350-A-29XXP038-A-FAPE3-06CSD-A-001-01

### Page 47

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CSE-A-001-01 Fig.BA Sol.AA SHEET 2/2
REV 00 Sep 16/22 A350-29-P038Removal of the T ube Covers
Page 47
CONF 003 004
D
(30)
(32)
(17)
C
(17)
(31)
D
(18)
ICN-A350-A-29XXP038-A-FAPE3-06CSE-A-001-01

### Page 48

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 48
CONF ALL
C. PROCEDURE
CONF 001
(1) Task A350-A-29-XX-P038-01001-520A-A (A350-A-29-XX-P038-01ZZZ-520Z-A)
Remove the Yellow Hydraulic Tubes between Frame 12 and Frame 22
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access
Door 811
Panel 121ABF, Panel 121BBF, Panel 121WAF,
Panel 121ZAF, Panel 122LAF, Panel 122MAF,
Panel 122QAF, Panel 122SAF
120
Work location From Frame 12 to Frame 18
Access Door 821Panel 132CAF, Panel 132DAF130
Work location From Frame 18 to Frame 22
Manpower/Resources/Skills
Man-hours 16.00 h
Minimum Number of person 2
Elapsed Time 8.00 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-A
MP A350-A-29-XX-XX-02ZZZ-170Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.

### Page 49

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 49
4 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.
5 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
6 For the specification of material application codes given in this Service
Bulletin, refer to the Ref. CML.
7 Put a container in position below the component to collect the hydraulic
fluid.
(b) Remove the clamp, item (12):
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 3 view J
1 CLAMP   Item (12) Discard
attached with
1 BOLT   Item (15) Discard
1 NUT   Item (19) Discard
(c) Remove the clamps, item (11):
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 2 view D
3 CLAMP   Item (11) Retain
attached with
6 BOLT-HEXAGON HEAD   Item (14) Retain
6 WASHER   Item (17) Discard
(d) Remove the clamp, item (11):
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 2 view E
1 CLAMP   Item (11) Retain
attached with
2 BOLT-HEXAGON HEAD   Item (37) Retain
2 WASHER   Item (17) Discard
(e) Remove the clamp, item (53), attached to the fitting in Frame 21:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 4 view K
1 CLAMP   Item (53) Retain
attached with
2 BOLT   Item (55) Retain
2 WASHER   Item (17) Discard
(f) Remove the blocks-clamping, item (10), between Frame 14 and Frame 21:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 3 view G
4 BLOCK-CLAMPING   Item (10) Retain
attached with
8 BOLT-HEXAGON HEAD   Item (13) Retain
8 WASHER   Item (17) Discard
8 NUT SELF-LOCKING   Item (18) Discard

### Page 50

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 50
(g) Remove the blocks-clamping, item (10), attached to the frame fittings:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 3 view F
5 BLOCK-CLAMPING   Item (10) Retain
attached with
10 BOLT-HEXAGON HEAD   Item (13) Retain
10 WASHER   Item (17) Discard
(h) Perform a pre-cut of the hydraulic pipe, item (50), to the rough needed length,
refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1, SHEET 4 view L.
NOTE: The cutting is necessary to make the installation of the new tube. The
accurate needed length is obtained later during the procedure.
(i) Remove the hydraulic tubes and their union parts:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1, SHEET 2 view C
and SHEET 3 view H
NOTE: If necessary, use a cutting tool in order to remove any hydraulic tube.
NOTE: Discard the tube, item (50), from the cut position to the forward.
1 TUBE V2911008000000 Item (1) Discard
1 TUBE V2911009100000 Item (3) Discard
1 TUBE V2911009200000 Item (4) Discard
1 TUBE V2911009300000 Item (35) Discard
1 TUBE V2911009400000 Item (5) Discard
1 TUBE V2911014200000 Item (36) Discard
1 TUBE V2911014300000 Item (6) Discard
1 TUBE V2919002500000 Item (50) Retain
6 UNION   Item (8) Discard
1 ELBOW 90 DEG   Item (9) Discard
(j) Remove the union, item (7), attached to the bulkhead, Frame 12:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 2 view B
1 Disconnect the tube, item (54), from the union, item (7), on the other side
of the bulkhead, Frame 12.
1 TUBE   Item (54) Retain
NOTE: Access to the tube through NLG bay.
2 Put a blanking plug on the disconnected line end of the tube, item (54).
3 Remove the union, item (7), attached to the bulkhead, Frame 12:
NOTE: If necessary, use a cutting tool in order to remove any hydraulic
tube.
1 UNION   Item (7) Discard

### Page 51

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 51
3 BOLT   Item (16) Discard
3 WASHER   Item (17) Discard
3 NUT SELF-LOCKING   Item (18) Discard
NOTE: Access to the nut through NLG bay.
4 Remove and clean the interfay sealant left after removal of union, item (7),
with:
  Non Aqueous Cleaner -
General
08BAA9  
and
  T extile - Lint free Cotton14SBA1

### Page 52

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CS1-A-003-01 Fig.BB Sol.AB SHEET 1/4
REV 00 Sep 16/22 A350-29-P038Removal of the Hydraulic T ubes
Page 52
CONF 001
L
F
C
C
B
A
FWD CARGO DOOR
Z120
Z130
FR12
FR21
FR27
A
FR12
FR13
FR14
FR16
FR17
(1)
D (2)
(3)
C
H
F G
F
G
F
G
G
(4)
FR20
D
(6)
(50)
FR21
E
FR19
FR18
(36)
C
(5)
C
CF J
D
T-CONNECTION
K
ICN-A350-A-29XXP038-A-FAPE3-06CS1-A-003-01

### Page 53

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CS2-A-002-01 Fig.BB Sol.AB SHEET 2/4
REV 00 Sep 16/22 A350-29-P038Removal of the Hydraulic T ubes
Page 53
CONF 001
(18)
(7)
B
(8)
C
TYPICAL VIEW
(17)
(11)
TYPICAL VIEW
(17)
(16)
(1)
D E
D
E
(14)
(37)
(54)
ICN-A350-A-29XXP038-A-FAPE3-06CS2-A-002-01

### Page 54

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CS3-A-003-01 Fig.BB Sol.AB SHEET 3/4
REV 00 Sep 16/22 A350-29-P038Removal of the Hydraulic T ubes
Page 54
CONF 001
(10)
(17)
(13)
TYPICAL VIEW
F
(18)
(9)
G
H
(10)
(17)
TYPICAL VIEW
(13)
(12)
(15)
(19)
J
ICN-A350-A-29XXP038-A-FAPE3-06CS3-A-003-01

### Page 55

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06MGQ-A-004-01 Fig.BB Sol.AB SHEET 4/4
REV 00 Sep 16/22 A350-29-P038Removal of the Hydraulic T ubes
Page 55
CONF 001
FR21
(50) 01CUTLINE
FWD
NOTE:
CUT ITEM (50) ROUGHLY AT THIS POINT TO MAKE THE INSTALLATION POSSIBLE.01
T-CONNECTION180 mm
(7.087 in)
L
(53)
(17)
(55)
K
ICN-A350-A-29XXP038-A-FAPE3-06MGQ-A-004-01

### Page 56

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 56
CONF 002 003
(1) Task A350-A-29-XX-P038-01002-520A-A (A350-A-29-XX-P038-01ZZZ-520Z-A)
Remove the Yellow Hydraulic Tubes between Frame 12 and Frame 22
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
Access
Door 811
Panel 121ABF, Panel 121BBF, Panel 121WAF,
Panel 121ZAF, Panel 122LAF, Panel 122MAF,
Panel 122QAF, Panel 122SAF
120
Work location From Frame 12 to Frame 18
Access Door 821Panel 132CAF, Panel 132DAF130
Work location From Frame 18 to Frame 22
Manpower/Resources/Skills
Man-hours 16.00 h
Minimum Number of person 2
Elapsed Time 8.00 h
Skills Airframe
Material necessary to do the job
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
ASR A350-A-51-42-XX-01ZZZ-667Z-A
MP A350-A-29-XX-XX-02ZZZ-170Z-A
SD A350-A-06-2X-XX-01ZZZ-04CZ-AA350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
(a) Standard practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the Frame (FR) identification, refer to Ref. SD A350-A-06-2X-XX-01ZZZ-
04CZ-A.
3 Remove and install fasteners in accordance with Ref. ASR A350-A-51-42-XX-
01ZZZ-667Z-A.
4 Put all the retained hardware in identified plastic bags and attach the bags
to the related unit.

### Page 57

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 57
5 Obey the general rules for removal and installation procedures for the
hydraulic systems, refer to Ref. MP A350-A-29-XX-XX-02ZZZ-170Z-A.
6 For the specification of material application codes given in this Service
Bulletin, refer to the Ref. CML.
7 Put a container in position below the component to collect the hydraulic
fluid.
(b) Remove the clamp, item (12):
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 3 view J
1 CLAMP   Item (12) Discard
attached with
1 BOLT   Item (15) Discard
1 NUT   Item (19) Discard
(c) Remove the clamps, item (11):
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 2 view D
3 CLAMP   Item (11) Retain
attached with
6 BOLT-HEXAGON HEAD   Item (14) Retain
6 WASHER   Item (17) Discard
(d) Remove the clamp, item (11):
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 2 view E
1 CLAMP   Item (11) Retain
attached with
2 BOLT-HEXAGON HEAD   Item (37) Retain
2 WASHER   Item (17) Discard
(e) Remove the clamp, item (53), attached to the fitting in Frame 21:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 4 view K
1 CLAMP   Item (53) Retain
attached with
2 BOLT   Item (55) Retain
2 WASHER   Item (17) Discard
(f) Remove the blocks-clamping, item (10), between Frame 14 and Frame 21:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 3 view G
4 BLOCK-CLAMPING   Item (10) Retain
attached with
8 BOLT-HEXAGON HEAD   Item (13) Retain
8 WASHER   Item (17) Discard
8 NUT SELF-LOCKING   Item (18) Discard
(g) Remove the blocks-clamping, item (10), attached to the frame fittings:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 3 view F
5 BLOCK-CLAMPING   Item (10) Retain

### Page 58

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 58
attached with
10 BOLT-HEXAGON HEAD   Item (13) Retain
10 WASHER   Item (17) Discard
(h) Perform a pre-cut of the hydraulic pipe, item (50), to the rough needed length,
refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1, SHEET 4 view L.
NOTE: The cutting is necessary to make the installation of the new tube. The
accurate needed length is obtained later during the procedure.
(i) Remove the hydraulic tubes and their union parts:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1, SHEET 2 view C
and SHEET 3 view H
NOTE: If necessary, use a cutting tool in order to remove any hydraulic tube.
NOTE: Discard the tube, item (50), from the cut position to the forward.
1 TUBE V2911009100000 Item (3) Discard
1 TUBE V2911009200000 Item (4) Discard
1 TUBE V2911009600000 Item (2) Discard
1 TUBE V2911009700000 Item (1) Discard
1 TUBE V2911009400000 Item (5) Discard
1 TUBE V2911014200000 Item (36) Discard
1 TUBE V2911014300000 Item (6) Discard
1 TUBE V2919002500000 Item (50) Retain
6 UNION   Item (8) Discard
1 ELBOW 90 DEG   Item (9) Discard
(j) Remove the union, item (7), attached to the bulkhead, Frame 12:
Refer to Ref. Fig.BB Removal of the Hydraulic T ubes SHEET 1 and SHEET 2 view B
1 Disconnect the tube, item (54), from the union, item (7), on the other side
of the bulkhead, Frame 12.
1 TUBE   Item (54) Retain
NOTE: Access to the tube through NLG bay.
2 Put a blanking plug on the disconnected line end of the tube, item (54).
3 Remove the union, item (7), attached to the bulkhead, Frame 12:
NOTE: If necessary, use a cutting tool in order to remove any hydraulic
tube.
1 UNION   Item (7) Discard
3 BOLT   Item (16) Discard
3 WASHER   Item (17) Discard

### Page 59

A350
SERVICE BULLETIN
REV 00 Sep 16/22 A350-29-P038
Page 59
3 NUT SELF-LOCKING   Item (18) Discard
NOTE: Access to the nut through NLG bay.
4 Remove and clean the interfay sealant left after removal of union, item (7),
with:
  Non Aqueous Cleaner -
General
08BAA9  
and
  T extile - Lint free Cotton14SBA1

### Page 60

A350
SERVICE BULLETIN
Figure ICN-A350-A-29XXP038-A-FAPE3-06CS4-A-003-01 Fig.BB Sol.AC SHEET 1/4
REV 00 Sep 16/22 A350-29-P038Removal of the Hydraulic T ubes
Page 60
CONF 002 003
L
C
C
B
A
FWD CARGO DOOR
Z120
Z130
FR12
FR21
FR27
A
FR12
FR13
FR14
FR16
FR17
(1)
D (2)
C
(3)
C
H
F G
F
G
F
G
G
(4)
FR20
D
(6)
(50)
FR21
E
FR19
FR18
F F
(36)
C
(5)
J
C
K
D
T-CONNECTION
ICN-A350-A-29XXP038-A-FAPE3-06CS4-A-003-01

The text continues at https://openairdocs.org/service-documents/airbus/a350-29-p038/file/f917a673949a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
