# Airbus Service Bulletin A350-42-P012

Copy: No revision named ("SB A350-42-P012"), 564 pages: PDF https://openairdocs.org/files/sha256/b2/d9/b2d936fd074de5d61a78f5f488579726f2ab19823fa2bbf03351d3f8fae16e03; text https://openairdocs.org/service-documents/airbus/a350-42-p012/file/b2d936fd074d.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0858, the docket of AD 2020-01-10. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-42-P012
- Page: https://openairdocs.org/service-documents/airbus/a350-42-p012

## Text (564 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0858, the docket of AD 2020-01-10. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 42
TITLE: INTEGRATED MODULAR AVIONICS - AVIONICS BATCH 6 - PART 1
MODIFICATION No.:
CONF 001 003 004
106469L42495
CONF ALL
113701L48141
113848L43622
114292L48282
113559L48350
114501L48336
113703L48143
114353L43683
113556L48116
113556L48352
113613L44220
113559L48109
113749L48124
113699L48140
CONF 001-003 006-008
114206L48291
CONF ALL
114129L48253
CONF 002 006-008
114504L48339
CONF 002 007
114618L48398
CONF 002 003 006-008
114503L48353
CONF 002 006
114330L48160

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 2
ATA SYSTEM: 42
TITLE: INTEGRATED MODULAR AVIONICS - AVIONICS BATCH 6 - PART 1
CONF ALL
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
CONF 001
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
106469L42495 113613L44220 113699L48140 113701L48141 113703L48143
113848L43622 114129L48253 114206L48291 114292L48282 114353L43683
MINOR
114501L48336
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF 002
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
113613L44220 113699L48140 113701L48141 113703L48143 113848L43622
114129L48253 114206L48291 114292L48282 114330L48160 114353L43683
MINOR
114501L48336 114503L48353 114504L48339 114618L48398
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF 003
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
106469L42495 113613L44220 113699L48140 113701L48141 113703L48143
113848L43622 114129L48253 114206L48291 114292L48282 114353L43683
MINOR
114501L48336 114503L48353

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 3
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF 004
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
106469L42495 113613L44220 113699L48140 113701L48141 113703L48143MINOR
113848L43622 114129L48253 114292L48282 114353L43683 114501L48336
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF 006
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
113613L44220 113699L48140 113701L48141 113703L48143 113848L43622
114129L48253 114206L48291 114292L48282 114330L48160 114353L43683
MINOR
114501L48336 114503L48353 114504L48339
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF 007
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
113613L44220 113699L48140 113701L48141 113703L48143 113848L43622
114129L48253 114206L48291 114292L48282 114353L43683 114501L48336
MINOR
114503L48353 114504L48339 114618L48398
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.

### Page 4

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 4
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF 008
MODIFICATION CLASSIFICATION
MAJOR 113556L48116 113556L48352 113559L48109 113559L48350 113749L48124
113613L44220 113699L48140 113701L48141 113703L48143 113848L43622
114129L48253 114206L48291 114292L48282 114353L43683 114501L48336
MINOR
114503L48353 114504L48339
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
NOTE: This modification related to an Airworthiness issue has been classified by Airbus
and confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this
minor change is handled by Airbus under its Design Organisation Approval No.
EASA.21J.031.
CONF ALL
B. REASON
(1) History
Integrated Modular Avionics (IMA) provides common and shared resources for
computing and communication. The system functions and applications are hosted in
common computing hardware platforms called Line Replaceable Module (LRM).
This Service Bulletin introduces a major software upgrade identified as Batch 6 Part 1.
The Batch 6 Parts 2 and 3 are respectively introduced by Service Bulletins No. Ref. SB
A350-42-P013 and Ref. SB A350-42-P014.
(2) Objective/Action
This Service Bulletin recommends installation of a package of A350 systems upgrade
including:
- Flight Control and Guidance System (FCGS) software X11 Standard (STD)
- Flight Warning System (FWS) S6 STD
- Control and Display System (CDS) S6.1 STD
- Core Processing Input/Output Modules (CPIOM), Common Remote Data
Concentrator (CRDC), Module Common Configuration T able (MCCT), Resource
BITE Configuration T able (RBCT) and Maintenance System Load (MSL) software
B24
- Avionics Full Duplex Switched Ethernet (AFDX) switch configuration table T48D.
NOTE: This operation can be done either manually or using the Smart Dataloading
T ool (SDT) function. The SDT will ease and speed-up embodiment of this
Service Bulletin, as well as reducing the risk of human errors, by using scripts
to automate dataloading and configuration verification operations.

### Page 5

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 5
(3) Advantages
The main modifications introduced by this Service Bulletin are described hereunder.
Flight Controls (F/CTL):
FCGS new X11 STD includes:
- Primary (PRIM) Flight Control Computer (FCC) STD P11
- Secondary (SEC) FCC STD S11
- Flight Control Data Concentrator (FCDC) STD F11
- Dedicated MSL and Software Pin Programming (SPP) software for A350-900 and
A350-1000 models.
This new STD brings the following main improvements:
- Introduction of T ake Off Monitoring (TOM) function activated through SPP
- Corrective FCGS STD for motor temperature sensor issues for Electrical Backup
Hydraulic Actuators (EBHAs) ( Ref. TFU 27.34.00.019) : Master Minimum
Equipment List (MMEL) alleviation
- Corrective FCGS STD for pressure sensor issues ( Ref. TFU 27.00.00.115): MMEL
alleviation
- Corrective FCGS STD for PRIM fault at engine start issues ( Ref. TFU
27.93.00.075): new PRIM logics
- Modification of the logics in case of Ram Air T urbine (RAT) extension, activated
through Hardware Pin Programming (HPP) (valid only for A350-1000).
- NOTE: In order to avoid wiring modification, this Service Bulletin can be
accomplished at the same time as Service Bulletin No. Ref. SB A350-24-P047
(MOD No. 114329L48289).
- Removal of Airplane Flight Manual (AFM) TR109 “ROW/ROP LIMITATION ON ICY
RUNWAYS FOR PRIM10 “ (AFM APPRO-TR)
- Automatic approach with automatic landing: maximum crosswind extended to
30kt (AFM LIM-22-FGS)
- Removal of tail strike indicator during T akeoff (TO)
- Correction of potential AP/ATHR unexpected disconnection during Automatic
Emergency Descent (AED) manoeuvre due to COM/MON synchronization (only
reported during Flight T est (FT) at AIRBUS).
Indicating recording systems:
FWS software S6 STD includes the S6 STD for operational software, a new MSL load, a
new SPP load, a new version of the Airbus T emporary Quick Change (ATQC) DATABASE
and empty Operator-Customized Electronic ECAM Database (OCED) DATABASE.
This STD implies a modification of both automatic and manual codes and integrates
the following main features:
- Anomalies correction and product improvements applicable to both variants
- Implementation of AFDX 1.4 architecture
- New Hydraulic (HYD) architecture
- Acquisition of Inertial Reference System (IRS) data from IRS partition and not
from Global Positioning System (GPS) one

### Page 6

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 6
- A350-1000 RAT performance improvement
- Deployable recorder
- Correction of SPP limitation
- Provisions for Light Cockpit SATCOM (LCS) and Aircraft Environment Surveillance
System (AESS) S4.
New ATQC database is generated for FWS STD S6 2.0, ATQC V2 for FWS S6 2.0.
In order to address the actual in-service situation AIRBUS has created the ECAM
T emporary Change (ECAM TC) codes.
This Service Bulletin allows the deactivation of the Envelope T emporary Change (ETC)
codes No. 24GE and No. 27MA from the FWS.
This ATQC still includes in its envelop ETC codes previously defined and this Service
Bulletin activates the following ones:
- ETC code 29BF (A350-1000 model only)
- ETC code 34TA.
Control and Display System (CDS):
The new STD of the CDS operating system S6.1 integrates the following main features
compared to S5.1:
- Evolutions for Airport Navigation Function (ANF) - Improvement for Head-Up
Display (HUD)
- Improvement for HUD
- Harmonized Primary Flight Display (PFD) in HDG/VS mode
- Weather hazard function display
- Modification of: Fuel Penalty Monitoring Function (FPMF) logics
- Aileron droop for Performance Improvement Package/ Ultra Long Range (PIP/ULR)
configuration
- Oil quantity modification on: System Display Engine (SD ENG) page
- AFDX 1.4 compatibility
- New HYD architecture / Indications on SD page
- Acquisition of IRS data from IRS partition and not from GPS one
- Modification of the cockpit manager allocation.
Navigation:
Accomplishment of this Service Bulletin allows declaration and deactivation of two
new SPP parameters for:
- WEATHER HAZARD function: “SPP_AESS_WXR_Hazard”
- New source selection for ADS-B OUT function: “SPP_AESS_XPDR_ADS-B_SBAS”.
IMA:
On AFDX side, this Service Bulletin introduces an AFDX network switch configuration
table corresponding to Inter System Communication Data (ISCD) T48D.
A new STD corresponding to IMA Batch 6 for the CRDC MCCT is brought by this Service
Bulletin.

### Page 7

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 7
For CPIOM J1 and CRDC, the modification consists in RBCT and MSL.
(4) Operational/Maintenance Consequences
The Operational/Maintenance Consequences of this Service Bulletin are covered by
the update of the affected publications detailed in "PLANNING INFORMATION".
This Service Bulletin has an impact on flight operations documentation; refer
to AirbusWorld to consult the Modification Operational Impact (MOI) Ref. MOI
113556 described in Ref. TFU 31.00.00.156, Ref. MOI 113559 described in Ref. TFU
31.60.00.021 and Ref. MOI 113749 described in Ref. TFU 27.90.00.053.
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
YES VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
CONF 001
No specific aircraft maintenance configuration required.
CONF 002
No specific aircraft maintenance configuration required.
CONF 003
No specific aircraft maintenance configuration required.
CONF 004
No specific aircraft maintenance configuration required.
CONF 006
No specific aircraft maintenance configuration required.
CONF 007
No specific aircraft maintenance configuration required.
CONF 008
No specific aircraft maintenance configuration required.
CONF ALL
E. MATERIAL PRICE INFORMATION
CONF 001
(1) Installation of Avionics Batch 6 - Part 1

### Page 8

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 8
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N02R00 1 300.00 USD Software
TOTAL   4650.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N02R00 1 300.00 USD Software
TOTAL   4650.00 USD  
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No material
CONF 002
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD

### Page 9

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 9
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 42P012A01R02 1 900.00 USD Bundle, grounding modules,
cable ties
Components See SB See Note Placard set
NOTE: Price information to be obtained from the given supplier.
CONF 003
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N02R00 1 300.00 USD Software
TOTAL   4650.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N02R00 1 300.00 USD Software
TOTAL   4650.00 USD  
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No material

### Page 10

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 10
CONF 004
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N04R00 1 300.00 USD Software
TOTAL   4650.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N04R00 1 300.00 USD Software
TOTAL   4650.00 USD  
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No material
CONF 006
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software

### Page 11

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 11
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
Part kit 42P012A01R02 1 900.00 USD Bundle, grounding modules,
cable ties
Components See SB See Note Placard set
NOTE: Price information to be obtained from the given supplier.
CONF 007
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment

### Page 12

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 12
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No material
CONF 008
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
FLS kit 42P012N01R00 1 4350.00 USD Software
FLS kit 42P012N03R00 1 150.00 USD Software
TOTAL   4500.00 USD  
Aircraft standard tools See SB See Note  
NOTE: Price information to be obtained from the given supplier.
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No material
CONF ALL
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
AAR CAL CCA CES CHH CPA CRK CSC DAL DLH ETD ETH EVE FBU FIN FWI HVN IBE MAS MAU
PAL QTR SIA TAM THA
G. CONCURRENT REQUIREMENTS
CONF 001 003 004
For OPTION 1 - Installation of Avionics Batch 6 - Part 1 without SDT, accomplishment of
this Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 111739L43234
Ref. SB A350-31-P032 114500L48369

### Page 13

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 13
Service Bulletin(s) Modification(s)
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P012 111325L42625 111917L43283
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 111739L43234 has
not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P012 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.0 FOR ACD) is a concurrent requirement if MOD No. 111325L42625
and MOD No. 111917L43283 have not been embodied before delivery.
Or
For OPTION 2 - Installation of Avionics Batch 6 - Part 1 with SDT, accomplishment of this
Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P016 112048L43508

### Page 14

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 14
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 111739L43234 has
not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P016 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.1) is a concurrent requirement if MOD No. 112048L43508 has not
been embodied before delivery.
CONF 002 007
For OPTION 1 - Installation of Avionics Batch 6 - Part 1 without SDT, accomplishment of
this Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-27-P030 113745L48150
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P012 111917L43283
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.

### Page 15

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 15
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P030 (FLIGHT CONTROLS - HIGH LIFT CONTROL
AND MONITORING - INTRODUCE NEW SFCC SOFTWARE STANDARD ‘S5.2’) is a
concurrent requirement if MOD No. 113745L48150 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P012 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.0 FOR ACD) is a concurrent requirement if MOD No. 111917L43283
has not been embodied before delivery.
Or
For OPTION 2 - Installation of Avionics Batch 6 - Part 1 with SDT, accomplishment of this
Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-27-P030 113745L48150
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P016 112048L43508
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.

### Page 16

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 16
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P030 (FLIGHT CONTROLS - HIGH LIFT CONTROL
AND MONITORING - INTRODUCE NEW SFCC SOFTWARE STANDARD ‘S5.2’) is a
concurrent requirement if MOD No. 113745L48150 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 has not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P016 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.1) is a concurrent requirement if MOD No. 112048L43508 has not
been embodied before delivery.
CONF 006 008
For OPTION 1 - Installation of Avionics Batch 6 - Part 1 without SDT, accomplishment of
this Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P012 111917L43283
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.

### Page 17

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 17
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P012 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.0 FOR ACD) is a concurrent requirement if MOD No. 111917L43283
has not been embodied before delivery.
Or
For OPTION 2 - Installation of Avionics Batch 6 - Part 1 with SDT, accomplishment of this
Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P016 112048L43508
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.

### Page 18

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 18
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P016 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.1) is a concurrent requirement if MOD No. 112048L43508 has not
been embodied before delivery.
CONF ALL
H. NATURE OF THE WORK
CONF 001
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF 002
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES

### Page 19

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 19
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF 003
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF 004
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF 006

### Page 20

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 20
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF 007
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF 008
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
AIRCRAFT NO
EQUIPMENT YES
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
AIRCRAFT NO
EQUIPMENT YES

### Page 21

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 21
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
AIRCRAFT YES
EQUIPMENT NO
CONF ALL
I. MANPOWER
CONF 001
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.80 h
ELAPSED TIME (HOURS) 5.25 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.70 h
ELAPSED TIME (HOURS) 4.70 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 002
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment

### Page 22

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 22
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
MANPOWER
TOTAL MAN-HOURS 8.25 h
ELAPSED TIME (HOURS) 4.25 h
CONF 003
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 004
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.80 h
ELAPSED TIME (HOURS) 5.25 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.70 h
ELAPSED TIME (HOURS) 4.70 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 006
(1) Installation of Avionics Batch 6 - Part 1

### Page 23

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 23
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
MANPOWER
TOTAL MAN-HOURS 8.25 h
ELAPSED TIME (HOURS) 4.25 h
CONF 007
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 008
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
MANPOWER
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h

### Page 24

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jun 26/19 A350-42-P012
Page 24
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
MANPOWER
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.

### Page 25

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-42XXP012-A-FAPE3-04MJJ-A-001-01 SHEET 1/1
REV 00 Jun 26/19 A350-42-P012General overview
Page 25
CONF ALL
J. GENERAL OVERVIEW
CONF ALL
A
8TC
10TC
OMT
KEYBOARD-OMT
B
VIEW LOOKING FWD
SOFTWARE UPLOADING
TO BE MANAGED
THROUGH THE OIT
AND THE OMT
DU-OUTER, F/O
KCCU-F/O
DU-OUTER, CAPT
1WK11
KCCU-CAPT
3WT
1WK21
2WT
A
B
FR1
Z210
FR12
ICN-A350-A-42XXP012-A-FAPE3-04MJJ-A-001-01

### Page 26

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-42XXP012-A-FAPE3-04Q7A-A-001-01 SHEET 1/1
REV 00 Jun 26/19 A350-42-P012General overview
Page 26
CONF 002 006
1200VURIGHT ELECTRONICS RACK
GROUNDING MODULES AND
WIRING TO BE INSTALLED IN THE 
1000VUCENTER ELECTRONICS RACK
GROUNDING MODULES AND
WIRING TO BE INSTALLED IN THE 
1100VULEFT ELECTRONICS RACK
GROUNDING MODULES AND
WIRING TO BE INSTALLED IN THE 
FR18
Z120
FR0
FR12
ICN-A350-A-42XXP012-A-FAPE3-04Q7A-A-001-01

### Page 27

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 27
ATA SYSTEM: 42
TITLE: INTEGRATED MODULAR AVIONICS - AVIONICS BATCH 6 - PART 1
CONF ALL
1. PLANNING INFORMATION
A. APPLICABILITY
(1) Models
ON A/C 0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215, 0225, 0229,
0233, 0241, 0252, 0258, 0262, 0286, 0290, 0296, 0306
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089-0101, 0103-0107, 0109,
0111-0117, 0119-0124, 0126-0130, 0132-0138, 0140, 0142-0151, 0153-0155, 0157-0160,
0162-0165, 0167, 0168, 0170, 0172-0187, 0189-0193, 0195-0205, 0207-0214, 0216-0221,
0223, 0224, 0226-0228, 0230-0232, 0234-0240, 0243-0245, 0247-0250, 0254-0256, 0259,
0261, 0263-0265, 0267-0269, 0271-0273, 0276-0282, 0284, 0285, 0287, 0289, 0291-0295,
0297, 0300-0303, 0305, 0307, 0309-0311
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0064 0066-0070 0072-0107 0109-0130 0132-0138 0140-0151
0153-0155 0157-0165 0167-0170 0172-0193 0195-0221 0223-0241 0243-0245
0247-0250 0252 0254-0256 0258 0259 0261-0265 0267-0269 0271-0273 0276-0282
0284-0287 0289-0297 0300-0303 0305-0307 0309-0311
(3) MSN by configuration
CONF 001
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0066 0067 0068 0069 0070 0072 0073
0074 0075 0076 0077 0078 0079 0080 0081 0082 0083 0084
0085 0086 0087 0089 0090 0091 0092 0093 0094 0095 0096
0097 0098 0099 0100 0101 0103 0104 0105 0106 0107 0109
0111 0112 0113 0114 0115 0116 0117 0119 0120 0121 0122
0123 0124 0126 0127 0128 0129 0130 0132 0133 0134 0135
0136 0137 0138 0140 0142 0143 0144 0145 0146 0147 0148
0149 0150 0151 0153 0154 0155 0157 0158 0159 0160 0162
0163 0164 0165 0167 0168 0170 0172 0173 0174 0175 0176
0177 0178 0179 0180 0181 0182 0183 0184 0185 0186 0187
0189 0190 0191 0192 0193 0195 0196 0197 0198 0199 0200
0201 0202 0203 0204 0205 0207 0208 0209 0210 0211 0212
0213 0214 0216 0217 0218 0219 0220 0221 0223 0226 0227
0228 0230 0231 0232 0235 0236 0238 0239 0240 0243 0244
0245 0247 0248 0250 0254 0255 0256 0259 0261 0263 0264
0265 0267 0268 0269 0271
001
CONF 002

### Page 28

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 28
MSN CONFIGURATION
0088 0102 0110 0118 0125 0141 0161 0169 0188 0206 0215
0225 0229 0233 0241 0252 0258 0262 0286 0296 0306
002
CONF 003
MSN CONFIGURATION
0224 0234 0237 0249 0272 0273 0276 0277 0278 0279 0280
0281 0282 0284 0285 0287 0289 0291 0292 0293 0294 0295
0297 0300 0301 0302 0303 0305 0307 0309 0310 0311
003
CONF 004
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0066 0067 0068 0069 0070 0072 0073
0074 0075 0076 0077 0078 0079 0080 0081 0082 0083 0084
0085 0086 0087 0089 0090 0091 0092 0093 0094 0095 0096
0097 0098 0099 0100 0101 0103 0104 0105 0106 0107 0109
0111 0112 0113 0114 0115 0116 0117 0119 0120 0121 0122
0123 0124 0126 0127 0128 0129 0130 0132 0133 0134 0135
0136 0137 0138 0140 0142 0143 0144 0145 0146 0147 0148
0149 0150 0151 0153 0154 0155 0157 0158 0159 0160 0162
0163 0164 0165 0167 0168 0170 0172 0173 0174 0175 0176
0177 0178 0179 0180 0181 0182 0183 0184 0185 0186
004
CONF 006
MSN CONFIGURATION
0088 0102 0110 0118 0125 0141 0161 0169 0188 0206 0215
0225 0229 0233 0241 0252 0258 0262 0286 0296 0306
006
CONF 007
MSN CONFIGURATION
0088 0102 0110 0118 0125 0141 0161 0169 0188 0206 0215
0225 0229 0233 0241 0252 0258 0262 0286 0290 0296 0306
007
CONF 008
MSN CONFIGURATION
0088 0102 0110 0118 0125 0141 0161 0169 0188 0206 0215
0225 0229 0233 0241 0252 0258 0262 0286 0290 0296 0306
008
CONF ALL
(4) Configuration definition
CONF 001
Configuration 001
CONF 001 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.

### Page 29

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 29
CONF 001 retrofits following modifications: 106469L42495, 113556L48116,
113556L48352, 113559L48109, 113559L48350, 113613L44220, 113699L48140,
113701L48141, 113703L48143, 113749L48124, 113848L43622, 114129L48253,
114206L48291, 114292L48282, 114353L43683, 114501L48336.
CONF 002
Configuration 002
CONF 002 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.
CONF 002 retrofits following modifications: 113556L48116, 113556L48352,
113559L48109, 113559L48350, 113613L44220, 113699L48140, 113701L48141,
113703L48143, 113749L48124, 113848L43622, 114129L48253, 114206L48291,
114292L48282, 114330L48160, 114353L43683, 114501L48336, 114503L48353,
114504L48339, 114618L48398.
CONF 003
Configuration 003
CONF 003 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.
CONF 003 retrofits following modifications: 106469L42495, 113556L48116,
113556L48352, 113559L48109, 113559L48350, 113613L44220, 113699L48140,
113701L48141, 113703L48143, 113749L48124, 113848L43622, 114129L48253,
114206L48291, 114292L48282, 114353L43683, 114501L48336, 114503L48353.
CONF 004
Configuration 004
CONF 004 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.
CONF 004 retrofits following modifications: 106469L42495, 113556L48116,
113556L48352, 113559L48109, 113559L48350, 113613L44220, 113699L48140,
113701L48141, 113703L48143, 113749L48124, 113848L43622, 114129L48253,
114292L48282, 114353L43683, 114501L48336.
CONF 006
Configuration 006
CONF 006 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.
CONF 006 retrofits following modifications: 113556L48116, 113556L48352,
113559L48109, 113559L48350, 113613L44220, 113699L48140, 113701L48141,
113703L48143, 113749L48124, 113848L43622, 114129L48253, 114206L48291,
114292L48282, 114330L48160, 114353L43683, 114501L48336, 114503L48353,
114504L48339.
CONF 007
Configuration 007
CONF 007 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.

### Page 30

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 30
CONF 007 retrofits following modifications: 113556L48116, 113556L48352,
113559L48109, 113559L48350, 113613L44220, 113699L48140, 113701L48141,
113703L48143, 113749L48124, 113848L43622, 114129L48253, 114206L48291,
114292L48282, 114353L43683, 114501L48336, 114503L48353, 114504L48339,
114618L48398.
CONF 008
Configuration 008
CONF 008 regards the specific PRE-SB status of the related aircraft.
For further information concerning the Configuration Definition, refer to Appendix
Configuration Definition T able.
CONF 008 retrofits following modifications: 113556L48116, 113556L48352,
113559L48109, 113559L48350, 113613L44220, 113699L48140, 113701L48141,
113703L48143, 113749L48124, 113848L43622, 114129L48253, 114206L48291,
114292L48282, 114353L43683, 114501L48336, 114503L48353, 114504L48339.
CONF ALL
B. CONCURRENT REQUIREMENTS
CONF 001 003 004
For OPTION 1 - Installation of Avionics Batch 6 - Part 1 without SDT, accomplishment of
this Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P012 111325L42625 111917L43283
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 111739L43234 has
not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.

### Page 31

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 31
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P012 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.0 FOR ACD) is a concurrent requirement if MOD No. 111325L42625
and MOD No. 111917L43283 have not been embodied before delivery.
Or
For OPTION 2 - Installation of Avionics Batch 6 - Part 1 with SDT, accomplishment of this
Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P016 112048L43508
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 111739L43234 has
not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.

### Page 32

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 32
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P016 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.1) is a concurrent requirement if MOD No. 112048L43508 has not
been embodied before delivery.
CONF 002 007
For OPTION 1 - Installation of Avionics Batch 6 - Part 1 without SDT, accomplishment of
this Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-27-P030 113745L48150
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P012 111917L43283
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P030 (FLIGHT CONTROLS - HIGH LIFT CONTROL
AND MONITORING - INTRODUCE NEW SFCC SOFTWARE STANDARD ‘S5.2’) is a
concurrent requirement if MOD No. 113745L48150 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.

### Page 33

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 33
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P012 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.0 FOR ACD) is a concurrent requirement if MOD No. 111917L43283
has not been embodied before delivery.
Or
For OPTION 2 - Installation of Avionics Batch 6 - Part 1 with SDT, accomplishment of this
Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-27-P030 113745L48150
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P016 112048L43508
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P030 (FLIGHT CONTROLS - HIGH LIFT CONTROL
AND MONITORING - INTRODUCE NEW SFCC SOFTWARE STANDARD ‘S5.2’) is a
concurrent requirement if MOD No. 113745L48150 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.

### Page 34

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 34
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 has not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P016 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.1) is a concurrent requirement if MOD No. 112048L43508 has not
been embodied before delivery.
CONF 006 008
For OPTION 1 - Installation of Avionics Batch 6 - Part 1 without SDT, accomplishment of
this Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P012 111917L43283
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.

### Page 35

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 35
NOTE: Service Bulletin No. Ref. SB A350-46-P012 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.0 FOR ACD) is a concurrent requirement if MOD No. 111917L43283
has not been embodied before delivery.
Or
For OPTION 2 - Installation of Avionics Batch 6 - Part 1 with SDT, accomplishment of this
Service Bulletin requires the prior or simultaneous accomplishment of these Service
Bulletin(s):
Service Bulletin(s) Modification(s)
Ref. SB A350-27-P013 110306L43006
Ref. SB A350-27-P023 113323L43656 111739L43234
Ref. SB A350-31-P032 114500L48369
Ref. SB A350-34-P021 113201L43588 113199L43183
Ref. SB A350-42-P008 112509L43629
Ref. SB A350-42-P010 112312L43552 112313L43553
Ref. SB A350-46-P016 112048L43508
NOTE: Service Bulletin No. Ref. SB A350-27-P013 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - DEFINE AND INSTALL FCGS STANDARD 8) is a concurrent
requirement if MOD No. 110306L43006 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-27-P023 (FLIGHT CONTROLS - PRIMARY FLIGHT
CONTROL SYSTEM (PFCS) - INSTALL FLIGHT CONTROL AND GUIDANCE SYSTEM
(FCGS) X10 STANDARD) is a concurrent requirement if MOD No. 113323L43656 and
MOD No. 111739L43234 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-31-P032 (INDICATING/RECORDING SYSTEMS
- FLIGHT WARNING SYSTEM (FWS) - INSTALL NEW AIRBUS TEMPORARY QUICK
CHANGE (ATQC) STANDARD (STD) V5 FOR FWS STD S5/2.2) is a concurrent
requirement if MOD No. 114500L48369 has not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-34-P021 (NAVIGATION - SOFTWARE PIN PROG.
(SPP) BROADCASTING - DEFINE AND INSTALL SPP LOADS FOR FSA NG STD 5.1 (VOR
AND SATCOM)) is a concurrent requirement if MOD No. 113199L43183 and MOD No.
113201L43588 have not been embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P008 (INDICATING MODULAR AVIONICS - AFDX
NETWORK - DEFINE AND INSTALL AFDX NETWORK SWITCH CONF TABLE TRT47P1) is
a concurrent requirement if MOD No. 112509L43629 has not been embodied before
delivery.
NOTE: Service Bulletin No. Ref. SB A350-42-P010 (INTEGRATED MODULAR AVIONICS
- CORE PROCESSING INPUT/OUTPUT MODULES (CPIOM) - UPGRADE OF CPIOM
CORE S/W TO STD S3.0.3 AND CRDC CORE S/W TO STD S3.1.3) is a concurrent
requirement if MOD No. 112312L43552 and MOD No. 112313L43553 have not been
embodied before delivery.
NOTE: Service Bulletin No. Ref. SB A350-46-P016 (INFORMATION SYSTEMS - INSTALL FSA-
NG STANDARD 5.1) is a concurrent requirement if MOD No. 112048L43508 has not
been embodied before delivery.
CONF ALL
C. REASON

### Page 36

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 36
(1) History
Integrated Modular Avionics (IMA) provides common and shared resources for
computing and communication. The system functions and applications are hosted in
common computing hardware platforms called Line Replaceable Module (LRM).
This Service Bulletin introduces a major software upgrade identified as Batch 6 Part 1.
The Batch 6 Parts 2 and 3 are respectively introduced by Service Bulletins No. Ref. SB
A350-42-P013 and Ref. SB A350-42-P014.
(2) Objective/Action
This Service Bulletin recommends installation of a package of A350 systems upgrade
including:
- Flight Control and Guidance System (FCGS) software X11 Standard (STD)
- Flight Warning System (FWS) S6 STD
- Control and Display System (CDS) S6.1 STD
- Core Processing Input/Output Modules (CPIOM), Common Remote Data
Concentrator (CRDC), Module Common Configuration T able (MCCT), Resource
BITE Configuration T able (RBCT) and Maintenance System Load (MSL) software
B24
- Avionics Full Duplex Switched Ethernet (AFDX) switch configuration table T48D.
NOTE: This operation can be done either manually or using the Smart Dataloading
T ool (SDT) function. The SDT will ease and speed-up embodiment of this
Service Bulletin, as well as reducing the risk of human errors, by using scripts
to automate dataloading and configuration verification operations.
(3) Advantages
The main modifications introduced by this Service Bulletin are described hereunder.
Flight Controls (F/CTL):
FCGS new X11 STD includes:
- Primary (PRIM) Flight Control Computer (FCC) STD P11
- Secondary (SEC) FCC STD S11
- Flight Control Data Concentrator (FCDC) STD F11
- Dedicated MSL and Software Pin Programming (SPP) software for A350-900 and
A350-1000 models.
This new STD brings the following main improvements:
- Introduction of T ake Off Monitoring (TOM) function activated through SPP
- Corrective FCGS STD for motor temperature sensor issues for Electrical Backup
Hydraulic Actuators (EBHAs) ( Ref. TFU 27.34.00.019) : Master Minimum
Equipment List (MMEL) alleviation
- Corrective FCGS STD for pressure sensor issues ( Ref. TFU 27.00.00.115): MMEL
alleviation
- Corrective FCGS STD for PRIM fault at engine start issues ( Ref. TFU
27.93.00.075): new PRIM logics
- Modification of the logics in case of Ram Air T urbine (RAT) extension, activated
through Hardware Pin Programming (HPP) (valid only for A350-1000).

### Page 37

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 37
- NOTE: In order to avoid wiring modification, this Service Bulletin can be
accomplished at the same time as Service Bulletin No. Ref. SB A350-24-P047
(MOD No. 114329L48289).
- Removal of Airplane Flight Manual (AFM) TR109 “ROW/ROP LIMITATION ON ICY
RUNWAYS FOR PRIM10 “ (AFM APPRO-TR)
- Automatic approach with automatic landing: maximum crosswind extended to
30kt (AFM LIM-22-FGS)
- Removal of tail strike indicator during T akeoff (TO)
- Correction of potential AP/ATHR unexpected disconnection during Automatic
Emergency Descent (AED) manoeuvre due to COM/MON synchronization (only
reported during Flight T est (FT) at AIRBUS).
Indicating recording systems:
FWS software S6 STD includes the S6 STD for operational software, a new MSL load, a
new SPP load, a new version of the Airbus T emporary Quick Change (ATQC) DATABASE
and empty Operator-Customized Electronic ECAM Database (OCED) DATABASE.
This STD implies a modification of both automatic and manual codes and integrates
the following main features:
- Anomalies correction and product improvements applicable to both variants
- Implementation of AFDX 1.4 architecture
- New Hydraulic (HYD) architecture
- Acquisition of Inertial Reference System (IRS) data from IRS partition and not
from Global Positioning System (GPS) one
- A350-1000 RAT performance improvement
- Deployable recorder
- Correction of SPP limitation
- Provisions for Light Cockpit SATCOM (LCS) and Aircraft Environment Surveillance
System (AESS) S4.
New ATQC database is generated for FWS STD S6 2.0, ATQC V2 for FWS S6 2.0.
In order to address the actual in-service situation AIRBUS has created the ECAM
T emporary Change (ECAM TC) codes.
This Service Bulletin allows the deactivation of the Envelope T emporary Change (ETC)
codes No. 24GE and No. 27MA from the FWS.
This ATQC still includes in its envelop ETC codes previously defined and this Service
Bulletin activates the following ones:
- ETC code 29BF (A350-1000 model only)
- ETC code 34TA.
Control and Display System (CDS):
The new STD of the CDS operating system S6.1 integrates the following main features
compared to S5.1:
- Evolutions for Airport Navigation Function (ANF) - Improvement for Head-Up
Display (HUD)
- Improvement for HUD

### Page 38

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 38
- Harmonized Primary Flight Display (PFD) in HDG/VS mode
- Weather hazard function display
- Modification of: Fuel Penalty Monitoring Function (FPMF) logics
- Aileron droop for Performance Improvement Package/ Ultra Long Range (PIP/ULR)
configuration
- Oil quantity modification on: System Display Engine (SD ENG) page
- AFDX 1.4 compatibility
- New HYD architecture / Indications on SD page
- Acquisition of IRS data from IRS partition and not from GPS one
- Modification of the cockpit manager allocation.
Navigation:
Accomplishment of this Service Bulletin allows declaration and deactivation of two
new SPP parameters for:
- WEATHER HAZARD function: “SPP_AESS_WXR_Hazard”
- New source selection for ADS-B OUT function: “SPP_AESS_XPDR_ADS-B_SBAS”.
IMA:
On AFDX side, this Service Bulletin introduces an AFDX network switch configuration
table corresponding to Inter System Communication Data (ISCD) T48D.
A new STD corresponding to IMA Batch 6 for the CRDC MCCT is brought by this Service
Bulletin.
For CPIOM J1 and CRDC, the modification consists in RBCT and MSL.
(4) Operational/Maintenance Consequences
The Operational/Maintenance Consequences of this Service Bulletin are covered by
the update of the affected publications detailed in "PLANNING INFORMATION".
This Service Bulletin has an impact on flight operations documentation; refer
to AirbusWorld to consult the Modification Operational Impact (MOI) Ref. MOI
113556 described in Ref. TFU 31.00.00.156, Ref. MOI 113559 described in Ref. TFU
31.60.00.021 and Ref. MOI 113749 described in Ref. TFU 27.90.00.053.
D. DESCRIPTION
NOTE: T o accomplish this Service Bulletin, you have two options.
Either you upload without SDT or you upload with SDT.
NOTE: T o accomplish this Service Bulletin, if you choose Option 2 "Uploading with SDT",
please ensure first that your Date Loading and Configuration System (DLCS) is
SDT capable (MOD No. 112048L43508 embodied or Service Bulletin No. Ref. SB
A350-46-P016 accomplished).
T o accomplish this Service Bulletin it is necessary to:
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
CONF 001 003
1 STEP 1 - Load Import

### Page 39

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 39
CONF 002 006-008
1 STEP 1 - Load Import
CONF 004
1 STEP 1 - Load Import
CONF ALL
2 STEP 2 - C/B Management Part 1
3 STEP 3 - C/B Management Part 2
4 STEP 4 - Upload AFDX Switches
CONF 001 003
5 STEP 5 - Upload MSL and SPP
CONF 002 006-008
5 STEP 5 - Upload MSL and SPP
CONF 004
5 STEP 5 - Upload MSL and SPP
CONF ALL
6 STEP 6 - Reset ASFC and OSFC
7 STEP 7 - Upload Flight Controls
8 STEP 8 - Upload CDS
9 STEP 9 - Upload CRDC A
CONF 001 004
10 STEP 10 - ETC Code Deactivation
CONF 002 006-008
10 STEP 10 - ETC Code Deactivation
CONF 003
10 STEP 10 - ETC Code Deactivation
CONF ALL
11 STEP 11 - Upload CRDC B, CPIOM J1 and FWS
CONF 001 003 004 006 008
12 STEP 12 - ETC Code Activation
CONF 002 007
12 STEP 12 - ETC Code Activation
CONF 001 003
13 STEP 13 - Configuration Check Part 1
CONF 002 006-008
13 STEP 13 - Configuration Check Part 1
CONF 004
13 STEP 13 - Configuration Check Part 1
CONF ALL
14 STEP 14 - Configuration Check Part 2
15 STEP 15 - BITE T est Part 1
16 STEP 16 - BITE T est Part 2
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
CONF 001 003

### Page 40

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 40
1 STEP 1 - Load Import
CONF 002 006-008
1 STEP 1 - Load Import
CONF 004
1 STEP 1 - Load Import
CONF 001 003
2 STEP 2 - SDT Load Import and C/B management
CONF 002 006-008
2 STEP 2 - SDT Load Import and C/B management
CONF 004
2 STEP 2 - SDT Load Import and C/B management
CONF 001 003
3 STEP 3 - Check of Import
CONF 002 006-008
3 STEP 3 - Check of Import
CONF 004
3 STEP 3 - Check of Import
CONF 001 003
4 STEP 4 - Check of A/C Pre-SB configuration
CONF 002 006-008
4 STEP 4 - Check of A/C Pre-SB configuration
CONF 004
4 STEP 4 - Check of A/C Pre-SB configuration
CONF 001
5 STEP 5 - ETC Code Deactivation
CONF 002 006-008
5 STEP 5 - ETC Code Deactivation
CONF 003
5 STEP 5 - ETC Code Deactivation
CONF 004
5 STEP 5 - ETC Code Deactivation
CONF 001 003
6 STEP 6 - Upload of the targets
CONF 002 006-008
6 STEP 6 - Upload of the targets
CONF 004
6 STEP 6 - Upload of the targets
CONF 001 003
7 STEP 7 - ETC Code Activation
CONF 002 007
7 STEP 7 - ETC Code Activation
CONF 004
7 STEP 7 - ETC Code Activation
CONF 006 008
7 STEP 7 - ETC Code Activation

### Page 41

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 41
CONF 001 003
8 STEP 8 - Reset ASFC and OSFC
CONF 002 006-008
8 STEP 8 - Reset ASFC and OSFC
CONF 004
8 STEP 8 - Reset ASFC and OSFC
CONF 001 003
9 STEP 9 - Check of A/C Post-SB configuration
CONF 002 006-008
9 STEP 9 - Check of A/C Post-SB configuration
CONF 004
9 STEP 9 - Check of A/C Post-SB configuration
CONF 001 003
10 STEP 10 - Validation of Post-SB configuration
CONF 002 006-008
10 STEP 10 - Validation of Post-SB configuration
CONF 004
10 STEP 10 - Validation of Post-SB configuration
CONF 001 003
11 STEP 11 - BITE T ests
CONF 002 006-008
11 STEP 11 - BITE T ests
CONF 004
11 STEP 11 - BITE T ests
CONF ALL
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
CONF 002 006
1 Modify the Equipment and the Wiring in the Center Electronics Rack
1000VU
2 Modify the Equipment and the Wiring in the Left Electronics Rack 1100VU
3 Modify the Equipment and the Wiring in the Right Electronics Rack 1200VU
CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Aviation Safety Agency (EASA)
will be issued to confirm this classification. The accomplishment timescale, which has
not yet been defined, will be given in the AD.
F. APPROVAL

### Page 42

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 42
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
CONF 001
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.05 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.80 h
ELAPSED TIME (HOURS) 5.25 h

### Page 43

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 43
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.05 h
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.70 h
ELAPSED TIME (HOURS) 4.70 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 002
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h

### Page 44

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 44
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.10 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.10 h
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST
None
TEST
None

### Page 45

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 45
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
PREPARATION
Job Set-up 0.50 h
Remove Panels for Access in the FWD Cargo Compartment 0.50 h
PROCEDURE
Modify the Equipment and the Wiring in the Center
Electronics Rack 1000VU
2.00 h
Modify the Equipment and the Wiring in the Left Electronics
Rack 1100VU
2.00 h
Modify the Equipment and the Wiring in the Right
Electronics Rack 1200VU
2.00 h
PREPARATION FOR TEST
Preparation for T est 0.10 h
TEST
T esting 0.15 h
CLOSE-UP
Install Panels removed for Access in the FWD Cargo
Compartment
0.50 h
Close-up 0.50 h
TOTAL MAN-HOURS 8.25 h
ELAPSED TIME (HOURS) 4.25 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix Manpower Gantt Chart.
NOTE: T o avoid wiring modification, this Service Bulletin can be accomplished
at the same time as Service Bulletin No. Ref. SB A350-24-P047 (MOD No.
114329L48289).
CONF 003
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h

### Page 46

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 46
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.10 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.10 h
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST

### Page 47

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 47
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 004
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.05 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST

### Page 48

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 48
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.80 h
ELAPSED TIME (HOURS) 5.25 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.05 h
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.70 h
ELAPSED TIME (HOURS) 4.70 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 006
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1

### Page 49

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 49
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.10 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.10 h
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h

### Page 50

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 50
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
PREPARATION
Job Set-up 0.50 h
Remove Panels for Access in the FWD Cargo Compartment 0.50 h
PROCEDURE
Modify the Equipment and the Wiring in the Center
Electronics Rack 1000VU
2.00 h
Modify the Equipment and the Wiring in the Left Electronics
Rack 1100VU
2.00 h
Modify the Equipment and the Wiring in the Right
Electronics Rack 1200VU
2.00 h
PREPARATION FOR TEST
Preparation for T est 0.10 h
TEST
T esting 0.15 h
CLOSE-UP
Install Panels removed for Access in the FWD Cargo
Compartment
0.50 h
Close-up 0.50 h
TOTAL MAN-HOURS 8.25 h
ELAPSED TIME (HOURS) 4.25 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix Manpower Gantt Chart.
NOTE: T o avoid wiring modification, this Service Bulletin can be accomplished
at the same time as Service Bulletin No. Ref. SB A350-24-P047 (MOD No.
114329L48289).
CONF 007
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts

### Page 51

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 51
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.10 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.10 h

### Page 52

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 52
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.
CONF 008
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - C/B Management Part 1 0.10 h
STEP 3 - C/B Management Part 2 0.10 h
STEP 4 - Upload AFDX Switches 0.40 h
STEP 5 - Upload MSL and SPP 0.50 h
STEP 6 - Reset ASFC and OSFC 0.20 h
STEP 7 - Upload Flight Controls 0.90 h
STEP 8 - Upload CDS 0.85 h
STEP 9 - Upload CRDC A 0.60 h
STEP 10 - ETC Code Deactivation 0.10 h
STEP 11 - Upload CRDC B, CPIOM J1 and FWS 0.85 h
STEP 12 - ETC Code Activation 0.10 h

### Page 53

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 53
STEP 13 - Configuration Check Part 1 0.45 h
STEP 14 - Configuration Check Part 2 0.35 h
STEP 15 - BITE T est Part 1 0.25 h
STEP 16 - BITE T est Part 2 0.45 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 7.85 h
ELAPSED TIME (HOURS) 5.30 h
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
PREPARATION
Job Set-up 0.25 h
PROCEDURE
STEP 1 - Load Import 1.15 h
STEP 2 - SDT Load Import and C/B management 0.35 h
STEP 3 - Check of Import 0.05 h
STEP 4 - Check of A/C Pre-SB configuration 0.05 h
STEP 5 - ETC Code Deactivation 0.10 h
STEP 6 - Upload of the targets 1.45 h
STEP 7 - ETC Code Activation 0.10 h
STEP 8 - Reset ASFC and OSFC 0.20 h
STEP 9 - Check of A/C Post-SB configuration 0.05 h
STEP 10 - Validation of Post-SB configuration 0.05 h
STEP 11 - BITE T ests 0.70 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 4.75 h
ELAPSED TIME (HOURS) 4.75 h
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
No physical work is required on aircraft.

### Page 54

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 54
CONF ALL
H. WEIGHT AND BALANCE
CONF 001 003 004 007 008
Not changed
CONF 002 006
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer's Empty Weight (MEW) and do not include operator's items. The definition of
MEW and operator's items is given in the Weight and Balance Manual (WBM), Ref. WBM.
Manufacturer's Empty Weight +1.0 kg (+2.205 lb)
Effect on Balance +7.9 kg.m (+57.141 lb.ft)
CONF ALL
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
CONF 001 003 004
CONCURRENT SERVICE BULLETIN (SB)
A350-27-P013 A350-27-P023
A350-31-P032 A350-34-P021
A350-42-P008 A350-42-P010
A350-46-P012 A350-46-P016
CONF 002 007
CONCURRENT SERVICE BULLETIN (SB)
A350-27-P013 A350-27-P023
A350-27-P030 A350-31-P032
A350-34-P021 A350-42-P008
A350-42-P010 A350-46-P012
A350-46-P016
CONF 006 008
CONCURRENT SERVICE BULLETIN (SB)
A350-27-P013 A350-27-P023
A350-31-P032 A350-34-P021
A350-42-P008 A350-42-P010
A350-46-P012 A350-46-P016
CONF 001
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A

### Page 55

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 55
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-24-41-XX-00ZZZ-761Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-24-41-XX-00ZZZ-761Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016

### Page 56

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 56
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
CONF 002
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A

### Page 57

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 57
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-24-41-XX-00ZZZ-761Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-24-41-XX-00ZZZ-761Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)

### Page 58

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 58
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-33-XX-01ZZZ-042Z-A A350-A-20-33-44-01ZZZ-041Z-A
A350-A-20-42-32-01ZZZ-041Z-A A350-A-20-42-33-01ZZZ-041Z-A
A350-A-20-51-20-01ZZZ-042Z-A A350-A-20-51-22-00ZZZ-600Z-A
A350-A-20-52-10-01ZZZ-042Z-A A350-A-20-52-21-00ZZZ-36AZ-A
A350-A-20-54-50-01ZZZ-042Z-A A350-A-20-55-XX-01ZZZ-042Z-A
A350-A-20-56-51-01ZZZ-04DZ-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-20-46-XX-00ZZZ-25BZ-A A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-27-93-XX-00ZZZ-320Z-A A350-A-27-93-34-00ZZZ-520Z-A
A350-A-27-93-34-00ZZZ-720Z-A
A350-A-50-13-61-00ZZZ-520Z-A
A350-A-50-13-61-00ZZZ-720Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
WEIGHT AND BALANCE MANUAL (WBM)
STANDARDS MANUAL (SM)
CONF 003
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A

### Page 59

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 59
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-24-41-XX-00ZZZ-761Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
(b) T ask set A350-A-42-XX-P012-01000-93AB-A OPTION 2 - Installation of Avionics
Batch 6 - Part 1 with SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-24-41-XX-00ZZZ-561Z-A
A350-A-24-41-XX-00ZZZ-761Z-A
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016

### Page 60

A350
SERVICE BULLETIN
REV 00 Jun 26/19 A350-42-P012
Page 60
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
(2) Modify the Equipment and the Wiring in the Avionics Compartment
(a) T ask set A350-A-42-XX-P012-02000-93AA-A Modify the Equipment and the Wiring
in the Avionics Compartment
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
SERVICE BULLETIN (SB)
A350-24-P047 A350-42-P013
A350-42-P014 A350-46-P016
TECHNICAL FOLLOW UP (TFU)
27.00.00.115 27.34.00.019
27.90.00.053 27.93.00.075
31.00.00.156 31.60.00.021
CONF 004
(1) Installation of Avionics Batch 6 - Part 1
(a) T ask set A350-A-42-XX-P012-01000-93AA-A OPTION 1 - Installation of Avionics
Batch 6 - Part 1 without SDT
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
42.00.00007
MODIFICATION OPERATIONAL IMPACT (MOI)
113556 113559
113749
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A

The text continues at https://openairdocs.org/service-documents/airbus/a350-42-p012/file/b2d936fd074d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
