# Airbus Service Bulletin A350-54-P009

Copy: No revision named ("SB A350-54-P009"), 46 pages: PDF https://openairdocs.org/files/sha256/9b/06/9b067cdb4d77914ef55ab1bb376a9a90588f947ab8be092cc641737c79732cfb; text https://openairdocs.org/service-documents/airbus/a350-54-p009/file/9b067cdb4d77.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2024-1881, the docket of AD 2024-19-04. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-54-P009
- Page: https://openairdocs.org/service-documents/airbus/a350-54-p009

## Text (46 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2024-1881, the docket of AD 2024-19-04. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES / PYLONS - AIR INTAKE COWL - INSPECTION - AIR INTAKE
FWD BULKHEADS ELONGATED HOLES
MODIFICATION No.:
None

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 22/23 A350-54-P009
Page 2
ATA SYSTEM: 54
TITLE: NACELLES / PYLONS - AIR INTAKE COWL - INSPECTION - AIR INTAKE
FWD BULKHEADS ELONGATED HOLES
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
During maintenance check, it has been observed in the field some cases of Nacelle
Anti-Icing (NAI) forward bulkheads found with elongated holes. These locating holes
are used during the manufacturing process and have no structural function and
do not transfer any loads. In operation, the locating holes are closed by fasteners.
The fastener vibration can generate the elongated holes and it can reduce the NAI
performance.
(2) Objective/Action
This Service Bulletin gives instructions to inspect the 18 air inlet locating holes. The
aim of this inspection is to check if the existing fasteners have damaged the locating
hole.
This Service Bulletin is published to advise all operators of A350–900 and A350–1000
aircraft of Vendor Service Bulletin (VSB) Ref. ROHR INC (51563) VSB RA35071-029
which inspects the fasteners and holes located in the air intake forward bulkheads on
engines 1 and 2.
(3) Advantages
The accomplishment of this Service bulletin contributes to limit the risk of low
pretension in the fastener and the fastener vibration.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB YES
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 22/23 A350-54-P009
Page 3
EVALUATION TABLE
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air
Inlet Holes
(a) T ask set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Aircraft
No material
(b) T ask set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Bench
No material
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
36V A1L AAR AZU CAL CCA CES CHH CPA CSC DAL DLH ETH EVE FBU FIN FJI FWI G2X HVN
IBE ITY MAS MAU PAL QTR SIA THA
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air
Inlet Holes
(a) T ask set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Aircraft
AIRCRAFT YES
EQUIPMENT NO
(b) T ask set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Bench
AIRCRAFT YES
EQUIPMENT NO
I. MANPOWER
(1) Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air
Inlet Holes
(a) T ask set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Aircraft
MANPOWER
TOTAL MAN-HOURS 1.25 h
ELAPSED TIME (HOURS) 0.75 h

### Page 4

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 22/23 A350-54-P009
Page 4
MANPOWER
Additional man-hours related to Vendor SB; refer to:
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 1
Ref. ROHR INC (51563) VSB RA35071-029
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 2
Ref. ROHR INC (51563) VSB RA35071-029
(b) T ask set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Bench
MANPOWER
TOTAL MAN-HOURS 7.50 h
ELAPSED TIME (HOURS) 2.50 h
Additional man-hours related to Vendor SB; refer to:
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 1
Ref. ROHR INC (51563) VSB
RA35071-029
BENCH
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 2
Ref. ROHR INC (51563) VSB
RA35071-029
BENCH

### Page 5

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-54XXP009-A-FAPE3-06VK2-A-002-01 Fig.SA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009General overview
Page 5
J. GENERAL OVERVIEW
CONF ALL
INTAKE FWD BULKHEADS
ON THE 18 HOLES
INSPECTION ON THE AIR
DO A SPECIAL DETAILED
A
Z411
Z421
A
A
ICN-A350-A-54XXP009-A-FAPE3-06VK2-A-002-01

### Page 6

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 6
ATA SYSTEM: 54
TITLE: NACELLES / PYLONS - AIR INTAKE COWL - INSPECTION - AIR INTAKE
FWD BULKHEADS ELONGATED HOLES
1. PLANNING INFORMATION
A. APPLICABILITY
NOTE: This Service Bulletin is only applicable to aircraft on which MOD No. 111256L89042
is not embodied.
NOTE: This Service Bulletin is only applicable to aircraft on which MOD No 111488L89041
is not embodied.
NOTE: The engine air inlet cowls Part Number (P/N) and Serial Number (S/N) references to
be inspected have been listed in Ref. ROHR INC (51563) VSB RA35071-029.
(1) Models
ON A/C 0088, 0102, 0110
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089-0101, 0103-0107, 0109, 0111-
0117, 0119-0124, 0126-0130, 0132-0138, 0140, 0142-0151, 0153-0155, 0157-0160, 0162-
0165, 0167, 0168, 0170, 0172-0187, 0189-0193, 0195-0205, 0207-0214, 0216-0221, 0223,
0224, 0226-0228, 0230-0232, 0234-0240, 0243-0251, 0254-0256, 0259-0261, 0263-0265,
0267-0273, 0276-0282, 0284, 0285, 0287, 0289, 0291-0295, 0297, 0299, 0300, 0311
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0064 0066-0070 0072-0107 0109-0117 0119-0124 0126-0130 0132-
0138 0140 0142-0151 0153-0155 0157-0160 0162-0165 0167 0168 0170 0172-0187
0189-0193 0195-0205 0207-0214 0216-0221 0223 0224 0226-0228 0230-0232 0234-
0240 0243-0251 0254-0256 0259-0261 0263-0265 0267-0273 0276-0282 0284 0285
0287 0289 0291-0295 0297 0299 0300 0311
(3) MSN by configuration
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0066 0067 0068 0069 0070 0072 0073
0074 0075 0076 0077 0078 0079 0080 0081 0082 0083 0084
0085 0086 0087 0088 0089 0090 0091 0092 0093 0094 0095
0096 0097 0098 0099 0100 0101 0102 0103 0104 0105 0106
0107 0109 0110 0111 0112 0113 0114 0115 0116 0117 0119
0120 0121 0122 0123 0124 0126 0127 0128 0129 0130 0132
0133 0134 0135 0136 0137 0138 0140 0142 0143 0144 0145
0146 0147 0148 0149 0150 0151 0153 0154 0155 0157 0158
0159 0160 0162 0163 0164 0165 0167 0168 0170 0172 0173
0174 0175 0176 0177 0178 0179 0180 0181 0182 0183 0184
0185 0186 0187 0189 0190 0191 0192 0193 0195 0196 0197
0198 0199 0200 0201 0202 0203 0204 0205 0207 0208 0209
001

### Page 7

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 7
MSN CONFIGURATION
0210 0211 0212 0213 0214 0216 0217 0218 0219 0220 0221
0223 0224 0226 0227 0228 0230 0231 0232 0234 0235 0236
0237 0238 0239 0240 0243 0244 0245 0246 0247 0248 0249
0250 0251 0254 0255 0256 0259 0260 0261 0263 0264 0265
0267 0268 0269 0270 0271 0272 0273 0276 0277 0278 0279
0280 0281 0282 0284 0285 0287 0289 0291 0292 0293 0294
0295 0297 0299 0300 0311
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
During maintenance check, it has been observed in the field some cases of Nacelle
Anti-Icing (NAI) forward bulkheads found with elongated holes. These locating holes
are used during the manufacturing process and have no structural function and
do not transfer any loads. In operation, the locating holes are closed by fasteners.
The fastener vibration can generate the elongated holes and it can reduce the NAI
performance.
(2) Objective/Action
This Service Bulletin gives instructions to inspect the 18 air inlet locating holes. The
aim of this inspection is to check if the existing fasteners have damaged the locating
hole.
This Service Bulletin is published to advise all operators of A350–900 and A350–1000
aircraft of Vendor Service Bulletin (VSB) Ref. ROHR INC (51563) VSB RA35071-029
which inspects the fasteners and holes located in the air intake forward bulkheads on
engines 1 and 2.
(3) Advantages
The accomplishment of this Service bulletin contributes to limit the risk of low
pretension in the fastener and the fastener vibration.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
NOTE: T o accomplish this Service Bulletin, Operators have 2 options, on BENCH or on
AIRCRAFT.
T o accomplish this Service Bulletin it is necessary to:
(1) Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air
Inlet Holes
(a) T ask set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Aircraft

### Page 8

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 8
1 Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 1
2 Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 2
3 Complete and Send the Inspection Report Sheet
(b) T ask set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Bench
1 Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 1
2 Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 2
3 Complete and Send the Inspection Report Sheet
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done within 12 Years from Entry Into
Service (EIS) or within 80 months from the first issue of this Service Bulletin (SB) and
whichever occurs first.
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds given but reference should be made to the AD for confirmation
of the mandated accomplishment timescale.
T able 1, CONF 001 — OPTION 1: ON AIRCRAFT — Do a Special Detailed Inspection (SDI)
on the air intake forward bulkheads of 18 air inlet holes of the engine 1.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do a SDI on the
air intake forward
bulkheads of 18
air inlet holes
of the engine
1, refer to Ref.
T ask A350-A-
54-XX-P009-
01ZZZ-300Z-A
Within 12 year(s)
from Entry
Into Service
(EIS) or within
80 month(s)
from the first
issue of this SB
and whichever
occurs first.
None None
If no finding/
no damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
01ZZZ-90AZ-A
None None None
If finding/damage
is detected
Do and send
the complete
inspection report
None None None

### Page 9

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 9
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
01ZZZ-90AZ-A
  AND
  Refer to VSB
RA35071–029 ,
report to Collins
Aerospace and
follow their
instructions
Before next flight None None
T able 2, CONF 001 — OPTION 1: ON AIRCRAFT — Do a Special Detailed Inspection (SDI)
on the air intake forward bulkheads of 18 air inlet holes of the engine 2.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do a SDI on the
air intake forward
bulkheads of 18
air inlet holes
of the engine
2, refer to Ref.
T ask A350-A-
54-XX-P009-
02ZZZ-300Z-A
Within 12 year(s)
from Entry
Into Service
(EIS) or within
80 month(s)
from the first
issue of this SB
and whichever
occurs first.
None None
If no finding/
no damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
01ZZZ-90AZ-A
None None None
If finding/damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
01ZZZ-90AZ-A
None None None
  AND
  Refer to VSB
RA35071–029 ,
report to Collins
Aerospace and
follow their
instructions
Before next flight None None
T able 3, CONF 001 — OPTION 2: ON BENCH — Do a Special Detailed Inspection (SDI)
on the air intake forward bulkheads of 18 air inlet holes of the engine 1.

### Page 10

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 10
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do a SDI on the
air intake forward
bulkheads of 18
air inlet holes
of the engine
1, refer to Ref.
T ask A350-A-
54-XX-P009-
03ZZZ-300Z-C
Within 12 year(s)
from Entry
Into Service
(EIS) or within
80 month(s)
from the first
issue of this SB
and whichever
occurs first.
None None
If no finding/
no damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
04ZZZ-90AZ-A
None None None
If finding/damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
04ZZZ-90AZ-A
None None None
  AND
  Refer to VSB
RA35071–029 ,
report to Collins
Aerospace and
follow their
instructions
Before next flight None None
T able 4, CONF 001 — OPTION 2: ON BENCH — Do a Special Detailed Inspection (SDI)
on the air intake forward bulkheads of 18 air inlet holes of the engine 2.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All aircraft Do a SDI on the
air intake forward
bulkheads of 18
air inlet holes
of the engine
2, refer to Ref.
T ask A350-A-
54-XX-P009-
04ZZZ-300Z-C
Within 12 year(s)
from Entry
Into Service
(EIS) or within
80 month(s)
from the first
issue of this SB
and whichever
occurs first.
None None
If no finding/
no damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
None None None

### Page 11

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 11
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
A-54-XX-P009-
04ZZZ-90AZ-A
If finding/damage
is detected
Do and send
the complete
inspection report
sheet, refer to
Ref. T ask A350-
A-54-XX-P009-
04ZZZ-90AZ-A
None None None
  AND
  Refer to VSB
RA35071–029 ,
report to Collins
Aerospace and
follow their
instructions
Before next flight None None
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air
Inlet Holes
(a) T ask set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Aircraft
PREPARATION
Job Set-up 0.50 h
PROCEDURE
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.50 h
TOTAL MAN-HOURS 1.25 h

### Page 12

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 12
ELAPSED TIME (HOURS) 0.75 h
Additional man-hours related to Vendor SB; refer to:
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 1
Ref. ROHR INC (51563) VSB RA35071-029
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 2
Ref. ROHR INC (51563) VSB RA35071-029
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix Manpower Gantt Chart Option 1.
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
(b) T ask set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Bench
PREPARATION
Job Set-up 0.50 h
Remove the Air Inlet Cowl of Engine 1 1.00 h
Remove the Air Inlet Cowl of Engine 2 1.00 h
PROCEDURE
Complete and Send the Inspection Report Sheet 0.25 h
PREPARATION FOR TEST
Install the Air Inlet Cowl of the Engine 1 2.00 h
Install the Air Inlet Cowl of the Engine 2 2.00 h
TEST
T est 0.25 h
CLOSE-UP
Close-up 0.50 h
TOTAL MAN-HOURS 7.50 h
ELAPSED TIME (HOURS) 2.50 h
Additional man-hours related to Vendor SB; refer to:
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 1
Ref. ROHR INC (51563) VSB
RA35071-029
BENCH
Do a Special Detailed Inspection on the
Air Intake Forward Bulkheads of 18 Air
Inlet Holes of the Engine 2
Ref. ROHR INC (51563) VSB
RA35071-029
BENCH
NOTE: The minimum man-hours necessary to accomplish this Service Bulletin
are those for the Inspection. Depending on the inspection result,
additional man-hours can apply.
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix Manpower Gantt Chart Option 2.
H. WEIGHT AND BALANCE

### Page 13

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 13
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air
Inlet Holes
(a) T ask set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Aircraft
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
00.00.00179
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A A350-A-71-60-43-01ZZZ-720Z-A
A350-A-71-60-43-02ZZZ-520Z-A
A350-A-71-60-62-00ZZZ-520Z-A
A350-A-71-60-62-00ZZZ-720Z-A
NON DESTRUCTIVE TEST (NDT)
A350-A-51-99-XX-01ZZZ-040Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-3X-XX-01ZZZ-04CZ-A
VENDOR SERVICE BULLETIN (VSB)
ROHR INC (51563) VSB RA35071-029
(b) T ask set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special Detailed
Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on Bench
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
00.00.00179
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A A350-A-71-60-43-01ZZZ-720Z-A
A350-A-71-60-43-02ZZZ-520Z-A

### Page 14

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 14
MAINTENANCE PROCEDURE (MP)
A350-A-71-60-61-00ZZZ-520Z-A
A350-A-71-60-61-00ZZZ-720Z-A
A350-A-71-60-62-00ZZZ-520Z-A
A350-A-71-60-62-00ZZZ-720Z-A
NON DESTRUCTIVE TEST (NDT)
A350-A-51-99-XX-01ZZZ-040Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-3X-XX-01ZZZ-04CZ-A
VENDOR SERVICE BULLETIN (VSB)
ROHR INC (51563) VSB RA35071-029
K. PUBLICATION AFFECTED
None
L. INDUSTRY SUPPORT INFORMATION
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign. For detailed
support, please refer to the related RIL V54M23000846.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.
For the accomplishment of this Service Bulletin before 31 December 2029, AIRBUS will
credit the man-hours indicated in this Service Bulletin at the agreed in-house warranty labor
rate. Claims for this allowance shall be received no later than 90 days after completion of
the last affected aircraft of your fleet fulfilling above timeframe conditions.

### Page 15

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 15
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-54-XX-P009-04000-93BA-A OPTION 1 - Special
Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on
Aircraft
MATERIAL QTY SEE NOTES
Referenced consumables See SB
Referenced parts See SB
Material for task set A350-A-54-XX-P009-04000-93BB-A OPTION 2 - Special
Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes on
Bench
MATERIAL QTY SEE NOTES
Referenced tools See SB
Referenced consumables See SB
Referenced parts See SB
B. TOOLING
Referenced tools for task set A350-A-54-XX-P009-04000-93BB-A OPTION 2 -
Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Bench
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-71-60-61-00ZZZ-520Z-A
Ref. MP A350-A-71-60-61-00ZZZ-720Z-A
C. CONSUMABLES
Referenced consumables for task set A350-A-54-XX-P009-04000-93BA-A OPTION
1 - Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Aircraft
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. ROHR INC (51563) VSB RA35071-029
Ref. MP A350-A-71-60-62-00ZZZ-720Z-A
Referenced consumables for task set A350-A-54-XX-P009-04000-93BB-A OPTION
2 - Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Bench
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. ROHR INC (51563) VSB RA35071-029
D. LIST OF NEW PARTS
Referenced parts for task set A350-A-54-XX-P009-04000-93BA-A OPTION 1 -
Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Aircraft
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. ROHR INC (51563) VSB RA35071-029
Referenced parts for task set A350-A-54-XX-P009-04000-93BB-A OPTION 2 -
Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Bench

### Page 16

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 16
T o accomplish this Service Bulletin it is necessary to use the expendable parts listed in:
Ref. ROHR INC (51563) VSB RA35071-029
Ref. MP A350-A-71-60-61-00ZZZ-720Z-A
E. LIST OF EXISTING PARTS
No parts

### Page 17

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 17
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-54-XX-P009-04000-93BA-A (A350-A-54-XX-P009-04ZZZ-93BZ-A)
OPTION 1 - Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes
on Aircraft
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower

### Page 18

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 18
TOTAL MAN-HOURS 1.25 h
ELAPSED TIME (HOURS) 0.75 h
Additional man-hours related to Vendor SB; refer to:
ROHR INC (51563) VSB RA35071-029
B. PREPARATION
(1) Task A350-A-54-XX-P009-01001-540A-A (A350-A-54-XX-P009-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 2
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP
A350-A-24-41-XX-00ZZZ-170Z-A
A350-A-71-60-43-02ZZZ-520Z-A
A350-A-71-60-62-00ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Put an access platform in position at engine 1 Zone 411 and engine 2 Zone 421.
(c) Do the removal of the inlet-cowl anti-ice access-panel, refer to Ref. MP A350-A-
71-60-62-00ZZZ-520Z-A.
(d) Do the removal of the P20T20 inlet-cowl access-panel, refer to Ref. MP A350-A-
71-60-43-02ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-54-XX-P009-01001-300A-A (A350-A-54-XX-P009-01ZZZ-300Z-A)
Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 1
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
411
Manpower/Resources/Skills
Man-hours
Minimum Number of person
Elapsed Time
Skills Airframe

### Page 19

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 19
Referenced Information
Manuals/Drawings References/Sheets
NDT A350-A-51-99-XX-01ZZZ-040Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A
VSB ROHR INC (51563) VSB RA35071-029
Procedure
Refer to Ref. Fig.BA Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Engine 1 and Ref. Fig.FA Flow Chart Engine 1.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-
04CZ-A.
2 For the Non Destructive T est (NDT), refer to Ref. NDT A350-A-51-99-XX-
01ZZZ-040Z-A.
(b) At the threshold given in the PLANNING INFORMATION paragraph 1.E.(2):
- Do the special detailled inspection on the air intake forward bulkheads of
the engine 1 in accordance with Ref. ROHR INC (51563) VSB RA35071-029:
NOTE: The engine air inlet cowls Part Number (P/N) and Serial Number (S/N)
references to be inspected have been listed in Ref. ROHR INC (51563)
VSB RA35071-029.
1 If no finding/no damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-01ZZZ-
90AZ-A.
b No further action required for engine 1.
2 If finding/damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-01ZZZ-
90AZ-A.
b Refer to Ref. ROHR INC (51563) VSB RA35071-029, report to COLLINS
Aerospace and follow their instructions.

### Page 20

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VK1-A-002-01 Fig.BA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Inspection on the Air Intake Forward
Bulkheads of 18 Air Inlet Holes on Engine 1 Page 20
CONF ALL
01
NOTE:
DO A SPECIAL DETAILED INSPECTION IN ACCORDANCE
WITH VSB RA35071-029.
Z411
A
INTAKE FWD BULKHEADS
ON THE 18 HOLES
01
INSPECTION ON THE AIR
DO A SPECIAL DETAILED
A
ICN-A350-A-54XXP009-A-FAPE3-06VK1-A-002-01

### Page 21

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VJZ-A-003-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Flow Chart Engine 1
Page 21
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THIS SERVICE BULLETIN.
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
01 FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).
NO FURTHER
ACTION
NO
YES
IS THERE
FINDING/DAMAGE
DETECTED?
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
0101
AEROSPACE
CONTACT COLLINS
DO A SPECIAL DETAILED INSPECTION ON
THE AIR INTAKE FORWARD BULKHEAD OF
01
THE 18 AIR INLET HOLES ON THE ENGINE 1
ICN-A350-A-54XXP009-A-FAPE3-06VJZ-A-003-01

### Page 22

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 22
(2) Task A350-A-54-XX-P009-02001-300A-A (A350-A-54-XX-P009-02ZZZ-300Z-A)
Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 2
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
421
Manpower/Resources/Skills
Man-hours
Minimum Number of person
Elapsed Time
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
NDT A350-A-51-99-XX-01ZZZ-040Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A
VSB ROHR INC (51563) VSB RA35071-029
Procedure
Refer to Ref. Fig.BC Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes on Engine 2 and Ref. Fig.FB Flow Chart Engine 2.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-
04CZ-A.
2 For the NDT, refer to Ref. NDT A350-A-51-99-XX-01ZZZ-040Z-A.
(b) At the threshold given in the PLANNING INFORMATION paragraph 1.E.(2):
- Do the special detailled inspection on the air intake forward bulkheads of
the engine 2 in accordance with Ref. ROHR INC (51563) VSB RA35071-029:
NOTE: The engine air inlet cowls Part Number (P/N) and Serial Number (S/N)
references to be inspected have been listed in Ref. ROHR INC (51563)
VSB RA35071-029.
1 If no finding/no damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-01ZZZ-
90AZ-A.
b No further action required for engine 2.
2 If finding/damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-01ZZZ-
90AZ-A.
b Refer to Ref. ROHR INC (51563) VSB RA35071-029, report to COLLINS
Aerospace and follow their instructions.

### Page 23

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06ZKI-A-001-01 Fig.BC Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Inspection on the Air Intake Forward
Bulkheads of 18 Air Inlet Holes on Engine 2 Page 23
CONF ALL
01
NOTE:
DO A SPECIAL DETAILED INSPECTION IN ACCORDANCE
WITH VSB RA35071-029.
INTAKE FWD BULKHEADS
ON THE 18 HOLES
01
INSPECTION ON THE AIR
DO A SPECIAL DETAILED
Z421
A
A
ICN-A350-A-54XXP009-A-FAPE3-06ZKI-A-001-01

### Page 24

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VJY-A-003-01 Fig.FB Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Flow Chart Engine 2
Page 24
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THIS SERVICE BULLETIN.
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
01 FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).
NO FURTHER
ACTION
NO
YES
IS THERE
FINDING/DAMAGE
DETECTED?
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
0101
AEROSPACE
CONTACT COLLINS
DO A SPECIAL DETAILED INSPECTION ON
THE AIR INTAKE FORWARD BULKHEAD OF
01
THE 18 AIR INLET HOLES ON THE ENGINE 2
ICN-A350-A-54XXP009-A-FAPE3-06VJY-A-003-01

### Page 25

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 25
(3) Task A350-A-54-XX-P009-01001-90AA-A (A350-A-54-XX-P009-01ZZZ-90AZ-A)
Complete and Send the Inspection Report Sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig.RA Inspection Report
Sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.
NOTE: T o send the Inspection Report sheet is not Required for Compliance (RC).

### Page 26

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VJX-A-006-01 Fig.RA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Inspection Report Sheet
Page 26
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES (FC) :
FLIGHT HOURS (FH) :
A350-54-P009
DATE OF INSPECTION :
INSPECTION METHOD : SPECIAL DETAILED
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
INSPECTION ENGINE 1
DAMAGE
YES NO
SN FC
SN FH
(REFER TO VSB RA35071-029 FOR IMPACTED SN AND PN OF AIR INLET COWLS)
SERIAL NUMBER (SN) OF AIR INLET COWL
PART NUMBER (PN) OF AIR INLET COWL
INSPECTION ENGINE 2
DAMAGE
YES NO
SN FC
SN FH
(REFER TO VSB RA35071-029 FOR IMPACTED SN AND PN OF AIR INLET COWLS)
SERIAL NUMBER (SN) OF AIR INLET COWL
PART NUMBER (PN) OF AIR INLET COWL
ICN-A350-A-54XXP009-A-FAPE3-06VJX-A-006-01

### Page 27

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 27
D. PREPARATION FOR TEST
None
E. TEST
None
F. CLOSE-UP
(1) Task A350-A-54-XX-P009-01001-740A-A (A350-A-54-XX-P009-01ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 2
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-71-60-43-01ZZZ-720Z-AA350-A-71-60-62-00ZZZ-720Z-A
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the installation of the inlet-cowl anti-ice access-panel, refer to Ref. MP A350-
A-71-60-62-00ZZZ-720Z-A.
(c) Do the installation of the P20T20 inlet-cowl access-panel, refer to Ref. MP A350-
A-71-60-43-01ZZZ-720Z-A.
(d) Remove the access platform(s).
(e) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-54-XX-P009-03001-90AA-A (A350-A-54-XX-P009-03ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 28

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 28
Task set A350-A-54-XX-P009-04000-93BB-A (A350-A-54-XX-P009-04ZZZ-93BZ-A)
OPTION 2 - Special Detailed Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet Holes
on Bench
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 7.50 h

### Page 29

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 29
ELAPSED TIME (HOURS) 2.50 h
Additional man-hours related to Vendor SB; refer to:
ROHR INC (51563) VSB RA35071-029
B. PREPARATION
(1) Task A350-A-54-XX-P009-02001-540A-A (A350-A-54-XX-P009-02ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 2
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-00ZZZ-170Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Put an access platform in position at engine 1 Zone 411 and engine 2 Zone 421.
(2) Task A350-A-54-XX-P009-03001-540A-A (A350-A-54-XX-P009-03ZZZ-540Z-A)
Remove the Air Inlet Cowl of Engine 1
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
411
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-71-60-43-02ZZZ-520Z-A
A350-A-71-60-61-00ZZZ-520Z-A
A350-A-71-60-62-00ZZZ-520Z-A
Procedure
(a) Put an access platform in position at engine 1 Zone 410.

### Page 30

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 30
(b) Remove the air inlet cowl of the engine 1, refer to Ref. MP A350-A-71-60-61-
00ZZZ-520Z-A.
(c) Do the removal of the P20T20 inlet-cowl access-panel of the engine 1, refer to
Ref. MP A350-A-71-60-43-02ZZZ-520Z-A.
(d) Do the removal of the inlet-cowl anti-ice access-panel, refer to Ref. MP A350-A-
71-60-62-00ZZZ-520Z-A.
(3) Task A350-A-54-XX-P009-04001-540A-A (A350-A-54-XX-P009-04ZZZ-540Z-A)
Remove the Air Inlet Cowl of Engine 2
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
421
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 2
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-71-60-43-02ZZZ-520Z-A
A350-A-71-60-61-00ZZZ-520Z-A
A350-A-71-60-62-00ZZZ-520Z-A
Procedure
(a) Put an access platform in position at engine 2 Zone 420.
(b) Remove the air inlet cowl of the engine 2, refer to Ref. MP A350-A-71-60-61-
00ZZZ-520Z-A.
(c) Do the removal of the P20T20 inlet-cowl access-panel of the engine 2, refer to
Ref. MP A350-A-71-60-43-02ZZZ-520Z-A.
(d) Do the removal of the inlet-cowl anti-ice access-panel, refer to Ref. MP A350-A-
71-60-62-00ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-54-XX-P009-03001-300A-C (A350-A-54-XX-P009-03ZZZ-300Z-C)
Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 1
Job Set-Up Information
Manpower/Resources/Skills
Man-hours
Minimum Number of person
Elapsed Time
Skills Airframe

### Page 31

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 31
Referenced Information
Manuals/Drawings References/Sheets
NDT A350-A-51-99-XX-01ZZZ-040Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A
VSB ROHR INC (51563) VSB RA35071-029
Procedure
Refer to Ref. Fig.BB Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes On Bench and Ref. Fig.FA Flow Chart Engine 1.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-
04CZ-A.
2 For the Non Destructive T est (NDT), refer to Ref. NDT A350-A-51-99-XX-
01ZZZ-040Z-A.
(b) At the threshold given in the PLANNING INFORMATION paragraph 1.E.(2):
- Do the special detailled inspection on the air intake forward bulkheads of
the engine 1 in accordance with Ref. ROHR INC (51563) VSB RA35071-029:
NOTE: The engine air inlet cowls Part Number (P/N) and Serial Number (S/N)
references to be inspected have been listed in Ref. ROHR INC (51563)
VSB RA35071-029.
1 If no finding/no damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-04ZZZ-
90AZ-A.
b No further action required for engine 1.
2 If finding/damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-04ZZZ-
90AZ-A.
b Refer to Ref. ROHR INC (51563) VSB RA35071-029, report to COLLINS
Aerospace and follow their instructions.

### Page 32

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06X9J-A-002-01 Fig.BB Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Inspection on the Air Intake Forward
Bulkheads of 18 Air Inlet Holes On Bench Page 32
CONF ALL
INSPECTION ON THE AIR
INTAKE FWD BULKHEADS
ON THE 18 HOLES
DO A SPECIAL DETAILED
01
NOTE:
DO A SPECIAL DETAILED INSPECTION IN ACCORDANCE
WITH VSB RA35071-029.
ON BENCH
01
ICN-A350-A-54XXP009-A-FAPE3-06X9J-A-002-01

### Page 33

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VJZ-A-003-01 Fig.FA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Flow Chart Engine 1
Page 33
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THIS SERVICE BULLETIN.
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
01 FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).
NO FURTHER
ACTION
NO
YES
IS THERE
FINDING/DAMAGE
DETECTED?
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
0101
AEROSPACE
CONTACT COLLINS
DO A SPECIAL DETAILED INSPECTION ON
THE AIR INTAKE FORWARD BULKHEAD OF
01
THE 18 AIR INLET HOLES ON THE ENGINE 1
ICN-A350-A-54XXP009-A-FAPE3-06VJZ-A-003-01

### Page 34

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 34
(2) Task A350-A-54-XX-P009-04001-300A-C (A350-A-54-XX-P009-04ZZZ-300Z-C)
Do a Special Detailed Inspection on the Air Intake Forward Bulkheads of 18
Air Inlet Holes of the Engine 2
Job Set-Up Information
Manpower/Resources/Skills
Man-hours
Minimum Number of person
Elapsed Time
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
NDT A350-A-51-99-XX-01ZZZ-040Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A
VSB ROHR INC (51563) VSB RA35071-029
Procedure
Refer to Ref. Fig.BB Inspection on the Air Intake Forward Bulkheads of 18 Air Inlet
Holes On Bench and Ref. Fig.FB Flow Chart Engine 2.
(a) Standard Practices given in this procedure:
1 For the identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-
04CZ-A.
2 For the NDT, refer to Ref. NDT A350-A-51-99-XX-01ZZZ-040Z-A.
(b) At the threshold given in the PLANNING INFORMATION paragraph 1.E.(2):
- Do the special detailled inspection on the air intake forward bulkheads of
the engine 2 in accordance with Ref. ROHR INC (51563) VSB RA35071-029:
NOTE: The engine air inlet cowls Part Number (P/N) and Serial Number (S/N)
references to be inspected have been listed in Ref. ROHR INC (51563)
VSB RA35071-029.
1 If no finding/no damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-04ZZZ-
90AZ-A.
b No further action required for engine 2.
2 If finding/damage is detected:
a After completion of all inspections, complete and send the Inspection
Report sheet in accordance with Ref. T ask A350-A-54-XX-P009-04ZZZ-
90AZ-A.
b Refer to Ref. ROHR INC (51563) VSB RA35071-029, report to COLLINS
Aerospace and follow their instructions.

### Page 35

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06X9J-A-002-01 Fig.BB Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Inspection on the Air Intake Forward
Bulkheads of 18 Air Inlet Holes On Bench Page 35
CONF ALL
INSPECTION ON THE AIR
INTAKE FWD BULKHEADS
ON THE 18 HOLES
DO A SPECIAL DETAILED
01
NOTE:
DO A SPECIAL DETAILED INSPECTION IN ACCORDANCE
WITH VSB RA35071-029.
ON BENCH
01
ICN-A350-A-54XXP009-A-FAPE3-06X9J-A-002-01

### Page 36

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VJY-A-003-01 Fig.FB Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Flow Chart Engine 2
Page 36
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THIS SERVICE BULLETIN.
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
01 FOR THE ACCOMPLISHMENT TIMESCALE, REFER TO PARAGRAPH 1.E.(2).
NO FURTHER
ACTION
NO
YES
IS THERE
FINDING/DAMAGE
DETECTED?
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
REPORT AND SEND
THE COMPLETED
INSPECTION 
REPORT SHEET
0101
AEROSPACE
CONTACT COLLINS
DO A SPECIAL DETAILED INSPECTION ON
THE AIR INTAKE FORWARD BULKHEAD OF
01
THE 18 AIR INLET HOLES ON THE ENGINE 2
ICN-A350-A-54XXP009-A-FAPE3-06VJY-A-003-01

### Page 37

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 37
(3) Task A350-A-54-XX-P009-04001-90AA-A (A350-A-54-XX-P009-04ZZZ-90AZ-A)
Complete and Send the Inspection Report Sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Report sheet, refer to Ref. Fig.RA Inspection Report
Sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.
NOTE: T o send the Inspection Report sheet is not Required for Compliance (RC).

### Page 38

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP009-A-FAPE3-06VJX-A-006-01 Fig.RA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Inspection Report Sheet
Page 38
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES (FC) :
FLIGHT HOURS (FH) :
A350-54-P009
DATE OF INSPECTION :
INSPECTION METHOD : SPECIAL DETAILED
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
INSPECTION ENGINE 1
DAMAGE
YES NO
SN FC
SN FH
(REFER TO VSB RA35071-029 FOR IMPACTED SN AND PN OF AIR INLET COWLS)
SERIAL NUMBER (SN) OF AIR INLET COWL
PART NUMBER (PN) OF AIR INLET COWL
INSPECTION ENGINE 2
DAMAGE
YES NO
SN FC
SN FH
(REFER TO VSB RA35071-029 FOR IMPACTED SN AND PN OF AIR INLET COWLS)
SERIAL NUMBER (SN) OF AIR INLET COWL
PART NUMBER (PN) OF AIR INLET COWL
ICN-A350-A-54XXP009-A-FAPE3-06VJX-A-006-01

### Page 39

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 39
D. PREPARATION FOR TEST
(1) Task A350-A-54-XX-P009-01001-720A-A (A350-A-54-XX-P009-01ZZZ-720Z-A)
Install the Air Inlet Cowl of the Engine 1
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
411
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-71-60-43-01ZZZ-720Z-A
A350-A-71-60-61-00ZZZ-720Z-A
A350-A-71-60-62-00ZZZ-720Z-A
Procedure
(a) Do the installation of the P20T20 inlet-cowl access-panel of the engine 1, refer to
Ref. MP A350-A-71-60-43-01ZZZ-720Z-A.
(b) Do the installation of the inlet-cowl anti-ice access-panel, refer to Ref. MP A350-
A-71-60-62-00ZZZ-720Z-A.
(c) Install the air inlet cowl of the engine 1, refer to Ref. MP A350-A-71-60-61-00ZZZ-
720Z-A.
(2) Task A350-A-54-XX-P009-02001-720A-A (A350-A-54-XX-P009-02ZZZ-720Z-A)
Install the Air Inlet Cowl of the Engine 2
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
421
Manpower/Resources/Skills
Man-hours 2.00 h
Minimum Number of person 2
Elapsed Time 1.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP
A350-A-71-60-43-01ZZZ-720Z-A
A350-A-71-60-61-00ZZZ-720Z-A
A350-A-71-60-62-00ZZZ-720Z-A

### Page 40

A350
SERVICE BULLETIN
REV 00 Dec 22/23 A350-54-P009
Page 40
Procedure
(a) Do the installation of the P20T20 inlet-cowl access-panel of the engine 2, refer to
Ref. MP A350-A-71-60-43-01ZZZ-720Z-A.
(b) Do the installation of the inlet-cowl anti-ice access-panel, refer to Ref. MP A350-
A-71-60-62-00ZZZ-720Z-A.
(c) Install the air inlet cowl of the engine 2, refer to Ref. MP A350-A-71-60-61-00ZZZ-
720Z-A.
E. TEST
(1) Task A350-A-54-XX-P009-01001-345A-A (A350-A-54-XX-P009-01ZZZ-345Z-A)
Test
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-71-60-61-00ZZZ-720Z-A
Procedure
(a) Remove the safety clips and tags, close the circuit breakers as specified after the
installation of the air inlet cowl, refer Ref. MP A350-A-71-60-61-00ZZZ-720Z-A.
(b) Do the test after the installation of the air inlet cowl, refer Ref. MP A350-A-71-60-
61-00ZZZ-720Z-A.
F. CLOSE-UP
(1) Task A350-A-54-XX-P009-02001-740A-A (A350-A-54-XX-P009-02ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 2
Elapsed Time 0.25 h
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-54-XX-P009-02001-90AA-A (A350-A-54-XX-P009-02ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 41

A350
SERVICE BULLETIN
APPENDIX
REV 00 Dec 22/23 A350-54-P009
Page 41
APPENDIX
A. Manpower Gantt Chart Option 1
Manpower Gantt Chart Option 1
For an explanation of the man-hours and elapsed time, refer to the next page(s).

### Page 42

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-54XXP009-A-FAPE3-06WOZ-A-001-01 Fig.AA Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Manpower Gantt Chart Option 1
Page 42
CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A350-54-P009
JOB SET-UP 0.50 0.252
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
1.25
0.75
STEPS
0
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
:
:
SB ELAPSED TIME
(HOURS)
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
0.25 0.251
CLOSE-UP 0.50 0.252
DO A SPECIAL DETAILED INSPECTION
ON ENGINE 1
IN ACCORDANCE WITH VSB
IN ACCORDANCE WITH VSBDO A SPECIAL DETAILED INSPECTION
ON ENGINE 2
COMPLETE AND SEND THE INSPECTION
REPORT SHEET
1
ICN-A350-A-54XXP009-A-FAPE3-06WOZ-A-001-01

### Page 43

A350
SERVICE BULLETIN
APPENDIX
REV 00 Dec 22/23 A350-54-P009
Page 43
B. Manpower Gantt Chart Option 2
Manpower Gantt Chart Option 2
For an explanation of the man-hours and elapsed time, refer to the next page(s).

### Page 44

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-54XXP009-A-FAPE3-06WOY-A-002-01 Fig.AB Sol.AA SHEET 1/1
REV 00 Dec 22/23 A350-54-P009Manpower Gantt Chart Option 2
Page 44
CONF ALL
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A350-54-P009
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
7.50
2.50
STEPS
0
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
:
:
SB ELAPSED TIME
(HOURS)
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
IN ACCORDANCE WITH VSB
IN ACCORDANCE WITH VSB
0.50 0.252JOB SET-UP
1.00 0.502
1.00 0.502
DO A SPECIAL DETAILED INSPECTION
ON ENGINE 1
DO A SPECIAL DETAILED INSPECTION
ON ENGINE 2
0.25 0.251
2.00 1.002
2.00 1.002
0.25 0.251TEST
0.252CLOSE-UP
COMPLETE AND SEND THE INSPECTION
REPORT SHEET
INSTALL THE AIR INLET COWL OF
ENGINE 1
INSTALL THE AIR INLET COWL OF
ENGINE 2
REMOVE THE AIR INLET COWL OF
ENGINE 1
REMOVE THE AIR INLET COWL OF
ENGINE 2
0.50
1 2 3
ICN-A350-A-54XXP009-A-FAPE3-06WOY-A-002-01

### Page 45

A350
SERVICE BULLETIN
APPENDIX
REV 00 Dec 22/23 A350-54-P009
Page 45
C. REPORTING SHEET
TITLE: NACELLES / PYLONS - AIR INTAKE COWL - INSPECTION - AIR INTAKE
FWD BULKHEADS ELONGATED HOLES
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 46

A350
SERVICE BULLETIN
APPENDIX
REV 00 Dec 22/23 A350-54-P009
Page 46
D. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
