# Airbus Service Bulletin A350-54-P011

Copy: No revision named ("SB A350-54-P011"), 40 pages: PDF https://openairdocs.org/files/sha256/82/5f/825ff01c14fe16fc78fd55d5f03d0ad26a1af0ae1f116fca69cd7171771e9f65; text https://openairdocs.org/service-documents/airbus/a350-54-p011/file/825ff01c14fe.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2025-0628; AD 2025-14-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-54-P011
- Page: https://openairdocs.org/service-documents/airbus/a350-54-p011

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2025-14-06](https://openairdocs.org/ad/2025-14-06.md), effective Aug 25, 2025: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/a350-54-p011/proposed.md).

## Text (40 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2025-0628; AD 2025-14-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 54
TITLE: NACELLES / PYLONS - PYLONS - INSPECTION OF RIB 9 SPOT FACES
MODIFICATION No.:
None

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jul 04/24 A350-54-P011
Page 2
ATA SYSTEM: 54
TITLE: NACELLES / PYLONS - PYLONS - INSPECTION OF RIB 9 SPOT FACES
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
In production line, one too deep spot face was detected on pylon Rib 9 at lower flange
bolting with the lower spar. During root cause investigation it has been noticed that
other areas could be potentially affected. A too deep spot face on any of both external
Rib 9 holes leads to a reduced fatigue life with a potential unsafe condition that cannot
be ruled out. A production quality check has been conducted to conclude that the
batch of aircraft included in the applicability list of this Service Bulletin are potentially
impacted.
(2) Objective/Action
The objective of this Inspection Service Bulletin is to detect the potential too deep spot
faces on the Pylon Rib 9 (2 bolts per pylon), to provide the inspection tasks and to
contact Airbus with the inspection results thru inspection report sheet.
(3) Advantages
The implementation of this Service Bulletin on the affected A/C will avoid further
repairs to be necessary to be performed due to a reduced fatigue life of the pylon
attachment.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB NO
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Jul 04/24 A350-54-P011
Page 3
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Inspection of Rib 9
(a) T ask set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET QTYPER A/C PRICE PER A/C MAIN PARTS
T ool kit 54P011T01R00 1 See SB GO-NoGO Gauges
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
AAR CAL CCA CES CPA CSC DAL DLH EDW ETH FBU FIN FWI HVN IBE ITY MAS MAU PAL QTR
SIA THA
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Inspection of Rib 9
(a) T ask set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
AIRCRAFT YES
EQUIPMENT NO
I. MANPOWER
(1) Inspection of Rib 9
(a) T ask set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
MANPOWER
TOTAL MAN-HOURS 7.25 h
ELAPSED TIME (HOURS) 4.75 h

### Page 4

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERW-A-001-01 Fig.SA Sol.AA SHEET 1/2
REV 00 Jul 04/24 A350-54-P011General overview
Page 4
J. GENERAL OVERVIEW
CONF ALL
A
B
Z460
Z450
A
B
C
C
ICN-A350-A-54XXP011-A-FAPE3-07ERW-A-001-01

### Page 5

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERX-A-003-01 Fig.SA Sol.AA SHEET 2/2
REV 00 Jul 04/24 A350-54-P011General overview
Page 5
CONF ALL
C
LH SHOWN
D
LH SHOWN
RH IDENTICAL
VIEW LOOKING FWD
INBD
RIB9
DO A SPECIAL DETAILED 
INSPECTION OF THE TWO 
SPOT FACES OF RIB 9
D
RH IDENTICAL
ICN-A350-A-54XXP011-A-FAPE3-07ERX-A-003-01

### Page 6

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 6
ATA SYSTEM: 54
TITLE: NACELLES / PYLONS - PYLONS - INSPECTION OF RIB 9 SPOT FACES
1. PLANNING INFORMATION
A. APPLICABILITY
(1) Models
ON A/C 0102, 0161, 0215, 0262
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089, 0091-0101, 0103-0107, 0109,
0111-0116, 0120-0122, 0124, 0126-0128, 0130, 0132, 0134-0138, 0140, 0142, 0144-0146,
0148-0151, 0154, 0155, 0157-0159, 0162, 0163, 0165, 0167, 0168, 0170, 0172, 0173, 0175,
0177, 0179-0181, 0183, 0186, 0187, 0190-0193, 0195-0205, 0207-0210, 0212-0214, 0216-
0221, 0223, 0224, 0226-0228, 0230-0232, 0234-0239, 0243-0246, 0248-0250, 0254-0256,
0259, 0263-0265, 0267-0273, 0276-0281, 0283, 0284, 0287
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0064 0066-0070 0072-0087 0089 0091-0107 0109 0111-0116 0120-
0122 0124 0126-0128 0130 0132 0134-0138 0140 0142 0144-0146 0148-0151 0154
0155 0157-0159 0161-0163 0165 0167 0168 0170 0172 0173 0175 0177 0179-0181
0183 0186 0187 0190-0193 0195-0205 0207-0210 0212-0221 0223 0224 0226-0228
0230-0232 0234-0239 0243-0246 0248-0250 0254-0256 0259 0262-0265 0267-0273
0276-0281 0283 0284 0287
(3) MSN by configuration
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0066 0067 0068 0069 0070 0072 0073
0074 0075 0076 0077 0078 0079 0080 0081 0082 0083 0084
0085 0086 0087 0089 0091 0092 0093 0094 0095 0096 0097
0098 0099 0100 0101 0102 0103 0104 0105 0106 0107 0109
0111 0112 0113 0114 0115 0116 0120 0121 0122 0124 0126
0127 0128 0130 0132 0134 0135 0136 0137 0138 0140 0142
0144 0145 0146 0148 0149 0150 0151 0154 0155 0157 0158
0159 0161 0162 0163 0165 0167 0168 0170 0172 0173 0175
0177 0179 0180 0181 0183 0186 0187 0190 0191 0192 0193
0195 0196 0197 0198 0199 0200 0201 0202 0203 0204 0205
0207 0208 0209 0210 0212 0213 0214 0215 0216 0217 0218
0219 0220 0221 0223 0224 0226 0227 0228 0230 0231 0232
0234 0235 0236 0237 0238 0239 0243 0244 0245 0246 0248
0249 0250 0254 0255 0256 0259 0262 0263 0264 0265 0267
0268 0269 0270 0271 0272 0273 0276 0277 0278 0279 0280
0281 0283 0284 0287
001
(4) Configuration definition

### Page 7

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 7
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
In production line, one too deep spot face was detected on pylon Rib 9 at lower flange
bolting with the lower spar. During root cause investigation it has been noticed that
other areas could be potentially affected. A too deep spot face on any of both external
Rib 9 holes leads to a reduced fatigue life with a potential unsafe condition that cannot
be ruled out. A production quality check has been conducted to conclude that the
batch of aircraft included in the applicability list of this Service Bulletin are potentially
impacted.
(2) Objective/Action
The objective of this Inspection Service Bulletin is to detect the potential too deep spot
faces on the Pylon Rib 9 (2 bolts per pylon), to provide the inspection tasks and to
contact Airbus with the inspection results thru inspection report sheet.
(3) Advantages
The implementation of this Service Bulletin on the affected A/C will avoid further
repairs to be necessary to be performed due to a reduced fatigue life of the pylon
attachment.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Inspection of Rib 9
(a) T ask set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
1 Do a Special Detailed Inspection of the Spot Faces on Rib 9 LH
2 Do a Special Detailed Inspection of the Spot Faces on Rib 9 RH
3 Complete the Inspection Report
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Union Aviation Safety Agency
(EASA) will be issued to confirm this classification. It is anticipated that the AD will
confirm the thresholds given but reference should be made to the AD for confirmation
of the mandated accomplishment timescale.
Accomplishment of this Service Bulletin must be done as defined in the below table:
NOTE: It is recommended to perform this Service Bulletin at the opportunity of an
engine overhaul or engine replacement.

### Page 8

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 8
T able 01, CONF ALL — Do a Special Detailed Inspection (SDI) of the condition of the
spot faces.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
All Aircraft Do a Special
Detailed
Inspection (SDI)
of the condition
of the spot faces
18000 Flight
Cycle(s) from
aircraft entry
into service.
None None
One or both
of the spot
faces are in
bad condition
Contact AIRBUS
and follow their
instructions
Before next flight None None
The spot faces
are in good
condition
Do an SDI of
the spot face
depths with GO-
NoGO Gauge
No. 1. Continue
to T able 02.
Before next flight None None
T able 02, CONF ALL — Do an SDI of the spot face depths with GO-NoGO Gauge No. 1.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
The spot faces
are in good
condition
Use GO-NoGO
Gauge No. 1 to
measure the
spot face depths
Before next flight None None
GO is confirmed
when GO-
NoGO Gauge
No. 1 is used
Send report
to AIRBUS
Upon completion
of inspection
None None
AND None None None
No further action None None None
GO is not
confirmed when
GO-NoGO Gauge
No. 1 is used
Do an SDI of
the spot faces
depths with GO-
NoGO Gauge
No. 2. Continue
to T able 03.
Before next flight None None
T able 03, CONF ALL — Do an SDI of the spot face depths with GO-NoGO Gauge No. 2.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
GO is not
confirmed when
GO-NoGO Gauge
No. 1 is used
Use GO-NoGO
Gauge No. 2 to
measure the
spot face depths
Before next flight None None
GO is confirmed
when GO-
Get a picture
of the Go-
Upon completion
of inspection
None None

### Page 9

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 9
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
NoGO Gauge
No. 2 is used
NoGO Gauge
No. 2 installed
AND None None None
Send report
to AIRBUS
Upon completion
of inspection
None None
AND None None None
Contact AIRBUS
for more
inspections
to be done
Upon completion
of inspection
None None
AND None None None
Do more
inspections
provided
by Airbus
3000 Flight
Cycle(s) from
completion
of inspection
None None
GO is not
confirmed when
GO-NoGO Gauge
No. 2 is used
Get a picture
of the Go-
NoGO Gauge
No. 2 installed
Upon completion
of inspection
None None
AND None None None
Do an SDI of
the spot faces
depths with GO-
NoGO Gauge
No. 3. Continue
to T able 04.
Before next flight None None
T able 04, CONF ALL — Do an SDI of the spot face depths with GO-NoGO Gauge No. 3.
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
GO is not
confirmed when
GO-NoGO Gauge
No. 2 is used
Use GO-NoGO
Gauge No. 3 to
measure the
spot face depths
Before next flight None None
GO is confirmed
when GO-
NoGO Gauge
No. 3 is used
Get a picture
of the Go-
NoGO Gauge
No. 3 installed
Upon completion
of inspection
None None
AND None None None
Send report
to AIRBUS
Upon completion
of inspection
None None
AND None None None
Contact AIRBUS
for more
inspections
to be done
Upon completion
of inspection
None None
AND None None None

### Page 10

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 10
COMPLIANCE TIME
CONDITIONS ACTION
THRESHOLD GRACE PERIOD
REPETITIVE
INTERVAL
Do more
inspections
provided
by Airbus
3000 Flight
Cycle(s) from
Completion
of inspection
None None
GO is not
confirmed when
GO-NoGO Gauge
No. 3 is used
Get a picture
of the Go-
NoGO Gauge
No. 3 installed
Upon completion
of inspection
None None
AND None None None
Contact AIRBUS
with report and
follow their
instructions
Before next flight None None
F. APPROVAL
The technical content of this document is approved under the authority of the Design
Organisation Approval ref. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Inspection of Rib 9
(a) T ask set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
PREPARATION
Job Set-up 1.00 h
Get Access to Rib 9 LH 0.50 h
Get Access to Rib 9 RH 0.50 h
PROCEDURE
Do a Special Detailed Inspection of the Spot Faces on Rib 9
LH
1.00 h
Do a Special Detailed Inspection of the Spot Faces on Rib 9
RH
1.00 h
Complete the Inspection Report 0.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP

### Page 11

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 11
Close Access to Rib 9 LH 1.00 h
Close Access to Rib 9 RH 1.00 h
Close-up 1.00 h
TOTAL MAN-HOURS 7.25 h
ELAPSED TIME (HOURS) 4.75 h
NOTE: For an explanation of the man-hours and elapsed time, refer to the
Gantt Chart given in Appendix A.
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Inspection of Rib 9
(a) T ask set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
CONSUMABLE MATERIAL LIST (CML)
See manual
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
00.00.00179
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A A350-A-54-52-61-00ZZZ-520Z-A
A350-A-54-52-61-00ZZZ-720Z-A
NON DESTRUCTIVE TEST (NDT)
A350-A-51-99-XX-01ZZZ-040Z-A
SYSTEM DESCRIPTION (SD)
A350-A-06-3X-XX-01ZZZ-04CZ-A
TECHNICAL FOLLOW UP (TFU)
54.50.00020
K. PUBLICATION AFFECTED
TOOL EQUIPMENT MANUAL (TEM)
See manual
L. INDUSTRY SUPPORT INFORMATION

### Page 12

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 12
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign. For detailed
support, please refer to the related RIL V54M24001071.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 13

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 13
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9
MATERIAL QTY SEE NOTES
T ool kit 54P011T01R00 1
Referenced tools See SB
Consumables See SB
Referenced consumables See SB
B. TOOLING
Tool kit 54P011T01R00
Availability 090 d (calendar days from receipt of order)
Procurement address
D4296
AIRBUS Material, Logistics and Suppliers
Customer Order Fulfilment
Weg beim Jaeger 150
22335 HAMBURG
GERMANY
Phone: +49 (0) 40 50 76 40 02
E-mail: Please contact your Single Point Of Contact
(SPOC)
Internet: http://spares.airbus.com
D4296
AIRBUS Material, Logistics and Suppliers
Weg beim Jaeger 150
22335 HAMBURG
GERMANY
Fax: +49 40 50 76 3225
E-mail: T ool.LEASE@airbus.com
Internet: http://spares.airbus.com
NOTE(S)
Customers with aircraft shown in the applicability of this Service Bulletin should send
a purchase order to AIRBUS at the address given above and quote the number of this
Service Bulletin.
Operators interested in the lease of standard tools should contact AIRBUS at the
address given above.
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
98V54003001000 1 GAUGE (1)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
Referenced tools for task set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib
9
T o accomplish this Service Bulletin it is necessary to use the tools listed in:
Ref. MP A350-A-54-52-61-00ZZZ-520Z-A
Ref. MP A350-A-54-52-61-00ZZZ-720Z-A
C. CONSUMABLES
Consumables for task set A350-A-54-XX-P011-01000-93BA-A Inspection of Rib 9

### Page 14

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 14
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced consumables for task set A350-A-54-XX-P011-01000-93BA-A
Inspection of Rib 9
T o accomplish this Service Bulletin it is necessary to use the consumable materials listed in:
Ref. MP A350-A-54-52-61-00ZZZ-720Z-A
D. LIST OF NEW PARTS
No parts
E. LIST OF EXISTING PARTS
No parts

### Page 15

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 15
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-54-XX-P011-01000-93BA-A (A350-A-54-XX-P011-01ZZZ-93BZ-A)
Inspection of Rib 9
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO A MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-XX-01ZZZ-
042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including Required for Compliance paragraph
contained herein, contact AIRBUS for further instructions and approval.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 7.25 h

### Page 16

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 16
ELAPSED TIME (HOURS) 4.75 h
B. PREPARATION
(1) Task A350-A-54-XX-P011-01001-540A-A (A350-A-54-XX-P011-01ZZZ-540Z-A)
Job Set-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-00ZZZ-170Z-AA350-A-54-52-61-00ZZZ-520Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-A-00-61-04-
11ZZZ-018Z-D “Maintenance Procedure - Introduction” in Manual Front Matter
section.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-A-24-
41-XX-00ZZZ-170Z-A.
(b) Do the Job Set-up procedure as specified in the Removal of the Forward Fairing
Access-Panels, refer to Ref. MP A350-A-54-52-61-00ZZZ-520Z-A.
(2) Task A350-A-54-XX-P011-02001-540A-A (A350-A-54-XX-P011-02ZZZ-540Z-A)
Get Access to Rib 9 LH
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-54-52-61-00ZZZ-520Z-A
Procedure
(a) Remove the Access Panel 453GL for access, refer to Ref. MP A350-A-54-52-61-
00ZZZ-520Z-A.
(3) Task A350-A-54-XX-P011-03001-540A-A (A350-A-54-XX-P011-03ZZZ-540Z-A)
Get Access to Rib 9 RH

### Page 17

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 17
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.50 h
Minimum Number of person 1
Elapsed Time 0.50 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-54-52-61-00ZZZ-520Z-A
Procedure
(a) Remove the Access Panel 463FL for access, refer to Ref. MP A350-A-54-52-61-
00ZZZ-520Z-A.
C. PROCEDURE
(1) Task A350-A-54-XX-P011-01001-346A-A (A350-A-54-XX-P011-01ZZZ-346Z-A)
Do a Special Detailed Inspection of the Spot Faces on Rib 9 LH
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
450 Access Panel 453GL
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Skills Airframe
Material necessary to do the job
Tool kit 54P011T01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
98V54003001000 1 GAUGE (1)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
NDT A350-A-51-99-XX-01ZZZ-040Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A

### Page 18

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 18
Manuals/Drawings References/Sheets
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
Ref. Fig.BA Do a Special Detailed Inspection of the Spot Faces on Rib 9 LH
Ref. Fig.FA Flow Chart
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
(b) Clean the two spot faces with a non-metallic scraper, refer to Sheet 02, View C:
with:
  T extile - Lint free Cotton14SBA1  
made moist with:
  Non Aqueous Cleaner -
General
08BAA9  
(c) Do a Special Detailed Inspection (SDI) of the condition of the two spot faces,
refer to Ref. NDT A350-A-51-99-XX-01ZZZ-040Z-A and Sheet 02, View C:
1 If one or both spot faces are in bad condition:
NOTE: A bad condition is specified by these possible conditions: the
washer is not correctly aligned with the nut, cracks, scratches,
corrosion, damage or missing hardware.
a Contact AIRBUS before next flight and follow their instructions.
2 If the two spot faces are in good condition:
NOTE: A good condition is specified by these possible conditions: the
washer is correctly aligned with the nut, no cracks, no scratches,
no corrosion, no damage and no missing hardware.
a Continue to the next SDI to measure the spot face depth.
(d) Do an SDI of the two spot faces to measure the spot face depth, refer to Sheet
03, View D and View E:
NOTE: GO condition is confirmed if the line on the GO-NoGO Gauge is seen.
1 Measure the spot face depth of the two spot faces. Use ASSY GAUGE RIB 9
STEP 1 98V54003001040 supplied by:
1 GO/NO GO GAUGES RIB
9
98V54003001000  
NOTE: Make sure the gauge is fully in contact with the bottom of the spot
face.
a If GO is confirmed:
<1> After completion of all inspections, complete and send the
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A.
b If GO is not confirmed:

### Page 19

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 19
<1> Continue to next step with ASSY GAUGE RIB 9 STEP 2
98V54003001042.
2 Measure the spot face depth of the two spot faces. Use ASSY GAUGE RIB 9
STEP 2 98V54003001042 supplied by:
1 GO/NO GO GAUGES RIB
9
98V54003001000  
NOTE: Make sure the gauge is fully in contact with the bottom of the spot
face.
a If GO is confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 2 installed and send it
with the Inspection Report sheet.
<2> Contact AIRBUS for more inspections to be done in accordance
with the threshold given in PLANNING INFORMATION paragraph
E.(2).
<3> After completion of all inspections, complete and send the
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A.
b If GO is not confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 2 installed and send it
with the Inspection Report sheet.
<2> Continue to next step with ASSY GAUGE RIB 9 STEP 3
98V54003001044.
3 Measure the spot face depth of the two spot faces. Use ASSY GAUGE RIB 9
STEP 3 98V54003001044 supplied by:
1 GO/NO GO GAUGES RIB
9
98V54003001000  
NOTE: Make sure the gauge is fully in contact with the bottom of the spot
face.
a If GO is confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 3 installed and send it
with the Inspection Report sheet.
<2> Contact AIRBUS for more inspections to be done in accordance
with the threshold given in PLANNING INFORMATION paragraph
E.(2).
<3> After completion of all inspections, complete and send the
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A.
b If GO is not confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 3 installed and send it
with the Inspection Report sheet.
<2> Contact AIRBUS before next flight with the completed
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A and follow their instructions.

### Page 20

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ES3-A-001-01 Fig.BA Sol.AA SHEET 1/3
REV 00 Jul 04/24 A350-54-P011Do a Special Detailed Inspection of the Spot Faces on Rib 9 LH
Page 20
CONF ALL
A
Z450
A
B
ICN-A350-A-54XXP011-A-FAPE3-07ES3-A-001-01

### Page 21

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ES4-A-001-01 Fig.BA Sol.AA SHEET 2/3
REV 00 Jul 04/24 A350-54-P011Do a Special Detailed Inspection of the Spot Faces on Rib 9 LH
Page 21
CONF ALL
B
C
VIEW LOOKING FWD
INBD
RIB9
E
C
D
ICN-A350-A-54XXP011-A-FAPE3-07ES4-A-001-01

### Page 22

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ES5-A-003-01 Fig.BA Sol.AA SHEET 3/3
REV 00 Jul 04/24 A350-54-P011Do a Special Detailed Inspection of the Spot Faces on Rib 9 LH
Page 22
CONF ALL
D
VIEW LOOKING FWD
INBD
 E
VIEW LOOKING FWD
INBD
TYPICAL VIEW
TYPICAL VIEW
RIB9 RIB9
GO-NoGO GAUGE
VIEW WITHOUT GO-NoGO GAUGE
VIEW LOOKING FWD INBD
TYPICAL VIEW
01
GO CONDITION IS CONFIRMED IF THE LINE ON THE GO-NoGO GAUGE IS SEEN01
NOTE:
SPOT FACE DEPTH
GO-NoGO GAUGE
RIB9
ICN-A350-A-54XXP011-A-FAPE3-07ES5-A-003-01

### Page 23

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERU-A-002-01 Fig.FA Sol.AA SHEET 1/2
REV 00 Jul 04/24 A350-54-P011Flow Chart
Page 23
CONF ALL
CLEAN THE SPOT FACES OF RIB 9
DO A SPECIAL DETAILED INSPECTION OF
THE CONDITION OF THE SPOT FACES
ARE THE TWO
SPOT FACES IN GOOD
CONDITION?
NO
CONTACT AIRBUS FOR
BEFORE NEXT FLIGHT,
FURTHER INSTRUCTIONS
YES
INSPECTION OF THE SPOT
DO A SPECIAL DETAILED
FACES WITH GO-NoGO
GAUGE No. 1
IS GO CONFIRMED
FOR GO-NoGO GAUGE
No. 1?
NO
INSPECTION OF THE SPOT
DO A SPECIAL DETAILED
FACES WITH GO-NoGO
GAUGE No. 2
YES
TO AIRBUS
SEND INSPECTION RESULTS
NO FURTHER ACTION
A
NOTE:
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
ICN-A350-A-54XXP011-A-FAPE3-07ERU-A-002-01

### Page 24

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERV-A-004-01 Fig.FA Sol.AA SHEET 2/2
REV 00 Jul 04/24 A350-54-P011Flow Chart
Page 24
CONF ALL
IS GO CONFIRMED
FOR GO-NoGO GAUGE
No. 2?
NO
A
YES
TO AIRBUS
SEND INSPECTION RESULTS
FURTHER INSPECTIONS TO BE
CONTACT AIRBUS FOR 
PERFORMED IN ACCORDANCE
WITH THE THRESHOLDS GIVEN
IN PARAGRAPH 1.E.(2)
IS GO CONFIRMED
FOR GO-NoGO GAUGE
No. 3?
YES
CONTACT AIRBUS WITH THE
BEFORE NEXT FLIGHT,
INSPECTION RESULTS FOR
FURTHER INSTRUCTIONS
NOTE:
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
INSPECTION OF THE SPOT
DO A SPECIAL DETAILED
FACES WITH GO-NoGO
GAUGE No. 3
GO-NoGO GAUGE No. 2
GET A PICTURE OF THE
INSTALLED
GO-NoGO GAUGE No. 2
GET A PICTURE OF THE
INSTALLED
GO-NoGO GAUGE No. 3
GET A PICTURE OF THE
INSTALLED
GO-NoGO GAUGE No. 3
GET A PICTURE OF THE
INSTALLED
NO
ICN-A350-A-54XXP011-A-FAPE3-07ERV-A-004-01

### Page 25

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 25
(2) Task A350-A-54-XX-P011-02001-346A-A (A350-A-54-XX-P011-02ZZZ-346Z-A)
Do a Special Detailed Inspection of the Spot Faces on Rib 9 RH
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
460 Access Panel 463FL
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Skills Airframe
Material necessary to do the job
Tool kit 54P011T01R00
ITEM PART No. QTY (UM) KEYWORD DRAWING SEE NOTES
98V54003001000 1 GAUGE (1)
NOTE(S)
(1): AIRBUS tool kits cannot be ordered as a complete set. For the necessary tools, send
an order for each single item through the given channel.
Consumables
ITEM REFERENCE CML DESCRIPTION DRAWING SEE NOTES
08BAA9 Non Aqueous Cleaner -General
14SBA1 T extile - Lint free Cotton
Referenced Information
Manuals/Drawings References/Sheets
NDT A350-A-51-99-XX-01ZZZ-040Z-A
SD A350-A-06-3X-XX-01ZZZ-04CZ-A
CML CONSUMABLE MATERIAL LIST (CML)
Procedure
Ref. Fig.BB Do a Special Detailed Inspection of the Spot Faces on Rib 9 RH
Ref. Fig.FA Flow Chart
(a) Standard Practices given in this procedure:
1 For identification of zones, refer to Ref. SD A350-A-06-3X-XX-01ZZZ-04CZ-A.
2 For the specification of Material application codes given in this Service
Bulletin, refer to Ref. CML.
(b) Clean the two spot faces with a non-metallic scraper, refer to Sheet 02, View C:
with:
  T extile - Lint free Cotton14SBA1  
made moist with:
  Non Aqueous Cleaner -
General
08BAA9

### Page 26

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 26
(c) Do a Special Detailed Inspection (SDI) of the condition of the two spot faces,
refer to Ref. NDT A350-A-51-99-XX-01ZZZ-040Z-A and Sheet 02, View C:
1 If one or both spot faces are in bad condition:
NOTE: A bad condition is specified by these possible conditions: the
washer is not correctly aligned with the nut, cracks, scratches,
corrosion, damage or missing hardware.
a Contact AIRBUS before next flight and follow their instructions.
2 If the two spot faces are in good condition:
NOTE: A good condition is specified by these possible conditions: the
washer is correctly aligned with the nut, no cracks, no scratches,
no corrosion, no damage and no missing hardware.
a Continue to the next SDI to measure the spot face depth.
(d) Do an SDI of the two spot faces to measure the spot face depth, refer to Sheet
03, View D and View E:
NOTE: GO condition is confirmed if the line on the GO-NoGO Gauge is seen.
1 Measure the spot face depth of the two spot faces. Use ASSY GAUGE RIB 9
STEP 1 98V54003001040 supplied by:
1 GO/NO GO GAUGES RIB
9
98V54003001000  
NOTE: Make sure the gauge is fully in contact with the bottom of the spot
face.
a If GO is confirmed:
<1> After completion of all inspections, complete and send the
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A.
b If GO is not confirmed:
<1> Continue to next step with ASSY GAUGE RIB 9 STEP 2
98V54003001042.
2 Measure the spot face depth of the two spot faces. Use ASSY GAUGE RIB 9
STEP 2 98V54003001042 supplied by:
1 GO/NO GO GAUGES RIB
9
98V54003001000  
NOTE: Make sure the gauge is fully in contact with the bottom of the spot
face.
a If GO is confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 2 installed and send it
with the Inspection Report sheet.
<2> Contact AIRBUS for more inspections to be done in accordance
with the threshold given in PLANNING INFORMATION paragraph
E.(2).

### Page 27

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 27
<3> After completion of all inspections, complete and send the
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A.
b If GO is not confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 2 installed and send it
with the Inspection Report sheet.
<2> Continue to next step with ASSY GAUGE RIB 9 STEP 3
98V54003001044.
3 Measure the spot face depth of the two spot faces. Use ASSY GAUGE RIB 9
STEP 3 98V54003001044 supplied by:
1 GO/NO GO GAUGES RIB
9
98V54003001000  
NOTE: Make sure the gauge is fully in contact with the bottom of the spot
face.
a If GO is confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 3 installed and send it
with the Inspection Report sheet.
<2> Contact AIRBUS for more inspections to be done in accordance
with the threshold given in PLANNING INFORMATION paragraph
E.(2).
<3> After completion of all inspections, complete and send the
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A.
b If GO is not confirmed:
<1> Get a picture of the Go-NoGO Gauge No. 3 installed and send it
with the Inspection Report sheet.
<2> Contact AIRBUS before next flight with the completed
Inspection Report sheet in accordance with Ref. T ask A350-A-54-
XX-P011-01ZZZ-90AZ-A and follow their instructions.

### Page 28

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERZ-A-001-01 Fig.BB Sol.AA SHEET 1/3
REV 00 Jul 04/24 A350-54-P011Do a Special Detailed Inspection
of the Spot Faces on Rib 9 RH Page 28
CONF ALL
A
B
A
Z460
ICN-A350-A-54XXP011-A-FAPE3-07ERZ-A-001-01

### Page 29

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ES0-A-001-01 Fig.BB Sol.AA SHEET 2/3
REV 00 Jul 04/24 A350-54-P011Do a Special Detailed Inspection
of the Spot Faces on Rib 9 RH Page 29
CONF ALL
B
C
VIEW LOOKING FWD
RIB9
E
INBD
C
D
ICN-A350-A-54XXP011-A-FAPE3-07ES0-A-001-01

### Page 30

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ES1-A-003-01 Fig.BB Sol.AA SHEET 3/3
REV 00 Jul 04/24 A350-54-P011Do a Special Detailed Inspection
of the Spot Faces on Rib 9 RH Page 30
CONF ALL
D
VIEW LOOKING FWD
E
VIEW LOOKING FWD
TYPICAL VIEW
TYPICAL VIEW
RIB9 RIB9
GO-NoGO GAUGE
VIEW WITHOUT GO-NoGO GAUGE
GO CONDITION IS CONFIRMED IF THE LINE ON THE GO-NoGO GAUGE IS SEEN01
NOTE:
INBD INBD
INBD VIEW LOOKING FWDTYPICAL VIEW
01
SPOT FACE DEPTH
GO-NoGO GAUGE
RIB9
ICN-A350-A-54XXP011-A-FAPE3-07ES1-A-003-01

### Page 31

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERU-A-002-01 Fig.FA Sol.AA SHEET 1/2
REV 00 Jul 04/24 A350-54-P011Flow Chart
Page 31
CONF ALL
CLEAN THE SPOT FACES OF RIB 9
DO A SPECIAL DETAILED INSPECTION OF
THE CONDITION OF THE SPOT FACES
ARE THE TWO
SPOT FACES IN GOOD
CONDITION?
NO
CONTACT AIRBUS FOR
BEFORE NEXT FLIGHT,
FURTHER INSTRUCTIONS
YES
INSPECTION OF THE SPOT
DO A SPECIAL DETAILED
FACES WITH GO-NoGO
GAUGE No. 1
IS GO CONFIRMED
FOR GO-NoGO GAUGE
No. 1?
NO
INSPECTION OF THE SPOT
DO A SPECIAL DETAILED
FACES WITH GO-NoGO
GAUGE No. 2
YES
TO AIRBUS
SEND INSPECTION RESULTS
NO FURTHER ACTION
A
NOTE:
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
ICN-A350-A-54XXP011-A-FAPE3-07ERU-A-002-01

### Page 32

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERV-A-004-01 Fig.FA Sol.AA SHEET 2/2
REV 00 Jul 04/24 A350-54-P011Flow Chart
Page 32
CONF ALL
IS GO CONFIRMED
FOR GO-NoGO GAUGE
No. 2?
NO
A
YES
TO AIRBUS
SEND INSPECTION RESULTS
FURTHER INSPECTIONS TO BE
CONTACT AIRBUS FOR 
PERFORMED IN ACCORDANCE
WITH THE THRESHOLDS GIVEN
IN PARAGRAPH 1.E.(2)
IS GO CONFIRMED
FOR GO-NoGO GAUGE
No. 3?
YES
CONTACT AIRBUS WITH THE
BEFORE NEXT FLIGHT,
INSPECTION RESULTS FOR
FURTHER INSTRUCTIONS
NOTE:
THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
INSPECTION OF THE SPOT
DO A SPECIAL DETAILED
FACES WITH GO-NoGO
GAUGE No. 3
GO-NoGO GAUGE No. 2
GET A PICTURE OF THE
INSTALLED
GO-NoGO GAUGE No. 2
GET A PICTURE OF THE
INSTALLED
GO-NoGO GAUGE No. 3
GET A PICTURE OF THE
INSTALLED
GO-NoGO GAUGE No. 3
GET A PICTURE OF THE
INSTALLED
NO
ICN-A350-A-54XXP011-A-FAPE3-07ERV-A-004-01

### Page 33

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 33
(3) Task A350-A-54-XX-P011-01001-90AA-A (A350-A-54-XX-P011-01ZZZ-90AZ-A)
Complete the Inspection Report
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
Ref. Fig.RA Inspection Report
(a) Complete the Inspection Report sheet, refer to Ref. Fig.RA Inspection Report.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.

### Page 34

A350
SERVICE BULLETIN
Figure ICN-A350-A-54XXP011-A-FAPE3-07ERY-A-005-01 Fig.RA Sol.AA SHEET 1/1
REV 00 Jul 04/24 A350-54-P011Inspection Report
Page 34
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
A/C MSN :
FLIGHT CYCLES :
FLIGHT HOURS :
A350-54-P011
DATE OF INSPECTION :
INSPECTION METHOD : SPECIAL DETAILED
INSPECTION
SEND THE COMPLETED INSPECTION REPORT
SHEET IN ACCORDANCE WITH ISI 00.00.00179
GAUGE No. 1
GO CONDITION
GAUGE No. 2
GO CONDITION
GAUGE No. 3
GO CONDITION
LH PYLON INBOARD BOLT
LH PYLON OUTBOARD BOLT
RH PYLON INBOARD BOLT
RH PYLON OUTBOARD BOLT
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
RIB9
DO A SPECIAL DETAILED 
INSPECTION OF THE TWO 
SPOT FACES OF RIB 9
LH SHOWN
RH IDENTICAL
VIEW LOOKING FWD
INBD
N/A
N/A
N/A
N/A
YES NO
YES NO
YES NO
YES NO
N/A
N/A
N/A
N/A
IF GO-NoGO GAUGE No. 2 OR No. 3 ARE USED, SEND PICTURES TO AIRBUS WITH THE GO-NoGO
GAUGE No. 2 AND No. 3 INSTALLED, ALONG WITH THIS INSPECTION REPORT SHEET.
NOTE:
ICN-A350-A-54XXP011-A-FAPE3-07ERY-A-005-01

### Page 35

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 35
D. PREPARATION FOR TEST
None
E. TEST
None
F. CLOSE-UP
(1) Task A350-A-54-XX-P011-01001-740A-A (A350-A-54-XX-P011-01ZZZ-740Z-A)
Close Access to Rib 9 LH
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
450
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-54-52-61-00ZZZ-720Z-A
Procedure
(a) Install the Access Panel 453GL, refer to Ref. MP A350-A-54-52-61-00ZZZ-720Z-A.
(2) Task A350-A-54-XX-P011-02001-740A-A (A350-A-54-XX-P011-02ZZZ-740Z-A)
Close Access to Rib 9 RH
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h
Minimum Number of person 1
Elapsed Time 1.00 h
Skills Airframe
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-54-52-61-00ZZZ-720Z-A
Procedure
(a) Install the Access Panel 463FL, refer to Ref. MP A350-A-54-52-61-00ZZZ-720Z-A.
(3) Task A350-A-54-XX-P011-03001-740A-A (A350-A-54-XX-P011-03ZZZ-740Z-A)
Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 1.00 h

### Page 36

A350
SERVICE BULLETIN
REV 00 Jul 04/24 A350-54-P011
Page 36
Minimum Number of person 1
Elapsed Time 1.00 h
Referenced Information
Manuals/Drawings References/Sheets
MP A350-A-54-52-61-00ZZZ-720Z-A
Procedure
(a) Do the Close-up procedure as specified in the Installation of the Forward Fairing
Access-Panels, refer to Ref. MP A350-A-54-52-61-00ZZZ-720Z-A.
(b) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(c) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-54-XX-P011-02001-90AA-A (A350-A-54-XX-P011-02ZZZ-90AZ-A)
Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 37

A350
SERVICE BULLETIN
APPENDIX
REV 00 Jul 04/24 A350-54-P011
Page 37
APPENDIX
A. MANPOWER GANTT CHART
MANPOWER GANTT CHART

### Page 38

A350
SERVICE BULLETIN
APPENDIX
Figure ICN-A350-A-54XXP011-A-FAPE3-07ES2-A-002-01 Fig.AA Sol.AA SHEET 1/1
REV 00 Jul 04/24 A350-54-P011MANPOWER GANTT CHART
Page 38
CONF ALL
0 1 2 3 4 5
1.00 1 1.00JOB SET-UP
0.50 1 0.50GET ACCESS TO RIB 9 LH
0.50 1 0.50GET ACCESS TO RIB 9 RH
1.00 1 1.00DO A SPECIAL DETAILED
INSPECTION OF THE SPOT
FACES ON RIB 9 LH
1.00 1 1.00DO A SPECIAL DETAILED
INSPECTION OF THE SPOT
FACES ON RIB 9 RH
0.25 1 0.25COMPLETE THE INSPECTION
REPORT
1.00 1 1.00CLOSE ACCESS TO RIB 9 LH
1.00 1 1.00CLOSE ACCESS TO RIB 9 RH
1.00 1 1.00CLOSE-UP
ELAPSED TIME ASSUMPTION SERVICE BULLETIN NO A350-54-P011 0102
01
02
STEPS MH PER ET/S
TOTAL MANHOURS
SB ELAPSED TIME
7.25
4.75
SB ELAPSED TIME
(HOURS)
NOTE:
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
MH : MANHOURS
PER: NUMBER OF PERSONS
ET/S: ELAPSED TIME PER STEP ICN-A350-A-54XXP011-A-FAPE3-07ES2-A-002-01

### Page 39

A350
SERVICE BULLETIN
APPENDIX
REV 00 Jul 04/24 A350-54-P011
Page 39
B. REPORTING SHEET
TITLE: NACELLES / PYLONS - PYLONS - INSPECTION OF RIB 9 SPOT FACES
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 40

A350
SERVICE BULLETIN
APPENDIX
REV 00 Jul 04/24 A350-54-P011
Page 40
C. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
