# Airbus Service Bulletin A350-78-P013

Copy: No revision named ("SB A350-78-P013"), 30 pages: PDF https://openairdocs.org/files/sha256/1d/d4/1dd45d713c6f52c3f6b5d5ef209b63b2fae76cff4aae6d32a8c990b49a6c167a; text https://openairdocs.org/service-documents/airbus/a350-78-p013/file/1dd45d713c6f.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0330, the docket of AD 2020-18-15. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: A350-78-P013
- Page: https://openairdocs.org/service-documents/airbus/a350-78-p013

## Text (30 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0330, the docket of AD 2020-18-15. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 1
CONF ALL
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
 
The content of this document is the property of Airbus. All rights including copyrights are reserved.
It is supplied in confidence and commercial security on its contents must be maintained.
It must not be used for any purpose other than that for which it is supplied, nor may information
contained in it be disclosed to unauthorized persons.
It must not be reproduced in whole or in part without permission in writing from the owners of the
copyright. Requests for reproduction of any data in this document and the media authorized for it must
be addressed to Airbus.
MANDATORY MANDATORY MANDATORY
ATA SYSTEM: 78
TITLE: EXHAUST - INSPECTION OF HINGE NUT
MODIFICATION No.:
None

### Page 2

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/19 A350-78-P013
Page 2
ATA SYSTEM: 78
TITLE: EXHAUST - INSPECTION OF HINGE NUT
SUMMARY
This summary is for information only and is not approved for modification of the aircraft.
A. MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR None
MINOR None
NOTE: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting
the airworthiness of the product. All other changes are major changes.
B. REASON
(1) History
Migration of a nut at Thrust Reverser (TR) Hinge 4 was observed in-service. The
attachment hardware installation used at Hinge 4 is the same as that at Hinges
2 and 3. Some nuts installed on TR Hinges 2, 3 and 4 may be installed with non-
compliant locking features or locking features could degrade quicker than anticipated.
This degradation can be accelerated when handling the nut, during Thrust Reverser
installation/re-installation. The Thrust Reverser installation procedure in the
Maintenance Procedure (MP) will be revised to make these nuts one-time-use parts.
(2) Objective/Action
This Service Bulletin is published to advise all operators of A350 aircraft of the issue of
Ref. ROHR INC (51563) VSB RA35078-059.
This Inspection Service Bulletin requires to replace the nut by a new one and to
perform a torque stripe after installation.
(3) Advantages
The accomplishment of this Service Bulletin will ensure timely detection and/or
prevention of possible damage and will contribute to avoid expensive repairs.
(4) Operational/Maintenance Consequences
None
C. GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE MANDATORY COST SAVING NO
A/C OPERATION
AFFECTED
NO VENDOR SB YES
CANCELS INSPECTION SB NO ETOPS AFFECTED NO
PAX COMFORT AFFECTED NO POTENTIAL AD YES
RELIABILITY AFFECTED NO STRUCTURAL LIFE EXTENSION NO
LIFE LIMIT NO LINE MAINTENANCE AFFECTED NO
NOTE: Service Bulletin must be accomplished.

### Page 3

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/19 A350-78-P013
Page 3
D. MAINTENANCE CONFIGURATION
No specific aircraft maintenance configuration required.
E. MATERIAL PRICE INFORMATION
(1) Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and
Engine 2
(a) T ask set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at the Thrust
Reverser (TR) Hinges on Engine 1 and Engine 2
No material
F. APPLICABILITY
This Service Bulletin is applicable to this (these) operator(s):
AAR BAW CAL CCA CES CHH CPA CRK CSC CSN DAL DLH ETD ETH EVE FBU FIN FWI HVN IBE
JAL MAS MAU PAL QTR SAA SIA TAM THA
G. CONCURRENT REQUIREMENTS
None
H. NATURE OF THE WORK
(1) Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and
Engine 2
(a) T ask set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at the Thrust
Reverser (TR) Hinges on Engine 1 and Engine 2
AIRCRAFT NO
EQUIPMENT YES
I. MANPOWER
(1) Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and
Engine 2
(a) T ask set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at the Thrust
Reverser (TR) Hinges on Engine 1 and Engine 2
MANPOWER
TOTAL MAN-HOURS 0.75 h
ELAPSED TIME (HOURS) 0.75 h
Additional man-hours related to Vendor SB; refer to:
Job Set-up on Engine 1 in accordance
with VSB
Ref. ROHR INC (51563) VSB RA35078-059
Job Set-up on Engine 2 in accordance
with VSB
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the LH Thrust Reverser Hinge 2,
3 and 4 on Engine 1
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the RH Thrust Reverser Hinge 2,
3 and 4 on Engine 1
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the LH Thrust Reverser Hinge 2,
3 and 4 on Engine 2
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the RH Thrust Reverser Hinge 2,
3 and 4 on Engine 2
Ref. ROHR INC (51563) VSB RA35078-059

### Page 4

A350
SERVICE BULLETIN
SUMMARY
REV 00 Dec 13/19 A350-78-P013
Page 4
MANPOWER
Close-up on Engine 1 in accordance with
VSB
Ref. ROHR INC (51563) VSB RA35078-059
Close-up on Engine 2 in accordance with
VSB
Ref. ROHR INC (51563) VSB RA35078-059

### Page 5

A350
SERVICE BULLETIN
SUMMARY
Figure ICN-A350-A-78XXP013-A-FAPE3-05CQ1-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013General overview
Page 5
J. GENERAL OVERVIEW
CONF ALL
PYLON REMOVED
A
A
HINGE No 2
HINGE No 2
HINGE No 3
HINGE No 4
HINGE No 3
NOTE:
VALID FOR ENGINE 101
VALID FOR ENGINE 202
01
02
01
02
B
B
B
B
B
B
5420EG1
5420EG2
5410EG1
5410EG2
NUT
TO BE INSPECTED
FOR CLARITY
B
TYPICAL
ICN-A350-A-78XXP013-A-FAPE3-05CQ1-A-001-01

### Page 6

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 6
ATA SYSTEM: 78
TITLE: EXHAUST - INSPECTION OF HINGE NUT
1. PLANNING INFORMATION
A. APPLICABILITY
(1) Models
ON A/C 0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215, 0225, 0229,
0233, 0241, 0252, 0258, 0262, 0286, 0290, 0296, 0306, 0315, 0326, 0330
350-1041
ON A/C 0005-0058, 0060-0064, 0066-0070, 0072-0087, 0089-0101, 0103-0107, 0109,
0111-0117, 0119-0124, 0126-0130, 0132-0138, 0140, 0142-0151, 0153-0155, 0157-0160,
0162-0165, 0167, 0168, 0170, 0172-0187, 0189-0193, 0195-0205, 0207-0214, 0216-0221,
0223, 0224, 0226-0228, 0230-0232, 0234-0240, 0243-0245, 0247-0251, 0254-0256, 0259,
0261, 0263-0265, 0267-0269, 0271-0273, 0276-0281, 0284, 0287, 0289, 0291-0295, 0297,
0300-0303, 0305, 0307, 0309-0312, 0314, 0316, 0318, 0321, 0322, 0324, 0325, 0327, 0329
350-941
CONF ALL
(2) Applicability by MSN
0005-0058 0060-0064 0066-0070 0072-0107 0109-0130 0132-0138 0140-0151
0153-0155 0157-0165 0167-0170 0172-0193 0195-0221 0223-0241 0243-0245
0247-0252 0254-0256 0258 0259 0261-0265 0267-0269 0271-0273 0276-0281 0284
0286 0287 0289-0297 0300-0303 0305-0307 0309-0312 0314-0316 0318 0321 0322
0324-0327 0329 0330
(3) MSN by configuration
MSN CONFIGURATION
0005 0006 0007 0008 0009 0010 0011 0012 0013 0014 0015
0016 0017 0018 0019 0020 0021 0022 0023 0024 0025 0026
0027 0028 0029 0030 0031 0032 0033 0034 0035 0036 0037
0038 0039 0040 0041 0042 0043 0044 0045 0046 0047 0048
0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0060
0061 0062 0063 0064 0066 0067 0068 0069 0070 0072 0073
0074 0075 0076 0077 0078 0079 0080 0081 0082 0083 0084
0085 0086 0087 0088 0089 0090 0091 0092 0093 0094 0095
0096 0097 0098 0099 0100 0101 0102 0103 0104 0105 0106
0107 0109 0110 0111 0112 0113 0114 0115 0116 0117 0118
0119 0120 0121 0122 0123 0124 0125 0126 0127 0128 0129
0130 0132 0133 0134 0135 0136 0137 0138 0140 0141 0142
0143 0144 0145 0146 0147 0148 0149 0150 0151 0153 0154
0155 0157 0158 0159 0160 0161 0162 0163 0164 0165 0167
0168 0169 0170 0172 0173 0174 0175 0176 0177 0178 0179
0180 0181 0182 0183 0184 0185 0186 0187 0188 0189 0190
0191 0192 0193 0195 0196 0197 0198 0199 0200 0201 0202
0203 0204 0205 0206 0207 0208 0209 0210 0211 0212 0213
0214 0215 0216 0217 0218 0219 0220 0221 0223 0224 0225
0226 0227 0228 0229 0230 0231 0232 0233 0234 0235 0236
0237 0238 0239 0240 0241 0243 0244 0245 0247 0248 0249
0250 0251 0252 0254 0255 0256 0258 0259 0261 0262 0263
0264 0265 0267 0268 0269 0271 0272 0273 0276 0277 0278
0279 0280 0281 0284 0286 0287 0289 0290 0291 0292 0293
0294 0295 0296 0297 0300 0301 0302 0303 0305 0306 0307
001

### Page 7

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 7
MSN CONFIGURATION
0309 0310 0311 0312 0314 0315 0316 0318 0321 0322 0324
0325 0326 0327 0329 0330
(4) Configuration definition
Configuration 001
CONF 001 is applicable for all the aircraft affected by this Service Bulletin as a
standard configuration.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Migration of a nut at Thrust Reverser (TR) Hinge 4 was observed in-service. The
attachment hardware installation used at Hinge 4 is the same as that at Hinges
2 and 3. Some nuts installed on TR Hinges 2, 3 and 4 may be installed with non-
compliant locking features or locking features could degrade quicker than anticipated.
This degradation can be accelerated when handling the nut, during Thrust Reverser
installation/re-installation. The Thrust Reverser installation procedure in the
Maintenance Procedure (MP) will be revised to make these nuts one-time-use parts.
(2) Objective/Action
This Service Bulletin is published to advise all operators of A350 aircraft of the issue of
Ref. ROHR INC (51563) VSB RA35078-059.
This Inspection Service Bulletin requires to replace the nut by a new one and to
perform a torque stripe after installation.
(3) Advantages
The accomplishment of this Service Bulletin will ensure timely detection and/or
prevention of possible damage and will contribute to avoid expensive repairs.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
T o accomplish this Service Bulletin it is necessary to:
(1) Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and
Engine 2
(a) T ask set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at the Thrust
Reverser (TR) Hinges on Engine 1 and Engine 2
1 Inspect the LH Thrust Reverser Hinge 2, 3 and 4 on Engine 1
2 Inspect the RH Thrust Reverser Hinge 2, 3 and 4 on Engine 1
3 Inspect the LH Thrust Reverser Hinge 2, 3 and 4 on Engine 2
4 Inspect the RH Thrust Reverser Hinge 2, 3 and 4 on Engine 2
5 Complete the Inspection Reporting Sheet
E. COMPLIANCE

### Page 8

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 8
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin must be done within 13 months from Aug
31/19.
This Service Bulletin has been classified Mandatory. It is expected that an
Airworthiness Directive (AD) published by the European Aviation Safety Agency (EASA)
will be issued to confirm this classification. It is anticipated that the AD will confirm
the threshold given but reference should be made to the AD for confirmation of the
mandated accomplishment timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the applicability has a modification or repair embodied that is not
of AIRBUS origin, and which affects the content of this Service Bulletin, the operator
is responsible for obtaining approval by its airworthiness authority for any adaptation
necessary before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also
not included.
(1) Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and
Engine 2
(a) T ask set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at the Thrust
Reverser (TR) Hinges on Engine 1 and Engine 2
PREPARATION
Job Set-up general 0.25 h
PROCEDURE
Complete the Inspection Reporting Sheet 0.25 h
PREPARATION FOR TEST
None
TEST
None
CLOSE-UP
Close-up 0.25 h
TOTAL MAN-HOURS 0.75 h
ELAPSED TIME (HOURS) 0.75 h
Additional man-hours related to Vendor SB; refer to:
Job Set-up on Engine 1 in accordance
with VSB
Ref. ROHR INC (51563) VSB RA35078-059
Job Set-up on Engine 2 in accordance
with VSB
Ref. ROHR INC (51563) VSB RA35078-059

### Page 9

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 9
Inspect the LH Thrust Reverser Hinge 2,
3 and 4 on Engine 1
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the RH Thrust Reverser Hinge 2,
3 and 4 on Engine 1
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the LH Thrust Reverser Hinge 2,
3 and 4 on Engine 2
Ref. ROHR INC (51563) VSB RA35078-059
Inspect the RH Thrust Reverser Hinge 2,
3 and 4 on Engine 2
Ref. ROHR INC (51563) VSB RA35078-059
Close-up on Engine 1 in accordance with
VSB
Ref. ROHR INC (51563) VSB RA35078-059
Close-up on Engine 2 in accordance with
VSB
Ref. ROHR INC (51563) VSB RA35078-059
H. WEIGHT AND BALANCE
Not changed
I. ELECTRICAL LOAD DATA
Not changed
J. REFERENCES
(1) Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and
Engine 2
(a) T ask set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at the Thrust
Reverser (TR) Hinges on Engine 1 and Engine 2
ELECTRICAL STANDARD PRACTICES (ESP)
A350-A-20-55-XX-01ZZZ-042Z-A
INTRODUCTION (INTRO)
A350-A-00-61-04-11ZZZ-018Z-D
IN SERVICE INFORMATION (ISI)
00.00.00179
MAINTENANCE PROCEDURE (MP)
A350-A-24-41-XX-00ZZZ-170Z-A
TECHNICAL FOLLOW UP (TFU)
78.30.00019
VENDOR SERVICE BULLETIN (VSB)
ROHR INC (51563) VSB RA35078-059
K. PUBLICATION AFFECTED
MAINTENANCE PROCEDURE (MP)
L. INDUSTRY SUPPORT INFORMATION
Refer to Ref. ROHR INC (51563) VSB RA35078-059 for the industry support terms of the
Vendor Service Bulletin parts and labor.
Modification of removed equipment should be negotiated directly with the Vendor as per
instructions given in Ref. ROHR INC (51563) VSB RA35078-059.

### Page 10

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 10
This Service Bulletin is the subject of an AIRBUS monitored retrofit campaign.
For the organization of this retrofit, you are kindly requested to contact AIRBUS retrofit
management department: monitored.retrofit@airbus.com.

### Page 11

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 11
2. MATERIAL INFORMATION
A. MATERIAL APPLICABILITY
Material for task set A350-A-78-XX-P013-01000-93BA-A Inspection of the Nut at
the Thrust Reverser (TR) Hinges on Engine 1 and Engine 2
MATERIAL QTY SEE NOTES
Referenced consumables See SB
B. TOOLING
No tools
C. CONSUMABLES
Referenced consumables for task set A350-A-78-XX-P013-01000-93BA-A
Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and Engine
2
NOTE: T o accomplish this Service Bulletin it is necessary to use the consumable materials
listed in the subsequent referenced Vendor Service Bulletin.
Ref. ROHR INC (51563) VSB RA35078-059
D. LIST OF NEW PARTS
No parts
E. LIST OF EXISTING PARTS
No parts

### Page 12

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 12
3. ACCOMPLISHMENT INSTRUCTIONS
Task set A350-A-78-XX-P013-01000-93BA-A
Inspection of the Nut at the Thrust Reverser (TR) Hinges on Engine 1 and Engine 2
WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL
WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY
SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR
MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND
THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC., AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND
DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO Ref. ESP A350-A-20-55-
XX-01ZZZ-042Z-A.
NOTE: The accomplishment instructions of this Service Bulletin include procedures given in
other documents or in other sections of the Service Bulletin. When the words “refer to”
are used and the operator has a procedure accepted by the local authority he belongs to,
the accepted alternative procedure can be used. When the words “in accordance with”
are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service Bulletin.
Operators can therefore, as deemed necessary, omit or add access and/or close-up steps
to add flexibility to their maintenance operations as long as the technical intent of the
Service Bulletin is met within the set parameters.
NOTE: Manual titles given in the accomplishment instructions are referred to by acronyms. Refer
to paragraph 1.J., References, for the definition of acronyms.
NOTE: This Service Bulletin is classified mandatory or expected to be classified mandatory by
an Airworthiness Directive (AD). The paragraphs 3.C. and 3.E. in these accomplishment
instructions are Required for Compliance (RC) and must be done to comply with the AD.
T o allow more flexibility, the rule "refer to" and "in accordance with" will apply to these
paragraphs 3.C. and 3.E. Other paragraphs are recommended and may be deviated from,
done as part of other actions or done with accepted methods different from those given
in the Service Bulletin, as long as the RC paragraphs can be done and the aircraft can be
put back into a serviceable condition.
NOTE: This Service Bulletin contains the instructions for the on-aircraft maintenance necessary
to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions, including RC paragraph contained herein, contact
AIRBUS for further instructions and approval.
NOTE: The purpose of flowcharts is to supplement the information given in the Procedure and
Compliance paragraphs and not to serve as the primary source for tasks or compliance
times given in this Service Bulletin.
A. TASK SET ASSOCIATED INFORMATION
Task Manpower
TOTAL MAN-HOURS 0.75 h

### Page 13

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 13
ELAPSED TIME (HOURS) 0.75 h
Additional man-hours related to Vendor SB; refer to:
ROHR INC (51563) VSB RA35078-059
B. PREPARATION
(1) Task A350-A-78-XX-P013-01001-540A-A - Job Set-up general
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
INTRO A350-A-00-61-04-11ZZZ-018Z-D
MP A350-A-24-41-XX-00ZZZ-170Z-A
Procedure
NOTE: For the basic Aircraft configuration, refer to Ref. INTRO A350-
A-00-61-04-11ZZZ-018Z-D “Introduction”.
(a) Make sure that the aircraft is electrically grounded, refer to Ref. MP A350-
A-24-41-XX-00ZZZ-170Z-A.
(2) Task A350-A-78-XX-P013-02001-540A-A - Job Set-up on Engine 1 in
accordance with VSB
Job Set-Up Information
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Do the preparation procedure in accordance with Ref. ROHR INC (51563) VSB
RA35078-059.
(3) Task A350-A-78-XX-P013-03001-540A-A - Job Set-up on Engine 2 in
accordance with VSB
Job Set-Up Information
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure

### Page 14

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 14
(a) Do the preparation procedure in accordance with Ref. ROHR INC (51563) VSB
RA35078-059.
C. PROCEDURE
(1) Task A350-A-78-XX-P013-01001-346A-A - Inspect the LH Thrust Reverser
Hinge 2, 3 and 4 on Engine 1
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
417
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Inspect the LH Thrust Reverser Hinge 2, 3 and 4, refer to Ref. Fig. Flow Chart and
Ref. Fig. Inspection of Thrust Reverser Hinge 2, 3 and 4 on Engine 1 and 2 and in
accordance with Ref. ROHR INC (51563) VSB RA35078-059.
1 Inspect Thrust Reverser Hinge 2:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
2 Inspect Thrust Reverser Hinge 3:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
3 Inspect Thrust Reverser Hinge 4:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
(b) Complete the Inspection Reporting Sheet, refer to Ref. T ask A350-A-78-XX-
P013-02ZZZ-90AZ-A.

### Page 15

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Flow Chart
Page 15
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE
INFORMATION GIVEN IN THE PROCEDURE AND COMPLIANCE
PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE
FOR TASKS OR COMPLIANCE TIMES GIVEN IN
THIS SERVICE BULLETIN.
FOR THE COMPLIANCE TIMES, REFER TO THE
ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
IN ACCORDANCE WITH VSB
RETAIN THE WASHER AND
REPLACE THE NUT
ON ENGINE 1 AND 2
INSPECT THE LH AND RH
THRUST REVERSER HINGE 2, 3 AND 4
ARE THE NUT
YES NOAND WASHER
INSTALLED?
IN ACCORDANCE WITH VSB
INSTALL A NEW
WASHER AND NUT
REPORT TO AIRBUS
INSPECTION RESULTS
NO FURTHER ACTION
IN ACCORDANCE WITH
THIS SERVICE BULLETIN
ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01

### Page 16

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Inspection of Thrust Reverser
Hinge 2, 3 and 4 on Engine 1 and 2 Page 16
CONF ALL
PYLON REMOVED
A
A
HINGE No 2
HINGE No 2
HINGE No 3
HINGE No 4
HINGE No 3
NOTE:
VALID FOR ENGINE 101
VALID FOR ENGINE 202
01
02
01
02
B
B
B
B
B
B
5420EG1
5420EG2
5410EG1
5410EG2
NUT
TO BE INSPECTED
FOR CLARITY
B
TYPICAL
ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01

### Page 17

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 17
(2) Task A350-A-78-XX-P013-03001-346A-A - Inspect the RH Thrust Reverser
Hinge 2, 3 and 4 on Engine 1
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
417
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Inspect the RH Thrust Reverser Hinge 2, 3 and 4, refer to Ref. Fig. Flow Chart and
Ref. Fig. Inspection of Thrust Reverser Hinge 2, 3 and 4 on Engine 1 and 2 and in
accordance with Ref. ROHR INC (51563) VSB RA35078-059.
1 Inspect Thrust Reverser Hinge 2:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
2 Inspect Thrust Reverser Hinge 3:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
3 Inspect Thrust Reverser Hinge 4:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
(b) Complete the Inspection Reporting Sheet, refer to Ref. T ask A350-A-78-XX-
P013-02ZZZ-90AZ-A.

### Page 18

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Flow Chart
Page 18
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE
INFORMATION GIVEN IN THE PROCEDURE AND COMPLIANCE
PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE
FOR TASKS OR COMPLIANCE TIMES GIVEN IN
THIS SERVICE BULLETIN.
FOR THE COMPLIANCE TIMES, REFER TO THE
ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
IN ACCORDANCE WITH VSB
RETAIN THE WASHER AND
REPLACE THE NUT
ON ENGINE 1 AND 2
INSPECT THE LH AND RH
THRUST REVERSER HINGE 2, 3 AND 4
ARE THE NUT
YES NOAND WASHER
INSTALLED?
IN ACCORDANCE WITH VSB
INSTALL A NEW
WASHER AND NUT
REPORT TO AIRBUS
INSPECTION RESULTS
NO FURTHER ACTION
IN ACCORDANCE WITH
THIS SERVICE BULLETIN
ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01

### Page 19

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Inspection of Thrust Reverser
Hinge 2, 3 and 4 on Engine 1 and 2 Page 19
CONF ALL
PYLON REMOVED
A
A
HINGE No 2
HINGE No 2
HINGE No 3
HINGE No 4
HINGE No 3
NOTE:
VALID FOR ENGINE 101
VALID FOR ENGINE 202
01
02
01
02
B
B
B
B
B
B
5420EG1
5420EG2
5410EG1
5410EG2
NUT
TO BE INSPECTED
FOR CLARITY
B
TYPICAL
ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01

### Page 20

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 20
(3) Task A350-A-78-XX-P013-02001-346A-A - Inspect the LH Thrust Reverser
Hinge 2, 3 and 4 on Engine 2
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
427
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Inspect the LH Thrust Reverser Hinge 2, 3 and 4, refer to Ref. Fig. Flow Chart and
Ref. Fig. Inspection of Thrust Reverser Hinge 2, 3 and 4 on Engine 1 and 2 and in
accordance with Ref. ROHR INC (51563) VSB RA35078-059.
1 Inspect Thrust Reverser Hinge 2:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
2 Inspect Thrust Reverser Hinge 3:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
3 Inspect Thrust Reverser Hinge 4:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
(b) Complete the Inspection Reporting Sheet, refer to Ref. T ask A350-A-78-XX-
P013-02ZZZ-90AZ-A.

### Page 21

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Flow Chart
Page 21
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE
INFORMATION GIVEN IN THE PROCEDURE AND COMPLIANCE
PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE
FOR TASKS OR COMPLIANCE TIMES GIVEN IN
THIS SERVICE BULLETIN.
FOR THE COMPLIANCE TIMES, REFER TO THE
ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
IN ACCORDANCE WITH VSB
RETAIN THE WASHER AND
REPLACE THE NUT
ON ENGINE 1 AND 2
INSPECT THE LH AND RH
THRUST REVERSER HINGE 2, 3 AND 4
ARE THE NUT
YES NOAND WASHER
INSTALLED?
IN ACCORDANCE WITH VSB
INSTALL A NEW
WASHER AND NUT
REPORT TO AIRBUS
INSPECTION RESULTS
NO FURTHER ACTION
IN ACCORDANCE WITH
THIS SERVICE BULLETIN
ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01

### Page 22

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Inspection of Thrust Reverser
Hinge 2, 3 and 4 on Engine 1 and 2 Page 22
CONF ALL
PYLON REMOVED
A
A
HINGE No 2
HINGE No 2
HINGE No 3
HINGE No 4
HINGE No 3
NOTE:
VALID FOR ENGINE 101
VALID FOR ENGINE 202
01
02
01
02
B
B
B
B
B
B
5420EG1
5420EG2
5410EG1
5410EG2
NUT
TO BE INSPECTED
FOR CLARITY
B
TYPICAL
ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01

### Page 23

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 23
(4) Task A350-A-78-XX-P013-04001-346A-A - Inspect the RH Thrust Reverser
Hinge 2, 3 and 4 on Engine 2
Job Set-Up Information
Working Area
Impacted Zone Access / Work Location
427
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Inspect the RH Thrust Reverser Hinge 2, 3 and 4, refer to Ref. Fig. Flow Chart and
Ref. Fig. Inspection of Thrust Reverser Hinge 2, 3 and 4 on Engine 1 and 2 and in
accordance with Ref. ROHR INC (51563) VSB RA35078-059.
1 Inspect Thrust Reverser Hinge 2:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
2 Inspect Thrust Reverser Hinge 3:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
3 Inspect Thrust Reverser Hinge 4:
a If the washer and nut is not installed:
<1> Install a new washer and nut in accordance with Ref. ROHR INC
(51563) VSB RA35078-059.
b If the washer and nut is installed:
<1> Retain the washer and replace the nut in accordance with Ref.
ROHR INC (51563) VSB RA35078-059.
(b) Complete the Inspection Reporting Sheet, refer to Ref. T ask A350-A-78-XX-
P013-02ZZZ-90AZ-A.

### Page 24

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Flow Chart
Page 24
CONF ALL
NOTE:
THE PURPOSE OF FLOWCHARTS IS TO SUPPLEMENT THE
INFORMATION GIVEN IN THE PROCEDURE AND COMPLIANCE
PARAGRAPHS AND NOT TO SERVE AS THE PRIMARY SOURCE
FOR TASKS OR COMPLIANCE TIMES GIVEN IN
THIS SERVICE BULLETIN.
FOR THE COMPLIANCE TIMES, REFER TO THE
ACCOMPLISHMENT TIMESCALE PARA 1.E.(2).
IN ACCORDANCE WITH VSB
RETAIN THE WASHER AND
REPLACE THE NUT
ON ENGINE 1 AND 2
INSPECT THE LH AND RH
THRUST REVERSER HINGE 2, 3 AND 4
ARE THE NUT
YES NOAND WASHER
INSTALLED?
IN ACCORDANCE WITH VSB
INSTALL A NEW
WASHER AND NUT
REPORT TO AIRBUS
INSPECTION RESULTS
NO FURTHER ACTION
IN ACCORDANCE WITH
THIS SERVICE BULLETIN
ICN-A350-A-78XXP013-A-FAPE3-05CQ0-A-001-01

### Page 25

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Inspection of Thrust Reverser
Hinge 2, 3 and 4 on Engine 1 and 2 Page 25
CONF ALL
PYLON REMOVED
A
A
HINGE No 2
HINGE No 2
HINGE No 3
HINGE No 4
HINGE No 3
NOTE:
VALID FOR ENGINE 101
VALID FOR ENGINE 202
01
02
01
02
B
B
B
B
B
B
5420EG1
5420EG2
5410EG1
5410EG2
NUT
TO BE INSPECTED
FOR CLARITY
B
TYPICAL
ICN-A350-A-78XXP013-A-FAPE3-05CPZ-A-001-01

### Page 26

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 26
(5) Task A350-A-78-XX-P013-02001-90AA-A - Complete the Inspection Reporting
Sheet
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Referenced Information
Manuals/Drawings References/Sheets
ISI 00.00.00179
Procedure
(a) Complete the Inspection Reporting Sheet with the inspection result, refer to Ref.
Fig. Inspection Reporting Sheet.
(b) Send the completed Inspection Report sheet in accordance with Ref. ISI
00.00.00179.
NOTE: T o send the Inspection Report sheet is not Required for Compliance (RC).

### Page 27

A350
SERVICE BULLETIN
Figure ICN-A350-A-78XXP013-A-FAPE3-05CRC-A-002-01 SHEET 1/1
REV 00 Dec 13/19 A350-78-P013Inspection Reporting Sheet
Page 27
CONF ALL
INSPECTION REPORT
SERVICE BULLETIN No :
OPERATOR:
FLIGHT CYCLES :
FLIGHT HOURS :
A350-78-P013
DATE OF INSPECTION :
INSPECTION METHOD : GENERAL VISUAL
INSPECTION
SHEET IN ACCORDANCE WITH ISI 00.00.00179
ENGINE 1
LH
THRUST REVERSER HALF
RH
THRUST REVERSER HALF
HINGE 2 NUT MISSING
HINGE 3 NUT MISSING
HINGE 4 NUT MISSING
HINGE 2 NUT MISSING
HINGE 3 NUT MISSING
HINGE 4 NUT MISSING
ENGINE 2
LH
THRUST REVERSER HALF
RH
THRUST REVERSER HALF
HINGE 2 NUT MISSING
HINGE 3 NUT MISSING
HINGE 4 NUT MISSING
HINGE 2 NUT MISSING
HINGE 3 NUT MISSING
HINGE 4 NUT MISSING
A/C MSN:
UPLOAD THE COMPLETED INSPECTION REPORT
ICN-A350-A-78XXP013-A-FAPE3-05CRC-A-002-01

### Page 28

A350
SERVICE BULLETIN
REV 00 Dec 13/19 A350-78-P013
Page 28
D. PREPARATION FOR TEST
None
E. TEST
None
F. CLOSE-UP
(1) Task A350-A-78-XX-P013-02001-740A-A - Close-up on Engine 1 in accordance
with VSB
Job Set-Up Information
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Do the Close-up procedure in accordance with Ref. ROHR INC (51563) VSB
RA35078-059.
(2) Task A350-A-78-XX-P013-03001-740A-A - Close-up on Engine 2 in accordance
with VSB
Job Set-Up Information
Referenced Information
Manuals/Drawings References/Sheets
VSB ROHR INC (51563) VSB RA35078-059
Procedure
(a) Do the Close-up procedure in accordance with Ref. ROHR INC (51563) VSB
RA35078-059.
(3) Task A350-A-78-XX-P013-01001-740A-A - Close-up
Job Set-Up Information
Manpower/Resources/Skills
Man-hours 0.25 h
Minimum Number of person 1
Elapsed Time 0.25 h
Procedure
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Put the aircraft back to its initial configuration.
G. ADMINISTRATIVE
(1) Task A350-A-78-XX-P013-01001-90AA-A - Administrative
Procedure
Confirm in the applicable aircraft records that you have completed all the work defined
in this Service Bulletin task set as required.

### Page 29

A350
SERVICE BULLETIN
APPENDIX
REV 00 Dec 13/19 A350-78-P013
Page 29
APPENDIX
A. REPORTING SHEET
TITLE: EXHAUST - INSPECTION OF HINGE NUT
MODIFICATION No.: None
(1) SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance
and Flight Operations Products if it is duly reported to Airbus.
(2) GENERAL information
The SB Reporting policy is published in ISI 00.00.00135. This document provides
information regarding: the SB Reporting means and benefits, the update of
customized Maintenance Products and customized Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations
Products" for further information on the update of affected Flight Operations Products.
(3) SB Reporting procedure
Standard practice to report SB is to use the online reporting application on
AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus, Question 2 "What are
the standard practices for SB Reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs,
Question 3 "What about the reporting of prerequisite Service Bulletins?"
NOTE: ISI 00.00.00179 covers all the frequently asked questions about SB Reporting.
It is revised on a regular basis.

### Page 30

A350
SERVICE BULLETIN
APPENDIX
REV 00 Dec 13/19 A350-78-P013
Page 30
B. QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin.
The reported data that you provide us will be used to analyse areas of difficulties and to
take corrective action to further improve the quality of our Service Bulletin.
We thank you for the time you have taken in completing this form.
Quality rating of this SB 4 3 2 1
Quality rating of the Accomplishment Instructions 4 3 2 1
Quality rating of the Illustrations 4 3 2 1
Is this SB easy to understand ? Y / N
NOTE: Please rate on a scale of 1 to 4, with 4 being the highest score
If you have difficulties in the accomplishment of this SB please quote below the area(s) and
give a short description of the issue.
Planning Material Instructions
X Applicability X T ooling X Preparation
X Reason X List of Materials
Operator Supplied
X Mod/Inspection
X Manpower X Kit content X T est
X References X Re-identification X Close-up
X Publication X Illustrations
X Industry Support
Comments :
Operator : Date :
Name/Title
Please return this form to :
AIRBUS
2, ROND POINT EMILE DEWOITINE
31700 BLAGNAC
FRANCE
Or via your Resident Customer Support Office.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.