# Airbus Alert Operators Transmission A24N006-20

Copy: No revision named ("A24N006-20 R01 with Appx 1 and 2"), 14 pages: PDF https://openairdocs.org/files/sha256/32/0f/320fe2e49d7c6fc8429c94bcb481752b0a930b879198869972ed0c9dbe59c08e; text https://openairdocs.org/service-documents/airbus/aot-a24n006-20/file/320fe2e49d7c.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0547, the docket of AD 2021-21-02. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Other document (Alert Operators Transmission)
- Number: A24N006-20
- Page: https://openairdocs.org/service-documents/airbus/aot-a24n006-20

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/aot-a24n006-20/proposed.md).

## Text (14 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0547, the docket of AD 2021-21-02. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A24N006-20 Rev 01 Page 1 of 6 Date: 12-OCT-2020
© AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
SUBJECT: ATA 24 – Ni-Cd Batteries - Risk of capacity reduction during aircraft parking
AIRCRAFT TYPE: A318,A319,A320,A321
OUR REF.: A24N006-20 Rev 01 dated 12-OCT-2020
OUR PREVIOUS REV: A24N006-20 Rev 00 dated 09-SEP-2020
EFFECTIVITY DATE: 9-SEP-2020 
0. REASON FOR REVISION
This AOT is revised mainly to :
  
update the information provided in the applicability paragraph of this AOT (§ 4.2.1).
Two groups of batteries (A and B) are now defined to further clarify which actions need to be 
accomplished for each group. 
  
remove the requirement for battery capacity restoration before the application of the on-wing 
preservation procedure. 
Note: 
The content of this AOT has been reworded and re-organised since last revision.
Therefore, “REV” tags have not been added to identify the different modifications.  
1. AIRCRAFT AFFECTED
 All Aircraft
2. REFERENCED DOCUMENTATION
2.1 APPENDIX
Appendix 1: Short term action
Appendix 2: On-wing battery preservation procedure 
2.2 REFERENCES
Ref 1: ISI 24.00.00046 (ATA 24 - Recommendations for parking & storage during COVID19      
period)
Ref 2: Task in AMM PB 10-10-00 (Parking and storage procedure)
Ref 3: Task in AMM PB 10-11-00 (Parking periodic ground checks)
Ref 4: Task in AMM PB 10-30-00 (Return to operation after a parking period)
Ref 5: Task in AMM PB 24-38-51 (Removal of the battery)
Ref 6: Task in AMM PB 31-21-00 (Procedure to set the Clock)
Ref 7: Task in AMM PB 24-41-00 (Energize the aircraft electrical Circuits)

### Page 2

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A24N006-20 Rev 01 Page 2 of 6 Date: 12-OCT-2020
© AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Ref 8: Task in AMM PB 24-41-00 (De-Energize the aircraft electrical circuits)
Ref 9: Task in AMM PB 24-42-00 (Energize the Ground Service Network from the External Power)
Ref 10: Task in AMM PB 24-42-00 (De-Energize the Ground Service Network from the External 
             Power)
Ref 11: SAFT Battery CMM 24-38-51 (Battery PN 2758)
Ref 12: SAFT Battery CMM 24-38-58 (Battery PN 416526)
3. REASON
The purpose of this AOT is to inform the operators:
●      that the capacity of the main batteries (FINs 2PB1 & 2PB2) may be reduced due to repetitive 
disconnections and connections during an aircraft parking period, as detailed in § 3.1                      
and § 4.2.1 of this AOT
●      and of the need of restoring the capacity of these batteries per ref 11 (or ref 12), within a defined 
time frame.
 3.1 FACTS
In the frame of massive aircraft grounding due to COVID-19 pandemic, several engineering reviews 
have been organised between Airbus and the battery supplier SAFT. During these reviews, it was 
highlighted that the current AMM aircraft parking procedures (per ref 2 & ref 3) requiring physical 
disconnection and periodic reconnection of batteries may induce a reduction in capacity for Ni-Cd 
batteries, when repetitively done.
The current AMM aircraft parking procedures require:
●        to disconnect the batteries when the aircraft is parked and de-energized for more than 2 days 
(per ref 2).
●        to reconnect the batteries when aircraft is energized during aircraft periodic ground checks 
(per ref 3).
●        to disconnect the batteries again at the end of the aircraft periodic ground checks (per ref 3).
When a Ni-Cd battery is physically disconnected from the aircraft loads, it self-discharges, due to an 
electrochemical phenomenon, thus, inducing a permanent reduction of battery capacity. 
After each cycle of battery self-discharge, the available battery capacity will decrease progressively and 
will not be recovered to 100% of its initial capacity even when the battery is charged again from the 
aircraft electrical network during the periodic ground checks per ref 3.
In order to restore the battery capacity, the battery must be sent to an approved battery shop for a 
battery periodical check or a battery regular check or a battery general overhaul per ref 11 (or ref 12).
Note 1: This action in shop includes a battery charge at constant current which allows to restore the 
battery capacity.

### Page 3

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A24N006-20 Rev 01 Page 3 of 6 Date: 12-OCT-2020
© AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Note 2: On aircraft, it is not possible to:
restore the battery capacity as the battery is charged at constant voltage.
check the battery capacity.
3.2 CONSEQUENCES
As the battery capacity may be significantly reduced, the battery performance may be affected and 
hence, the battery functions may not be fully guaranteed.
4. SHORT TERM ACTION
NOTE: This AOT is classified mandatory or expected to be classified mandatory by an Airworthiness 
Directive (AD). The accomplishment instructions marked as Required for Compliance (RC) must be done 
to comply with the AD. “RC” is indicating these paragraphs accordingly. If an AD is issued, reference 
should be made to the AD for the mandated accomplishment timescale.
NOTE: The accomplishment instructions of this AOT include procedures given in other documents or 
in other sections of the AOT. When the words ’refer to’ are used and the operator has a procedure 
accepted by the local authority he belongs to, the accepted alternative procedure can be used. When 
the words ’in accordance with’ are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this AOT do not 
constitute or affect the technical intent of the AOT. Operators can therefore, as deemed necessary, omit 
or add access and/or close-up steps to add flexibility to their maintenance operations as long as the 
technical intent of the AOT is met within the set parameters.
 4.1 PLANNING AND MANPOWER
 4.1.1 ACCOMPLISHMENT TIMESCALE (RC)
The compliance time for this AOT is defined as follows:
      Within 4 months after the AOT effectivity date or prior to next flight, whichever occurs latest.
For additional information, refer to appendix 1 of this AOT.
4.1.2 MANPOWER
 N/A
 4.2 DESCRIPTION
 4.2.1 APPLICABILITY
Group A
This AOT is applicable to Ni-Cd batteries (PN 2758 or PN 416526) which have been disconnected, kept 
(on aircraft) and reconnected on aircraft per ref 2 and ref 3 more than 4 times during an aircraft parking 
period since last battery periodical check or battery regular check or battery general overhaul per ref 11 
(or ref 12) and which are still installed on aircraft, at the effectivity date of this AOT.
Refer to § 4.1.1, § 4.2.2 and § 4.2.3.1 of this AOT for the accomplishment of the required actions.

### Page 4

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A24N006-20 Rev 01 Page 4 of 6 Date: 12-OCT-2020
© AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Group B
This AOT is also applicable to all other Ni-Cd batteries (PN 2758 or PN 416526) not identified in 
group A.
Refer to § 4.2.3.2 of this AOT for the accomplishment of the required actions.
 4.2.2 TERMINATING ACTION (RC)
The restoration of the capacity of the batteries, identified in group A in § 4.2.1 of this AOT, is the 
terminating action for this AOT and is defined as follows:
-   Do a battery periodical check or a battery regular check or a battery general overhaul per ref 
11 (or ref 12) in an approved battery shop.
Note: This action in shop includes a battery charge at constant current allowing to restore the 
battery capacity.
4.2.3 APPLICATION OF NEW AMM PROCEDURES (RC)
In order to preserve batteries, when the aircraft is parked and de-energized for more than 2 days, the 
AMM will be revised to introduce, as detailed in § 5.2 of this AOT, the off-wing battery preservation or 
the on-wing battery preservation.  
4.2.3.1. Batteries identified in group A in § 4.2.1 of this AOT and installed on aircraft
After the terminating action, as detailed in § 4.2.2 of this AOT, is completed, the off-wing battery 
preservation or the on-wing battery preservation, as detailed in § 5.2 of this AOT, must be applied when 
the aircraft is parked and de-energized for more than 2 days.
From the effectivity date of this AOT, operators can start applying the off-wing battery preservation or 
the on-wing battery preservation when the aircraft is parked and de-energized more than 2 days. 
However, it is recommended that the battery capacity restoration, as detailed in § 4.2.2 of this AOT, is 
performed before the application of the on-wing battery preservation.
Note 1: A battery, affected by the issue detailed in § 3.1 of this AOT, cannot be restored through the 
application of the on-wing battery preservation.
Note 2: If the on-wing preservation procedure is applied for batteries with a reduced capacity, there is 
a risk that these batteries are over discharged before the aircraft is energized again per ref 3. This 
situation may prevent the battery from being recharged on aircraft.
4.2.3.2 Batteries identified in group B in § 4.2.1 of this AOT and installed on aircraft
After effectivity date of this AOT, the off-wing battery preservation or the on-wing battery preservation, 
as detailed in § 5.2 of this AOT, must be applied when the aircraft is parked and de-energized more 
than 2 days.
4.2.4 ACCESS
 N/A
 4.2.5 INSPECTION REQUIREMENTS
 N/A

### Page 5

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A24N006-20 Rev 01 Page 5 of 6 Date: 12-OCT-2020
© AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
 4.2.6 FINDINGS
 N/A
 4.3 SPARES AND TOOLING
 N/A
 5. FURTHER INFORMATION
 5.1 FOLLOW-UP PLAN
Additional information related to this AOT (for instance, frequently asked questions, complementary 
recommendations if any) will be provided through ref 1. 
5.2 IMPACTED DOCUMENTATION
The AMM will be revised (currently planned for November 2020) to introduce, as detailed below, the 
off-wing battery preservation or the on-wing battery preservation.  
The AMM advance copies are currently available since 29-SEP-2020.
A - Off Wing Battery Preservation
If the aircraft is parked and de-energized more than 2 days, and the Off Wing battery Preservation 
method is used, then the batteries have to be disconnected and removed from aircraft per ref 5.
Note 1: To allow ground periodic checks per ref 3 during an aircraft parking period, batteries must be 
re-installed on aircraft and re-connected to the aircraft electrical network.
Note 2: Batteries removed from aircraft in parking or storage have to be stored per ref 11 (or per ref 
12).
B - On-Wing Battery Preservation
The on-wing battery preservation is a new procedure consisting in leaving the battery physically 
connected to the aircraft electrical network and keeping a minimum battery hot bus consumption, when 
the aircraft is parked and de-energized more than 2 days. This is achieved by pulling the circuit breakers 
of some loads supplied by the battery hot buses, as detailed in the appendix 2 of this AOT. In this 
configuration, there is no battery self-discharge, and hence the progressive and permanent reduction 
of the capacity of the batteries is avoided. 
When the on-wing preservation procedure is applied, batteries must be sent to an approved battery 
shop for a battery regular check per ref 11 (or per ref 12), every six months during the aircraft parking 
period.   
6. AOT APPROVAL
The technical content of this document is approved under the authority of the DOA ref.EASA.21J.031.

### Page 6

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A24N006-20 Rev 01 Page 6 of 6 Date: 12-OCT-2020
© AIRBUS S.A.S. 2020. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
7. REPORTING
Questions about this AOT are to be addressed to Airbus Customer Services through  TechRequest on 
Airbus World, selecting Maintenance Engineering Domain, Engineering Support Section and ATA 24-
38.
As per latest reporting policy (Ref to OIT 999.0018/16), inspection results (with or without findings) are 
to be addressed to Airbus Customer Services through the generic e-mail address:
inspection.results@airbus.com.
Best Regards,
Christian FREMONT
VICE PRESIDENT ENGINEERING SUPPORT
CUSTOMER SERVICES
Jean Pierre GOMEZ
VICE PRESIDENT A320  PROGRAMME
CUSTOMER SERVICES

### Page 7

Appendix 1 : Short Term Action
 
 
 
 
 
Figure 1
 
 
 
 
Some
 
examples
 
 
AOT
 
Applicability
 
confirmed?
 
Terminating action needed?
 
 
When?
 
 
 
 
Application of new AMM procedures
 
needed, if aircraft is parked again or remain
 
in parking?
 
 
 
Example 1
 
Group A
 
 
Yes
 
 
T
​
CT
​
 , at the latest
 
 
 
 
Recommended before AOT terminating action
 
Required after AOT terminating action
 
 
 
Example 2
Group A
 
 
Yes
 
 
T
​
CT
​
 , at the latest
 
 
 
 
Recommended before AOT terminating action
 
Required after AOT terminating action
 
 
 
Example 3
 
Group A
 
Yes
 
 
Prior to next flight
 
 
Recommended before AOT terminating action
 
Required after AOT terminating action
 
 
 
Example 1
 
Group B
 
Not applicable
 
 
 
Required after AOT effectivity date
 
 
Example 2
Group B
 
Not applicable
 
 
Required after AOT effectivity date
 
 
 
Example 3
Group B
 
Not applicable
 
 
Required after AOT effectivity date
 
 
 
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 1 of 1
 
Date: 
​
12-OCT- 2020

### Page 8

Appendix 2 : On-wing battery preservation procedure
 
 
The
procedures
per
ref
2,
ref
3
and
ref
4
are
modified
to
include
the
instructions
for
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the on-wing battery preservation, as detailed below:
 
A/ The parking and storage procedure (ref 2) is modified as follows:
 
●
Perform all steps from step 3.A.(1) to step 4.T.(1) of ref 2.
 
●
Do
not
perform
step
4.T.(2)
of
ref
2.
For
ACJ
configuration,
do
not
perform
steps
4.T.(2)
and
4.T(3)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
of ref 2.
 
●
Perform all steps from step 5.A.(1) to step 5.A.(8) of ref 2.
 
●
Perform the following steps after step 5.A.(8) of ref 2:
 
(1)
In the cockpit, on overhead panel 35VU, release the pushbutton switches of BAT 1(2).
 
(2)
In the cockpit, on the overhead panel 35VU, check the voltage of the BAT 1(2): 
 
(a)
If
one
of
the
battery
voltages
is
less
than
26V, perform
a
cycle
of
battery
charge
as
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
follows:
 
○
On the ECAM control panel:
 
-
Push the ELEC key to get the ELEC system page.
 
○
On the control panel 35VU:
 
-
Push
the
related
BAT
1(2)
pushbutton
switch
(OFF
and
FAULT
legends
off)
 
 
 
 
 
 
 
 
 
 
 
 
to start the charging cycle of the battery 1(2),
 
○
If
the
aircraft
is
energized
from
external
power
or
IDGs,
on
the
APU
section
of
the
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
overhead control and indicating panel 25VU:
 
-
Push the APU MASTER SW pushbutton switch (ON legend comes on).
 
-
Wait two seconds.
 
-
Release the APU MASTER SW pushbutton switch (ON legend goes off).
 
○
On the lower ECAM DU:
 
-
The
green
line
between
the
BAT
1(2)
indication
and
the
DC
BAT
busbar
 
 
 
 
 
 
 
 
 
 
 
 
 
indication comes into view. The arrow points to the BAT 1(2) indication.
 
-
The
related
parameter
indications
(voltage
and
current)
come
into
view
 
 
 
 
 
 
 
 
 
 
green.
 
○
Wait until the battery contactor opens.
 
-
The
green
line
between
the
BAT
1(2)
indication
and
the
DC
BAT
busbar
 
 
 
 
 
 
 
 
 
 
 
 
 
indication:
 
-
Goes out of view if the battery is correctly charged
 
-
Stays in view if a battery charging is necessary.
 
Note: 
​
The time for the battery to charge can be 30 minutes.
 
○
On
the
lower
ECAM
DU,
on
the
ELEC
page,
make
sure
that
the
battery
voltage
is
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
more than 26VDC and the battery discharge current is equal to or less than 1A.
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 1 of 7
 
Date:
​
 12-OCT-2020

### Page 9

(b)
Otherwise, no further actions required.
 
●
Perform step 5.A.(9) of ref 2
 
●
Perform the following steps after step 5.A.(9) of ref 2.
 
(1)
Energize the ground service network from the external power per ref 9
 
 
Note:
​
This
step
is
necessary
only
to
have
light
in
the
avionic
bay
and
in
the
cockpit.
​
If
a
torch
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
is used to perform steps (2) to (4) below, step (1) above can be disregarded.
 
(2)
In
the
cockpit,
on
overhead
panel
35VU,
put
the
WARNING
NOTICE(S)
in
position
“Do
not
to
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
operate the batteries”.
 
(3)
Get access to the avionics compartment:
 
-
Put
the
ACCESS
PLATFORM
2M
(6
FT)
-
ADJUSTABLE
in
position
at
the
avionics
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
compartment door 822.
 
- Open access door 822.
 
- Open the access panel of BATTERY power center 105VU.
 
 
(4)
Immediately open, safety and tag these circuit breakers after the aircraft is de-energized. :
 
Panel
 
Designation
 
FIN
 
Location
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
5PB1
 
D01
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
12PB1
 
E01
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
5PB2
 
D02
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
12PB2
 
E02
 
 
Note:
​
 In this configuration, the parking brake hydraulic system cannot be pressurized and
 
depressurized.
 
Note: 
​
In this configuration, the horn is not operative.
 
(5)
De-energize the ground service network from the external power per ref 10
 
Note:
​
If
a
torch
has
been
used
to
perform
steps
(2)
to
(4)
above,
step
(5)
above
can
be
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
disregarded.
 
●
Perform all steps from step 5.A.(10) to step 5.B.(5) of ref 2.
 
 
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 2 of 7
 
Date:
​
 12-OCT-2020

### Page 10

B/ The parking periodic ground checks procedure (ref 3)  is modified as
 
follows:
 
 
●
Perform all steps from step 3.A.(1) to step 3.B.(1).(a) of ref 3.
 
●
Perform the following steps instead of step 3.B.(2).(a) of ref 3:
 
(1)
Energize the ground service network from the external power per ref 9
 
Note:
​
This
step
is
necessary
only
to
have
light
in
the
avionic
bay
and
in
the
cockpit.
​
If
a
torch
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
is used to perform steps (2) to (4) below, step (1) above can be disregarded.
 
(2)
Get access to the avionics compartment.
 
-
Put
the
ACCESS
PLATFORM
2M
(6
FT)
-
ADJUSTABLE
in
position
at
the
avionics
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
compartment door 822.
 
- Open access door 822.
 
- Open the access panel of BATTERY power center 105VU.
 
(3)
Remove safety clips and tags and close these circuit breakers:
 
Panel
 
Designation
 
FIN
 
Location
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
5PB1
 
D01
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
12PB1
 
E01
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
5PB2
 
D02
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
12PB2
 
E02
 
 
(4)
In
the
cockpit,
on
overhead
panel
35VU,
remove
the
WARNING
NOTICE(S)
in
position
“Do
 
 
 
 
 
 
 
 
 
 
 
 
 
 
not to operate the batteries”.
 
(5)
De-energize the ground service network from the external power per ref 10
 
Note: 
​
If a torch has been used to perform steps (2) to (4) above, step (5) can be disregarded.
 
●
Perform step 3.B.(2).(b) per ref 3.
 
 
●
After step 3.B.(2).(b) per ref 3, adjust the clock per ref 6
 
●
Perform
all
steps
from
step
3.B.(2).(c)
to
step
4.M.(2)
(or
for
A320neo
PW
configuration,
to
step
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4.M.(1)) per ref 3.
 
 
●
Perform
the
following
steps
instead
of
step
4.M.(3)
(or
or
A320neo
PW
configuration,
instead
of
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
step 4.M.(2)) per ref 3 :
 
(1)
In the cockpit, on overhead panel 35VU, release the pushbutton switches of BAT 1(2).
 
(2)
In the cockpit, on the overhead panel 35VU, check the voltage of the BAT 1(2):
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 3 of 7
 
Date:
​
 12-OCT-2020

### Page 11

(a)
If
one
of
the
battery
voltages
is
less
than
26V, perform
a
cycle
of
battery
charge
as
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
follows:
 
○
On the ECAM control panel:
 
-
Push the ELEC key to get the ELEC system page.
 
○
On the control panel 35VU:
 
-
Push
the
related
BAT
1(2)
pushbutton
switch
(OFF
and
FAULT
legends
off)
 
 
 
 
 
 
 
 
 
 
 
 
to start the charging cycle of the battery 1(2),
 
○
If
the
aircraft
is
energized
from
external
power
or
IDGs,
on
the
APU
section
of
the
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
overhead control and indicating panel 25VU:
 
-
Push the APU MASTER SW pushbutton switch (ON legend comes on).
 
-
Wait two seconds.
 
-
Release the APU MASTER SW pushbutton switch (ON legend goes off).
 
○
On the lower ECAM DU:
 
-
The
green
line
between
the
BAT
1(2)
indication
and
the
DC
BAT
busbar
 
 
 
 
 
 
 
 
 
 
 
 
 
indication comes into view. The arrow points to the BAT 1(2) indication.
 
-
The
related
parameter
indications
(voltage
and
current)
come
into
view
 
 
 
 
 
 
 
 
 
 
green.
 
○
Wait until the battery contactor opens.
 
-
The
green
line
between
the
BAT
1(2)
indication
and
the
DC
BAT
busbar
 
 
 
 
 
 
 
 
 
 
 
 
 
indication:
 
-
Goes out of view if the battery is correctly charged
 
-
Stays in view if a battery charging is necessary.
 
Note: 
​
The time for the battery to charge can be 30 minutes.
 
○
On
the
lower
ECAM
DU,
on
the
ELEC
page,
make
sure
that
the
battery
voltage
is
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
more than 26VDC and the battery discharge current is equal to or less than 1A.
 
(b)
Otherwise, no further actions required.
 
●
Perform step 4.M.(4) (or for A320neo PW configuration, perform step 4.M.(3))  of ref 3.
 
 
●
Perform
the
following
steps
after
step
4.M.(4)
(or
for
A320neo
PW
configuration,
after
step
4.M.(3))
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
of ref 3.
 
 
(1)
Energize the ground service network from the external power per ref 9
 
 
Note:
​
This
step
is
necessary
only
to
have
light
in
the
avionic
bay
and
in
the
cockpit.
​
If
a
torch
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
is used to perform steps (2) to (4) below, step (1) above can be disregarded.
 
(2)
In
the
cockpit,
on
overhead
panel
35VU,
put
the
WARNING
NOTICE(S)
in
position
“Do
not
to
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
operate the batteries”.
 
(3)
Get access to the avionics compartment.
 
-
Put
the
ACCESS
PLATFORM
2M
(6
FT)
-
ADJUSTABLE
in
position
at
the
avionics
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
compartment door 822.
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 4 of 7
 
Date:
​
 12-OCT-2020

### Page 12

- Open access door 822.
 
- Open the access panel of BATTERY power center 105VU.
 
(4)
Immediately open, safety and tag these circuit breakers after the aircraft is de-energized. :
 
Panel
 
Designation
 
FIN
 
Location
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
5PB1
 
D01
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
12PB1
 
E01
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
5PB2
 
D02
 
105VU
 
 
ELEC/HOT BUS/702PP SPLY
 
12PB2
 
E02
 
 
Note:
​
 In this configuration, the parking brake hydraulic system cannot be pressurized and
 
depressurized.
 
Note: 
​
In this configuration, the horn is not operative.
 
(5)
De-Energize the ground service network from the external power per ref 10.
 
Note:
​
If
a
torch
has
been
used
to
perform
steps
(2)
to
(4)
above,
step
(5)
above
can
be
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
disregarded.
 
●
Perform all steps from step 5.A.(1) to step 5.A.(4) per ref 3.
 
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 5 of 7
 
Date:
​
 12-OCT-2020

### Page 13

C/
The
return
to
operation
after
a
parking
period
procedure
(ref
4)
is
modified
 
 
 
 
 
 
 
 
 
 
 
 
 
 
as follows:
 
●
Perform the steps 3.A.(1) and 3.A.(2) of ref 4.
 
●
Perform the following steps instead of step 3.B.(1) of ref 4:
 
(1)
Energize the ground service network from the external power per ref 9
 
 
Note:
​
This
step
is
necessary
only
to
have
light
in
the
avionic
bay
and
in
the
cockpit.
​
If
a
torch
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
is used to perform steps (2) to (4) below, step (1) can be disregarded.
 
(2)
Get access to the avionics compartment.
 
-
Put
the
ACCESS
PLATFORM
2M
(6
FT)
-
ADJUSTABLE
in
position
at
the
avionics
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
compartment door 822.
 
- Open access door 822.
 
- Open the access panel of BATTERY power center 105VU.
 
(3)
Remove safety clips and tags and close these circuit breakers:
 
Panel
 
Designation
 
FIN
 
Location
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
5PB1
 
D01
 
105VU
 
ELEC/HOT BUS/701PP SPLY
 
12PB1
 
E01
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
5PB2
 
D02
 
105VU
 
ELEC/HOT BUS/702PP SPLY
 
12PB2
 
E02
 
 
(4)
In
the
cockpit,
on
overhead
panel
35VU,
remove
the
WARNING
NOTICE(S)
in
position
“Do
 
 
 
 
 
 
 
 
 
 
 
 
 
 
not to operate the batteries”.
 
(5)
De-energize the ground service network from the external power per ref 10.
 
Note:
​
If
a
torch
has
been
used
to
perform
steps
(2)
to
(4)
above,
step
(5)
above
can
be
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
disregarded.
 
●
Perform step 3.B.(2) per ref 4.
 
 
●
Perform the following steps after step 3.B.(2) per ref 4:
 
 
(1)
Adjust the clock per ref 6.
 
(2)
In the cockpit, on overhead panel 35VU, release the pushbutton switches of BAT 1(2).
 
(3)
In the cockpit, on the overhead panel 35VU, check the voltage of the BAT 1(2): 
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 6 of 7
 
Date:
​
 12-OCT-2020

### Page 14

(a)
If
one
of
the
battery
voltages
is
less
than
26V, perform
a
cycle
of
battery
charge
as
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
follows:
 
○
On the ECAM control panel:
 
-
Push the ELEC key to get the ELEC system page.
 
○
On the control panel 35VU:
 
-
Push
the
related
BAT
1(2)
pushbutton
switch
(OFF
and
FAULT
legends
off)
 
 
 
 
 
 
 
 
 
 
 
 
to start the charging cycle of the battery 1(2),
 
○
If
the
aircraft
is
energized
from
external
power
or
IDGs,
on
the
APU
section
of
the
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
overhead control and indicating panel 25VU:
 
-
Push the APU MASTER SW pushbutton switch (ON legend comes on).
 
-
Wait two seconds.
 
-
Release the APU MASTER SW pushbutton switch (ON legend goes off).
 
○
On the lower ECAM DU:
 
-
The
green
line
between
the
BAT
1(2)
indication
and
the
DC
BAT
busbar
 
 
 
 
 
 
 
 
 
 
 
 
 
indication comes into view. The arrow points to the BAT 1(2) indication.
 
-
The
related
parameter
indications
(voltage
and
current)
come
into
view
 
 
 
 
 
 
 
 
 
 
green.
 
○
Wait until the battery contactor opens.
 
-
The
green
line
between
the
BAT
1(2)
indication
and
the
DC
BAT
busbar
 
 
 
 
 
 
 
 
 
 
 
 
 
indication:
 
-
Goes out of view if the battery is correctly charged
 
-
Stays in view if a battery charging is necessary.
 
Note: 
​
The time for the battery to charge can be 30 minutes.
 
○
On
the
lower
ECAM
DU,
on
the
ELEC
page,
make
sure
that
the
battery
voltage
is
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
more than 26VDC and the battery discharge current is equal to or less than 1A.
 
(b)
Otherwise, no further actions required.
 
●
Perform all steps from step 3.B.(3) to step 5.A.(5) of ref 4.
 
 
 
AOT ref:
​
 A24N006-20 Rev 01
 
Page 7 of 7
 
Date:
​
 12-OCT-2020

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
