# Airbus All Operators Transmission A28L006-17

## Copies (3)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- No revision named ("AOT A28L006-17 R00 with flowchart"), 8 pages: PDF https://openairdocs.org/files/sha256/64/88/6488d5e59415e09fb4d076736e6d527138b8dffdba0452f18d5ea1cbec2275df; text https://openairdocs.org/service-documents/airbus/aot-a28l006-17/file/6488d5e59415.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-1104; AD 2017-25-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- No revision named ("AOT A28L006-17 R05"), 6 pages: PDF https://openairdocs.org/files/sha256/e9/dc/e9dc10c055356fdb087e89a6f0614149b42936dae3fa9b4f2efcc06d4f196907; text https://openairdocs.org/service-documents/airbus/aot-a28l006-17/file/e9dc10c05535.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2020-0197, the docket of AD 2020-21-05. Not covered by OpenAirDocs’ CC0 dedication.
- No revision named ("AOT A28L006-17 R06"), 5 pages: PDF https://openairdocs.org/files/sha256/01/56/0156f9f8a464e102579198ce2c91d00c092be46f6e40ad5f78a4d6ca9b9c84c0; text https://openairdocs.org/service-documents/airbus/aot-a28l006-17/file/0156f9f8a464.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0372, the docket of AD 2021-16-18. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Other document (All Operators Transmission)
- Number: A28L006-17
- Page: https://openairdocs.org/service-documents/airbus/aot-a28l006-17

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2017-25-16](https://openairdocs.org/ad/2017-25-16.md), effective Dec 29, 2017: No revision named

## Text (8 pages)

No revision named, the newest copy. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-1104; AD 2017-25-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CUSTOMER SERVICES DIRECTORATE
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX FRANCE
TELEPHONE + 33 (0)5 61 93 33 33
ALERT OPERATORS TRANSMISSION - AOT
AOT ref: A28L006-17 Rev 00 Page 1 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
SUBJECT: ATA 28 – Fuel Pump Cavitation Erosion
AIRCRAFT TYPE: A330,A340
OUR REF.: A28L006-17 Rev 00 dated 03-NOV-2017
1. AIRCRAFT AFFECTED
ALL A330, A340 Aircraft models
2. REFERENCED DOCUMENTATION
FOT ref. 999.0094/17
2.1 APPENDIX
Flowchart_AOT.pdf
2.2 REFERENCES
Aircraft Maintenance Manual:
Center Tank Pumps:
Ref.1: AMM 28-26-51-000-802-A “Removal of the Fuel Pump Element”
Ref.2: AMM 28-26-51-400-802-A “Installation of the Fuel Pump element”
Rear Center Tank Pumps:
Ref.3: AMM 28-26-56-000-801-A “Removal of the RCT Fuel-Transfer Pump Element”
Ref.4: AMM 28-26-56-400-801-A “Installation of the RCT Fuel-Transfer Pump Element”
Stand-By Pumps:
Ref.5: AMM 28-21-51-000-802-A “Removal of the fuel Pump Element”
Ref.6: AMM 28-21-51-400-802-A “Installation of the Fuel Pump element”
Aft Transfer Pumps:
Ref.7: AMM 28-27-58-000-801-A “Removal of the Center-Tank Fuel-Transfer Pump Element”
Ref.8: AMM 28-27-58-400-801-A “Installation of the Center-Tank Fuel-Transfer Pump Element”
Ref.9: AMM 28-27-59-000-801-A “Removal of the Fuel-Transfer Pump Element”
Ref.10: AMM 28-27-59-400-801-A “Installation of the Fuel-Transfer Pump Element”
Master Minimum Equipment List:
A330:
MMEL 28-21-01
MMEL 28-26-02
A340-200/-300:
MMEL 28-21-01
MMEL 28-21-02
MMEL 28-26-02
A340-500/-600:
MMEL 28-21-01
MMEL 28-21-02
MMEL 28-26-02 
MMEL 28-26-08

### Page 2

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A28L006-17 Rev 00 Page 2 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
MMEL 28-27-06
MMEL 28-27-07
3. REASON
The purpose of this AOT is to inform A330/A340 operators of fuel pump cavitation erosion that may lead 
to a break-through and to explain the need to perform an inspection on fuel pumps located at certain 
positions on the aircraft. 
3.1 FACTS
A pump was removed from an aircraft due to an independent failure. When returned to Eaton, cavitation 
erosion was observed to have breached the fuel pump housing through the inlet webs and exposed the 
fuel pump power supply wires.
Evaluation of previously removed pumps showed that some of these had also experienced similar 
erosion in varying degrees. However, no other instance of break-through due to cavitation erosion was 
found.
Due to design similarities, PN 568-1-28300-101, 568-1-28300-103 and 568-1-28300-200 only are 
considered affected.
3.2 CONSEQUENCES
The above scenario potentially exposes fuel to an ignition source which is considered as unsafe. 
3.3 AIM
The aim of this AOT is to inform operators of the need to perform inspections on fuel pumps PN 568-1-
28300-101, 568-1-28300-103 and 568-1-28300-200 that have accumulated more than 10000FH on the 
following positions:
 
CTR Tank 
(600QL1,600QL2)
Rear CTR Tank 
(608QL1, 
608QL2)
Standby 
pumps 
(112QA1, 
112QA2)
Aft transfer pump 
(712QN1,712QN2 
& 
711QN1,711QN2, 
711QN3, 711QN4)
A330-200 X (except A330-200F)  X  
A330-300
X (when equipped with 
wet center tank MOD 
204025)  X  
A340-200 X   
A340-300 X   
A340-500 X X X
A340-600 X  X
4. SHORT TERM ACTION

### Page 3

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A28L006-17 Rev 00 Page 3 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.1 PLANNING AND MANPOWER
4.1.1 ACCOMPLISHMENT TIMESCALE
Inspect fuel pumps above 10000FH since new or last Vendor visit, and inspect pumps prior to any 
installation, within the following timeframe based on the location:
A330-200/-300 (when equipped with wet center tank MOD 204025): 
oCenter Tank Pumps (except for A330-200F) should be inspected within 20 days. 
oStand-by pumps should be inspected within 40 days.
A340-200/-300:
oCenter Tank Pumps should be inspected within 20 days. 
A340-500:
oCenter Tank and Rear Center Tank Pumps should be inspected within 20 days. 
oAft Transfer Pumps should be inspected within 20 days.
A340-600:
oCenter Tank Pumps should be inspected within 20 days. 
oAft Transfer Pumps should be inspected within 20 days.
Note: For Center Tank pumps , Rear Center Tank pumps and Aft Transfer pumps, deactivation of the 
pumps by pulling and tagging the related circuit breaker and application of the corresponding MMEL 
Item can be considered to postpone the inspection and/or the replacement of the pump in case of 
severe erosion (case 3 below) for the MMEL Item validity duration (refer to paragraph 5.2 for details).
4.1.2 MANPOWER
The estimated time to perform the removal, inspection and re-installation of the fuel pump is 1 man-hour 
per pump.
4.2 DESCRIPTION
4.2.1 ACCESS
Please refer to ACCESS information listed in the related AMM Task (from Ref. 1 to 10)
4.2.2 INSPECTION REQUIREMENTS
The inspection can be carried out visually to evaluate the severity of the erosion if any (refer to 
paragraph 4.2.3 FINDINGS for the different actions to be performed).

### Page 4

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A28L006-17 Rev 00 Page 4 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
The following procedure should be performed for each applicable pump within the timeframe defined 
in paragraph 4.1.1 ACCOMPLISHMENT TIMESCALE:
1. Remove the pump from the A/C by applying the corresponding AMM Task (Ref. 1, 3, 5, 7 or 
9).
2. Perform a detailed visual inspection of the vane of the pump at the location indicated on 
below figures:
Figure 1 – Position of the web
3. Record and report upon inspection of each aircraft the following information for traceability:
a. Photograph of the inspected area
b. Unit Serial Number
c. Aircraft Registration Number
d. Number of Flight Hours of the Unit
e. Number of Flight Cycles of the Unit
f. Unit FIN number
g. Level of findings (ref. paragraph 4.2.3 FINDINGS)
4. Refer to Paragraph 4.2.3 FINDINGS.

### Page 5

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A28L006-17 Rev 00 Page 5 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.2.3 FINDINGS
The three below criteria are to be compared with the findings found on the pump to decide which action 
should be applied to close the inspection:
Case 1: Light Erosion (blemishing):
Surface blemishing with grey anodise treatment removed from web
Base material has begun to erode with light blemishing without pitting or cavity.
Case 2: Medium Erosion (pitting): 
An extensive surface blemishing with grey anodise treatment removed from web
Base material has eroded with pitting or single or multiple shallow cavities
Case 3: Severe Erosion (breakthrough):
Base material is heavily eroded with pitting and single or multiple deep cavities leading to 
break through the material
In case of:
No findings or Light erosion findings (blemishing): the pump is acceptable for flight but must be 
inspected again every 5000FH provided that the level of erosion remains light or non-existent as 
defined above.
Medium erosion findings (pitting): the pump is acceptable for flight but must be inspected again 
every 800FH provided that the level of erosion remains medium as defined above.
Severe erosion findings (breakthrough): the pump is not acceptable for flight and must be 
replaced immediately. For Center tank, Rear Center tank and Aft transfer Pump, it is possible to 
deactivate the pump. Refer to Paragraph 5.2 for more details.

### Page 6

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A28L006-17 Rev 00 Page 6 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.3 SPARES AND TOOLING
Retrofit policy and complementary details will be provided in RIL Ref.LR28M17010273.
5. FURTHER INFORMATION
5.1 FOLLOW-UP PLAN
It is anticipated that this AOT will be mandated by an AD. An ISB may follow to supersede or cancel this 
AOT.
5.2 IMPACTED DOCUMENTATION
The present AOT is impacting the MMEL documentation and will be followed up by a MMEL “major 
event change” and a FOT to cover all the changes.
The following changes in the MMEL are to be followed:
For A330:
MMEL Items 28-21-01 become No-Go Items.
When applicable, MMEL Items 28-26-02 can be applied provided that the related circuit 
breaker is pulled and tagged for the duration of the MMEL Item .
For A340-200/-300:
MMEL Items 28-21-01, 28-21-02 become No-Go Items. 
MMEL Items 28-26-02 can be applied provided that the related circuit breaker is pulled and 
tagged for the duration of the MMEL Item.
For A340-500:
MMEL Items 28-21-01 and 28-21-02 become No-Go Items.
MMEL Items 28-26-02 can be applied provided that the related circuit breaker is pulled and 
tagged for the duration of the MMEL Item.
MMEL Item 28-26-07 can be applied provided that the related circuit breaker is pulled and 
tagged for the duration of the MMEL Item.
For A340-600:
MMEL Items 28-21-01 and 28-21-02 become No-Go Items.
MMEL Items 28-26-02 can be applied provided that the related circuit breaker is pulled and 
tagged for the duration of the MMEL Item.
6. AOT APPROVAL
The technical content of this document is approved under the authority of DOA nr. EASA.21J.031.
7. REPORTING
Retrofit will be performed through the monitored retrofit described in RIL Ref. LR28M17010273
Questions about this AOT are to be addressed to Airbus Customer Services through TechRequest on 
Airbus World, selecting Engineering Domain, Engineering Support Section and ATA 28-21 or 28-26.

### Page 7

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A28L006-17 Rev 00 Page 7 of 7 Date: 03-NOV-2017
© AIRBUS S.A.S. 2017. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
As per latest reporting policy (Ref to OIT 999.0018/16), inspection results (with or without findings) 
including the list of information detailed in Paragraph 4.2.2 are to be addressed to Airbus Customer 
Services - upon inspection of each aircraft - through the generic e-mail address: 
inspection.results@airbus.com copy monitored.retrofit@airbus.com.
Best Regards,
Jean-Luc MOUYSSET
VICE PRESIDENT ENGINEERING SUPPORT
CUSTOMER SERVICES
Guillaume PELEGRINO
VICE PRESIDENT A330-A340  PROGRAMME
CUSTOMER SERVICES

### Page 8 (OCR)

Start
1s the pump life above  No
10000FH or is the pump being  → No further action
relocated
Inspect the pump in
accordance with paragraph
4.2.2 instructions
erosion: blemishing  Case 1: No findings or  Light level of  Assess the level of  Case 3: Severe level  of erosion: breakthrough
erosion in accordance with
paragraph 4.2.3
Case 2: Medium level
of erosion: pitting
The pump is acceptable for
flight and need to be re-
inspected after 5000FH
The pump is acceptable for
flight and need to be re-
inspected after 800FH
The pump is not acceptable for
flight and need to be replaced
or temporarily deactivated
End

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
