# Airbus Alert Operators Transmission A32L004-14

Copy: No revision named ("AOT A32L004-14"), 5 pages: PDF https://openairdocs.org/files/sha256/75/2f/752f781079dad1019ccd0755e7b959a9d3093589a2762084fd55b0c1a84250f4; text https://openairdocs.org/service-documents/airbus/aot-a32l004-14/file/752f781079da.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-1981; AD 2016-01-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Other document (Alert Operators Transmission)
- Number: A32L004-14
- Page: https://openairdocs.org/service-documents/airbus/aot-a32l004-14

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-01-03](https://openairdocs.org/ad/2016-01-03.md), effective Feb 17, 2016: No revision named

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/aot-a32l004-14/proposed.md).

## Text (5 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-1981; AD 2016-01-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CUSTOMER SERVICES DIRECTORATE 
1 ROND POINT MAURICE BELLONTE 
31707 BLAGNAC CEDEX FRANCE 
TELEPHONE + 33 (0)5 61 93 33 33 
AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A32L004-14 Page 1 of 5 Date: 28-JUL-2014 
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT 
 
 
SUBJECT: ATA  32 –  MAIN LANDING GEAR (MLG) BOGIE BEAM BORE INSPECTION 
  
 
AIRCRAFT TYPE:  A330,A340 
 
 
OUR REF.:  A32L004-14 dated  28-JUL-2014. 
 
 
1. AIRCRAFT AFFECTED 
 
A330-200/300 and A340-200/300 fitted with PN 201252 series or PN 201490 series Main Landing Gear 
that are Pre-Modification 58896 (Ref. 2 embodied by Ref. 15 and Ref. 16) 
 
And 
 
Whose last overhaul was pre CMM 32-11-74 Rev.26 (201252 series - issued 1st October 2010) or CMM 
32-12-05 Rev.21 (201490 series - issued 1st October 2010) 
 
Note: if the operator has carried out Bogie bore inspection in accordance with A33/34- 32-272 (Ref. 9) 
since or concurrently with the last application of A33/34-32-285 (Ref. 14), then the MLG is not affected 
by this AOT. If VSB A33/34 -32-285 has been carried out after the application of the VSB A33/34- 32-
272 (Ref. 9), then the MLG is affected by this AOT.  
 
 
2. REFERENCED DOCUMENTATION 
 
2.1 APPENDIX 
 
Appendix 1: Flow chart 
Appendix 2: Proforma for reporting 
Appendix 3: Area to be cleaned and inspected 
Appendix 4: Method of repair 
 
2.2 REFERENCES 
 
Ref. 1: AMM 32-11-14-010-801A Removal of the MLG Bogie Beam assembly for access, complete with 
wheels and brakes. 
Ref. 2: Modification 58896 - Improved 2 part paint scheme for Basic, Growth and Enhanced MLG Bogie 
Beam. 
Ref. 3: CMM 32-11-74, Basic MLG, Bogie Assembly, Messier-Bugatti-Dowty 
Ref. 4: CMM 32-12-05, Growth MLG, Bogie Assembly, Messier-Bugatti-Dowty  
Ref. 5: 20-00-10, Messier-Bugatti-Dowty Standard Practices Manual 
Ref. 6: PCS-2700, Paint Stripping, Messier-Dowty 
Ref. 7: PCS-2800, Temporary Corrosion and damage protection of parts, Messier-Bugatti-Dowty  
Ref. 8: PCS-2500, Polyurethane Paint – Two-Coat Process, Messier-Bugatti-Dowty 
Ref. 9: A33/34-32-272 Inspection of the Bogie Beam Internal Diameter for Corrosion, Messier B ugatti 
Dowty (Service Bulletin) 
Ref. 10: PCS-2141, LHE Cadmium Brush Plating, Messier-Bugatti-Dowty

### Page 2

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT  
 
AOT ref: A32L004-14 Page 2 of 5 Date: 28-JUL-2014 
IRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT 
 
Ref. 11: M-DLPS1004-4-1, Machining Requirements for Ultra High Tensile Steels 1760MPa (255 KSI) 
Tensile Strength and Above, Dowty Aerospace Gloucester Limited 
Ref 12: M-DLNDT 17 Eddy Current Flaw Detection Method, Messier-Dowty 
Ref 13: PCS-2302 Rotary Flap Peening of Metal Parts, Messier-Dowty 
Ref 14: A33/34-32-285 Inspection of the Bogie Pivot Pin, Messier-Bugatti-Dowty (Service Bulletin). 
Ref 15: SB A330-32-3237, A340-32-4279, Improved 2 part paint scheme for Basic, Growth and 
Enhanced MLG Bogie Beam, Airbus, Oct 14/11. 
Ref 16: A33/34- 32-283 (Enhanced), SB A33/34-32-284 (Basic, Growth) , Introduction of a new Bogie 
and Dressings with a new two coat paint procedure, Messier-Bugatti-Dowty (Service Bulletin). 
 
 
3. REASON 
 
From in -service experience it was found that the inner bore of some bogie beams had been 
insufficiently re- protected against corrosion after inspection and/or possible maintenance actions  
performed in this area (absence of corrosion inhibitor and damage to paint protection has been found 
in some specific areas) 
 
The purpose of this AOT is to request operators to accomplish a one-off clean, removal of the temporary 
corrosion inhibiting protection and inspection of the paint. Furthermore if paint is found to be damaged 
the operator is requested to inspect for corrosion on the MLG Bogie Beam internal bore over an area 
around the Bogie Pivot pin (Appendix 3).  
 
3.1 FACTS 
 
Evidence from In-Service Experience of Bogie Pivot Pin inspections has shown that the Bogie Beam 
internal bore corrosion protection may be damaged or missing in the area of the bogie pivot pin bore. 
 
3.2 CONSEQUENCES 
 
Insufficient corrosion protection can lead to corrosion of the bogie bore base metal and potentially lead 
to the rupture of the Bogie Beam if left undetected.   
 
3.3 AIM 
 
This AOT requests operators to inspect and restore any damaged paint in the area shown in Appendix 
3, with a two part paint scheme in accordance with Appendix 4, and to restore the temporary corrosion 
inhibiting compound in accordance with Ref. 7 if no corrosion is found. If corrosion is found, this shall be 
repaired in accordance with Appendix 4 and the corrosion protection restored in accordance with 
Appendix 4 & Ref. 7. 
 
 
4. SHORT TERM ACTION 
 
 
4.1 PLANNING AND MANPOWER 
 
4.1.1 ACCOMPLISHMENT TIMESCALE 
 
- The accomplishment of the Cleaning, inspection and restoration of the corrosion protection 
called for in Para 4.2 must be performed no later than 12 months after the issuance of this 
AOT.

### Page 3

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT  
 
AOT ref: A32L004-14 Page 3 of 5 Date: 28-JUL-2014 
IRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT 
 
 
- Embodiment of VSB A33/34-32-272 (SB 32-4268 or SB 32-3225) within the 12 months, which 
follows the issuance of this AOT, constitutes an acceptable method to comply with the 
requirements of this AOT. 
 
4.1.2 MANPOWER 
 
It is estimated that it will take approximately 4 man- hours to do this instruction for each Main Landing 
Gear leg.  
 
Note 1: It is assumed that the equipment has been placed in a maintenance status and man- hour 
estimates do not include preparation, close-out or administrative functions. 
 
Note 2: AV100D takes a minimum of 8 hours to cure, refer to PCS -2800 (Ref. 7). It is important to 
comply with the protective treatment curing time. AV100D should be fully cured before reassembly of 
the Bogie Pivot pin.  
 
4.2 DESCRIPTION 
 
4.2.1 ACCESS 
 
Note: This inspection check can be done with the Bogie, Dressings, Wheels and Brakes attached to the 
Bogie Beam Assembly and the Bogie Beam assembly aligned with the Sliding tube. The procedure for 
the preparation of the inspection is found in Ref. 1.  
 
Remove the bogie pivot pin in accordance with Ref. 1 procedures.  
 
Note: This AOT can be accomplished without disconnecting the middle part of the Brake Rods or 
moving the Bogie Beam away from the aircraft. 
 
4.2.2 INSPECTION REQUIREMENTS 
 
WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING 
NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:  
 THE FLIGHT CONTROLS 
 THE FLIGHT CONTROL SURFACES 
 
- 4.2.2.1 Detailed Clean: 
 
Use a clean dry lint free cloth to remove any build- up of grease and to clean the area around 
the interface between the Bogie Pivot pin and the Bogie Beam bore (Appendix 3) ensuring 
that the area of inspection extends beyond the Bogie Bore change in internal profile 
(minimum 200mm from the Bogie Pivot Centre-Line). 
 
Carefully remove the temporary corrosion inhibiting compound in the area as defined in 
Appendix 3 in accordance with Ref. 7 by swabbing using a clean, dry lint free cloth and White 
Spirit only.  
 
NOTE: Application of White Spirit  is to be onto the cloth prior to cleaning and must not be 
poured directly into the Bogie Beam bore. 
  
 
- 4.2.2.2 Detailed Inspection:

### Page 4

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT  
 
AOT ref: A32L004-14 Page 4 of 5 Date: 28-JUL-2014 
IRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT 
 
 
- Carry out detailed visual inspection of the paint over the area defined in Appendix 3 
 
o NOTE: The detailed visual inspection can be made using a light source and mirror or 
a boroscope to ensure full coverage of the area defined in Appendix 3.    
 
- If the paint is found to be missing or damaged locally remove in accordance with Appendix 4 
paragraph 1.(1) and: 
 
o Carry out detailed visual surface inspection of the Cadmium plate / base metal over 
the affected area in accordance with Appendix 4 paragraph 1. (2) and repair any 
corrosion or damage in accordance with Appendix 4 paragraph 1.(3). 
o Record condition of any corroded areas in Appendix 2. 
 
- Restore paint in accordance with Appendix 4 paragraph 1.(2) or 1.(3) as appropriate and restore 
temporary corrosion inhibiting compound in accordance with Appendix 4 paragraph 1.(3)(j) and 
Ref. 7. 
- If paint is not found to be missing or damaged then restore temporary corrosion inhibiting 
compound in accordance with Appendix 4 paragraph 1.(3)(j) and Ref. 7. 
 
4.2.3 FINDINGS 
 
Proforma (Appendix 2) to be returned to Airbus within 90 days of completion of inspection. 
 
4.3 SPARES AND TOOLING 
 
See Appendix 4  
 
 
5. FURTHER INFORMATION 
 
It is anticipated that this AOT will be rendered mandatory by issuance of an EASA Airworthiness 
Directive (AD). 
 
 
6. AOT APPROVAL 
 
The technical content of this document is approved under the authority of DOA nr. EASA.21J.031.  
 
 
7. REPORTING 
 
Questions about this AOT and inspection results with or without findings are to be sent to Airbus 
Customer Services engineering as soon as possible, after the AOT application, to the attention of: 
 
Philippe Kerangueven 
Product Leader A330/340 
ATA 32 - Landing Gear Systems 
Customer Services – SEEL1 
AIRBUS  
    
Phone : +33 (0) 5 67 19 18 42 
Fax : +33 (0) 5 67 19 12 05 
Email: philippe.kerangueven@airbus.com

### Page 5

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT  
 
AOT ref: A32L004-14 Page 5 of 5 Date: 28-JUL-2014 
IRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT 
 
 
Best Regards, 
 
 
 
Jean-Luc MOUYSSET 
VICE PRESIDENT ENGINEERING SUPPORT 
CUSTOMER SERVICES 
Philippe GOURDON 
VICE PRESIDENT A330/A340 PROGRAMME 
CUSTOMER SERVICES

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.