Copy: No revision named ("AOT_A57P016-21_r00"), 11 pages: PDF https://openairdocs.org/files/sha256/2f/b9/2fb9d142a4b1fbe7d8ea6b65c0364235423f0db24e82cfd138a3c38111be56cc; text https://openairdocs.org/service-documents/airbus/aot-a57p016-21/file/2fb9d142a4b1.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0657, the docket of AD 2022-03-10. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Other document (All Operators Transmission)
- Number: A57P016-21
- Page: https://openairdocs.org/service-documents/airbus/aot-a57p016-21

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2022-03-10](https://openairdocs.org/ad/2022-03-10.md), effective Mar 17, 2022: No revision named

## Text (11 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2021-0657, the docket of AD 2022-03-10. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CUSTOMER SERVICES DIRECTORATE
2 ROND POINT EMILE DEWOITINE
31700 BLAGNAC FRANCE
TELEPHONE + 33 (0)5 61 93 33 33
ALERT OPERATORS TRANSMISSION - AOT
AOT ref: A57P016-21 Rev 00 Page 1 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
SUBJECT: ATA 57 – Inspection of Main Landing Gear Support Structure Fuse Pins
AIRCRAFT TYPE: A350
OUR REF.: A57P016-21 Rev 00 dated 01-APR-2021
EFFECTIVITY DATE: 8 April 2021.
1. AIRCRAFT AFFECTED
All A/C listed below:
MODEL MSN
A350-900
0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 
0020, 0021, 0022, 0023, 0024, 0026, 0027, 0028, 0029, 0030, 0031, 0034, 0035, 0037, 
0040, 0080, 0081, 0082, 0083, 0084, 0085, 0086, 0087, 0089, 0090, 0091, 0092, 0093, 
0094, 0095, 0096, 0097, 0098, 0099, 0100, 0101, 0103, 0104, 0105, 0106, 0107, 0109, 
0111, 0112, 0113, 0114, 0115, 0116, 0117, 0119, 0120, 0121, 0122, 0123, 0124, 0126, 
0127, 0128, 0129, 0130, 0132, 0133, 0134, 0135, 0136, 0137, 0138, 0140, 0142, 0143, 
0144, 0145, 0146, 0147, 0148, 0149, 0150, 0151, 0153, 0154, 0155, 0157, 0158, 0159, 
0160, 0162, 0163, 0164, 0165, 0167, 0168, 0170, 0172, 0173, 0174, 0175, 0176, 0177, 
0178, 0179, 0180, 0181, 0182, 0183, 0184, 0185, 0186, 0187, 0189, 0190, 0191, 0192, 
0193, 0195, 0196, 0197, 0198, 0199, 0200, 0201, 0202, 0203, 0204, 0205, 0207, 0208, 
0209, 0210, 0211, 0212, 0213, 0214, 0216, 0217, 0218, 0219, 0220, 0221, 0223, 0224, 
0226, 0227, 0228, 0230, 0231, 0232, 0234, 0235, 0236, 0237, 0238, 0239, 0240, 0243, 
0244, 0245, 0246, 0247, 0248, 0249, 0250, 0251, 0254, 0255, 0256, 0257, 0259, 0260, 
0261, 0263, 0264, 0265, 0267, 0268, 0269, 0271, 0272, 0273, 0276, 0277, 0278, 0279, 
0280, 0281, 0282, 0284, 0287, 0289, 0291, 0292, 0293, 0294, 0295, 0297, 0299, 0300, 
0301, 0302, 0303, 0305, 0307, 0309, 0310, 0311, 0312, 0313, 0314, 0316, 0318, 0320, 
0321, 0322, 0324, 0325, 0327, 0328, 0329, 0331, 0333, 0334, 0335, 0337, 0339, 0341, 
0343, 0344, 0345, 0347, 0348, 0349, 0351, 0352, 0354, 0355, 0357, 0358, 0359, 0363, 
0364, 0365, 0366, 0369, 0370, 0371, 0373, 0375, 0376, 0378, 0379, 0381, 0383, 0385, 
0387, 0389, 0390, 0391, 0392, 0394, 0395, 0396, 0397, 0398, 0400, 0401, 0403, 0404, 
0405, 0406, 0407, 0408, 0410, 0411, 0412, 0413, 0416, 0418, 0419, 0421, 0422, 0425, 
0427, 0431, 0433, 0436, 0439, 0443, 0445, 0447, 0451, 0455, 0458, 0468, 0476
A350-1000
0088, 0102, 0110, 0118, 0125, 0141, 0161, 0169, 0188, 0206, 0215, 0225, 0229, 0233, 
0241, 0252, 0258, 0262, 0266, 0274, 0286, 0290, 0296, 0298, 0306, 0315, 0319, 0326, 
0330, 0332, 0336, 0340, 0342, 0346, 0350, 0356, 0362, 0368, 0372, 0374, 0380, 0382, 
0386, 0388, 0399, 0402, 0415, 0420, 0426, 0432, 0446
2. REFERENCED DOCUMENTATION
2.1 APPENDIX
Appendix 1: Inspection Flow Chart
Appendix 2: Inspection Report Form
2.2 REFERENCES
[1] A350 IPD 57-26-63-02 – ATTACHMENT INSTL MLG
[2] Repair Instruction for A350-900: R57V-40112 (Removal and Replacement of Fuse Pins, 
MLG FWD Pintle Assembly, Both Wings)

### Page 2

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 2 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
[3] Repair Instruction for A350-1000: R57V-40113 (Removal and Replacement of Fuse Pins, 
MLG FWD Pintle Assembly, Both Wings)
[4] MP Task A350-A-32-12-XX-00ZZZ-397Z-A – Open the MLG Doors for Maintenance
[5] NDT A350-A-51-99-XX-01001-040A-A – Visual
3. REASON
3.1 FACTS
During maintenance inspection, an operator reported that one of the Fuse Pins retaining the Main Landing 
Gear Support Structure (MLGSS) was not correctly engaged in the Trunnion Block and not correctly 
secured with the associated Retaining Pin.
A mis-installation of Fuse Pins at MLGSS Forward Pintle was identified as the root cause of such finding.
The Trunnion Block installed in the Forward Pintle fitting ensures the connection between the Main 
Landing Gear (MLG) and the Wing Rear Spar.
The Trunnion Block is secured by 4 (four) Fuse Pins and the Fuse Pin Carrier is secured by 2 (two) Fuse 
Pins in accordance with Ref [1].
All Fuse Pins are locked by Retaining Pins to prevent rotation and migration.
A/C not listed in §1 were already inspected and cleared in production.
For these A/C the Fuse Pins were correctly engaged and secured with associated Retaining Pins.
C
D
B
A350-900 shown, A350-1000 similar
Figure 1 – Details of affected area

### Page 3

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 3 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
C
Fuse Pin
Fuse Pin
Fuse Pin
E
D
Fuse Pin
Figure 2 – Fuse Pins at Trunnion Block Assembly
Fuse Pin
Fuse PinE
Figure 3 – Fuse Pins at Fuse Pin Carrier Assembly

### Page 4

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 4 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Retaining Pin
E
Figure 4 – Retaining Pin installation
3.2 CONSEQUENCES
The Fuse Pin is categorised as Principal Structure Element (PSE).
If a Fuse Pin is not correctly engaged and secured by the Retaining Pin, migration of the Fuse Pin may 
occur. In the worst case, it could lead to the loss of the Fuse Pin.
If no corrective action is performed, this could lead to a MLG collapse under standard operations.
3.3 AIM
The aim of this AOT is to provide instructions for a one-time inspection of the 6 (six) Fuse Pins installed 
at MLGSS Trunnion Block and Fuse Pin Carrier.
This one-time inspection will check the installation to ensure the complete set of the 6 (six) Fuse Pins are 
correctly engaged and secured with their Retaining Pins.
4. SHORT TERM ACTION
NOTE: This AOT is classified mandatory or expected to be classified mandatory by an Airworthiness 
Directive (AD). The accomplishment instructions marked as Required for Compliance (RC) must be done 
to comply with the AD. “RC” is indicating these paragraphs accordingly. 
NOTE: The accomplishment instructions of this AOT include procedures given in other documents or in 
other sections of the AOT. When the words ’refer to’ are used and the operator has a procedure accepted 
by the local authority he belongs to, the accepted alternative procedure can be used. When the words ’in 
accordance with’ are used then the given procedure must be followed.
NOTE: The access and close-up instructions, not comprising return to service tests, in this AOT do not 
constitute or affect the technical intent of the AOT. Operators can therefore, as deemed necessary, omit 
or add access and/or close-up steps to add flexibility to their maintenance operations as long as the 
technical intent of the AOT is met within the set parameters.

### Page 5

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 5 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.1 PLANNING AND MANPOWER
NOTE:
Airbus recommend to perform the instructions mentioned in this AOT in a suitable location with appropriate 
maintenance facilities.
Indeed, in case of finding such as one Fuse Pin not correctly installed, repair instructions might require 
aircraft jacking in accordance with Ref [2] or Ref [3], depending of A/C type A350-900 or A350-1000.
On a case by case basis, if the reported finding cannot be repaired at the aircraft location, Airbus shall be 
contacted to review if a repositioning flight can be granted.
However, in case of more than one Fuse Pin reported not correctly installed, then Airbus won’t be in 
position to grant such repositioning flight.
4.1.1 ACCOMPLISHMENT TIMESCALE – (RC)
The inspection as described in paragraphs 4.2.2 and 4.2.3 must be completed within 6 months or 500 
Flight Cycles (FC) whichever occurs first from the effective issuance date of this AOT.
4.1.2 MANPOWER
The estimated time to perform the inspection defined in paragraph 4.2.2 is 1 Man Hour per A/C if no 
findings.
The inspection can be performed by one person.
The estimated time to perform the corrective action defined in paragraph 4.2.3 is 24 Man Hours per 
A/C for one side and 30 Man Hours per A/C for both sides.
4.2 DESCRIPTION
4.2.1 ACCESS
Use a standard platform or cherry picker to get access to the inspection area close to the wing MLG 
Forward Pintle Pin Trunnion assembly. 
Open the MLG Doors for access, in accordance with Ref [4].
Put the WARNING NOTICE(S) in position adjacent to the landing-gear control lever to tell persons not to 
operate the landing gear.

### Page 6

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 6 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.2.2 INSPECTION REQUIREMENTS – (RC)
On the Left Hand (LH) and the Right Hand (RH) wing:
Perform a Visual Inspection in accordance with Ref [5] of the 6 (six) Fuse Pins and associated Retaining 
Pins shown in figures 2, 3, 4 to confirm the Fuse Pins are correctly installed.
“Correctly installed” is defined as: Fuse Pin secured by the Retaining Pin (Refer to Fig. 5 and Fig. 6).
Any suitable tools may be used to complete this inspection (i.e. Light, inspection mirror).
I. If the 6 (six) Fuse Pins are correctly installed, no further action is required from this AOT.
Fuse Pin engaged and 
secured with Retaining Pin
Note: Fuse Pin head mark can be at 
12 o’clock, 6 o’clock or not visible.
Figure 5 – Fuse Pin with Retaining Pin correctly installed
Figure 6 – Fuse Pin with Retaining Pin correctly installed


### Page 7

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 7 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
II. If one Fuse Pin is not correctly installed on the Left or Right side, proceed to step 4.2.3 
corrective action for the affected side.
Retaining Pin not securing 
the Fuse Pin
Fuse Pin not engaged in the 
Trunnion Block
X
X
Fuse Pin migrated
Figure 7 – Fuse Pin with the Retaining Pin not correctly installed 
III. If more than one Fuse Pin are not correctly installed on the Left or Right side, contact Airbus.

### Page 8

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 8 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.2.3 CORRECTIVE ACTION – (RC)
If only one Fuse Pin is not correctly installed accomplish the corrective actions in accordance with Ref 
[2] or Ref [3]. 
If more than one Fuse Pin per side are incorrectly installed, contact Airbus before next flight for further 
instructions.
4.3 SPARES AND TOOLING
In case of corrective action with Ref [2] or Ref [3], the Fuse Pins must be removed with a dedicated 
Fuse Pin extractor tool:
- For A350-900: P/N 98V57004012000.
- For A350-1000 P/N 98V57004042000.
NOTE: A350-1000 Fuse Pin extractor tool can be used on A350-900.
            The extractor tool for A350-900 can not be used for A350-1000. 
In case of corrective action, please find below the procedure for Fuse Pin sourcing:
- Send the inspection report form (Appendix 2) to Airbus Customer Services through TechRequest on 
Airbus World, selecting Engineering Domain, Engineering Support Section and ATA 57-26.
- Once Airbus Customer Services validate the Fuse Pins sourcing please contact your Single Point Of 
Contact (SPOC) through http://spares.airbus.com on AOG basis; for Free Of Charge (FOC) Fuse Pins 
delivery. These FOC conditions are valid until the end of the AOT compliance timeframe.
-In case of no spare availability and only one Fuse Pin not correctly installed, a temporary RDAF can be 
analyzed on a case by case basis to reinstall the initial Fuse Pins with a life limitation.
5. FURTHER INFORMATION
5.1 FOLLOW-UP PLAN
This AOT is expected to be mandated by an Airworthiness Directive (AD) published by the Airworthiness 
Authorities. 
5.2 IMPACTED DOCUMENTATION
No specific documentation is impacted.
6. AOT APPROVAL
The technical content of this document is approved under the authority of the DOA ref.EASA.21J.031.

### Page 9

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 9 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
7. REPORTING
Questions about this AOT are to be addressed to Airbus Customer Services through TechRequest on 
Airbus World, selecting Engineering Domain (Engineering Support) and ATA 57-26.
As per latest reporting policy (Ref to OIT 999.0018/16), inspection results (with or without findings) are to 
be addressed to Airbus Customer Services through the generic e-mail address: 
inspection.results@airbus.com.
Best Regards,
Christian FREMONT
VICE PRESIDENT ENGINEERING SUPPORT
CUSTOMER SERVICES
Pilar ALVAREZ
VICE PRESIDENT A350  PROGRAMME
CUSTOMER SERVICES

### Page 10 (OCR)

AIRBUS
ALERT OPERATORS TRANSMISSION - AOT
APPENDIX 1 - Inspection Flow Chart
Within 500FC or 6 Months whichever occurs
first from the effective issuance date of this
AOT
Perform a Visual Inspection of the 6 fuse pins
at MLG Forward Pintle Fitting
LH and RH Wing
4 on trunnion block)  Are the 6 Fuse pins  (2 on carrier and  YES  Send Inspection results  (Appendix2) with NIL  FINDING to Airbus in  accordance with OIT  No Further Action Required
correctly installed?  999.0018/16
NO
Is there more than
one Fuse Pin per  YES  Contact AIRBUS before
side incorrectly  next flight
installed ?
NO
Send Inspection results to support
spare management (Appendix2)
to Airbus in accordance with OIT
999.0018/16
Perform corrective action in
accordance with Ref [2] Or Ref [3]
No Further Action Required
AOT ref: A57P016-21 Rev 00  Page 10 of 11  Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

### Page 11

ALERT OPERATORS TRANSMISSION - AOT 
AOT ref: A57P016-21 Rev 00 Page 11 of 11 Date: 01-APR-2021
© AIRBUS S.A.S. 2021. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
APPENDIX 2 – Inspection Report Form
A/C INFORMATION:
OPERATOR: 
A/C MSN:
A/C REGISTRATION:
FLIGHT CYCLES
FLIGHT HOURS: 
DATE OF INSPECTION:
VISUAL INSPECTION RESULT:
Fuse Pin Outboard Upper
Fuse Pin Outboard Middle
Fuse Pin Outboard Lower
Fuse Pin Inboard Middle
Fuse Pin Inboard Lower
Fuse Pin Inboard Upper
                          Fuse Pins Identification (LHS view).
FUSE PIN CORRECTLY INSTALLED? LH WING (Y/N) RH WING (Y/N)
Fuse Pin Outboard Upper
Fuse Pin Inboard Upper
Fuse Pin Outboard Middle
Fuse Pin Inboard Middle
Fuse Pin Outboard Lower
Fuse Pin Inboard Lower
COMMENTS:

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.