# Airbus All Operators Transmission A71L008-14

Copy: Revision 01 ("AOT_A71L008_14 R01"), 9 pages: PDF https://openairdocs.org/files/sha256/7e/49/7e498db87ec920970d8debb6144e401ce3895e1d8c0417ebe04993b20eae25f5; text https://openairdocs.org/service-documents/airbus/aot-a71l008-14/file/7e498db87ec9.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-7533; AD 2016-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Other document (All Operators Transmission)
- Number: A71L008-14
- Latest revision known: A71L008-14, Revision 01, dated December 18, 2014 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/aot-a71l008-14

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2016-11-01](https://openairdocs.org/ad/2016-11-01.md), effective Jul 12, 2016: Revision 01

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/airbus/aot-a71l008-14/proposed.md).

## Text (9 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-7533; AD 2016-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

CUSTOMER SERVICES DIRECTORATE
1 ROND POINT MAURICE BELLONTE
31707 BLAGNAC CEDEX FRANCE
TELEPHONE + 33 (0)5 61 93 33 33
AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT
AOT ref: A71L008-14 Rev 01 Page 1 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
SUBJECT: ATA  71 –  TRENT 500 - AFT AND FWD ENGINE MOUNT BOLTS - TORQUE CHECK
AIRCRAFT TYPE:  A340-500,A340-600
OUR REF.:  A71L008-14 Rev 01 dated  18-DEC-2014.
OUR PREV. REF.: A71L008-14 Rev 00 dated 29-SEP-2014.
0. REASON FOR REVISION
The revision 01 is issued to include part numbers into aft engine mounts parts (Washer and Nut 
Retainer) and the Engine Manual task references.
The revised paragraphs are indicated between **BEG. REV** and **END REV**.
1. AIRCRAFT AFFECTED
Applicable to all A340-500/600 aircraft fitted with TRENT500 engines within below effectivity and on 
engine(s) that was (were) never removed since first Entry Into Service (EIS):
- From MSN0715 included,
- Till MSN1122 included.
2. REFERENCED DOCUMENTATION
2.1 APPENDIX
N/A
2.2 REFERENCES
AMM Task 20-21-11
AMM Task 24-42-00-862-801
AMM Task 24-42-00-861-801
AMM Task 71-00-51-400-801-A
AMM Task 71-13-00-010-806
AMM Task 71-13-00-410-806
AMM Task 78-30-00-440-814
AMM Task 78-30-00-040-815
AMM Task 78-36-00-010-804
AMM Task 78-36-00-410-804
AIPC Figure 70 (Sheet 01/01) / 71-21-42
AIPC Figure 70 (Sheet 01/01) / 71-22-42
**BEG. REV** 
Rolls-Royce Engine Illustrated Parts Catalogue Figure 71-21-11-01 FRONT MOUNT
Rolls-Royce Engine Illustrated Parts Catalogue Figure 71-21-12-01 REAR MOUNT

### Page 2

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 2 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
**END REV**
3. REASON
3.1 FACTS
In July 2013, while performing an engine removal on an A330 aircraft at the Airbus Long Range (LR) 
Final Assembly Line (FAL) in Toulouse, one forward engine mount bolt was found not torqued.
The investigation concluded this was due to a human error during engine installation.
All other aircraft that were in the FAL were inspected and confirmed compliant.
Since January 2014 an improved process related to engine installation is applied in LR FAL.
However it is possible that some aircraft may have been delivered between Jun-2006 and Jan-2014 with 
under torqued bolts, and consequently a torque check of the AFT and FWD engine mount bolts is 
required.
3.2 CONSEQUENCES
Engine mounts are certified with a failsafe case considering one pylon bolt fully broken. However, it is 
possible that some aircraft may have been delivered with one or several bolt under-torqued.
3.3 AIM
The aim of this AOT is to provide operators with the instructions to perform a onetime torque check on 
the AFT and FWD engine mount bolts.
This AOT applies to aircraft within effectivity defined in paragraph 1 of this AOT and whose engines 
have never been removed since first EIS.
4. SHORT TERM ACTION
4.1 PLANNING AND MANPOWER
4.1.1 ACCOMPLISHMENT TIMESCALE
Airbus requires that the inspections as per procedure described in paragraph 4.2, are carried out at first 
opportunity and no later than 2000FH after receipt of this “Alert Operators Transmission”.
4.1.2 MANPOWER
The estimated time to perform the inspection is 3 man-hours (MH) per engine:
- Get and close access: 2 MH.
- Check Torque of aft and fwd Bolts: 1 MH.
The estimated time to perform the corrective action(s) in case of findings is:
- Torqueing on an under-torqued bolt (get and close access time not included): 0,5 MH
- Replacement of all fwd engine mount bolts and nuts:
o All bolts at once (requiring engine removal and then reinstallation): 10MH
- Replacement of all aft engine mount bolts and nuts:
o All bolts at once (requiring engine removal and then reinstallation): 10MH
4.2 DESCRIPTION

### Page 3

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 3 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
4.2.1 ACCESS
4.2.1.1 Get access
Make sure that the safety devices and the warning notices are in position before you start a task on or 
near:
- The flight control.
- The flight control surfaces.
- The landing gear and the related doors.
- Components that move.
Movement of components can kill or injure persons.
WARNING: YOU MUST BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER 
THE ENGINE IS SHUTDOWN. THE ENGINE PARTS CAN STAY HOT FOR ALMOST 1 HOUR.  
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS 
CAN CAUSE AN INJURY. IF YOU GET AN INJURY PUT IT IN COLD WATER FOR 10 MINUTES 
AND GET MEDICAL AID.  
Energize the ground service network as per AMM Task 24-42-00-861-801.
Make sure the engine 1 (2) (3) (4) has been shut down for a minimum of 5 minutes before doing this 
procedure.
Put a WARNING NOTICE(S) to tell persons not to start the engines.
Get Access to the Avionics Compartment
- Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE 
Open, safety and tag these circuit breakers: 
- FOR FIN 4040EM1 (DEMOUNTABLE POWER PLANT, ENG1) 
o Panel: 722VU / Designation: T/R LOCKING ENG 1 / FIN: 3EG1 / Location: B44 
o Panel: 722VU / Designation: FADEC B ENG 1 / FIN: 13KS1 / Location: K46 
o Panel: 742VU / Designation: FADEC A ENG 1 / FIN: 12KS1 / Location: N74
- FOR FIN 4040EM2 (DEMOUNTABLE POWER PLANT, ENG2) 
o Panel: 721VU / Designation: T/R LOCKING ENG 2 / FIN: 3EG2 / Location: G07 
o Panel: 722VU / Designation: FADEC B ENG 2 / FIN: 13KS2 / Location: D43 
o Panel: 742VU / Designation: FADEC A ENG 2 / FIN: 12KS2 / Location: Q73 
- FOR FIN 4040EM3 (DEMOUNTABLE POWER PLANT, ENG3)
o Panel: 722VU / Designation: T/R LOCKING ENG 3 / FIN: 3EG3 / Location: F41 
o Panel: 722VU / Designation: FADEC B ENG 3 / FIN : 13KS3 / Location: K47 
o Panel: 742VU / Designation: FADEC A ENG 3 / FIN : 12KS3 / Location: Q74
- FOR FIN 4040EM4 (POWER PLANT-DEMOUNTABLE, ENG4)
o Panel: 721VU / Designation: T/R LOCKING ENG 4 / FIN: 3EG4 / Location: C04 
o Panel: 722VU / Designation: FADEC B ENG 4 / FIN : 13KS4 / Location: D44
o Panel : 742VU / Designation : FADEC A ENG 4 / FIN : 12KS4 / Location: N75
Open the fan cowl doors as per AMM Task 71-13-00-010-806:
- For 4040EM1 (POWERPLANT- DEMOUNTABLE, ENG1) 415AL, 416AR
- For 4040EM2 (POWERPLANT- DEMOUNTABLE, ENG2) 425AL, 426AR
- For 4040EM3 (POWER PLANT-DEMOUNTABLE, ENG3) 435AL, 436AR
- For 4040EM4 (POWER PLANT-DEMOUNTABLE, ENG4) 445AL, 446AR

### Page 4

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 4 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Deactivate the thrust reverser for maintenance as per AMM Task 78-30-00-040-815
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR 
AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND 
CAUSE INJURY AND/OR DAMAGE.  
Open the thrust reverser doors as per AMM Task 78-36-00-010-804:
- FOR 4040EM1 (POWER PLANT-DEMOUNTABLE, ENG1), 417AL, 418AR.
- FOR 4040EM2 (POWER PLANT-DEMOUNTABLE, ENG2), 427AL, 428AR.
- FOR 4040EM3 (POWER PLANT-DEMOUNTABLE, ENG3), 437AL, 438AR.
- FOR 4040EM4 (POWER PLANT-DEMOUNTABLE, ENG4), 447AL, 448AR
4.2.1.2 Forward Engine mount
Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the side of the engine.  
Remove Forward Mount Bolt Retaining assy.  
(Refer to AIPC Figure 70 (Sheet 01/01) / 71-21-42)
- Remove the bolts (items 10 and 15), washers (item 30), nuts (items 45 and 50), brackets (items 
60) and plates (items 70 and 80) from the four bolts (item 20).  
Proceed to torque check as detailed in paragraph 4.2.2.1 and proceed to corrective actions defined in 
4.2.3.1 in case of findings. Refer to paragraph 4.3 for bolts, nuts and washers part numbers.
Install Forward Mount Bolt Retaining assy.  
(Refer to AIPC Figure 70 (Sheet 01/01) / 71-21-42)
- Install the bolts (items 10 and 15), washers (item 30), nuts (items 45 and 50), brackets (items 
60) and plates (items 70 and 80) on the four bolts (item 20). Apply torque as per standard 
practices AMM 20-21-11.
Remove the ACCESS PLATFORM 5M (16 FT).
4.2.1.3 Aft Engine mount
Install an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the side of the engine.  
Remove Aft Mount Bolt Retaining assy.  
(Refer to AIPC Figure 70 (Sheet 01/01) / 71-22-42)
- Remove the bolt (item 10), washer (item 40), and retainer (items 90)  on bolt head side from the 
four bolts (item 30).
Proceed to torque check as detailed in paragraph 4.2.2.2 and proceed to corrective actions defined in 
4.2.3.2 in case of findings. Refer to paragraph 4.3 for bolts, nuts and washers part numbers.
Install Aft Mount Bolt Retaining assy.  
(Refer to AIPC Figure 70 (Sheet 01/01) / 71-22-42)
- Install the bolt (item 10), washer (item 40), and retainers (items 90) from the four bolts (item 30). 
- Torque the bolts (item 10) as per standard practices specified into AMM task 20-21-11.
Remove the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE.
4.2.1.4 Close Access
Put the ACCESS PLATFORM 5M (10 FT) ADJUSTABLE in position.

### Page 5

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 5 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Make sure that the work area is clean and clear of tools and other items.
Close the thrust reverser cowl doors as per AMM Task 78-36-00-410-804:
- FOR 4040EM1 (DEMOUNTABLE POWER PLANT, ENG1), 417AL, 418AR.
- FOR 4040EM2 (POWER PLANT-DEMOUNTABLE, ENG2), 427AL, 428AR.
- FOR 4040EM3 (POWER PLANT-DEMOUNTABLE, ENG3), 437AL, 438AR.
- FOR 4040EM4 (POWER PLANT-DEMOUNTABLE, ENG4), 447AL, 448AR
Make the thrust reverser serviceable after maintenance as per AMM Task 78-30-00-440-814.
Close the fan cowl doors as per AMM Task 71-13-00-410-806:  
- For 4040EM1 (POWERPLANT- DEMOUNTABLE, ENG1) 415AL, 416AR
- For 4040EM2 (POWERPLANT- DEMOUNTABLE, ENG2) 425AL, 426AR
- For 4040EM3 (POWER PLANT-DEMOUNTABLE, ENG3) 435AL, 436AR
- For 4040EM4 (POWER PLANT-DEMOUNTABLE, ENG4) 445AL, 446AR
Remove the access platform(s).
Get access to the avionics compartment.
Remove the safety clips and the tags and close these circuit breakers: 
- FOR FIN 4040EM1 (DEMOUNTABLE POWER PLANT, ENG1) 
o Panel: 722VU / Designation: T / R LOCKING ENG 1 / FIN: 3EG1 / Location: B44
o Panel: 722VU / Designation: FADEC B ENG 1 / FIN: 13KS1 / Location: K46 
o Panel: 742VU / Designation: FADEC A ENG 1 / FIN: 12KS1 / Location: N74
- FOR FIN 4040EM2 (DEMOUNTABLE POWER PLANT, ENG2) 
o Panel: 721VU / Designation: T / R LOCKING ENG 2 / FIN: 3EG2 / Location: G07
o Panel: 722VU / Designation: FADEC B ENG 2 / FIN: 13KS2 / Location: D43 
o Panel: 742VU / Designation: FADEC A ENG 2 / FIN: 12KS2 / Location: Q73 
- FOR FIN 4040EM3 (DEMOUNTABLE POWER PLANT, ENG3)
o Panel: 722VU / Designation: T / R LOCKING ENG 3 / FIN: 3EG3 / Location: F41
o Panel: 722VU / Designation: FADEC B ENG 3 / FIN : 13KS3 / Location: K47 
o Panel: 742VU / Designation: FADEC A ENG 3 / FIN : 12KS3 / Location: Q74
- FOR FIN 4040EM4 (POWER PLANT-DEMOUNTABLE, ENG4)
o Panel: 721VU / Designation: T / R LOCKING ENG 4 / FIN: 3EG4 / Location: C04
o Panel: 722VU / Designation: FADEC B ENG 4 / FIN : 13KS4 / Location: D44
o Panel : 742VU / Designation : FADEC A ENG 4 / FIN : 12KS4 / Location: N75
De-energize the ground service network as per AMM Task 24-42-00-862-801.
4.2.2 INSPECTION REQUIREMENTS
4.2.2.1 Forward engine mount bolts
Mark all four pylon bolts head and the adjacent area to provide a reference point to indicate if the bolt 
moves.  
Apply a torque of 3540.4lbf.in (40m.daN) in a clockwise direction (tightening direction) to all four engine 
forward mount pylon bolts, to check for a loose condition.  
4.2.2.2 Aft engine mount bolts

### Page 6

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 6 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
Mark all four pylon bolts head and the adjacent area to provide a reference point to indicate if the bolt 
moves.  
Apply a torque of 4248.5lbf.in (48m.daN) in a clockwise direction (tightening direction) to all four engine 
aft mount pylon bolts, to check for a loose condition.  
4.2.3 FINDINGS
4.2.3.1 Forward engine mount bolts
4.2.3.1.1 Instructions
Check the marking applied in para 4.2.2.1 to confirm if the bolt has moved.
- If one bolt rotates:
o Before next flight, 
o Re-torque twice the affected bolt as per AMM Task 71-00-51-400-801-A 
(subtask 71-00-51-420-050-A) between 57 and 67.5m.daN (420.35 and 497.79 
lbf.ft).
o At next engine removal,
o Discard and replace the 4 bolts and nuts and washers by new ones, and 
proceed to inspections check. Refer to paragraph 4.2.3.1.2 for procedure 
details.
- If several bolts rotate:
o Contact Airbus for further actions before next flight
- If one pylon bolt fully broken:
o Discard and replace the 4 bolts and nuts and washers with new ones before next flight 
and proceed to inspections check. Refer to paragraph 4.2.3.1.2 for procedure details.
NOTE: Inspection results with or without findings have to be sent to Airbus Customer Services 
Engineering.
4.2.3.1.2 Procedure details
Bolt replacement off-wing and Inspection to carry out:
- Proceed to engine removal as per AMM Task 71-00-51 PB401.
- Remove retaining hardware from all bolts.
- Remove and replace the 4 bolts and associated nuts and washers by new ones.
- Perform Fluorescent Penetrant Inspection and dimensional check on impacted forward engine 
mount platform when engine is removed 
o If nil finding, replace the forward platform at next engine removal
o If local deformation is exhibited during the check, replace the forward platform before 
next flight 
- Install the retaining hardware on all bolts.
- Install the engine as per AMM Task 71-00-51 PB401.
**BEG. REV**
NOTE: In case of one pylon bolt is found under-torqued, the forward Platform items that have to be 
checked are 400 and 500 on RR Engine Illustrated Parts Catalogue (see Chapter 71 Power Plant -> 
Figure 71-21-11-01 FRONT MOUNT). Refer to the Rolls-Royce Engine Manual to perform the 
Fluorescent Penetrant Inspection and the dimensional checks.

### Page 7

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 7 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
**END REV**
4.2.3.2 Aft engine mount bolts
4.2.3.2.1 Instructions
Check the marking applied in para 4.2.2.2 to confirm if the bolt has moved.
- If one bolt rotates:
o Before next flight, 
o Re-torque twice the affected bolt as per AMM task 71-00-51-400-801-A 
(subtask 71-00-51-420-050-A) between 68 and 81m.daN (501.47 and 597.35 
lbf.ft).
o At next engine removal,
o Discard and replace the 4 bolts and nuts and washers by new ones, and 
proceed to inspections. Refer to paragraph 4.2.3.2.2 for procedure details
- If several bolts rotate:
o Contact Airbus for further actions before next flight  
- If one pylon bolt fully broken:
o Discard and replace the 4 bolts and nuts with new one before next flight, and proceed 
to inspections check. Refer to paragraph 4.2.3.2.2 for procedure details.
NOTE: Inspection results with or without findings have to be sent to Airbus Customer Services 
Engineering.
4.2.3.2.2 Procedure details
Bolt replacement off-wing and Inspection to carry out:
- Proceed to engine removal as per AMM Task 71-00-51 PB401.
- Remove retaining hardware from all bolts.
- Remove and replace the 4 bolts and associated nuts and washers by new ones.
- Perform Fluorescent Penetrant Inspection and dimensional check on impacted rear engine 
mount hardware when engine is removed 
o If nil finding, replace the rear beam at next engine removal
o If local deformation is exhibited during the check, replace the rear beam before next 
flight.
- Install the retaining hardware on all bolts.
- Install the engine as per AMM Task 71-00-51 PB401.
**BEG. REV**
NOTE: In case of one pylon bolt is found under-torqued, the Aft Beam (Rear Mount Beam) item that has 
to be checked is 600 on Rolls-Royce Engine Illustrated Parts Catalogue (see Chapter 71 Power Plant -> 
Figure 71-21-12-01 REAR MOUNT). Refer to the Rolls-Royce Engine Manual to perform the 
Fluorescent Penetrant Inspection and the dimensional checks.
**END REV**
4.3 SPARES AND TOOLING
4.3.1 Forward mount hardware

### Page 8

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 8 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT
- Bolt part-number: BLT5468 / FW33110
- Nut part-number: U755355
- Washer part-number: UP11304
4.3.2 Aft mount hardware
- Bolt part-number: BLT5681
- Nut part-number: U755357
**BEG. REV**
- Washer part-number: UP11493
- Nut Retainer part-number: U755358
**END REV**
5. FURTHER INFORMATION
5.1 FOLLOW-UP PLAN
No further action is expected following AOT completion.
5.2 IMPACTED DOCUMENTATION
N/A
6. AOT APPROVAL
The technical content of this document is approved under the authority of DOA nr. EASA.21J.031.
7. REPORTING
Questions about this AOT and inspection results with or without findings are to be sent to Airbus 
Customer Services engineering as soon as possible, after the AOT application, to the attention of:
Virginie HIRTZ
Nacelle Systems and Structure Engineer
Engineering Support - SEEE6
CUSTOMER SERVICES
Phone +33 (0)5 82 05 61 81
Fax +33 (0)5 61 93 36 14
Mailto: virginie.hirtz@airbus.com
Best Regards,
Jean-Luc MOUYSSET
VICE PRESIDENT ENGINEERING SUPPORT
CUSTOMER SERVICES
Philippe GOURDON
VICE PRESIDENT SUPPORT LR PROGRAMME
CUSTOMER SERVICES

### Page 9

AALLEERRTT  OOPPEERRAATTOORRSS  TTRRAANNSSMMIISSSSIIOONN  --  AAOOTT 
AOT ref: A71L008-14 Rev 01 Page 9 of 9 Date: 18-DEC-2014
© AIRBUS S.A.S. 2014. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.