# Airbus Service Bulletin 24-1062-07

Copy: No revision named ("SB_24_1062_07"), 151 pages: PDF https://openairdocs.org/files/sha256/8e/02/8e02ee30187a1e09c534af96efadd9d43b82c50a37d1e448c09286e87b9891ad; text https://openairdocs.org/service-documents/airbus/sb-24-1062-07/file/8e02ee30187a.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-5591, the docket of AD 2016-19-02. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: 24-1062-07
- Page: https://openairdocs.org/service-documents/airbus/sb-24-1062-07

## Text (151 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-5591, the docket of AD 2016-19-02. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 24
TITLE: ELECTRICAL POWER - WING S - ADDITIONAL PROTECTION FOR
CABLE ROUTES IN THE TRAILING EDGE
MODIFICATION No.: 22851J0886
This page transmits Revision No.07 of Service Bulletin No.A320-24-1062
ADDITIONAL WORK
**CONF ALL
Operators who have accomplished this Service Bulletin before Rev 05 and then accomplished the
additional work given in Rev 05 do not need to do the additional work detailed in Rev 06.
Operators who have accomplished this Service Bulletin before Rev 05 but who have not accomplished
the additional work given in Rev 05 will need to do the additional work in Rev 06.
Operators who have accomplished this Service Bulletin for the first time at Rev 05 will need to do the
additional work in Rev 06.
REASON
Revision No. 07 issued to update the modification notes in the accomplishment instructions.
The opportunity is taken to produce this Service Bulletin in the latest format.
CHANGES
SUMMARY
MODIFICATIONS
 Minor editorial or document structure change
 N
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
Minor editorial or document structure change
 N
GENERAL EVALUATION
 Minor editorial or document structure change
 N
MATERIAL PRICE INFORMATION
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Minor editorial or document structure change
 N
EFFECTIVITY
 Minor editorial or document structure change
 N
CONCURRENT REQUIREMENTS
 Minor editorial or document structure change
 N
REFERENCES / REPERCUSSIONS
 Minor editorial or document structure change
 N
NATURE OF THE WORK
 Minor editorial or document structure change
 N
MANPOWER
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
APPENDICES
 Minor editorial or document structure change
 N
Fig. A-USAAA
 Minor editorial or document structure change
 N
Fig. A-USAAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-USAAB
 Minor editorial or document structure change
 N
Fig. A-USAAB Sheet 01
 Minor editorial or document structure change
 N
PLANNING INFORMATION
EFFECTIVITY
 Minor editorial or document structure change
 N
Configuration definition
 Minor editorial or document structure change
 N
CONF 001
 Minor editorial or document structure change
 N
CONF 002
 Minor editorial or document structure change
 N
CONF 003
 Minor editorial or document structure change
 N
CONF 004
 Minor editorial or document structure change
 N
CONF 005
 Minor editorial or document structure change
 N
Material Effectivity
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
CONCURRENT REQUIREMENTS
 Minor editorial or document structure change
 N
REASON
 Minor editorial or document structure change
 N
History
 Minor editorial or document structure change
 N
Objective/Action
 Minor editorial or document structure change
 N
Advantages
 Minor editorial or document structure change
 N
Operational/Maintenance
Consequences
Minor editorial or document structure change
 N
DESCRIPTION
 Minor editorial or document structure change
 N
COMPLIANCE
 Minor editorial or document structure change
 N
Classification
 Minor editorial or document structure change
 N
Accomplishment Timescale
 Minor editorial or document structure change
 N
APPROVAL
 Minor editorial or document structure change
 N
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Minor editorial or document structure change
 N
MANPOWER
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
WEIGHT AND BALANCE
 Minor editorial or document structure change
 N
ELECTRICAL LOAD DATA
 Minor editorial or document structure change
 N
REFERENCES
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
PUBLICATION AFFECTED
 Minor editorial or document structure change
 N
Minor editorial or document structure change
 N
INTERCHANGEABILITY/MIXABILITY
 Minor editorial or document structure change
 N
SPARES
 Minor editorial or document structure change
 N
MATERIAL INFORMATION
MATERIAL - PRICE AND AVAILABILITY
 Minor editorial or document structure change
 N
Procurement Addresses
 Minor editorial or document structure change
 N
Price and Availability
 Minor editorial or document structure change
 N
INDUSTRY SUPPORT INFORMATION
 Minor editorial or document structure change
 N
LIST OF COMPONENTS
 Minor editorial or document structure change
 N
Kit 241062B01R00
 Minor editorial or document structure change
 N
Kit 241062B02R00
 Minor editorial or document structure change
 N
Kit 241062B03R00
 Minor editorial or document structure change
 N
Kit 241062B04R00
 Minor editorial or document structure change
 N
Kit 241062B05R00
 Minor editorial or document structure change
 N
LIST OF MATERIALS - OPERATOR
SUPPLIED
Minor editorial or document structure change
 N
PARTS TO BE RE-IDENTIFIED BY
OPERATOR
Minor editorial or document structure change
 N
TOOLING
 Minor editorial or document structure change
 N
ACCOMPLISHMENT INSTRUCTIONS
TASK 241062- 831-895-001-
MODIFICATION
Minor editorial or document structure change
 N
Task associated data - 001
 Minor editorial or document structure change
 N
Task associated data - 002
 Minor editorial or document structure change
 N
Task associated data - 003
 Minor editorial or document structure change
 N
Task associated data - 004
 Minor editorial or document structure change
 N
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Task associated data - 005
 Minor editorial or document structure change
 N
Subtask 241062-910-402-001
 Minor editorial or document structure change
 N
Subtask 241062-839-401-001
 Minor editorial or document structure change
 N
Subtask 241062-910-402-001
 Minor editorial or document structure change
 N
Subtask 241062-839-401-001
 Minor editorial or document structure change
 N
Subtask 241062-910-402-001
 Minor editorial or document structure change
 N
Subtask 241062-839-401-001
 Minor editorial or document structure change
 N
Subtask 241062-941-401-001
 Minor editorial or document structure change
 N
Subtask 241062-010-401-001
 Minor editorial or document structure change
 N
Subtask 241062-941-401-001
 Minor editorial or document structure change
 N
Subtask 241062-010-401-001
 Minor editorial or document structure change
 N
Subtask 241062-941-401-001
 Minor editorial or document structure change
 N
Subtask 241062-010-401-002
 Minor editorial or document structure change
 N
Subtask 241062-831-408-001
 Minor editorial or document structure change
 N
Subtask 241062-831-408-002
 Minor editorial or document structure change
 N
Subtask 241062-831-408-003
 Minor editorial or document structure change
 N
Subtask 241062-410-401-001
 Minor editorial or document structure change
 N
Subtask 241062-942-401-001
 Minor editorial or document structure change
 N
Subtask 241062-410-401-001
 Minor editorial or document structure change
 N
Subtask 241062-942-401-001
 Minor editorial or document structure change
 N
Subtask 241062-410-401-002
 Minor editorial or document structure change
 N
Subtask 241062-942-401-001
 Minor editorial or document structure change
 N
TASK 241062- 831-896-001-
MODIFICATION - ADDITIONAL WORK
(Introduced at Revision No. 06)
Minor editorial or document structure change
 N
Task associated data - 001
 Minor editorial or document structure change
 N
Task associated data - 002
 Minor editorial or document structure change
 N
Task associated data - 003
 Minor editorial or document structure change
 N
Task associated data - 004
 Minor editorial or document structure change
 N
Task associated data - 005
 Minor editorial or document structure change
 N
Subtask 241062-910-403-001
 Minor editorial or document structure change
 N
Subtask 241062-839-402-001
 Minor editorial or document structure change
 N
Subtask 241062-910-403-001
 Minor editorial or document structure change
 N
Subtask 241062-839-402-001
 Minor editorial or document structure change
 N
Subtask 241062-941-402-001
 Minor editorial or document structure change
 N
Subtask 241062-010-402-001
 Minor editorial or document structure change
 N
Subtask 241062-941-402-003
 Minor editorial or document structure change
 N
Subtask 241062-010-402-002
 Minor editorial or document structure change
 N
Subtask 241062-831-402-001
 Minor editorial or document structure change
 N
Subtask 241062-831-402-002
 Minor editorial or document structure change
 N
Subtask 241062-410-402-001
 Minor editorial or document structure change
 N
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Subtask 241062-942-402-001
 Minor editorial or document structure change
 N
Subtask 241062-410-402-002
 Minor editorial or document structure change
 N
Subtask 241062-942-402-002
 Minor editorial or document structure change
 N
Fig. A-UBAAA
 Minor editorial or document structure change
 N
Fig. A-UBAAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBAAB
 Minor editorial or document structure change
 N
Fig. A-UBAAB Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBAAC
 Minor editorial or document structure change
 N
Fig. A-UBAAC Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBAAD
 Minor editorial or document structure change
 N
Fig. A-UBAAD Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBAAE
 Minor editorial or document structure change
 N
Fig. A-UBAAE Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBBAA
 Minor editorial or document structure change
 N
Fig. A-UBBAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBBAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBBAA Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBBAB
 Minor editorial or document structure change
 N
Fig. A-UBBAB Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBBAB Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBBAB Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBCAA
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 06
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 07
 Minor editorial or document structure change
 N
Fig. A-UBCAA Sheet 08
 Minor editorial or document structure change
 N
Fig. A-UBCAB
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 06
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 07
 Minor editorial or document structure change
 N
Fig. A-UBCAB Sheet 08
 Minor editorial or document structure change
 N
Fig. A-UBCAC
 Minor editorial or document structure change
 N
Fig. A-UBCAC Sheet 01
 Minor editorial or document structure change
 N
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Fig. A-UBCAC Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBCAC Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBCAC Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBCAC Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBCAC Sheet 06
 Minor editorial or document structure change
 N
Fig. A-UBDAA
 Minor editorial or document structure change
 N
Fig. A-UBDAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBDAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBDAA Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBDAA Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBDAA Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBDAA Sheet 06
 Minor editorial or document structure change
 N
Fig. A-UBDAB
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 06
 Minor editorial or document structure change
 N
Fig. A-UBDAB Sheet 07
 Minor editorial or document structure change
 N
Fig. A-UBDAC
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 06
 Minor editorial or document structure change
 N
Fig. A-UBDAC Sheet 07
 Minor editorial or document structure change
 N
Fig. A-UBEAA
 Minor editorial or document structure change
 N
Fig. A-UBEAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBEAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBEAA Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBEAA Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBEAB
 Minor editorial or document structure change
 N
Fig. A-UBEAB Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBEAB Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBEAB Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBEAB Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBEAB Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBEAC
 Minor editorial or document structure change
 N
Fig. A-UBEAC Sheet 01
 Minor editorial or document structure change
 N
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
Fig. A-UBEAC Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBEAC Sheet 03
 Minor editorial or document structure change
 N
Fig. A-UBEAC Sheet 04
 Minor editorial or document structure change
 N
Fig. A-UBEAC Sheet 05
 Minor editorial or document structure change
 N
Fig. A-UBFAA
 Minor editorial or document structure change
 N
Fig. A-UBFAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBFAA Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBFAB
 Minor editorial or document structure change
 N
Fig. A-UBFAB Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBFAB Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBFAC
 Minor editorial or document structure change
 N
Fig. A-UBFAC Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBFAC Sheet 02
 Minor editorial or document structure change
 N
Fig. A-UBGAA
 Minor editorial or document structure change
 N
Fig. A-UBGAA Sheet 01
 Minor editorial or document structure change
 N
Fig. A-UBHAA
 Minor editorial or document structure change
 N
Fig. A-UBHAA Sheet 01
 Minor editorial or document structure change
 N
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
REVISION SEQUENCE
ORIGINAL: Nov 20/92
REVISION No. : 07 - Nov 28/11
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 24
TITLE: ELECTRICAL POWER - WING S - ADDITIONAL PROTECTION FOR
CABLE ROUTES IN THE TRAILING EDGE
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 None
MINOR
 22851J0886
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Further to investigations, carried out relative to Arc Tracking, it is considered advantageous to improve
the electrical installation of the ’S’ cable routes, specifically, in the gaps (windows) between the
raceways.
There are two standards of raceway installed. The original standard is Pre-Mod. 20609J0261/J0262 and
the later standard is Post Mod. 20609J0261/J0262. The original standard can be identified by Octants
installed between raceway gaps.
The gaps between raceways are designed to permit for the wing flexure. On the original standard, the
raceway break at Spoiler 3 position is a raceway ‘joint’. This joint was designed to make it easier for the
raceway installation through the track ribs. There is no physical gap between the raceways. The
raceways are bolted together at this joint and are not designed for wing flexure, it is not necessary to
install the cable protection at this location.
Where gaps (windows) between raceways are found to be greater than 3mm, for both standards of
raceway installation, the insulator (cable protection) should be installed in accordance with this Service
Bulletin.
This modification introduces a barrier between the ‘M’ and ‘S’ cable routes, which is installed onto the
‘S’ cable route between the raceways (gaps of 3mm or greater) to protect the electrical installation.
Also, added protection is installed in the wing tip and wing root installations.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
The added protection will protect the ’S’ cable routes in the event of arc tracking occurring in the ‘M’
route harness in the trailing edge and wing tip.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 NO
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 241062B01R00
 1
 11,730.00
 Insulators, Cable Ties
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 241062B02R00
 1
 14,830.00
 Insulators, Cable Ties
**CONF 003
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 241062B03R00
 1
 14,310.00
 Insulators, Cable Ties
**CONF 004
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 241062B04R00
 1
 3,900.00
 Insulators, Cable Ties
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
**CONF 005
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Kit 241062B05R00
 1
 1,170.00
 Insulators, Cable Ties
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
31V 56W 83V 86Z 98W AAF AAN ACA ADR AEU AFR AGC AHY
ANA ART B2V BAW BGH BIE BTV C9G CTN CYP D2F DAL DLH
EAA F2I FHY FPY G8E HEJ IAC IBE IRA JAV JET KAC KPS
LBT MLD MMA MSR MXA RNV SHY SKU SNX SOL SVR TAM TAR
UDC USA VLG XLF
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 NO
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 241062-831-895-001: MODIFICATION
TOTAL MANHOURS
 50.00
ELAPSED TIME (HOURS)
 50.00
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
TOTAL MANHOURS
 0.00
**CONF 002
Task 241062-831-895-001: MODIFICATION
TOTAL MANHOURS
 50.00
ELAPSED TIME (HOURS)
 50.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
TOTAL MANHOURS
 0.00
**CONF 003
Task 241062-831-895-001: MODIFICATION
TOTAL MANHOURS
 46.00
ELAPSED TIME (HOURS)
 46.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
TOTAL MANHOURS
 0.00
**CONF 004
Task 241062-831-895-001: MODIFICATION
TOTAL MANHOURS
 0.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
TOTAL MANHOURS
 28.00
ELAPSED TIME (HOURS)
 28.00
**CONF 005
Task 241062-831-895-001: MODIFICATION
TOTAL MANHOURS
 0.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
APPENDICES
**CONF ALL
None
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
**CONF 001 thru 002
FRONT SPAR
REAR SPAR
LH WING SHOWN
RH WING SIMILAR
RIB27
RIB26
RIB25
RIB24
RIB23
RIB22
RIB21
RIB20
RIB19
RIB18
RIB17
RIB16
RIB15
RIB14
RIB13
RIB12
RIB11
RIB10
RIB9
RIB8
RIB7
RIB6
RIB5
RACEWAY
N_SB_241062_7_SAAA_01_00
MODIFICATION AREA:
NOTE:
AFT OF THE REAR SPAR, BETWEEN RIBS 5 AND 27
AND NEAR THE REAR SPAR AT RIB 27.
ADDED CABLE PROTECTION
AT GAPS BETWEEN
RACEWAYS, ADJACENT
TO THESE RIB LOCATIONS
Figure A-USAAA - Sheet 01
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
**CONF 003
FRONT SPAR
REAR SPAR
LH WING SHOWN
RH WING SIMILAR
RIB27
RIB26
RIB25
RIB24
RIB23
RIB22
RIB21
RIB20
RIB19
RIB18
RIB17
RIB16
RIB15
RIB14
RIB13
RIB12
RIB11
RIB10
RACEWAY
MODIFICATION AREA:
NOTE:
AFT OF THE REAR SPAR, BETWEEN RIBS 10 AND 27
AND NEAR THE REAR SPAR AT RIB 27.
ADDED CABLE PROTECTION
AT GAPS BETWEEN
RACEWAYS, ADJACENT
TO THESE RIB LOCATIONS
N_SB_241062_7_SAAB_01_00
Figure A-USAAB - Sheet 01
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A318/A319/A320/A321
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 24
TITLE: ELECTRICAL POWER - WING S - ADDITIONAL PROTECTION FOR
CABLE ROUTES IN THE TRAILING EDGE
MODIFICATION No.: 22851J0886
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
This modification is embodied by Service Bulletin only. The intent of this modification
is embodied before delivery on A/C MSN 0340 and subsequent through modification
22626J0827.
NOTE
: Modification 22626J0827 introduces an arc-tracking resistant cable which
does not require cable protection between the raceways.
(1) Models
320-211 320-212 320-231
(2) Effectivity by MSN
0029 0039 0042-0059 0061-0078 0080-0090 0093-0097 0099 0102-0104 0109-0128
0132 0135-0155 0157-0162 0164-0176 0178-0179 0181-0183 0185-0192 0194-0224
0226-0237 0239-0270 0272-0279 0281-0303 0305-0312 0314 0316-0337 0339
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A318/A319/A320/A321
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
31V
 0164
56W
 0247 0257 0327 0336
83V
 0226
86Z
 0169
98W
 0039 0042 0103 0120
AAF
 0244
AAN
 0299
ACA
 0059 0068 0073 0084 0122 0126 0127 0141 0149 0150 0154 0159
0174 0175 0183 0210 0231 0232 0233 0242 0248 0253 0254 0255
0265 0277 0284 0290 0309 0324 0330
ADR
 0043 0191
AEU
 0136
AFR
 0044 0061 0062 0063 0102 0115 0144 0145 0155 0186 0187 0214
0227 0228 0236 0237 0239 0270 0278 0285 0286 0287 0337
AGC
 0190 0279
AHY
 0331
ANA
 0139 0151 0167 0170 0196 0212 0219 0245 0300 0328
ART
 0142 0310 0311 0333
B2V
 0185
BAW
 0109
BGH
 0221 0294
BIE
 0293
BTV
 0168
C9G
 0246
CTN
 0258
CYP
 0256
D2F
 0211 0243 0251 0326
DAL
 0118 0121 0125 0152 0153 0160 0171 0192 0197 0206 0208 0213
0262 0263 0272 0273 0281 0282 0297 0298 0306 0307 0318 0319
0329 0339
DLH
 0069 0070 0071 0072 0078 0083 0086 0093 0094 0104 0110 0111
0116 0117 0135 0137 0147 0161 0162 0172 0200 0201 0202 0209
0216 0217 0218 0267 0268 0269
EAA
 0325
F2I
 0128 0188 0283
FHY
 0132 0288
FPY
 0112
G8E
 0305
HEJ
 0087 0088
IAC
 0045 0046 0047 0048 0049 0050 0051 0056 0057 0058 0074 0075
0080 0089 0090 0095 0096 0097 0308 0314
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A318/A319/A320/A321
SERVICE BULLETIN
OPERATOR
 MSN
IBE
 0176 0207 0223 0274
IRA
 0303 0312
JAV
 0029
JET
 0204 0215
KAC
 0181 0182 0195
KPS
 0234
LBT
 0222 0301
MLD
 0249
MMA
 0113 0114 0295 0316
MSR
 0165 0166 0178 0194 0198 0322
MXA
 0252 0259 0260 0261 0275 0276 0291 0292 0296 0320 0321 0332
RNV
 0229
SHY
 0138 0148
SKU
 0179
SNX
 0289
SOL
 0302
SVR
 0140 0157 0203 0220
TAM
 0250 0334 0335
TAR
 0119 0123 0124 0205
UDC
 0085 0230 0235
USA
 0052 0053 0054 0055 0064 0065 0066 0067 0076 0077 0081 0082
0099 0317
VLG
 0143 0146 0158 0173 0199 0224 0240 0241 0264 0266 0323
XLF
 0189
(4) Configuration by MSN
MSN
 CONFIGURATION
0029 0039 0042 0043 0044 0045 0046 0047 0048 0049 0050
0051 0052 0053 0054 0055 0056 0057 0058 0059
001 004
0061 0062 0063 0064 0065 0066 0067 0068 0069 0070 0071
0072 0073 0074 0075 0076 0077 0078 0080 0081 0082 0083
0084 0085 0086 0087 0088 0089 0090 0093 0094 0095 0096
0097 0099 0102 0103 0104 0109 0110 0111 0112 0113 0114
0115 0116 0117 0118 0119 0120 0121 0122 0123 0124 0125
0126 0127 0128 0132 0135 0136 0137 0138 0139 0140 0141
0142 0143 0144 0145 0146 0147 0148 0149 0150 0151 0152
0153 0154 0155 0157 0158 0159 0160 0161 0162 0164 0165
0166 0167 0168 0169 0170 0171 0172 0173 0174 0175 0176
0178 0179 0181 0182 0183 0185 0186 0187 0188 0189 0190
0191 0192 0194 0195 0196 0197 0198 0199 0200 0201 0202
0203 0204 0205 0206 0207 0208 0209 0210 0211 0212 0213
0214 0215 0216 0217 0218 0219
002 005
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A318/A319/A320/A321
SERVICE BULLETIN
MSN
 CONFIGURATION
0220 0221 0222 0223 0224 0226 0227 0228 0229 0230 0231
0232 0233 0234 0235 0236 0237 0239 0240 0241 0242 0243
0244 0245 0246 0247 0248 0249 0250 0251 0252 0253 0254
0255 0256 0257 0258 0259 0260 0261 0262 0263 0264 0265
0266 0267 0268 0269 0270 0272 0273 0274 0275 0276 0277
0278 0279 0281 0282 0283 0284 0285 0286 0287 0288 0289
0290 0291 0292 0293 0294 0295 0296 0297 0298 0299 0300
0301 0302 0303 0305 0306 0307 0308 0309 0310 0311 0312
0314 0316 0317 0318 0319 0320 0321 0322 0323 0324 0325
0326 0327 0328 0329 0330 0331 0332 0333 0334 0335 0336
0337 0339
003 005
(5) Configuration definition
**CONF 001
Config. 001 is valid for aircraft that are Pre Modification Nos. 20609J0261 and
21814J0617.
**CONF 002
Config. 002 is valid for aircraft that are Post Modification No. 20609J0261 and Pre
Modification No. 21814J0617.
**CONF 003
Config. 003 is valid for aircraft that are Post Modification Nos. 20609J0261 and
21814J0617.
**CONF 004
Config. 004 is valid for aircraft that are Pre Modification No. 20609J0261 who are
required to do the additional work as specified in this Service Bulletin.
**CONF 005
Config. 005 is valid for aircraft that are Post Modification No. 20609J0261 who are
required to do the additional work as specified in this Service Bulletin.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 241062B01R00
 1
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 241062B02R00
 1
**CONF 003
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 241062B03R00
 1
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF 004
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 241062B04R00
 1
**CONF 005
MATERIAL
 QTY PER A/C
 SEE NOTES
Kit 241062B05R00
 1
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Further to investigations, carried out relative to Arc Tracking, it is considered
advantageous to improve the electrical installation of the ’S’ cable routes, specifically, in
the gaps (windows) between the raceways.
There are two standards of raceway installed. The original standard is Pre-Mod.
20609J0261/J0262 and the later standard is Post Mod. 20609J0261/J0262. The original
standard can be identified by Octants installed between raceway gaps.
The gaps between raceways are designed to permit for the wing flexure. On the original
standard, the raceway break at Spoiler 3 position is a raceway ‘joint’. This joint was
designed to make it easier for the raceway installation through the track ribs. There is no
physical gap between the raceways. The raceways are bolted together at this joint and
are not designed for wing flexure, it is not necessary to install the cable protection at this
location.
Where gaps (windows) between raceways are found to be greater than 3mm, for both
standards of raceway installation, the insulator (cable protection) should be installed in
accordance with this Service Bulletin.
(2) Objective/Action
This modification introduces a barrier between the ‘M’ and ‘S’ cable routes, which is
installed onto the ‘S’ cable route between the raceways (gaps of 3mm or greater) to
protect the electrical installation. Also, added protection is installed in the wing tip and
wing root installations.
(3) Advantages
The added protection will protect the ’S’ cable routes in the event of arc tracking
occurring in the ‘M’ route harness in the trailing edge and wing tip.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A318/A319/A320/A321
SERVICE BULLETIN
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 241062-831-895-001: MODIFICATION
(1) Install the Insulators and the Cable Ties to the Areas of Clearance for the ’S’ Cable
Routes (Between Ribs 5 and 27)
**CONF 002
Task 241062-831-895-001: MODIFICATION
(1) Install the Insulators and the Cable Ties to the Areas of Clearance for the ’S’ Cable
Routes (Between Ribs 5 and 27)
**CONF 003
Task 241062-831-895-001: MODIFICATION
(1) Install the Insulators and the Cable Ties to the Areas of Clearance for the ’S’ Cable
Routes (Between Ribs 10 and 27)
**CONF 004
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision
No. 06)
(1) MODIFICATION - ADDITIONAL WORK - Install the Insulators and Cable Ties
between Ribs 8 and 26
**CONF 005
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision
No. 06)
(1) MODIFICATION - ADDITIONAL WORK - Install the Insulators and Cable Ties
between Ribs 24 and 26
**CONF ALL
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A318/A319/A320/A321
SERVICE BULLETIN
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin has been rendered mandatory by the issue of an
Airworthiness Directive (AD) published by the European Aviation Safety Agency (EASA).
The AD must be used as the reference document for the mandatory accomplishment
timescale.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organization Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, which affects the content of this Service Bulletin, the operator is responsible
for obtaining approval by its airworthiness authority for any adaptation necessary before
incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
**CONF 001
Task 241062-831-895-001: MODIFICATION
Get Access
 7.00
On Aircraft
Install the Insulators and the Cable Ties to the Areas of
Clearance for the ’S’ Cable Routes (Between Ribs 5
and 27)
35.00
Tests
 0.00
Close-Up
 8.00
TOTAL MANHOURS
 50.00
ELAPSED TIME (HOURS)
 50.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
On Aircraft
TOTAL MANHOURS
 0.00
**CONF 002
Task 241062-831-895-001: MODIFICATION
Get Access
 7.00
On Aircraft
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A318/A319/A320/A321
SERVICE BULLETIN
Task 241062-831-895-001: MODIFICATION
Install the Insulators and the Cable Ties to the Areas of
Clearance for the ’S’ Cable Routes (Between Ribs 5
and 27)
35.00
Tests
 0.00
Close-Up
 8.00
TOTAL MANHOURS
 50.00
ELAPSED TIME (HOURS)
 50.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
On Aircraft
TOTAL MANHOURS
 0.00
**CONF 003
Task 241062-831-895-001: MODIFICATION
Get Access
 6.00
On Aircraft
Install the Insulators and the Cable Ties to the Areas of
Clearance for the ’S’ Cable Routes (Between Ribs 10
and 27)
33.00
Tests
 0.00
Close-Up
 7.00
TOTAL MANHOURS
 46.00
ELAPSED TIME (HOURS)
 46.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
On Aircraft
TOTAL MANHOURS
 0.00
**CONF 004
Task 241062-831-895-001: MODIFICATION
On Aircraft
TOTAL MANHOURS
 0.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
Get Access
 4.00
On Aircraft
MODIFICATION - ADDITIONAL WORK - Install the
Insulators and Cable Ties between Ribs 8 and 26
20.00
Tests
 0.00
Close-Up
 4.00
TOTAL MANHOURS
 28.00
ELAPSED TIME (HOURS)
 28.00
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF 005
Task 241062-831-895-001: MODIFICATION
On Aircraft
TOTAL MANHOURS
 0.00
Task 241062-831-896-001: MODIFICATION - ADDITIONAL WORK (Introduced at Revision No.
06)
Get Access
 1.50
On Aircraft
MODIFICATION - ADDITIONAL WORK - Install the
Insulators and Cable Ties between Ribs 24 and 26
2.00
Tests
 0.00
Close-Up
 1.50
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
**CONF ALL
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-41-57 12-34-24 24-41-00
27-50-00 27-60-00 27-64-44
57-31-21 57-51-37
Elec. Std. Practices Manual (ESPM)
 20-33-10 20-33-30 20-33-33
20-33-43 20-33-44 20-53-00
20-55-00
Standards Manual (SM)
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-41-57 12-34-24 24-41-00
27-50-00 27-60-00 27-64-44
57-31-21 57-51-37
Elec. Std. Practices Manual (ESPM)
 20-33-10 20-33-30 20-33-33
20-33-43 20-33-44 20-53-00
20-55-00
Standards Manual (SM)
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF 003
Aircraft Maintenance Manual (AMM)
 06-41-57 12-34-24 24-41-00
27-50-00 27-60-00 27-64-44
57-31-21 57-51-37
Elec. Std. Practices Manual (ESPM)
 20-33-10 20-33-30 20-33-33
20-33-43 20-33-44 20-53-00
20-55-00
Standards Manual (SM)
**CONF 004
Aircraft Maintenance Manual (AMM)
 06-41-57 12-34-24 24-41-00
27-50-00 27-60-00 57-51-37
Elec. Std. Practices Manual (ESPM)
 20-33-10 20-33-30 20-33-33
20-33-43 20-33-44 20-53-00
20-55-00
Standards Manual (SM)
**CONF 005
Aircraft Maintenance Manual (AMM)
 12-34-24 24-41-00 57-51-37
Elec. Std. Practices Manual (ESPM)
 20-33-10 20-33-30 20-33-33
20-33-43 20-33-44 20-53-00
20-55-00
Standards Manual (SM)
**CONF ALL
K. PUBLICATION AFFECTED
Elec. Std. Practices Manual (ESPM)
 20-33-43
Illustrated Parts Catalog (IPC)
 24-92-05
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A318/A319/A320/A321
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Kit 241062B01R00
Kit 241062B02R00
Kit 241062B03R00
Kit 241062B04R00
Kit 241062B05R00
Customers with aircraft shown in the
effectivity of this Service Bulletin should send
a purchase order to AIRBUS. Quote the
number of this Service Bulletin. The address
is:
AIRBUS Material, Logistics and Suppliers
Weg beim Jaeger 150
D-22335 HAMBURG
GERMANY
For ordering by internet:
http://spares.airbus.com
For ordering by fax: +49 40 50 76 2590
For ordering by E-mail: airbus.kit@airbus.com
(2) Price and Availability
Kit 241062B01R00
Cost
 11,730.00 USD
Availability
 120 calendar days from receipt of order
The sales terms (costs and availability) are estimated in relation to economic conditions
at the issue date of the Service Bulletin.
The Kit availability given above is the standard lead time from the date of your purchase
order. If you require Kits before this time, please include a retrofit planning schedule with
your order so that we can try to comply with your requirements.
Kit 241062B02R00
Cost
 14,830.00 USD
Availability
 120 calendar days from receipt of order
The sales terms (costs and availability) are estimated in relation to economic conditions
at the issue date of the Service Bulletin.
The Kit availability given above is the standard lead time from the date of your purchase
order. If you require Kits before this time, please include a retrofit planning schedule with
your order so that we can try to comply with your requirements.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A318/A319/A320/A321
SERVICE BULLETIN
Kit 241062B03R00
Cost
 14,310.00 USD
Availability
 120 calendar days from receipt of order
The sales terms (costs and availability) are estimated in relation to economic conditions
at the issue date of the Service Bulletin.
The Kit availability given above is the standard lead time from the date of your purchase
order. If you require Kits before this time, please include a retrofit planning schedule with
your order so that we can try to comply with your requirements.
Kit 241062B04R00
Cost
 3,900.00 USD
Availability
 120 calendar days from receipt of order
The sales terms (costs and availability) are estimated in relation to economic conditions
at the issue date of the Service Bulletin.
The Kit availability given above is the standard lead time from the date of your purchase
order. If you require Kits before this time, please include a retrofit planning schedule with
your order so that we can try to comply with your requirements.
Kit 241062B05R00
Cost
 1,170.00 USD
Availability
 120 calendar days from receipt of order
The sales terms (costs and availability) are estimated in relation to economic conditions
at the issue date of the Service Bulletin.
The Kit availability given above is the standard lead time from the date of your purchase
order. If you require Kits before this time, please include a retrofit planning schedule with
your order so that we can try to comply with your requirements.
B. INDUSTRY SUPPORT INFORMATION
AIRBUS will not provide industry support for accomplishment of this Service Bulletin.
C. LIST OF COMPONENTS
Kit 241062B01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 ABS0596S001
 8 (ea)
 Insulatr
2
 ABS0596S002
 8 (ea)
 Insulatr
3
 ABS0596S003
 6 (ea)
 Insulatr
4
 ABS0596M001
 3 (ea)
 Insulatr
5
 ABS0596U001
 3 (ea)
 Insulatr
6
 NSA935401-03
 90 (ea)
 Tie
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A318/A319/A320/A321
SERVICE BULLETIN
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 241062B02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 ABS0596S001
 10 (ea)
 Insulatr
2
 ABS0596S002
 10 (ea)
 Insulatr
3
 ABS0596S003
 10 (ea)
 Insulatr
4
 ABS0596M001
 5 (ea)
 Insulatr
5
 ABS0596U001
 1 (ea)
 Insulatr
6
 NSA935401-03
 90 (ea)
 Tie
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 241062B03R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 ABS0596S001
 10 (ea)
 Insulatr
2
 ABS0596S002
 10 (ea)
 Insulatr
3
 ABS0596S003
 10 (ea)
 Insulatr
4
 ABS0596M001
 5 (ea)
 Insulatr
6
 NSA935401-03
 90 (ea)
 Tie
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
Kit 241062B04R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 ABS0596S001
 4 (ea)
 Insulatr
2
 ABS0596S002
 4 (ea)
 Insulatr
3
 ABS0596S003
 2 (ea)
 Insulatr
6
 NSA935401-03
 60 (ea)
 Tie
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A318/A319/A320/A321
SERVICE BULLETIN
Kit 241062B05R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 ABS0596S001
 1 (ea)
 Insulatr
2
 ABS0596S002
 1 (ea)
 Insulatr
3
 ABS0596S003
 1 (ea)
 Insulatr
6
 NSA935401-03
 12 (ea)
 Tie
NOTE
: If you find part numbers of hardware components in the related kit(s) which
you cannot identify in the LIST OF COMPONENTS of this Service Bulletin,
refer to Standards Manual (SM). The SM will give you the correct part number
to part number relationship.
D. LIST OF MATERIALS - OPERATOR SUPPLIED
None
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
F. TOOLING
None
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A318/A319/A320/A321
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 241062-831-895-001 - MODIFICATION
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: ISOLATE ALL THE ELECTRICAL CIRCUITS.
WARNING
: MAKE SURE THAT THE EXTERNAL POWER CONNECTOR IS NOT
CONNECTED.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATION, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS
- REGULARLY REMOVE SHAVINGS, UNWANTED MATERIAL AND OTHER
CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
CAUTION
: THE MATERIAL USED FOR THE CABLE PROTECTION IS THE ONLY
APPROVED SPECIFICATION. DO NOT USE ANY OTHER TYPES OF
INSULATOR, BECAUSE SATISFACTORY PROTECTION WILL NOT BE MADE.
Task Associated Data
**CONF 001
Zone
534 573 574 575 634 673 674 675
Access
Door
 574AB 574BB 674AB 674BB
Panel
 534AB 573AB 573BB 573CB 573FB 575AB 575BB 575CB
575DB 575EB 575FB 575GB 575HB 575KB 575LB 575MB
634AB 673AB 673BB 673CB 673FB 675AB 675BB 675CB
675DB 675EB 675FB 675GB 675HB 675KB 675LB 675MB
Manpower
TOTAL MANHOURS
 50.00
ELAPSED TIME (HOURS)
 50.00
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF 002
Zone
534 573 574 575 634 673 674 675
Access
Door
 574AB 574BB 674AB 674BB
Panel
 534AB 573AB 573BB 573CB 573FB 575AB 575BB 575CB
575DB 575EB 575FB 575GB 575HB 575KB 575LB 575MB
634AB 673AB 673BB 673CB 673FB 675AB 675BB 675CB
675DB 675EB 675FB 675GB 675HB 675KB 675LB 675MB
Manpower
TOTAL MANHOURS
 50.00
ELAPSED TIME (HOURS)
 50.00
**CONF 003
Zone
534 573 574 575 634 673 674 675
Access
Door
 574AB 574BB 674AB 674BB
Panel
 534AB 573AB 575AB 575BB 575CB 575DB 575EB 575FB
575GB 575HB 575KB 575LB 575MB 634AB 673AB 675AB
675BB 675CB 675DB 675EB 675FB 675GB 675HB 675KB
675LB 675MB
Manpower
TOTAL MANHOURS
 46.00
ELAPSED TIME (HOURS)
 46.00
**CONF 004
Manpower
TOTAL MANHOURS
 0.00
**CONF 005
Manpower
TOTAL MANHOURS
 0.00
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 241062-910-402-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A318/A319/A320/A321
SERVICE BULLETIN
References
Elec. Std. Practices Manual (ESPM)
 20-33-10
20-33-30
20-33-33
20-33-43
20-33-44
20-53-00
20-55-00
(a) Wiring and Routing (Refer to ESPM 20-33-10).
(b) Wiring Protection (Refer to ESPM 20-33-30).
(c) Wiring Protection (flexible conduits) (Refer to ESPM 20-33-33).
(d) Raceway Assemblies (Refer to ESPM 20-33-43).
(e) Cable ties (Refer to ESPM 20-33-44).
(f) Repair Processes (Re fer to ESPM 20-53-00).
(g) Cleaning of Electrical Co mponents (Refer to ESPM 20-55-00).
(h) To prevent damage to cables, make you sure are careful and keep disturbance to
an absolute minimum.
(2) Subtask 241062-839-401-001 - Administrative
Manpower Resources
Skills
 UTILITY
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 241062-910-402-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Elec. Std. Practices Manual (ESPM)
 20-33-10
20-33-30
20-33-33
20-33-43
20-33-44
20-53-00
20-55-00
(a) Wiring and Routing (Refer to ESPM 20-33-10).
(b) Wiring Protection (Refer to ESPM 20-33-30).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A318/A319/A320/A321
SERVICE BULLETIN
(c) Wiring Protection (flexible conduits) (Refer to ESPM 20-33-33).
(d) Raceway Assemblies (Refer to ESPM 20-33-43).
(e) Cable ties (Refer to ESPM 20-33-44).
(f) Repair Processes (Re fer to ESPM 20-53-00).
(g) Cleaning of Electrical Co mponents (Refer to ESPM 20-55-00).
(h) To prevent damage to cables, make you sure are careful and keep disturbance to
an absolute minimum.
(2) Subtask 241062-839-401-001 - Administrative
Manpower Resources
Skills
 UTILITY
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 003
(1) Subtask 241062-910-402-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Elec. Std. Practices Manual (ESPM)
 20-33-10
20-33-30
20-33-33
20-33-43
20-33-44
20-53-00
20-55-00
(a) Wiring and Routing (Refer to ESPM 20-33-10).
(b) Wiring Protection (Refer to ESPM 20-33-30).
(c) Wiring Protection (flexible conduits) (Refer to ESPM 20-33-33).
(d) Raceway Assemblies (Refer to ESPM 20-33-43).
(e) Cable ties (Refer to ESPM 20-33-44).
(f) Repair Processes (Re fer to ESPM 20-53-00).
(g) Cleaning of Electrical Co mponents (Refer to ESPM 20-55-00).
(h) To prevent damage to cables, make you sure are careful and keep disturbance to
an absolute minimum.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A318/A319/A320/A321
SERVICE BULLETIN
(2) Subtask 241062-839-401-001 - Administrative
Manpower Resources
Skills
 UTILITY
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 004
None
**CONF 005
None
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 241062-941-401-001 - Job Set-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-869-002
24-41-00, Page Block 201
Task 27-50-00-866-008
Task 27-60-00-866-002
(a) Extend the flaps (Refer to AMM Task 27-50-00-866-008).
(b) Extend the spoilers (Refer to AMM Task 27-60-00-866-002).
(c) De-energize the aircraft electrical network (Refer to AMM 24-41-00 Page Block
201) and electrically ground the aircraft for maintenance operations (Refer to AMM
Task 12-34-24-869-002).
(2) Subtask 241062-010-401-001 - External Preparation
Work Zones and Access Panels
Zone
 Access/Work location
573
 Access
 Panel 573AB, Panel 573BB, Panel 573CB,
Panel 573FB
574
 Access
 Door 574AB, Door 574BB
575
 Access
 Panel 575AB, Panel 575BB, Panel 575CB,
Panel 575DB, Panel 575EB, Panel 575FB, Panel
575GB, Panel 575HB, Panel 575KB, Panel
575LB, Panel 575MB
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A318/A319/A320/A321
SERVICE BULLETIN
534
 Access
 Panel 534AB
673
 Access
 Panel 673AB, Panel 673BB, Panel 673CB,
Panel 673FB
674
 Access
 Door 674AB, Door 674BB
675
 Access
 Panel 675AB, Panel 675BB, Panel 675CB,
Panel 675DB, Panel 675EB, Panel 675FB, Panel
675GB, Panel 675HB, Panel 675KB, Panel
675LB, Panel 675MB
634
 Access
 Panel 634AB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Task 57-31-21-000-001
Task 57-51-37-000-002
Task 57-51-37-000-003
Task 57-51-37-000-004
Task 57-51-37-000-005
Task 57-51-37-000-008
Task 57-51-37-000-009
(a) Put access platform(s) in position as necessary.
(b) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-002):
- from the LH wing remove 573AB, 573BB and 573CB
- from the RH wing remove 673AB, 673BB and 673CB.
(c) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-003):
- from the LH wing remove 573FB
- from the RH wing remove 673FB.
(d) Remove the access doors that follow (Refer to AMM Task 57-51-37-000-008):
- from the LH wing remove 574AB
- from the RH wing remove 674AB.
(e) Remove the access doors that follow (Refer to AMM Task 57-51-37-000-009):
- from the LH wing remove 574BB
- from the RH wing remove 674BB.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A318/A319/A320/A321
SERVICE BULLETIN
(f) Remove the access panels that follow (Refer to AMM 06-41-57 Page Block 001 for
location):
- from the LH wing remove 534AB
- from the RH wing remove 634AB.
(g) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-004):
- from the LH wing remove 575AB, 575BB, 575CB, 575DB, 575EB, 575FB,
575GB and 575HB
- from the RH wing remove 675AB, 675BB, 675CB, 675DB, 675EB, 675FB,
675GB and 675HB.
(h) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-005):
- from the LH wing remove 575KB, 575LB and 575MB
- from the RH wing remove 675KB, 675LB and 675MB.
(i) Remove the wing tip from the LH and RH wing (Refer to AMM Task
57-31-21-000-001).
**CONF 002
(1) Subtask 241062-941-401-001 - Job Set-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-869-002
24-41-00, Page Block 201
Task 27-50-00-866-008
Task 27-60-00-866-002
(a) Extend the flaps (Refer to AMM Task 27-50-00-866-008).
(b) Extend the spoilers (Refer to AMM Task 27-60-00-866-002).
(c) De-energize the aircraft electrical network (Refer to AMM 24-41-00 Page Block
201) and electrically ground the aircraft for maintenance operations (Refer to AMM
Task 12-34-24-869-002).
(2) Subtask 241062-010-401-001 - External Preparation
Work Zones and Access Panels
Zone
 Access/Work location
573
 Access
 Panel 573AB, Panel 573BB, Panel 573CB,
Panel 573FB
574
 Access
 Door 574AB, Door 574BB
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A318/A319/A320/A321
SERVICE BULLETIN
575
 Access
 Panel 575AB, Panel 575BB, Panel 575CB,
Panel 575DB, Panel 575EB, Panel 575FB, Panel
575GB, Panel 575HB, Panel 575KB, Panel
575LB, Panel 575MB
534
 Access
 Panel 534AB
673
 Access
 Panel 673AB, Panel 673BB, Panel 673CB,
Panel 673FB
674
 Access
 Door 674AB, Door 674BB
675
 Access
 Panel 675AB, Panel 675BB, Panel 675CB,
Panel 675DB, Panel 675EB, Panel 675FB, Panel
675GB, Panel 675HB, Panel 675KB, Panel
675LB, Panel 675MB
634
 Access
 Panel 634AB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Task 57-31-21-000-001
Task 57-51-37-000-002
Task 57-51-37-000-003
Task 57-51-37-000-004
Task 57-51-37-000-005
Task 57-51-37-000-008
Task 57-51-37-000-009
(a) Put access platform(s) in position as necessary.
(b) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-002):
- from the LH wing remove 573AB, 573BB and 573CB
- from the RH wing remove 673AB, 673BB and 673CB.
(c) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-003):
- from the LH wing remove 573FB
- from the RH wing remove 673FB.
(d) Remove the access doors that follow (Refer to AMM Task 57-51-37-000-008):
- from the LH wing remove 574AB
- from the RH wing remove 674AB.
(e) Remove the access doors that follow (Refer to AMM Task 57-51-37-000-009):
- from the LH wing remove 574BB
- from the RH wing remove 674BB.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A318/A319/A320/A321
SERVICE BULLETIN
(f) Remove the access panels that follow (Refer to AMM 06-41-57 Page Block 001 for
location):
- from the LH wing remove 534AB
- from the RH wing remove 634AB.
(g) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-004):
- from the LH wing remove 575AB, 575BB, 575CB, 575DB, 575EB, 575FB,
575GB and 575HB
- from the RH wing remove 675AB, 675BB, 675CB, 675DB, 675EB, 675FB,
675GB and 675HB.
(h) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-005):
- from the LH wing remove 575KB, 575LB and 575MB
- from the RH wing remove 675KB, 675LB and 675MB.
(i) Remove the wing tip from the LH and RH wing (Refer to AMM Task
57-31-21-000-001).
**CONF 003
(1) Subtask 241062-941-401-001 - Job Set-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-869-002
24-41-00, Page Block 201
Task 27-50-00-866-008
Task 27-60-00-866-002
(a) Extend the flaps (Refer to AMM Task 27-50-00-866-008).
(b) Extend the spoilers (Refer to AMM Task 27-60-00-866-002).
(c) De-energize the aircraft electrical network (Refer to AMM 24-41-00 Page Block
201) and electrically ground the aircraft for maintenance operations (Refer to AMM
Task 12-34-24-869-002).
(2) Subtask 241062-010-401-002 - External Preparation
Work Zones and Access Panels
Zone
 Access/Work location
573
 Access
 Panel 573AB
574
 Access
 Door 574AB, Door 574BB
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A318/A319/A320/A321
SERVICE BULLETIN
575
 Access
 Panel 575AB, Panel 575BB, Panel 575CB,
Panel 575DB, Panel 575EB, Panel 575FB, Panel
575GB, Panel 575HB, Panel 575KB, Panel
575LB, Panel 575MB
534
 Access
 Panel 534AB
673
 Access
 Panel 673AB
674
 Access
 Door 674AB, Door 674BB
675
 Access
 Panel 675AB, Panel 675BB, Panel 675CB,
Panel 675DB, Panel 675EB, Panel 675FB, Panel
675GB, Panel 675HB, Panel 675KB, Panel
675LB, Panel 675MB
634
 Access
 Panel 634AB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Task 27-64-44-000-001
Task 57-31-21-000-001
Task 57-51-37-000-002
Task 57-51-37-000-004
Task 57-51-37-000-005
Task 57-51-37-000-008
Task 57-51-37-000-009
(a) Put access platform(s) in position as necessary.
(b) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-002):
- from the LH wing remove 573AB
- from the RH wing remove 673AB.
(c) Remove the access doors that follow (Refer to AMM Task 57-51-37-000-008):
- from the LH wing remove 574AB
- from the RH wing remove 674AB.
(d) Remove the access doors that follow (Refer to AMM Task 57-51-37-000-009):
- from the LH wing remove 574BB
- from the RH wing remove 674BB.
(e) Remove the access panels that follow (Refer to AMM 06-41-57 Page Block 001 for
location):
- from the LH wing remove 534AB
- from the RH wing remove 634AB.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A318/A319/A320/A321
SERVICE BULLETIN
(f) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-004):
- from the LH wing remove 575AB, 575BB, 575CB, 575DB, 575EB, 575FB,
575GB and 575HB
- from the RH wing remove 675AB, 675BB, 675CB, 675DB, 675EB, 675FB,
675GB and 675HB.
(g) Remove the access panels that follow (Refer to AMM Task 57-51-37-000-005):
- from the LH wing remove 575KB, 575LB and 575MB
- from the RH wing remove 675KB, 675LB and 675MB.
(h) Remove the wing tip from the LH and RH wing (Refer to AMM Task
57-31-21-000-001).
(i) Disconnect the actuator from Spoiler 4 (Refer to AMM Task 27-64-44-000-001).
Support the Spoiler 4 in the extended position.
**CONF 004
None
**CONF 005
None
**CONF ALL
C. PROCEDURE
NOTE
: These instructions are applicable for the LH and the RH wings.
NOTE
: There are two standards of raceway installed. the original standard Pre-Mod.
20609J0261 and the later standard Post Mod. 20609J0261. The original
standard can be identified by Octants installed between the raceway gaps on
the bends.
NOTE
: There are three types of insulator (cable protection) that can be used, the M
and U type (channel sections) and the S type (split wrap-over sleeving):
- Where possible and when access is satisfactory, use the S type insulator.
- Where access is difficult or could result in damage to the installation
and/or cables, use the M or U type insulators. This is because they do
not require disturbance of the raceway electrical installation, only the
removal of the original cable tie installed onto the bundle in the gap
(window) between raceways.
- Use the S type insulator on curving harness bundles.
- Cut the insulator to a size and shape to fit into the gap (window) between
two raceways where the gaps (windows) are 3.0mm (0.12in.) or greater.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A318/A319/A320/A321
SERVICE BULLETIN
NOTE
: Due to the cable bundle diameter, it is not normally possible to install the S
type insulator (cable protection) inside the raceway channel, but where it does
allow, then it is permitted. Do not:
- force the insulator into the raceway channel as this will compress the
cable bundle and can cause damage
- force the insulator into the raceway channel as over capacity will force
the raceway webs apart. This can cause damage to the raceway and can
compress the adjacent cable bundles
- install cable ties into the raceway channels as this will compress the
cable bundle and can force the raceway webs apart. This can cause
damage to the raceway and the adjacent cable bundles.
NOTE
: The insulators (cable protection) are designed to be installed over the ’S’
route cables and into the gap (window) between two raceways.
NOTE
: Use the applicable size of insulator, directly related to the cable size of the ’S’
route to be protected.
NOTE
: Make sure that when the split circular-type is used the insulator split has an
overlap at the top to point away from the ’M’ routes. When the M or U type is
used the ’open’ channel points away from the ’M’ routes.
NOTE
: The insulator is supplied in lengths of approximately 300 mm (11.80 in.). Cut
each length as necessary so that when it is installed it goes against both
faces of the related raceway, when applicable.
NOTE
: Where the gaps between two raceways are found to be greater than 3.0mm
(0.12in.), for both standards of raceway installation, the insulator (cable
protection) should be installed in accordance with this Service Bulletin.
NOTE
: Where it is necessary to remove the raceway cable retainer components,
exercise great care to prevent damage to cables or the raceway.
NOTE
: Before you disturb the cables and installation of the insulators (cable
protection) and following re-installation of the electrical installation, check the
cables for signs of damage.
NOTE
: Before you disturb the cables and installation of the insulators (cable
protection), make sure that the cables and electrical installation are clean and
free of contamination, dirt or grit.
NOTE
: Harness-to-harness contact is not permitted. Do not tie the ’1S’ and ’2S’ cable
routes together.
Protect each ’1S’ and ’2S’ cable route with one of the insulators that follow:
- ABS0596S001, Item 1
- ABS0596S002, Item 2
- ABS0596S003, Item 3
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A318/A319/A320/A321
SERVICE BULLETIN
- ABS0596U001, Item 5
and one Cable Tie, Item 6 to prevent harness-to-harness contact between the
’1S’ and ’2S’ cable routes.
NOTE
: When you install insulator ABS0596M001, Item 4, make sure that the ’1S’
cable route is installed in one channel and the ’2S’ cable route is installed in
the other channel. This will prevent harness-to-harness contact between the
’1S’ and ’2S’ cable routes.
Use one Cable Tie, Item 6 to hold the ’1S’ and ’2S’ cable routes inside the
channels of the insula tor ABS0596M001, Item 4.
**CONF 001
(1) Subtask 241062-831-408-001 - Install the Insulators and the Cable Ties to the Areas
of Clearance for the ’S’ Cable Routes (Between Ribs 5 and 27)
Work Zones and Access Panels
Zone
 Access/Work location
574
 Work location
 from Rib 5 to Rib 7
575
 Work location
 from Rib 8 to Rib 27
674
 Work location
 from Rib 5 to Rib 7
675
 Work location
 from Rib 8 to Rib 27
Manpower Resources
Manhours
 35.00
Minimum number of person
 1
Subtask elapsed time
 35.00
Skills
 AIRFRAME
ELECTRICAL
Material necessary to do the job
Kit 241062B01R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 ABS0596S001
 8 (ea)
 Insulatr
2
 ABS0596S002
 8 (ea)
 Insulatr
3
 ABS0596S003
 6 (ea)
 Insulatr
4
 ABS0596M001
 3 (ea)
 Insulatr
5
 ABS0596U001
 3 (ea)
 Insulatr
6
 NSA935401-03
 90 (ea)
 Tie
References
Elec. Std. Practices Manual (ESPM)
 20-33-33
20-33-44
Fig. A-UBAAA
Applicable Areas for the Modification
Sheet 01
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A318/A319/A320/A321
SERVICE BULLETIN
References
Fig. A-UBBAA
View of Raceway Clearance, Adjacent to
Ribs 5, 6, and 7
Sheet 01
Sheet 02
Sheet 03
Fig. A-UBCAA
View of Raceway Clearance, Adjacent to
Ribs 8 thru 15
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
Sheet 08
Fig. A-UBDAA
View of Raceway Clearance, Adjacent to
Ribs 16 thru 21
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Fig. A-UBEAA
View of Raceway Clearance, Adjacent to
R i b2 2t h r u2 6
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Fig. A-UBFAA
View of Raceway Clearance, Adjacent to
Rib 27
Sheet 01
Sheet 02
Refer to Fig. A-UBAAA Sheet 01
(a) Use these items from Kit B01R00 in the work steps that follow:
8 (ea) Insulator ABS0596S001 Item 1
8 (ea) Insulator ABS0596S002 Item 2
6 (ea) Insulator ABS0596S003 Item 3
3 (ea) Insulator ABS0596M001 Item 4
3 (ea) Insulator ABS0596U001 Item 5
90 (ea) Cable Tie NSA935401-03 Item 6
1
 Install the Insulators and Cable Ties between Ribs 5 and 8
Refer to Fig. A-UBBAA Sheet 01
 , Fig. A-UBBAA Sheet 02
 and Fig. A-UBBAA
Sheet 03
) (the views are looking forward on the rear spar) and at Rib 5, Rib 6,
Rib 7 and Rib 8 at the areas of clearance (gaps) for the ’S’ cable routes,
install as applicable:
- Insulator, Item 1
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A318/A319/A320/A321
SERVICE BULLETIN
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
OR
- Insulator, Item 5
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
2
 Install the Insulators and Cable Ties between Ribs 8 and 16
Refer to Fig. A-UBCAA Sheet 01
 , Fig. A-UBCAA Sheet 02
 , Fig. A-UBCAA
Sheet 03
 , Fig. A-UBCAA Sheet 04
 , Fig. A-UBCAA Sheet 05
 , Fig. A-UBCAA
Sheet 06
 , Fig. A-UBCAA Sheet 07
 and Fig. A-UBCAA Sheet 08
 ) (the views
are looking forward on the rear spar) and at Rib 8, Rib 9, Rib 10, Rib 11, Rib
12, Rib 13, Rib 14 and Rib 15 at the areas of clearance (gaps) for the ’S’
cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
OR
- Insulator, Item 5
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A318/A319/A320/A321
SERVICE BULLETIN
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
3
 Install the Insulators and Cable Ties between Ribs 16 and 22
Refer to Fig. A-UBDAA Sheet 01
 , Fig. A-UBDAA Sheet 02
 , Fig. A-UBDAA
Sheet 03
 , Fig. A-UBDAA Sheet 04
 , Fig. A-UBDAA Sheet 05
 and Fig. A-
UBDAA Sheet 06
 ) (the views are looking forward on the rear spar) and at Rib
16, Rib 17, Rib 18, Rib 19, Rib 20, Rib 21 and Rib 22 at the areas of
clearance (gaps) for the ’S’ cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
OR
- Insulator, Item 5
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
4
 Install the Insulators and Cable Ties between Ribs 22 and 27
Refer to Fig. A-UBEAA Sheet 01
 , Fig. A-UBEAA Sheet 02
 , Fig. A-UBEAA
Sheet 03
 and Fig. A-UBEAA Sheet 04
 ) (the views are looking forward on the
rear spar) and at Rib 22, Rib 23, Rib 24, Rib 25, Rib 26 and Rib 27 at the
areas of clearance (gaps) for the ’S’ cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A318/A319/A320/A321
SERVICE BULLETIN
- Insulator, Item 4
OR
- Insulator, Item 5
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
5
 Install the Insulators and Cable Ties at Rib 27
Refer to Fig. A-UBFAA Sheet 01
 and Fig. A-UBFAA Sheet 02
 ) outboard of Rib
Rib 27 at the areas of clearance (gaps) for the ’S’ cable routes, install as
applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
**CONF 002
(1) Subtask 241062-831-408-002 - Install the Insulators and the Cable Ties to the Areas
of Clearance for the ’S’ Cable Routes (Between Ribs 5 and 27)
Work Zones and Access Panels
Zone
 Access/Work location
574
 Work location
 from Rib 5 to Rib 7
575
 Work location
 from Rib 8 to Rib 27
674
 Work location
 from Rib 5 to Rib 7
675
 Work location
 from Rib 8 to Rib 27
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 31
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A318/A319/A320/A321
SERVICE BULLETIN
Manpower Resources
Manhours
 35.00
Minimum number of person
 1
Subtask elapsed time
 35.00
Skills
 AIRFRAME
ELECTRICAL
Material necessary to do the job
Kit 241062B02R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 ABS0596S001
 10 (ea)
 Insulatr
2
 ABS0596S002
 10 (ea)
 Insulatr
3
 ABS0596S003
 10 (ea)
 Insulatr
4
 ABS0596M001
 5 (ea)
 Insulatr
5
 ABS0596U001
 1 (ea)
 Insulatr
6
 NSA935401-03
 90 (ea)
 Tie
References
Elec. Std. Practices Manual (ESPM)
 20-33-33
20-33-44
Fig. A-UBAAB
Applicable Areas for the Modification
Sheet 01
Fig. A-UBBAB
View of Raceway Clearance, Adjacent to
Ribs 5, 6, and 7
Sheet 01
Sheet 02
Sheet 03
Fig. A-UBCAB
View of Raceway Clearance, Adjacent to
Ribs 8 thru 15
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
Sheet 08
Fig. A-UBDAB
View of Raceway Clearance, Adjacent to
Ribs 16 thru 21
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
Fig. A-UBEAB
View of Raceway Clearance, Adjacent to
R i b2 2t h r u2 6
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 32
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A318/A319/A320/A321
SERVICE BULLETIN
References
Fig. A-UBFAB
View of Raceway Clearance, Adjacent to
Rib 27
Sheet 01
Sheet 02
Refer to Fig. A-UBAAB Sheet 01
(a) Use these items from Kit B02R00 in the work steps that follow:
10 (ea) Insulator ABS0596S001 Item 1
10 (ea) Insulator ABS0596S002 Item 2
10 (ea) Insulator ABS0596S003 Item 3
5 (ea) Insulator ABS0596M001 Item 4
1 (ea) Insulator ABS0596U001 Item 5
90 (ea) Cable Tie NSA935401-03 Item 6
1
 Install the Insulators and Cable Ties between Ribs 5 and 8
Refer to Fig. A-UBBAB Sheet 01
 , Fig. A-UBBAB Sheet 02
 and Fig. A-UBBAB
Sheet 03
) (the views are looking forward on the rear spar) and at Rib 5, Rib 6,
Rib 7 and Rib 8 at the areas of clearance (gaps) for the ’S’ cable routes,
install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
OR
- Insulator, Item 5
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 33
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A318/A319/A320/A321
SERVICE BULLETIN
2
 Install the Insulators and Cable Ties between Ribs 8 and 16
Refer to Fig. A-UBCAB Sheet 01
 , Fig. A-UBCAB Sheet 02
 , Fig. A-UBCAB
Sheet 03
 , Fig. A-UBCAB Sheet 04
 , Fig. A-UBCAB Sheet 05
 , Fig. A-UBCAB
Sheet 06
 , Fig. A-UBCAB Sheet 07
 and Fig. A-UBCAB Sheet 08
 ) (the views
are looking forward on the rear spar) and at Rib 8, Rib 9, Rib 10, Rib 11, Rib
12, Rib 13, Rib 14 and Rib 15 at the areas of clearance (gaps) for the ’S’
cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
3
 Install the Insulators and Cable Ties between Ribs 16 and 22
Refer to Fig. A-UBDAB Sheet 01
 , Fig. A-UBDAB Sheet 02
 , Fig. A-UBDAB
Sheet 03
 , Fig. A-UBDAB Sheet 04
 , Fig. A-UBDAB Sheet 05
 , Fig. A-UBDAB
Sheet 06
 and Fig. A-UBDAB Sheet 07
 ) (the views are looking forward on the
rear spar) and at Rib 16, Rib 17, Rib 18, Rib 19, Rib 20, Rib 21 and Rib 22 at
the areas of clearance (gaps) for the ’S’ cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
and secure with a
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 34
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A318/A319/A320/A321
SERVICE BULLETIN
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
4
 Install the Insulators and Cable Ties between Ribs 22 and 27
Refer to Fig. A-UBEAB Sheet 01
 , Fig. A-UBEAB Sheet 02
 , Fig. A-UBEAB
Sheet 03
 , Fig. A-UBEAB Sheet 04
 and Fig. A-UBEAB Sheet 05
 ) (the views
are looking forward on the rear spar) and at Rib 22, Rib 23, Rib 24, Rib 25,
Rib 26 and Rib 27 at the areas of clearance (gaps) for the ’S’ cable routes,
install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
5
 Install the Insulators and Cable Ties at Rib 27
Refer to Fig. A-UBFAB Sheet 01
 and Fig. A-UBFAB Sheet 02
 ) outboard of Rib
Rib 27 at the areas of clearance (gaps) for the ’S’ cable routes, install as
applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 35
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A318/A319/A320/A321
SERVICE BULLETIN
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
**CONF 003
(1) Subtask 241062-831-408-003 - Install the Insulators and the Cable Ties to the Areas
of Clearance for the ’S’ Cable Routes (Between Ribs 10 and 27)
Work Zones and Access Panels
Zone
 Access/Work location
575
 Work location
 from Rib 10 to Rib 27
675
 Work location
 from Rib 10 to Rib 27
Manpower Resources
Manhours
 33.00
Minimum number of person
 1
Subtask elapsed time
 33.00
Skills
 AIRFRAME
ELECTRICAL
Material necessary to do the job
Kit 241062B03R00
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 ABS0596S001
 10 (ea)
 Insulatr
2
 ABS0596S002
 10 (ea)
 Insulatr
3
 ABS0596S003
 10 (ea)
 Insulatr
4
 ABS0596M001
 5 (ea)
 Insulatr
6
 NSA935401-03
 90 (ea)
 Tie
References
Elec. Std. Practices Manual (ESPM)
 20-33-33
20-33-44
Fig. A-UBAAC
Applicable Areas for the Modification
Sheet 01
Fig. A-UBCAC
View of Raceway Clearance, Adjacent to
Ribs 10 thru 15
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Fig. A-UBDAC
View of Raceway Clearance, Adjacent to
Ribs 16 thru 21
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Sheet 06
Sheet 07
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 36
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A318/A319/A320/A321
SERVICE BULLETIN
References
Fig. A-UBEAC
View of Raceway Clearance, Adjacent to
R i b2 2t h r u2 6
Sheet 01
Sheet 02
Sheet 03
Sheet 04
Sheet 05
Fig. A-UBFAC
View of Raceway Clearance, Adjacent to
Rib 27
Sheet 01
Sheet 02
Refer to Fig. A-UBAAC Sheet 01
(a) Use these items from Kit B03R00 in the work steps that follow:
10 (ea) Insulator ABS0596S001 Item 1
10 (ea) Insulator ABS0596S002 Item 2
10 (ea) Insulator ABS0596S003 Item 3
5 (ea) Insulator ABS0596M001 Item 4
90 (ea) Cable Tie NSA935401-03 Item 6
1
 Install the Insulators and Cable Ties between Ribs 10 and 16
Refer to Fig. A-UBCAC Sheet 01
 , Fig. A-UBCAC Sheet 02
 , Fig. A-UBCAC
Sheet 03
 , Fig. A-UBCAC Sheet 04
 , Fig. A-UBCAC Sheet 05
 and Fig. A-
UBCAC Sheet 06
 ) (the views are looking forward on the rear spar) and at Rib
10, Rib 11, Rib 12, Rib 13, Rib 14 and Rib 15 at the areas of clearance (gaps)
for the ’S’ cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 37
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A318/A319/A320/A321
SERVICE BULLETIN
2
 Install the Insulators and Cable Ties between Ribs 16 and 22
Refer to Fig. A-UBDAC Sheet 01
 , Fig. A-UBDAC Sheet 02
 , Fig. A-UBDAC
Sheet 03
 , Fig. A-UBDAC Sheet 04
 , Fig. A-UBDAC Sheet 05
 , Fig. A-UBDAC
Sheet 06
 and Fig. A-UBDAC Sheet 07
 ) (the views are looking forward on the
rear spar) and at Rib 16, Rib 17, Rib 18, Rib 19, Rib 20, Rib 21 and Rib 22 at
the areas of clearance (gaps) for the ’S’ cable routes, install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
3
 Install the Insulators and Cable Ties between Ribs 22 and 27
Refer to Fig. A-UBEAC Sheet 01
 , Fig. A-UBEAC Sheet 02
 , Fig. A-UBEAC
Sheet 03
 , Fig. A-UBEAC Sheet 04
 and Fig. A-UBEAC Sheet 05
 ) (the views
are looking forward on the rear spar) and at Rib 22, Rib 23, Rib 24, Rib 25,
Rib 26 and Rib 27 at the areas of clearance (gaps) for the ’S’ cable routes,
install as applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
OR
- Insulator, Item 4
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 38
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A318/A319/A320/A321
SERVICE BULLETIN
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
4
 Install the Insulators and Cable Ties at Rib 27
Refer to Fig. A-UBFAC Sheet 01
 and Fig. A-UBFAC Sheet 02
 ) outboard of
Rib Rib 27 at the areas of clearance (gaps) for the ’S’ cable routes, install as
applicable:
- Insulator, Item 1
OR
- Insulator, Item 2
OR
- Insulator, Item 3
and secure with a
- Cable Tie, Item 6 (Refer to ESPM 20-33-33).
NOTE
: If necessary, cut the unwanted part of the Cable Tie, Item 6 to
a satisfactory length ( Refer to ESPM 20-33-44).
**CONF 004
None
**CONF 005
None
**CONF ALL
D. TEST
**CONF 001
None
**CONF 002
None
**CONF 003
None
**CONF 004
None
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 39
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF 005
None
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 241062-410-401-001 - External Close-up
Work Zones and Access Panels
Zone
 Access/Work location
573
 Access
 Panel 573AB, Panel 573BB, Panel 573CB,
Panel 573FB
574
 Access
 Door 574AB, Door 574BB
575
 Access
 Panel 575AB, Panel 575BB, Panel 575CB,
Panel 575DB, Panel 575EB, Panel 575FB, Panel
575GB, Panel 575HB, Panel 575KB, Panel
575LB, Panel 575MB
673
 Access
 Panel 673AB, Panel 673BB, Panel 673CB,
Panel 673FB
674
 Access
 Door 674AB, Door 674BB
675
 Access
 Panel 675AB, Panel 675BB, Panel 675CB,
Panel 675DB, Panel 675EB, Panel 675FB, Panel
675GB, Panel 675HB, Panel 675KB, Panel
675LB, Panel 675MB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Task 27-64-44-400-001
Task 57-31-21-400-001
Task 57-51-37-400-002
Task 57-51-37-400-003
Task 57-51-37-400-004
Task 57-51-37-400-005
Task 57-51-37-400-008
Task 57-51-37-400-009
(a) Install the access panels that follow (Refer to AMM Task 57-51-37-400-002):
- at the LH wing install 573AB, 573BB and 573CB
- at the RH wing install 673AB, 673BB and 673CB.
(b) Install the access panels that follow (Refer to AMM Task 57-51-37-400-003):
- at the LH wing install 573FB
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 40
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A318/A319/A320/A321
SERVICE BULLETIN
- at the RH wing install 673FB.
(c) Install the access doors that follow (Refer to AMM Task 57-51-37-400-008):
- at the LH wing install 574AB
- at the RH wing install 674AB.
(d) Install the access doors that follow (Refer to AMM Task 57-51-37-400-009):
- at the LH wing install 574BB
- at the RH wing install 674BB.
(e) Install the access panels that follow (Refer to AMM 06-41-57 Page Block 001 for
location):
- at the LH wing install 534AB
- at the RH wing install 634AB.
(f) Install the access panels that follow (Refer to AMM Task 57-51-37-400-004):
- at the LH wing install 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB
and 575HB
- at the RH wing install 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB
and 675HB.
(g) Install the access panels that follow (Refer to AMM Task 57-51-37-400-005):
- at the LH wing install 575KB, 575LB and 575MB
- at the RH wing install 675KB, 675LB and 675MB.
(h) Install the wing tip from the LH and RH wing (Refer to AMM Task
57-31-21-400-001).
(2) Subtask 241062-942-401-001 - Close-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 24-41-00, Page Block 201
Task 27-50-00-866-009
Task 27-60-00-866-002
(a) Energize the aircraft electrical network (Refer to AMM 24-41-00 Page Block 201).
(b) Retract the flaps (Refer to AMM Task 27-50-00-866-009).
(c) Retract the spoilers (Refer to AMM Task 27-60-00-866-002).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 41
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A318/A319/A320/A321
SERVICE BULLETIN
(d) Remove the access platform(s).
(e) Remove the warning notices.
**CONF 002
(1) Subtask 241062-410-401-001 - External Close-up
Work Zones and Access Panels
Zone
 Access/Work location
573
 Access
 Panel 573AB, Panel 573BB, Panel 573CB,
Panel 573FB
574
 Access
 Door 574AB, Door 574BB
575
 Access
 Panel 575AB, Panel 575BB, Panel 575CB,
Panel 575DB, Panel 575EB, Panel 575FB, Panel
575GB, Panel 575HB, Panel 575KB, Panel
575LB, Panel 575MB
673
 Access
 Panel 673AB, Panel 673BB, Panel 673CB,
Panel 673FB
674
 Access
 Door 674AB, Door 674BB
675
 Access
 Panel 675AB, Panel 675BB, Panel 675CB,
Panel 675DB, Panel 675EB, Panel 675FB, Panel
675GB, Panel 675HB, Panel 675KB, Panel
675LB, Panel 675MB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Task 27-64-44-400-001
Task 57-31-21-400-001
Task 57-51-37-400-002
Task 57-51-37-400-003
Task 57-51-37-400-004
Task 57-51-37-400-005
Task 57-51-37-400-008
Task 57-51-37-400-009
(a) Install the access panels that follow (Refer to AMM Task 57-51-37-400-002):
- at the LH wing install 573AB, 573BB and 573CB
- at the RH wing install 673AB, 673BB and 673CB.
(b) Install the access panels that follow (Refer to AMM Task 57-51-37-400-003):
- at the LH wing install 573FB
- at the RH wing install 673FB.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 42
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A318/A319/A320/A321
SERVICE BULLETIN
(c) Install the access doors that follow (Refer to AMM Task 57-51-37-400-008):
- at the LH wing install 574AB
- at the RH wing install 674AB.
(d) Install the access doors that follow (Refer to AMM Task 57-51-37-400-009):
- at the LH wing install 574BB
- at the RH wing install 674BB.
(e) Install the access panels that follow (Refer to AMM 06-41-57 Page Block 001 for
location):
- at the LH wing install 534AB
- at the RH wing install 634AB.
(f) Install the access panels that follow (Refer to AMM Task 57-51-37-400-004):
- at the LH wing install 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB
and 575HB
- at the RH wing install 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB
and 675HB.
(g) Install the access panels that follow (Refer to AMM Task 57-51-37-400-005):
- at the LH wing install 575KB, 575LB and 575MB
- at the RH wing install 675KB, 675LB and 675MB.
(h) Install the wing tip from the LH and RH wing (Refer to AMM Task
57-31-21-400-001).
(2) Subtask 241062-942-401-001 - Close-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 24-41-00, Page Block 201
Task 27-50-00-866-009
Task 27-60-00-866-002
(a) Energize the aircraft electrical network (Refer to AMM 24-41-00 Page Block 201).
(b) Retract the flaps (Refer to AMM Task 27-50-00-866-009).
(c) Retract the spoilers (Refer to AMM Task 27-60-00-866-002).
(d) Remove the access platform(s).
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 43
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A318/A319/A320/A321
SERVICE BULLETIN
(e) Remove the warning notices.
**CONF 003
(1) Subtask 241062-410-401-002 - External Close-up
Work Zones and Access Panels
Zone
 Access/Work location
573
 Access
 Panel 573AB
574
 Access
 Door 574AB, Door 574BB
575
 Access
 Panel 575AB, Panel 575BB, Panel 575CB,
Panel 575DB, Panel 575EB, Panel 575FB, Panel
575GB, Panel 575HB, Panel 575KB, Panel
575LB, Panel 575MB
673
 Access
 Panel 673AB
674
 Access
 Door 674AB, Door 674BB
675
 Access
 Panel 675AB, Panel 675BB, Panel 675CB,
Panel 675DB, Panel 675EB, Panel 675FB, Panel
675GB, Panel 675HB, Panel 675KB, Panel
675LB, Panel 575MB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-41-57, Page Block 001
Task 27-64-44-400-001
Task 57-31-21-400-001
Task 57-51-37-400-002
Task 57-51-37-400-004
Task 57-51-37-400-005
Task 57-51-37-400-008
Task 57-51-37-400-009
(a) Install the access panels that follow (Refer to AMM Task 57-51-37-400-002):
- at the LH wing install 573AB
- at the RH wing install 673AB.
(b) Install the access doors that follow (Refer to AMM Task 57-51-37-400-008):
- at the LH wing install 574AB
- at the RH wing install 674AB.
(c) Install the access doors that follow (Refer to AMM Task 57-51-37-400-009):
- at the LH wing install 574BB
- at the RH wing install 674BB.
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 44
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 59

@A318/A319/A320/A321
SERVICE BULLETIN
(d) Install the access panels that follow (Refer to AMM 06-41-57 Page Block 001 for
location):
- at the LH wing install 534AB
- at the RH wing install 634AB.
(e) Install the access panels that follow (Refer to AMM Task 57-51-37-400-004):
- at the LH wing install 575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB
and 575HB
- at the RH wing install 675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB
and 675HB.
(f) Install the access panels that follow (Refer to AMM Task 57-51-37-400-005):
- at the LH wing install 575KB, 575LB and 575MB
- at the RH wing install 675KB, 675LB and 675MB.
(g) Install the wing tip from the LH and RH wing (Refer to AMM Task
57-31-21-400-001).
(2) Subtask 241062-942-401-001 - Close-up
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 24-41-00, Page Block 201
Task 27-50-00-866-009
Task 27-60-00-866-002
(a) Energize the aircraft electrical network (Refer to AMM 24-41-00 Page Block 201).
(b) Retract the flaps (Refer to AMM Task 27-50-00-866-009).
(c) Retract the spoilers (Refer to AMM Task 27-60-00-866-002).
(d) Remove the access platform(s).
(e) Remove the warning notices.
**CONF 004
None
**CONF 005
None
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 45
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 60

@A318/A319/A320/A321
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Nov 20/92 SERVICE BULLETIN No.: A320-24-1062
REVISION No.: 07 - Nov 28/11 Page: 46
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

The text continues at https://openairdocs.org/service-documents/airbus/sb-24-1062-07/file/8e02ee30187a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
