# Airbus Service Bulletin 28-1221

Copy: Revision 2 ("SB 28-1221 Rev2"), 40 pages: PDF https://openairdocs.org/files/sha256/60/7c/607c837d629b95eac0a2a66653183bf3fbf329460357e9cec9a7b181e1cd085b; text https://openairdocs.org/service-documents/airbus/sb-28-1221/file/607c837d629b.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-7526, the docket of AD 2017-08-03. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: 28-1221
- Latest revision known: 28-1221, Revision 2 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/airbus/sb-28-1221

## Text (40 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-7526, the docket of AD 2017-08-03. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - VENTING SYSTEM - IN SPECTION OF FUEL VENT PROTECTOR
MODIFICATION No.: None
This page transmits Revision No.02 of Service Bulletin No.A320-28-1221
ADDITIONAL WORK
**CONF ALL
Additional work is required by this revision for aircraft modified by the original issue of this Service
Bulletin.
Unless otherwise stated by an Airworthiness Directive, AIRBUS recommends the additional work to be
accomplished within one year after the issue of this revision.
REASON
Revision No. 02 issued to:
- add sealant to Consumable Materials List (CML)
- correct the FIN numbers affected by this Service Bulletin
- add worksteps to overcoat the nuts (item 2, P/N NSA5474-4K7) and bolts (item 1, P/N NAS1304-3)
with sealant after installation
CHANGES
SUMMARY
REASON/DESCRIPTION/OPERATIONAL
CONSEQUENCES
REASON UPDATED
 R
GENERAL EVALUATION
 GENERAL EVALUATION TABLE UPDATED
 R
EFFECTIVITY
 OPERATOR LIST UPDATED
 R
REFERENCES / REPERCUSSIONS
 REFERENCES/REPERCUSSIONS TABLE
UPDATED
R
MANPOWER
 MANPOWER UPDATED
 R
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
PLANNING INFORMATION
EFFECTIVITY
 EFFECTIVITY RELATED INFORMATION
UPDATED
R
REASON
History
 HISTORY UPDATED
 R
COMPLIANCE
Accomplishment Timescale
 ACCOMPLISHMENT TIMESCALE UPDATED
CONFIGURATION UPDATED
R
MANPOWER
 MANPOWER UPDATED
 R
REFERENCES
 REFERENCED DOCUMENTATION UPDATED
 R
MATERIAL INFORMATION
LIST OF MATERIALS - OPERATOR
SUPPLIED
Consumable Materials
Consumable CMLB01
 CONSUMABLE MATERIAL SET UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
R
ACCOMPLISHMENT INSTRUCTIONS
TASK 281221- 832-895-001-Inspect the
Fuel Vent Protector
TASK SOLUTION UPDATED
NOTE UPDATED
R
Subtask 281221-910-401-001
 SUBTASK SOLUTION UPDATED
REFERENCED DOCUMENTATION UPDATED
REFERENCES UPDATED
R
Subtask 281221-832-401-001
 SUBTASK SOLUTION UPDATED
QUANTITY UPDATED
CONSUMABLE UPDATED
REFERENCED DOCUMENTATION UPDATED
CONFIGURATION UPDATED
FIGURE REFERENCE UPDATED
MATERIAL LIST UPDATED
REFERENCES UPDATED
R
TASK 281221- 831-895-001-ADDITIONAL
WORK - Apply sealant to nuts and bolts
TASK SOLUTION ADDED
 N
Task associated data - 001
 TASK ASSOCIATED DATA ADDED
 N
Subtask 281221-910-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-839-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-941-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-010-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-831-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-410-403-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-700-402-001
 SUBTASK SOLUTION ADDED
 N
Subtask 281221-942-402-001
 SUBTASK SOLUTION ADDED
 N
Fig. A-UBBAA
 FIGURE SOLUTION ADDED
 N
Fig. A-UBBAA Sheet 01
 SHEET ADDED
 N
Fig. A-UBAAA
Fig. A-UBAAA Sheet 01
 SHEET UPDATED
 R
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
FILLING INSTRUCTIONS
This Service Bulletin has been generated electronically and is reissued as a complete document.
Replace the complete document.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
Revision No. 01 issued to:
change the compliance from RECOMMENDED to MANDATORY
give clarification of the FIN numbers affected by this Service Bulletin
add torque values in Paragraph 3.C.(2)
add worksteps for the lubrication of the O-Rings and wirelocking of the lagging
update the Service Bulletin effectivity.
REVISION SEQUENCE
ORIGINAL: Jul 21/14
REVISION No. : 01 - Jun 23/15
REVISION No. : 02 - Jan 11/16
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A318/A319/A320/A321
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
This Page Intentionally Left Blank
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - VENTING SYSTEM - IN SPECTION OF FUEL VENT PROTECTOR
**CONF ALL
MODIFICATIONS
None
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
The Fuel Vent Protector PN 786073-1-0 FIN 194QM (195QM) is part of the stack pipe connected to the
National Advisory Committee for Aeronautics (NACA) Vent Intake Assembly. If a ground fire occurs, it
prevents the ignition of the fuel v apour in the surge tank (and theref ore, the venting system). It also
allows air to flow freely through it in two directions and prevents ice formation. The Fuel Vent Protector
consists of an ice protector cartridge and a flame arrestor cartridge within a metal body. A circlip holds
the ice protector and flame arrestor cartridges in position.
More than one circlip out of a batch of 400 produced by the vendor Intertechnique in August 2012, were
found corroded. Several circlips have been found to be corroded due to a surface treatment (shot
peening) operation being omitted during manufacture. Two suspect circlips have been inspected and
the presence of corrosion has been confirmed.
Fuel Vent Protector FIN 48QM
 (49QM
) are not affected by this Service Bulletin.
This Inspection Service Bulletin introduces a one-time Detailed Inspection of the Fuel Vent Protector. If
the Part Number (PN) and Serial Number (SN) of the Fuel Vent Protector are found to be part of the
affected batch, the Fuel Vent Protector (containing the circlip) must be replaced.
This one-time inspection will detect affected units and prevent possible future in-service issues.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 MANDATORY (1)
 CANCELS INSPECTION SB
 NO
POTENTIAL AD
 YES
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
EVALUATION TABLE
DE-FUELLING/VENTILATION
 YES
NOTE
 (1)
: Service Bulletin must be accomplished.
MATERIAL PRICE INFORMATION
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Component COMPB01
 1
 See SB
 O-rings
Equipment BFEB01
 1
 See SB
 Fuel Vent Protector
EFFECTIVITY
This Service Bulletin is applicable to this (these) operator(s) :
AAR ABY AFL AMU AVA AXM BER
 CEB CES CRK CSN CSZ CTV
DKH DLH EVA EWG
 FFT
 GOW GWI HVN IAW IBE IBS IGO JAS
JJP JST LAN NKS SFJ SVA SVW SWR TAR TGW THA THY USA
VLG VOI VRD WZZ
CONCURRENT REQUIREMENTS
None
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
Task 281221-832-895-001: Inspect the Fuel Vent Protector
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
Task 281221-831-895-001: ADDITIONAL WORK - Apply sealant to nuts and bolts
TOTAL MANHOURS
 4.25
ELAPSED TIME (HOURS)
 4.25
APPENDICES
None
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A318/A319/A320/A321
SERVICE BULLETIN
SUMMARY
**CONF ALL
N_SB_281221_7_SAAA_01_00
INTAKE VENT
ADAPTOR
FUEL VENT
PROTECTOR
LAGGING
NACA VENT
INTAKE ASSEMBLY
194QM
(195QM)
B
B
ARIB23
RIB22
Z550 (Z650)
A
Figure A-USAAA - Sheet 01
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A318/A319/A320/A321
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
MANDATORY
 MANDATORY
 MANDATORY
ATA SYSTEM: 28
TITLE: FUEL - VENTING SYSTEM - IN SPECTION OF FUEL VENT PROTECTOR
MODIFICATION No.: None
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
NOTE
: Effectivity is limited to aircraft potentially affected.
(1) Models
318-112 319-115 319-132 320-214 320-216 320-232 320-233 321-211
321-231
(2) Effectivity by MSN
5438 5441 5444-5445 5447 5457 5459-5461 5463-5464 5469 5473-5478 5481-5483
5485-5488 5490-5493 5495-5505 5507-5515 5517-5518 5520-5527 5530 5536 5539
5541 5544 5547 5551 5553 5556
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
AAR
 5500
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A318/A319/A320/A321
SERVICE BULLETIN
OPERATOR
 MSN
ABY
 5502
AFL
 5536
AMU
 5459 5523
AVA
 5477
AXM
 5505 5547
BER
 5522
CEB
 5498
CES
 5461 5481 5508 5524 5527
CRK
 5514 5544
CSN
 5503
CSZ
 5521
CTV
 5511 5541 5551 5556
DKH
 5491
DLH
 5441 5487
EVA
 5485
EWG
 5497
 5525
FFT
 5526
GOW
 5463
GWI
 5457
HVN
 5438 5469 5495
IAW
 5464
IBE
 5486
IBS
 5501
IGO
 5460 5473 5476 5507
JAS
 5478
JJP
 5492 5499 5520
JST
 5482
LAN
 5483 5493
NKS
 5517
SFJ
 5512
SVA
 5447 5509
SVW
 5445
SWR
 5518
TAR
 5474
TGW
 5496
THA
 5553
THY
 5490
USA
 5444 5475 5504 5513
VLG
 5530
VOI
 5488 5510
VRD
 5515
WZZ
 5539
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A318/A319/A320/A321
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
5438 5441 5444 5445 5447 5457 5459 5460 5461 5463 5464
5469 5473 5474 5475 5476 5477 5478 5481 5482 5483 5485
5486 5487 5488 5490 5491 5492 5493 5495 5496 5497 5498
5499 5500 5501 5502 5503 5504 5505 5507 5508 5509 5510
5511 5512 5513 5514 5515 5517 5518 5520 5521 5522 5523
5524 5525 5526 5527 5530 5536 5539 5541 5544 5547 5551
5553 5556
001
(5) Configuration definition
**CONF 001
Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a
standard configuration.
(6) Material Effectivity
MATERIAL
 QTY PER A/C
 SEE NOTES
Component COMPB01
 1
 (1)
Equipment BFEB01
 1
 (1) (2)
Consumable CMLB01
 1
NOTE
 (1)
: The quantity given in all kits is to complete the task on both LH and RH
wings.
NOTE
 (2)
: BFEB01 will only be required depending on inspection results.
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
The Fuel Vent Protector PN 786073-1-0 FIN 194QM (195QM) is part of the stack pipe
connected to the National Advisory Committee for Aeronautics (NACA) Vent Intake
Assembly. If a ground fire occurs, it prevents the ignition of the fuel vapour in the surge
tank (and therefore, the vent ing system). It also allows ai r to flow freely through it in
two directions and prevents ice formation. The Fuel Vent Protector consists of an ice
protector cartridge and a flame arrestor cartridge within a metal body. A circlip holds the
ice protector and flame arrestor cartridges in position.
More than one circlip out of a batch of 400 produced by the vendor Intertechnique in
August 2012, were found corroded. Several circlips have been found to be corroded due
to a surface treatment (shot peening) operation being omitted during manufacture. Two
suspect circlips have been inspected and the presence of corrosion has been confirmed.
Fuel Vent Protector FIN 48QM
 (49QM
) are not affected by this Service Bulletin.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A318/A319/A320/A321
SERVICE BULLETIN
(2) Objective/Action
This Inspection Service Bulletin introduces a one-time Detailed Inspection of the Fuel
Vent Protector. If the Part Number (PN) and Serial Number (SN) of the Fuel Vent
Protector are found to be part of the affected batch, the Fuel Vent Protector (containing
the circlip) must be replaced.
(3) Advantages
This one-time inspection will detect affected units and prevent possible future in-service
issues.
(4) Operational/Maintenance Consequences
None
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
Task 281221-832-895-001: Inspect the Fuel Vent Protector
(1) Remove the NACA Vent Intake Assembly
(2) Inspect and if necessary Replace the Fuel Vent Protector FIN 194QM (195QM)
(3) Install the NACA Vent Intake Assembly
Task 281221-831-895-001: ADDITIONAL WORK - Apply sealant to nuts and bolts
(1) Remove the NACA Vent Intake Assembly
(2) Apply sealant to nuts and bolts
(3) Install the NACA Vent Intake Assembly
E. COMPLIANCE
(1) Classification
MANDATORY: Service Bulletin must be accomplished.
(2) Accomplishment Timescale
This Service Bulletin has been classified Mandatory by the issue of an Airworthiness
Directive (AD) published by the European Av iation Safety Agenc y (EASA). The AD must
be used as the reference document for the mandated accomplishment timescale.
Condition
 Action
 Threshold (whichever
occurs first)
Repetitive Interval
(whichever occurs first)
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A318/A319/A320/A321
SERVICE BULLETIN
All Aircraft
 Remove the NACA vent
intake assmebly in
accordance with
SUBTASK
281221-010-401 001
Remove the NACA Vent
Intake Assembly
 .
Remove and inspect the
fuel vent protector in
accordance with
SUBTASK
281221-832-401 001
Inspect and if necessary
Replace the Fuel Vent
Protector FIN 194QM
(195QM)
 .
30 months/7500 Flight
Hours/5000 Flight
Cycles since Airbus
date of manufacture.
None
The fuel vent protector
is not part of the batch
affected.
Re-install the fuel vent
protector in accordance
with SUBTASK
281221-832-401 001
Inspect and if necessary
Replace the Fuel Vent
Protector FIN 194QM
(195QM)
 .
Re-install the NACA
intake assembly in
accordance with
SUBTASK
281221-410-402 001
Install the NACA Vent
Intake Assembly
 .
None
 None
The fuel vent protector
is part of the batch
affected.
Replace the vent
protector with one that
is not from the affected
batch in accordance
with SUBTASK
281221-832-401 001
Inspect and if necessary
Replace the Fuel Vent
Protector FIN 194QM
(195QM)
 .
Re-install the NACA
intake assembly in
accordance with
SUBTASK
281221-410-402 001
Install the NACA Vent
Intake Assembly
 .
None
 None
Table 1, Config 001 - Inspect the Fuel Vent Protector
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A318/A319/A320/A321
SERVICE BULLETIN
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
Task 281221-832-895-001: Inspect the Fuel Vent Protector
Get Access
 1.00
On Aircraft
Remove the NACA Vent Intake Assembly
 1.00
Inspect and if necessary Replace the Fuel Vent
Protector FIN 194QM (195QM)
1.00
Install the NACA Vent Intake Assembly
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
Task 281221-831-895-001: ADDITIONAL WORK - Apply sealant to nuts and bolts
Get Access
 1.00
On Aircraft
Remove the NACA Vent Intake Assembly
 1.00
Apply sealant to nuts and bolts
 0.25
Install the NACA Vent Intake Assembly
 1.00
Close-Up
 1.00
TOTAL MANHOURS
 4.25
ELAPSED TIME (HOURS)
 4.25
H. WEIGHT AND BALANCE
Not Changed
I. ELECTRICAL LOAD DATA
Not Changed
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A318/A319/A320/A321
SERVICE BULLETIN
J. REFERENCES
Aircraft Maintenance Manual (AMM)
 06-20-00 12-34-24 20-21-11
28-12-47
Consumable Material List (CML)
Elec. Std. Practices Manual (ESPM)
 20-55-00
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-24-00
K. PUBLICATION AFFECTED
None
L. INTERCHANGEABILITY/MIXABILITY
Not Applicable
M. SPARES
None
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A318/A319/A320/A321
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A318/A319/A320/A321
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Vendor parts are to be procured from addresses provided by Zodiac:
Equipment BFEB01
 For Europe:
BD Sagnat
BP 3
42230 Roche la Moliere
France
Equipment BFEB01
 For the USA:
W175 N5737 Technology Drive
Menomonee Falls
WI 53051
USA
Equipment BFEB01
 For Asia:
36 Loyang Drive
Singapore 508949
Equipment BFEB01
 For the Middle East:
Abu Dhabi International Airport
Cargo Village Area
P.O. Box 106675
Abu Dhabi
United Arab Emirates
(2) Price and Availability
No AIRBUS kit will be provided.
Operator supplied standard hardware parts required to accomplish this Service Bulletin
are to be supplied from the operator’s stock.
Procurement terms for the equipment must be negotiated with the equipment supplier.
B. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
C. LIST OF COMPONENTS
No Kit
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A318/A319/A320/A321
SERVICE BULLETIN
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Mineral Oil Base Grease - Vaseline
Or Petrolatum
03FAB1
 As required
Polysulfide Sealant
 06ABB1
 As required
Wire-Locking Dia: 0.8 mm Cres
Nickel Alloy
14QFB1
 As required
(2) Components
Component COMPB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
2
 NSA5474-4K7
 8
 NUT
4
 NSA8203-238
 4
 O-RING
5
 NSA8203-242
 2
 O-RING
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: The quantity given in all kits is to complete the task on both LH and RH
wings.
(3) Equipment
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
6
 786073-1-0
 2
 PROTECT
NOTE
: The quantity given in all kits is to complete the task on both LH and RH
wings.
NOTE
: BFEB01 will only be required depending on inspection results.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
None
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A318/A319/A320/A321
SERVICE BULLETIN
F. TOOLING
None
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A318/A319/A320/A321
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A318/A319/A320/A321
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 281221-832-895-001 - Inspect the Fuel Vent Protector
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS INSTRUCTION IS APPLICABLE TO A CRITICAL DESIGN
CONFIGURATION CONTROL LIMITAT ION (CDCCL) ITEM. CAREFULLY OBEY
ALL GIVEN INSTRUCTIONS WHEN YOU DO THIS STEP. IF YOU DO NOT
OBEY THESE INSTRUCTIONS, A DA NGEROUS CONDITION CAN OCCUR
THAT CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A318/A319/A320/A321
SERVICE BULLETIN
NOTE
: The purpose of flow charts is to supplement the information given in the Procedure
and Compliance paragraphs and not to serve as the primary source for tasks or
compliance times given in this Service Bulletin.
Task Associated Data
Zone
550 650
Modified FIN
194QM 195QM
Manpower
TOTAL MANHOURS
 5.00
ELAPSED TIME (HOURS)
 5.00
A. GENERAL
(1) Subtask 281221-910-401-001 - Standard Practices
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
Task 20-21-11-911-001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-24-00
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For torque values of standard threaded fasteners, tightening, refer to AMM Task
20-21-11-911-001.
(c) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(d) Apply sealant in accordance with SRM 51-24-00.
(2) Subtask 281221-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 281221-941-401-001 - Job Set-Up
Work Zones and Access Panels
Zone
 Access/Work location
550
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A318/A319/A320/A321
SERVICE BULLETIN
650
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-869-002
Task 28-12-47-000-001
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-869-002.
(b) Do the Job Set-Up procedure in "Removal of the NACA Vent Intake Assembly",
refer to AMM Task 28-12-47-000-001.
C. PROCEDURE
(1) Subtask 281221-010-401-001 - Remove the NACA Vent Intake Assembly
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from Rib 22 to Rib 23
650
 Work location
 from Rib 22 to Rib 23
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A318/A319/A320/A321
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-000-001
NOTE
: These instructions are applicable to both the LH and RH wings.
(a) Remove the NACA Vent Intake Assembly, refer to AMM Task 28-12-47-000-001.
NOTE
: Do not disassemble the NACA Vent Intake Assembly. Only the Fuel Vent
Protector will need to be removed for inspection at the next step.
(2) Subtask 281221-832-401-001 - Inspect and if necessary Replace the Fuel Vent
Protector FIN 194QM (195QM)
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
Material necessary to do the job
Component COMPB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
2
 NSA5474-4K7
 8
 NUT
4
 NSA8203-238
 4
 O-RING
5
 NSA8203-242
 2
 O-RING
NOTE
: The quantity given in all kits is to complete the task on both LH and RH
wings.
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
6
 786073-1-0
 2
 PROTECT
NOTE
: The quantity given in all kits is to complete the task on both LH and RH
wings.
NOTE
: BFEB01 will only be required depending on inspection results.
NOTE
: The above list of components is not an AIRBUS Kit, the required parts
shall be ordered as necessary through the given channel.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Mineral Oil Base Grease -
Vaseline Or Petrolatum
03FAB1
 As required
Polysulfide Sealant
 06ABB1
 As required
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A318/A319/A320/A321
SERVICE BULLETIN
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Wire-Locking Dia: 0.8 mm
Cres Nickel Alloy
14QFB1
 As required
References
Structural Repair Manual (SRM)
 51-24-00
Fig. A-UBAAA
Removal and Installation of the Fuel
Vent Protector
Sheet 01
Fig. A-UFAAA
Inspection Flowchart
Sheet 01
Fig. A-UBBAA
Apply sealant to nuts and bolts
Sheet
 01
NOTE
: These instructions are applicable to both the LH and RH wings.
(a) Remove, refer to Fig. A-UBAAA Sheet 01
 :
8 Bolt NAS1304-3 Item (1) Retain
8 Nut NSA5474-4K7 Item (2) Discard
2 Adaptor-Vent,Intake D2815002900000 Item (3) Retain
4 O-Ring NSA8203-238 Item (4) Discard
2 Protector-Fuel, Vent 786073-1-0 Item (6) Retain
2 O-Ring NSA8203-242 Item (5) Discard
(b) Cut the lockwire laced around the Lagging, Item (7).
NOTE
: When removing the lockwire from the Lagging, Item (7), make note
of the lacing method used.
(c) Remove, refer to Fig. A-UBAAA Sheet 01
 :
2 Lagging D2815003120000 Item (7) Retain
(d) Inspect the fuel vent protector 194QM (195QM) identification labels and make sure
that the protector is not one of the affected batch, refer to Fig. A-UFAAA Sheet 01
 ,
as shown in Table 1.
NOTE
: Part Numbers included on a identification placard marked Amdt B.
can be used on the aircraft even if the serial number is shown in
the table below. Identification placards marked Amdt B. indicate
previous repair by the manufacturer.
786073IN03900
 786073IN03904
 786073IN03788
 786073IN03910
 786073IN03787
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A318/A319/A320/A321
SERVICE BULLETIN
786073IN03908
 786073IN03897
 786073IN03901
 786073IN03753
 786073IN03898
786073IN03914
 786073IN03899
 786073IN03906
 786073IN03757
 786073IN03761
786073IN03961
 786073IN03905
 786073IN03947
 786073IN03760
 786073IN03859
786073IN03756
 786073IN03754
 786073IN03948
 786073IN03821
 786073IN03758
786073IN03907
 786073IN03951
 786073IN03964
 786073IN03848
 786073IN03851
786073IN03810
 786073IN03820
 786073IN03827
 786073IN03945
 786073IN03962
786073IN03833
 786073IN03853
 786073IN03911
 786073IN03752
 786073IN03969
786073IN03817
 786073IN03814
 786073IN03836
 786073IN03946
 786073IN03972
786073IN03871
 786073IN03826
 786073IN03984
 786073IN03830
 786073IN03978
786073IN03850
 786073IN03977
 786073IN03980
 786073IN03877
 786073IN04011
786073IN03812
 786073IN04023
 786073IN04024
 786073IN03839
 786073IN03927
786073IN04013
 786073IN03867
 786073IN03930
 786073IN04009
 786073IN03819
786073IN03971
 786073IN03940
 786073IN03981
 786073IN03829
 786073IN03965
786073IN04048
 786073IN04070
 786073IN03860
 786073IN03759
 786073IN03868
786073IN03966
 786073IN03878
 786073IN03755
 786073IN03849
 786073IN03983
786073IN03925
 786073IN03834
 786073IN04066
 786073IN04184
 786073IN04017
786073IN04025
 786073IN03874
 786073IN03967
 786073IN03840
 786073IN03987
786073IN03882
 786073IN03985
 786073IN04019
 786073IN03937
 786073IN04065
786073IN03997
 786073IN04187
 786073IN03922
 786073IN04026
 786073IN04010
786073IN03996
 786073IN03893
 786073IN03938
 786073IN03986
 786073IN03982
786073IN04039
 786073IN04068
TABLE 1 - AFFECTED SERIAL NUMBERS OF FUEL VENT PROTECTOR, PN 786073
(e) If the fuel vent protector is not one of the affected batch, reinstall all removed items
as detailed in step (g).
If the fuel vent protector is one of the affected batch, install a replacement protector
not from the affected batch and all remaining removed items as detailed in step (g).
(f) Lubricate the O-Rings, Item 4 and Item 5, use:
Mineral Oil Base
Grease - Vaseline
Or Petrolatum
03FAB1 As required
NOTE
: Lubricate with the minimum amount required.
(g) Install, refer to Fig. A-UBAAA Sheet 01
 :
4 O-Ring NSA8203-238 Item 4
2 O-Ring NSA8203-242 Item 5
2 Lagging D2815003120000 Item (7) Retained at
removal
2 Adaptor-Vent,Intake D2815002900000 Item (3) Retained at
removal
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A318/A319/A320/A321
SERVICE BULLETIN
2 Protector-Fuel, Vent 786073-1-0 Item (6) Retained at
removal
or
2 Protector-Fuel, Vent 786073-1-0 Item 6
8 Bolt NAS1304-3 Item (1) Retained at
removal
8 Nut NSA5474-4K7 Item 2
(h) Lace the Lagging, Item (7) with lockwire, use:
Wire-Locking Dia:
0.8 mm Cres Nickel
Alloy
14QFB1 As required
NOTE
: Twist the ends of the lockwire together and lay them flat to the
Protector-Fuel, Vent, Item 6.
(i) Torque tighten the Nuts, Item 2, to between 6.78 Nm (60 lbf.in.) and 7.91 Nm (70
lbf.in.).
(j) Apply to nuts and bolts in accordance with SRM 51-24-00, refer to Fig. A-UBBAA
Sheet 01
:
Polysulfide Sealant
 06ABB1
 As required
(k) If the removed fuel vent protector was one of the affected batch, return it to the
vendor for refurbishment. Return to:
For Europe:
BD Sagnat
BP 3
42230 Roche la Moliere
France
For the USA:
W175 N5737 Technology Drive
Menomonee Falls
WI 53051
USA
For Asia:
36 Loyang Drive
Singapore 508949
For the Middle East:
Abu Dhabi International Airport
Cargo Village Area
P.O. Box 106675
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A318/A319/A320/A321
SERVICE BULLETIN
Abu Dhabi
United Arab Emirates
(3) Subtask 281221-410-402-001 - Install the NACA Vent Intake Assembly
Work Zones and Access Panels
Zone
 Access/Work location
550
650
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-400-001
NOTE
: These instructions are applicable to both the LH and RH wings.
(a) Install the NACA Vent Intake Assembly, refer to AMM Task 28-12-47-400-001.
D. TEST
(1) Subtask 281221-700-401-001 - Testing
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-400-001
(a) The testing is included in the Installation of the NACA Intake Assembly, refer to
AMM Task 28-12-47-400-001.
E. CLOSE-UP
(1) Subtask 281221-942-401-001 - Close-Up
Work Zones and Access Panels
Zone
 Access/Work location
550
650
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-400-001
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A318/A319/A320/A321
SERVICE BULLETIN
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Close-Up procedure for the Installation of the NACA Intake Assembly, refer
to AMM Task 28-12-47-400-001.
(c) Put the aircraft back to its initial configuration.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A318/A319/A320/A321
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A318/A319/A320/A321
SERVICE BULLETIN
Task 281221-831-895-001 - ADDITIONAL WORK - Apply sealant to nuts and bolts
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS INSTRUCTION IS APPLICABLE TO A CRITICAL DESIGN
CONFIGURATION CONTROL LIMITAT ION (CDCCL) ITEM. CAREFULLY OBEY
ALL GIVEN INSTRUCTIONS WHEN YOU DO THIS STEP. IF YOU DO NOT
OBEY THESE INSTRUCTIONS, A DA NGEROUS CONDITION CAN OCCUR
THAT CAN CAUSE A POSSIBLE FUEL TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
"refer to" are used and the operator has a procedure accepted by the local
authority he belongs to, the accepted alternative procedure can be used. When the
words "in accordance with" are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: This Service Bulletin is classified mandatory or expected to be classified mandatory
by an Airworthiness Directive (AD). The paragraphs 3.C. and 3.D. in these
accomplishment instructions are Required for Compliance (RC) and must be done
to comply with the AD. Other paragraphs are recommended and may be deviated
from, done as part of other actions or done with accepted methods different from
those given in the Service Bulletin, as long as the RC paragraphs can be done and
the aircraft can be put back into a serviceable condition.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A318/A319/A320/A321
SERVICE BULLETIN
Task Associated Data
Zone
550
 650
Manpower
TOTAL MANHOURS
 4.25
ELAPSED TIME (HOURS)
 4.25
A. GENERAL
(1) Subtask 281221-910-402-001 - Standard Practices
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 06-20-00, Page Block 001
Task 20-21-11-911-001
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-24-00
(a) For the identification of zones, refer to AMM 06-20-00, Page Block 001.
(b) For torque values of standard threaded fasteners, tightening, refer to AMM Task
20-21-11-911-001.
(c) For the specification of materials (Mat. No.) given in this Service Bulletin, refer to
Consumable Material List (CML).
(d) Apply sealant in accordance with SRM 51-24-00.
(2) Subtask 281221-839-402-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
B. PREPARATION
(1) Subtask 281221-941-402-001 - Job Set-up
Work Zones and Access Panels
Zone
 Access/Work location
550
650
Manpower Resources
Skills
 AIRFRAME
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A318/A319/A320/A321
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 12-34-24-869-002
Task 28-12-47-000-001
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM Task
12-34-24-869-002.
(b) Do the Job Set-Up procedure in "Removal of the NACA Vent Intake Assembly",
refer to AMM Task 28-12-47-000-001.
C. PROCEDURE
(1) Subtask 281221-010-402-001 - Remove the NACA Vent Intake Assembly
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from
 Rib 22 to
 Rib 23
650
 Work location
 from
 Rib 22 to
 Rib 23
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-000-001
NOTE
: These instructions are applicable to both the LH and RH wings.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A318/A319/A320/A321
SERVICE BULLETIN
(a) Remove the NACA Vent Intake Assembly, refer to AMM Task 28-12-47-000-001.
NOTE
: Do not disassemble the NACA Vent Intake Assembly. The sealant will be
applied to the already installed nuts and bolts in the next step.
(2) Subtask 281221-831-402-001 - Apply sealant to nuts and bolts
Work Zones and Access Panels
Zone
 Access/Work location
550
 Work location
 from
 Rib 22 to
 Rib 23
650
 Work location
 from
 Rib 22 to
 Rib 23
Manpower Resources
Manhours
 0.25
Minimum number of person
 1
Subtask elapsed time
 0.25
Skills
 AIRFRAME
Material necessary to do the job
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Polysulfide Sealant
 06ABB1
References
Structural Repair Manual (SRM)
 51-24-00
Fig. A-UBBAA
Apply sealant to nuts and bolts
Sheet
 01
(a) Apply to nuts and bolts in accordance with SRM 51-24-00, refer to Fig. A-UBBAA
Sheet 01
:
Polysulfide Sealant
 06ABB1
 As required
(3) Subtask 281221-410-403-001 - Install the NACA Vent Intake Assembly
Work Zones and Access Panels
Zone
 Access/Work location
550
650
Manpower Resources
Manhours
 1.00
Minimum number of person
 1
Subtask elapsed time
 1.00
Skills
 AIRFRAME
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A318/A319/A320/A321
SERVICE BULLETIN
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-400-001
(a) Install the NACA Vent Intake Assembly, refer to AMM Task 28-12-47-400-001.
D. TEST
(1) Subtask 281221-700-402-001 - Testing
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-400-001
(a) The testing is included in the Installation of the NACA Intake Assembly, refer to
AMM Task 28-12-47-400-001.
E. CLOSE-UP
(1) Subtask 281221-942-402-001 - Close-up
Work Zones and Access Panels
Zone
 Access/Work location
550
650
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 Task 28-12-47-400-001
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Do the Close-Up procedure for the Installation of the NACA Intake Assembly, refer
to AMM Task 28-12-47-400-001.
(c) Put the aircraft back to its initial configuration.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF ALL
BZ550 (Z650)
A
ARIB23
RIB22
01
NACA VENT
INTAKE ASSEMBLY
B
LH SHOWN
RH SYMMETRICAL
LH SHOWN
RH SYMMETRICAL
01
01
PRINCIPLE OF SEALING
MATERIAL No 06ABB1
MATERIAL No 06ABB1
APPLY SEALANT TO NUTS AND BOLTS
N_SB_281221_7_BBAA_01_01
Figure A-UBBAA - Sheet 01
Apply sealant to nuts and bolts
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF ALL
BZ550 (Z650)
A
A
NACA VENT
INTAKE ASSEMBLY
RIB23
RIB22
IDENTIFICATION
LABELS
(6) 6
(4) 4
(3)
(4) 4
(7)
(1)
(5) 5
B
(2) 2
NOTE:
APPLY THE MINIMUM APPLICATION OF LUBRICANT,01
MATERIAL No 03FAB1 BEFORE INSTALLATION.
LACE−UP WITH LOCKWIRE, MATERIAL No 14QFB1 TWIST02
THE ENDS TOGETHER AND LAY THEM FLAT.
02
01
01
01
194QM
195QM
x4
x4
LH
RH
N_SB_281221_7_BAAA_01_07
Figure A-UBAAA - Sheet 01
Removal and Installation of the Fuel Vent Protector
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A318/A319/A320/A321
SERVICE BULLETIN
**CONF ALL
QUESTION
ACTION
FINDING
NOTE: THE PURPOSE OF FLOW CHARTS IS TO SUPPLEMENT THE INFORMATION
GIVEN IN THE PROCEDURE AND COMPLIANCE PARAGRAPHS AND NOT TO
SERVE AS THE PRIMARY SOURCE FOR TASKS OR COMPLIANCE TIMES
GIVEN IN THIS SERVICE BULLETIN.
N_SB_281221_7_FAAA_01_00
REMOVE NACA INTAKE ASSEMBLY
REMOVE AND INSPECT THE 
FUEL VENT PROTECTOR
IS THE FUEL VENT
PROTECTOR PART OF
RE−INSTALL THE FUEL
VENT  PROTECTOR
RE−INSTALL THE NACA 
INTAKE ASSEMBLY
NO FURTHER ACTION
THE BATCH AFFECTED?
RE−INSTALL THE NACA 
INTAKE ASSEMBLY
NO FURTHER ACTION
RETURN THE REMOVED
VENT PROTECTOR TO
INTERTECHNIQUE FOR
REFURBISHMENT
NO YES
REPLACE THE VENT
PROTECTOR WITH ONE
 THAT IS NOT FROM
THE AFFECTED BATCH
Figure A-UFAAA - Sheet 01
Inspection Flowchart
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A318/A319/A320/A321
SERVICE BULLETIN
REPORTING SHEET
TITLE: FUEL - VENTING SYSTEM - IN SPECTION OF FUEL VENT PROTECTOR
MODIFICATION No.: None
Please complete the appropriate item (A or B):
A - SB WILL BE
 embodied YES/NO (if NO please comment)
If YES, aircraft concer ned (as per SB effectivity by default) and planned dates (month/year) of
embodiment:
B - SB HAS BEEN
 embodied on aircraft:
Operator comments:
From Airline:
Name/Title:
Signature: Date:
If operational documentation is affected (see Paragraph 1.K of this SB): If information is needed prior to
next normal revision or prior to SB embodiment, please indicate required service(s):
Either: Modification Operational Impact (MOI), if available YES/NO
Or : Intermediate revision YES/NO
Important Information:
 This SB will only be incorporated in your maintenance and operational
documentation if this sheet is returned to Airbus and signed by a duly authorised representative. With
the next feasible revision, this will result in
- Updating of maintenance documentation to show pre and post SB data.
- Updating of maintenance and operational documentation to show post SB data after embodiment.
If this SB requires previous or simultaneous accomplishment of other SBs, Airbus shall automatically
include them in the manual revisions. Refer to SIL 00-037 for detailed information.
Please return this completed sheet to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn: SDC32 Technical Data and Documentation Services
F A X :( + 3 3 )56 19 32 80 6
e-mail: sb.reporting@airbus.com
or via your Resident Customer Support Office.
Alternatively, SB lists via letters or fax are also accepted.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A318/A319/A320/A321
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jul 21/14 SERVICE BULLETIN No.: A320-28-1221
REVISION No.: 02 - Jan 11/16 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
