# Airbus Service Bulletin 28-2178: No revision named

- Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2017-0714, the docket of AD 2017-25-09. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Airbus Service Bulletin 28-2178](https://openairdocs.org/service-documents/airbus/sb-28-2178.md)
- Title as filed: SB_28-2178_r00
- Pages: 58
- PDF: https://openairdocs.org/files/sha256/37/7f/377fb2e2a51188fcded501f78122cc24b8f00d47493779c7ab9cbf5fdc87d055
- Page: https://openairdocs.org/service-documents/airbus/sb-28-2178/file/377fb2e2a511

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

@A310
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
This summary is for information only and is not approved for modification of the aircraft.
ATA SYSTEM: 28
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSTALL FUEL PUMP CANISTER
WITH NEW HOOD/MESH FOR OUTER AND TRIM TANK POSITIONS
**CONF ALL
MODIFICATIONS
MODIFICATION CLASSIFICATION
MAJOR
 None
MINOR
 13643H5740
 13740H5756
NOTE
: As per EASA IR 21, a minor change is one that has no appreciable effect on the
mass, balance, structural strength, reliability, operational characteristics affecting the
airworthiness of the product. All other changes are major changes.
NOTE
: Please ignore the above note (if it is present), this note is auto-generated and does not
apply to this SB.
NOTE
: This modification is related to an airworthiness issue which has been re-classified and
confirmed by EASA as minor in accordance with EU Part 21.A.91. As such, this is
handled by AIRBUS under its D esign Organisation Approval No. EASA.21J.031.
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Fuel pump canisters are located in pairs in all fuel tanks. There is a fabricated aluminium hood (in two
halves) which forms a surface between the fuel pump inlet mesh and the fuel pump canister body.
Some operators have reported cases of cracking on the hood in the inner wing fuel tanks. On one
aircraft, part of the hood detached and was found inside the fuel tank.
Fuel pump canister hoods are currently subject to a mandatory inspection in accordance with Inspection
Service Bulletin No. A310-28-2173.
Following the investigation into in-service failures, this Service Bulletin introduces new canister hoods
for the wing outer tank and the trim tank fuel pumps (where fitted) only. No other fuel pump positions
are affected by this Service Bulletin.
The new design consists of a new two part stainless steel hood assembly that is installed over the
existing inlet mesh as before. To account for tolerances in the inlet mesh diameter and to avoid
installation pre-stress, each hood half has an enlarged central hole, through which a stepped fastener is
installed.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 2

@A310
SERVICE BULLETIN
SUMMARY
Accomplishment of this Service Bulletin will reduce the scope of the Inspection Service Bulletin No.
A310-28-2173 by canceling the requirement for the repeat inspection of the fuel pump canisters in the
outer wing and trim tank (only).
The installation of a new fuel pump canister hood changes the part number of the canister assembly.
The Operational/Maintenance Consequences of this Service Bulletin are covered by the update of the
affected publications detailed in ’PLANNING INFORMATION’.
GENERAL EVALUATION
EVALUATION TABLE
COMPLIANCE
 RECOMMENDED (1)
 CANCELS INSPECTION SB
 YES
POTENTIAL AD
 NO
 A/C OPERATION AFFECTED
 NO
RELIABILITY AFFECTED
 NO
 PAX COMFORT AFFECTED
 NO
COST SAVING
 NO
 ETOPS AFFECTED
 NO
STRUCTURAL LIFE EXTN
 NO
 VENDOR SB INVOLVED
 NO
DE-FUELLING/VENTILATION
 YES
NOTE
 (1)
: Service Bulletin recommended to be accomplished to prevent significant operational
disruptions.
MATERIAL PRICE INFORMATION
**CONF 001
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Equipment BFEB01
 4
 See SB
 Hood halves and attachments
**CONF 002
MATERIAL PRICE INFORMATION TABLE
MATERIAL SET
 QTY PER
A/C
PRICE PER
A/C (USD)
MAIN PARTS
Equipment BFEB01
 6
 See SB
 Hood halves and attachments
EFFECTIVITY
**CONF ALL
This Service Bulletin is applicable to this (these) operator(s) :
18T 19U 40T 50W 58X 82Z 98W 99Y AFG BBC CFC DGA F2I
FDX GAF I2L IRA IRM IYE K1P KAC KZU PCA PIA QAF R1T
RJA ROT RZO SGX SUD TBN THY TSC UBD UZB WHT
CONCURRENT REQUIREMENTS
None
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 3

@A310
SERVICE BULLETIN
SUMMARY
REFERENCES / REPERCUSSIONS
TFU
 None
OEB
 None
AOT
 None
SIL
 None
ISI
 None
LINE MAINTENANCE AFFECTED
 No
LIFE LIMIT
 None
OTHER
 None
NATURE OF THE WORK
AIRCRAFT
 YES
EQUIPMENT
 YES
HARD
 NO
SOFT
 NO
OBRM
 NO
MANPOWER
**CONF 001
Task 282178-831-895-001: Modification
TOTAL MANHOURS
 11.00
ELAPSED TIME (HOURS)
 4.50
**CONF 002
Task 282178-831-895-001: Modification
TOTAL MANHOURS
 15.50
ELAPSED TIME (HOURS)
 4.50
APPENDICES
**CONF ALL
Appendix 01 - Manpower Gantt Chart
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 4

@A310
SERVICE BULLETIN
SUMMARY
**CONF 001
NOTE:
AREA OF MODIFICATION.
A
LH WING SHOWN
RH WING SIMILAR
A
RIB14
A
Z500
Z600
REAR SPAR
Z650RH
Z550LH
B C
TYPICAL TYPICAL
BEFORE AFTER
FUEL PUMP
CANISTER
HOOD HALF
B C
FUEL PUMP
CANISTER
HOOD HALF
B_SB_282178_7_SAAA_01_02
Figure A-USAAA - Sheet 01
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 5

@A310
SERVICE BULLETIN
SUMMARY
**CONF 002
NOTE:
AREA OF MODIFICATION.
A
LH WING SHOWN
RH WING SIMILAR
A
RIB14
B
A
Z319
B
Z500
Z600
REAR SPAR
Z650RH
Z550LH
C D
C D
TYPICAL TYPICAL
BEFORE AFTER
FUEL PUMP
CANISTER
HOOD HALF
C D
FUEL PUMP
CANISTER
HOOD HALF
B_SB_282178_7_SAAB_01_01
Figure A-USAAB - Sheet 01
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 6

@A310
SERVICE BULLETIN
SUMMARY
This Page Intentionally Left Blank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 7

@A310
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX
FRANCE
T e l:( 3 3 )56 19 33 33 3
Telex : AIRBU 530526F
F a x:( 3 3 )56 19 34 25 1
ATA SYSTEM: 28
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSTALL FUEL PUMP CANISTER
WITH NEW HOOD/MESH FOR OUTER AND TRIM TANK POSITIONS
MODIFICATION No.: 13643H5740 13740H5756
NOTE
: Please ignore the above note (if it is present), this note is auto-generated and does
not apply to this SB.
NOTE
: This modification is related to an airworthiness issue which has been re-classified
and confirmed by EASA as minor in acco rdance with EU Part 21.A.91. As
such, this is handled by AIRBUS under its Design Organisation Approval No.
EASA.21J.031.
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the
property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with
any information contained in it. It is delivered on the express condition that said document and the
information contained in it shall be treated as confidential, shall not be used for any purpose other than
that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall
not be duplicated in any manner (except for the purposes of performing the tasks described hereunder
and provided that any recipient of such document shall comply with the conditions herein), without
AIRBUS prior written consent.
1. PLANNING INFORMATION
**CONF ALL
A. EFFECTIVITY
(1) Models
310-203 310-221 310-222 310-304 310-308 310-322 310-324 310-325
(2) Effectivity by MSN
0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362 0364 0369 0378 0394
0399 0413 0418-0419 0421-0422 0425 0431 0434 0436-0437 0439 0441 0444-0447
0449 0452 0456-0458 0467 0472-0473 0478 0480 0482-0484 0488-0492 0494-0500
0503 0519-0520 0522-0524 0526 0537 0539 0545 0547 0549-0552 0562 0564-0565
0567-0568 0571 0574 0576 0585-0588 0590-0595 0597 0599-0600 0620 0622 0624
0636 0644 0646-0649 0651 0653 0656 0658 0660-0661 0663 0667 0671-0672 0674
0676 0678 0682 0687 0689 0691 0700 0702 0704 0706
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 8

@A310
SERVICE BULLETIN
(3) Effectivity by Operator
The Operator/MSN relationship is provided for information only and is correct at the time
of issue in accordance with the information available to AIRBUS. Any future changes
resulting from transfer of an aircraft from one operator to another will not be reflected in
this list unless the Service Bulletin is revised for another reason.
OPERATOR
 MSN
18T
 0473
19U
 0399
40T
 0413
50W
 0498
58X
 0431
82Z
 0550 0551
98W
 0495
99Y
 0489
AFG
 0496 0497
BBC
 0594 0700
CFC
 0425 0441 0444 0446 0482
DGA
 0418 0421 0422
F2I
 0491 0520
FDX
 0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362 0364
0369 0378 0394 0439 0449 0452 0456 0457 0458 0467 0492 0500
0539 0549 0552 0593
GAF
 0434 0484 0503 0522 0523
I2L
 0661
IRA
 0436 0671
IRM
 0488 0499 0524 0526 0537 0547 0564 0567 0586 0595 0620
IYE
 0568 0702 0704
K1P
 0648
KAC
 0647 0649 0663
KZU
 0592 0622 0646
PCA
 0419
PIA
 0585 0587 0590 0653 0656 0660 0676 0678 0682 0687 0689 0691
QAF
 0667
R1T
 0591
RJA
 0445 0490
ROT
 0636 0644
RZO
 0571 0624 0651
SGX
 0519 0562
SUD
 0437
TBN
 0565
THY
 0478 0480
TSC
 0447 0472 0483 0545 0588 0597 0599 0600 0658
UBD
 0672 0674
UZB
 0574 0576 0706
WHT
 0494
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 9

@A310
SERVICE BULLETIN
(4) Configuration by MSN
MSN
 CONFIGURATION
0162 0230 0245 0248 0267 0278 0281 0283 0331 0356 0362
0364 0369 0394 0419
001
0378 0399 0413 0418 0421 0422 0425 0431 0434 0436 0437
0439 0441 0444 0445 0446 0447 0449 0452 0456 0457 0458
0467 0472 0473 0478 0480 0482 0483 0484 0488 0489 0490
0491 0492 0494 0495 0496 0497 0498 0499 0500 0503 0519
0520 0522 0523 0524 0526 0537 0539 0545 0547 0549 0550
0551 0552 0562 0564 0565 0567 0568 0571 0574 0576 0585
0586 0587 0588 0590 0591 0592 0593 0594 0595 0597 0599
0600 0620 0622 0624 0636 0644 0646 0647 0648 0649 0651
0653 0656 0658 0660 0661 0663 0667 0671 0672 0674 0676
0678 0682 0687 0689 0691 0700 0702 0704 0706
002
(5) Configuration definition
**CONF 001
Config. 001 is valid for A310-200 aircraft given in the effectivity of this Service Bulletin as
a standard configuration.
**CONF 002
Config. 002 is valid for A310-300 aircraft given in the effectivity of this Service Bulletin as
a standard configuration.
(6) Material Effectivity
**CONF 001
MATERIAL
 QTY PER A/C
 SEE NOTES
Equipment BFEB01
 4
 (1)
Reidentified part set REIDB01
 1
Consumable CMLB01
 1
NOTE
 (1)
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
**CONF 002
MATERIAL
 QTY PER A/C
 SEE NOTES
Equipment BFEB01
 6
 (1)
Reidentified part set REIDB01
 1
Consumable CMLB01
 1
NOTE
 (1)
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 3
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 10

@A310
SERVICE BULLETIN
**CONF ALL
B. CONCURRENT REQUIREMENTS
None
C. REASON
(1) History
Fuel pump canisters are located in pairs in all fuel tanks. There is a fabricated aluminium
hood (in two halves) which forms a surface between the fuel pump inlet mesh and the
fuel pump canister body.
Some operators have reported cases of cracking on the hood in the inner wing fuel
tanks. On one aircraft, part of the hood detached and was found inside the fuel tank.
Fuel pump canister hoods are currently subject to a mandatory inspection in accordance
with Inspection Service Bulletin No. A310-28-2173.
(2) Objective/Action
Following the investigation into in-service failures, this Service Bulletin introduces new
canister hoods for the wing outer tank and the trim tank fuel pumps (where fitted) only.
No other fuel pump positions are affected by this Service Bulletin.
The new design consists of a new two part stainless steel hood assembly that is
installed over the existing inlet mesh as before. To account for tolerances in the inlet
mesh diameter and to avoid installation pre-stress, each hood half has an enlarged
central hole, through which a stepped fastener is installed.
(3) Advantages
Accomplishment of this Service Bulletin will reduce the scope of the Inspection Service
Bulletin No. A310-28-2173 by canceling the requirement for the repeat inspection of the
fuel pump canisters in the outer wing and trim tank (only).
The installation of a new fuel pump canister hood changes the part number of the
canister assembly.
(4) Operational/Maintenance Consequences
The Operational/Maintenance Consequences of this Service Bulletin are covered by the
update of the affected publications detailed in ’PLANNING INFORMATION’.
D. DESCRIPTION
To accomplish this Service Bulletin it is necessary to :
**CONF 001
Task 282178-831-895-001: Modification
(1) Replace the Hood Halves of the Fuel Pump Canisters in the LH Outer Wing Tank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 4
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 11

@A310
SERVICE BULLETIN
(2) Replace the Hood Halves of the Fuel Pump Canisters in the RH Outer Wing Tank
(3) Re-identify the Fuel Pump Canisters in the LH Outer Wing Tank
(4) Re-identify the Fuel Pump Canisters in the RH Outer Wing Tank
**CONF 002
Task 282178-831-895-001: Modification
(1) Replace the Hood Halves of the Fuel Pump Canisters in the LH Outer Wing Tank
(2) Replace the Hood Halves of the Fuel Pump Canisters in the RH Outer Wing Tank
(3) Replace the Hood Halves of the Fuel Pump Canisters in the Trim Tank
(4) Re-identify the Fuel Pump Canisters in the LH Outer Wing Tank
(5) Re-identify the Fuel Pump Canisters in the RH Outer Wing Tank
(6) Re-identify the Fuel Pump Canisters in the Trim Tank
**CONF ALL
E. COMPLIANCE
(1) Classification
RECOMMENDED: Service Bulletin recommended to be accomplished to prevent
significant operational disruptions.
(2) Accomplishment Timescale
Accomplishment of this Service Bulletin is recommended at the earliest opportunity
where manpower and facilities are available.
F. APPROVAL
The technical content of this document is approved under the authority of Design
Organisation Approval No. EASA.21J.031.
If an aircraft listed in the effectivity has a modification or repair embodied that is not of
AIRBUS origin, and which affects the content of this Service Bulletin, the operator is
responsible for obtaining approval by its airworthiness authority for any adaptation necessary
before incorporation of the Service Bulletin.
G. MANPOWER
The manpower estimates given in this Service Bulletin are based on the direct labor cost to
do the work. These estimates assume that the work will be done by experienced personnel,
and may need to be revised upwards to suit operator’s circumstances. The estimates do not
include the time to prepare, plan or inspect the work. Manufacture and procurement of parts
and tools, drying times for paints, sealants, etc., and general administration work are also not
included.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 5
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 12

@A310
SERVICE BULLETIN
**CONF 001
Task 282178-831-895-001: Modification
Get Access
 1.00
On Aircraft
Replace the Hood Halves of the Fuel Pump Canisters
in the LH Outer Wing Tank
4.00
Replace the Hood Halves of the Fuel Pump Canisters
in the RH Outer Wing Tank
4.00
Re-identify the Fuel Pump Canisters in the LH Outer
Wing Tank
0.50
Re-identify the Fuel Pump Canisters in the RH Outer
Wing Tank
0.50
Close-Up
 1.00
TOTAL MANHOURS
 11.00
ELAPSED TIME (HOURS)
 4.50
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAA
 given in Appendix 01 - Manpower Gantt Chart .
**CONF 002
Task 282178-831-895-001: Modification
Get Access
 1.00
On Aircraft
Replace the Hood Halves of the Fuel Pump Canisters
in the LH Outer Wing Tank
4.00
Replace the Hood Halves of the Fuel Pump Canisters
in the RH Outer Wing Tank
4.00
Replace the Hood Halves of the Fuel Pump Canisters
in the Trim Tank
4.00
Re-identify the Fuel Pump Canisters in the LH Outer
Wing Tank
0.50
Re-identify the Fuel Pump Canisters in the RH Outer
Wing Tank
0.50
Re-identify the Fuel Pump Canisters in the Trim Tank
 0.50
Close-Up
 1.00
TOTAL MANHOURS
 15.50
ELAPSED TIME (HOURS)
 4.50
NOTE
: For an explanation of the manhours and elapsed time, refer to the Gantt
Chart, Fig. A-UAAAB
 given in Appendix 01 - Manpower Gantt Chart .
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 6
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 13

@A310
SERVICE BULLETIN
**CONF ALL
H. WEIGHT AND BALANCE
**CONF 001
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer’s Empty Weight (MEW) and do not include operator’s items. For the definition of
MEW and operator’s items, refer to the Weight and Balance Manual (WBM) Chapter 1-00-07.
Manufacturers Empty Weight +0.6 KG (+1.3 LB)
Effect on Balance +16.2 KGM (+117.2 LB.FT )
**CONF 002
The weight and balance estimates given in this Service Bulletin are based on the
Manufacturer’s Empty Weight (MEW) and do not include operator’s items. For the definition of
MEW and operator’s items, refer to the Weight and Balance Manual (WBM) Chapter 1-00-07.
Manufacturers Empty Weight +0.9 KG (+2.0 LB)
Effect on Balance +26.9 KGM (+194.6 LB.FT )
**CONF ALL
I. ELECTRICAL LOAD DATA
Not Changed
J. REFERENCES
**CONF 001
Aircraft Maintenance Manual (AMM)
 06-21-00 06-41-00 20-21-12
24-00-00 28-00-00 28-10-00
28-11-22 28-25-00
Consumable Material List (CML)
ATA Common Support Data Dictionary (CSDD),
Chapter 2
Elec. Std. Practices Manual (ESPM)
 20-55-00
Process and Material Specification (PMS)
 Process and Material Specification
(PMS) 01-06-12
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-30-29 51-40-00
Weight and Balance Manual (WBM)
 Chapter 1-00-07
**CONF 002
Aircraft Maintenance Manual (AMM)
 06-21-00 06-41-00 20-21-12
24-00-00 28-00-00 28-10-00
28-11-22 28-11-33 28-25-00
Consumable Material List (CML)
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 7
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 14

@A310
SERVICE BULLETIN
ATA Common Support Data Dictionary (CSDD),
Chapter 2
Elec. Std. Practices Manual (ESPM)
 20-55-00
Process and Material Specification (PMS)
 Process and Material Specification
(PMS) 01-06-12
Standards Manual (SM)
Structural Repair Manual (SRM)
 51-30-29 51-40-00
Weight and Balance Manual (WBM)
 Chapter 1-00-07
**CONF ALL
K. PUBLICATION AFFECTED
**CONF 001
Illustrated Parts Catalog (IPC)
 28-21-21
Maintenance Planning Document (MPD)
 282100-04-1
282100-05-1
282100-05-2
**CONF 002
Illustrated Parts Catalog (IPC)
 28-21-21 28-27-12
Maintenance Planning Document (MPD)
 282100-04-1
282100-05-1
282100-05-2
**CONF ALL
L. INTERCHANGEABILITY/MIXABILITY
The interchangeability/mixability possibilities are for new or modified parts introduced by the
accomplishment of this Service Bulletin.
**CONF 001
DESCRIPTION
 OLD PART N˚
 NEW PART N˚
 INT
 MIXABILITY
 SEE
NOTES
Screw
 MS35206-228
 MS35206-228
 01
 Not
Applicable
Screw
 MS35206-228
 C93-463
 01
 Not
Applicable
Washer
 AN935-6L
 G764100
 01
 Not
Applicable
Hood
 205481
 C93-467
 01
 Not
Applicable
Canister-Fuel Booster
Pump
2052C11
 2052C11-5
 01
 Not
Applicable
Canister-Fuel Booster
Pump
2052C12
 2052C12-5
 01
 Not
Applicable
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 8
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 15

@A310
SERVICE BULLETIN
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
**CONF 002
DESCRIPTION
 OLD PART N˚
 NEW PART N˚
 INT
 MIXABILITY
 SEE
NOTES
Screw
 MS35206-228
 MS35206-228
 01
 Not
Applicable
Screw
 MS35206-228
 C93-463
 01
 Not
Applicable
Washer
 AN935-6L
 G764100
 01
 Not
Applicable
Hood
 205481
 C93-467
 01
 Not
Applicable
Canister-Fuel Booster
Pump
2052C11
 2052C11-5
 01
 Not
Applicable
Canister-Fuel Booster
Pump
2052C12
 2052C12-5
 01
 Not
Applicable
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
**CONF ALL
M. SPARES
None
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 9
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 16

@A310
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 10
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 17

@A310
SERVICE BULLETIN
2. MATERIAL INFORMATION
**CONF ALL
A. MATERIAL - PRICE AND AVAILABILITY
(1) Procurement Addresses
Vendor parts are to be procured from .
Equipment BFEB01
 For Europe, Middle East, Africa
ZODIAC AEROSPACE
61 Rue Pierre Curie CS20001
78373 Plaisir Cedex
FRANCE
Phone: +33 161 34 23 23
Phone AOG: +33 172 02 23 23
Fax:+33 161 34 21 08
For USA
ZODIAC AEROSPACE
4900 St Joe Boulevard
Building 200 Suite 400
College Park
GA 30337
USA
Phone: +1 678 228 8153
Phone AOG: +1 800 879 0411
Fax:+1 404 559 0041
For Asia
ZODIAC AEROSPACE
36 Loyang Drive
Singapore 508949
Phone: +65 6579 2230
Phone AOG: +655 9770 5061
Fax:+65 65579 2231
(2) Price and Availability
No AIRBUS kit will be provided.
Procurement terms for the equipment must be negotiated with the equipment supplier.
B. INDUSTRY SUPPORT INFORMATION
Industry support terms for the equipment must be negotiated with the equipment supplier.
C. LIST OF COMPONENTS
No Kit
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 11
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 18

@A310
SERVICE BULLETIN
D. LIST OF MATERIALS - OPERATOR SUPPLIED
(1) Consumable Materials
NOTE
: To accomplish this Service Bulletin it is necessary to use the
consumable materials listed i n the subsequent re ferenced tasks:
- AMM 28-11-22, Page Block 401
- AMM 28-11-33, Page Block 401.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO CML
MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner-- Acetone
 08BBH1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
(2) Components
None
(3) Equipment
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 ITEM
 OLD PART N˚
 INT
 SEE
NOTES
1
 C93-467
 2
 HOOD
 (1)
 205481
 01
2
 MS35206-228
 4
 SCREW
 (2)
 MS35206-228
 01
3
 G764100
 4
 WASHER
 (3)
 AN935-6L
 01
4
 C93-463
 2
 SCREW
 (2)
 MS35206-228
 01
NOTE
: For definitions of interchangeability codes in column INT., refer to ATA
Common Support Data Dictionary (CSDD), Chapter 2.
NOTE
: If you find part numbers of hardware components in the related kit(s)
which you cannot identify in the LIST OF COMPONENTS of this Service
Bulletin, refer to Standards Manual (SM). The SM will give you the
correct part number to part number relationship.
NOTE
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
E. PARTS TO BE RE-IDENTIFIED BY OPERATOR
Reidentified part set REIDB01
ITEM
 NEW PART N˚
 KEYWORD
 ITEM
 OLD PART N˚
 SEE
NOTES
2052C11-5
 CANISTER
 2052C11
2052C12-5
 CANISTER
 2052C12
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 12
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 19

@A310
SERVICE BULLETIN
F. TOOLING
None
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 13
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 20

@A310
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 14
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 21

@A310
SERVICE BULLETIN
3. ACCOMPLISHMENT INSTRUCTIONS
Task 282178-831-895-001 - Modification
WARNING
: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS
INCLUDED IN THE REFERENCED PROCEDURES.
WARNING
: THIS PROCEDURE USES A FUEL SYSTEM ITEM THAT IS IN A CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION CONTROL LIMITATION
(CDCCL). CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF A
POSSIBLE FUEL TANK IGNITION. YOU MUST KEEP ALL THE CDCCL ITEMS
IN THE APPROVED CONFIGURATION. DAMAGE, WEAR OR CHANGES TO A
CDCCL ITEM CAN CAUSE A POSSIBLE TANK EXPLOSION.
CAUTION
: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP
ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY
AND MECHANICALLY SERVICEABLE) . WHEN YOU DO MAINTENANCE
WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING,
COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO
THIS:
- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS
NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND
OTHER CONTAMINATION.
THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION
AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION.
IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.
NOTE
: The accomplishment instructions of this Service Bulletin include procedures given
in other documents or in other sections of the Service Bulletin. When the words
’refer to’ are used and the operator has a procedure accepted by the local authority
he belongs to, the accepted alternative procedure can be used. When the words ’in
accordance with’ are used then the given procedure must be followed.
NOTE
: The access and close-up instructions, not comprising return to service tests, in this
Service Bulletin do not constitute or affect the technical intent of the Service
Bulletin. Operators can therefore, as deemed necessary, omit or add access and/or
close-up steps to add flexibility to their maintenance operations as long as the
technical intent of the Service Bulletin is met within the set parameters.
NOTE
: Manual titles given in the accomplishment instructions are referred to by acronyms.
Refer to paragraph 1.J., References, for the definition of acronyms.
NOTE
: Discarded parts must be managed at the operator’s discretion.
NOTE
: This Service Bulletin contains the instructions for the on-aircraft maintenance
necessary to ensure the continued airworthiness of the aircraft.
For any deviations to the instructions contained herein, contact AIRBUS for further
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 15
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 22

@A310
SERVICE BULLETIN
instructions and approval.
Task Associated Data
**CONF 001
Zone
550 650
Modified FIN
280018 280019 280020 280021
Access
Panel
 550BB 650BB
Manpower
TOTAL MANHOURS
 11.00
ELAPSED TIME (HOURS)
 4.50
**CONF 002
Zone
311 312 319 550 650
Modified FIN
280018 280019 280020 280021 280432 280433
Access
Panel
 319AZ 319BZ 550BB 650BB
Manpower
TOTAL MANHOURS
 15.50
ELAPSED TIME (HOURS)
 4.50
**CONF ALL
A. GENERAL
**CONF 001
(1) Subtask 282178-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
28-00-00, Page Block 301
28-10-00, Page Block 301
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-30-29
51-40-00
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 16
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 23

@A310
SERVICE BULLETIN
(a) For the specification of materials (Mat. No.) that you must use in this Service
Bulletin, refer to Consumable Material List (CML).
(b) Obey the safety procedures when you do work in a fuel tank, refer to AMM
28-00-00, Page Block 301 and AMM 28-10-00, Page Block 301.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(e) Remove and install fasteners in accordance with SRM 51-30-29.
(f) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(g) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(h) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 282178-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF 002
(1) Subtask 282178-910-401-001 - Standard Practices
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
06-41-00, Page Block 001
20-21-12, Page Block 001
28-00-00, Page Block 301
28-10-00, Page Block 301
Consumable Material List (CML)
Structural Repair Manual (SRM)
 51-30-29
51-40-00
(a) For the specification of materials (Mat. No.) that you must use in this Service
Bulletin, refer to Consumable Material List (CML).
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 17
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 24

@A310
SERVICE BULLETIN
(b) Obey the safety procedures when you do work in a fuel tank, refer to AMM
28-00-00, Page Block 301 and AMM 28-10-00, Page Block 301.
(c) For the identification of access panels, refer to AMM 06-41-00, Page Block 001.
(d) For the identification of zones, refer to AMM 06-21-00, Page Block 001.
(e) Remove and install fasteners in accordance with SRM 51-30-29.
(f) To torque tighten the standard threaded fasteners, refer to AMM 20-21-12, Page
Block 001.
(g) If alternative and substitute fasteners have to be used, you must make sure that the
associated nut/collar are compatible in accordance with SRM 51-40-00 ’Mating Part’
column.
(h) If the length of any fastener specified in this Service Bulletin does not meet
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
(2) Subtask 282178-839-401-001 - Administrative
Manpower Resources
Skills
 NON SPECIFIC
Write in the applicable aircraft records that you have done all the work given in this
Service Bulletin.
**CONF ALL
B. PREPARATION
**CONF 001
(1) Subtask 282178-941-401-001 - Job Set-Up
Work Zones and Access Panels
Zone
 Access/Work location
550
650
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
24-00-00, Page Block 301
28-10-00, Page Block 301
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 18
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 25

@A310
SERVICE BULLETIN
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Defuel the aircraft, refer to AMM 28-25-00, Page Block 301.
(c) Prepare the aircraft as specified in AMM Task ’STORAGE - SERVICING (Fuel
Tank Draining, Venting and Entry)’, refer to AMM 28-10-00, Page Block 301.
1
 Before you go into a fuel tank you must complete the Pre-Entry Checklist,
refer to AMM 28-10-00, Page Block 301.
(d) Put platforms in position to get access to the applicable zones, refer to AMM
06-21-00, Page Block 001:
- Wing tanks outer - Zones 550 LH
- Wing tanks outer - Zones 650 RH
(2) Subtask 282178-010-401-001 - Remove the Fuel Tank Access Panel from the LH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 19
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 26

@A310
SERVICE BULLETIN
(a) From the LH wing, refer to AMM 28-11-22, Page Block 401, remove the fuel tank
access panel 550BB.
(3) Subtask 282178-010-402-001 - Remove the Fuel Tank Access Panel from the RH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) From the RH wing, refer to AMM 28-11-22, Page Block 401, remove the fuel tank
access panel 650BB.
**CONF 002
(1) Subtask 282178-941-401-002 - Job Set-Up
Work Zones and Access Panels
Zone
 Access/Work location
550
650
319
Manpower Resources
Skills
 NON SPECIFIC
References
Aircraft Maintenance Manual (AMM)
 06-21-00, Page Block 001
24-00-00, Page Block 301
28-10-00, Page Block 301
28-25-00, Page Block 301
NOTE
: The items given in this note shall be considered as the basic Aircraft
configuration before you start a maintenance task:
- Aircraft on the ground resting on landing gear (the ground safety
locks and the wheel chocks are in position on the landing gear)
- Engine shut down, thrust reversers closed and locked
- Aircraft in clean configuration
- Parking brake applied
- Aircraft electrical network de-energized
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 20
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 27

@A310
SERVICE BULLETIN
- Hydraulic system s depressurized
- Access to the cockpit and cabin is available
- All circuit breakers are in closed position
- All controls in NORM, AUTO or OFF position.
(a) Make sure that the aircraft is electrically grounded, refer to AMM 24-00-00, Page
Block 301.
(b) Defuel the aircraft, refer to AMM 28-25-00, Page Block 301.
(c) Prepare the aircraft as specified in AMM Task ’STORAGE - SERVICING (Fuel
Tank Draining, Venting and Entry)’, refer to AMM 28-10-00, Page Block 301.
1
 Before you go into a fuel tank you must complete the Pre-Entry Checklist,
refer to AMM 28-10-00, Page Block 301.
(d) Put platforms in position to get access to the applicable zones, refer to AMM
06-21-00, Page Block 001:
- Wing tanks outer - Zones 550 LH
- Wing tanks outer - Zones 650 RH
- Trim tank - Zones 311 and 312,
(2) Subtask 282178-010-401-001 - Remove the Fuel Tank Access Panel from the LH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) From the LH wing, refer to AMM 28-11-22, Page Block 401, remove the fuel tank
access panel 550BB.
(3) Subtask 282178-010-402-001 - Remove the Fuel Tank Access Panel from the RH
Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 21
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 28

@A310
SERVICE BULLETIN
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) From the RH wing, refer to AMM 28-11-22, Page Block 401, remove the fuel tank
access panel 650BB.
(4) Subtask 282178-010-403-002 - Remove the Fuel Tank Access Panel from the Trim
Tank
Work Zones and Access Panels
Zone
 Access/Work location
311
 Access
 Panel 319AZ
312
 Access
 Panel 319BZ
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-33, Page Block 401
(a) From the trim tank, refer to AMM 28-11-33, Page Block 401, remove the fuel tank
access panels 319AZ and 319BZ.
**CONF ALL
C. PROCEDURE
**CONF 001
(1) Subtask 282178-831-401-001 - Replace the Hood Halves of the Fuel Pump
Canisters in the LH Outer Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Manhours
 4.00
Minimum number of person
 2
Subtask elapsed time
 2.00
Skills
 AIRFRAME
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 22
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 29

@A310
SERVICE BULLETIN
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 C93-467
 4
 HOOD
2
 MS35206-228
 8
 SCREW
3
 G764100
 8
 WASHER
4
 C93-463
 4
 SCREW
NOTE
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner--
Acetone
08BBH1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-UBAAA
Removal and Installation of the Fuel
Pump Canister Hood Halves in the
Outer Tanks
Sheet 01
Sheet 02
(a) Remove the hood halves from the fuel pump canisters 280018 and 280020 in the
LH wing outer tank.
1
 From the inboard fuel pump canister 280020 in the LH wing outer tank, refer
to Fig. A-UBAAA Sheet 01
 , Views B and C, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
2
 From the outboard fuel pump canister 280018 in the LH wing outer tank, refer
to Fig. A-UBAAA Sheet 01
 , Views B and C, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 23
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 30

@A310
SERVICE BULLETIN
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
(b) Clean the fuel pump mesh filters, use:
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner-- Acetone
08BBH1 As required
(c) Visually inspect the fuel pump mesh filters for signs of holes and a satisfactory weld
where it attaches to the top land. If any damage is found, replace mesh.
(d) Install the new hood halves onto the fuel pump canisters 280018 and 280020, in
the LH wing outer tank.
1
 At the inboard fuel pump canister 280020 in the LH wing outer tank, refer to
Fig. A-UBAAA Sheet 02
 , Views D, E and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAA Sheet 02
 ,V i e wE .
2
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
3
 At the outboard fuel pump canister 280018 in the LH wing outer tank, refer to
Fig. A-UBAAA Sheet 02
 , Views D, E and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 24
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 31

@A310
SERVICE BULLETIN
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAA Sheet 02
 ,V i e wE .
4
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
(2) Subtask 282178-831-402-001 - Replace the Hood Halves of the Fuel Pump
Canisters in the RH Outer Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Manhours
 4.00
Minimum number of person
 2
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 C93-467
 4
 HOOD
2
 MS35206-228
 8
 SCREW
3
 G764100
 8
 WASHER
4
 C93-463
 4
 SCREW
NOTE
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner--
Acetone
08BBH1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-UBAAA
Removal and Installation of the Fuel
Pump Canister Hood Halves in the
Outer Tanks
Sheet 01
Sheet 02
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 25
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 32

@A310
SERVICE BULLETIN
(a) Remove the hood halves from the fuel pump canisters 280019 and 280021 in the
RH wing outer tank.
1
 From the inboard fuel pump canister 280021 in the RH wing outer tank, refer
to Fig. A-UBAAA Sheet 01
 , Views B and C, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
2
 From the outboard fuel pump canister 280019 in the RH wing outer tank, refer
to Fig. A-UBAAA Sheet 01
 , Views B and C, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
(b) Clean the fuel pump mesh filters, use:
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner-- Acetone
08BBH1 As required
(c) Visually inspect the fuel pump mesh filters for signs of holes and a satisfactory weld
where it attaches to the top land. If any damage is found, replace mesh.
(d) Install the new hood halves onto the fuel pump canisters 280018 and 280020, in
the RH wing outer tank.
1
 At the inboard fuel pump canister 280020 in the RH wing outer tank, refer to
Fig. A-UBAAA Sheet 02
 , Views D, E and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 26
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 33

@A310
SERVICE BULLETIN
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAA Sheet 02
 ,V i e wE .
2
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
3
 At the outboard fuel pump canister 280018 in the RH wing outer tank, refer to
Fig. A-UBAAA Sheet 02
 , Views D, E and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAA Sheet 02
 ,V i e wE .
4
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
(3) Subtask 282178-930-401-001 - Re-identify the Fuel Pump Canisters in the LH Outer
Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 27
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 34

@A310
SERVICE BULLETIN
Material necessary to do the job
Reidentified part set REIDB01
ITEM
 NEW PART N˚
 KEYWORD
 ITEM
 OLD PART N˚
 SEE
NOTES
2052C11-5
 CANISTER
 2052C11
2052C12-5
 CANISTER
 2052C12
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
(a) Re-identify the pump canisters in the LH wing outer tank, refer to Process and
Material Specification (PMS) 01-06-12.
1
 After modification the PN of the pump canisters in the LH wing outer tank will
change as follows:
2 Canister-Fuel Booster
Pump
2052C11
will become:
2 Canister-Fuel Booster
Pump
2052C11-5
or
2 Canister-Fuel Booster
Pump
2052C12
will become:
2 Canister-Fuel Booster
Pump
2052C12-5
(4) Subtask 282178-930-402-001 - Re-identify the Fuel Pump Canisters in the RH Outer
Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 28
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 35

@A310
SERVICE BULLETIN
Material necessary to do the job
Reidentified part set REIDB01
ITEM
 NEW PART N˚
 KEYWORD
 ITEM
 OLD PART N˚
 SEE
NOTES
2052C11-5
 CANISTER
 2052C11
2052C12-5
 CANISTER
 2052C12
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
(a) Re-identify the pump canisters in the RH wing outer tank, refer to Process and
Material Specification (PMS) 01-06-12.
1
 After modification the PN of the pump canisters in the RH wing outer tank will
change as follows:
2 Canister-Fuel Booster
Pump
2052C11
will become:
2 Canister-Fuel Booster
Pump
2052C11-5
or
2 Canister-Fuel Booster
Pump
2052C12
will become:
2 Canister-Fuel Booster
Pump
2052C12-5
**CONF 002
(1) Subtask 282178-831-401-002 - Replace the Hood Halves of the Fuel Pump
Canisters in the LH Outer Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Manhours
 4.00
Minimum number of person
 2
Subtask elapsed time
 2.00
Skills
 AIRFRAME
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 29
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 36

@A310
SERVICE BULLETIN
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 C93-467
 4
 HOOD
2
 MS35206-228
 8
 SCREW
3
 G764100
 8
 WASHER
4
 C93-463
 4
 SCREW
NOTE
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner--
Acetone
08BBH1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-UBAAB
Removal and Installation of the Fuel
Pump Canister Hood Halves in the
Outer Tanks and Trim Tank
Sheet 01
Sheet 02
(a) Remove the hood halves from the fuel pump canisters 280018 and 280020 in the
LH wing outer tank.
1
 From the inboard fuel pump canister 280020 in the LH wing outer tank, refer
to Fig. A-UBAAB Sheet 01
 , Views C and D, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
2
 From the outboard fuel pump canister 280018 in the LH wing outer tank, refer
to Fig. A-UBAAB Sheet 01
 , Views C and D, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 30
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 37

@A310
SERVICE BULLETIN
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
(b) Clean the fuel pump mesh filters, use:
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner-- Acetone
08BBH1 As required
(c) Visually inspect the fuel pump mesh filters for signs of holes and a satisfactory weld
where it attaches to the top land. If any damage is found, replace mesh.
(d) Install the new hood halves onto the fuel pump canisters 280018 and 280020, in
the LH wing outer tank.
1
 At the inboard fuel pump canister 280020 in the LH wing outer tank, refer to
Fig. A-UBAAB Sheet 02
 , Views E, F and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAB Sheet 02
 ,V i e wF .
2
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
3
 At the outboard fuel pump canister 280018 in the LH wing outer tank, refer to
Fig. A-UBAAB Sheet 02
 , Views E, F and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 31
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 38

@A310
SERVICE BULLETIN
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAB Sheet 02
 ,V i e wF .
4
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
(2) Subtask 282178-831-402-002 - Replace the Hood Halves of the Fuel Pump
Canisters in the RH Outer Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Manhours
 4.00
Minimum number of person
 2
Subtask elapsed time
 2.00
Skills
 AIRFRAME
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 C93-467
 4
 HOOD
2
 MS35206-228
 8
 SCREW
3
 G764100
 8
 WASHER
4
 C93-463
 4
 SCREW
NOTE
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner--
Acetone
08BBH1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-UBAAB
Removal and Installation of the Fuel
Pump Canister Hood Halves in the
Outer Tanks and Trim Tank
Sheet 01
Sheet 02
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 32
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 39

@A310
SERVICE BULLETIN
(a) Remove the hood halves from the fuel pump canisters 280019 and 280021 in the
RH wing outer tank.
1
 From the inboard fuel pump canister 280021 in the RH wing outer tank, refer
to Fig. A-UBAAB Sheet 01
 , Views C and D, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
2
 From the outboard fuel pump canister 280019 in the RH wing outer tank, refer
to Fig. A-UBAAB Sheet 01
 , Views C and D, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
(b) Clean the fuel pump mesh filters, use:
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner-- Acetone
08BBH1 As required
(c) Visually inspect the fuel pump mesh filters for signs of holes and a satisfactory weld
where it attaches to the top land. If any damage is found, replace mesh.
(d) Install the new hood halves onto the fuel pump canisters 280018 and 280020, in
the RH wing outer tank.
1
 At the inboard fuel pump canister 280020 in the RH wing outer tank, refer to
Fig. A-UBAAB Sheet 02
 , Views E, F and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 33
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 40

@A310
SERVICE BULLETIN
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAB Sheet 02
 ,V i e wF .
2
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
3
 At the outboard fuel pump canister 280018 in the RH wing outer tank, refer to
Fig. A-UBAAB Sheet 02
 , Views E, F and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAB Sheet 02
 ,V i e wF .
4
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
(3) Subtask 282178-831-403-002 - Replace the Hood Halves of the Fuel Pump
Canisters in the Trim Tank
Work Zones and Access Panels
Zone
 Access/Work location
319
 Access
 Panel 319AZ, Panel 319BZ
Manpower Resources
Manhours
 4.00
Minimum number of person
 2
Subtask elapsed time
 2.00
Skills
 AIRFRAME
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 34
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 41

@A310
SERVICE BULLETIN
Material necessary to do the job
Equipment BFEB01
ITEM
 NEW PART N˚
 QTY (UM)
 KEYWORD
 SEE
NOTES
1
 C93-467
 4
 HOOD
2
 MS35206-228
 8
 SCREW
3
 G764100
 8
 WASHER
4
 C93-463
 4
 SCREW
NOTE
: One Kit BFEB01 is required for the modification of each Fuel Pump
Canister.
Consumable CMLB01
ITEM
 DESCRIPTION
 REFERENCE TO
CML MAT. No.
QTY PER A/C
 SEE
NOTES
Non Aqueous Cleaner--
Acetone
08BBH1
 As required
Textile-Lint Free Cotton
 14SBA1
 As required
References
Fig. A-UBAAB
Removal and Installation of the Fuel
Pump Canister Hood Halves in the
Outer Tanks and Trim Tank
Sheet 01
Sheet 02
(a) Remove the hood halves from the fuel pump canisters 280432 and 280433 in the
trim tank.
1
 From the LH fuel pump canister 280432 in the trim tank, refer to Fig. A-
UBAAB Sheet 01
, Views C and D, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
2
 From the RH fuel pump canister 280433 in the trim tank, refer to Fig. A-
UBAAB Sheet 01
, Views C and D, remove:
6 Screw MS35206-228 Item (2) Discard
6 Washer AN935-6L Item (3) Discard
2 Hood 205481 Item (1) Discard
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 35
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 42

@A310
SERVICE BULLETIN
NOTE
: Make sure that the canister hood halves (and fasteners) are
removed from the fuel tank in their entirety. If any fragment of
a canister hood is found to be missing, make sure that it is
removed from the fuel tank.
(b) Clean the fuel pump mesh filters, use:
Textile-Lint Free
Cotton
14SBA1 As required
and
Non Aqueous
Cleaner-- Acetone
08BBH1 As required
(c) Visually inspect the fuel pump mesh filters for signs of holes and a satisfactory weld
where it attaches to the top land. If any damage is found, replace mesh.
(d) Install the new hood halves onto the fuel pump canisters 280432 and 280433, in
the trim tank.
1
 At the LH fuel pump canister 280432 in the trim tank, refer to Fig. A-UBAAB
Sheet 02
, Views E, F and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAB Sheet 02
 ,V i e wF .
2
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
3
 At the RH fuel pump canister 280018 in the trim tank, refer to Fig. A-UBAAB
Sheet 02
, Views E, F and Section A-A, install:
2 Hood Half C93-467 Item 1
with:
4 Screw MS35206-228 Item 2
2 Stepped-Screw
Assembly
C93-463 Item 4
4 Washer G764100 Item 3
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 36
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 43

@A310
SERVICE BULLETIN
NOTE
: Make sure that the clearance is equal between the hood
halves, refer to Fig. A-UBAAB Sheet 02
 ,V i e wF .
4
 Torque the Screw, Item 2 and the Stepped Screw Assembly, Item 5, to 0.2
m.daN (1.47 lbf ft).
(4) Subtask 282178-930-401-001 - Re-identify the Fuel Pump Canisters in the LH Outer
Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Reidentified part set REIDB01
ITEM
 NEW PART N˚
 KEYWORD
 ITEM
 OLD PART N˚
 SEE
NOTES
2052C11-5
 CANISTER
 2052C11
2052C12-5
 CANISTER
 2052C12
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
(a) Re-identify the pump canisters in the LH wing outer tank, refer to Process and
Material Specification (PMS) 01-06-12.
1
 After modification the PN of the pump canisters in the LH wing outer tank will
change as follows:
2 Canister-Fuel Booster
Pump
2052C11
will become:
2 Canister-Fuel Booster
Pump
2052C11-5
or
2 Canister-Fuel Booster
Pump
2052C12
will become:
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 37
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 44

@A310
SERVICE BULLETIN
2 Canister-Fuel Booster
Pump
2052C12-5
(5) Subtask 282178-930-402-001 - Re-identify the Fuel Pump Canisters in the RH Outer
Wing Tank
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Reidentified part set REIDB01
ITEM
 NEW PART N˚
 KEYWORD
 ITEM
 OLD PART N˚
 SEE
NOTES
2052C11-5
 CANISTER
 2052C11
2052C12-5
 CANISTER
 2052C12
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
(a) Re-identify the pump canisters in the RH wing outer tank, refer to Process and
Material Specification (PMS) 01-06-12.
1
 After modification the PN of the pump canisters in the RH wing outer tank will
change as follows:
2 Canister-Fuel Booster
Pump
2052C11
will become:
2 Canister-Fuel Booster
Pump
2052C11-5
or
2 Canister-Fuel Booster
Pump
2052C12
will become:
2 Canister-Fuel Booster
Pump
2052C12-5
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 38
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 45

@A310
SERVICE BULLETIN
(6) Subtask 282178-930-403-002 - Re-identify the Fuel Pump Canisters in the Trim
Tank
Work Zones and Access Panels
Zone
 Access/Work location
319
 Access
 Panel 319AZ, Panel 319BZ
Manpower Resources
Manhours
 0.50
Minimum number of person
 1
Subtask elapsed time
 0.50
Skills
 AIRFRAME
Material necessary to do the job
Reidentified part set REIDB01
ITEM
 NEW PART N˚
 KEYWORD
 ITEM
 OLD PART N˚
 SEE
NOTES
2052C11-5
 CANISTER
 2052C11
2052C12-5
 CANISTER
 2052C12
References
Process and Material Specification
(PMS)
Process and Material Specification (PMS)
01-06-12
(a) Re-identify the pump canisters in the trim tank, refer to Process and Material
Specification (PMS) 01-06-12.
1
 After modification the PN of the pump canisters in the trim tank will change as
follows:
2 Canister-Fuel Booster
Pump
2052C11
will become:
2 Canister-Fuel Booster
Pump
2052C11-5
or
2 Canister-Fuel Booster
Pump
2052C12
will become:
2 Canister-Fuel Booster
Pump
2052C12-5
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 39
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 46

@A310
SERVICE BULLETIN
**CONF ALL
D. TEST
**CONF 001
(1) Subtask 282178-700-401-001 - Testing
Manpower Resources
Skills
 AIRFRAME
NOTE
: The tests that are necessary are included in the Subtasks that follow:
- SUBTASK 282178-410-401 001 Install the Fuel Tank Access Panels
at the LH Wing
- SUBTASK 282178-410-402 001 Install the Fuel Tank Access Panels
at the RH Wing
The manhours for the tests are included in the referenced Service
Bulletin subtasks.
**CONF 002
(1) Subtask 282178-700-401-002 - Testing
Manpower Resources
Skills
 AIRFRAME
NOTE
: The tests that are necessary are included in the Subtasks that follow:
- SUBTASK 282178-410-401 001 Install the Fuel Tank Access Panels
at the LH Wing
- SUBTASK 282178-410-402 001 Install the Fuel Tank Access Panels
at the RH Wing
- SUBTASK 282178-410-403 002 Install the Fuel Tank Access Panels
at the Trim Tank
The manhours for the tests are included in the referenced Service
Bulletin subtasks.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 40
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 47

@A310
SERVICE BULLETIN
**CONF ALL
E. CLOSE-UP
**CONF 001
(1) Subtask 282178-410-401-001 - Install the Fuel Tank Access Panels at the LH Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) At the LH wing, refer to AMM 28-11-22, Page Block 401, install the fuel tank
access panel 550BB.
(2) Subtask 282178-410-402-001 - Install the Fuel Tank Access Panels at the RH Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) At the LH wing, refer to AMM 28-11-22, Page Block 401, install the fuel tank
access panel 650BB.
(3) Subtask 282178-942-401-001 - Close-Up
Manpower Resources
Skills
 NON SPECIFIC
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Remove the access platform(s).
(c) Put the aircraft back to its initial configuration.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 41
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 48

@A310
SERVICE BULLETIN
**CONF 002
(1) Subtask 282178-410-401-001 - Install the Fuel Tank Access Panels at the LH Wing
Work Zones and Access Panels
Zone
 Access/Work location
550
 Access
 Panel 550BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) At the LH wing, refer to AMM 28-11-22, Page Block 401, install the fuel tank
access panel 550BB.
(2) Subtask 282178-410-402-001 - Install the Fuel Tank Access Panels at the RH Wing
Work Zones and Access Panels
Zone
 Access/Work location
650
 Access
 Panel 650BB
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-22, Page Block 401
(a) At the LH wing, refer to AMM 28-11-22, Page Block 401, install the fuel tank
access panel 650BB.
(3) Subtask 282178-410-403-002 - Install the Fuel Tank Access Panels at the Trim Tank
Work Zones and Access Panels
Zone
 Access/Work location
311
 Access
 Panel 319AZ
312
 Access
 Panel 319BZ
Manpower Resources
Skills
 AIRFRAME
References
Aircraft Maintenance Manual (AMM)
 28-11-33, Page Block 401
(a) At the trim tank, refer to AMM 28-11-33, Page Block 401, install the fuel tank
access panels 319AZ and 319BZ.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 42
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 49

@A310
SERVICE BULLETIN
(4) Subtask 282178-942-401-001 - Close-Up
Manpower Resources
Skills
 NON SPECIFIC
(a) Make sure that the work areas are clean and clear of tools and other items of
equipment.
(b) Remove the access platform(s).
(c) Put the aircraft back to its initial configuration.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 43
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 50

@A310
SERVICE BULLETIN
**CONF 001
A
A
C
BEFORE
TYPICAL
HOOD HALF
FILTER
FUEL PUMP
CANISTER
HOOD HALF
TYPICAL
C
B
C
LH WING SHOWN
RH WING SIMILAR
A
RIB14
B D
(2)
(3)
(2)
(3)
(1)
(3)
(2)
REAR SPAR
Z650RH
Z550LH
Z500
Z600
B_SB_282178_7_BAAA_01_00
Figure A-UBAAA - Sheet 01
Removal and Installation of the Fuel Pump Canister Hood Halves in the Outer Tanks
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 44
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 51

@A310
SERVICE BULLETIN
**CONF 001
TYPICAL
MAINTAIN A
CLEARANCE HERE
A A
TYPICAL
D
E
NOTE:
MAKE SURE THAT THE CLEARANCE IS 01
EQUAL BETWEEN THE HOOD HALVES.
4
1
AFTER
2
3
3
2
A
A
4 01
01
1
HOOD HALF
FILTER
FUEL PUMP
CANISTER
HOOD HALF
E
E
B_SB_282178_7_BAAA_02_01
Figure A-UBAAA - Sheet 02
Removal and Installation of the Fuel Pump Canister Hood Halves in the Outer Tanks
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 45
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 52

@A310
SERVICE BULLETIN
**CONF 002
D
A
LH WING SHOWN
RH WING SIMILAR
A
RIB14
B
BEFORE
TYPICAL
HOOD HALF
FILTER
FUEL PUMP
CANISTER
HOOD HALF
TYPICAL
C E
C E
C
D
D
A
Z319
B
(2)
(3)
(2)
(3)
(1)
(3)
(2)
Z500
Z600
REAR SPAR
Z650RH
Z550LH
B_SB_282178_7_BAAB_01_00
Figure A-UBAAB - Sheet 01
Removal and Installation of the Fuel Pump Canister Hood Halves in the Outer Tanks and Trim Tank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 46
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 53

@A310
SERVICE BULLETIN
**CONF 002
TYPICAL
MAINTAIN A
CLEARANCE HERE
A A
AFTER
TYPICAL
NOTE:
MAKE SURE THAT THE CLEARANCE IS 01
EQUAL BETWEEN THE HOOD HALVES.
E
F
4
1
2
3
3
2
A
A
4 01
01
1
HOOD HALF
FILTER
FUEL PUMP
CANISTER
HOOD HALF
F
F
B_SB_282178_7_BAAB_02_01
Figure A-UBAAB - Sheet 02
Removal and Installation of the Fuel Pump Canister Hood Halves in the Outer Tanks and Trim Tank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 47
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 54

@A310
SERVICE BULLETIN
This Page Intentionally Left Blank
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 48
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 55

@A310
SERVICE BULLETIN
Appendix 01 - Manpower Gantt Chart
**CONF 001
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A310−28−2178
GET ACCESS 1.00 1.00
4.00 2.00
4.00 2.00
0.50 0.50
0.50 0.50
1
2
2
1
1
CLOSE−UP 1.00 1.00 1
REPLACE THE HOOD HALVES OF
REPLACE THE HOOD HALVES OF
RE−IDENTIFY THE FUEL PUMP
RE−IDENTIFY THE FUEL PUMP
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
11.00
4.50
STEPS
50
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
:
:
SB ELAPSED TIME
(HOURS)
1 2 3 4
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
THE FUEL PUMP CANISTERS IN
THE FUEL PUMP CANISTERS IN
CANISTERS IN THE LH OUTER
CANISTERS IN THE RH OUTER
THE LH OUTER WING TANK
THE RH OUTER WING TANK
WING TANK
WING TANK
B_SB_282178_7_AAAA_01_01
Figure A-UAAAA - Sheet 01
Manpower Gantt Chart
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 56

@A310
SERVICE BULLETIN
Appendix 01 - Manpower Gantt Chart
**CONF 002
ELAPSED TIME ASSUMPTION SERVICE BULLETIN No A310−28−2178
GET ACCESS 1.00 1.00
4.00 2.00
4.00 2.00
0.50 0.50
0.50 0.50
1
2
2
1
1
CLOSE−UP 1.00 1.00 1
REPLACE THE HOOD HALVES OF THE FUEL PUMP
CANISTERS IN THE LH OUTER WING TANK
REPLACE THE HOOD HALVES OF THE FUEL PUMP
CANISTERS IN THE RH OUTER WING TANK
RE−IDENTIFY THE FUEL PUMP CANISTERS
IN THE LH OUTER WING TANK
RE−IDENTIFY THE FUEL PUMP CANISTERS
IN THE RH OUTER WING TANK
4.00 2.00
0.50 0.50
2
1
REPLACE THE HOOD HALVES OF THE FUEL PUMP
CANISTERS IN THE TRIM TANK
RE−IDENTIFY THE FUEL PUMP CANISTERS
IN THE TRIM TANK
MH ET/S
TOTAL MANHOURS
SB ELAPSED TIME
15.50
4.50
STEPS
50
MH
ET/S:
PER
MANHOURS
ELAPSED TIME PER STEP
NUMBER OF PERSONS
01
02
THIS CHART IS ONLY A PROPOSAL.
OPERATORS MAY DETERMINE THAT ANOTHER WAY
TO DO THE WORK IS MORE SUITABLE FOR THEM.
01
02
NOTE:
PER
:
:
SB ELAPSED TIME
(HOURS)
1 2 3 4
IF A VSB IS INVOLVED, THE ASSOCIATED MANHOURS
ARE NOT REFLECTED IN THIS GANTT CHART.
B_SB_282178_7_AAAB_01_01
Figure A-UAAAB - Sheet 01
Manpower Gantt Chart
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 2
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 57

@A310
SERVICE BULLETIN
Service Bulletin REPORTING
TITLE: FUEL - MAIN FUEL PUMP SYSTEM - INSTALL FUEL PUMP CANISTER
WITH NEW HOOD/MESH FOR OUTER AND TRIM TANK POSITIONS
MODIFICATION No.: 13643H5740 13740H5756
NOTE
: Please ignore the above note (if it is present), this note is auto-generated and does
not apply to this SB.
NOTE
: This modification is related to an airworthiness issue which has been re-classified
and confirmed by EASA as minor in acco rdance with EU Part 21.A.91. As
such, this is handled by AIRBUS under its Design Organisation Approval No.
EASA.21J.031.
SB Reporting status
This Service Bulletin will only be incorporated into affected customized Maintenance and Flight
Operations Products if it is duly reported to Airbus.
General information
The SB Reporting policy is published in ISI 00.00.00135. This document provides information regarding:
the SB Reporting means and benefits, the update of customized Maintenance Products and customized
Flight Operations Products.
If this Service Bulletin has an operational impact, refer to paragraph "Flight Operations Products" for
further information on the update of affected Flight Operations Products.
SB Reporting procedure
Standard practice to report SB is to use the online reporting application on AirbusWorld.
Refer to ISI 00.00.00179:
- For complete information on reporting means to Airbus. Question 2 "What are the standard
practices for SB reporting?"
- If this SB requires previous or simultaneous accomplishment of other SBs, Question 3 "What about
the reporting of prerequisite Service Bulletin?"
NOTE:
 ISI 00.00.00179 covers all the frequently asked questions about SB Reporting. It is revised on a
regular basis.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

### Page 58

@A310
SERVICE BULLETIN
QUALITY PERCEPTION FORM
Use this form to tell us what is your perception of the quality of this Service Bulletin. The reported data
that you provide us will be used to analyse areas of difficulties and to take corrective action to further
improve the quality of our Service Bulletins.
We thank you for the time you have taken in completing this form.
(Please rate on a scale of 1 to 4, with 4 being the highest score)
- Quality rating of this SB 4321
- Quality rating of the Accomplishment Instructions 4321
- Quality rating of the Illustrations 4321
- Is this SB easy to understand ? Y/N
If you have had difficulties in the accomplishment of this SB please quote below the area(s) and give a
short description of the issue.
Planning Material Instructions
X Effectivity X Kit content X Preparation
X Reason X List of Materials Operator Supplied X Mod/Inspection
X Manpower X Industry support X Test
X References X Re-identification X Close-Up
X Publication X Tooling X Illustrations
Comments:
Operator: Date:
Name/Title:
Please return this form to:
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Attn : SEM4 Service Bulletins Management
F A X:( 3 3 )56 19 34 25 1
Or via your Resident Customer Support Office.
DATE: Jan 09/17 SERVICE BULLETIN No.: A310-28-2178
REVISION No.: 00 - Jan 09/17 Page: 1
7
Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
