# Airbus Service Bulletin 57-6017-04

Copy: No revision named ("SB_57_6017_04"), 32 pages: PDF https://openairdocs.org/files/sha256/10/92/109237d0e6f0d29a477f57767f4ea4c1a02d177181dbcf32af2a35603db8263c; text https://openairdocs.org/service-documents/airbus/sb-57-6017-04/file/109237d0e6f0.md. Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-4813, the docket of AD 2016-11-05. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Airbus](https://openairdocs.org/service-documents/airbus.md)
- Type: Service bulletin (Service Bulletin)
- Number: 57-6017-04
- Page: https://openairdocs.org/service-documents/airbus/sb-57-6017-04

## Text (32 pages)

Rights: © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-4813, the docket of AD 2016-11-05. Not covered by OpenAirDocs’ CC0 dedication. This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

• A300 - 600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax  : (33) 5 61 93 42 51
MANDATORY MANDATORY MANDATORY
ATA SYSTEM : 57
TITLE : WINGS - INSPECTION OF REAR SPAR AT SELECTED BOLT LOCATIONS FOR ATTACHMENT OF
MLG FORWARD PICK-UP FITTING AND MLG RIB 5 AFT OF REAR SPAR (ALTERNATE MOD:
07716H1095 SB A300-57-6020).
MODIFICATION NO. : NONE
This page transmits revision No. 04 of Service Bulletin A300-57-6017.
ADDITIONAL WORK
No additional work is required by this revision for aircraft inspected by any
previous revision.
REASON
This Service Bulletin is  issued at revision 04 to inform Operators that the
inspection is reinstated. Also inspection thresholds, repeat intervals and grace
periods with Flight Hours (FH) conversion figures have been added to the
Accomplishment Timescale.
CHANGES
SUMMARY:
. AIRBUS address has been amended.
. TITLE has been amended.
- REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
Text amended to apply inspection to post Mod. 07601H1085 aircraft.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 1
Printed in France

### Page 2 (OCR)

G A300 - 600  SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
. Text related to Mod. 11440H5432 (SB A300-57-6073) has been amended
to reinstate the inspection.
. Text related to revision 04 has been added.
• Airworthiness Directive (AD) statement has been deleted from Summary.
- EFFECTIVITY
- Effectivity has been updated.
• REFERENCES/REPERCUSSIONS
. TFU has been amended.
SERVICE BULLETIN:
. AIRBUS address has been amended.
. TITLE has been amended.
- Copyright statement has been added.
- PLANNING INFORMATION
- EFFECTIVITY
- Para. (1) Effectivity has been updated.
- Para. (2) (a) Effectivity has been updated.
- Para. (2) (b) Effectivity has been updated.
- Para. (2) (c) Effectivity by MSN and kit/configuration has been added.
- REASON
- Para. B. (1) History.
. Text amended to apply inspection to post Mod. 07601H1085 aircraft.
. Text related to Mod. 11440H5432 (SB A300-57-6073) has been amended
to reinstate the inspection.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 2
Printed in France

### Page 3 (OCR)

G A300 - 600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
. Text related to revision 04 has been added.
- Para. B. (5) Accomplishment Timescale
. Para. (a) Airworthiness Directive (AD) statement has been
amended.
. Para. (b) Text has been amended and Table has been added to
include inspection thresholds, repeat intervals and grace periods
with FH conversion figures.
- APPROVAL
. Approval statement has been amended.
• ACCOMPLISHMENT INSTRUCTIONS
- INSPECTION
. Para. (1) US inspection changed to inspection.
. Para. (2) Note has been amended to include reinstated inspection.
- REPAIR
. AI/SE-EIC has been changed to AIRBUS.
- CLOSE-UP
. AI/SE-E1 has been changed to AIRBUS.
APPENDIX 1:
. AIRBUS INDUSTRIE has been changed to AIRBUS.
ACCEPTANCE/REJECTION SHEET:
. AIRBUS address has been amended.
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 3
Printed in France

### Page 4 (OCR)

• A300 - 600
SERVICE BULLETIN
REVISION TRANSMITTAL SHEET
FILING INSTRUCTIONS
1. Remove and destroy pages 1, 2, 3 and 4 of the Summary and pages 1 thru 12 of the
Service Bulletin, pages 1, 2, 3, 4, 5 and 6 of Appendix 1, page 1 of 1 of the
Record Sheet and page 1 of 1 of the Acceptance/Rejection sheet.
2. Insert pages 1, 2, 3 and 4 of the Summary, pages 1 thru 16 of the Service
Bulletin, pages 1, 2, 3, 4, 5 and 6 of Appendix 1, page 1 of 1 of the Record
Sheet and page 1 of 1 of the Acceptance/Rejection sheet.
Put this Revision Transmittal Sheet in front of the Service Bulletin.
HISTORY OF PREVIOUS REVISIONS
This is only applicable for Revision 04 and subsequent. If information is required
for revisions issued previous to this, please check your copies of Revision
Transmittal Sheet or contact AIRBUS.
REVISION SEQUENCE
ORIGINAL : Nov 22/93
REVISION No. : 01 - Jul 24/94
REVISION No. : 02 - Jan 14/97
REVISION No. : 03 - Nov 19/97
REVISION No. : 04 - Feb 24/11
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 4
Printed in France

### Page 5 (OCR)

• A300 - 600
SERVICE BULLETIN
SUMMARY
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax  : (33) 5 61 93 42 51
This summary is for information only
and is not approved for modification of the aircraft
MANDATORY MANDATORY MANDATORY
ATA SYSTEM : 57
TITLE : WINGS - INSPECTION OF REAR SPAR AT SELECTED BOLT LOCATIONS FOR ATTACHMENT oF
MLG FORWARD PICK-UP FITTING AND MLG RIB 5 AFT OF REAR SPAR (ALTERNATE MOD:
07716H1095 SB A300-57-6020).
MODIFICATION NO. : NONE
REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES
During full-scale fatigue testing, cracks were discovered in the rear spar emanating from
certain bolt holes at the attachment of the MLG forward pick-up fitting and the MLG Rib 5
aft at approximately 62,000 simulated flights. It is possible that similar cracks will
appear on in-service aircraft.
The Initial Issue and Revision 01 of this Service Bulletin (SB) required mandatory High
Frequency Eddy Current (HFEC) inspections of certain fastener holes where the MLG forward
pick-up fitting and MLG Rib 5 aft are attached to the rear spar. This required the
fasteners to be removed. Revision 02 of this SB replaced the HFEC inspection with an
Ultrasonic (US) inspection which does not require the fasteners to be removed.
Production Modification No. 07601H1085 introduced cold working of the MLG forward pick-up
fitting attachment holes. This has been embodied on MSN 554 and subsequent.  However, due
to the introduction of the Extended Service Goal 2 (ESG2) aircraft post Modification No.
07601H1085 will need to be inspected using this Service Bulletin.
For aircraft pre Modification No. 07601H1085, retrofit Modification 07716H1095 (SB A300-
57-6020) was introduced to install oversize studs in the bolt holes covered by this
inspection. However, even after embodiment of Modification 07716H1095 (SB A300-57-6020)
further inspections are required.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 1
Printed in France

### Page 6 (OCR)

• A300 - 600
SERVICE BULLETIN
SUMMARY
Modification 11440H5432 (SB A300-57-6073), oversizes and cold expands the bolt holes and
installs oversize studs. However, due to the introduction of the ESG2 aircraft post
Modification No. 11440H5432 (SB A300-57-6073) which operate beyond the DSG will need to
be inspected using this Service Bulletin.
Modification 11440H5432 (SB A300-57-6073) is strongly recommended for embodiment at
14,400 Flight Cycles (FC) or 32,400 Flight Hours (FH), whichever occurs first.
Revision 03 of this Service Bulletin was issued to include US inspection requirements for
aircraft on which HFEC inspections have already been done in accordance with the Initial
Issue and Revision 01 of this Service Bulletin and
- cracks were found and
• the cracks were removed by oversizing the hole by 0.0312 inches (0.795 mm) or
0.0625 inches (1.590 mm).
Revision 04 of this Service Bulletin has been issued to reinstate the inspection
requirement which was previously cancelled by the embodiment of Modification 11440H5432
(SB A300-57 6073) or production modification 07601H1085. Changes to the inspection
schedule were included to account for all aircraft operations. Changes include revised
inspection thresholds, repeat intervals and grace periods with FH conversion figures.
Early detection of  cracks is beneficial as significant cracking in this area would
necessitate very extensive and costly repairs.
Mandatory inspections are required at certain bolt holes where the MLG forward pick-up
fitting and MLG RIB 5 aft are attached to the rear spar. The inspections must be done at
the thresholds and repeat intervals given. Aircraft which are already in the inspection
program will require a repeat inspection at the next inspection interval. For other
aircraft the appropriate inspection grace periods are given.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 2
Printed in France

### Page 7 (OCR)

A300 - 600
SERVICE BULLETIN
SUMMARY
EFFECTIVITY
This Service Bulletin is applicable to these operators:
66U, AAL, AAW, ABD, AHK, AMU, CES, CSN, DLH, FZI, FDX, G8E, IRA, IRM, JAL, KAC,
KAL, LAA, MNB, MON, MSR, MXU, OHY, QTR, SUD, TAR, THA, UZB
SERVICE BULLETIN TO BE ACCOMPLISHED PREVIOUSLY OR SIMULTANEOUSLY
None
REFERENCES/REPERCUSSIONS
TFU  : 572103002
OEB  : None
AOT  : None
SIL  : None
LIFE LIMIT  : None
LINE MAINTENANCE AFFECTED  : No
OTHER  : None
NATURE OF WORK
AIRCRAFT  : Yes
EQUIPMENT  : No
HARD  : No
SOFT  : No
OBRM  : No
COMPLIANCE
Mandatory
MANPOWER
Aircraft
TOTAL MANHOURS  226.0
ELAPSED TIME (HOURS)  56.5
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 3
Printed in France

### Page 8 (OCR)

© A300 - 600  SERVICE BULLETIN
SUMMARY
MATERIAL INFORMATION
AIRCRAFT DATA
None
EQUIPMENT DATA
None
APPENDICES
None
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 4
Printed in France

### Page 9 (OCR)

• A300 - 600
SERVICE BULLETIN
AIRBUS
CUSTOMER SERVICES DIRECTORATE
1 Rond Point Maurice Bellonte
31707 BLAGNAC CEDEX FRANCE
Tel : (33) 5 61 93 33 33
Telex : AIRBU 530526F
Fax  : (33) 5 61 93 42 51
MANDATORY MANDATORY MANDATORY
ATA SYSTEM : 57
TITLE : WINGS - INSPECTION OF REAR SPAR AT SELECTED BOLT LOCATIONS FOR ATTACHMENT OF
MLG FORWARD PICK-UP FITTING AND MLG RIB 5 AFT OF REAR SPAR (ALTERNATE MOD:
07716H1095 SB A300-57-6020).
MODIFICATION NO. : NONE
This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain
the property of AIRBUS; no intellectual property right or license is granted by
AIRBUS in connection with any information contained in it. It is delivered on the
express condition that said document and the information contained in it shall be
treated as confidential, shall not be used for any purpose other than that for which
it is hereby delivered. It shall not be disclosed in whole or in part to third
parties and shall not be duplicated in any manner (except for the purposes of
performing the tasks described hereunder and provided that any recipient of such
document shall comply with the conditions herein), without AIRBUS prior written
consent.
1. PLANNING INFORMATION
A. EFFECTIVITY
(1)  Models
B4-601, B4-603, B4-605R, B4-620, B4-622, B4-622R, C4-605R/F, C4-620,
F4-605R
(2)  Aircraft
(a)  Effectivity by MSN
The Service Bulletin is applicable to aircraft MSN:
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 1
Printed in France

### Page 10 (OCR)

S A300 - 600
SERVICE BULLETIN
0284 0294 0301 0307 0312  0317  0321  0336  0344  0348 0351  0354  0358
0361 0365  0368 0380  0388  0398 0401  0405  0408  0411 0414  0417 0423
0459  0460 0461 0462  0463  0464  0465  0466  0469  0470 0474  0477  0479
0505  0506  0507 0508  0509  0510  0511  0512  0513  0514 0515  0516 0517
0518 0521 0525 0529  0530  0532  0536 0540  0543  0546 0553  0554 0555
0556 0557 0558 0559  0560 0561  0563 0566  0569  0572 0575 0577 0579
0581  0582  0584 0601  0602  0603  0604 0605  0606  0607 0608 0609 0610
0611  0612  0613 0614 0615  0616 0617 0618  0619 0621 0623 0625 0626
0627 0628  0629 0630 0631  0632  0633 0635 0637 0639 0641 0643 0645
0657 0659 0662 0664 0666 0668 0670 0673 0675 0677 0679 0681 0683
0685  0688 0692 0694  0696  0699  0701  0703  0705  0707 0709  0711  0713
0715  0717  0719 0721 0722  0723  0724  0725  0726 0727 0728  0730
0731  0732 0733 0734 0735  0736  0737 0738  0739  0740 0741 0742 0743
0745 0746 0747 0748  0750 0752  0754 0755  0756 0757
0759 0760 0761 0762 0763 0764  0766  0768 0769  0770 0771
0772 0773  0774 0775 0777  0778 0779 0780  0781 0782 0783 0784 0785
0786 0787 0788 0789 0790 0791 0792 0793 0794  0797 0799  0800 0801
0802 0803 0804 0836 0837  0838 0855 0856 0857 0858 0859 0860 0870
0871 0873 0874 0875 0876 0877 0878
(b)  The Operator MSN relationship is provided for information only and
is correct at the time of issue in accordance with the information
available to AIRBUS. Any further changes resulting from transfer
of an aircraft from one Operator to another will not be reflected
in this list unless the Service Bulletin is revised for another
reason.
OPERATOR  MSN
66U  0762
AAL  0423 0459  0460 0461 0463 0466 0469
0470 0474  0506  0507  0508  0509 0510
0511  0512  0513  0514  0515  0516  0517
0606 0610 0612 0615 0619 0626 0639
0643 0645 0675
AAW  0354
ABD  0529 0557 0755
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 2
Printed in France

### Page 11 (OCR)

9A300 - 600
SERVICE BULLETIN
OPERATOR  MSN
AHK  0855 0856 0857 0858 0859 0860 0870
0871
AMU  0677 0743
CES  0521 0525 0532 0707 0725 0732 0741
0746 0754 0763
CSN  0733 0734 0739 0750 0756
DLH  0380 0401  0405 0623 0701  0773
F2I  0284 0294  0301 0307 0312 0317 0321
0336 0348  0351 0408 0618
FDX  0358 0361  0365  0388 0417 0477 0479
0530 0536  0543  0555 0559  0572 0575
0579  0581  0611  0613 0625  0630 0633
0657  0659  0664  0668 0688  0709  0713
0715  0726  0728  0735  0736  0738  0742
0745  0748  0752  0757  0759  0760  0761
0766  0768  0769  0771 0772  0774  0777
0778  0779  0780  0781 0789  0790  0791
0792  0793  0794  0799  0800  0801  0802
0803  0804  0873  0874 0875  0876 0877
0878
G8E  0462 0465
IRA  0632 0696  0723 0727
IRM  0411 0414 0546 0553 0608
JAL  0602 0617 0621 0637 0641 0670 0679
0683 0703 0711 0724 0729 0730 0737
0740 0753 0770 0783 0797 0836 0837
0838
KAC  0344 0673 0694 0699 0719 0721
KAL  0582 0609 0627 0631 0662 0685 0692
0731
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 3
Printed in France

### Page 12 (OCR)

G A300 - 600
SERVICE BULLETIN
OPERATOR  MSN
LAA  0601 0616
MNB  0758
MON  0540 0556 0604 0605
MSR  0561 0607
MXU  0767 0788
OHY  0584 0603 0744 0747 0749 0764
QTR  0554 0560 0614
SUD  0666 0775
TAR  0505 0558 0563
THA  0368 0398 0464 0518 0566 0569 0577
0628 0629 0635 0681 0705 0782 0784
0785 0786 0787
UZB  0717 0722
(c) Effectivity by MSN and Kit/Configuration
None
(3)  Spares
None
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 4
Printed in France

### Page 13 (OCR)

© A300 - 600
SERVICE BULLETIN
B. REASON
(1)  History
During full-scale fatigue testing, cracks were discovered in the rear
spar emanating from certain bolt holes at the attachment of the MLG
forward pick-up fitting and the MLG Rib 5 aft at approximately 62,000
simulated flights. There is a possibility of similar cracks appearing in
service.
The Initial Issue and Revision 01 of this Service Bulletin (SB)
required mandatory High Frequency Eddy Current (HFEC) inspections
of certain fastener holes where the MLG forward pick-up fitting and
MLG Rib 5 aft are attached to the rear spar. This required the
fasteners to be removed. Revision 02 of this SB replaced the HFEC
inspection with an Ultrasonic (US) inspection which does not require the
fasteners to be removed.
Production Modification No. 07601H1085 introduced cold working of the
MLG forward pick-up fitting attachment holes. This has been embodied on
MSN 554 and subsequent. However, due to the introduction of the Extended
Service Goal 2 (ESG2) aircraft post Modification No. 07601H1085 wilL need
to be inspected using this Service Bulletin.
For aircraft pre Modification No. 07601H1085, retrofit Modification
07716H1095 (SB A300-57-6020) was introduced to install oversize studs in
the bolt holes covered by this inspection. However, even after embodiment
of Modification 07716H1095 (SB A300-57-6020) further inspections of the
bolt holes are required.
Modification 11440H5432 (SB A300-57-6073), oversizes and cold
expands the bolt holes and installs oversize studs. However, due to the
introduction of ESG2 aircraft post Modification 11440H5432 (SB A300-57.
6073) which operate beyond the DSG will need to be inspected using this
Service Bulletin.
Modification 11440H5432 (SB A300-57-6073) is strongly recommended
for embodiment at 14,400 Flight Cycles (FC) or 32,400 Flight Hours
(FH) (whichever occurs first).
Revision 02 of this Service Bulletin (SB) was issued to change the
inspection method from HFEC and US and to include reference to
modification 11440H5432 (SB A300-57-6073). The US Inspection does not
require bolt removal or jacking of the aircraft. However the
inspection intervals are reduced.
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 5
Printed in France

### Page 14 (OCR)

• A300 - 600
SERVICE BULLETIN
Revision 03 of this Service Bulletin was issued to include US inspection
requirements for aircraft on which HFEC inspections have already been
done in accordance with Initial Issue or Revision 01 of this Service
Bulletin and:
- cracks were found and
- the cracks were removed by oversizing the hole by 0.0312 inches
(0.795 mm) or 0.0625 inches (1.590 mm).
Revision 04 of this Service Bulletin has been issued to reinstate the
inspection requirement which was previously cancelled by the embodiment
of Modification 11440H5432 (SB A300-57-6073) or production Modification
07601H1085. Changes to the inspection schedule were also included to
account for all aircraft operations. Changes include revised inspection
thresholds, repeat intervals and grace periods with FH conversion
figures.
(2)  Objectives
Mandatory inspections are required at certain bolt holes where the
MLG forward pick-up fitting and MLG Rib 5 aft are attached to the
rear spar.
(3)  Advantages
Early detection of cracks is beneficial  as significant cracking in
this area would necessitate very extensive and costly repairs.
(4)  Operational/Maintenance Consequences
None
(5)  Accomplishment Timescale
(a)  Accomplishment of this Service Bulletin has been rendered mandatory
by the issue of an Airworthiness Directive (AD) published by the
European Aviation Safety Agency (EASA).  The AD must be used as the
reference document for the mandatory accomplishment timescale.
(b)  Mandatory inspections are required at certain bolt holes
where the MLG forward pick-up fitting and MLG Rib 5 aft are
attached to the rear spar. The inspections must be done at the
thresholds and repeat intervals given in Table 1. Aircraft
which are already in the inspection program will require a repeat
inspection at the next inspection interval. For other aircraft the
appropriate inspection grace periods are given in Table 1.
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION NO. :  04 Feb 24/11  PAGE : 6
Printed in France

### Page 15 (OCR)

@A300 - 600
SERVICE BULLETIN
TABLE 1 Structural Inspection Program
Maintenance Task
A/C Type  Modification  Inspection  Inspection  Grace
Version  Standard  Method  Threshold  Repeat Interval  Period**
FC  FH  FC  FH  FC  FH
A300 - 600*  Pre-Mod. 07716 or  US  14,400  32,400  4,500  10,100  900  2,000
Mat: RR58  Pre-Mod. 11440
Post-Mod. 07716  US  8,900  20,000  4,000  9,000  800  1,800
(SB A300-57-6020)
Post-Mod. 11440  US  26,100  58,700  4,000  9,000  800  1,800
(SB A300-57 - 6073)
A300 - 600*  Pre-Mod. 07716 or  US  14,400  32,400  7,400  16,600  1,400  3,100
Mat: 7010  Pre-Mod. 11440
Post-Mod. 07716  US  9,800  22,000  6,800  15,300  1,300  2,900
(SB A300-57-6020)
Post-Mod.  11440  US  26,100  58,700  6,800  15,300  1,300  2,900
(SB A300-57-6073)
Production Mod.  US  28,800  64,800  7,400  16,600  1,400  3,100
07601
A300 - 600*  Production Mod.  US  34,600  77,800  8,900  20,000  1,600  3,600
Freighters  07601
Mat: 7010
For aircraft subject to short-range mission only, the inspections are identical
to those for normal operations.
**  Grace period is Limited to 24 months or given FC/FH figures which ever comes
first.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 7
Printed in France

### Page 16 (OCR)

2A300 - 600
SERVICE BULLETIN
The number of touch and go flights can be neglected when they
are less than 5 percent of the total number of flights
between two consecutive inspections. When the percentage of
touch and go flights is more than 5 percent of the total
number of flights between two consecutive inspections,
each touch and go flight beyond 5 percent has to be counted
as a flight cycle. A touch and go is a landing in which the
aircraft touches the runway and does not come to a full stop
before commencing an additional flight.
C. DESCRIPTION
To accomplish this Service Bulletin it is necessary to:
(1) Defuel the aircraft.
(2) Gain access to the inboard fuel tanks.
(3) Identify the selected bolts/studs at the MLG forward pick-up
fitting and the MLG Rib 5 aft.
(4) Do a US inspection of selected bolts/stud holes of the MLG forward
pick-up fitting and MLG Rib 5 aft.
(5) Carry out approved repairs if cracks are found.
(6) Close up.
D. APPROVAL
Approved under EASA Design Organisation Approval No. EASA.21J. 031.
If an aircraft listed in the effectivity has a modification or repair that is
not of AIRBUS origin, and which effects the content of this Service Bulletin,
the operator is responsible for obtaining approval by its airworthiness
authority for any adaptation necessary before incorporation of the Service
Bulletin.
MANPOWER
This Service Bulletin assumes that the aircraft has been placed in a
maintenance status. The man-hours/elapsed time does not include preparation
for the inspection, non-productive elapsed times, repair or administrative
functions.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 8
Printed in France

### Page 17 (OCR)

@ A300 - 600
SERVICE BULLETIN
AIRCRAFT
Gain Access  100.00
Inspection  16.0
Close Up  110.0
TOTAL MANHOURS  226.0
ELAPSED TIME (HOURS)  56.5 (4 Fitters)
F_  MATERIAL - COST AND AVAILABILITY
None
G. TOOLING - PRICE AND AVAILABILITY
None
H.  WEIGHT AND BALANCE
None
I.  REFERENCES
Aircraft Maintenance Manual (AMM)  : 28-00-00 28-10-00 28-11-22
Structural Repair Manual (SRM)  : 51-10-13 51-76-20
Service Bulletin (SB)  : A300-57-6020 A300-57-6073
Nondestructive  Testing Manual (NT)  : Part 4, 57-20-16
J.  PUBLICATIONS AFFECTED
None
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 9
Printed in France

### Page 18 (OCR)

» A300 - 600
SERVICE BULLETIN
2. ACCOMPLISHMENT INSTRUCTIONS
A_  GENERAL
WARNING:  LANDING GEAR - MAKE CERTAIN THAT THE GROUND SAFETIES ARE IN
POSITON.
FLIGHT CONTROLS - MAKE CERTAIN THAT THE GROUND SAFETIES AND
NOTICES ARE IN POSITION.
OBSERVE THE SAFETY PRECAUTIONS IN AMM 28-00-00 P.BLOCK 301.
NOTE:  The following instructions apply to LH and RH wings unless
otherwise  stated.
(1)  Preparation
(a)  Drain the fuel tanks (Refer to AMM 28-10-00 P.Block 301).
(b)  Gain Access to the inboard fuel tanks via access doors
542/642 CB. (Refer to AMM 28-11-22 P.Block 401).
(c)  Clean sealant from the selected fastener heads within the
fuel tank. (Refer to Figure 1 and Figure 2).
INSPECTION
Figure 1 and Figure 2.
(1)  Carry out an inspection of the selected bolts/stud holes (Refer to
NTM Part 4 57-20-16).
(2)  Where no cracks are found, refer to Accomplishment Instructions
paragraph E. and repair as necessary.
NOTE: If no cracks are found, it is strongly recommended to embody
Modification 11440H5432 (SB A300 57-6073). However, even
after embodiment of modification 11440H5432 (SB A300-57-
6073) further inspections are still required for aircraft
which operate beyond the Design Service Goal (DSG).
(3)  Where cracks are found, refer to Accomplishment Instructions
paragraph C. and repair as necessary.
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. :  04 Feb 24/11  PAGE : 10
Printed in France

### Page 19 (OCR)

• A300 - 600
SERVICE BULLETIN
C.  REPAIR
(1)  If any cracks are indicated, report details to AIRBUS SE-A and
carry out an approved repair before further flight.
D-  TEST
None.
E -  CLOSE - UP
(1)  Re-seal the fastener heads within the fuel tanks (Refer to
SRM 51 - 76-20) .
(2)  Ensure working areas are clean and clear of tools and miscellaneous
items of equipment.
(3)  Replace access doors 542/642CB (Refer to AMM 28-11-22 P. Block
401).
(4)  Report all findings, including nil findings, to AIRBUS SE-A (Refer
to SRM 51-10-13 P. Block 1.
DOCUMENTATION
Record the accomplishment of this Service Bulletin in the relevant
aircraft technical records.
DATE: Nov 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 11
Printed in France

### Page 20 (OCR)

• A300 - 600
SERVICE BULLETIN
THIS PAGE IS INTENTIONALLY LEFT BLANK
DATE: NoV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 12
Printed in France

### Page 21 (OCR)

9 A300-601
SERVICE BULLETI
MLG FORWARD PICK-UP FITTING
ALG RIB 5 AFT
MLG FWD PICK-UP FITTING
VIEW LOOKING FORWARD ON
AFT FACE OF REAR SPAR.
(L/H WING DRAWN)
OUTBD
REAR SPAR
MLG RIB 5 AFT FORWARD ATTACHMENT FLANGE
VIEW LOOKING FORWARD ON AFT FACE OF
REAR SPAR. (L/H WING DRAWN)
OUTBD
Area to be inspected.
Figure 1 Sheet 1
DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 13
Printed in France

### Page 22 (OCR)

GA300-600
SERVICE BULLETIN
VIEW ON MLG FORWARD PICK-UP FITTING
ATTACHED TO AFT FACE OF REAR SPAR
OUTBD  LOOKING FORWARD. (L/H WING DRAWN)
HOLE POSITIONS TO BE INSPECTED
MARKED : -
J12
UP
VIEW ON RIB 5 AFT FLANGE ATTACHMENT
OUTBD <  TO AFT FACE OF REAR SPAR LOOKING
FORWARD. (L/H WING DRAWN)
_15  HOLE POSITIONS TO BE INSPECTED
MARKED : T
116
Fasteners to be inspected.
Figure 2 Sheet 1
DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 14
Printed in France

### Page 23 (OCR)

GA300-600
SERVICE BULLETIN
3. MATERIAL INFORMATION
None.
DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 15
Printed in Franca

### Page 24 (OCR)

GA300-600
SERVICE BULLETIN
THIS PAGE INTENTIONALLY LEFT BLANK
DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 16
Printed in France

### Page 25 (OCR)

• A300-600
SERVICE BULLETIN
APPENDIX 1
AIRCRAFT JACKING REQUIREMENTS
(1) Electrically ground the aircraft (Refer to AMM 24-40-00, Page Block
301).
(2) Detuel the aircratt (Refer to AMM 28-10-00, Page Block 301).
(3) Remove the Left and Right engines (Refer to AMM 71-00-00, Page
Block 401).
CAUTION: THE SAFETY STAY AT FUSELAGE FRAME 85 MUST BE IN POSITION FOR
THIS PROCEDURE.
(4) Refer to Figure 1 and Table 1 for jacking locations and jacking
Loads.
(5) Each jacking point requires one jack and one load cell.
WARNING: FOR SAFETY PRECAUTIONS DURING JACKING, REFER TO AMM
07-11-00.
(6) Jack aircraft in accordance with the following procedure:
(a) Jack aircraft at Nose Landing Gear (point 1) and rib 8 jacking
points (points 2 and 3).
NOTE : The Main Landing Gear (MLG) can now be removed if
required. If the MLG is to remain installed it must be
supported by applying a load of 5834 lbf (2595 daN) to
each MLG assembly (Refer to Table 1, Figure 2 and AMM
07-12-002.
(b)  Position jacks and fittings/cradles at remaining positions,
points 4 to 14 inclusive (or points 4 to 12 inclusive if the
MLG is not installed).
(c) Apply loads in accordance with steps 1 to 4 as shown in Table
1 (Page 4) at points 4 to 14 inclusive (or points 4 to 12
inclusive if the MLG is not installed).
(d) Check loads at points 1 to 4 and either 7 to 14 or 7 to 12
and adjust (Refer to Table 1, Step 4).
CAUTION: LOADS MUST BE MONITORED DURING THE INSPECTION
PERIOD. THE LOADS APPLIED AND THE WEIGHT OF THE
AIRCRAFT MUST NOT CHANGE DURING THE INSPECTION
PERIOD. IF ANY MAJOR COMPONENTS ARE TO BE REMOVED OR
REPLACED DURING THE INSPECTION, AIRBUS
MUST BE CONTACTED FIRST. ENSURE JACKS ARE SECURED.
AVOID DEFORMATION OF SKIN PANEL FORWARD OF FRONT
SPAR OR AFT OF THE REAR SPAR.
7  DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 1 of 6
Printed in FRANCE

### Page 26 (OCR)

© A300-600
SERVICE BULLETIN
APPENDIX 1
(e) After completion of inspection, the aircraft must be lowered
in reverse sequence of operations.
7 DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 2

### Page 27 (OCR)

GA300-600
SERVICE BULLETIN
APPENDIX 1
FRAME 11  FRAME 85
RIB 13
RIB 8
FRAME 76
FRAME 40  FRAME
AIB B
RIB 13
FRONT SPAR  REAR SPAR
Aircraft Jacking Points
Figure 1
7 DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 3
Printed in FRANCE

### Page 28 (OCR)

A300-600
SERVICE BULLETIN
APPENDIX 1
JACKING POINTS  APPLIED LOADS (LB)
STEP 1  STEP 2  STEP 3  STEP 4
(25%)  (50%)  (75%)  (100%)
1 (FR.11)  27558
2 (RIB 8 LH R/S)  3307
3 (RIB 8 RH R/S)  3307
4 (FR 85)  2921  5842  8763  11685
5 (FR 40)  6614  13228  19842  26455
6 (FR 47)  5401  10803  16204  21605
7 (FR 76 RH)  3252  6504  9755  13007
8 (FR 76 LH)  3252  6504  9755  13007
9 CRIB  13 LH F/S)  2811  5622  8433  11244
10 (RIB 13 LH R/S)  2039  4079  6118  8157
11 (RIB 13 RH F/S)  2811  5622  8433  11244
12 (RIB 13 RH R/S)  2039  4079  6118  8157
13  MAIN U/C LH  5834
(IF INSTALLED)
14  MAIN U/C RH  5834
(IF INSTALLED)
Table 1
Jacking Loads + or - 10 % Tolerance
7 DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 4
Printed in FRANCE

### Page 29 (OCR)

A300-600
SERVICE BULLETIN
APPENDIX 1
Jacking  Cradle or  I Jack Part  Load  Cell  Qty Load Cell  Qty
Point  Fitting Part  NO.  Part  NO -  Adapter Part
NO.  No.
1 (FR. 11)  N/ A  D3011  343A160KN2  1 98A07003910200  1
98A07003906200
2 CRib 8 LH  N/ A  D8004  343A400KN2  1 98A07004002000
R/S)  98A07003909200
98A07003911200
3 CRib 8 RH  N/A  D8004  343A400KN2  198A07004002000
R/S>  98A07003909200
98A07003911200
4 (FR. 85)  N/A  D0504  343A63KN2  1 98A07003907200
98A07003906200
5 (FR. 40)  RTA075002  N/A  343A63KN2  4  N/A
6 (FR. 47)  RTA075002  N/A  343A63KN2  4  N/A
7 (FR. 76  RTA075010  MS02-3  343A100KN2  1 98A07003907200
RH)  98A07003906200
8 (FR. 76  RTA075009  MS02-3  343A100KN2  1 98A07003907200
LHO  98A07003906200
9 CRIB 13 LH  98A57004010000  RTA075001  343-63KN2  1  98A7003907200
F/S)
10  CRIB 13  98A57004010000  RTA075001  343-63KN2  98A7003907200
LH R/S)
11  CRIB 13  98A57004010000  RTA075001  343-63KN2  98A7003907200  1
RH F/S)
12 (RIB 13  98A57004010000  RTA075001  343-63KN2  1  98A7003907200
R/S)
13 LH MLG  STANDARD
CIf  AXLE JACK
insta (led)
14 RH MLG  STANDARD
ICIF  AXLE JACK
installed)
Table 2
Jacking Points and Equipment for Fuselage and Wing
7  DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 5

### Page 30 (OCR)

© A300-600
SERVICE BULLETIN
APFENDIX 1
JACKING
POINTS
NOTE: Both points on the MLG Bogie to be jacked
simultaneously to a combined total load of 5834 lbf
(2595 daN).
Figure 2
Jacking of Main Landing Gear
7  DATE : NOV 22/93  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE : 6

### Page 31 (OCR)

REVISION No. : 04 Feb 24/11  DATE : NOV22/93  A300  SB No.  A300-57-6017  INSPECTION REPORT
A/C MSN  DATE OF  INSPECTION
FLIGHT CYCLES  INSPECTION  METHOD  : VISUAL
FLIGHT HOURS  NDT
(SPECIFY METHOD)
FINDINGS  - YES  NO  IF YES,  CRACK  CONFIRMED BY :
(SPECIFY METHOD)
ILLUSTRATION WHICH DEFINES  PARAMETER  TABLE TO INSERT RECORDS OF  REQUIRED
BE RECORDED  CRACK LENGTH, CRACK  PARAMETERS  (E.G.  HOLE NO., CRACK LENGTH,
Printed in FRANCE  PAGE : 1 of 1  SERVICE BULLETIN No. : A300-57-6017  Record Sheet  DEPTH, EDGE MARGIN  PLEASE LIST OTHER FINDINGS, EXCLUDING CRACK.  ETC.>.  AREA REPAIRED IN ACCORDANCE WITH.  REPAIR BY OVERSIZE ETC.).  SERVICE BULLETIN  A300-600
SRM  AIB INSTRUCTION

### Page 32 (OCR)

5 A300-600
SERVICE BULLETIN
ACCEPTANCE/REJECTION SHEET
AIRBUS
PRODUCT SUPPORT DIRECTORATE
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE
Tel: (33) 61-93-33-3330526 F
Telex : AIRBU 5
TITLE : WINGS - REAR SPAR AT SELECTED BOLT LOCATIONS FOR ATTACHMENT OF
MLG FORWARD PICK-UP  • FITTING AND MLG RIB 5 AFT OF REAR SPAR
(Alternative Mod. 07716 SB A300-57-6020).
MODIFICATION No. : INSPECTION  ATA SYSTEM : 57
IS BEING HEREWITH SUBMITTED TO YOU FOR REVIEW
Please fill :  - REJECTED
...WILL BE EMBODIED
.. EFFECTIVITY
This SB can only be incorporated in your "customized" documentation
within the agreed time schedule in so far as this sheet is returned
to us on purchase date and signed by a duly authorizedand empowered
officer or representative.
Please return to :
FROM :
AIRBUS
AIRLINE :  PRODUCT SUPPORT DIRECTORATE
1 Rond Point Maurice BELLONTE
31707 BLAGNAC CEDEX FRANCE
NAME :  Att. : SDC32 - Technical Publications
Department
DATE :
7 DATE :NOV22/?3  SERVICE BULLETIN No. : A300-57-6017
REVISION No. : 04 Feb 24/11  PAGE: 1 of 1
Printed in FRANCE

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
