# Aircraft Industries Mandatory Bulletin L410UVP-E/143a

Copy: Revision 2 ("143ar2_e20_en (1)"), 8 pages: PDF https://openairdocs.org/files/sha256/98/f4/98f4c0ef2026388539d55dd1092f1edc9b9f2c2d55d22ed313aadfedeeadbe18; text https://openairdocs.org/service-documents/aircraft-industries/l410uvp-e-143a/file/98f4c0ef2026.md. Rights: © Aircraft Industries. Filed by the FAA in regulations.gov docket FAA-2018-0462; AD 2018-11-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Aircraft Industries](https://openairdocs.org/service-documents/aircraft-industries.md)
- Type: Service bulletin (Mandatory Bulletin)
- Number: L410UVP-E/143a
- Latest revision known: L410UVP-E/143a, Revision 2, dated March 7, 2018 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/aircraft-industries/l410uvp-e-143a

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2018-11-04](https://openairdocs.org/ad/2018-11-04.md), effective Jun 27, 2018: Revision 2

## Text (8 pages)

Rights: © Aircraft Industries. Filed by the FAA in regulations.gov docket FAA-2018-0462; AD 2018-11-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Q 0501 Př.2/C Aircraft Industries, a.s., 686 04 Kunovice, Czech Republic, phone: +420 572 817 660, fax: +420 572 816 112, e-mail: ots@let.cz 
 
MANDATORY BULLETIN 
MB No.: L410UVP-E/143a Revision 2 
Concerns: L 410 UVP-E20 airplanes from S/N 2904 to 3114 inclusive (including 
airplanes having R letter in Serial Number). 
Subject: Modification of the electrical  circuit of the propeller pitch lock system function 
test. 
Revision 2 extends the applicability to S/N specified above, cancels inspection and 
adjustment of engine push/pull control rod and Beta Switch and adds the 
modification of the electrical circuit of the propeller pitch lock system function 
test. 
To be carried out Within 25 flight hours (FH) or 20 flight cycles (FC) or 30 days 
at the latest by: after the effectivity date of this bulletin whichever occurs first. 
To be carried out by: Organization  certified for periodic maintenance 
of L 410 UVP-E20 airplanes or AI representatives. 
Costs to be covered by: Operator. 
Necessary material 
to be delivered by: Aircraft Industries, a.s., Czech Republic on a request. 
Bull. becomes effective: On the day of release. 
Total No. of pages: 8 
Bulletin L410UVP-E/143a Revision 2 supersedes previous bulletins L410UVP-E/143a 
Revision 1, L410UVP-E/142a Revision 3 and L410UVP-E/492b Revision 2. 
.................................... 
Released: Pavel Jurák 
Head of airworthiness dept. 
The technical content of this document is approved under the authority of DOA ref. EASA. 21J.119. 
Date of release: March 7, 2018

### Page 2

Page: 2  L410UVP-E/143a 
Pages: 8  Revision 2 
PERFORMANCE: mandatory 
1. INSTRUCTIONS FOR PLANNING 
A. CONCERNS 
1. Airplane Model 
L 410 UVP-E20 
2. Version / S/N 
From S/N 2904 to 3114 inclusive (including airplanes having R letter in Serial 
Number). 
3. Qualification for Implementation 
Concurrent implementation of the GEAC service bulletin SB-H80-76-00-00-0036 
is recommended. 
4. New Equipment 
Not required. 
B. REASON 
Modification of the electrical circuit of the propeller pitch lock system function test. 
C. DESCRIPTION 
Modification of the electrical circuit of the propeller pitch lock system function test. 
Function check of the TCL microswitch of the propeller pitch lock system. 
D. APPROVAL 
On the basis of data of the Design Changes No. ZKB 059 019, ZKB 059 077 and 
ZKB 059 089. 
E. MAN-HOURS 
Supposed Man-hours: 8 M-hours 
F. MATERIAL - AVAILABILITY 
1. New Equipment 
Not required. 
2. Installation Parts 
Will be delivered by the airplane manufacturer Aircraft Industries, a.s., 
686 04 Kunovice, Czech Republic on a request. 
3. Costs 
To be covered by the operator.

### Page 3

L410UVP-E/143a  Page: 3 
Revision 2  Pages: 8 
G. SPECIAL EQUIPMENT 
Not required. 
H. WEIGHT AND BALANCE 
Influence of the modification on the airplane empty weight and balance is negligible. 
I. USED DOCUMENTATION 
 Airplane Maintenance Manual 
 Airplane Wiring Manual 
 Airplane Flight Manual 
 B574 493X SALM wiring diagram 
 B574 747N Installation of relays 
J. AMENDED DOCUMENTATION  AND APPROPRIATE AMENDMENTS 
AFM L410UVP-E/259d documentation bulletin. 
MS Not affected. 
MM Supplement No. 210, Revision 5. 
WM Supplement No. 210, Revision 4. 
2. INSTRUCTIONS FOR IMPLEMENTATION 
A. PREPARATORY WORK 
 Disconnect the external power supply plug accord. to the MM, chap. 024.40.00.B. 
 Remove accumulators from the airplane according to the MM, chap. 024.30.04.A. 
 Remove the side covers of the control panel in the cockpit according to the MM, 
chap. 031.12.00. 
 Tilt the RH instrument panel according to the MM, chap. 031.11.00. 
 Remove PFD from the RH instrument panel. 
 Remove the airframe de-icing control box from the RH control panel. 
 Lower the bottom cowling of the LH and RH engine according to the MM, chap. 
054.00.01.

### Page 4

Page: 4  L410UVP-E/143a 
Pages: 8  Revision 2 
B. PROCEDURE 
Modification of the electrical circuit of the propeller pitch lock system function 
test 
 Install V900 ground according to the Dwg. No. B574 747N, View P. Stick V900 el. 
symbol close to the ground. Use material pos. 1, 2, 3 of point 3.A. of this bulletin. 
 Perform as follows according to t he original SALM 601 wiring diagram in the 
Supplement No. 210 of the WM, chap. 076.14.00: 
 Remove the bracket with the M897 and M898 relays installed inside the control 
panel in the cockpit. 
 Remove the M891 and M892 relays behind the RH instrument panel from the 
bulkhead 4. 
 Disconnect the 9337М wire from the М891-6 relay and connect it to the М891-3 
relay according to the B574 493X wiring diagram. 
 Disconnect the 9552М wire from the М891-2 relay and connect it to the М891-B 
relay according to the B574 493X wiring diagram. 
 Disconnect the 9553М wire from the М891-B relay and connect it to the М891-5 
relay according to the B574 493X wiring diagram. 
 Disconnect the 9364M wire from the M891-4 relay and connect it to the M891-5 
relay (together with the 9553M and 9552M wires) according to the B574 493X 
wiring diagram. 
 Disconnect the 9363M wire from the M897-4 (or M897-2) relay (unfasten it from 
a cable harness) and connect it to the V900 ground according to the B574 493X 
wiring diagram. 
 Disconnect the 9412М wire from the М892-6 relay and connect it to the М892-3 
relay according to the B574 493X wiring diagram. 
 Disconnect the 9557М wire from the М892-2 relay and connect it to the М892-B 
relay according to the B574 493X wiring diagram. 
 Disconnect the 9359М wire from the М892-B relay and connect it to the М892-5 
relay according to the B574 493X wiring diagram. 
 Disconnect the 9352M wire from the M892-4 relay and connect it to the M892-5 
relay (together with the 9359M and 9557M wires) according to the B574 493X 
wiring diagram. 
 Disconnect the 9351M wire from the M898-4 (or M898-2) relay (unfasten it from 
a cable harness) and connect it to the V900 ground according to the B574 493X 
wiring diagram. 
 Install back the M891 and M892 relays. 
 Install back the bracket with the M897 and M898 relays.

### Page 5

L410UVP-E/143a  Page: 5 
Revision 2  Pages: 8 
Function check of the TCL microswitch of the propeller pitch lock system 
 Disconnect the BETA feedback lever from the connecting rod - see Fig. 1. 
 
Fig. 1 
 Disconnect the M893 connector of the propeller pitch lock (component of the 
P-W22-1 propeller governor) on the LH / RH engine - see Fig. 2. 
 
Fig. 2

### Page 6

Page: 6  L410UVP-E/143a 
Pages: 8  Revision 2 
 Connect the voltmeter to the „A“ and „B“ pins on the M893 flange connector on the 
LH / RH engine. Connect the red wire of voltmeter (+ voltage pole) on the „A“ pin 
and the black wire of voltmeter (- voltage pole, ground) to the „B“ pin. Set the appro-
priate range of voltage to min. 30 V DC on the voltmeter. 
 
Fig. 3 
 Verify the LH / RH TCL is set in the idle position in the cockpit. 
 Install the airplane accumulators according to the MM, chap. 024.30.04.A. 
 Switch on the BATTERY I, II switches and the ELU LH / RH, CWD LH ENGINE, 
AIRFRAME, ELECTRO, RH ENGINE circuit breakers on the overhead panel in the 
cockpit. 
 Verify the PITCH LOCK circuit breaker on the circuit breakers panel in the cockpit is 
ON. 
 Press the PROPELLER PITCH LOCK TEST button on the LH control panel. During 
the pressing and holding this button the BETA RANGE and LIMITER ACTIVE cells 
(on the CWD of LH / RH engine) and PROPELLER PITCH LOCK cell (on the 
instrument panel glareshield - LH / RH) shall light and at the same time voltage 
about +28 V DC shall be indicated on the voltmeter, which is connected on the 
M893 flange connector on the LH / RH engine. 
 Move the LH / RH TCL in the cockpit over their full range (from the idle to max. 
power) and check that the +28 V DC voltage is always on the M893 flange con-
nector of the LH / RH engine.

### Page 7

L410UVP-E/143a  Page: 7 
Revision 2  Pages: 8 
 Move the LH / RH TCL in the cockpit to the BETA area and check that the +28 V DC 
voltage on the M893 flange connector of the LH / RH engine has disappeared (vol-
tage range from 0 to 1.5 V) and at the same time the PROPELLER PITCH LOCK 
cell (on the instrument panel glareshield - LH / RH) has gone off. 
 Release the PROPELLE R PITCH LOCK TEST button and switch off the ELU LH 
/ RH, CWD LH ENGINE, AIRFRAME, ELECTRO, RH ENGINE circuit breakers and 
BATTERY I, II switches on the overhead panel. 
 Connect back the M893 connector of propeller pitch lock on the LH / RH engine. 
 Connect the BETA feedback lever to the connecting rod - see Fig. 1. 
C. TESTS 
NOTE 
Implementation of the GEAC service bulletin SB-H80-76-00-00-0036 
is recommended before undermentioned check. 
 Check the propeller pitch lock f unction according to the AFM, Sec. 4 „Engine 
starting“. Carry out the check on the Maximum take-off power and Maximum 
reverse power according to the Airplane Flight Manual. 
D. FINISHING WORK 
 Install the bottom cowling of t he LH and RH engine according to the MM, chap. 
054.00.01. 
 Install the side covers of the control panel in the cockpit according to the MM, 
chap. 031.12.00. 
 Install back the airframe de-icing control box on the RH control panel. 
 Install back the PFD on the RH instrument panel. 
 Install the RH instrument panel according to the MM, chap. 031.11.00. 
 Insert the Supplements and L410UVP-E/259d documentation bulletin into the 
respective airplane manuals. 
3. NECESSARY MATERIAL 
A. INSTALLATION PARTS DELIVERED  BY THE AIRPLANE MANUFACTURER 
Pos. AI Identifier Name Pcs/Aircraft
1 3105 6314 M3x14 Screw, DIN 84 A 1 
2 3372 0003 M3 Lock nut, ONL 3248 1 
3 3565 5632 3.2 Washer, DIN 125-1A 2

### Page 8

Page: 8  L410UVP-E/143a 
Pages: 8  Revision 2 
4. RECORD IN THE AIRPLANE LOGBOOK 
Modification of the electrical circuit of the propeller pitch lock system function test has 
been performed according to the L410UVP-E/143a Revision 2 mandatory bulletin. 
Date: ....................…… Performed: .. ..................................................... 
 (legible signature of v erification engineer) 
Elaborated by: Ing. Zdeněk Klofáč 
Checked by: Ing. Pavel Ulrich

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
