# APPH Service Bulletin 32-19: Revision 4

- Rights: © APPH. Filed by the FAA in regulations.gov docket FAA-2014-0020; AD 2014-07-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [APPH Service Bulletin 32-19](https://openairdocs.org/service-documents/apph/sb-32-19.md)
- Title as filed: U.S. DOT/FAA - APPH 32-19
- Pages: 9
- PDF: https://openairdocs.org/files/sha256/3f/fb/3ffb7f787caf044b7ee5e00398328361c038e6c37988b59eca82289de3f1aad1
- Page: https://openairdocs.org/service-documents/apph/sb-32-19/file/3ffb7f787caf

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

apph
SERVICE BULLETIN 32-19
LETTER OF TRANSMITTAL
Tor
Revision 4
Issued: - April 3rd 2013  By:- Technical Publications
APPH Ltd
Engineering Division
Unit 1 Pembroke Court
Manor Park, Runcorn
Cheshire
WA7 1TG
England
ACTION  REASON
(1)  revised service bulletin 32-19 Rev 4.  Destroy the existing service bulletin  32-19 Rev 3 and replace with the  Figure 2 revised.  Repair procedure revised,
Date of initial issue: December 19th 1985
Date of revision 1: Not Known
Date of revision 2: April 4th 1989
Date of revision 3: March 16th 1990
Signed.  G CI
Chief Design Engineer
Date..  1/04113
Letter of Transmittal No. 4
Page 1 of 1

### Page 2 (OCR)

apph
BBA Aviation  APPH Ltd.
Engineering Division, Unit 1, Pembroke Court, Chancellor Road, Manor Park, Runcorn,
Cheshire, WA7 1TG, England.
FAX (+44) 01928 579626 TEL (+44) 01928 532600
SERVICE BULLETIN
32-19
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
1.  PLANNING INFORMATION
A.  Effectivity
(1) Aircraft:  Jetstream
(2) Unit:  MLG
(3) Part Numbers:  Port Types  1863 (Pre strike off 3)
1863/4A, 1863/4B and 1863/4C
(Pre Mod 86-04-003 Re-issue 6)
B00A702850A (Pre strike off 7)
B00A702925A (Pre strike off 5)
Starboard Types  1864 (Pre strike off 3)
1864/4A, 1864/4B and 1864/4C
(Pre Mod 86-04-003 Re-issue 6)
B00A702851A (Pre strike off 7)
B00A702926A (Pre strike off 5)
B. Reason
A crack has been found in a cylinder attachment spigot during routine inspection after a
landing gear removal. Investigation has attributed the cause to stress corrosion.
C.  Description
This Service Bulletin requires an inspection to be made for signs of cracks on the cylinder
attachment spigot housing. Compliance with this Service Bulletin is not required when SB
D.  Compliance
The technical content of this Service Bulletin is subject to EASA AIRWORTHINESS
DIRECTIVE consultation and must be accomplished at the next and subsequent
overhauls. The inspection must also be carried out on spare or overhauled landing gear
before installing into the aircraft. On installed landing gear the inspection should be carried
out within 300 landings or 3 calendar months whichever is the sooner and repeated
thereafter at 1200 landings or 1 calendar year whichever is the sooner. It is recommended
that intermediate visual inspection be carried out to aircraft manufacturers instructions. It
is also recommended that the inspection be carried out at 300 landings or 3 months after
a heavy landing has occurred.
December 19 / 85
Revision 4 April 3rd 2013  32-19
Page 1

### Page 3 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
E. Approval
The technical content of this bulletin is approved under the authority of Design
Organisation Approval No. DOA. EASA.21J.131.
F.  Manpower
Assuming the main gear to be in service allow two manhours to complete the work detailed
in Section 2 of this bulletin.
G. Material, cost and availability
Not applicable
H. Special Tools
Not applicable
Weight Change
None
J. References
BAE SYSTEMS Regional Aircraft Service Bulletin 32-A-JA851226.
K. Other Publications Affected
Recommended Maintenance Schedule Publication No. J/PSD/RMS/80.
This Service Bulletin amplifies the Special Instructions contained within the
Recommended Maintenance Schedules, Section 3, Page 4, Para, 4.1.2, but
does not constitute substitution for these Special Instructions.
2. ACCOMPLISHMENT INSTRUCTIONS
The MLG must be removed from the aircraft.
A.  Inspect the cylinder attachment spigot housing.
(1) Clean the areas to be inspected, refer to Figure 1.
(2)  Carry out the Non Destructive Test (NDT) examination in accordance with the
procedure given in 2.B., or approved equivalent.
If the protective finish shows signs of lifting or cracking, affected areas are to
be cleaned back to bare metal and re-inspected.
December 19 / 85  32-19
Revision 4 April 3rd 2013  Page 2

### Page 4 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
B. Carry out Non Destructive Test, refer to Figures 3 and 4.
()  Equipment and Materials
(a)  Hocking Locator UH' test set or equivalent.
(D)  Standard calibration block NFE.
(C)  Shielded spade probe NFE 2 MHz.
(a)  0,08 - 0,1 mm PTFE tape.
(2) Instrument Setting and Calibration
Operating mode: Zero limit
Alarm:  Continuous
Frequency:  2 MHz
Metal selector  Al. Mg.
(a) Attach PTFE cover or tape to probe tip. With probe connected, carry out initial
setting-up and balancing procedure on equipment with probe on standard
NFE calibration block in accordance with manufacturers instruction.
(b) Use Sensitivity/Gain control, calibrate equipment to give 80% full scale
deflection on meter from 0,5 mm deep slot in standard calibration block.
(c) Adjust lamp and buzzer alarm to operate at 20% of full scale deflection.
The above procedure is based on the use of EC52 issue 2, eddy current
test equipment. If other equipment is used, approved equivalent
apparatus, materials, instrument settings and calibration must be
employed.
(3) Procedure
(a)  Position probe in scan areas A and B, refer to Figures 1 and 3. Position the
equipment and check the probe lines up with the scan area, then zero the
equipment.
Carry out a series of tight zig-zag scans at probe width intervals to examine
the complete scan area.
(c)  Position the probe in scan areas C and D, refer to Figures 1 and 4. Position
the equipment and check the probe lines up with the scan area, then zero the
equipment.
(d)  Carry out a series of tight zig-zag scans at probe width intervals to examine
the complete scan area.
December 19 / 85  32-19
Revision 4 April 3rd 2013  Page 3

### Page 5 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
(e) Any indication which cannot be attributed to edge, geometric, ferrous effect
or probe handling is to be considered a defect.
(T)  Care must be taken to ensure the probe is kept normal to the scan surface and
the scan is carried out as close to the machined flat edge and steel spigot as
possible.
(g)  Small cracks may be repaired as shown in Figure 2, to a maximum permissible
depth of 0.10 inch measured from the face of the spigot housing.
NOTE  Two or more cracks of any depth, or a single crack in excess of 0.10 inch
depth, are cause for rejection and replacement of the affected landing gear
leg.
(h) Reprotect any areas where the protective treatment has been removed using
Alocrom 1200. Paint all areas with primer followed by polyurethane paint,
except area 'C'. DO NOT PAINT AREA 'C' WITH PRIMER AND
POLYURETHANE PAINT EXCEPT ANY MINOR LOCAL REPAIRS.
C.  Method of identification
(1)  Record the incorporation of this Service Bulletin in the appropriate aircraft log book
and in the log cards for the port and starboard main gear.
(2)  The results of this inspection, whether cracks are found or not are to be reported to
Customer Technical Support at:
Customer Technical Support (Building 37)
BAE Systems (Operations) Ltd
Prestwick International Airport
Ayrshire, KA9 2RW
Scotland
Fax: +44 (0) 1292675432
email: raengliaison@baesystems.com
3.  MATERIAL INFORMATION
Not applicable
4.  ISSUING AUTHORITY
The technical content of this document is approved under the authority of
DOA number EASA.21J.131.
Signed.
APPH LIMITED
Date !іo4!!3
December 19 / 85
Revision 4 April 3rd 2013  32-19
Page 4

### Page 6 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
POSITION WHERE
CRACK INITIATES
AREA A
POSSIBLE PATH
OF CRACK
POSITION WHERE
CRACK INITIATES
AREA B
INSPECT THE
WHOLE OF THE
AREA C  END FACE AT
BOTH ENDS
AREA D
NOTE:
SHADED AREAS INDICATE WHERE
INSPECTION IS TO TAKE PLACE
Scan Areas
Figure 1
December 19 / 85  32-19
Revision 4 April 3rd 2013  Page 5

### Page 7 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
SMOOTH BLEND
I APPLY ALOCROM ONLY TO
THE FACE OF AREA 'C'.
THE FACE OF AREA 'D' CAN
BE REPAIRED WITH ALOCROM,
PRIMER AND PAINT.
0.50 INCH
MIN RAD
ANY LOCAL REPAIRED
0.50 INCH  SURFACES CAN BE REPAIRED  WITH ALOCROM, PRIMER AND
PAINT.
0.10 INCH
MAX
V
NOTE:
REPAIR TO HAVE POLISHED FINISH,
FREE FROM TOOL MARKS
Local Repair
Figure 2
December 19 / 85  32-19
Revision 4 April 3rd 2013  Page 6

### Page 8 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
MACHINED FLAT  TYPICAL SCAN PATH  EXPECTED DEFECT
SCAN AREA
1.5 INCH MIN  SPIGOT
Scan Areas A and B
Figure 3
December 19 / 85  32-19
Revision 4 April 3rd 2013  Page 7

### Page 9 (OCR)

apph
BBA Aviation
MLG ASSEMBLY - INSPECT CYLINDER ATTACHMENT SPIGOT HOUSING
MACHINED FLAT  , EXPECTED DEFECT
TYPICAL SCAN PATH
SCAN AREA
Scan Areas C and D
Figure 4
December 19 / 85  32-19
Revision 4 April 3rd 2013  Page 8

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
