# BAE Systems Service Bulletin 27-JM5350: Revision 1

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2021-0961, the docket of AD 2022-03-18. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Service Bulletin 27-JM5350](https://openairdocs.org/service-documents/bae-systems/27-jm5350.md)
- Title as filed: Jetstream Series 3100_3200 SB 27-JM5350 Revision 1
- Pages: 17
- PDF: https://openairdocs.org/files/sha256/67/90/6790f5e4fbd5fc3be1b8ca12664bc2181012cb9981420b5416ddbe92aa464a06
- Page: https://openairdocs.org/service-documents/bae-systems/27-jm5350/file/6790f5e4fbd5

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

JETSTREAM
Series 3100/3200
SERVICE BULLETIN
27-JM 5350
Printed in U.K.
REVISION NO.1
Effectivity
Jetstream Series 200,
Series 3100 and Series
3200 Aircraft
This page transmits Revision No.1 to Service Bulletin 27-JM 5350
which at Original Issue consisted of 15 pages.
Title:  Flight Controls - Introduction of Modified Push Rod
Assembly at Gustlock/Power Lever Baulk Mechanism.
(Modification JM 5350)
This revision is issued to up-grade the status of the bulletin
from OPTIONAL to OPTIONAL - HIGHLY RECOMMENDED.
Aircraft on which the bulletin, at original Issue, has already
been accomplished, require no further rework.
Remove and destroy pages 1, 2 and 3 at original Issue standard.
Insert new pages 1, 2 and 3 at Revision No.1 standard.
All other pages remain at Original Issue.
ORIGINAL ISSUE May 6/94  PAGE 1 OF 1

### Page 2

(No text on this page.)

### Page 3 (OCR)

JETSTREAM
Series 3100/3200
SERVICE BULLETIN
27-JM 5350
TITLE:  FLIGHT CONTROLS - INTRODUCTION OF MODIFIED PUSH ROD
ASSEMBLY AT GUSTLOCK/POWER LEVER BAULK MECHANISM
(MODIFICATION JM 5350)
1. PLANNING INFORMATION
A. Effectivity
Jetstream Series 200, Series 3100 and Series 3200 Aircraft
up to and including constructors number 927, and from
constructors number 929 to 936 inclusive.
B. Reason
operators have reported that both power levers were able to
be pushed into the flight range, with the gust lock lever
fully engaged.
So ver bai ace as found to be bent. bent.a1o, in the porest
Embodiment of this service bulletin installs a stronger
push rod assembly.
C. Description
This service bulletin affects the push rod assembly on the
gust lock/power lever baulk mechanism in the flight
compartment centre console.
Retrospective embodiment is achieved by gaining access to
and removing the existing push rod assembly.  A new push
rod assembly is installed to reconnect the power lever
baulk mechanism to the gust lock system.
The work requires that the system is functionally tested.
A duplicate inspection is to be carried out.
ORIGINAL ISSUE FEB 26/92  27-JM 5350
REVISION NO.1 May 6/94  PAGE 1

### Page 4 (OCR)

JETSTREAM
SERVICE BULLETIN
The work is affected by the following modifications:
MOD 7561  Introduction of gust lock disengagement at
(Mandatory)  or before 50% of operating lever travel
plus revised lock units with improved
efficiency.
MOD 7669  Introduction of improved gust
lock system.
MOD 7689A -  Introduction of revised gust lock control
system (retrospective embodiment).
MOD 7689B -  Introduction of positive means of
disengaging gust locks (production
embodiment).
D. Approval
This service bulletin has been classified as OPTIONAL.
R  Jetstream Aircraft Ltd. HIGHLY RECOMMEND accomplishment of
R  this bulletin at the earliest opportunity. The technical
content of this bulletin is approved under the authority of
R  CAA Approval No. DAI/9386/92.
F. Manpower
6 manhours
F. Material Price and Availability
Indicative price £173.00 excluding taxes. The above
information is provided for planning purposes only, and is
based on pricing prevailing at the time of issue of this
bulletin.
Firm prices may be obtained from the Spares Manager,
Customer Support, Jetstream Aircraft Itd., Prestwick
Airport, Ayrshire, KA9 2RW, Scotland.
G. Tooling - Cost and Availability
No special tools are required, only those items of ground
equipment or tools that may be specified in the aircraft
technical manuals referred to in the accomplishment
instructions in this service bulletin.
H. Weight and Balance
None
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 2  REVISION NO.1 MaY 6/94

### Page 5 (OCR)

JETSTREAM
SERVICE BULLETIN
I. References
Jetstream Series 3100 and Series 3200 Aircraft Maintenance
Manual, Chapters 24, 25, 27 and 76.
Jetstream Series 200 Aircraft Maintenance Manual, Chapters
19, 30, 40 and 55.
J. Publications Affected
The following aircraft manuals are affected:
LIK  Maintenance Manual
Illustrated Parts Catalogue
Operators must advise the Technical Publications Manager,
R  Jetstream Aircraft Ltd., Prestwick Airport, Ayrshire, KA9
2RW, Scotland, of the accomplishment of this service
bulletin and request the necessary revision for the
affected manuals.
Operators of Jetstream Series 200 aircraft are advised that
the content of this service bulletin can be used with
current manuals.
R  K. This service bulletin has been clasified as OPTIONAL.
R  Jetstream Aircraft Ltd., HIGHLY RECOMMEND the
R  accomplishment of this service bulletin at the earliest
R
R  This service bulletin complies with British Civil
R  Airworthiness Requirements, Section A, Chapter A2-5.
R  Signed  P Seeles..
R  Date  38 Маз 1994
R  CAA Approval Number DAI/9386/92.
ORIGINAL ISSUE FEB 26/92  27-JM 5350
REVISION NO.1 May 6/94  PAGE 3

### Page 6 (OCR)

JETSTREAM
SERVICE BULLETIN
Printed in the UK
THIS PAGE IS INTENTIONALLY BLANK
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 4

### Page 7 (OCR)

JETSTREAM
SERVICE BULLETIN
2. ACCOMPLISHMENT INSTRUCTIONS
WARNING:  MINIMUM CLEARANCE BETWEEN MOVING AND STRUCTURAL
PARTS MUST BE 0.20IN. (5.08MM) UNLESS OTHERWISE
STATED. FOR AIRCRAFT WITH CONSTRUCTOR'S NUMBER 931
AND ABOVE, THE CLEARANCE MAY REDUCE TO
0.05IN. (1.28MM) AT THE FOLLOWING POINTS (REFER TO
FIGURE 6).
(1) BETWEEN THE RUDDER LOCK HORIZONTAL CONTROL ROD
AND THE EDGE OF THE HOLE THROUGH BULKHEAD STN.463.
(i1) BETWEEN THE ELEVATOR LOCK CONTROL ROD AND THE
RUDDER LOCK BELLCRANK BRACKET MOUNTED ON BULKHEAD
STN.463.
CAUTION:  TO AVOID DAMAGE, MAKE SURE BEFORE MOVING CONTROLS
THAT CONTROL RUNS AND CONTROL SURFACES ARE FREE
FROM OBSTRUCTION.
DUPLICATE INSPECTION
WHENEVER ANY PART OF THIS SYSTEM IS DISMANTLED, ADJUSTED,
REPAIRED OR RENEWED, DETAILED INVESTIGATION MUST BE MADE  ON
COMPLETION TO ENSURE THAT DISTORTION, TOOLS, RAGS OR ANY OTHER
LOOSE ARTICLES OR FOREIGN MATTER SUCH AS COULD IMPEDE THE FREE
MOVEMENT AND SAFE OPERATION OF THE SYSTEM ARE NOT PRESENTI  AND
THAT THE SYSTEMS AND INSTALLATIONS IN THE WORK AREA ARE CLEAN.
WHENEVER ANY PART OF EITHER THE MAIN OR ANY OTHER ASSOCIATED
SYSTEM IS DISMANTLED, ADJUSTED, REPAIRED OR RENEWED, THAT PART OF
THE SYSTEM THAT HAS BEEN DISTURBED SHALL BE SUBJECTED TO A
DUPLICATE INSPECTION FOR SECURITY OF LOCKING DEVICES, FULL AND
FREE MOVEMENT, DIRECTION AND TENSION CHECKS AND, FOR AIRCRAFT ON
THE UNITED KINGDOM REGISTER, THE COMPLETION OF THIS WORK SHALL BE
CERTIFIED IN ACCORDANCE WITH THE BRITISH CIVIL AIRWORTHINESS
REQUIREMENTS, SECTION A, CHAPTER A5-3.
CAUTION:  EXERCISE EXTREME CARE, AS IT MAY BE DIFFICULT TO
RETRIEVE ITEMS INADVERTENTLY DROPPED IN THE FLIGHT
COMPARTMENT CENTRE CONSOLE.
Note:  Statements MM refer to the Jetstream Series 3100
and Series 3200 Aircraft Maintenance Manual,
Jetstream Series 200 Aircraft Maintenance Manual
references follow in brackets.
A. Preparation
(1)  Render the aircraft electrically safe in accordance
with the MM, Chapter 24 (55).
ORIGINAL ISSUE FEB 26/92  27-JM 5350
PAGE 5

### Page 8 (OCR)

JETSTREAM
SERVICE BULLETIN
Remove the right hand crew seat and support structure.
in accordance with MM, Chapter 25 (30).
Remove the centre console right side panel and right
side trim panel in accordance with MM, Chapter 25
(30).
B. Accomplishment
(1)  Refer to Figures 1 and 2:
At push rod assembly, Part No. 1372011419, remove the
split pin and collar  from each end. Remove the
shackle pins and withdraw the push rod assembly.
Retain the collars and shackle pins, discard the split
pins.
Ensure the flight control gust locks are rigged in
accordance with MM, Chapter 27 (19). Ensure the power
levers are rigged in accordance with MM, Chapter 76
(40) .
(3)  Push the power levers fully forward and set the gust
lock operating lever to the position shown in Figure
3.
i.e.  0.60 † 0.03in from bottom of lever slot for the
following aircraft: constructors numbers 604,
703, 705, 707, 814, 818, 819, 821, 823, 824,
828, 830  to 833 incl., 835 to 837  incl. and  840
and above.
OR
1.20 ‡ 0.03in from bottom of lever slot for all
other aircraft.
ever in position ure  Insert a screw, washer and nut in the lever slot
and tighten to secure the gust lock operating
(4) Refer to Figures 2 and 5:
Hold the baulk mechanism against the baulk plates on
the power quadrant assembly.  Connect the new push rod
assembly, Part No. 137201E429, to the baulk lever.
Adjust the length until the shackle pin can be
inserted through the bellcrank lever and push rod
without disturbing the baulk mechanism.
(5)  Lubricate the shackle pins with Aeroshell Fluid 12
(MIL-L-6085 DEF STAN 91-49).
(6)  With the power levers in the FULL REVERSE position,
remove the securing screw, washer and nut, and set
lock operating handle to IN position.
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 6

### Page 9 (OCR)

JETSTREAM
SERVICE BULLETIN
(7)  Push both power levers forward until the baulk
engages.  Check that power levers are positioned
within the dimensions shown in Figure 4. The new push
rod assembly, Part No. 137201E429, may be shortened or
lengthened by up to two turns to achieve this.
(8)  Adhere a piece of adhesive tape on the panel alongside
the gust lock operating handle (see Figure 3).
(9)  Slowly move the gust lock operating handle from the IN
position towards the oUr position, while applying
slight pressure to test for movement on the rudder,
elevator and aileron controls. At the point where all
nree controis are iree, mark the position oi tne
lower edge of the gust lock operating handle on the
adhesive tape.
(10)  Continue the movement of the gust lock operating
handle while applying forward pressure to both power
levers.  At the point where both power levers can be
advanced to FLIGHT, mark the position of the lower
edge of the gust lock operating handle on the adhesive
tape.
(11) The distance between the two marks is to be a minimum
of 0.30in.  To achieve this, the new push rod
assembly, Part No. 137201E429, may be adjusted.
(12) If any  adjustment is made at operation (11), repeat
operations (7),  (9), (10) and (11) until the power
levers are baulked and the gust lock disengagement
sequence can be achieved within limits.
(13) Remove the adhesive tape. Check that the gust lock
operating handle when released from IN, or any
intermediate position, returns to the oUT position.
(14) Check that when the power levers are baulked, each
lever can individually be moved into the FLIGHT range
while the other remains baulked.
C. Aircraft Recovery
(1)  Carry out a functional check of the gust lock system
in accordance with the MM, Chapter 27 (19).
(2)  Carry out a Duplicate Inspection of the gust lock
control system.
ORIGINAL ISSUE FEB 26/92  27-JM 5350
PAGE 7

### Page 10 (OCR)

JETSTREAM
SERVICE BULLETIN
(3)  Carry out a check for loose articles in the work area
and install the console side panels in accordance with
the MM, Chapter 25 (30).
(4)  Install the right hand seat and support structure in
accordance with the MM, Chapter 25 (30).
(5)  Ensure the work area is clean and clear of tools and
miscellaneous items of equipment.
(6)  Record in the relevant aircraft documents the
embodiment of Modification JM 5350.
Note:  Operators are reminded of the necessity to inform
British Aerospace of the accomplishment of this
service bulletin in order to obtain the necessary
revisions for the affected manuals, see para 1.J.
- Publications Affected - of this bulletin.
Note:  Operators are reminded that is is their
responsibility to amend the aircraft weighing
report, if necessary, in accordance with the
weight  and balance changes given at para. 1.H. of
this bulletin.
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 8

### Page 11 (OCR)

JETSTREAM
SERVICE BULLETIN
LOCATION OF
PUSH ROD
137201E419
PUSH ROD
(137201E419)
FIGURE 1
ORIGINAL ISSUE FEB 26/92  27-JM 5350
PAGE 9

### Page 12 (OCR)

JETSTREAM
SERVICE BULLETIN
REMOVE AND RETAIN
PIN (SP4YB4)
REMOVE AND REJECT
PUSH ROD ASSEMBLY
SPLIT PIN (SP90C4)
(137201E419)
REMOVE AND RETAIN
PIN (SP4YB4)  Printed in the UK
REMOVE AND REJECT
, SPLIT PIN (SP90C4)  PRE-MOD
REMOVE AND RETAIN
COLLAR (S135C)
- PIN (SP4YB4)
PUSH ROD ASSEMBLY
SPLIT PIN (SP90C4)
(137201E429)
PIN (SP4YB4)
SPLIT PIN (SP90C4)  POST-MOD
- COLLAR (S135C)
REMOVAL/INSTALLATION OF PUSH ROD
FIGURE 2
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 10

### Page 13 (OCR)

JETSTREAM
SERVICE BULLETIN
GUST LOCK
OPERATING LEVER
FOR AIRCRAFT WITH
CONSTRUCTOR'S Nos.-
604;703;705;707;814;
818;819;821;823;824;
828;830 to 833 Inc.;  835 to B37 Inc.;and  SECURING SCREW,  WASHER AND NUT
840 and above,
THIS DIMENSION 0.60 + 0.03 In.
FOR ALL OTHER AIRCRAFT  OU
THIS DIMENSION 1.20 = 0.03 In.
ADHESIVE TAPE
FIGURE 3
ORIGINAL ISSUE FEB 26/92  27-JM 5350
PAGE 11

### Page 14 (OCR)

JETSTREAM
SERVICE BULLETIN
Printed in the UK
0.25 in (6.35 mm) MAX  0.06 in (1.5 mm) MIN
- POWER LEVER
FORWARD
FLIGHT IDLE  GUIDE PLATE
POSITION
POWER LEVER SETTING
FIGURE 4
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 12

### Page 15 (OCR)

JETSTREAM
SERVICE BULLETIN
POWER LEVERS
FEATHEA LEVEAS
NEW PUSH ROD
ASSEMBLY
CONNECTED HERE
PUSE AGAINST BAULK
MECHANISM HERE UNTIL
PLUNGER IS HARD
AGAINST BAULK PLATES
ON POWER QUADRANT
ASSEMBLY
FORWARD
PLUNGER  POWER QUADRANT
FIGURE 5
ORIGINAL ISSUE FEB 26/92  27-JM 5350
PAGE 13

### Page 16 (OCR)

JETSTREAM
SERVICE BULLETIN
FORWARD
RUDDER HINGE  LINE
PART VIEW LOOKING
RIGHT ON RUDDER
RUDDER GUST LOCK  AND ELEVATOR LOCK
CONTROL RODS
BULKHEAD  STN 463.0  AUDDER LOCK
HORIZONTAL CONTROL POD
PART No. 1379159E401
SKIN PROFILE 463.0
BIAS SPRING
B
RUDDER LOCK
VERTICAL CONTROL ROD  PART VIEW
PART No. 1379155E403
LOOKING AFT ON
BULKHEAD 463.0
ELEVATOR LOCK
CONTROL ROD  PART No. 1379155E401  HORIZONTAL DATUM
NOTE: The clearance between
moving parts in areas
'A' and 'B' may
reduce to 0.05 in.
(1.28 mm) with gust  LAYSHAFT
locks engaged.
AIRCRAFT 931 AND ABOVE
FIGURE 6
27-JM 5350  ORIGINAL ISSUE FEB 26/92
PAGE 14

### Page 17 (OCR)

JETSTREAM
SERVICE BULLETIN
3. MATERIAL INFORMATION
Note:  The following material data is provided on a 'per'
aircraft basis.
A. New parts supplied as modification kit
New P/N  Oty  Keyword  Old P/N  Instruction
Disposition
137201E429  1  Push Rod  137201E419  New part
Assembly
B. Parts to be re-worked
None
c. Old parts not re-usable
137201E419  Push Rod Assembly
D. Old parts re-usable on pre-mod aircraft
None
E. Replacement parts - operators supply
SP90C4  Split pin  A/R
Lubricant -  Aeroshell Fluid 12 - US spec MIL-L-6085
- UK spec DEF STAN 91-49
ORIGINAL ISSUE FEB 26/92  27-JM 5350
PAGE 15

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
