# BAE Systems Service Bulletin 32-A-JA851226: Revision 5

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2014-0020; AD 2014-07-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Service Bulletin 32-A-JA851226](https://openairdocs.org/service-documents/bae-systems/32-a-ja851226.md)
- Title as filed: U.S. DOT/FAA - 32-A-JA-851226
- Pages: 13
- PDF: https://openairdocs.org/files/sha256/e1/d2/e1d29a367b98ef1b694ed1e70691ab8a9663ddc10844de8989e4d2eb4991ee94
- Page: https://openairdocs.org/service-documents/bae-systems/32-a-ja851226/file/e1d29a367b98

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERIES 3100 & 320
SERVICE BULLETIN
BAE SYSTEMS (OPERATIONS) LIMITED,
PRESTWICK INTERNATIONAL AIRPORT,
AYRSHIRE, KA9 2RW,
SCOTLAND.
TRANSMITTAL SHEET
This page transmits Revision 5 to Service Bulletin 32-A-JA851226 Pages 1 to 10.
TITLE: LANDING GEAR - TO INTRODUCE NDT AND VISUAL INSPECTIONS OF MAIN
LANDING GEAR PINTLE HOUSING FOR CRACKS.
AMENDMENT JA 851226
INSPECTION
REASONS FOR REVISION
Clarification of access during non-destructive testing inspection, and revision to the instructions for
reprotection of the yoke pintle.
Re-format Service Bulletin to the latest standard.
DETAILS OF CHANGES
Page 1 - Vendor Service Bulletin 32-19 up issued to Revision 4.
Page 2 - Summary of tasks involved included and Vendor Service Bulletin 32-19 up issued to
Revision 4.
Page 3 - Vendor Service Bulletin up issued to revision 4 and address of BAE SYSTEMS revised to
the latest standard. New paragraph added - Aircraft Noise Levels.
Page 4 - Approval statements revised to the latest standard.
Page 5 - Independent inspection statement revised to the latest standard.
Page 6 - Instruction added to remove special washer, if fitted, for access, vendor Service Bulletin
up issued to revision 4 and address of BAE SYSTEMS revised to the latest standard.
Page 7 - Address of BAE SYSTEMS revised to the latest standard and new recovery section
included.
INSTRUCTIONS FOR INCORPORATION
Remove complete Service Bulletin at Revision 4.
Add complete Service Bulletin at Revision 5.
Incorporation of this revision does not require rework of the inspections carried out by previous
revisions of this Inspection Service Bulletin.
ORIGINAL ISSUE: DEC 19/85
REVISION 5: 30th April 2013  32-A-JA851226
BAE SYSTEMS (Operations) Limited.  PAGE 1 OF 1
Printed in the U.K.

### Page 2 (OCR)

THIS PAGE INTENTIONALLY BLANK

### Page 3 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERiES 7100 & 3200
SERVICE BULLETIN
BAE SYSTEMS (OPERATIONS) LIMITED,
PRESTWICK INTERNATIONAL AIRPORT,
AYRSHIRE, KA9 2RW,
SCOTLAND.
32-A-JA851226
TITLE: LANDING GEAR - TO INTRODUCE NDT AND VISUAL INSPECTIONS OF MAIN
LANDING GEAR PINTLE HOUSING FOR CRACKS.
AMENDMENT JA 851226
INSPECTION
1.  PLANNING INFORMATION
A.  Effectivity
All HP 137 Mk1 Aircraft and Jetstream Series 200 Aircraft. Jetstream Series 3100
aircraft fitted with main landing gears as defined in APPH Service Bulletin 32-19
Revision 4 and APPH Service Bulletin 32-40 (this inspection service bulletin applies to
main landing gears with a microswitch hole in the cylinder).
B.  Reason
Cases have been reported of cracks in the yoke pintle housing for the landing gear
attachment spigot of the main leg forging. The cracks were found during routine landing
gear removal, and have been attributed to stress corrosion. Inspections are required to
prevent hazardous development of cracks.
In those legs incorporating a hole for the microswitch, in-service cracking of the main
landing gear cylinder has been reported during routine landing gear removal. The
cracking is in the vicinity of the yoke pintle housing.
The cracking was due to fatigue. If left unchecked these cracks could grow to such an
extent that structural failure of the main landing gear could occur.
C.  Description
This Inspection Service Bulletin (ISB) introduces APPH Service Bulletin (SB) 32-19
Revision 4 and APPH SB 32-40, which calls for NDT inspections of the pintle housings
on the main landing gear for cracks. In order to carry out the NDT inspections it is
necessary to remove the main landing gear legs.
Revision 5 of this ISB introduces an additional instruction to remove and subsequently
reinstall the special washer, to improve access to carry out the inspection, on those
aircraft that are post mod JM7862.
ORIGINAL ISSUE: DEC 19/85  32-A-JA851226
REVISION 5: 30"h April 2013  PAGE 1 of 10
BAE SYSTEMS (Operations) Limited.
Printed in the U.K.

### Page 4 (OCR)

IRITISH AEROSPAC
JETSTREAM
SERIES 3100 & 3200
SERVICE BULLETIN
APPH SB 32-19 Revision 4 calls for an inspection of the microswitch hole (if the
microswitch hole is there) at the main landing gear cylinder web in accordance with
APPH SB 32-40. The inspection of the microswitch hole may be done with the yoke
pintle housing inspection. APPH SB 32-19 Revision 4 also revises the instructions for
reprotection of the yoke pintle.
Work comprises:-
- Removing electrical power from aircraft.
Part A
- Jacking the aircraft.
- Removing main landing gear leg, and special washer if fitted (post mod JM7862).
- Doing an NDT of the pintle housings of the main landing gear for cracks.
Installing the main landing gear leg.
- Lowering aircraft and remove aircraft jacks.
Part B
- Doing a visual inspection of the pintle housings of the main landing gear for signs of
cracking and corrosion damage.
- Doing a confirmatory NDT inspection if necessary.
Part C
NOTE: Part C is only required if there is a microswitch hole in the main landing gear
cylinder web.
- Jacking the aircraft.
- Remove the main landing gear leg.
- Doing an NDT of the microswitch hole in the main landing gear cylinder web.
Installing the main landing gear leg.
- Lowering aircraft and remove aircraft jacks.
Parts A, B and C
- Amending the aircraft records.
D.  Manpower
14 manhours.
This does not include NDT inspection time in accordance with APPH Service Bulletin
32-19, Revision 4 and APPH Service Bulletin 32-40.
Mechanical and electrical skills are necessary.
Material - Cost and Availability
Not applicable.
32-A-JA851226  ORIGINAL ISSUE: DEC 19/85
PAGE 2  REVISION 5: 30hh April 2013
Printed in the U.K.

### Page 5 (OCR)

JETSTREAM  IRITISH AEROSPACE
SERIES 3100 & 3200
SERVICE BULLETIN
F.  Tooling - Price and Availability
The specialist NDT equipment detailed in APPH Service Bulletin 32-19, Revision 4 and
APPH Service Bulletin 32-40 or equivalent equipment will be required during
accomplishment of that Service Bulletin.
Cost and availability is by arrangement between the customer and BAE SYSTEMS.
G.  Weight and Balance
None.
Aircraft Noise Levels
Aircraft noise is not affected.
Electrical Load Data
Not affected.
J.  Software Accomplishment Summary
Not applicable.
K.  References
APPH Service Bulletin 32-19 Revision 4 or later.
APPH Service Bulletin 32-40.
Revision 3 Maintenance Manual (HP 137 Mk. 1) Aircraft Servicing Manual (Jetstream
Series 200) Maintenance Manual (Jetstream Series 3100).
Maintenance Manual chapters 7, 24 and 32.
Servicing Manual chapters 3, 7,10 and 20.
L  Publications Affected
The following aircraft manuals are affected by this Inspection Service Bulletin.
Jetstream Series 3100 aircraft;
Maintenance Manual.
Maintenance Schedule.
Component Maintenance Manual.
Operators of HP137 Mk1 and Jetstream Series 200 aircraft are advised that the content
of this service bulletin can be used with current manuals.
Operators are requested to advise The Business Support Team, BAE SYSTEMS
(Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, SCOTLAND,
of the accomplishment of this ISB and request the necessary revisions for the affected
M.  Family Tree Of Modification Relationships
Not applicable.
ORIGINAL ISSUE: DEC 19/85  32-A-JA851226
REVISION 5: 30" April 2013  PAGE 3
Printed in the U.K.

### Page 6 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERIES 3100 & 3200
SERVICE BULLETIN
N.  Approval
The technical content of this ISB is the subject of EASA Airworthiness Directive
consultation.
For aircraft on the United Kingdom register, compliance with this service bulletin must
be achieved as follows:-
1.  The Non Destructive Test detailed in Part A of this bulletin must be
accomplished at the first convenient overhaul of the main landing gear or
within 300 landings or within 3 calendar months from receipt of this ISB,
whichever is the sooner, and must be repeated thereafter at every 1200
landings or within one calendar year, whichever is the sooner.
2.  Intermediate visual inspections, as detailed in Part B of the accomplishment
instructions of this ISB, must be accomplished at intervals of 300 landings or 3
3.  The Non Destructive Test detailed in APPH Service Bulletin 32-19, Revision 4
must also be accomplished within 3 calendar months or 300 landings,
whichever is the sooner, after a heavy or abnormal landing has occurred.
4.  Applicable only to aircraft fitted with main landing gear incorporating a
microswitch hole.
Part C of this bulletin must be accomplished at 10,600 landings followed by
repeat inspections every 1,200 landings.
If APPH Service Bulletin 32-40, at original issue, has already been
accomplished, then the threshold inspection requirements have been
satisfied. The 1,200 landings repeat inspection requirement will apply from
the date of the accomplishment of APPH Service Bulletin 32-40.
Any main landing gear in storage should be inspected prior to installation on
the aircraft, or by the end of 2003, whichever is the earlier.
5.  Accomplishment of BAe Service Bulletin 32-JA 880340 - Title - To introduce
main landing gear cylinders manufactured from L161 material, renders
compliance with this ISB unnecessary.
The technical content of the bulletin is approved under the authority of EASA Part 21
Approval No. EASA.21J.047.
Signed  . 313
Date  344/1)
EASA Part 21 Approval No. EASA.21J.047.
32-A-JA851226  ORIGINAL ISSUE: DEC 19/85
PAGE 4  REVISION 5: 30" April 2013
Printed in the U.K.

### Page 7 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERIES 3100 & 3200
SERVICE BULLETIN
2.  ACCOMPLISHMENT INSTRUCTIONS
WARNING: MAKE SURE THE AIRCRAFT AND THE AIRCRAFT SYSTEMS ARE MADE
SAFE AS DETAILED IN THE APPLICABLE CHAPTERS OF THE AIRCRAFT
MAINTENANCE MANUAL.
WARNING: THE MINIMUM CLEARANCE BETWEEN MOVING AND STRUCTURAL PARTS
MUST BE 0.2 IN (5.1 MM) UNLESS OTHERWISE STATED.
CAUTION: IF AN ELECTRICAL CONNECTION OR CONNECTOR IS DISMANTLED,
ASSEMBLED OR REPLACED, DO A CONTINUITY CHECK AND, IF
APPLICABLE, A SCREEN BONDING CHECK BEFORE THE ASSEMBLY IS
CONNECTED TO EQUIPMENT.
CAUTION:  OBSERVE THE ELECTRICAL SAFETY PRECAUTIONS IN MM CHAPTER 24
(22) (7).
NOTE: Abbreviations used in the accomplishment instructions of this service bulletin
are:
MM - Maintenance Manual.
SM - Servicing Manual.
NOTE:  Statements MM refer to Jetstream Series 3100 Aircraft Maintenance Manual
chapters. HP 137 Mk 1 Maintenance Manual and Jetstream Series 200 Aircraft
Servicing Manual references follow in parenthesis.
A.  Preparation
(1) Remove the aircraft power supply in accordance with MM, Chapter 24(22) (7).
(2) Jack the aircraft in accordance with MM, Chapter 7 (3) (7).
ORIGINAL ISSUE: DEC 19/85  32-A-JA851226
REVISION 5: 30" April 2013  PAGE 5
Printed in the U.K.

### Page 8 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERIES 2100 & 3200
SERVICE BULLETIN
B.  Accomplishment
Part A - NON DESTRUCTIVE TESTING
(1)  Remove main landing gear leg in accordance with MM, Chapter 32(10) (20).
(2)  Remove the special washer, if fitted for access (post mod JM7862).
(3)  Carry out the NDT inspection detailed in APPH Service Bulletin 32-19, Revision 4.
(4) Carry out any necessary repairs, as allowed in APPH Service Bulletin 32-19
Revision 4.
(5) Refit special washer previously removed for access.
(6) Install the main landing gear leg in accordance with MM, Chapter 32(10) (20).
Lower the aircraft from the jacks, in accordance with MM, Chapter 7(3) (7).
(8)  Report the results of the inspection, whether cracks are found or not, to the Fleet
Data Department, BAE SYSTEMS (Operations) Limited, Prestwick International
Airport, Ayrshire, KA9 2RW, Scotland.
PART B - VISUAL INSPECTION
NOTE:  This inspection may be carried out with the main landing gear leg in position.
Areas to be inspected are those detailed in APPH Service Bulletin 32-19
Revision 4, Non Destructive Test in scan area 'A' only.
(1)  Ensure that areas to be inspected are clean.
(2)  Visually inspect the areas for signs of cracking and corrosion damage, using a
good light source, magnifying glass and mirror.
Note:  If the protective finish shows signs of lifting or cracking, the affected areas
must be cleaned to the bare metal and re-inspected.
Carry out a confirmatory NDT inspection as detailed in Part A above, if the visual
inspection reveals suspicious indications of the presence of small cracks.
(4) Reprotect any areas where the surface finish has been removed using Alocrom
1200 followed by primer and polyurethane paint.
(5) Report the results of the inspections, whether cracks are found or not, to:-
Fleet Data Department, BAE Systems (Operations) Limited, Prestwick
international Airport, Ayrshire, KA9 2RW, Scotland.
32-A-JA851226  ORIGINAL ISSUE: DEC 19/85
PAGE 6  REVISION 5: 30th April 2013
Printed in the U.K.

### Page 9 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERIES 3100 & 3200
SERVICE BULLETIN
PART C - NON DESTRUCTIVE TEST OF THE MICROSWITCH HOLE.
(7)  Refer to MM, Chapter 24 (22) (7).
Make the aircraft is electrically safe.
(2)  Refer to APPH service bulletin 32-40.
Inspect the left and right main landing gears at the cylinder web for a microswitch
hole.
(a) If there is no microswitch hole.
Do step (8) below, no further action is required.
(b) If there is a microswitch hole do steps (3) to (8) below.
(3) Refer to MM, Chapter 7 (3) (7).
Jack the aircraft.
(4) Refer to MM, Chapter 32 (10) (20).
Remove main landing gear leg.
(5)  Do APPH service bulletin 32-40.
(6) Refer to MM, Chapter 32 (10) (20).
Install the main landing gear leg.
(7)  Refer to MM, Chapter 7 (3) (7).
Lower the aircraft from the jacks.
(8)  Report the results of the inspection, whether cracks are found or not, to the Fleet
Data Department, BAE SYSTEMS (Operations) Limited, Prestwick International
Airport, Ayrshire, KA9 2RW, Scotland.
C.  Recovery
(1)  Aircraft records:-
(a)  Record compliance with Part A of ISB 32-A-JA 851226 in all relevant aircraft
documents.
Record compliance with Part B of ISB 32-A-JA 851226 in all relevant aircraft
documents.
(C) Record the compliance with Part C of ISB 32 A JA851226 in all relevant
aircraft documents.
NOTE:  Operators are reminded of the necessity to inform;-
The Business Support Team, BAE SYSTEMS (Operations) Limited, Prestwick
International Airport, Ayrshire, KA9 2RW, SCOTLAND,
of the compliance with this ISB in order to obtain the necessary revisions for the
affected manuals, see paragraph 1.L. Publications Affected, of this bulletin.
ORIGINAL ISSUE: DEC 19/85  32-A-JA851226
REVISION 5: 30"h April 2013  PAGE 7
Printed in the U.K.

### Page 10 (OCR)

BRITISH AEROSPACE
JETSTREAM
SERiES 3100 & 3200
SERVICE BULLETIN
BLANK PAGE
32-A-JA851226  ORIGINAL ISSUE: DEC 19/85
PAGE 8  REVISION 5: 30th April 2013
Printed in the U.K.

### Page 11 (OCR)

HISH AEROSPAL
JETSTREAM
SERIES 3100 & 3200
SERVICE BULLETIN
3. MATERIAL INFORMATION
Not applicable.
ORIGINAL ISSUE: DEC 19/85  32-A-JA851226
REVISION 5: 30hh April 2013  PAGE 9
Printed in the U.K

### Page 12 (OCR)

BRITISH AEROSPAC
JETSTREAM
SERIES 3100 & 3200
SERVICE BULLETIN
BLANK PAGE
32-A-JA851226  ORIGINAL ISSUE: DEC 19/85
PAGE 10  Printed in the U.K.  REVISION 5: 30th April 2013

### Page 13 (OCR)

ACCOMPLISHMENT REPORT
INSPECTION SERVICE BULLETIN NUMBER  32-A-JA851226
TITLE: LANDING GEAR - TO INTRODUCE NDT AND VISUAL INSPECTIONS OF MAIN
LANDING GEAR PINTLE HOUSING FOR CRACKS.
AMENDMENT JA 851226
INSPECTION
THE BUSINESS SUPPORT TEAM,
BAE SYSTEMS (OPERATIONS) LIMITED,
PRESTWICK INTERNATIONAL AIRPORT,
AYRSHIRE, KA9 2RW,
SCOTLAND.
Telephone:  (01292) 675207
Fax:  (01292) 675704
E-mail:  RAPublications@baesystems.com
PLEASE BE ADVISED THAT THE ABOVE SERVICE BULLETIN HAS BEEN EMBODIED ON
AIRCRAFT CONSTRUCTORS NUMBER(S):
WE REQUEST THE APPROPRIATE REVISIONS TO APPLICABLE MANUALS.
NAME: .
SIGNED:
COMPANY:
DATE:
SERVICE BULLETIN COMMENTS/FEEDBACK
Please report any non-technical comments or inaccuracies regarding this service bulletin to the
above address.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
