# BAE Systems Alert Service Bulletin 32-A189: ASB.32-A189

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2022-1574; AD 2022-25-18 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Alert Service Bulletin 32-A189](https://openairdocs.org/service-documents/bae-systems/32-a189.md)
- Title as filed: ASB.32-A189
- Pages: 14
- PDF: https://openairdocs.org/files/sha256/2c/50/2c50a4e20842f97e77742e2308f4ce6254453daf4fcb32fd44ffe91c535ab84c
- Page: https://openairdocs.org/service-documents/bae-systems/32-a189/file/2c50a4e20842

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

TITLE: LANDING GEAR - MAIN LANDING GEAR SIDESTAY - INSPECTION OF THE
OUTER LINK (LH AND RH) FOR CRACKS AND DIMENSIONAL CHECKS.
1.Planning information
A.Effectivity
(1) Aircraft
Aircraft affected by this inspection are defined below:-
BAe 146-301
All BAe 146 100, 200, 300 Series
All AVRO 146-RJ70, RJ85, RJ100 Series
Operators with main landing gear (MLG) Sidestay outer links
with the Safran Landing Systems (SLS) part numbers:
200884304, 200884305, 200884346, 200884347, 201105300,
201105301, 201105308, 201105309, 201299300, 201299301,
201299305, 201299306.
B.Reason
An operator recently reported, during routine maintenance,
cracking on the shoulders of the MLG sidestay outer link.
Evidence indicates that some MLG sidestay outer links may have
incorrect dimensions that could be the cause of cracking.
Failure of a MLG sidestay outer link could result in the collapse
of the MLG, which could lead to a runway departure with
corresponding aircraft damage and possible loss of life depending
on the operational environment.
C.Description
It is necessary that operators carry out a one off detailed
inspection and dimensional tolerance check of the MLG sidestay
outer links, and provide feedback accordingly.
SLS and BAE Systems Air Prestwick will assess the reported
dimensions and advise operators of any resulting necessary action,
which may either require change tothe currently declared MLG
sidestay outer link airworthiness limitation, or be declared
non-airworthy, requiring immediate replacement in-service.
BAE SYSTEMS (Operations) Limited, Prestwick International Airport, Ayrshire,
KA9 2RW, Scotland.
ALERT
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page1of14
Printed in England

### Page 2

D.Compliance
The technical content of this Alert Service Bulletin (ASB) is the
subject of UK CAA Airworthiness Directive consultation.
Accomplish the instructions of para 2.C.(1) and 2.C.(2), within
one month of the date of this ASB.
If the recommendations in BAE Systems Air Prestwick All Operator
Message (AOM) 22-013V-2 have been satisfied, then the instructions
of para 2.C.(1) will have been met.
E.Approval
The technical content of this document is approved under the
authority of the DOA Ref.UK.21J.0047.
The technical content of this document is approved under the
authority of the UK CAA design organisation approval reference:
AD/1852/05.
F.Manpower
Toinspect as defined in para. 2
1.0 man-hours per MLG sidestay outer link.
This man-hour estimate does not include time for gaining access
to, or cleaning, the inspection area.
G.Materials - cost and availability
Cost and Availability is by arrangement between the Operator and
BAE Systems.
H.Tooling - cost and availability
Not applicable.
I.Weight and balance
Not applicable.
J.References
AOM 22-013V-2.
K.Publications affected
Not applicable.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page2of14
Printed in England

### Page 3

L.Electrical load data
Not applicable.
M.Software Accomplishment Summary
Not applicable.
N.Aircraft Noise Levels
Not applicable.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page3of14
Printed in England

### Page 4

This Page Is Intentionally Left Blank.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page4of14
Printed in England

### Page 5

2.Accomplishment instructions
A.General
(1) The following abbreviations are used within this document:-
ASB - Alert Service Bulletin
MLG - Main Landing Gear
SLS - Safran Landing Systems
B.Preparation
(1) Gain access tothe LH and RH MLG.
C.Inspection
(1) Perform a Detailed Inspection of the areas indicated in
Drawing 1 (view on arrow ’A’) as follows:
(a) Clean the MLG sidestay outer link. Use white spirit.
(b) Use a magnifying glass (x 5 magnification or greater) and
examine the MLG sidestay outer link for any sign of cracks
through the paint in the four areas indicated: refer to
Drawing 1 (view on arrow ’A’).
In the event that a crack is detected, record the findings
in Appendix 1 and return toBAE Systems Air Prestwick.
(2) Refer to Drawing 2. Perform dimensional checks as follows:
(a) Record/photograph of the MLG sidestay outer link only part
number, serial number (located on the inboard side) and any
markings relative to concessions/repairs performed on the
part. Also, specify right hand/left hand. Record using the
Appendix 2.
(b) Record/photograph, using a ruler or Vernier calliper,
dimensions ’A’, ’B1’, ’B2’, ’C1’ and ’C2’, as shown in
Drawing 2 for both the upper and lower surfaces. Record
using the Appendix 2.
(c) Return the data recorded in Appendix 2 to BAE Systems Air
Prestwick.
SLS and BAE Systems Air Prestwick will assess the reported
dimensions and advise operators of any resulting necessary
action, which may either require change to the currently
declared MLG sidestay outer link airworthiness limitation,
or be declared non-airworthy, requiring immediate
replacement in-service.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page5of14
Printed in England

### Page 6

D.Test
Not applicable.
E.Close up
(1) Make sure work area is clean, and clear of tools and
miscellaneous equipment.
F.Documentation
Return all required Inspection Report details (see Appendices 1
and 2) via e-mail toraengliaiso n@baesystems.co m
G.Terminating action
(1) None.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page6of14
Printed in England

### Page 7 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
UPLOCK  RETRACTION  DIRECTION
UNIT  JACK  LINK
OLEO LOCK
JACK
DOWNLOCK  - CRANK
UPLOCK  JACK
JACK
SPRING
NOTE
APPLY GREASE
ASSISTER  HERE
JACK  NEW LABEL
SIDESTAY
* INSPECT FOR CRACKS
AT ALL LOCATIONS
INDICATED
OUTER LINK
A  VIEW ON ARROW "A'  n32a18901
INSPECTION OF MLG SIDESTAY OUTER LINK
DRAWING 1.
Date: 16-SEP-2022  ASB. 32-A189
Revision: Initial issue  Page 7 of 14
Printed in England

### Page 8 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
DIMENSION B1  - DIMENSION B2
(MINIMUM WALL  (MINIMUM WALL
THICKNESS)  THICKNESS)
DIMENSION A
DIMENSION C1 -  — DIMENSION C2
VIEW ON ARROW 'B'
UPPER SURFACE SHOWN
LOWER SURFACE SIMILAR
n32a018902
INSPECTION OF MLG SIDESTAY OUTER LINK
DRAWING 2.
Date: 16-SEP-2022  ASB. 32-A189
Revision: Initial issue  Page 8 of 14
Printed in England

### Page 9

3.Material information
Not applicable.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page9of14
Printed in England

### Page 10

This Page Is Intentionally Left Blank.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page10of14
Printed in England

### Page 11

APPENDIX 1
1.INSPECTION REPORT
A.Complete and return this form as detailed
OPERATOR:
AIRCRAFT REGISTRATION:
CONSTRUCTOR’S NUMBER:
FLIGHT HOURS:
LANDINGS:
DATE INSPECTION PERFORMED:
FINDINGS:
To: Custo mer Technical Support (Building 37), 
BAE Systems Air Prestwick,
Prestwick International Airport, 
Ayrshire,
KA9 2RW,
United Kingdom.
e-mail raengliaison@baesystems.com
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page11of14
Printed in England

### Page 12

This Page Is Intentionally Left Blank.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page12of14
Printed in England

### Page 13

INSPECTION SERVICE BULLETIN 
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT 
Date: 16-SEP-2022  ASB.32-A189 
Revision: Initial issue  Page 13 of 14 
 
APPENDIX 2  
1. DIMENSIONAL INSPECTION REPORT 
 
A. Complete and return this form as detailed 
MLG SIDESTAY OUTER LINK 
Aircraft Type  
Operator  
Constructor’s Number  
Part Number  
Serial Number  
Special Marking 
(Concession/Repair)  
 
 UPPER SURFACE LOWER SURFACE 
Dimension (Inches) 
as per Drawing 2. 
 
Use Ruler or Vernier 
Calliper. 
LH RH LH RH 
A = A = A = A = 
B1 = B1 = B1 = B1 = 
B2 = B2 = B2 = B2 = 
C1 = C1 = C1 = C1 = 
C2 = C2 = C2 = C2 = 
 
Return this form to:- 
 
Customer Technical Support (Building 37), 
BAE Systems Air Prestwick, 
Prestwick International Airport, 
Ayrshire, 
KA9 2RW, 
United Kingdom. 
 
e-mail: raengliaison@baesystems.com

### Page 14

This Page Is Intentionally Left Blank.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Date: 16-SEP-2022 ASB.32-A189
Revision: Initial issue Page14of14
Printed in England

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
