# BAE Systems Inspection Service Bulletin ISB.21-162: Revision 4

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2016-9186; AD 2017-04-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Inspection Service Bulletin ISB.21-162](https://openairdocs.org/service-documents/bae-systems/isb21-162.md)
- Title as filed: SB ISB.21-162R04
- Pages: 16
- PDF: https://openairdocs.org/files/sha256/82/c0/82c071796d82065397a5272de586be7f2234fe444e15e056965e0281eda13778
- Page: https://openairdocs.org/service-documents/bae-systems/isb21-162/file/82c071796d82

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BAE SYSTEMS (Operations) Limited, Prestwick International Airport, Ayrshire,
KA9 2RW, Scotland.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
TRANSMITTAL FOR INSPECTION SERVICE BULLETIN REVISION
SERVICE BULLETIN No.ISB.21-162
DATE: 07-JUN-2010
TITLE: AIR CONDITIONING - INSPECTION FOR CRACKING OF SKIN AT FRONT
AND REAR DISCHARGE VALVES.
REVISION: 4  DATE: 28-JAN-2015
ACTIONS
(1) Remove and discard Service Bulletin at revision 3.
(2) Insert Service Bulletin at revision 4.
REASONS FOR REVISION
(1)  Effectivity extended to all AVRO 146-RJ Series aircraft (see
para. 1.A. (1)).
(2)  Internal visual inspection added (see para.1.C and
para.2.C. (1)).
(3)  Compliance requirements clarified for BAe 146 Series and AVRO
146-RJ Series aircraft (see para.1.D).
(4)  Instruction added explaining what to do when no damage is
found (see para.2.C.(2) and para.2.c.(3)).
(5)  Alternative  sealant added (see para.2.C.(3), para.2.G.(3) and
para. 3.A. (1)).
(6) Editorial.
NO RETROSPECTIVE ACTION IS REQUIRED FOR AIRCRAFT THAT HAVE
PREVIOUSLY BEEN INSPECTED IN ACCORDANCE WITH THIS INSPECTION
SERVICE BULLETIN AT REVISION 3 OR EARLIER.
Date: 07-JUN-2010  REVISION TRANSMITTAL SHEET
ISB.21-162
Revision: 4 28-JAN-2015  Page 1 of 2
Printed in England

### Page 2 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
TRANSMITTAL FOR INSPECTION SERVICE BULLETIN REVISION
SERVICE BULLETIN No.ISB.21-162
This Page Is Intentionally Left Blank.
Date: 07-JUN-2010  REVISION TRANSMITTAL SHEET
ISB.21-162
Revision: 4 28-JAN-2015  Page 2 of 2
Printed in England

### Page 3 (OCR)

BAE SYSTEMS (Operations) Limited/ 2RW, Scotland.  Prestwick International Airport, Ayrshire,
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
TITLE: AIR CONDITIONING - INSPECTION FOR CRACKING OF SKIN AT FRONT
AND REAR DISCHARGE VALVES.
1.Planning information
A. Effectivity
(1) Aircraft
Aircraft affected by this inspection are defined below:-
ALL BAe 146-100, 200, 300 and 301 Series.
ALL AVRO 146-RJ70, RJ85 and RJ100 Series.
Check the aircraft technical records for accomplishment of
this inspection.
B. Reason
Moisture ingress into the aluminium/sealant mixture between the
water trap/air drier and the fuselage skin adjacent to the front
and rear discharge valves has resulted in corrosion build-up. This
build-up of corrosion has resulted in cracking of the fuselage
skin.
C.Description
This inspection bulletin details a visual inspection of the
internal fuselage at the location of the water trap/air driers to
determine if water  trap/air driers are installed, and details an
external Detailed Visual Inspection (DVI) for bulging, surface
anomalies and cracking of the fuselage skin adjacent to the
forward and rear discharge valve outlets. The bulletin also
details the actions necessary to improve corrosion protection.
D. CompLiance
The technical content of this Inspection Service Bulletin (ISB) is
subject to EASA AIRWORTHINESS DIRECTIVE consultation.
NOTE: Aircraft that have accomplished para.2.C.(1) and
para.2.C. (2) in accordance with this ISB at Revision 3 or
earlier have accomplished the physical inspection and
improved corrosion protection.
For all BAe 146 Series aircraft only
One-off improved corrosion protection (by means of additional edge
sealant) per para.2.C. (3) is to be accomplished at the next
maintenance input or within 2 years of the issue date of Revision
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 1 of 14
Printed in England

### Page 4 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
3 of this bulletin, whichever is the earlier.
For all AVRO 146-RJ aircraft only
Carry out a one-off physical inspection of the aircraft per
para.2.C.(1) to confirm if water trap/air driers are installed at
the next suitable maintenance input or within 12 months of the
issue date of Revision 4 of this ISB, whichever is the earlier.
If water trap/air driers are not installed then no further
inspection is required for this ISB.
If water trap/air driers are installed then carry out the external
DVI per para.2.C. (2). If damage is found, carry out any skin
repairs necessary in accordance with para.2.G.
If no damage is found carry out a one-off improved corrosion
protection (by means of additional edge sealant) per para.2.C.(3)
within 24 months of the issue date of Revision 4 of this ISB.
For all aircraft
after the initial inspection, the external DVI defined ir
ara.2.C.(2) must be repeated every 2 years. If terminating  action
defined in para.2.G is performed, then the requirement for repeat
inspections is terminated. However, removing the water trap/air
drier may damage the fuselage skin, therefore it is recommended
that the terminating action should only be carried out if a BAE
SYSTEMS approved repair to the skin under the water trap/air drier
is required.
E. Approval
The technical information  contained in this document has been
approved under the authority of EASA Part 21 Approval No.
EASA. 21J.047.
F Manpower
8 hours. This does not include time for sealant curing.
G.Materials - cost and availability
Cost and Availability is by arrangement between the Operator and
BAE SYSTEMS.
H. Tooling - cost and availability
Cost and Availability is by arrangement between the Operator and
BAE SYSTEMS.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 2 of 14
Printed in England

### Page 5 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
I.Weight and balance
No Effect.
J. References
Aircraft Maintenance Manual (AMM) 20-10-01 and 21-30-31.
Structural Repair Manual (SRM) 53-00-00 and 53-00-12.
K.Publications affected
Aircraft Maintenance Manual (AMM).
Structural Repair Manual (SRM).
L. Electrical load data
Not applicable.
M.Software Accomplishment Summary
Not applicable.
N.Aircraft noise levels
Not applicable.
Date: 07-JUN-2010  ISB. 21-162
Revision: 4 28-JAN-2015  Page 3 of 14
Printed in England

### Page 6 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 4 of 14
Printed in England

### Page 7 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
2.Accomplishment instructions
A. GeneraL
(1) The following abbreviations are used within this document:-
AMM - Aircraft Maintenance Manual
SRM - Structural Repair Manual
(2) Observe all WARNINGS and CAUTIONS appearing in the AMM
referred to in this ISB.
B.Preparation
(1) Open, safety and tag the following circuit breaker(s):-
Table 1.
PANEL  LABEL/SERVICE  GRID REF/
IDENT
211-50-30  Dump Ditch Motors  F32
211-50-30  Man Pressn Ctrl  C32
(2) Refer to AMM 21-30-31 page block 401 and Drawing 1 and locate
the front and rear discharge valve outlets and water trap/air
driers.
C. Inspection
(1) Perform a visual inspection of the internal fuselage at the
location of the water trap/air driers in order to determine
whether or not water trap/air driers are installed.
NOTE: If water trap/air driers are not installed then no
NOTE: If the anked and in hose ready  further inspections are required.  If the water trap/air driers are installed they may have
been blanked and the hoses removed. If the water
trap/air driers are blanked then the water trap/air
driers should be recorded as installed. Thereafter,
carry out the external DVI of the fuselage skin adjacent
to the discharge valve outlets in para.2.C.(2) and the
one-off improved corrosion protection in para.2.C.(3).
(2)  Perform an external DVI of the fuselage skin adjacent to the
discharge valve outlets (one frame bay fore and aft, one
stringer above and below) to check for bulging, surface
anomalies and cracking.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 5 of 14
Printed in England

### Page 8 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
If damage is found, go to para.2.G and perform the
Terminating Action.
If no damage is found go to para.2.E or if this is the first
inspection carry out the one-off improved corrosion
protection in para.2.C.(3).
(3)  Apply additional PR1422A-2, PR1764B-2 or PR1828B-1/2 edge
sealant between the water trap/air drier and the fuselage
skin to stop any moisture ingress between the water trap/air
drier and the skin panel.
NOTE: The edge sealant must not contain aluminium.
If no damage is found go to para.2.E.
D.Test
None.
E .Close up
(1) Remove tags and close the following circuit breaker (s):-
Table 2.
PANEL  LABEL/SERVICE  GRID REF/
IDENT
211-50-30  Dump Ditch Motors  F32
211-50-30  Man Pressn Ctrl  C32
(2) Make  certain work  area is clean, and clear of tools and
miscellaneous equipment.
F.Documentation
(1)  Complete a copy of Inspection Report attached to this ISB and
return by fax or mail.
OR
Return all required Inspection Report details via e-mail.
G.Terminating Action
(1)  Remove Water Trap/Air Drier
NOTE: Removing the water trap/air drier should only be carried
out as part of a BAE SYSTEMS approved repair.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 6 of 14
Printed in England

### Page 9 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
(a) Loosen the hose clamp securing the hose to the water
trap/air drier and disconnect the hose from the water
trap/air drier.
(b) Using a non-metallic spatula-type tool and taking care not
to damage the aircraft skin, break the adhesion between the
water trap/air drier and the aircraft skin and remove the
water trap/air drier.
(2) Repair Aircraft Skin
Refer to SRM 53-00-00 for allowable damage.
(a) If damage is allowable, repair as detailed in SRM 53-00-12
fig. 202.
NOTE: Make sure the pitching of the repair fasteners does
not interfere with the separator re-installation.
(b) If damage is not allowable, contact BAE Systems for a
suitable repair.
(3) Re-install Water Trap/Air Drier
(a) Taking care not to damage the aircraft skin,  clean off all
traces of old sealant from the water trap/air drier and
aircraft skin using a suitable cleaning agent.
(b) Ensure the skin in the  area beneath the water  trap/air
drier is free from protective treatment to allow for
electrical conductivity.
(c) Bond water trap/air drier to aircraft skin using PR1764B-2
conductive sealant.
(d) Re-install water trap/air drier so that the angle is as
large as possible to allow water to fall to drain.
(e) Check for adequate edge sealing once the drier is
re-installed. Apply additional PR1422A-2, PR1764B-2 or
PR1828B-1/2 edge sealant between the water trap/air drier
and the fuselage skin to stop any moisture ingress between
the water trap/air drier and the skin panel as required.
NOTE: The edge sealant must not contain aluminium.
(f) Refer to AMM 20-10-01 page block 1 and do an electrical
bonding check.
(g) Attach the hose to the water trap/air drier and secure
using hose clamp.
Date: 07-JUN-2010  ISB. 21-162
Revision: 4 28-JAN-2015  Page 7 of 14
Printed in England

### Page 10 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
(h) Remove safety clips and tags and close the following
circuit breakers:-
Table 3.
PANEL  LABEL/SERVICE  GRID REF/IDENT
211-50-30  DUMP DITCH MOTORS  F32
211-50-30  MAN PRESSN CTRL  C32
(i) Make certain work area is clean, and clear of tools and
miscellaneous equipment.
(j) Record accomplishment of terminating action in aircraft
records.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 8 of 14
Printed in England

### Page 11 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
FRAME 34
FRAME 23.
DISCHARGE VALVE
(REF)
WATER TRAP
TYPICAL
B SIMILAR
HOSE
CLAMP
AIR DRIER
EDGE SEALANT (FREE OF ALUMINIUM POWDER) SHOULD BE APPLIED TO
COMPLETE THE SEAL BETWEEN THE AIR DRIER/WATER TRAP AND THE FUSELAGE SKIN
• WATER TRAP/AIR DRIER AND DISCHARGE VALVE MAY BE BLANKED, AND HOSE REMOVED.
B2116201
TYPICAL LOCATION OF WATER TRAP/AIR DRIERS
DRAWING 1.
Date: 07-JUN-2010  ISB. 21-162
Revision: 4 28-JAN-2015  Page 9 of 14
Printed in England

### Page 12 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 10 of 14
Printed in England

### Page 13 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
3.Material information
A. Materials
(1) Materials required (Operator supplied).
DESCRIPTION  MATERIAL NUMBER  QTY
(REF. AMM 20-20-00)
PR1422A-2 Sealant  09-002A  AR
or
PR1764B-2 Sealant  09-582  AR
or
PR1828B-1/2 Sealant  09-596A  AR
NOTE: AR denotes as required.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 11 of 14
Printed in England

### Page 14 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 12 of 14
Printed in England

### Page 15 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
APPENDIX 1
1.INSPECTION REPORT
A. Complete and return this form as detailed
OPERATOR:
AIRCRAFT REGISTRATION:
CONSTRUCTORS NUMBER:
FLIGHT HOURS:
LANDINGS:
DATE INSPECTION PERFORMED:
FINDINGS:
To:  Customer Technical Support (Building 37),
BAE SYSTEMS (Operations) Limited,
Prestwick International Airport,
Ayrshire,
KA9 2RW,
Scotland.
Fax + 44 (0) 1292 675432
e-mail raengliaison@baesystems.com
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 13 of 14
Printed in England

### Page 16 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 07-JUN-2010  ISB.21-162
Revision: 4 28-JAN-2015  Page 14 of 14
Printed in England

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
