# BAE Systems Inspection Service Bulletin ISB.53-249: No revision named

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2024-1478; AD 2024-17-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Inspection Service Bulletin ISB.53-249](https://openairdocs.org/service-documents/bae-systems/isb53-249.md)
- Title as filed: ISB 53-249 R0
- Pages: 20
- PDF: https://openairdocs.org/files/sha256/d1/c7/d1c7841abe904d5baae3186c608dfe3a797a1cd4ba3191535297c62b6ebbca0e
- Page: https://openairdocs.org/service-documents/bae-systems/isb53-249/file/d1c7841abe90

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BAE SYSTEMS (Operations) Limited, Prestwick International Airport, Ayrshire,
KA9  2RW, Scotland.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
TITLE:  FUSELAGE - CENTRE FUSELAGE - TO INSPECT FORWARD RIB O LONGERON
1.Planning information
A.Effectivity
(1)  Aircraft
Aircraft affected by this inspection are defined below:-
BAe 146 Series 301.
AlL BAe 146 100, 200, 300 Series.
ALL AVRO 146-RJ70, RJ85, RJ100 Series.
B. Reason
An operator recently reported, during routine maintenance,
cracking on the radius of the Rib 0 Forward Longeron at Frame 26.
The cracking initiated close to a local blend in the radius.
Failure of a Rib O Forward Longeron could result in loss of
continuity across the wing box, causing re-distribution of loading
into the fuselage skin or the adjacent Rib 1 longerons. Such
re-distribution if not detected and corrected, could result in
failure of the fuselage skin, leading to rapid decompression  and
potential loss of the  aircraft.
C.Description
This Inspection Service Bulletin (ISB) requires a one-off visual
and high frequency eddy current inspection of the radius of the
Rib O Forward Longeron at Frame 26.
D. Compliance
The technical content of this ISB is the subject of UK CAA
Airworthiness Directive consultation.
Accomplish the instructions in para.2.C within 6 months of
publication of this ISB.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 1 of 20
Printed in England

### Page 2 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
E. ApprovaL
The technical content of this document is approved under the
authority of the DOA Ref.UK.21J.0047.
The technical content of this document is approved under the
authority of the UK CAA design organisation approval reference:
AD/1852/05.
F. Manpower
To inspect as defined in para.2.C - 2.0 man-hours.
This man-hour  estimate does not include time for gaining access
to,  or cleaning, the inspection area, paint removal and paint
re-instatement.
G.Materials - cost and availability
None.
H.Tooling
10x Magnifier
High Frequency Eddy Current inspection equipment.
Inspection light
Metallic straight edge (minimum 6 in. (152.4mm.))
Mirror
Non-metallic scraper.
I.Weight and balance
Not applicable.
J.References
Aircraft Maintenance Manual, Chapters 06-40-00, 20-10-10,
20-10-11, 20-10-12, 20-20-00.
Test Instrument manufacturer's handbook.
Structural Repair Manual, Chapter 51-23-00.
Non-Destructive Testing Manual, Part 1, 20-00-00, Part 6,
20-00-00, 20-06-00.
K.Publications affected
Not applicable.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 2 of 20
Printed in England

### Page 3 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
L.Electrical load data
Not applicable.
M.Software Accomplishment Summary
Not applicable.
N.Aircraft Noise Levels
Not applicable.
Date:  25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 3 of 20
Printed in England

### Page 4 (OCR)

BAE SYSTEMS
BAe 146 SERIES/AUR SERVE SERES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 25-AUG-2023  Revision: Initial issue  page 4 of 2l
Printed in England

### Page 5 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
2.Accomplishment instructions
A. General
WARNING:  WHENEVER ANY PART OF THE MAIN OR ASSOCIATED CONTROL SYSTEM
IS DISMANTLED, ADJUSTED, REPAIRED OR RENEWED, THAT PART OF
THE SYSTEM WHICH HAS BEEN DISTURBED SHALL BE
A SECOND INDEPENDENT INSPECTION FOR SECURITY OF LOCKING
DEVICES, FULL AND FREE MOVEMENT, DIRECTION AND TENSION
CHECKS.
ACCEPTABLE MEANS OF COMPLIANCE M.A. 402 (a) TO EASA PART
M, OR TO AN EQUIVALENT NATIONAL STANDARD.
(1) The following abbreviations are used within this document:-
AMM - Aircraft Maintenance Manual
jaw - in accordance with
ISB - Inspection Service Bulletin
LH - Left Hand
RH - Right Hand
SRM - Structural Repair Manual.
NTM - Non-Destructive Testing Manual.
(2)  Observe all WARNINGS and CAUTIONS appearing in the AMM
referred to in this ISB.
(3)  Restore protective treatment as required, using epoxy primer
(Material No.16-580) and polyurethane top coat grey (Material
No. 16-584).
B.Preparation
(1) Refer to AMM 06-40-00. Remove access panels 281AT,
281AZ, 281BT, 281CT, 282AZ, 282BT, 282CT.
(2) Gain access to the Rib O Forward Longeron.
(3) Remove sealant and clean the LH and RH edge of the Longeron,
to allow the  straight edge to be located (Ref. Drawing 1).
- Refer to AMM 20-20-00. Use an approved cleaner and a
non-metallic scraper.
(4)  Remove primer and paint from the radius edge and flanges of
the LH and RH sides of Rib O Forward Longeron iaw AMM
20-10-10 (Ref. Drawing 1).
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 5 of 20
Printed in England

### Page 6 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
C. Inspection
(1)  Refer to Drawing 1. Perform a detailed inspection of the
radius edge and flanges of the LH and RH sides of Rib O
Forward Longeron for  evidence of rough edges, nicks, or
visible cracking.
- Use 10x magnification and a strong light and mirror as
required.
(2) Refer to Drawing 1. Inspect for evidence of blending or
undercutting in the radius and flanges of the LH and RH sides
of Rib O Forward Longeron.
- Use a metallic straight edge (minimum 6 inches (152.4 mm))
NOTE: Blending or undercutting is present if a gap is visible
between the straight edge and the edge of the longeron.
(3) Refer to Appendix 2  inspection of the radius edge.  Perform a high frequency eddy current
(4) Before further flight, report any cracking, surface defects,
blending or undercutting found to BAE Systems Repair Design
Office (raengliaisonabaesystems.com) and await further
instruction. Use a copy of the Inspection Report form in
Appendix 1.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 6 of 20
Printed in England

### Page 7 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
FRAME 29
REAR SPAR
(REF)
FRAME 26
FRONT SPAR
(REF)
RIB 0 FORWARD
LONGERON
FWD
FRAME
24  FRAME
25
FRAME
TYPICAL  26
FWD
CAREFULLY PLACE THE STRAIGHT EDGE ALONG THE EDGE
STRAIGHT EDGE  RADIUS  OF THE LONGERON TOWARDS THE RADIUS.
MINIMUM LENGTH
6.0 in. (152.4 mm)  DO NOT PUSH THE END OF THE STRAIGHT EDGE INTO THE
RADIUS.
FLANGE
IF THERE IS EVIDENCE OF BLENDING OR UNDERCUTTING
ALONG THE EDGE THEN REPAIR ACTION MAY BE REQUIRED.
INSPECT THE RADIUS ON BOTH SIDES OF THE LONGERON.
VIEW ON ARROW 'C'
POSSIBLE BLEND
OR UNDERCUT
STRIP PAINT AND PRIMER IN THIS
AREA ON THE FLANGE AND RADIUS EDGE
ON BOTH SIDES OF THE LONGERON  N5324901
INSPECTION OF LH AND RH RIB O FORWARD LONGERON
DRAWING 1.
Date:  25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 7 of 20
Printed in England

### Page 8 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
D.Test
Not applicable.
E.Close up
(1)  Make sure work area is clean, and clear of tools and
miscellaneous equipment.
(2)  Refer to AMM 20-10-11. Restore protective treatment as
required, using coloured chemical conversion coating,
Material No.13-002 or Material No.13-002A and epoxy primer
(Material No.16-580).
(3) Refer to AMM 20-10-12. Restore paint finish as required,
using polyurethane top coat grey (Material No.16-584).
(4)  Refer to SRM 51-23-00. Reinstate sealant (Material
No.09-002A) in area of inspection as required.
(5)  Refer to AMM 06-40-00.  Install access panels 281AT, 281AZ,
281BT, 281CT, 282AZ, 282BT, 282CT.
F.Documentation
(1) Record, in aircraft technical records, embodiment of this SB.
G.Terminating action
(1) None.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 8 of 20
Printed in England

### Page 9 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
3. Material information
A. Materials
(1) Materials required (Operator supplied).
Table 1.
DESCRIPTION  MATERIAL NUMBER  QTY.
(REF.AMM 20-20-00 )
Coloured chemical conversion coating  13-002 or 13-002A  A/R
epoxy primer  16-580  A/R
polyurethane top coat grey  16-584  A/R
PR1422B-2 Sealant  09-002  AYR
NOTE:  A/R denotes as required.
Date:  25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 9 of 20
Printed in England

### Page 10 (OCR)

BAE SYSTEMS
BAe 146 SERIES/AUR SERVE SERES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 25-AUG-2023
Revision: Initial issue
Printed in England

### Page 11 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
APPENDIX 1
1.INSPECTION REPORT
A. Complete and return this form as detailed
OPERATOR:
AIRCRAFT REGISTRATION:
CONSTRUCTOR'S NUMBER:
FLIGHT HOURS:
LANDINGS:
DATE INSPECTION PERFORMED:
FINDINGS:
To:  Customer Technical Support (Building 37),
BAE SYSTEMS (Operations) Limited,
Prestwick International Airport,
Ayrshire,
KA9 2RW,
SCOTLAND.
e-mail raengliaison@baesystems.com
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 11 of 20
Printed in England

### Page 12 (OCR)

BAE SYSTEMS
BAe 146 SERIES/AUR SERVE SERES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 25-AUG-2023  page 1zo20
Revision: Initial issue
Printed in England

### Page 13 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
APPENDIX 2
HIGH FREQUENCY EDDY CURRENT INSPECTION OF RIB O FORWARD LONGERON
RADIUS
1.COMPONENT OR AREA TO BE INSPECTED
A.Wing to Fuselage Attachment Longeron
(1) The forward longeron at Rib 0 (Ref. Drawing 2).
(a) Wing to fuselage attachment longeron.
B.Description Of Possible Damage
(1) Inspection
(a) Cracks initiating at the free edge of the horizontal
flanges of the forward longeron at Rib O in the upper or
inboard/outboard surfaces, 0.1 in. (2.54 mm) or greater in
Length.
C.Related Documents
(1) NTM Part 1, Chapter 20-00-00, Section 3, Safety Precautions.
(2)  NTM Part 6, Chapter 20-00-00, Eddy Current Testing - General.
(3) NTM Part 6, Chapter 20-06-00, Instrument calibration.
(4) Aircraft Maintenance Manual (AMM).
(5) Test Instrument Manufacturer's Handbook.
D.Equipment and Materials
(1) The following  equipment was used during the development of
this instruction and was found to be acceptable.
(a) Instrument: Elotest B1 v4 phase analysis eddy current
instrument, with B1-2BN-1 adapter, from Rohmann (UK) Ltd.
(b) Balance load:  Inductance - 47 uH. Part number 5A058, from
Hocking NDT Ltd.
(c) Probe 1: Absolute, shielded, 500 kHz straight probe with a
90-degree tip. Part number LS-171-1E, from Rohmann (UK)
Ltd.
(d) Probe 2: Absolute, shielded, 500 kHz pencil probe. Part
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 13 of 20
Printed in England

### Page 14 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
number LS-185-1E, from Rohmann (UK) Ltd.
(e) Calibration standard: Aluminium block with 0.020 in. (0.5
mm) deep slot. Part number 29A029, from Hocking NDT Ltd
(Refer to NTM, PART 6, 20-06-00).
NOTE: Probe 1 or Probe 2 to be used as required at Operators
discretion.
NOTE: Any comparable eddy current equipment may be used
provided it satisfies the requirements of this
instruction and is capable of resolving the slot in the
calibration standard at the required level of
sensitivity.
E.Preparation
(1) Make sure adequate staging is in place to provide safe access
to the inspection area.
(2) Make sure inspection area is clean and free from sealant.
(3)  Check the inspection area for any visible damage prior to
inspection.
Table 2.
Calibration Settings
Initial settings:  Set to manufacturers instructions
Alarm:  Optional - Refer to manufacturers instructions
Frequency:  Set to 500 kHz
Gain:  Set to produce the required sensitivity
Pre amp:  -10 dB
Y spread:  20 dB
X spread:  0 dB
Filter:  Band:  Set to Static
High pass:  Set to Off
Low pass:  Set to 40 Hz
Bandwidth limiter:  Set to Off
Timebase/Display:  Y/X
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 14 of 20
Printed in England

### Page 15 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
Dot position:  Refer to Figure 2
F.Sensitivity Settings
(1) Place the probe  on the surface of the calibration standard
away from the slots and balance the instrument.
(2) Set lift-off effect to horizontal and to the left.
(3)  Slide the probe over the 0.020 in. (0.5 mm) slot in the
calibration standard and adjust the settings to obtain a
display similar to Drawing 3.
(a) Ensure that the 0.020 in. (0.5 mm) slot produces a vertical
displacement of 60 percent Full Screen Height (FSH).
NOTE: Where the surface to be inspected is painted the
Lift-off, zero and sensitivity adjustments should be
carried out with a non-conducting shim of similar
thickness to the paint between the probe and
calibration standard.
G.Inspection Procedure
(1) Select the area for inspection, (Ref. Drawing 4) - Fastener
positions 39A & 39B, 38A & 38B.
(2) Place the probe on the surface to be inspected and balance
the instrument.
(3) Reset lift-off as required (Ref. Drawing 3).
(4) Scan along the free edge between Frame 26 and the centreline
of second fastener forward of Frame 26 (Ref. Drawing 4).
(5) Repeat G. (1) to G. (4) for the remaining two scans for that
flange.
(6) Repeat G.(1) to G.(4) for the opposite flange.
H.Acceptance Criteria
(1) Interpret signals by reference to Drawing 3.
(2) Any indication with  a rapid vertical spot displacement having
an amplitude of 20 percent FSH or greater that cannot be
attributed to  ferrous effect, probe handling or component
geometry shall be considered to be a crack.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 15 of 20
Printed in England

### Page 16 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
NOTE: Cracks and other discrete surface damage  can usually be
identified by a rapid vertical spot displacement, which
once the crack or  damage has been crossed returns to the
balanced position.
NOTE: Smooth, gradual spot movement is a common occurrence and
can happen for a variety of reasons, such as paint
thickness variation lift-off), edge effect and
conductivity changes.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 16 of 20
Printed in England

### Page 17 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
S D000000
FRAME 29
REAR SPAR
(REF)
FRAME 26
FRONT SPAR
(REF)
RIB O FORWARD
LONGERON
N5324902
FORWARD LONGERON, RIB O, AT FRAME 26
DRAWING 2.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 17 of 20
Printed in England

### Page 18 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
SIGNAL FROM
SIGNAL  0.020in (0.5mm) SLOT  60% FSH
FROM EDGE
75% FSH
50% FSH
25% FSH
'X' INDICATES
BALANCE POSITION
LIFT OFF
TYPICAL ELOTEST B1 V4 SCREEN DISPLAY
FOR 0.020in (0.5mm) SLOT IN CALIBRATION STANDARD
N5324903
TYPICAL SCREEN DISPLAY - HIGH FREQUENCY (PHASE ANALYSIS) EDDY CURRENTS
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 18 of 20
Printed in England

### Page 19 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
- FRAME 26
INSPECT THE FREE EDGES OF THE LONGERON
FASTENER  LEFT AND RIGHT HORIZONTAL FLANGES
POSTIONS  FROM FRAME 26 TO CENTRELINE OF THE
SECOND FASTENER ATTACHING THE
LONGERON (38A AND 38B) AT THREE
POSITIONS FOR EACH SIDE
C
PROBE SCAN
VIEW ON ARROW 'D*  POSITIONS
SECTION 'C-C'
(NOT TO SCALE)
CROSS SECTION SHOWING PROBE
POSITIONS FOR EACH SCAN
(3 SCANS PER FLANGE)
FWD
FRAME 26
FASTENERS
SCAN UP TO
FRAME 26
PROBE
VIEW ON ARROW 'B'  0.079 in. (2.0 mm)  MAXIMUM
FROM EDGE
SCAN PATHS  OF FLANGE  N5324904
FORWARD LONGERON, RIB O, AT FRAME 26 SCAN PATHS
DRAWING 4.
Date:  25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 19 of 20
Printed in England

### Page 20 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
I.Reporting/Repair/Rectification
(1)  All crack and discontinuity indications are to be recorded in
the relevant aircraft documentation and the appropriate BAE
Systems approved repair rectification taken.
Reporting Procedure
(2) Report all cracks/discontinuities to:
BAE Systems Repair Design Office
(raengliaisonabaesystems.com) using Appendix 1.
(3) Also send the information that follows:
- Aircraft constructors number.
- Aircraft registration.
- Flying hours and number of landings.
- ISB number.
- Fastener location.
- Direction and length of the crack or discontinuity/percent
FSH.
Date: 25-AUG-2023  ISB.53-249
Revision: Initial issue  Page 20 of 20
Printed in England

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
