# BAE Systems Inspection Service Bulletin J41-24-043: Revision 3

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2014-0619; AD 2015-06-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Inspection Service Bulletin J41-24-043](https://openairdocs.org/service-documents/bae-systems/j41-24-043.md)
- Title as filed: J41-24-043R03
- Pages: 24
- PDF: https://openairdocs.org/files/sha256/b7/4e/b74efc2f078db12a551bdca3545255adb1747355d0dc669608af322c60ae9605
- Page: https://openairdocs.org/service-documents/bae-systems/j41-24-043/file/b74efc2f078d

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
BAE SYSTEMS (OPERATIONS) LIMITED,
PRESTWICK INTERNATIONAL AIRPORT,
AYRSHIRE, KA9 2RW,
SCOTLAND.
J41-24-043
TRANSMITTAL SHEET
This page transmits revision 3 of service bulletin J41-24-043, pages 1 to 20.
TITLE:  ELECTRICAL POWER - DO GENERATION - OVERHEAT FAILURE OF EARTH POSTS
(LEFT AND RIGHT).
INSPECTION
Actions
(1) Remove and discard service bulletin at revision 2.
(2) Insert Service Bulletin at revision 3.
Reasons for Revision
(1) Para.2.B.(2). (e) Accomplishment - Torque value changed to 200 Ibf.in. (22.6 Nm.)
(2) Para.2.C.(1). Recovery - Installation of fairings added.
INCORPORATION OF THIS REVISION DOES NOT REQUIRE REWORK OF THE
MODIFICATION(S) EMBODIED BY EARLIER REVISIONS OF THIS SERVICE BULLETIN.
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 1 OF 1

### Page 2

(No text on this page.)

### Page 3 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
BAE SYSTEMS (OPERATIONS) LIMITED,
PRESTWICK INTERNATIONAL AIRPORT,
AYRSHIRE, KA9 2RW,
SCOTLAND.
J41-24-043
MILE:  ELECTRICAL POWER - DC GENERATION - OVERHEAT FAILURE OF EARTH POSTS
(LEFT AND RIGHT)
INSPECTION BULLETIN
PLANNING INFORMATION
A.  Effectivity
All Jetstream Series 4100 Aircraft.
B.  Reason
An operator has reported an incident involving an overheat failure of the bracket on
which is located the earth post for the generator and propeller de-ice systems. Although
the earth post and cables were not damaged, the mounting bracket and underlying
structure was damaged and needed to be replaced or repaired.
This Service Bulletin is to make sure there are no signs of corrosion or damage to the
aircraft structure on or around the bracket, that the earth posts are secure and that the
electrical performance of each earth post is within specified limits.
C.  Description
This Service Bulletin calls for an inspection of the earth post EP2 (Left) and earth post
EP4 (Right) on the structure for the Left and Right power plants.
The tasks are as follows:
- Fairing panels are removed.
- Inspect for signs of arcing and lateral movement of the earth post.
- A high-current millivolts-drop test is done between each earth post and the main wing
- The panels are installed.
- The aircraft records are amended.
D. Manpower
4.0 man-hours.
Electrical skills are necessary.
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 1 of 20

### Page 4 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
E. Material - Cost and Availability
Not applicable.
F.  Tooling - Price and Availability
Refer to AMM Subtask 20-21-00-760-004.
ITEM 20-0002  Ammeter, 150 amp.
ITEM 20-0007  Millivolt meter.
ITEM 20-0009  Variable power-supply unit, 150 amp.
Alternatively, use the following commercially available equipment or equivalent.
Megger MOM2  High current hand held micro-ohmmeter.
G.  Weight and Balance
None.
Aircraft Noise Levels
Aircraft noise is not affected.
Electrical Load Data
Not affected.
Software Accomplishment Summary
Not applicable.
K. References
- Aircraft Maintenance Manual (AMM). Chapters 06, 12, 20 and 71.
- Structural Repair Manual (SRM). Chapter 51.
Publications Affected
None.
J41-24-043  ORIGINAL ISSUE: SEP 27/11
PAGE 2  Revision 3: 16th June 2014

### Page 5 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
M. Family Tree Of Modification Relationships
Not applicable.
N.  Approval
BAE SYSTEMS recommends that this service bulletin is accomplished within 12 months
of the original issue date of this service bulletin.
The technical content of this service bulletin is the subject of EASA Airworthiness
Directive consultation.
The technical content of this service bulletin is approved under the authority of EASA
PART 21 Approval No. EASA.21J.047.
Signed
Date  ....
EASA Part 21 Approval No. EASA.21J.047.
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16t June 2014  PAGE 3

### Page 6 (OCR)

BAO JET STE: 4100
SERVICE BULLETIN
BLANK PAGE
J41-24-043  PAGE 4  ORIGINAL ISSUE: SEP 27/1  Revision 3: 16th June 201

### Page 7 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
2.  ACCOMPLISHMENT INSTRUCTIONS
WARNING: MAKE SURE THE AIRCRAFT AND THE AIRCRAFT SYSTEMS ARE MADE
SAFE AS DETAILED IN THE APPLICABLE CHAPTERS OF THE AIRCRAFT
MAINTENANCE MANUAL.
NOTE: Abbreviations used in the accomplishment instructions of this service bulletin
are:
AMM - Aircraft Maintenance Manual.
SRM - Structural Repair Manual.
A.  Preparation
(7)  Refer to AMM, Chapter 12-00-00. Remove all aircraft electrical power.
(2) Display a warning notice in the flight compartment 'DO NOT APPLY
POWER TO THE AIRCRAFT
Accomplishment - Left and Right - Information in brackets is applicable to the Right
installation.
(1) Refer to the AMM Chapters 06 and 71. Remove the inboard fairing panel
414AR from the left engine and the outboard fairing panel 424AR from the
right engine.
(2)  Refer to Figure 1 and the SRM Chapter 51. Look for defects and take
actions as follows:
Inspect the structure around the earth post EP2 (EP4) and the
mounting bracket to which it is attached. Look for damage caused by
arcing or signs that the structure has been overheated. Also look for a
colour change of the protective treatments on the structure. No lateral
movement of the earth post is permissible.
Examine the attachment of the nacelle horizontal support on the same
mounting bracket. Look for damage caused by arcing or signs that the
linkage has been overheated.
(c) If any movement or damage is apparent then this must be repaired
before further flight.
Report all findings of damage to:-
Repair Drawing Office,
BAE Systems (Operations) Limited,
Prestwick International Airport,
Ayrshire, KA9 2RW,
Scotland.
Give the aircraft tail number, flying hours and details of the damage.
Request a repair scheme.
(d)  Inspect the earth cables for the generator and propeller de-ice
systems. Look for signs that the cable insulation has been overheated.
Look for arcing damage or signs that the terminal tags have been
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 5

### Page 8 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
overheated. Replace damaged cables and retest systems affected as
appropriate.
(e) Check torque load of the earth post stiff nut to 200 Ibf.in. (22.6 Nm.)
Refer to the procedure in Appendix 3 for the high-current millivolt-drop test.
Alternatively, use a high current micro-ohmmeter such as a Megger MOM2
or equivalent and follow the manufacturer's instructions for high current
measurements.
(a)  Do a high-current millivolts-drop test for the earth bolt EP2 (EP4)
using a nominal test current of 100 amp.
EITHER
Measure the resistance between the earth bolt and the adjacent
primary structure. The resistance must not be greater than 200
micro-ohms.
OR
2  Measure the resistance between the earth bolt and the bracket,
and measure the resistance between the bracket and the adjacent
primary structure. The resistance for each measurement must not
be greater than 100 micro-ohms
If any resistance measurement is found to be in excess of the quoted limits,
then steps must be taken to investigate the source of the high resistance
and to clean all the surfaces to achieve the requisite resistance value before
rurther flight.
Complete the record sheets attached to this bulletin in Appendices 1 and 2,
and send the results to BAE Systems at the address shown.
C.  Hecovery
(1)  Remove all materials, tools and equipment. Make sure work area is clean.
(2)  Refer to the AMM Chapters 06 and 71. Install the inboard fairing panel
414AR on the left engine and the outboard fairing panel 424AR on the right
engine.
(3) Remove warning notice from the flight compartment.
(4) Restore electrical power to the aircraft.
(5) Aircraft records:
Add service bulletin number 'J41-24-043' to the aircraft records.
Operators are reminded of the necessity to inform the Business
Support Team, Technical Publications, BAE SYSTEMS, Regional
Aircraft, Prestwick International Airport, Ayrshire, KA9 2RW,
SCOTLAND, of the accomplishment of this SB in order to obtain
the necessary revisions for the affected manuals, see paragraph
1.L. Publications Affected, of this SB.
J41-24-043  ORIGINAL ISSUE: SEP 27/11
PAGE 6  Revision 3: 16h June 2014

### Page 9 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
414AR
1000009000 00  - 424AR
GENERATOR CABLE
SEALANT
NUT
HW14-6
PROPELLER DE-ICE CABLE
NUT
NAS509-6
WASHER
SP47J
WASHER
SP 122.
WASHER
SP122J
BRACKET
14157435-7 LEFT  EARTH BOLT
14157436-8 RIGHT  PKS1017-6
• FRONT SPAR
(REF)
24-43-10001
Earth Post Installation EP2 left and EP4 right.
FIGURE 1
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 7

### Page 10 (OCR)

AE JETSTREAM
eries 410
BLANK PAGE
AGE  1-24-04  Revision 3: 16th June 201  June 201.

### Page 11 (OCR)

3Ae JETSTREAM
series 410
SERVICE BULLETIN
З.  MATERIAL INFORMATION
Not applicable.
ORIGINAL ISSUE: SEP 27/11  Revision 3: 16 June 2014  J41-24-04.  PAGE S

### Page 12 (OCR)

SAE JETSTREAM
Series 410
BLANK PAGE
J41-24-043  ORIGINAL ISSUE: SEP 27/11
PAGE 10  Revision 3: 16th June 2014

### Page 13 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
CONTINUED AIRWORTHINESS
A.  Continued Airworthiness Instructions
Continued airworthiness instructions applicable to this service bulletin are detailed
below.
B.  Scheduled Maintenance
The instructions within this Inspection Service Bulletin will be the subject of a
MRB review and, as such, may then provide the basis for repeat inspections,
with the instructions incorporated in the AMM.
C.  Removal Procedures
(1) Not applicable.
D. Installation Procedures
(1) Not applicable.
E.  Test Procedures
(1) Not applicable.
Trouble Shooting
(1) Not applicable.
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 11

### Page 14 (OCR)

BAOJETSTREAD
BLANK PAGE
PAGE 123  ORIGINAL ISSUE: SEP 27/1
Revision 3: 16th June 201

### Page 15 (OCR)

BAe JETSTREAM
Series 4100
Appendix 1 - Test Record Sheet.
(T)  Refer to section 2.B.(2).(a) to (c) of the main bulletin and confirm if any damage was
referred to the Repair Design Office (RDO), BAE Systems (Operations) Limited.
YES  NO
(2)  Refer to Section 2.B. (2). (d) of the main bulletin and confirm if any cables have been
replaced.
YES  NO
Details (if applicable)
(3)  Refer to Section 2.B. (3). (a) of the main bulletin and record the final micro-ohm
measurements obtained.
Result  Limit
Location  Test Number
(micro-ohms)  (micro-ohms)
Left Wing  Either  1 (Earth Bolt to Structure)  < 200
Or  2 (Earth Bolt to Bracket)  < 100
And  2 (Bracket to Structure  < 100
Right Wing  Either  1 (Earth Bolt to Structure)  < 200
Or  2 (Earth Bolt to Bracket)  < 100
And  2 (Bracket to Structure)  < 100
(4)  Also, record here whether any remedial action e.g. cleaning was required to achieve the
above measurements.
Left Wing  YES  NO
Right Wing  YES  NO
(5)  Send the results to BAE Systems (Operations) Limited (see Appendix 2).
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 13

### Page 16 (OCR)

BAO JETSTREAM
BLANK PAGE
PAGE 143  Revisions: 16h Sure 2201  June 201

### Page 17 (OCR)

BAe JETSTREAM
Series 4100
Appendix 2 - Inspection Report.
Complete and return this form and the form in Appendix 1 to:-
Customer Technical Support (Building 37),
BAE Systems (Operations) Limited,
Prestwick International Airport,
Ayrshire,
KA9 2RW,
Scotland.
Fax + 44 (0) 1292 675432
E-mail raengliaison@baesystems.com
Operator
Aircraft Registration
Constructor's Number
Flight Hours
Landings
Inspection Date
Findings
Brief details of Test Equipment used
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 15

### Page 18 (OCR)

BAe JETSTREAM
Series 4100
BLANK PAGE
J41-24-043  ORIGINAL ISSUE: SEP 27/11
PAGE 16  Revision 3: 16th June 2014

### Page 19 (OCR)

BAe JETSTREAM
Series 4100
Appendix 3 - Procedure for High-Current Millivolt-Drop Test.
A. General
NOTE: The following procedure is applicable to the left earth post installation EP2 and the
right earth post installation EP4.
NOTE: The following procedure is a modified version of the test in AMM 20-21-00 page
210 Subtask 20-21-00-760-004.
NOTE: As an alternative to this procedure, operators can use a high current micro-
ohmmeter such as a Megger MOM2 or equivalent and follow the manufacturer's
instructions for high current measurements.
B. Equipment
Item  Description
20-0002  Ammeter, 150 amp
20-0007  Millivolt meter
20-0009  Variable Power Supply Unit (VPSU), 0 to 150 amp
C. Test
WARNING: BECAUSE OF THE CONFINED SPACE IN WHICH THIS TEST MAY NEED
TO BE PERFORMED, CARE MUST BE TAKEN TO ENSURE THAT THE
OPERATOR IS REMOTE FROM THE TEST AREA WHEN APPLYING THE
HIGH CURRENT.
(1)  Make sure the fasteners and the probes are clean.
(2)  Connect the millivolt meter probes as shown in figure 1.
NOTE: The millivolt meter probes should be bolted in place to ensure the operator
can remain remote from the test area.
Caution: The power connections must be bolted onto the structure and onto the
earth post.
Caution: Ensure that appropriately sized cables are used for the test.
(3)  Connect the VPSU and the ammeter and bolt in place as shown in figure 1. Make
sure that the fasteners are near to each side of the electrically bonded joint, but not
on it.
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 17

### Page 20 (OCR)

BAe JETSTREAM
Series 4100
SERVICE BULLETIN
(4)  Attach the test leads for the millivolt meter to positions near to each side of the
electrically bonded joint, but not on it.
NOTE: If the use of probes is unavoidable, then apply heavy pressure to the probes
whilst taking the measurements.
(5)  Adjust the VPSU to provide a test current of 100 amps.
WARNING: MAKE SURE THE TEMPERATURE OF THE JOINT DOES NOT
INCREASE TO MORE THAN 40 DEGREES CELSIUS (104 DEGREES
FARENHEIT) ABOVE THE LOCAL TEMPERATURE.
(6)  After a minimum of one minute, record the millivolt meter reading obtained.
Adjust the VPSU until no current flows and then disconnect the VPSU, the millivolt
meter and the ammeter.
(8)  Remove all of the equipment.
(9)  Make sure the resistance is within the following limits:-
(a)  If the resistance measurement is between the earth bolt and the adjacent
primary structure, then the resistance must not be greater than 200 micro-
ohms.
OR
(b)  If the resistance measurement is between the earth bolt and the bracket, and
then between the bracket and the adjacent primary structure then the
resistance for each measurement must not be greater than 100 micro-ohms.
NOTE:  To get the resistance of the electrically bonded joint, in micro-ohms, divide
the voltage by the current:-
e.g. 7.5 millivolts divided by 100 amps = 75 micro-ohms.
J41-24-043  ORIGINAL ISSUE: SEP 27/11
PAGE 18  Revision 3: 16th June 2014

### Page 21 (OCR)

BAe JETSTREAM
Series 4100
EARTH POST  STRUCTURE
EARTH RETURN
BOLTED  BOLTED
CONNECTION  - CONNECTION
PROBE  PROBE
PSU
VARIABLE
24-43-10002
Schematic - High current test
FIGURE 1
ORIGINAL ISSUE: SEP 27/11  J41-24-043
Revision 3: 16th June 2014  PAGE 19

### Page 22 (OCR)

BAe JETSTREAM
series 410
SERVICE BULLETIN
BLANK PAGE
J41-24-043  ORIGINAL ISSUE: SEP 27/11
PAGE 20  Revision 3: 16th June 2014

### Page 23 (OCR)

ACCOMPLISHMENT REPORT
SERVICE BULLETIN NUMBER  J41-24-043
TITLE: ELECTRICAL POWER - DC GENERATION - OVERHEAT FAILURE OF EARTH POSTS
(LEFT AND RIGHT).
TO: THE BUSINESS SUPPORT TEAM,
TECHNICAL PUBLICATIONS,
BAE SYSTEMS (OPERATIONS) LIMITED,
PRESTWICK INTERNATIONAL AIRPORT,
AYRSHIRE, KA9 2RW,
SCOTLAND.
Telephone: (01292) 675207
Fax:  (01292) 675704
E-mail:  RAPublications@baesystems.com
PLEASE BE ADVISED THAT THE ABOVE SERVICE BULLETIN HAS BEEN EMBODIED ON
AIRCRAFT CONSTRUCTORS NUMBER(S):
WE REQUEST THE APPROPRIATE REVISIONS TO APPLICABLE MANUALS.
NAME: .
SIGNED:.
COMPANY: .............
DATE: .............•......
SERVICE BULLETIN COMMENTS/FEEDBACK
Please report any non-technical comments or inaccuracies regarding this service bulletin to the
above address.

### Page 24

(No text on this page.)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
