# BAE Systems Service Bulletin 26-078: No revision named

- Rights: © BAE Systems. Filed by the FAA in regulations.gov docket FAA-2013-0793, the docket of AD 2014-01-04. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [BAE Systems Service Bulletin 26-078](https://openairdocs.org/service-documents/bae-systems/sb-26-078.md)
- Title as filed: U.S. DOT/FAA - ISB.26-078
- Pages: 10
- PDF: https://openairdocs.org/files/sha256/de/ba/debae31ab9b828fe45bdd684467fd1172cf685b6b0ad71e8a53b49b9aed06aeb
- Page: https://openairdocs.org/service-documents/bae-systems/sb-26-078/file/debae31ab9b8

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

BAE SYSTEMS (Operations) Limited, Prestwick International Airport, Ayrshire,
KA9  2RW, Scotland.
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
TITLE: INSPECTION OF FIRE BOTTLES FOR EXCESSIVE SOLDER BETWEEN
OPERATING HEAD AND CONTAINER.
1.Planning information
A.Effectivity
(1) Aircraft
Aircraft affected by this inspection are defined below :-
All BAe 146 301 Series
AlL BAe 146 100, 200, 300 Series
ALL AVRO 146-RJ70, RJ85, RJ100 Series
Those aircraft fitted with Kidde Graviner engine and APU
Automatic Fire Extinguisher 57333 series, that have been
overhauled to CMM 26-21-40 at revisions up to and including
revision 13.
Check the aircraft technical records for accomplishment of
this inspection bulletin before actioning this Inspection
Service Bulletin.
B. Reason
A case has occurred where the use of excessive solder during fire
bottle overhaul has resulted in the fire bottle failing to
discharge when activated by the fire handle. The excessive solder
has accumulated in the vicinity of the frangible plug, preventing
the plug from fracturing and releasing the extinguishant.
C.Description
This Inspection Service Bulletin details the procedure to inspect
the engine and APU fire bottles. Removal and installation of the
fire bottles is performed in accordance with the Aircraft
Maintenance Manual (AMM) and examination to determine if the fire
bottles are affected by the excessive solder issue is performed in
accordance with Kidde Graviner Service Bulletin 26-080 at revision
1 or later.
Date: 21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 1 of 10
Printed in England

### Page 2 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
D. Compliance
The technical content of this inspection Service Bulletin is the
subject of EASA AIRWORTHINESS DIRECTIVE consultation.
This Inspection Service Bulletin is to be accomplished by 1st
October 2012.
E. ApprovaL
The technical information contained in this document has been
approved under the authority of EASA Part 21 Approval No.
EASA.21J.047.
The technical information contained in this document has been
approved under the authority of UK CAA Approval Reference:
AD/1852/05.
F.Manpower
Refer to Kidde Graviner Service Bulletin 26-080 at revision 1 or
later.
G.Materials - cost and availability
None.
H.Tooling - cost and availability
None.
I.Weight and balance
None .
J. References
AMM 12-10-24 page block 1, Electrical Power - Servicing
AMM 26-20-11 page block 201, Engine Fire Extinguisher -
Maintenance Practices
AMM 26-21-31 page block 201, APU Fire Extinguisher - Maintenance
Practices
Kidde Graviner SB 26-080 at revision 1 or later.
K.Publications affected
None.
Date:  21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 2 of 10
Printed in England

### Page 3 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
L.Electrical load data
None .
Date: 21-SEP-2011  page 3 of 1  26-07
Revision: Initial issue
Printed in England

### Page 4 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date:  21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 4 of 10
Printed in England

### Page 5 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
2. Accomplishment instructions
A. GeneraL
(1) The following abbreviations are used within this document :-
AMM - Aircraft Maintenance Manual
Observe all WARNINGS and CAUTIONS appearing in the Aircraft
Maintenance Manual (AMM) referred to in this Service
Bulletin.
B.Preparation
NOTE: Any bottle overhauled by Kidde Graviner or Hugens does not
need inspection as the closing actions have been embodied.
Any bottle where the overhaul can be demonstrated to satisfy
the requirements of Kidde Graviner Service Inspection Letter
01-10 does not need inspection as the closing actions have
been embodied.
(1) Refer to AMM 12-10-24 and de-energize the aircraft busbars.
C.Inspection
(1)  Remove the engine or APU fire bottle to be inspected in
accordance with AMM 26-20-11 page block 201 or AMM 26-21-31
page block 201 including removal of cartridge, as
appropriate,
(2)  Inspect the fire bottle in accordance with Kidde Graviner SB
26-080 at revision 1 or later.
Install a serviceable fire bottle and test in accordance with
AMM 26-20-11 page block 201 or AMM 26-21-31 page block 201
including installation of cartridge, as appropriate.
NOTE: The serviceable fire bottle must have passed the
inspection in accordance with Kidde Graviner Service
Bulletin 26-080 at revision 1 or later, or been
overhauled in accordance with Kidde Graviner CMM
26-21-40 at revision 14 or later.
D. Test
None.
Date: 21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 5 of 10
Printed in England

### Page 6 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
E.Close up
(1)  Make certain work area is clean, and clear of tools and
miscellaneous equipment.
F.Documentation
(1)  Complete a copy of Inspection Report attached to this
Inspection Service Bulletin and return by fax or mail.
OR
Return all required Inspection Report details via e-mail.
(2) Record the accomplishment of this Inspection in the aircraft
technical records.
G.Terminating action
None.
Date: 21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 6 of 10
Printed in England

### Page 7 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
3.Material information
None -
Date: 21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 7 of 10
Printed in England

### Page 8 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date:  21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 8 of 10
Printed in England

### Page 9 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
APPENDIX 1
1.INSPECTION REPORT
A.Complete and return this form as detailed
OPERATOR:
AIRCRAFT REGISTRATION:
CONSTRUCTORS NUMBER:
FLIGHT HOURS:
LANDINGS:
DATE INSPECTION PERFORMED:
FINDINGS:
To:  Customer Technical Support (Building 37),
BAE SYSTEMS (Operations) Limited,
Prestwick International Airport,
Ayrshire,
KA9 2RW,
Scotland.
Fax + 44 (0) 1292 675432
e-mail raengliaison@baesystems.com
Date: 21-SEP-2011  ISB. 26-078
Revision: Initial issue  Page 9 of 10
Printed in England

### Page 10 (OCR)

BAE SYSTEMS
INSPECTION SERVICE BULLETIN
BAe 146 SERIES/AVRO 146-RJ SERIES AIRCRAFT
This Page Is Intentionally Left Blank.
Date: 21-SEP-2011  ISB_  26-078
Revision: Initial issue  Page 10 of 10
Printed in England

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
