# Bell Alert Service Bulletin 412CF-21-72: Revision A

- Rights: © Bell Textron Inc. Filed by the FAA in regulations.gov docket FAA-2024-0768; AD 2024-16-19 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bell Alert Service Bulletin 412CF-21-72](https://openairdocs.org/service-documents/bell/412cf-21-72.md)
- Title as filed: Bell ASB 412CF-21-72 Rev A
- Pages: 7
- PDF: https://openairdocs.org/files/sha256/e8/04/e8045f05f3383fa05a992f7d7524e8089ab3d7b7c38bddafefe3a84b323ed283
- Page: https://openairdocs.org/service-documents/bell/412cf-21-72/file/e8045f05f338

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ASB 412CF-21-72-RA 
Page 1 of 7 
Approved for public release. 
 
 
  ALERT SERVICE BULLETIN 412CF-21-72 
26 January 2022 
Revision A, 23 February 2022 
 
 
MODEL AFFECTED:  412CF 
 
SUBJECT: TAILBOOM ATTACHMENT HARDWARE, 
INSPECTION AND REPLACEMENT OF 
 
HELICOPTERS AFFECTED: Serial numbers 46400 through 46499.  
 
COMPLIANCE: Part I: Within the next 300 flight hours or 90 days after 
the release date of revision A of this bulletin. 
 
 Part II: Within 1 to 5 flight hours after accomplishment 
of Part I.  
 
Part III: Within the next 600 flight hours or 12 months, 
whichever comes first after accomplishment of Part II  
and every 600 flight hours or 12 months thereafter. 
 
DESCRIPTION: 
 
Revision A of this bulletin is being released to correct minor grammatical errors and to 
change t he existing 100 H ours After Installation Of Tailboom Special Inspection, 
currently published in the Maintenance Manual. This change is introduced in Part II to 
improve the effectiveness of the torque check and minimize the risk of bolt fatigue due 
to possible loss of torque after tailboom or bolt installation. For helicopters that have 
Part I of the original release of this bulletin accomplished, it is acceptable to accomplish 
Part II of this bulletin revision A within the next 25 flight hours / 30 days whichever comes 
first after the release date of revision A. F or helicopters that do not have Part I of this 
bulletin accomplished and had the tailboom installed within the last 100 flight hours , it 
is acceptable to accomplish the torque check of the tailboom attachment bolts in 
accordance with the currently published 100 H ours After Installation Of Tailboom 
Special Inspection.

### Page 2

ASB 412CF-21-72-RA 
Page 2 of 7 
Approved for public release. 
Part III has been created in this revision to clarify the requirements of the new 600 hours 
/ 12 months Special Inspection introduced as Part II in the original release of the bulletin.   
 
Bell receives occasional reports of tailboom attachment barrel nuts found cracked. The 
root cause for cracking can vary from corrosion damage, high time in service or 
hydrogen embrittlement. In a recent case,  the upper left -hand barrel nut was found 
cracked with less than 1000 hours in service. The investigation revealed that cracking 
was due to hydrogen embrittlement.   
 
Part I of this bulletin mandates the replacement of the four current steel alloy barrel nuts 
NAS577BxA with nickel alloy barrel nut s NAS577CxA that offer better corrosion 
resistance and are not susceptible to hydrogen embrittlement. This will mitigate the risk 
of barrel nut cracking that can lead to loss of attachment bolt torque and subsequent 
fracture. Bell investigated two recent reports of in- flight upper  left hand tailboom 
attachment bolt fracture. The root cause of the  fracture has been attributed to fatigue 
and low torque is suspected as being a contributing factor. In both cases, a lou d bang 
was heard followed by a yaw.  
 
Due to the criticality of the tailboom attachment points and, since the upper left 
attachment is the most critical, Part I of this bulletin also mandates the replacement of 
the upper left tailboom attachment bolt  as well as a detailed visual inspection of the 
three other bolts. Any bolt that requires replacement must be replaced with a new bolt.  
 
The Maintenance Manual (MM) will be revised to include the replacement of the upper 
left-hand bolt when the tailboom is removed/installed during the scheduled 5000 Hour / 
5-Year Inspection while the remaining three bolts will require a detailed visual 
inspection.  
 
Part II of this bulletin changes the existing 100 Hours After Installation o f Tailboom 
Special Inspection requirement. The torque check is now to be accomplished between 
1 and 5 flight hours after tailboom installation or bolt replacement and repeated until 
torque has stabilized (three times maximum). Unt il incorporation to the Maintenance 
Manual Chapter 5, Part II will require accomplishment anytime the tailboom is installed 
or a tailboom attachment bolt is replaced. 
 
Part III of this bulletin introduces a new recurring torque check of all four attachment  
bolts. This new torque check requirement will also be incorporated in the Maintenance 
Manual as a Special Inspection every 600 flight hours / 12 months. Any bolt found below 
the minimum specified torque will require replacement and an inspection of the 
associated barrel nut for condition will be required. Part III will require accomplishment 
until this new 600 hours / 12 months Special Inspection is incorporated in the 
Maintenance Manual Chapter 5.  
 
Applicability of this bulletin  to any spare part shall be determined prior to its installation 
on an affected helicopter.

### Page 3

ASB 412CF-21-72-RA 
Page 3 of 7 
Approved for public release. 
APPROVAL: 
 
The engineering design aspects of this bulletin are FAA approved. 
 
CONTACT INFO: 
 
For any questions regarding this bulletin, please contact: 
 
Bell Product Support Engineering 
Tel: 1-450-437-2862 / 1-800-363-8023 / productsupport@bellflight.com 
 
MANPOWER: 
 
Approximately 2.0 man-hours are required to complete this bulletin.  This estimate is 
based on hands-on time and may vary with personnel and facilities available. 
 
WARRANTY: 
 
There is no warranty credit applicable for parts or labor associated with this bulletin. 
 
MATERIAL: 
 
Required Material: 
 
The following material is required for the accomplishment of this bulletin and may be 
obtained through your Bell Supply Center. 
 
Part Number Nomenclature Qty (Note) 
   
NAS577C9A Barrel nut 1  
NAS577C8A Barrel nut 1 
NAS577C6A Barrel nut 2 
NAS578C9A Retainer 1 
NAS578C8A Retainer 1 
NAS578C6A Retainer 2 
NAS629-26 Bolt 1(1)  
NAS628-26 Bolt 1 (2) 
NAS626-26 Bolt 2 (2,3) 
 
Notes:  
1. NAS629-24 bolt can be used provided proper thread engagement can be achieved. 
2. Only required if the bolt does not meet the inspection criteria provided in this bulletin. 
3. NAS626-24 bolt can be used provided proper thread engagement can be achieved.

### Page 4

ASB 412CF-21-72-RA 
Page 4 of 7 
Approved for public release. 
Consumable Material: 
 
The following material is required to accomplish this bulletin, but may not require 
ordering, depending on the operator’s consumable material stock levels.  This material 
may be obtained through your Bell Supply Center. 
 
Part Number Nomenclature Qty (Note) Reference * 
    
2400-00259-00 Aeriol Thixo  No 2 Aviation 
Grease 
14.4 Oz (1) C-561 
2010-00088-00 Sealant  2 Oz C-308 
2230-10536-00 Torque seal lacquer 1 Oz (2,3,4) C-049 
 
* C-XXX numbers refer to the consumables list in the BHT-ALL-SPM, Standard Practices Manual 
 
NOTES: 
 
1. High Pressure grease (C-172) can be used as an alternate. 
2. Quantity indicated is the format that the product is delivered in. Actual quantity 
required to accomplish the instructions in this bulletin may be less than what has 
been delivered.  
3. 2230-10536-00 torque seal lacquer (C-049) is color yellow, however other colors are 
available, at customer’s option, as shown in BHT -ALL-SPM Standard Practice 
Manual, in Chapter 13 under C-049. 
4. Polyurethane paint (C -245) or 2230- 10547-00 (Vibra- TITE Viz -Torque® 202) are 
acceptable alternates to C-049.  
 
SPECIAL TOOLS: 
 
None required. 
 
WEIGHT AND BALANCE: 
 
Not affected. 
 
ELECTRICAL LOAD DATA: 
 
Not affected. 
 
REFERENCES: 
 
C-12-146-000/MF-001, Maintenance Manual, Chapters 5 and 53  
C-12-146-000/MY-001 Illustrated Parts List, Chapter 53 
BHT-412CF-IPB Illustrated Parts Breakdown, Chapter 53

### Page 5

ASB 412CF-21-72-RA 
Page 5 of 7 
Approved for public release. 
PUBLICATIONS AFFECTED: 
 
C-12-146-000/MF-001, Maintenance Manual, Chapters 5 and 53  
C-12-146-000/MY-001 Illustrated Parts List, Chapter 53 
BHT-412CF-IPB Illustrated Parts Breakdown, Chapter 53 
 
ACCOMPLISHMENT INSTRUCTIONS: 
 
Part I. Tailboom attachment hardware inspection and replacement.  
 
1. Prepare the helicopter for maintenance.  
2. At the forward end of the tailboom, remove the four plug buttons covering the 
tailboom attachment barrel nuts. 
3. Using adequate tailboom support equipment, support tailboom to remove the load at 
the tailboom attachment points.     
4. Gain access to the tailboom attachment bolts and remove the upper left -hand bolt. 
Discard bolt and retain countersunk washer and plain washers. (C-12-146-000/MF-
001, Chapter 53).  
5. Remove barrel nut and install new barrel nut NAS577C9A with new retainer 
NAS578C9A. 
CAUTION 
 
Grease (C-561) or (C-172) shall be applied on bolt shank only. 
Grease shall not be applied to bolt threads. 
 
6. Apply a coating of grease (C-561) or (C-172) to bolt shank only.  
7. Place countersunk washer on bolt with countersunk side facing bolt head. Install new 
bolt with previously removed plain washers between countersunk washer and fitting. 
Ensure not less than one thread or no more than two threads are showing. Adjust 
quantity of plain washers as required. Refer to the applicable Illustrated Parts 
Breakdown (IPB) for plain washer part number. Torque bolt 1300 to 1600 inch-
pounds (147 to 181 Nm). (C-12-146-000/MF-001, Chapter 53).  
8. Remove upper right-hand bolt with countersunk washer and plain washers. Retain 
washers for reuse. 
9. Visually inspect bolt for mechanical or corrosion damage. Any corrosion including 
surface corrosion is cause for rejection.  Damaged threads and detectable wear or 
mechanical damage on the bolt shank or bolt head radii are cause for rejection.

### Page 6

ASB 412CF-21-72-RA 
Page 6 of 7 
Approved for public release. 
10. Remove the barrel nut and install new barrel nut NAS577C8A with new retainer 
NAS578C8A. If the removed barrel nut is found cracked, discard the bolt and install 
a new one. 
CAUTION 
 
Grease (C-561) or (C-172) shall be applied on bolt shank only. 
Grease shall not be applied to bolt threads. 
 
11. Apply a coating of grease (C-561) or (C-172) to the bolt shank only.  
12. Place cou ntersunk washer on bolt with countersunk side facing bolt head. Install 
serviceable bolt with previously removed plain washers between countersunk 
washer and fitting. Ensure that not less than one thread or no more than two threads 
are showing. Adjust quantity of plain washers as required. Refer to the applicable 
Illustrated Parts Breakdown (IPB) for plain washer part number. Torque bolt 1000 to 
1200 inch-pounds (113 to 136 Nm). (C-12-146-000/MF-001, Chapter 53). 
CAUTION 
 
The lower tailboom attachment bolts and barrel nuts must be 
removed one at a time. 
 
13. Remove one of the two lower bolts  with countersunk washer and plain washers. 
Retain washers for reuse. 
14. Visually inspect bolt for mechanical or corrosion damage. Any corrosion including 
surface corrosion is cause for rejection.  Damaged threads and detectable wear or 
mechanical damage on the bolt shank or bolt head radii are cause for rejection.  
15. Remove the barrel nut and install a new barrel nut NAS577C6A with a new retainer 
NAS578C6A. If the removed barrel nut is found cracked, discard the bolt and install 
a new one. 
CAUTION 
 
Grease (C-561) or (C-172) shall be applied on bolt shank only. 
Grease shall not be applied to bolt threads.  
 
16. Apply a coating of grease (C-561) or (C-172) to the bolt shank only.

### Page 7

ASB 412CF-21-72-RA 
Page 7 of 7 
Approved for public release. 
17. Place countersunk washer on bolt with countersunk side facing bolt head. Install bolt 
with previously removed plain washers between countersunk washer and fitting. 
Ensure that not less than one thread or no more than two threads are showing. Adjust 
quantity of plain washers as required. Refer to the applicable Illustrated Parts  
Breakdown (IPB) for plain washer part number. Torque bolt 400 to 430 inch-pounds 
(45.2 to 48.6 Nm). (C-12-146-000/MF-001, Chapter 53). 
18. Repeat steps 13 through 17 for the remaining lower bolt.  
19. Apply sealant (C-308) to plug buttons and install. 
20. Make an entry in the helicopter logbook and historical service records indicating 
compliance with Part I of this Alert Service Bulletin. 
Part II. Between 1 and 5 flight hours after tailboom installation or attachment bolt 
replacement.  
 
1. Carry out a torque check  of the tailboom  attachment bolts using the torque values 
specified in Part I . Torque check must be repeated every 1 to 5 flight hours until 
torque has stabilized (Three times maximum).  If after three attempts the torque has 
not stabilized; inspect bolt and replace barrel nut. 
2. Once the torque is stabilized, apply torque seal (C-049) witness mark to all four bolt 
heads. 
Part III. Recurring torque check of the tailboom attachment hardware. 
 
1. Carry out a torque check of the tailboom attachment bolts 600 flight hours or 12 
months, whichever comes first after accomplishment of Part II, and every 600 flight 
hours or 12 months thereafter. Re-apply torque seal (C-049) as required. 
2. Any bolt found below the minimum torque specified in Part I  must be replaced. 
Inspect the associated barrel nut for condition and for loss of tare torque; replace as 
necessary. Any bolt that requires replacement must be torque checked in 
accordance with Part II.  
3. Make an entry in the helicopter logbook and historical service records indicating 
compliance with Part III of this Alert Service Bulletin.

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
