# Bell Alert Service Bulletin 412-09-135: No revision named

- Rights: © Bell Textron Inc. Filed by the FAA in regulations.gov docket FAA-2012-0082; AD 2013-01-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bell Alert Service Bulletin 412-09-135](https://openairdocs.org/service-documents/bell/sb-412-09-135.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 16
- PDF: https://openairdocs.org/files/sha256/2d/aa/2daaed5b7ff52d42e0ce5a0ccc5c18099ceb3e06db05b39a4caffcad87e4bee9
- Page: https://openairdocs.org/service-documents/bell/sb-412-09-135/file/2daaed5b7ff5

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

NO. 
  
DATE 
PAGE 
    DATE  
    REV  
     ALERT SERVICE BULLETIN 
AN APPROPRIATE ENTRY SHOULD BE MADE IN THE AIRCRAFT LOGBOOK UPON ACCOMPLISHMENT 
IF OWNERSHIP OF AIRCRAFT HAS CHANGED PLEASE FORWARD TO NEW OWNER 
412-09-135 
Aug 25, 2009 
1 of 16 
 
 
 
 
MODEL AFFECTED:  412 /412EP  
 
  
SUBJECT: HIGH AFT CROSSTUBE ASSEMBLIES P/N 412-
050-011-101, / -103, / -105, / -107, 412-050-045-
105: MANDATORY INSPECTION 
 
 
HELICOPTERS AFFECTED: Model 412 / 412EP helicopters serial numbers 
33001 through 33213, 36001 and subsequent. 
  
 The intent of this bulleti n will be incorporated into the 
Model 412 Maintenance Manual at a future date. 
 
   
COMPLIANCE: Within 6 months after receipt of this bulletin. 
 
Part I 
 Schedule and accomplish a reoccurring 12 month / 
2500 landing Fluorescent Penetrant Inspection of aft 
high crosstube. 
Part II 
Schedule and accomplish a reoccurring 12 month / 
2500 landing Deflection Check of aft high crosstube  
Part III 
Establish a mandatory use of aft high crosstube 
towing retention kit per BH T-412-SI-58 at helicopter 
weight of 8900Ibs and higher.

### Page 2

ASB 412-09-135 
Page 2 of 16 
 
 
DESCRIPTION: 
 
As a result of reported field failures, Bell Helicopter has completed a load survey, 
coupon testing and analysis of the high aft crosstubes. The results indicate repetitive 
cycle fatigue damage can occur during towing and landing operational events. These 
results warrant a 12 month / 2500 landing (which ever comes first) repetitive 
Fluorescent Penetrant Inspection, Deflection Check, and a mandatory use of the aft 
crosstube retention kit (BHT-412-SI-58) at helicopter weights at or above 8900 lb. 
 
APPROVAL: 
 
The engineering design aspects of this bulletin are FAA/DER approved. 
 
 
MANPOWER: 
 
Approximately 10 man-hours are required to co mplete this bulletin not including paint 
and primer cure times. Man-hours are based on hands-on time, and may vary with 
personnel and facilities available. 
 
 
WARRANTY: 
 
There is no warranty provided for this bulletin. 
 
 
MATERIAL: 
 
Required Material: 
The following material is required for the ac complishment of this bulletin and may be 
obtained through your Bell Helicopter Textron Supply Center. 
 
Part Number Nomenclature  Quantity  
412-050-045-117 Clamp Assembly A/R 
206-050-301-111 Abrasion Strip A/R 
LARSON L101 Larson Film A/R 
412-706-031-101* Towing Provisions A/R 
412-250-100-101* Puller  Equipment A/R 
212-070-600-143** Decal 2 
 
* See BHT-412-SI-58 
** Acceptable to locally manufacture per Figure 3

### Page 3

ASB 412-09-135 
Page 3 of 16 
 
 
Consumable Material: 
The following material is required to a ccomplish this bulletin and may be obtained 
through your Bell Helicopter Textron Supply Center. 
 
Part Number Nomenclature  Quantity  Reference  
AMS-S-8802 Sealant 1 C-308 
LARSON L100 Adhesive A/R C-571 
MIL-R-81294 Paint Remover A/R C-436 * 
EWDE072 
3950 Scotchcal 
Primer Kit (1GAL,1QT) 
Edge Sealer 
A/R 
A/R 
C-246 
C-349 
MS-242N Quik-Freeze A/R C-137 
 
* Customers may also use Turco 5351(T-5469) 
 
SPECIAL TOOLS: 
 
None required  
 
WEIGHT AND BALANCE: 
 
Not affected 
 
ELECTRICAL LOAD DATA: 
 
Not affected 
 
REFERENCES: 
 
BHT-412-IPB Illustrated Parts Breakdown 
BHT-412-MM Maintenance Manual, Rev 12 
BHT OSN 412-07-32 
BHT-ALL-SPM Standard Practices Manual 
BHT ASB 412-08-129 (AAI ASB AA-07109) 
BHT-ASB 412-99-97 
BHT-412-SI-58 Gross Weight Towing Kit Provisions & Puller Equipment 
 
 
PUBLICATIONS AFFECTED: 
 
BHT-412-IPB Illustrated Parts Breakdown 
BHT-412-MM Maintenance Manual 
BHT-412-MD-1, 2, & 3 
BHT-412-SI-2 Emergency Float Kit 
BHT-412-SI-40 High Skid Gear / High Crosstube

### Page 4

ASB 412-09-135 
Page 4 of 16 
 
 
BHT-412-SI-58 Gross Weight Towing Kit Provisions & Puller Equipment 
BHT-412-SI-60 Emergency Floats 
 
 
ACCOMPLISHMENT INSTRUCTIONS 
 
ESTABLISHING REQUIREMENTS: 
 
1. Review the high landing gear aft cro sstube component history card and determine 
bulletin applicability as indicated in Table 1 below. 
 
TABLE 1 
 
Crosstube 
Assembly Part 
Number 
Sub Assembly 
Crosstube Part 
Number (See Note) 
Crosstube sub-
assembly (Non-
procurable) (See note) 
Bare Crosstube 
(Non-procurable) 
412-050-011-101 412-050-010-101 N/ A this level 412-050-010-103 
412-050-011-103 412-050-010-107 412-050-010-109 412-050-010-103 
412-050-011-105 412-050-010-107 412-050-010-109 412-050-010-103 
412-050-011-107 412-050-010-111 412-050-010-113 412-050-010-115 
412-050-045-105 412-050-045-107 N/ A this level 412-050-044-101 
412-321-104 See AAI ASB AA-07109 / BHT ASB 412-08-129 
 
Note: Sub-assemblies are indicated abov e for tracking purposes. Tracking is 
accomplished at the sub assembly par t number level on Bell 12-digit part 
numbers. The factory serial numbers or the company control serial numbers 
are visible in the cuff area above the skid tube saddle; refer to ASB 412-99-97. 
 
2. Amend the component history card to reflect the bulletin requirements for a 
recurring 12 month / 2500 landing aft cro sstube Fluorescent Penetrant Inspection 
and a Deflection Check. Refer to acco mplishment instructions Part I & II 
respectively. 
 
3. Establish maintenance practices to  mandate towing with the aft crosstube 
retention kit. Refer to the Accomplishment Instructions Part III. 
   
 
ACCOMPLISHMENT INSTRUCTIONS 
 
PART I - Accomplish a reoccurring 12 month / 2500 landing aft crosstube 
Fluorescent Penetrant Inspection as indicated below.

### Page 5

ASB 412-09-135 
Page 5 of 16 
 
 
-NOTE- 
 
The high aft crosstube Fluoresce nt Penetrant Inspection can 
be accomplished by any pers on meeting the personnel 
Qualification / Certification Requirements of the BHT-ALL-
SPM (ref. Chapter 6, Section 6-5). 
 
 
1. Remove the landing gear assembly from the helicopter as per BHT-412-MM. 
 
CAUTION 
 
TEMPORARILY INSTALLING A SECONDARY LANDING 
GEAR OR MAINTAINING A CONNECTION TO AN 
OVERHEAD CRANE IS RECOMMENDED DURING THIS 
MAINTENANCE ACTION. 
 
2. Remove the aft crosstube fr om the landing gear assembly. 
 
3. Remove the support beam from the aft crosstube as per BHT-412-MM   
 
4. Remove the hardware retaining BL 14 clamp assemblies P/N 412-050-045-115 or / 
-117 (left & right hand) on the high aft crosstube. Refer to Figure 1 below. 
 
CAUTION 
 
CROSSTUBE TEMPERATURE NOT TO EXCEED 200ºF 
(93.3ºC) WHEN USING HEAT  GUN. EXCESSIVE HEAT 
WILL DAMAGE CROSSTUBE. 
 
 
5. Use heat gun to soften sealant bonding t he clamp assembly to the crosstube. 
Separate the clamp from crosstube and the abrasion strip (if installed). 
 
-NOTE- 
 
Crosstubes 412-050-011-ALL do not have the abrasion 
strips bonded to the under side at BL 14 or the Larson L101 
material bonded to the under side at BL 00. Fluorescent 
Penetrant Inspection is requi red in these areas prior to 
reworking these crosstubes to meet the protective 
requirements of 412-050-045 crosstubes, containing the 
above mentioned items. Refer to “Rework” section below for 
the 412-050-011-ALL high aft crosstubes.

### Page 6

ASB 412-09-135 
Page 6 of 16 
 
 
-NOTE- 
 
Crosstube 412-050-045-107 with AAI replacement lower 
support 604-026-003 at BL 00 re quire Fluorescent Penetrant 
Inspection in this area. Refer to “Rework” section  
 
 
6. Remove abrasion strip P/N 206-050-301-11 1 at BL 14 from the crosstube lower 
surface only if it has become partially de- bonded; or, if further maintenance related 
investigation is deemed necessary. Removal of the abrasion strips from crosstubes 
412-050-045-107 or reworked 412-050-011-ALL series crosstubes is not necessary 
to accomplish the Fluorescent Penetrant Inspection.  If abrasion strips must be 
removed, use a plastic scraper to separat e the strip from the crosstube while 
cooling the strip with Quik-freeze C-137 to de-grade the bond line. Start at a corner 
and continue peeling carefully while mainta ining the bond line in a cool / frozen 
state.    
 
-NOTE- 
 
The upper support 412-050-006-101 on the aft crosstube is 
bonded with structural adhesive and is not  designed to be 
removed. 
 
 
7.  Removal of the lower crosstube s upport P/N 412-050- 007-101 incorporating the 
abrasion strip at BL 0.0 is unnecessary unless there are signs of looseness or 
debonding. If the abrasion strip must be removed, use a plastic scraper to separate 
the strip from the crosstube while cooling the strip wi th Quik-freeze C-137 to de-
grade the bond line. Start at a corner  and continue peeling carefully while 
maintaining the bond line in a cool / fr ozen state. Crosstube assembly 412-050-
045-107 and reworked crosst ubes 412-050-011-ALL have the abrasion strip under 
BL 0.0 support.  Crosstubes P/N 412-050-011- ALL in the original condition without 
the Larson L101 under the lower support P/ N 412-050-007-101 at BL 0.0 require 
removal of the lower support for the first Fluorescent Penetrate Inspection (refer to 
Rework section for 412-050-011-ALL high aft crosstubes). 
 
-NOTE- 
 
Lower support P/N 604-026-00 3 comes with black nylon 
abrasion material bonded to the support. The Larson L101 
abrasion strip shall not be used with this support. 
 
8. Remove lower crosstube support P/N 604 -026-003 (if installed)  from Crosstubes 
412-050-011-ALL and 412-050-045-107 to accomplish the first Fluorescent 
Penetrant Inspection.

### Page 7

ASB 412-09-135 
Page 7 of 16 
 
 
9. Remove Larson L101 abrasion strip bonded to  the crosstube at BL 0.0 if using AAI 
replacement support P/N 604-026-003 to accomplish the first Fluorescent 
Penetrant Inspection. 
 
 
CLEANING AND PREPARATION  
 
1. Use a plastic scraper to remove residual sealant on the crosstube. It is not required 
to remove the sealant bead around t he periphery of the 412-050-006-101 upper / 
412-050-007-101 lower supports at BL 00 unless the sealing bead has been 
damaged on crosstube series 412-050-045. Residual sealant, Larson L101 film 
and Larson adhesive will need to be remov ed from crosstubes affected by the 
installation of spare r eplacement lower support 604-026- 003. Original crosstubes 
P/N 412-050-011-ALL without Larson L101 (adhesive film) under the lower support 
at BL 0.0 require the residual sealant to be removed for the first Fluorescent 
Penetrant inspection only. 
 
CAUTION 
 
PROTECT ABRASION STRI PS AND UPPER / LOWER 
SUPPORTS (BL 14, BL 00) FROM PAINT REMOVER 
CONTAMINATION AS REQUIRED  
 
2. Prepare crosstube for the inspection pr ocess by removing the paint on the 
crosstube in the area indicated in Figure 2. 
a. Crosstube P/N 412-050-045 will require the paint to be removed in area 
depicted in Figure 2 wit h the exceptions of the abr asion strip areas and the 
412-050-006-101 upper and 412-050-007-101 lower supports (BL 0.0). The 
paint and Larson abrasion strip will need to be removed in the lower support 
area at BL 00 if support P/N 604-026-003 has been installed.    
b. Crosstube P/N 412-050-011- ALL which does not have the abrasion strip 
under the clamp assembly at BL 14 or Larson L101 material under the lower 
support at BL.0.0 will require the paint to be removed under the lower center 
support. 
 
3. Apply chemical paint remover (C-436) to the crosstube with a brush following 
manufacturer’s directions and the BHT-ALL-SPM.

### Page 8

ASB 412-09-135 
Page 8 of 16 
 
 
CAUTION 
 
A PLASTIC SCRAPER OR AB RASIVE PAD C-407 MAY BE 
USED TO GENTLY ASSIST THE PAINT REMOVAL 
PROCESS. USE OF THE PLASTIC SCRAPER OR 
ABRASIVE PAD IS TO BE ACCOMPLISHED IN A 
LONGITUDINAL DIRECTION  ENSURING NOT TO 
ABRADE THE CROSSTUBE METAL SURFACE. 
 
4. Reapply the paint remover as required to  completely remove the paint and primer. 
Rinse crosstube surface clean using potable water and dry thoroughly. Inspect 
crosstube to ensure the bare metal of the cr osstube is clearly visible and free of paint 
and primer residue in the affected area. 
 
5. Protect crosstube immediat ely after cleaning by applying corrosion preventive oil if 
the inspection process is delayed. Wrap in barrier material and secure with tape. 
 
INSPECTION 
 
CAUTION 
 
USE CARE TO PREVENT CONTAMINATION FROM 
FLUORESCENT PENETRANT CHEMICALS ON THE 
ABRASION STRIPS AND UP PER / LOWER SUPPORT 
(BL14, BL 00) AS APPLICABLE. 
 
 
-NOTE- 
 
The aft crosstube Fluorescent Penetrant Inspection can be 
accomplished by any person meeting the personnel 
Qualification / Certification Requirements of the BHT-ALL-
SPM (ref. Chapter 6, Section 6-5). 
 
1. Inspect the crosstube, with the exception of the areas covered by the protective 
abrasion strips (if installed) and upper c enter support using Fluorescent Penetrant 
method per ASTM E1417, Type 1 Method B, C or D using a penetrant sensitivity 
level of 2 or 3 (Refer to  BHT-ALL-SPM Chapter 6). 
2. All penetrant inspection materials utilized shall be compatible, and shall meet 
requirements of SAE AMS 2644.

### Page 9

ASB 412-09-135 
Page 9 of 16 
 
 
-NOTE- 
 
The use of visible dye systems is prohibited. 
 
3. Inspect crosstube damage per limits spec ified in the Maintenance Manual (BHT-
412-MM-5, Chapter 32) to determine allo wable damage and cleanup. No cracks 
are permitted. To determine the appropriat e Inspection Criteria Table in the 
Maintenance Manual for a specific high a ft crosstube, refer to cross reference 
Table 2 below. 
 
TABLE 2 
 
Crosstube 
Assembly Part 
Number 
Sub Assembly 
Crosstube Part 
Number 
Crosstube With 10,000 
Takeoff/ Landing Limit 
using Standard 
Inspection Criteria  
Crosstube With 20,000 
Takeoff/ Landing Limit 
using Improved 
Inspection Criteria 
412-050-011-101 412-050-010-101 X  
412-050-011-103 412-050-010-107 X  
412-050-011-105 412-050-010-107 X  
412-050-011-107 412-050-010-111 X  
412-050-045-105 412-050-045-107  X 
412-321-104   X 
See AAI ASB AA-07109 / 
BHT ASB 412-08-129 
 
 
REPAIR  
 
1. Repair all damaged crosstubes that are found to be  within acceptable limits as 
indicated in BHT-412-MM-5 Standard or Im proved inspection criteria Tables, 
record all repairs. 
 
2. Replace crosstubes that are beyond t he maximum allowable damage limits as 
indicated in the inspection Tables. 
 
 
REWORK OF CROSSTUBES 
 
-NOTE- 
 
High aft crosstubes 412-050-011 -ALL shall incorporate the 
bonding procedures and abrasion strips at BL 00 and BL14 
locations, to provide an equival ent level of protection as 
used on replacement cro sstubes P/N 4 12-050-045-105/-
107/-107A.

### Page 10

ASB 412-09-135 
Page 10 of 16 
 
 
-NOTE- 
 
It is required to omit the Larson L101 abrasion strip on the 
412-050-011-ALL and 412-050-045-107 crosstubes at BL 00 
when installing lower support 604-026-003. 
 
 
1. Apply primer (C-246) to areas where paint has been removed for inspections as 
per BHT-ALL-SPM. 
 
CAUTION 
 
DO NOT SAND CROSSTUBE IN  A CIRCUMFERENTIAL 
DIRECTION. SAND CROSSTU BE IN A LONGITUDINAL 
DIRECTION ONLY. 
 
-NOTE- 
 
It is required to complete the first Fluorescent Penetrant 
Inspection before installation of the abrasion strips at BL 0.0 
and BL 14 on the crosstubes 412-050-011-ALL. 
 
-NOTE- 
 
Abrasion strip bonding is ac complished prior to the 
installation of the BL 14 band clamp P/ N 412-050-045-115 
and BL 00 lower support P/N 412-050-007-101 installation. 
 
2. Lightly abrade the primer on the crosst ube common to the abrasion strip taking 
care not to expose bare material. 
 
-NOTE- 
Replacement of abrasion strip material on the under side of 
the crosstubes at station BL 0.0 and BL 14 locations on 412-
050-045-ALL high aft crosstubes is not required if it has not 
been damaged during inspection. 
 
 
3. Install the abrasion strip material on the under side of the crosstubes at both BL 0.0 
and BL 14 locations on all high aft cr osstubes series 412-050-011-ALL and 412-
050-045-107 per the BHT-412-MM, as requi red. Abrasion strip removal for 
subsequent Fluorescent Penetrant Inspecti ons is not required. When installing 
replacement lower support 604-026-003 at BL  00 the Larson L101 abrasion strip is 
not required. The replacement support has a black nylon abrasion material bonded 
to the support.

### Page 11

ASB 412-09-135 
Page 11 of 16 
 
 
-NOTE- 
 
All BL14 band clamps shall have an adhesive film on the 
inner surface prior installation. 
 
 
4. Use band clamp assembly 412-050-045-115 (replaced by 412-050-045-117) or 
prepare band clamp P/N 330 C400-338-S (alt. P/N 333C 400-338-S) by adding the 
adhesive film as indicated in the BHT- 412-MM, BL 14 clamp preparation. Clamp 
assembly 412-050-045-117 and clamp 333C400-338-S both have longer “T” bolts 
to ease installation. 
 
 
CAUTION 
 
CONFIRM BAND CLAMP POSITIONING PRIOR TO 
INSTALLATION AS PER BHT-412-MM. DO NOT POSITION 
BAND CLAMP OVERLAP AT CENTER OF RETENTION 
CAP RUBBER BUMPER. OVER  ROTATION OF THE 
CLAMP ASSEMBLY COULD RESULT IN DAMAGE TO THE 
AIRFRAME TUNNEL FROM THE CLAMP “T” BOLTS. 
 
 
CAUTION 
 
DO NOT SAND CROSSTUBE IN A CIRCUMFERENTIAL DIRECTION. 
 
5. Lightly abrade the primer on the cro sstube and abrasion strip common to the band 
clamp (P/N 412-050-045-117) taking care not to expose bare material. 
 
CAUTION 
 
REMOVE PROTECTIVE BACK ING FILM TO EXPOSE 
ADHESIVE FILM PRIOR TO BONDING CLAMP. 
 
6. Install band clamp assembly P/N 412- 050-045-117 using sealan t (C-308) as per 
the BHT-412-MM. Ensure complete sealant  coverage of the inner clamp surface, 
avoiding air pockets. 
 
7. Trim the “T” bolts on the clamp asse mbly 412-050-045-117 to provide adequate 
clearance from fuselage tunnel, as require d. Normally the “T” bolt should have 
approximately ½ inch of threads visible afte r installation. Deburr as required. Prime 
(C-246) and paint (as required) bare metal on “T” bolt for corrosion protection.

### Page 12

ASB 412-09-135 
Page 12 of 16 
 
 
8. Lightly abrade the abrasion strip or the crosstube primer on the crosstube at BL 0.0 
common to the lower support P/N 412-050-007-101 or 604-026-003 taking care not 
sand through abrasion strip or  primer on crosstube expo sing bare material. The 
Larson L101 abrasion strip is not requi red when installing replacement lower 
support 604-026-003.   
 
9. Install lower support P/ N 412-050-007-101 or 604-026-003 using sealant (C-308) 
per the BHT-412 Maintenance Manual. Prio r to bonding the replacement lower 
support 604-026-003 with sealant (C-308) light ly abrade the black nylon abrasion 
material taking care not to expose bare metal.  
 
10. Repaint crosstube as required per BHT-ALL-SPM. 
 
11. Annotate component records to indicate incorporation of abrasion strips on 412-
050-011 series crosstubes by the addition of “FM” to the end of the part number 
sequence (e.g. 412-050-011-107FM), for future reference. 
 
12. Annotate helicopter / component records to indicate Part I of this bulletin has been 
accomplished. 
 
 
ACCOMPLISHMENT INSTRUCTIONS 
 
PART II - ACCOMPLISH AFT CROSSTUBE DEFLECTION CHECK AND 
ESTABLISH A RECURRING 12 MONTH / 2500 LANDING 
DEFLECTION CHECK (WHICH EVER COMES FIRST). 
 
CAUTION 
 
ENSURE HELICOPTER IS STABILIZED ON JACKS 
BEFORE PROCEEDING TO ACQUIRING 
MEASUREMENTS. 
 
1. Hoist or jack the helicopter until the weight is removed from the landing gear. 
 
2. Determine the BL 0.0 from  the walking beam pivot point position and hang a plumb 
line to obtain the measurement from BL 0.0 to the outside edge of the skid tubes as 
indicated.  
 
3. Confirm aft crosstube is within deflections limits indicated in the BHT-412-MM. 
 
4. Replace aft crosstubes that exceed t he dimensional tolerances indicated. 
 
5. Annotate helicopter / component records to i ndicate Part II of this bulletin has been 
accomplished.

### Page 13

ASB 412-09-135 
Page 13 of 16 
 
 
ACCOMPLISHMENT INSTRUCTIONS 
 
PART III - TOWING: 
 
Helicopter towing operations can result in  fatigue damage to the aft crosstube. To 
prevent this damage, the reco mmendation to restrain the hi gh aft crosstube as stated 
in the maintenance manual (BHT-412-MM-2), is now mandatory  when towing at 
weights greater than or equal to 8900 lb. 
 
The puller assembly used in the Service In struction BHT-412-SI-58 is equipped with a 
load limiter called a “Load Sentry”. The mec hanism is preset to provide a 4000 pound 
tension load on the crosstube. This high load counteracts the loads being applied to 
the crosstube by the towing ac tions and weight of the he licopter. The Load Sentry is 
contained in the handle of the retention devise and works similar to a torque wrench. 
 
1. Install CAUTION decal P/N 212-070-600-143  per Figure 3 on pilot and co-pilot side 
and apply sealer (C-349) allowing 0.125 in (3.175) overlap on all sides of decal, as 
required. 
 
2. Review Bell Helicopter Service Instru ction BHT-412-SI-58 to determine the items 
required to use of this kit. 
 
CAUTION 
 
ENSURE LANDING GEAR MEETS THE MINIMUM 
REQUIREMENTS FOR TOWING PER THE SERVICE 
INSTRUCTION. TOWING SHOULD ONLY BE ACCOMPLISHED 
USING THE FORGED TOW FITTINGS P/N 204-050-104-101 
AND SUPPORT BEAM ASSEMBLY P/N 412-050-003-109, 
INCLUDING SUBSEQUENT REPLACEMENTS OF EACH ITEM. 
 
 
3. Establish helicopter towing practices for high landing gear at weights greater than 
or equal to  8900 lb and incorporate the use of Service Instruction BHT-412-SI-58. 
 
4. Customers that use helicopt er landing dollies (movable platforms) are also required 
to use the restraining devise per BHT-412-SI-58 at helicopter weights greater than 
or equal to 8900 lb for high landing gear. 
 
5. When towing a helicopter (at weights le ss than 8900 lbs) over unprepared surfaces 
or rough terrain with or without the use of a dolly, the use of Service Instruction 
BHT-412-SI-58 is strongly recommended. 
6. Annotate helicopter / component records to i ndicate Part III of this bulletin has been 
accomplished.

### Page 14 (OCR)

ASB 412-09-135
Page 14 of 16
BL
0.0
15.80 IN
(401.32 mm)
0.15 IN (3.81 mm) R
TRUE TYP
- 0.37 IN (9.40 mm)
4.74 IN  VIEW LOOKING FORWARD
(120.40 mm)
0.05 TO 0.15 IN.
(3.81 TO 12.7 mm)
TYPICAL OVERLAP
08518_001
1. Clamp assembly (412-050-045-115/-117)
2. Abrasion strip (206-050-301-111)
3.  Aft crosstube (Ref)
Upper center support (412-050-006-101)
5. Larson L101 abrasion strip (raw material size 0.020 x 5.0 x 6.0 inch (0.051 x 127 x 152.4 mm))
6. Lower center support (412-050-007-101) replaced by (604-026-003)
T 50 TO 70 IN-LB  (67.8 TO 94.9 Nm
FIGURE 1

### Page 15 (OCR)

ASB 412-09-135
Page 15 of 16
REMOVE PAINT/PRIMER
FROM CROSSTUBE, BOTH SIDES
- HIGH AFT
CROSSTUBE
BL
08518_002
NOTES
/ 1 Protect abrasion strip P/N 206-050-301-111 (if installed) during paint removal process.
/2 Protect upper and lower support during paint removal process. Crosstubes 412-050-011 in original condition
without larson L101 under the lower support will require the lower support to be removed for paint stripping
and fluorescent penetrant inspection.
FIGURE 2

### Page 16 (OCR)

ASB 412-09-135
Page 16 of 16
DECAL LOCATION PILOT
AND COPILOT SIDES
CAUTION
WHEN TOWING AT OR  3 IN.
ABOVE 8900 LBS,  (76.2 mm)
Refer to Maintenance
Manual Chapters 4 & 9
5 IN.
(127 mm)
08518_003
NOTE
Decal characters are in red (Medium Compact Helvetica Font) 60 point for the first line and 36 point for the
remaining lines, on a white background.
FIGURE 3

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
