# Bell Alert Service Bulletin 430-22-61: No revision named

- Rights: © Bell Textron Inc. Filed by the FAA in regulations.gov docket FAA-2026-3476, the docket of AD 2026-13-12. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Bell Alert Service Bulletin 430-22-61](https://openairdocs.org/service-documents/bell/sb-430-22-61.md)
- Title as filed: Bell ASB 430-22-61
- Pages: 14
- PDF: https://openairdocs.org/files/sha256/bc/4b/bc4bfc48b6aae2fb8fb1177b0ebe85c87dd3cc12a8c80a9acaa4b58524f3bd7c
- Page: https://openairdocs.org/service-documents/bell/sb-430-22-61/file/bc4bfc48b6aa

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ASB 430-22-61 
Page 1 of 14 
Approved for public release. 
 
 
  ALERT SERVICE BULLETIN 430-22-61 
6 November 2023 
 
 
MODEL AFFECTED:  430 
 
SUBJECT: MAIN ROTOR PITCH LINK ASSEMBLY 
COMPONENTS - INSPECTION AND 
AIRWORTHINESS LIFE REVISION OF 
 
 
HELICOPTERS AFFECTED: Serial numbers 49001 through 49129. 
  
COMPLIANCE: PART I: Within 50 flight hours or 60 days, whichever 
comes first, after the release date of this bulletin.  
 
 PART II: Within 50 flight hours or 60 days, whichever 
comes first after accomplishment of PART I, and every 
50 flight hours or 60 days , whichever comes fi rst 
thereafter. 
 
 PART III:  Within 150 flight hours or 12 months, 
whichever comes first after accomplishment of PART 
I, and every 150 flight hours or 12 months, whichever 
comes first thereafter.  
 
PART IV: If required by PART II of this bulletin. 
 
DESCRIPTION: 
 
This Alert Service Bulletin (ASB) supersedes and replaces ASB 430-21-60. 
Based on analysis and service history, Bell has elected to reduce the airworthiness life 
of the main rotor pitch link assembly clevises and the universal bearings due to possible 
damage and excessive bending loads on the clevis caused by a stiff and/or binding 
bearing. A stiff and/or binding bearing may be attributed to a lack of lubrication.

### Page 2

ASB 430-22-61 
Page 2 of 14 
Approved for public release. 
Rather than having an airworthiness life assigned to the main rotor pitch link assembly; 
the clevis, the tube assembly, the universal bearing, the clevis-to-universal bearing bolt, 
and the rod end assembly will all have individually assigned retirement lives as shown 
in Table 1 of the ACCOMPLISHMENT INSTRUCTIONS. 
 
PART I of this bulletin introduces new main rotor pitch link assemblies  430-010-411-
109 and 430-010-411-111 replacing the 430-010-411-105 and 430-010-411-107 
respectively, as well as instructions to inspect the detail parts of the pitch link 
assemblies. PART I also introduces new airworthiness life limits to the clevis and the 
universal bearing in Table 1. 
 
PART II mandates a recurring 50 flight hour or 60 days, whichever occurs first,  10X 
visual inspection of the installed clevis. 
 
PART III mandates a recurring 150 flight hour or 12 months, whichever occurs first, 
inspection of the universal bearing. 
 
PART IV has the procedures to perform a Magnetic Particle Inspection of  the clevis 
430-010-432-101, if required following accomplishment of PART II. 
 
Applicability of this bulletin to any spare part shall be determined prior to its installation 
on an affected helicopter. 
 
APPROVAL: 
 
The engineering design aspects of this bulletin are Transport Canada Civil Aviation 
(TCCA) approved. 
 
CONTACT INFO: 
 
For any questions regarding this bulletin, please contact: 
 
Bell Product Support Engineering 
Tel: 1-450-437-2862 / 1-800-363-8023 / productsupport@bellflight.com 
 
MANPOWER: 
 
Approximately 2.0 man-hours are required to complete PART I this bulletin. 
Approximately 1.0 man-hours are required to complete PART II this bulletin. 
Approximately 2.0 man-hours are required to complete PART III this bulletin. 
Approximately 4.0 man-hours are required to complete PART IV this bulletin. 
 
This estimate is based on hands-on time and may vary with personnel and facilities 
available.

### Page 3

ASB 430-22-61 
Page 3 of 14 
Approved for public release. 
WARRANTY: 
 
There is no warranty credit applicable for parts or labor associated with this bulletin. 
 
MATERIAL: 
 
Required Material: 
The following material is required for the accompl ishment of this bulletin and may be 
obtained through your Bell Supply Center. 
 
Part Number Nomenclature Qty (Note) 
   
430-010-432-101 Clevis A/R (1) 
212-010-412-103 Universal Bearing A/R (1)(2) 
430-010-431-109 Tube Assembly A/R (3) 
430-010-431-111 Tube Assembly A/R (3) 
430-010-433-101 Rod End Assembly A/R (3) 
50-047C6-28 Universal to Pitch Link Bolt A/R (3) 
   
NOTES: 
 
1. Only required if the new assigned airworthiness life limit has been exceeded or the 
component does not meet the inspection criteria as described in the 
ACCOMPLISHMENT INSTRUCTIONS. 
2. Universal bearing 212 -010-412-103 replaces the universal bearing 212-010-412-
001. 
3. Only required if found unserviceable after accomplishment of PART I. 
 
Consumable Material: 
The following material is required to accomplish this bulletin, but may not require 
ordering, depending on the operator’s consumable material stock levels.  This material 
may be obtained through your Bell Supply Center. 
 
Part Number Nomenclature Qty (Note) Reference * 
    
2100-00044-00 
2100-09016-02 
1650-03297-00 
CPC Grade 1 
CPC Grade 2 
Safety Wire 0.032 inch 
1 PT (1) 
1 PT (1) 
1 LB (1, 2) 
C-101 
C-104 
C-405 
 
* C-XXX numbers refer to the consumables list in the BHT-ALL-SPM, Standard Practices Manual 
 
NOTES: 
 
1. Quantity indicated is the format that the product is delivered in. Actual quantity 
required to accomplish the instructions in this bulletin may be less than what has 
been delivered. 
2. Sold as a 1 pound roll; replaces the 5 pound roll part number 1650-03296-00.

### Page 4

ASB 430-22-61 
Page 4 of 14 
Approved for public release. 
SPECIAL TOOLS: 
 
None required. 
  
WEIGHT AND BALANCE: 
 
Not affected. 
 
ELECTRICAL LOAD DATA: 
 
Not affected. 
 
REFERENCES: 
 
BHT-430-IPB Illustrated Parts Breakdown, Chapter 62 
BHT-430-MM Maintenance Manual, Chapter 62 
BHT-430-CR&O Component Repair and Overhaul Manual, Chapter 62 
BHT-ALL-SPM Standard Practices Manual, Chapter 6 
ASB 430 -21-60 MAIN ROTOR PITCH LINK ASSEMBLY CLEVIS AND UNIVERSAL 
BEARING, INSPECTION OF. 
 
PUBLICATIONS AFFECTED: 
 
BHT-430-MM Maintenance Manual, Chapters 4 and 62 
BHT-430-IPB Illustrated Parts Breakdown, Chapter 62 
 
ACCOMPLISHMENT INSTRUCTIONS: 
 
PART I: Main rotor pitch link assembly inspection, part number re-identification 
and new airworthiness life limits 
 
1. Prepare the helicopter for maintenance. 
-NOTE- 
 
Record the length of the pitch link assembly and the condition 
of the color coding prior to disassembly. This will reduce the 
track and balance efforts after re -assembly of the pitch link 
assembly. At disassembly, omit removal of the inserts. 
 
2. Remove the pitch link assemblies from the helicopter (BHT-430-MM, Chapter 62). 
3. Disassemble the pitch link assemblies (BHT-430-CR&O, Chapter 62).

### Page 5

ASB 430-22-61 
Page 5 of 14 
Approved for public release. 
4. Review the helicopter logbook and the component information on the Historical 
Service Records (HSR) for the removed main rotor pitch link assemblies 430 -010-
411-105 and 430-010-411-107. 
a. Replace any component that has exceeded the new assigned airworthiness life 
limit as defined in Table 1. 
b. Replace the clevis 430 -010-432-101 if the newly assigned 2500 flight hour 
airworthiness life limit, as defined in Table 1, has been exceeded. 
c. Replace the universal bearing 212-010-412-001 with a 212-010-412-103 bearing 
if it has exceeded 1250 flight hours, as defined in Table 1.  
-NOTE- 
 
Universal bearing 212-010-412-103 is the direct replacement 
for the 212-010-412-001. Universal bearings 212 -010-412-
103 and 212-010-412-103FM are considered alternates to 
each other and interchangeable. The airworthiness life for part 
numbers listed applies to all successive dash numbers (or 
suffixes) for that component unless otherwise specified. 
Suffixes (letters following the dash numbers) are for reference 
only and are not intended to alter the part number. 
 
d. If the airworthiness life of the 212 -010-412-001 universal bearing has not 
exceeded 1250 flight hours, re-identify by crossing out the (-001) and replacing it 
with (-103FM) by dot-peening or vibro-etching to a maximum depth of 0.005 inch 
(0.127 mm) and no closer than 0.01  inch (0.254 mm) from the edge of the part.  
The total time in service shall not be reset. 
5. Perform a detailed visual inspection of the pitch link tube assembly, the rod end 
assembly, and bolt attaching the clevis to the universal bearing  (BHT-430-MM, 
Chapter 62). Replace any part that does not meet the published inspection criteria. 
6. Perform a detailed visual inspection of the clevis in accordance with PART II and the 
universal bearing in accordance with PART III of this bulletin. Replace any part that 
does not meet the inspection criteria described. 
-NOTE- 
 
Blank Historical Service Record (HSR) cards can be 
downloaded from the Technical Publications website at 
www.mybell.com (in the GENERAL INFO drop down menu 
under RECORD CARDS).

### Page 6

ASB 430-22-61 
Page 6 of 14 
Approved for public release. 
7. Prepare four new Historical Service Records for the re-identified pitch link assemblies 
430-010-411-109FM and 430-010-411-111FM and their sub-components as follows: 
 
-NOTE- 
 
Pitch link assembly 430 -010-411-109 is the direct 
replacement for the 430 -010-411-105. Pitch link assemblies 
430-010-411-109 and 430 -010-411-109FM are considered 
alternates to each other and interchangeable.  
The 430-010-411-111 is the direct replacement for the 430 -
010-411-107. Pitch link assemblies 430 -010-411-111 and 
430-010-411-111FM are considered alternates to each other  
and interchangeable. The airworthiness life for part number s 
listed applies to all successive dash numbers (or suffixes) for 
that component unless otherwise specified. Suffixes (letters 
following the dash numbers) are for reference only and are 
not intended to alter the part number. 
 
a. Enter the new pitch link assembly  part number 430-010-411-109FM and 430-
010-411-111FM, as applicable, and serial number on the first page of the HSR. 
Use the same serial number as on the previous pitch link assembly 430-010-411-
105 and 430-010-411-107. 
 
-NOTE- 
 
If the time in service of a sub -component of the pitch link 
assembly cannot be identified using the existing helicopter 
records, the affected component shall be replaced. 
 
b. With reference to Table 1, enter the part numbers and serial numbers of all sub-
components on the second page of the HSR .  The time in service shall not be 
reset. 
c. Retain the old Historical Service Records with the newly created records. 
8. Re-identify the pitch link assembly data plate  part number 430 -010-411-105 by 
crossing out the (-105) and changing it to (-109FM). This may be accomplished by 
dot-peening or vibro -etching to a maximum depth of 0.005  inch (0.127 mm).  Re-
identify pitch link assembly 430 -010-411-107 to 430 -010-411-111FM in the same 
manner. The “FM” suffix indicates the part was Field Modified.  
9. Assemble the pitch link assemblies (BHT-430-CR&O, Chapter 62). 
10. Install the pitch link assemblies (BHT-430-MM, Chapter 62).

### Page 7

ASB 430-22-61 
Page 7 of 14 
Approved for public release. 
11. Perform main rotor track and balance adjustments (BHT-430-MM, Chapter 18). 
12. Make an entry in the helicopter logbook and historical service records indicating 
compliance with PART I of this Alert Service Bulletin. 
 
PART II: Main rotor pitch link assembly clevis 10X visual recurring inspection. 
 
1. Prepare helicopter for maintenance. 
2. Clean the clevis (BHT -430-MM, Chapter 62 ). Remove all contaminants from the 
clevises. Utilize a stiff bristle brush to clean the threaded area. Verify thread roots are 
clean using up to 10X magnifying glass. 
 
-NOTE- 
 
Any suspected defects found during the 10X inspection must 
be investigated further by performing a magnetic particle 
inspection (MPI) of the clevis in accordance with PART IV of 
the ACCOMPLISHMENT INSTRUCTIONS of this bulletin. 
 
3. Perform a detailed visual inspection of the neck  and threaded area of the installed 
pitch link clevises using a 10X magnifying glass (Figure 1). Inspect for corrosion and 
mechanical damage (BHT-430-CR&O, Chapter 62). 
a. If no cracks are found, go to step 5. 
b. If cracks are found, replace the pitch link clevis (BHT-430-CR&O, Chapter 62). 
4. Replace any clevises that are beyond allowable damage limits (BHT-430-CR&O, 
Chapter 62 ) and report findings to Bell Product Support Engineering  at 
productsupport@bellflight.com. 
5. Make an entry in the helicopter logbook and historical service records indicating 
findings and compliance with PART II of this Alert Service Bulletin. 
 
PART III: Main rotor pitch link assembly universal bearing recurring inspection. 
 
1. Prepare the helicopter for maintenance. 
2. Remove the pitch links assemblies (BHT-430-MM, Chapter 62).

### Page 8

ASB 430-22-61 
Page 8 of 14 
Approved for public release. 
CAUTION 
 
A worn,  stiff or damaged universal bearing may cause an 
increase in vibrations that may lead to accelerated wear or 
damage to other components. In extreme cases and over 
time, the clevis can be subjected to excessive bending loads 
resulting from a stiff or degrade d universal bearing due to 
insufficient lubrication. 
 
It is critical that the purge greasing requirements of the 
universal bearing be adhered to. (BHT-430-MM, Chapter 12).  
 
The following purge greasing intervals shall not be 
exceeded. 
 
The 25 flight hour purge greasing interval specified in BHT -
430-MM, Chapter 12 , is the maximum interval permitted 
under normal operation. It is necessary to decrease the 
interval of servicing when the operating conditions are more 
severe. A salt -laden environment would be considered as a 
severe operating condition. Refer to the Corrosion Control 
Guide CSSD -PSE-87-001 Para 10 -2 with regards to the 
Frequency of Cleaning. 
 
Purge-greasing of the universal bearings shall be carried out 
after each day of operation in rain, snow, or after washing the 
helicopter to remove any trapped moisture. 
 
Purge-greasing of the universal bearings shall be carried out 
every 7 days for helicopters parked outside in a heavy dew 
environment to remove any trapped moisture. 
 
-NOTE- 
 
The universal bearing should rotate smoothly and be free of 
binding. Some slight ratcheting may be felt when turning the 
bearing. This slight ratcheting felt throughout the whole 
rotation is considered normal; however, an elevated force (or 
no force) felt in a specific zone during the full rotation of the 
bearing is cause for rejection. Replace any universal bearing 
that exceeds the axial and radial play limits or displays signs 
of binding. 
 
3. Remove the universal bearings from the pitch link assemblies and perform a detailed 
visual inspection for wear, damage, binding, stiffness, and looseness (BHT -430-
CR&O, Chapter 62).

### Page 9

ASB 430-22-61 
Page 9 of 14 
Approved for public release. 
4. Inspect the hardware for signs of wear and damage; replace as necessary  (BHT-
430-MM, Chapter 62). 
5. Replace any universal bearings that exceed the axial and radial play limits as well 
as those that display signs of stiffness, binding and looseness (BHT-430-CR&O). 
6. Purge-grease the bearings of each universal bearing ensuring all four grease fittings 
allow for grease purging. 
7. Assemble the pitch link assemblies (BHT-430-CR&O, Chapter 62). 
8. Install the pitch link assemblies (BHT-430-MM, Chapter 62). 
9. Make an entry in the helicopter logbook and historical service records indicating 
findings and compliance with PART III of this Alert Service Bulletin. 
 
PART IV: Main rotor pitch link clevis Magnetic Particle Inspection. 
 
1. Perform a Magnetic Particle Inspection (MPI) of the pitch link clevis as follows: 
a. Use a gauss meter to verify that the residual magnetization of the part is three 
gauss or less. Demagnetize as needed (BHT-ALL-SPM, Chapter 6). 
b. Clean the part  (BHT-ALL-SPM, Chapter 5). Remove all contaminants from the 
clevises. Utilize a stiff bristle brush to clean the threaded area. Verify thread roots 
are clean using up to 10X magnifying glass. 
 
c. Perform a Magnetic Particle Inspection (MPI) of the clevises as shown in Figures 
2 and 3.  Perform a demagnetization between Shot #1 and Shot #2, and again 
upon completion of the inspection.  Refer to BHT -ALL-SPM, Chapter 6, for 
additional information about the magnetic particle inspection procedures. 
 
d. Use a 10X magnifying glass under ultraviolet (UV) lighting to inspect the neck and 
thread root areas. When inspecting threads, only check the root areas after Shot 
#2. Top of threads may have fluorescence. If excessive fluorescence is observed 
on the threads that have been in contact with the coil, rotate the part 180 degrees 
and perform Shot #2 again. 
 
e. Replace any clevises that hav e signs of cracking and report findings to Bell 
Product Support Engineering at productsupport@bellflight.com. 
 
2. If no anomalies are found during the magnetic particle inspection, perform selective 
brush cadmium plating to replace any missing cadmium plating. Following the brush 
cadmium plating, apply the chromate conversion coating (BHT -ALL-SPM, Chapter 
3). 
3. Assemble the main rotor pitch link assemblies (BHT-430-CR&O, Chapter 62).

### Page 10

ASB 430-22-61 
Page 10 of 14 
Approved for public release. 
4. Install the pitch link assemblies (BHT-430-MM, Chapter 62). 
5. Carry out main rotor track and balance adjustments (BHT-430-MM, Chapter 18). 
6. Make an entry in the helicopter logbook and historical service record indicating  
compliance with PART IV of this Alert Service Bulletin.

### Page 11

ASB 430-22-61 
Page 11 of 14 
Approved for public release. 
Table 1 – Main Rotor Pitch Link Assembly Configuration 
 
 
 
PART NUMBER ITEM 
 
CONFIGURATION 
 
Airworthiness 
Life NOTES 
430-010-411-XXX Pitch Link Assembly -109/-109FM -111/-111FM On Condition (1, 2) 
430-010-431-109 Tube Assembly x  10,000 (6) 
430-010-431-111 Tube Assembly  x 10,000 (6) 
430-010-432-101 Clevis x x 2,500 (3,6) 
212-010-412-103/-
103FM 
Universal Bearing x x 1,250 (4, 5, 6) 
430-010-433-101 Rod End Assembly x x 10,000 (6) 
50-047C6-28 Universal to Pitch 
Link Bolt 
x x 2,500 (3,6) 
 
NOTES: 
 
1. Pitch Link Assembly 430-010-411-109 replaces the 430 -010-411-105 
and the 430-010-411-111 replaces the 430-010-411-107. 
2. The two jam nuts that are part of the pitch link assembly are standard 
hardware, not airworthiness life limited , and are not shown in the 
configuration table. Refer to the BHT-430-IPB for part numbers. 
3. The clevis airworthiness life and the universal to pitch link bolt are 
reduced from 10,000 to 2,500 flight hours. 
4. The universal bearing airworthiness life limit is reduced from 10,000 to 
1,250 flight hours. Universal bearing 212-010-412-103 replaces the 212-
010-412-001. 
5. Universal bearings 212-010-412-001 that have not exceeded 1250 flight 
hours shall be re-identified as 212-010-412-103FM. 
6. These components may require replacement based on their condition 
before reaching their respective assigned airworthiness life.

### Page 12

ASB 430-22-61 
Page 12 of 14 
Approved for public release. 
 
 
 
 
 
 
 
 
 
 
 
Figure 1 – Main Rotor Pitch Link Assembly Clevis 10X Inspection Area.

### Page 13

ASB 430-22-61 
Page 13 of 14 
Approved for public release. 
Clevis part number 430-010-432-101 Material: CRES 15-5PH 
 
Shot #1 Shot #2 
Central bar through clevis holes Coil shot, bottom of 5-turn coil 
600 Amps – Demagnetize before Shot #2 400 Amps 
 
              
 
Figure 1 – Magnetic Particle Inspection (MPI) 
 
 
 
 
NOTES: 
 
1. Verify that the magnetization of the part is three gauss or less. 
2. Preclean the part (BHT-ALL-SPM). Remove all contaminants from the clevis utilizing 
a stiff bristle brush to clean threaded areas. Ensure the thread roots are clean using 
up to 10X magnification. 
3. Carry out the magnetic particle inspection as defined above.  Demagnetize after 
Shot #1 inspection, and again after Shot #2 inspection. 
4. Use up to 10X magnification under ultraviolet (UV) light to inspect neck and thread 
root areas. While inspecting threads, check only root areas after Shot #2; top of 
threads may have fluorescence. If excessive fluorescence is observed on the 
threads that have been in contact with the coil, flip the part 180 degrees and perform 
Shot #2 again. 
 
Figure 2 – Magnetic Particle Inspection (MPI). 
          Hall effect probe locations, >30 gauss 
minimum

### Page 14

ASB 430-22-61 
Page 14 of 14 
Approved for public release. 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES: 
 
1. Top of threads may show fluorescence. Inspect root areas for indication of cracking. 
2. Due to the fine threads on the clevis, it is recommended that the inspection of the 
root areas be accomplished using a 10X magnifying glass under UV lighting. 
 
 
 
 
 
 
 
Figure 3 – Photo of Shot #2 of Magnetic Particle Inspection (MPI)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
