# Boeing Alert Service Bulletin 717-53A0036: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0977; AD 2014-05-22 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 717-53A0036](https://openairdocs.org/service-documents/boeing/717-53a0036.md)
- Title as filed: U.S. DOT/FAA - SB-717-53A0036
- Pages: 33
- PDF: https://openairdocs.org/files/sha256/a5/97/a59789aa444dfc1a8cf36104c744f1d035c8f8de38128792ede4ccbd4fadfc87
- Page: https://openairdocs.org/service-documents/boeing/717-53a0036/file/a59789aa444d

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
717
Service Bulletin
ALERT
Number: 717-53A0036
Original Issue: August 12, 2013
ATA System: 5310
SUBJECT: FUSELAGE - Main Frame - Inspect Overwing Frame for Cracks
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2013 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: August 12, 2013
717-53A0036
1 of 33
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
2 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ......................................... 9
B. Concurrent Requirements ...................................... 1 0
C. Reason ................................................ 1 0
D. Description .............................................. 1 0
E. Compliance .............................................. 1 1
F. Approval ............................................... 1 3
G. Manpower .............................................. 1 4
H. Weight and Balance Changes .................................... 1 5
I. Electrical Load Data ......................................... 1 5
J. References .............................................. 1 5
1. Existing Data: ......................................... 1 5
2. Data Supplied with this Service Bulletin: ........................... 1 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 6
4. Process Data: ......................................... 1 6
K. Publications Affected ........................................ 1 6
L. Interchangeability and Intermixability of Parts ........................... 1 6
M. Software Accomplishment Summary ................................ 1 6
2. MATERIAL INFORMATION ........................................ 1 7
A. Material - Price and Availability ................................... 1 7
B. Industry Support Information .................................... 1 7
C. Parts Necessary for Each Airplane ................................. 1 7
1. Kits/Parts ............................................ 1 7
2. Parts and Materials Supplied by the Operator ........................ 2 0
3. Parts Modified and Reidentified ................................ 2 1
4. Parts Removed and Not Replaced .............................. 2 1
D. Parts Necessary to Change Spares ................................. 2 1
E. Special Tooling - Price and Availability ............................... 2 1
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 1
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 3
A. GENERAL INFORMATION ..................................... 2 3
B. WORK INSTRUCTIONS ....................................... 2 5
FIGURE 1: OVERWING FRAME - GENERAL VISUAL INSPECTION .................. 3 0
FIGURE 2: OVERWING FRAME - EDDY CURRENT HIGH FREQUENCY INSPECTION ....... 3 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
3 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
4 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
717
Service Bulletin
ALERT
SummaryNumber: 717-53A0036Original Issue: August 12, 2013
ATA System: 5310
SUBJECT: FUSELAGE - Main Frame - Inspect Overwing Frame for Cracks
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Thirteen 717 airplanes have been reported with cracked overwing frames at Stations Y=674.000, Y=696.000
and Y=715.000. The airplanes had between 18,235 - 36,208 flight-hours and 11,991 - 45,091 landing cycles.
These cracked frames were addressed by Boeing Alert Service Bulletin 717-53A0034. Subsequent to the
issuance of Boeing Alert Service Bulletin 717-53A0034, one 717 airplane has been reported with a cracked
overwing frame, on the right side, at Station Y=737 which has a similar frame design. The airplane had
accumulated 31,960 flight-hours and 22,025 landing cycles. The frame crack was found during accomplishment
of a scheduled maintenance task that inspects the overwing floor beam-to-frame intersection. The crack, which
originated in the upper radius of the frame inboard tab just below the floor, was caused by fatigue. All the noted
frames are a part of 717 Principal Structural Element (PSE) 53.30.02.11. Inspection of the overwing frame at
Stations Y=737, left and right sides, will determine if cracks exist. Depending on the length of any crack found,
Boeing can provide frame repair and/or replacement instructions. If not corrected, an undetected crack may
sever the frame, which may increase the loading of adjacent frames and result in damage to adjacent structure
and extensive repair, or ultimately could lead to the loss of overall structural integrity of the airplane.
Boeing Fleet Team Digest (FTD) 717 FTD 53-09003 is related to this service bulletin.
ACTION
NOTE: Boeing recommends Alert Service Bulletin 717-53A0034, Revision1 be accomplished in conjunction
with this service bulletin due to the short compliance time and proximity of the frame inspection area.
This service bulletin gives instructions to do a General Visual Inspection (GVI) and an Eddy Current High
Frequency (ETHF) inspection of the overwing frame at Station Y=737, left and right sides. Based on inspection
results, do as follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
5 of 33

### Page 6

CONDITION 1: NO CRACK IN FRAME FOUND
1. Do repetitive GVI and ETHF inspections of the overwing frame at Station 737 for cracks at the intervals
specified in Paragraph 1.E., Compliance.
CONDITION 2: ANY CRACK IN FRAME FOUND LESS THAN .125 INCH IN LENGTH
1. Option 1: Frame Repair
a. Contact Boeing for repair instructions and do the repair when specified in Paragraph 1.E.,
Compliance.
b. Do repetitive GVI and ETHF inspections of the repaired overwing frame as recommended by
Boeing.
2. Option 2: Frame Replacement
a. Replace the cracked overwing frame when specified in Paragraph 1.E., Compliance.
b. Do repetitive GVI and ETHF inspections of the replaced overwing frame when specified in Paragraph
1.E., Compliance.
CONDITION 3: ANY CRACK FOUND IN FRAME EQUAL TO OR GREATER THAN .125 INCH IN LENGTH
1. Replace the cracked overwing frame when specified in Paragraph 1.E., Compliance.
2. Do repetitive GVI and ETHF inspections of the replaced overwing frame when specified in Paragraph
1.E., Compliance.
EFFECTIVITY
All 717-200 Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection procedures given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
6 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 7

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
7 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
8 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
717
Service Bulletin
ALERT
Number: 717-53A0036
Original Issue: August 12, 2013
ATA System: 5310
SUBJECT: FUSELAGE - Main Frame - Inspect Overwing Frame for Cracks
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
717-200 Airplanes-1
Airplanes Not Initially Inspected in Accordance With Multi Operator
Message (MOM) MOM-MOM-13-0375-01B
1
Airplanes Initially Inspected in Accordance With Multi Operator
Message (MOM) MOM-MOM-13-0375-01B
2
Airplane Models:
717-200
GroupFuselage Num-
ber
15002 - 5099
15100 - 5156
2. Spares Affected
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
9 of 33

### Page 10

B. Concurrent Requirements
None.
C. Reason
Thirteen 717 airplanes have been reported with cracked overwing frames at Stations Y=674.000,
Y=696.000 and Y=715.000. The airplanes had between 18,235 - 36,208 flight-hours and 11,991 -
45,091 landing cycles. These cracked frames were addressed by Boeing Alert Service Bulletin
717-53A0034. Subsequent to the issuance of Boeing Alert Service Bulletin 717-53A0034, one 717
airplane has been reported with a cracked overwing frame, on the right side, at Station Y=737 which
has a similar frame design. The airplane had accumulated 31,960 flight-hours and 22,025 landing
cycles. The frame crack was found during accomplishment of a scheduled maintenance task that
inspects the overwing floor beam-to-frame intersection. The crack, which originated in the upper radius
of the frame inboard tab just below the floor, was caused by fatigue. All the noted frames are a part of
717 Principal Structural Element (PSE) 53.30.02.11. Inspection of the overwing frame at Stations
Y=737, left and right sides, will determine if cracks exist. Depending on the length of any crack found,
Boeing can provide frame repair and/or replacement instructions. If not corrected, an undetected crack
may sever the frame, which may increase the loading of adjacent frames and result in damage to
adjacent structure and extensive repair, or ultimately could lead to the loss of overall structural integrity
of the airplane.
Boeing Fleet Team Digest (FTD) 717 FTD 53-09003 is related to this service bulletin.
D. Description
NOTE: Boeing recommends Alert Service Bulletin 717-53A0034, Revision1 be accomplished in
conjunction with this service bulletin due to the short compliance time and proximity of the
frame inspection area.
This service bulletin gives instructions to do a General Visual Inspection (GVI) and an Eddy Current
High Frequency (ETHF) inspection of the overwing frame at Station Y=737, left and right sides. Based
on inspection results, do as follows:
CONDITION 1: NO CRACK IN FRAME FOUND
1. Do repetitive GVI and ETHF inspections of the overwing frame at Station 737 for cracks at the
intervals specified in Paragraph 1.E., Compliance.
CONDITION 2: ANY CRACK IN FRAME FOUND LESS THAN .125 INCH IN LENGTH
1. Option 1: Frame Repair
a. Contact Boeing for repair instructions and do the repair when specified in Paragraph 1.E.,
Compliance.
b. Do repetitive GVI and ETHF inspections of the repaired overwing frame as recommended by
Boeing.
2. Option 2: Frame Replacement
a. Replace the cracked overwing frame when specified in Paragraph 1.E., Compliance.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
10 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 11

b. Do repetitive GVI and ETHF inspections of the replaced overwing frame when specified in
Paragraph 1.E., Compliance.
CONDITION 3: ANY CRACK FOUND IN FRAME EQUAL TO OR GREATER THAN .125 INCH IN
LENGTH
1. Replace the cracked overwing frame when specified in Paragraph 1.E., Compliance.
2. Do repetitive GVI and ETHF inspections of the replaced overwing frame when specified in Paragraph
1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
151, 161717-200
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Accomplish the required action(s), based on the applicable condition(s), in Table 1 or Table 2, in
accordance with Paragraph 3. Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Group 1, Configuration 1:
TABLE 1: LEFT AND RIGHT SIDE OVERWING FRAME AT STATION 737 - INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later )
ActionCondition
-Within 6000 flight
cycles after the
original issue date
of this service bul-
letin.
Before 12,000 total
flight cycles.
Do a General Visual Inspec-
tion and a Eddy Current
High Frequency inspection
of the left and right side
overwing frames at Sta. 737
for cracks.
ALL AIRPLANES
9,300 flight cycles.-Within 9,300 flight
cycles after initial
inspection.
Do General Visual Inspec-
tions and Eddy Current
High Frequency inspections
of the left and right side
overwing frames at Sta. 737
for cracks.
CONDITION 1: NO
CRACK IN FRAME
FOUND
(a)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
11 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 12

Group 1, Configuration 1:
TABLE 1: LEFT AND RIGHT SIDE OVERWING FRAME AT STATION 737 - INSPECTION
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever Occurs
Later )
ActionCondition
Repeat inspection
of repaired over-
wing frame as rec-
ommended by
Boeing.
-Before further
flight.
OPTION 1: Contact Boeing
for repair instructions and
do the repair.
CONDITION 2:
ANY CRACK IN
FRAME FOUND
LESS THAN .125
INCH IN LENGTH
--Before further
flight.
OPTION 2 (ACTION 1):
Replace the cracked over-
wing frame.
9,300 flight cycles.-Within 12,000 flight
cycles after replace-
ment.
OPTION 2 (ACTION 2): Do
General Visual Inspections
and Eddy Current High Fre-
quency inspections of the
replaced overwing frame.
(a)
--Before further
flight.
(ACTION 1) Replace the
cracked overwing frame.
CONDITION 3:
ANY CRACK
FOUND IN FRAME
EQUAL TO OR
GREATER THAN
.125 INCH IN
LENGTH
9,300 flight cycles.-Within 12,000 flight
cycles after replace-
ment.
(ACTION 2) Do General Vi-
sual Inspections and Eddy
Current High Frequency in-
spections of the replaced
overwing frame.
(a)
(a) If cracks are found during the repetitive inspections, do the work specified in Condition 2 or Condition 3.
Group 1, Configuration 2:
TABLE 2: LEFT AND RIGHT SIDE OVERWING FRAME AT STATION 737 - INSPECTION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--Within 9,300 flight
cycles after over-
wing frame inspec-
tion at Sta. 737 or
within 12,000 flight
cycles after replace-
ment.
Do a General Visual Inspec-
tion and a Eddy Current
High Frequency inspection
of the left and right side
overwing frame at Sta. 737
for cracks.
ALL AIRPLANES
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
12 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 13

Group 1, Configuration 2:
TABLE 2: LEFT AND RIGHT SIDE OVERWING FRAME AT STATION 737 - INSPECTION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
9,300 flight cycles.-Within 9,300 flight
cycles after initial
inspection.
Do General Visual Inspec-
tions and Eddy Current
High Frequency inspections
of the left and right side
overwing frame at Sta. 737
for cracks.
CONDITION 1: NO
CRACK IN FRAME
FOUND
(a)
Repeat inspection
of repaired over-
wing frame as rec-
ommended by
Boeing.
-Before further
flight.
OPTION 1: Contact Boeing
for repair instructions and
do the repair.
CONDITION 2:
ANY CRACK IN
FRAME FOUND
LESS THAN .125
INCH IN LENGTH
--Before further
flight.
OPTION 2 (ACTION 1):
Replace the cracked over-
wing frame.
9,300 flight cycles.-Within 12,000 flight
cycles after replace-
ment.
OPTION 2 (ACTION 2): Do
General Visual Inspections
and Eddy Current High Fre-
quency inspections of the
replaced overwing frame.
(a)
--Before further
flight.
(ACTION 1) Replace the
cracked overwing frame.
CONDITION 3:
ANY CRACK
FOUND IN FRAME
EQUAL TO OR
GREATER THAN
.125 INCH IN
LENGTH
9,300 flight cycles.-Within 12,000 flight
cycles after replace-
ment.
(ACTION 2) Do General Vi-
sual Inspections and Eddy
Current High Frequency in-
spections of the replaced
overwing frame.
(a)
(a) If cracks are found during the repetitive inspections, do the work specified in Condition 2 or Condition 3.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
13 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 14

G. Manpower
The tables below show an estimate of the task hours necessary to do the inspections and frame
replacement for each airplane. This estimate is for direct labor only, done by an experienced crew.
Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time.
These are some examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
CONDITION 1:
Elapsed HoursTask HoursNumber of PersonsTask
2.510.04Open Access
1.01.01FIGURE 1
1.01.01FIGURE 2
2.510.04Close Access
7.022.0TOTAL FOR EACH AIRPLANE
NOTE: Maximum total Task Hours and Elapsed Hours are given for the initial and repetitive inspection
of each airplane.
Condition 2, Option 1: Maximum total Task Hours and Elapsed Hours are based on repair instructions
from Boeing and are to be estimated by the operator.
Condition 2, Option 2 or Condition 3:
Elapsed HoursTask HoursNumber of PersonsTask
5.020.04Open Access
1.01.01FIGURE 1
1.01.01FIGURE 2
6.06.01Remove Cusp Mem-
brane
2.04.02Defuel
10.020.02Remove Frame
24.048.02Install Frame
6.06.01Install Cusp Mem-
brane
5.020.04Close Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
14 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 15

Condition 2, Option 2 or Condition 3:
Elapsed HoursTask HoursNumber of PersonsTask
60.0126.0TOTAL FOR EACH AIRPLANE
NOTE: Maximum total Task Hours and Elapsed Hours are given for the replacement of one frame.
Additional Task Hours and Elapsed Hours to replace the other frame are contingent upon
inspection results and are to be estimated by the operator.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Multi Operator Message (MOM) MOM-MOM-13-0375-01B
b. Boeing Service Bulletin 717-53A0034, Revision 1
c. Boeing Drawings, 5940477, 7595071, 9910151, SE10000000
d. Non-Destructive Test Standard Practices Manual (NDTSPM), Document Number MDC93K0393,
Part 06 Eddy Current: 06-10-01.001 (Procedure 1 - Surface Defect Detection), Part 09
Visual/Optical: 09-00-04 (Suppliers/Vendors), Part 09 Visual/Optical: 09-00-06 (Process
Examples), Part 09 Visual/Optical: 09-00-07 (Evaluation/Verification)
e. 717 Aircraft Maintenance Manual (AMM) 07-20-01, 12-11-01, 20-60-01, 20-60-26, 25-23-05,
25-28-02, 25-82-01, 52-21-01, 53-21-01, 53-53-01
f. 717 Fleet Team Digest (FTD) 53-09003
g. 717 Structural Repair Manual (SRM) 51, 51-10-04, 51-20-05, 51-40-03, 51-40-08, 51-41-01,
51-41-02, 51-41-03, 51-41-05
2. Data Supplied with this Service Bulletin:
No data is supplied with this service bulletin. To obtain the data necessary to support this service
bulletin submit a data request to:
Data and Services Management
MS D800-0019
3855 Lakewood Boulevard
Long Beach, California 90846
Phone: (562) 593-6996
Fax: (562) 593-2001
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
15 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 16

E-mail: dse.boecom@boeing.com
a. Drawings:
ADCNDCN/REVSheetTitleDrawing No
-BDWGCOVER INSTL CUSP HOLE5940477
-CHDWGCUSP AND MEMBRANE INSTL - STA 484
TO 623
9910151
--DWGFRAME INSTL - OVERWING SERVICE
REWORK DRAWING
SR95530016
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
4. Process Data:
Douglas Process Specifications referred to on the drawings and in the Work Instructions are not
given in this service bulletin since these procedures are frequently used as standard shop practices.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
16 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 17

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane . Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the original date
of this Service
Bulletin (US Dol-
lars)
ROLT as of the
original date of
this Service Bul-
letin (Calendar
Days)
NameKit Number
$41,530.0090 DaysFrame Instl Kit - LHS - Station 737SA95530036-3
$41,530.0090 DaysFrame Instl Kit - RHS - Station 737SA95530036-5
B. Industry Support Information
Boeing warranty remedies are not available for the inspection procedures given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
Condition 1, Condition 2, Option 1
None.
Condition 2, Option 2 and Condition 3
Kit SA95530036
NotesExisting Part
Number
NameQTYNew Part Number
-5-3
Frame Instl Kit -
LHS - Station 737
.-SA95530036-3
Frame Instl Kit -
RHS - Station 737
-.SA95530036-5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
17 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 18

Kit SA95530036
NotesExisting Part
Number
NameQTYNew Part Number
-5-3
(a)CLIP112913870-1
CLIP.12920756-1
CLIP1.2920756-2
(c)NUT ASSY94943D0006-3
(c)NUT ASSY333D0006-4
(a)CLIP119919672-19
CLIP.19919672-23
CLIP1.9919672-24
CLIP119919672-63
SPACER119919672-7
FRAME.19923408-503
FRAME1.9923408-504
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
18 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 19

Kit SA95530036
NotesExisting Part
Number
NameQTYNew Part Number
-5-3
(b)PIN44HLT435-6-4
PIN11HLT435-6-7
PIN55HLT435-6-8
PIN11HLT435-8-6
PIN22HLT435-8-7
PIN22HLT436-6-2
PIN1111HLT436-6-3
PIN44HLT436-6-4
PIN2222HLT436-6-5
PIN44HLT436-6-6
PIN44HLT436-6-7
PIN44HLT436-6-8
PIN44HLT436-6-9
PIN99HLT436-8-5
PIN22HLT436-8-7
PIN22HLT439-6-5
PIN2929HLT439-6-6
PIN88HLT439-6-7
PIN1515HLT439-6-8
RIVET22MS20470AD5-10D
RIVET1212MS20470AD5-11D
RIVET55MS20470AD5-12D
RIVET1313MS20470AD5-13D
RIVET11MS20470AD6-14D
NUT5555MS21042L3
NUT1111MS21042L4
(b)RIVET11NAS1097AD6-12D
WASHER5555NAS1252-10L
WASHER1111NAS1252-416L
(b) (c)PIN44S4931920-6-6
PIN2626S4931920-6-8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
19 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 20

Kit SA95530036
NotesExisting Part
Number
NameQTYNew Part Number
-5-3
(a) Some Boeing parts are supplied in a temporary configuration. Those parts are
identified with a 'U' or 'Y' in place of the '-' (dash) in the part number. It is permit-
ted to install parts identified with a 'U' or 'Y' as an alternative to the '-' (dash)
number part. Boeing Drawing SE10000000, Sheets 5.0 and 6.0 contain more
data.
(b) If grip length shown is not available at Boeing, fasteners supplied in kits may
be one grip length longer than indicated. Also, if any fasteners part numbers
listed are not available or have been superseded, substitute fasteners may be
supplied in kits.
(c) Or approved equivalent. Refer to Approved Equivalent Parts List Drawing (AEPL)
7595071.
2. Parts and Materials Supplied by the Operator
NOTE: If removal of the 9910151 Membranes are necessary for overwing frame
inspection/replacement, operator's should refer to the 9910151 Drawing for the fasteners
and materials necessary to reinstall the membranes.
NotesNameQTYPart Number / Specification
(a)Tape, Cloth Coated, Pressure Sensi-
tive
1 RollPolyken 225 or Polyken 225FR
(DMS 1968-2, Type 2)
OR
Equivalent
OR
(b)Tape, Adhesive, Insulation Cover
Splicing
Orcon OT-16A
(DMS 1984, Type 6, Class 2)
OR
Equivalent
(c)Sealing Compound1
Quart
PR-1422 Class B-2
(DMS 2082)
OR
Equivalent
(d)Tape, Adhesive, Double Faced1 Roll235
(DMS 1971)
OR
Equivalent
(a) Can be purchased from: Covalence Specialty Adhesives Limited Liability Corporation
(LLC) (CAGE: 80769), 25 Forge Parkway, Franklin, Massachusetts 02038.
(b) Can be purchased from: Orcon Corporation (CAGE: 1WFJ0), 1570 Atlantic Street, Union
City, California 94587.
(c) Can be purchased from: PRC-DeSoto International, Incorporated (CAGE: 92108), 12780
San Fernando Road, Sylmar, California 91342.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
20 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 21

NotesNameQTYPart Number / Specification
(d) Can be purchased from: Ideal Tape Company (CAGE:3X706), 1400 Middlesex Street,
Lowell, Massachusetts 01851.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None
E. Special Tooling - Price and Availability
The operator can supply the tools shown in Paragraph 2.F., Special Tooling Necessary to do this
Service Bulletin. Tool price and supply data are not given.
F. Special Tooling Necessary to do this Service Bulletin
General Visual Inspection (GVI) equipment and Eddy Current High Frequency (ETHF) inspection
equipment necessary to accomplish this service bulletin are listed in the Non-Destructive Testing
Standard Practice Manual (NDTSPM) and are to be procured from operator's stock or sources indicated.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
21 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 22

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
22 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT
BLANK PAGE

### Page 23

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: IF ELECTRICAL POWER IS APPLIED TO THE AIRPLANE, MAKE SURE YOU OBEY
ALL PRECAUTIONS WHILE YOU DO WORK. IF YOU DO NOT OBEY THE
PRECAUTIONS, DEATH OR INJURY TO PERSONS, AND DAMAGE TO THE AIRPLANE
CAN OCCUR.
CAUTION: ELECTRICALLY GROUND THE AIRPLANE. THIS WILL HELP TO PREVENT DAMAGE
TO THE AIRPLANE OR EQUIPMENT.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Equivalent parts are listed in the AEPL, Drawing 7595071.
3. Use the approved fastener and process material substitutions, in accordance with
717 SRM 51.
4. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
5. A 1/8-inch thick stack of the same type washers called for in this service bulletin is
the maximum thickness which may be used under fastener head or nut to counteract
accumulation of tolerances.
EXCEPTION: When the available fastener length increments are greater than
1/16-inch, a 3/16-inch thick stack of the same type washers may be used.
6. Oversize fasteners must be used when hole diameter exceeds the maximum diameter
specified.
7. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in 717 SRM 51.
– Torque Values:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
23 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 24

— Values for structural fasteners are given in 717 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 717
Airplane Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 717
Airplane Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
8. Obey all of the warnings and cautions given in the specified manual sections.
9. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
10. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
13. Some Boeing parts are supplied in a temporary configuration. Those parts are
identified with a 'U' or 'Y' in place of the '-' (dash) in the part number. It is permitted
to install parts identified with a 'U' or 'Y' as an alternative to the '-' (dash) number
part. Boeing Drawing SE10000000, Sheets 5.0 and 6.0 contain more data.
14. If shading is used, shaded areas in Figures are reference only. Shaded areas in
Figures may look different than your airplane.
15. Boeing recommends Alert Service Bulletin 717-53A0034, Revision1 be accomplished
in conjunction with this service bulletin due to the short compliance time and proximity
of the overwing frame inspection area.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
24 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 25

16. Some steps in the Work Instructions are identified as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
identified as RC must be done to comply with the AD. Alternative procedures for
steps not identified with RC can be used if the RC steps can still be done as specified,
and the airplane can be put back in a serviceable condition. An Alternative Method
of Compliance (AMOC) is not necessary for deviations to steps that are not identified
as RC.
17. Refer to the manuals that follow as accepted procedures:
OperationAccepted Procedure
Sealant - Maintenance Practices717 AMM 20-60-01
Corrosion/Erosion Control and Prevention717 SRM 51-10-04
Repair Sealing717 SRM 51-20-05
Fastener Substitution and Interchangeability717 SRM 51-40-03
Drilling, Countersinking, and Dimpling717 SRM 51-40-08
Installing Bolts, Screws, and Washers717 SRM 51-41-01
Installing and Removing Rivets717 SRM 51-41-02
Installing and Removing Lockbolts717 SRM 51-41-03
Installing and Removing Hi-Lok Fasteners717 SRM 51-41-05
B. WORK INSTRUCTIONS
1. Remove and keep passenger compartment items and attaching parts, as necessary, to get access
to the overwing frame inspection area at Station Y=737, on the left and right sides. Refer to Table
1 for a list of AMM accepted procedures:
TABLE 1
Accepted ProcedureItem
717 AMM 25-23-05Seats, Passenger
717 AMM 25-28-02Panel, Cabin Sidewall
717 AMM 25-82-01Insulation, Passenger Compartment
717 AMM 52-21-01Door, Overwing Emergency Exit
717 AMM 20-60-26Floor Coverings
717 AMM 53-21-01Floor Panels, Passenger Compartment
2. Remove the tape from the cutout between the cusp membrane and frame to get access to each
frame inspection area.
3. Remove and keep the cusp membrane to get access to frame inspection area. Use operator's
standard shop practices.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
25 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 26

NOTE: Removal of the cusp membrane may not be necessary if it is determined that there is
sufficient access to do the inspections that follow.
4. RC - Do a General Visual Inspection (GVI) and an Eddy Current, High Frequency (ETHF) inspection
of the overwing frame at Station Y=737 for cracks, on the left and right sides, in accordance with
FIGURE 1 and FIGURE 2.
5. CONDITION 1: NO CRACK IN FRAME FOUND:
a. If removed, install the kept cusp membrane for each frame. Use operator's standard shop
practices.
NOTE: Refer to Boeing Drawing 9910151 for installation fasteners and materials.
b. Apply DMS 1968, Type 2, Cloth Coated Tape or DMS 1984, Type 6, Class 2, Adhesive Tape
from the cutout in the cusp membrane to the overwing frame at Station Y=737 to control the
flow of cabin air. Strips of tape may be overlapped to nest in and around the frame and extend
1 1/2 inches minimum onto the membrane and overwing frame. The tape may be split or
applied in strips to close the openings around conduit passing through the membrane in the
area noted on the drawing. Refer to Boeing Drawing 5940477 and DPS 2.590-4 as an accepted
procedure.
c. Install the kept passenger compartment items and attaching parts removed to get access to
the overwing frame inspection area at Station Y=737, on the left and right sides.
d. Put the airplane back to a serviceable condition.
e. RC - Do repetitive GVI and ETHF inspections of the overwing frame at Station Y=737 for
cracks, on the left and right sides, in accordance with FIGURE 1 and FIGURE 2.
6. CONDITION 2: ANY CRACK IN FRAME FOUND LESS THAN .125 INCH IN LENGTH
a. Option 1: Frame Repair
(1) RC - Contact Boeing for repair instructions and do the repair.
(2) Put the airplane back to a serviceable condition.
(3) RC - Do repetitive inspections of the repaired overwing frame at Station Y=737 for cracks,
on the left and right sides, as recommended by Boeing.
b. Option 2: Frame Replacement
(1) Defuel the airplane. Refer to 717 AMM 12-11-01 as an accepted procedure.
CAUTION: OPERATORS SHOULD SUSPEND ANY MAINTENANCE PROCEDURES
THAT WOULD AFFECT THE AIRFRAME LOADS DURING THE OVERWING
FRAME REPLACEMENT. IF SUCH MAINTENANCE PROCEDURES ARE NOT
SUSPENDED, DAMAGE TO THE AIRFRAME CAN OCCUR.
(2) Support the airplane as follows:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
26 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 27

(a) If both the left and right sides of the overwing frame are cracked, operators should
replace the cracked frame on one side of the airplane before starting the replacement
of the opposite side while the airplane is on its wheels.
(b) Shoring of the airplane is necessary if the frames on both sides of the airplane are
to be replaced at the same time. Refer to 717 AMM 07-20-01 as an accepted
procedure.
(3) In the passenger compartment, remove and keep additional interior items and attaching
parts between L9 and L18, on the left and/or right sides, to get access to the cracked
overwing frame at Station Y=737.
(4) Remove and keep the cusp membrane to get access to overwing frame replacement
area. Use operator's standard shop practices.
(5) Remove and keep the applicable wing to fuselage fillet panel,150FL on the left side and/or
160FR on the right side, to get access to the cracked overwing frame exterior. Refer to
717 AMM 53-53-01 as an accepted procedure.
(6) RC - Replace cracked overwing frame in accordance with Service Rework Drawing
SR95530016, Revision Level New.
(7) Install the kept cusp membrane for each frame. Use operator's standard shop practices.
NOTE: Refer to Boeing Drawing 9910151 for installation fasteners and materials.
(8) Apply DMS 1968, Type 2, Cloth Coated Tape or DMS 1984, Type 6, Class 2, Adhesive
Tape from the cutout in the cusp membrane to the overwing frame at Station Y=737 to
control the flow of cabin air. Strips of tape may be overlapped to nest in and around the
frame and extend 1 1/2 inches minimum onto the membrane and overwing frame. The
tape may be split or applied in strips to close the openings around conduit passing through
the membrane in the area noted on the drawing. Refer to Boeing Drawing 5940477 and
DPS 2.590-4 as an accepted procedure.
(9) Install the kept passenger compartment items and attaching parts between L9 and L18,
on the left and/or right sides, removed to get access to the cracked overwing frame at
Station Y=737. Refer to Table 2 for a list of accepted AMM procedures.
TABLE 2
Accepted ProcedureItem
717 AMM 25-23-05Seats, Passenger
717 AMM 25-28-02Panel, Cabin Sidewall
717 AMM 25-82-01Insulation, Passenger Compartment
717 AMM 52-21-01Door, Overwing Emergency Exit
717 AMM 20-60-26Floor Coverings
717 AMM 53-21-01Floor Panels, Passenger Compartment
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
27 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 28

(10) Install the kept applicable wing to fuselage fillet panel,150FL on the left side and/or 160FR
on the right side, removed to get access to the cracked overwing frame exterior. Refer
to 717 AMM 53-53-01 as an accepted procedure.
(11) Put the airplane back to a serviceable condition.
(12) RC - Do repetitive GVI and ETHF inspections of the overwing frame at Station Y=737 for
cracks, on the left and right sides, in accordance with FIGURE 1 and FIGURE 2.
7. CONDITION 3: ANY CRACK FOUND IN FRAME EQUAL TO OR GREATER THAN .125 INCH
IN LENGTH
a. Defuel the airplane. Refer to 717 AMM 12-11-01 as an accepted procedure.
CAUTION: OPERATORS SHOULD SUSPEND ANY MAINTENANCE PROCEDURES THAT
WOULD AFFECT THE AIRFRAME LOADS DURING THE OVERWING FRAME
REPLACEMENT. IF SUCH MAINTENANCE PROCEDURES ARE NOT
SUSPENDED, DAMAGE TO THE AIRFRAME CAN OCCUR.
b. Support the airplane as follows:
(1) If both the left and right sides of the overwing frame are cracked, operators should replace
the cracked frame on one side of the airplane before starting the replacement of the
opposite side while the airplane is on its wheels.
(2) Shoring of the airplane is necessary if the frames on both sides of the airplane are to be
replaced at the same time. Refer to 717 AMM 07-20-01 as an accepted procedure.
c. In the passenger compartment, remove and keep additional interior items and attaching parts
between L9 and L18, on the left and/or right sides, to get access to the cracked overwing
frame at Station Y=737.
d. Remove and keep the cusp membrane to get access to frame replacement area. Use operator's
standard shop practices.
e. Remove and keep the applicable wing to fuselage fillet panel,150FL on the left side and/or
160FR on the right side, to get access to the cracked overwing frame exterior. Refer to 717
AMM 53-53-01 as an accepted procedure.
f. RC - Replace cracked overwing frame in accordance with Service Rework Drawing
SR95530016, Revision Level New.
g. Install the kept cusp membrane for each frame. Use operator's standard shop practices.
NOTE: Refer to Boeing Drawing 9910151 for installation fasteners and materials.
h. Apply DMS 1968, Type 2, Cloth Coated Tape or DMS 1984, Type 6, Class 2, Adhesive Tape
from the cutout in the cusp membrane to the overwing frame at Station Y=737 to control the
flow of cabin air. Strips of tape may be overlapped to nest in and around the frame and extend
1 1/2 inches minimum onto the membrane and overwing frame. The tape may be split or
applied in strips to close the openings around conduit passing through the membrane in the
area noted on the drawing. Refer to Boeing Drawing 5940477 and DPS 2.590-4 as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
28 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 29

i. Install the kept passenger compartment items and attaching parts between L9 and L18, on
the left and/or right sides, removed to get access to the cracked overwing frame at Station
Y=737. Refer to Table 2 for a list of accepted AMM procedures.
TABLE 2
Accepted ProcedureItem
717 AMM 25-23-05Seats, Passenger
717 AMM 25-28-02Panel, Cabin Sidewall
717 AMM 25-82-01Insulation, Passenger Compartment
717 AMM 52-21-01Door, Overwing Emergency Exit
717 AMM 20-60-26Floor Coverings
717 AMM 53-21-01Floor Panels, Passenger Compartment
j. Install the kept applicable wing to fuselage fillet panel,150FL on the left side and/or 160FR
on the right side, removed to get access to the cracked overwing frame exterior. Refer to 717
AMM 53-53-01 as an accepted procedure.
k. Put the airplane back to a serviceable condition.
l. RC - Do repetitive GVI and ETHF inspections of the overwing frame at Station Y=737 for
cracks, on the left and right sides, in accordance with FIGURE 1 and FIGURE 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
29 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 30 (OCR)

BOEING SERVICE BULLETIN 717-53A0036
ALERT  ALERT
STA
737
STA
737
•TYPICAL
CRACK
FRP
ARPECTION VIIIA  AREA
LEFT SIDE SHOWN  2242089
RIGHT SIDE OPPOSITE
FIGURE 1: OVERWING FRAME - GENERAL VISUAL INSPECTION
(SHEET 1 OF 2)
Original Issue: August 12, 2013
Export Controlled ECCN: 9E991 - BOEING  717-53A0036
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  30 of 33

### Page 31

The step number shown below agrees with the number shown in the circle symbol in the figure.
MORE DATAIDENTIFICATIONNAMEPROCEDURETASKSTEP
(a) (b) (c) (d)9923408-503/-504FrameGeneral Visual
(GVI)
Inspect1
(a) Do a General Visual Inspection of the overwing frame in the inspection area. Use of remote
visual devices to access all locations is acceptable.
(b) Use adjacent lightening holes for the remote visual inspection. Look for cracks that start inboard
and down from the upper radius of the frame tab.
(c) Refer to NDTSPM Part 09 Visual/Optical: 09-00-06 (Process Examples) for remote visual device
usage and NDTSPM Part 09 Visual/Optical: 09-00-04 (Suppliers/Vendors) for current suppli-
er/vendor information.
(d) Refer to NDTSPM Part 09 Visual/Optical: 09-00-07 (Evaluation/Verification) for general infor-
mation on how to evaluate a suspect indication of a defect. Refer to Owner Operator Manual
of specific device on its operation to aid in the discovery and sizing of any suspected defect.
FIGURE 1: OVERWING FRAME - GENERAL VISUAL INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
31 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

### Page 32 (OCR)

BOEING SERVICE BULLETIN 717-53A0036
ALERT  ALERT
STA
737
STA
737
EDDY CURRENT
100  PROBE
FRP—
TYPICAL
CRACK
INSPECTION
AREA
LEFT SIDE SHOWN  2242090
RIGHT SIDE OPPOSITE
FIGURE 2: OVERWING FRAME - EDDY CURRENT HIGH FREQUENCY INSPECTION
(SHEET 1 OF 2)
Original Issue: August 12, 2013
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  717-53A0036
Work - See page 1 for details.  32 of 33

### Page 33

The step number shown below agrees with the number shown in the circle symbol in the figure.
MORE DATAIDENTIFICATIONNAMEPROCEDURETASKSTEP
(a) (b) (c)9923408-503/-504FrameEddy Current,
High Frequency
(ETHF)
Inspect1
(a) Do an ETHF inspection of the upper radius of the frame tab in the inspection area in accordance
with NDTSPM Part 06 Eddy Current: 06-10-01.001 (Procedure 1 - Surface Defect Detection),
Procedure 1, Calibration Method "G" and Scan Method "69".
(b) Look for cracks that start in the forward and aft direction.
(c) Any indication which exhibits the same relative phase angle and an amplitude of 50 percent or
greater than the indication obtained from the calibration notch in the reference standard is
considered a crack.
FIGURE 2: OVERWING FRAME - EDDY CURRENT HIGH FREQUENCY INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 12, 2013
717-53A0036
33 of 33
BOEING SERVICE BULLETIN 717-53A0036
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
