# Boeing Alert Requirements Bulletin 737-27A1313 RB: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2020-1140; AD 2022-06-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 737-27A1313 RB](https://openairdocs.org/service-documents/boeing/737-27a1313-rb.md)
- Title as filed: 737-27A1313 RB-Rev 1--
- Pages: 30
- PDF: https://openairdocs.org/files/sha256/1e/39/1e39a5c9965ceee2e283b36dcaa9407cb3fcbd87649583abeba8be64dd098e97
- Page: https://openairdocs.org/service-documents/boeing/737-27a1313-rb/file/1e39a5c9965c

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-27A1313 RB
Original Issue: March 18, 2020
Revision 1: June 24, 2020
ATA System: 2721 2510
SUBJECT: FLIGHT CONTROLS - Rudder and Rudder Trim Control System - Rudder Pedal Shroud
Assemblies and Upper Cover Assemblies Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
1 of 30
2.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
2 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
FIGURE 3: CAPTAIN'S RUDDER PEDAL UPPER COVER ASSEMBL Y - CHANGE . . . . . . . . . . 17
FIGURE 4: CAPTAIN'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE. . . . . . . . . . . . . 21
FIGURE 10: FIRST OFFICER'S RUDDER PEDAL UPPER COVER ASSEMBL Y - CHANGE . . . . . . 24
FIGURE 11: FIRST OFFICER'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE . . . . . . . . 28
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
3 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
4 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Revision Transmittal SheetNumber: 737-27A1313 RBOriginal Issue: March 18, 2020
Revision 1: June 24, 2020
ATA System: 2721 2510
SUBJECT: FLIGHT CONTROLS - Rudder and Rudder Trim Control System - Rudder Pedal Shroud
Assemblies and Upper Cover Assemblies Change
This revision includes all pages of the requirements bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Effects of this Revision on airplanes on which Original Issue was previously done:
None.
REASON FOR REVISION
This revision is sent to make improvements to the instructions given to change the Captain's and First Officer's
rudder pedal upper cover assembly. The changes affect the Work Instructions and Figures. In addition, a new
Appendix has been added to give operators the option to make an installation shop aid to help with the positioning
of the new brackets.
These sections were changed:
- In Paragraph 4, Approval, of the Requirements Bulletin, updated approval statement.
- In FIGURE 3 of the Requirements Bulletin, changed and added new illustration views, changed the dimension
precision, updated the step table, added alternative part, changed and added a footnote in the step table.
- In FIGURE 4 of the Requirements Bulletin, updated footnotes in the step table to reference Revision 1 of the
service bulletin.
- In FIGURE 10 of the Requirements Bulletin, changed and added new illustration views, changed the dimension
precision, updated the step table, added alternative part, applied a footnote to a step number, changed and
added a footnote in the step table.
- In FIGURE 11 of the Requirements Bulletin, updated footnotes in the step table to reference Revision 1 of the
service bulletin.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
5 of 30

### Page 6

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
REVISION HISTORY
Service BulletinService BulletinRequirement BulletinRequirement Bulletin
737-27A1313737-27A1313737-27A1313 RB737-27A1313 RB
Issue DateIssue Date
March 18, 2020Original Issue:March 18, 2020Original Issue:
June 24, 2020Revision 1:June 24, 2020Revision 1:
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
6 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 7

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-27A1313 RB
Original Issue: March 18, 2020
Revision 1: June 24, 2020
ATA System: 2721 2510
SUBJECT: FLIGHT CONTROLS - Rudder and Rudder Trim Control System - Rudder Pedal Shroud
Assemblies and Upper Cover Assemblies Change
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 737-8, 737-9 Airplane(s), line number(s) 5602, 5668, 5788, 5852,
5902, 5948, 5992, 6034, 6074, 6114, 6154, 6188, 6222, 6272, 6290, 6308, 6326, 6344, 6360,
6372, 6384, 6396, 6408, 6420, 6430, 6441, 6448, 6456, 6464, 6472, 6481, 6490, 6499, 6508,
6515, 6521, 6528, 6535, 6542, 6548, 6555, 6562, 6569, 6575, 6582, 6589, 6594, 6598, 6603,
6607, 6612, 6616, 6621, 6625, 6630, 6634, 6639, 6643, 6648, 6652, 6657, 6661, 6666, 6672,
6677, 6681, 6686, 6690, 6695, 6699, 6704, 6708, 6713, 6717, 6722, 6726, 6731, 6735, 6740,
6749, 6753, 6758, 6762, 6767, 6771, 6776, 6780, 6783, 6785, 6789, 6792, 6794, 6796, 6803,
6805, 6807, 6810, 6814, 6816, 6819, 6821, 6825, 6828, 6830, 6834, 6837, 6839, 6841, 6843,
6848, 6850, 6852, 6855, 6859, 6861, 6864, 6866, 6868, 6872, 6875, 6877, 6881, 6884, 6886,
6890, 6893, 6895, 6897, 6899, 6904, 6906, 6908, 6911, 6915, 6917, 6920, 6922, 6926, 6929,
6931, 6935, 6938, 6940, 6942, 6944, 6949, 6951, 6953, 6956, 6960, 6963, 6965, 6968, 6970,
6973, 6975-6976, 6978, 6980, 6983, 6985, 6988, 6990-6991, 6993, 6995, 6998, 7000, 7003,
7005-7006, 7008, 7010, 7013, 7015, 7018, 7020, 7023, 7025, 7027-7028, 7030, 7033, 7035, 7038,
7040, 7042-7043, 7045, 7048, 7050, 7053, 7055, 7060, 7062, 7064-7065, 7068, 7070, 7073, 7075,
7077, 7079-7080, 7083, 7085, 7088, 7090, 7093, 7095-7096, 7098, 7100, 7103, 7105, 7108,
7110-7111, 7113, 7115, 7118, 7120, 7123, 7125, 7128, 7130, 7132-7133, 7135, 7138, 7140, 7143,
7145, 7147-7148, 7150, 7153, 7155, 7158, 7160, 7163, 7165-7166, 7168, 7170, 7173, 7175, 7178,
7180-7181, 7183, 7185-7186, 7188, 7190, 7192-7193, 7195-7196, 7198, 7200-7201, 7203, 7205,
7207-7208, 7210-7211, 7213, 7215-7216, 7218, 7220, 7222-7223, 7225-7226, 7228, 7230-7231,
7233, 7236-7238, 7240-7241, 7245-7246, 7248, 7250, 7252-7253, 7255-7256, 7258, 7261, 7265,
7267-7268, 7270-7271, 7275-7276, 7278, 7281-7283, 7286, 7288, 7290-7291, 7293, 7295-7296,
7298, 7300-7301, 7303, 7305-7306, 7308, 7310-7311, 7313, 7315-7316, 7320-7321, 7323, 7325,
7328, 7330-7331, 7333, 7335-7336, 7338, 7340-7341, 7343, 7345, 7348, 7350, 7353, 7355-7356,
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
7 of 30

### Page 8

7358, 7360-7361, 7363, 7365-7366, 7368, 7370, 7373, 7375, 7378, 7380-7381, 7383-7385,
7388-7390, 7393-7395, 7398-7401, 7403-7406, 7409-7411, 7413-7414, 7416, 7419, 7421, 7423,
7428, 7430, 7433, 7435, 7446 in 1 Group(s). Where the effectivity is presented with hyphens
between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers
1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
DESCRIPTIONCONFIGURATIONGROUP
737-8/-9 Airplanes that it is necessary to have their rudder pedal
shroud assemblies and upper cover assemblies changed.
-1
Airplane Models:
737-8, 737-9
GroupVariable Number
11A001 - 1A002
11A004 - 1A035
11A201 - 1A209
11A211
11A301 - 1A318
11A401 - 1A413
11A451 - 1A467
11A476 - 1A482
11A501 - 1A502
11A521 - 1A523
11A531
11A541 - 1A545
11A601 - 1A614
11A676 - 1A691
11A726 - 1A730
11A741 - 1A743
11A751 - 1A757
11A801
11A851 - 1A866
11A916 - 1A919
GroupVariable Number
11A926 - 1A929
11A943
11A951 - 1A956
11B001 - 1B011
11B101 - 1B124
11B201 - 1B206
11B251 - 1B266
11B376 - 1B380
11B386 - 1B389
11B396
11B401
11B491 - 1B494
11B511 - 1B512
11B521 - 1B522
11B531
11B540 - 1B541
11B566 - 1B569
11B576 - 1B578
11B601
11B635 - 1B636
GroupVariable Number
11B651 - 1B657
11B701
11B801 - 1B806
11B930 - 1B934
11C001 - 1C002
11C201 - 1C202
11C221 - 1C222
11C301 - 1C305
11C326 - 1C335
11C401 - 1C404
11C451
11C453
11C501 - 1C510
11C690
11C701 - 1C712
11C826 - 1C827
11C946 - 1C947
11D002 - 1D004
11D051 - 1D056
11D101 - 1D114
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
8 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 9

GroupVariable Number
11D201
11D251 - 1D253
11D401
11D466 - 1D467
GroupVariable Number
11J021
11J041 - 1J042
11J066 - 1J067
11J101 - 1J102
GroupVariable Number
11J301
11J401 - 1J402
11J601
--
B. Spares Affected
Examine your spares supply for the parts or components identified below. If any parts or components
are found, refer to Accomplishment Instructions for the recommended action.
Part NamePart Number
SHROUD ASSY233A2319-1
SHROUD ASSY233A2319-2
SHROUD ASSY233A2319-3
SHROUD ASSY233A2319-4
UPPER COVER ASSY251A3122-11
UPPER COVER ASSY251A3122-12
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 737-27A1313 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 737-27A1313 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Table 1 and Table 2 in accordance
with the Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
9 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 10

Table 1: WORK PACKAGE 1: Captain's Rudder Pedal Shroud Assemblies and Upper Cover As-
sembly - Change
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 27 months
after the original is-
sue date of Re-
quirements Bulletin
737-27A1313 RB
or within 27
months after the
date of issuance of
the original stan-
dard certificate of
airworthiness or
the original export
certificate of airwor-
thiness, whichever
occurs later.
Remove the Captain's rudder pedal
shroud assemblies and upper cover
assembly.
All Airplanes
OPTION 1 (ACTION 1): Change the
Captain's rudder pedal upper cover
assembly.
OPTION 1 (ACTION 2): Change the
Captain's rudder pedal shroud assem-
blies.
OPTION 1 (ACTION 3): Install the
Captain's rudder pedal changed
shroud assemblies and changed up-
per cover assembly.
OPTION 2 (ACTION 1): Change the
Captain's rudder pedal shroud assem-
blies.
OPTION 2 (ACTION 2): Install the
Captain's rudder pedal changed
shroud assemblies and a new upper
cover assembly.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
10 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 11

Table 2: WORK PACKAGE 2: First Officer's Rudder Pedal Shroud Assemblies and Upper Cover
Assembly - Change
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 27 months
after the original is-
sue date of Re-
quirements Bulletin
737-27A1313 RB
or within 27
months after the
date of issuance of
the original stan-
dard certificate of
airworthiness or
the original export
certificate of airwor-
thiness, whichever
occurs later.
Remove the First Officer's rudder
pedal shroud assemblies and upper
cover assembly.
All Airplanes
OPTION 1 (ACTION 1): Change the
First Officer's rudder pedal upper
cover assembly.
OPTION 1 (ACTION 2): Change the
First Officer's rudder pedal shroud
assemblies.
OPTION 1 (ACTION 3): Install the
First Officer's rudder pedal changed
shroud assemblies and changed up-
per cover assembly.
OPTION 2 (ACTION 1): Change the
First Officer's rudder pedal shroud
assemblies.
OPTION 2 (ACTION 2): Install the
First Officer's rudder pedal changed
shroud assemblies and a new upper
cover assembly.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the requirements bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
11 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 12

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
12 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT
BLANK PAGE

### Page 13

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 737 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 737
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
13 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 14

6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
10. The work instructions are divided into work packages. Each work package can be
completed independently during separate maintenance visits.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
B. WORK INSTRUCTIONS
Actions Required for Compliance:
1. Requirements:
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
14 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 15

Table 1: Work Package 1: Captain's Rudder Pedal Shroud Assemblies and Upper Cover As-
sembly - Change
Refer to the listed pro-
cedures in SB 737-
27A1313 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of Com-
pliance
ActionCondition
Do Work Package 1,
PART 1: Preparation
Access and Removal.
-Remove the Captain's
rudder pedal shroud as-
semblies and upper
cover assembly.
All Airplanes
-FIGURE 3OPTION 1 (ACTION 1):
Change the Captain's
rudder pedal upper cov-
er assembly.
-FIGURE 4OPTION 1 (ACTION 2):
Change the Captain's
rudder pedal shroud as-
semblies.
Do Work Package 1,
PART 2: Installation,
Test and Close Access.
-OPTION 1 (ACTION 3):
Install the changed Cap-
tain's rudder pedal
changed shroud assem-
blies and changed upper
cover assembly.
-FIGURE 4OPTION 2 (ACTION 1):
Change the Captain's
rudder pedal shroud as-
semblies.
Do Work Package 1,
PART 2: Installation,
Test and Close Access.
-OPTION 2 (ACTION 2):
Install the changed Cap-
tain's rudder pedal
changed shroud assem-
blies and a new upper
cover assembly.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
15 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 16

Table 2: Work Package 2: First Officer's Rudder Pedal Shroud Assemblies and Upper Cover
Assembly - Change
Refer to the listed pro-
cedures in SB 737-
27A1313 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of Com-
pliance
ActionCondition
Do Work Package 2,
PART 1: Preparation
Access and Removal.
-Remove the First Offi-
cer's rudder pedal
shroud assemblies and
upper cover assembly.
All Airplanes
-FIGURE 10OPTION 1 (ACTION 1):
Change the First Offi-
cer's rudder pedal upper
cover assembly.
-FIGURE 11OPTION 1 (ACTION 2):
Change the First Offi-
cer's rudder pedal
shroud assemblies.
Do Work Package 2,
PART 2: Installation,
Test and Close Access.
-OPTION 1 (ACTION 3):
Install the changed First
Officer's rudder pedal
changed shroud assem-
blies and changed upper
cover assembly.
-FIGURE 11OPTION 2 (ACTION 1):
Change the First Offi-
cer's rudder pedal
shroud assemblies.
Do Work Package 2,
PART 2: Installation,
Test and Close Access.
-OPTION 2 (ACTION 2):
Install the changed First
Officer's rudder pedal
changed shroud assem-
blies and a new upper
cover assembly.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1: June 24, 2020
16 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 17 (OCR)

REQUIREMENTS BULLETIN 737-27A1313
ALERT  ALERT
BRACKET
(2 LOCATIONS) 1
B
UPPER COVER
ASSEMBLY  B
31 HOLE
(4 LOCATIONS)
6)T 6 LOCATIONS
_ 0.096
0.076
BRACKET
UPPER COVER
ASSEMBLY  A-A  2904898
FIGURE 3: CAPTAIN'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 1 OF 4)
Original Issue: March 18, 2020
Revision 1 June 24, 2020  Export Controlled ECCN: 9E991  Copyright © Unpublished  737-27A1313 RB
Work - See page 1 for details.  17 of 30

### Page 18 (OCR)

REQUIREMENTS BULLETIN 737-27A1313
ALERT  ALERT
HOLE
(8 LOCATIONS) (4
NUTPLATE
(4 LOCATIONS) 3
(8 LOCATIONS) (5)7  RIVET
4 LOCATIONS
2) (7
4.755
(REF)
2.865
(REF)
UPPER COVER (
ASSEMBLY
- 2.474  2.474.
(REF)  (REF)
CL
TYPICAL  B-B  2936255
FIGURE 3: CAPTAIN'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 2 OF 4)
Original Issue: March 18, 2020
Revision 1 June 24, 2020  Export Controlled ECCN: 9E991  Copyright © Unpublished  737-27A1313 RB
Work - See page 1 for details.  18 of 30

### Page 19

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
On upper cover as-
sembly as shown.
2233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Put / Hold1
(a)4-HOLEDrill2
-2233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Release
(a)4-HOLEDeburr
(b)4BACN10JR3CFDNUTPLATEPut / Hold3
(c)8-HOLEDrill4
(c)8-HOLEDeburr
-4BACN10JR3CFDNUTPLATEInstall (New)5
(d)8BACR15DR3AN2RIVET, BLINDInstall (New)
(d)6-HOLECountersink6
(d)(g)6BACR15BA6AD5CRIVET, 100 DEGInstall (New)
Refer to SOPM 20-
43-03 as an accept-
ed procedure. (e)
-TYPE 2, CLASS ACHEMICAL CONVER-
SION COATING
Apply7
Refer to SOPM 20-
41-02 as an accept-
ed procedure. (e)
-BMS 10-11, TYPE 1PRIMERApply
Refer to SOPM 20-
41-02 or SOPM 20-
41-04 as an accept-
ed procedure. (e)
-BMS 10-11, TYPE 2
(BMS 10-83, TYPE 3
optional)
ENAMELApply
(f)1251A3122-( )UPPER COVER ASSYIdentify8
(a) Match drill and deburr the hole into the upper cover assembly with the hole in the bracket. The hole diam-
eter is 0.218 - 0.229.
(b) Align the center hole of the nutplate with the hole in the upper cover assembly and align the nutplate as
shown.
(c) The hole diameter is 0.098 - 0.103.
(d) Refer to 737 MAX 8/9 SRM 51-40-02 and 737 MAX 8/9 SRM 51-40-08 as an accepted procedure.
(e) Manually apply chemical conversion coating, then apply 1 coat of primer and then apply 1 coat of enamel
(color BAC 703 Gray) to the rivets and any bare metal surfaces to repair finish.
(f) Apply service bulletin number 737-27A1313 near the upper cover assembly part number. Refer to SOPM
20-50-10, RUBBER STAMP (CODE RO), as an accepted procedure.
FIGURE 3: CAPTAIN'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
19 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 20

More DataQtyIdentificationNameTaskStep
(g) Double-flush countersink rivet tail to 0.00 to 0.01 inches. Refer to 737 MAX 8/9 SRM 51-40-02 as an ac-
cepted procedure.
FIGURE 3: CAPTAIN'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
20 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 21

FIGURE 4: CAPTAIN'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
21 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 22 (OCR)

REQUIREMENTS BULLETIN 737-27A1313
ALERT  ALERT
RIGHT RUDDER PEDAL
SHROUD ASSEMBLY
4) SHROUD ASSEMBLY
D
3 SCREW
(3 LOCATIONS)
BRACKET
D-D  C-C  2905018
FIGURE 4: CAPTAIN'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE
(SHEET 2 OF 3)
Original Issue: March 18, 2020
Revision 1 June 24, 2020  Export Controlled ECCN: 9E991  Copyright © Unpublished  737-27A1313 RB
Work - See page 1 for details.  22 of 30

### Page 23

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
-1233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Install (New)1
(a)3BACS12ER3K8SCREW, 100 DEG
HEAD
Install (New)
(b)1233A2319-( )SHROUD ASSYIdentify2
-1233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Install (New)3
(a)3BACS12ER3K8SCREW, 100 DEG
HEAD
Install (New)
(c)1233A2319-( )SHROUD ASSYIdentify4
(a) Refer to SOPM 20-50-01 as an accepted procedure for fastener installation.
(b) For a changed 233A2319-1 or 233A2319-3, apply service bulletin number 737-27A1313 near the shroud
assembly part number. Refer to SOPM 20-50-10, PART MARK M (CODE M), as an accepted procedure.
(c) For a changed 233A2319-2 or 233A2319-4, apply service bulletin number 737-27A1313 near the shroud
assembly part number. Refer to SOPM 20-50-10, PART MARK M (CODE M), as an accepted procedure.
FIGURE 4: CAPTAIN'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
23 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 24 (OCR)

REQUIREMENTS BULLETIN 737-27A1313
ALERT  ALERT
I BROCATIONS)
UPPER COVER
ASSEMBLY
HOLE
(4 LOCATIONS) 2T
6 LOCATIONS
_ 0.096
0.076
BRACKET
UPPER COVER
A-A  ASSEMBLY  2937647
FIGURE 10: FIRST OFFICER'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 1 OF 4)
Original Issue: March 18, 2020
Revision 1 June 24, 2020  Export Controlled ECCN: 9E991  Copyright © Unpublished  737-27A1313 RB
Work - See page 1 for details.  24 of 30

### Page 25 (OCR)

REQUIREMENTS BULLETIN 737-27A1313
ALERT  ALERT
HOLE
(8 LOCATIONS) (4
NUTPLATE
(4 LOCATIONS) (3) 5)
(8 LOCATIONS) (5X]  RIVET
4 LOCATIONS
4.755
(REF)
2.865
(REF)
UPPER COVER (8)
ASSEMBLY
2.474  - 2.474
(REF)  (REF)
CL
TYPICAL  B-B  2936413
FIGURE 10: FIRST OFFICER'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 2 OF 4)
Original Issue: March 18, 2020
Revision 1 June 24, 2020  Export Controlled ECCN: 9E991  Copyright © Unpublished  737-27A1313 RB
Work - See page 1 for details.  25 of 30

### Page 26

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
On upper cover as-
sembly as shown.
2233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Put / Hold1
(a)4-HOLEDrill2
-2233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Release
(a)4-HOLEDeburr
(b)4BACN10JR3CFDNUTPLATEPut / Hold3
(c)8-HOLEDrill4
(c)8-HOLEDeburr
-4BACN10JR3CFDNUTPLATEInstall (New)5
(d)8BACR15DR3AN2RIVET, BLINDInstall (New)
(d)6-HOLECountersink6
(d)(g)6BACR15BA6AD5CRIVET, 100 DEGInstall (New)
Refer to SOPM 20-
43-03 as an accept-
ed procedure. (e)
-TYPE 2, CLASS ACHEMICAL CONVER-
SION COATING
Apply7
Refer to SOPM 20-
41-02 as an accept-
ed procedure. (e)
-BMS 10-11, TYPE 1PRIMERApply
Refer to SOPM 20-
41-02 or SOPM 20-
41-04 as an accept-
ed procedure. (e)
-BMS 10-11, TYPE 2
(BMS 10-83, TYPE 3
optional)
ENAMELApply
(f)1251A3122-( )UPPER COVER ASSYIdentify8
(a) Match drill and deburr the hole into the upper cover assembly with the hole in the bracket. The hole diam-
eter is 0.218 - 0.229.
(b) Align the center hole of the nutplate with the hole in the upper cover assembly and align the nutplate as
shown.
(c) The hole diameter is 0.098 - 0.103.
(d) Refer to 737 MAX 8/9 SRM 51-40-02 and 737 MAX 8/9 SRM 51-40-08 as an accepted procedure.
(e) Manually apply chemical conversion coating, then apply 1 coat of primer and then apply 1 coat of enamel
(color BAC 703 Gray) to the rivets and any bare metal surfaces to repair finish.
(f) Apply service bulletin number 737-27A1313 near the upper cover assembly part number. Refer to SOPM
20-50-10, RUBBER STAMP (CODE RO), as an accepted procedure.
FIGURE 10: FIRST OFFICER'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
26 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 27

More DataQtyIdentificationNameTaskStep
(g) Double-flush countersink rivet tail to 0.00 to 0.01 inches. Refer to 737 MAX 8/9 SRM 51-40-02 as an ac-
cepted procedure.
FIGURE 10: FIRST OFFICER'S RUDDER PEDAL UPPER COVER ASSEMBLY - CHANGE
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
27 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 28

FIGURE 11: FIRST OFFICER'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
28 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

### Page 29 (OCR)

REQUIREMENTS BULLETIN 737-27A1313
ALERT  ALERT
RIGHT RUDDER PEDAL
SHROUD ASSEMBLY
.C
(4) SHROUD ASSEMBLY
3) SCREW  / (3 LOCATIONS)
BRACKET
D-D  C-C  2905473
FIGURE 11: FIRST OFFICER'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE
(SHEET 2 OF 3)
Original Issue: March 18, 2020
Revision 1 June 24, 2020  Export Controlled ECCN: 9E991  Copyright © Unpublished  737-27A1313 RB
Work - See page 1 for details.  29 of 30

### Page 30

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
-1233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Install (New)1
(a)3BACS12ER3K8SCREW, 100 DEG
HEAD
Install (New)
(b)1233A2319-( )SHROUD ASSYIdentify2
-1233A2373-7SHROUD - FORWARD
PANEL, BRACKET
Install (New)3
(a)3BACS12ER3K8SCREW, 100 DEG
HEAD
Install (New)
(c)1233A2319-( )SHROUD ASSYIdentify4
(a) Refer to SOPM 20-50-01 as an accepted procedure for fastener installation.
(b) For a changed 233A2319-1 or 233A2319-3, apply service bulletin number 737-27A1313 near the shroud
assembly part number. Refer to SOPM 20-50-10, PART MARK M (CODE M), as an accepted procedure.
(c) For a changed 233A2319-2 or 233A2319-4, apply service bulletin number 737-27A1313 near the shroud
assembly part number. Refer to SOPM 20-50-10, PART MARK M (CODE M), as an accepted procedure.
FIGURE 11: FIRST OFFICER'S RUDDER PEDAL SHROUD ASSEMBLIES - CHANGE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 18, 2020
737-27A1313 RBRevision 1 June 24, 2020
30 of 30
REQUIREMENTS BULLETIN 737-27A1313
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.