# Boeing Alert Service Bulletin 737-28A1212: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0028; AD 2011-12-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-28A1212](https://openairdocs.org/service-documents/boeing/737-28a1212.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin
- Pages: 99
- PDF: https://openairdocs.org/files/sha256/2c/16/2c16e23415488aa5f6a593dc73835524a448edb9ba9b86559e923d0f0b799861
- Page: https://openairdocs.org/service-documents/boeing/737-28a1212/file/2c16e2341548

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1212
Original Issue: July 23, 2009
Revision 1: August 27, 2010
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2009 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
1 of 99
5.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
2 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 3 0
B. Concurrent Requirements ...................................... 3 0
C. Reason ................................................ 3 0
D. Description .............................................. 3 1
E. Compliance .............................................. 3 3
F. Approval ............................................... 3 4
G. Manpower .............................................. 3 4
H. Weight and Balance Changes .................................... 3 9
I. Electrical Load Data ......................................... 3 9
J. References .............................................. 4 0
1. Existing Data: ......................................... 4 0
2. Data supplied with this Service Bulletin: ........................... 4 0
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 4 0
K. Publications Affected ........................................ 4 0
L. Interchangeability and Intermixability of Parts ........................... 4 1
2. MATERIAL INFORMATION ........................................ 4 3
A. Material - Price and Availability ................................... 4 3
B. Industry Support Information .................................... 4 4
C. Parts Necessary For Each Airplane ................................. 4 4
1. Kits/Parts: ........................................... 4 4
2. Parts and Materials Supplied by the Operator: ........................ 4 6
3. Parts Modified and Reidentified: ............................... 4 7
4. Parts Removed and Not Replaced: .............................. 4 7
D. Parts Necessary to Change Spares ................................. 4 7
E. Special Tooling - Price and Availability ............................... 4 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 4 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 9
A. GENERAL INFORMATION ..................................... 4 9
B. WORK INSTRUCTIONS ....................................... 5 0
FIGURE 1: M181, M182, M183 RELAY MODULE ASSEMBLY REPLACEMENT [Group 1, 8] ..... 5 4
FIGURE 2: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 2, Configuration 1] . . . 56
FIGURE 3: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 3, 9-13, Configuration 1] . 58
FIGURE 4: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 4, Configuration 1] . . . 60
FIGURE 5: REPLACEMENT OF THE FUEL PUMP POWER RELAYS [Group 5, Configuration 1] . . . 62
FIGURE 6: REPLACEMENT OF THE FUEL PUMP POWER RELAY [Group 6, Configuration 1] . . . 65
FIGURE 7: REPLACEMENT OF THE FUEL PUMP POWER RELAY [Group 7, Configuration 1] . . . 68
FIGURE 8: W0044 WIRE BUNDLE ROUTING [Group 2-3, 6-7, 9-13, Configuration 1] ......... 7 1
FIGURE 9: WIRE BUNDLE W0044 - WIRING CHANGES [Group 2, Configuration 1] ......... 7 2
FIGURE 10: WIRE BUNDLE W0044 - WIRING CHANGES [Group 3, 12, Configuration 1] ....... 7 4
FIGURE 11: WIRE BUNDLE W0044 - WIRING CHANGES [Group 6-7, 9, Configuration 1] ....... 7 6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
3 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 4

FIGURE 12: WIRE BUNDLE W0044 - WIRING CHANGES [Group 10, Configuration 1] ......... 7 7
FIGURE 13: WIRE BUNDLE W0044 - WIRING CHANGES [Group 11, 13, Configuration 1] ....... 7 8
FIGURE 14: FUEL BOOST PUMP CONNECTOR - WIRE LOCATION [Group 8, Configuration 1] . . . 80
FIGURE 15: FUEL BOOST PUMP GROUNDS - WIRE LOCATION [Group 8, Configuration 1] ..... 8 1
FIGURE 16: FUEL BOOST PUMP CONNECTOR - WIRING CHANGES [Group 8, Configuration 1] . . 82
FIGURE 17: FUEL BOOST PUMP CONNECTOR - WIRE LOCATION [Group 8, Configuration 2] . . . 84
FIGURE 18: FUEL BOOST PUMP GROUNDS - WIRE LOCATION [Group 8, Configuration 2] ..... 8 5
FIGURE 19: FUEL BOOST PUMP CONNECTOR - WIRING CHANGES [Group 8, Configuration 2] . . 86
FIGURE 20: FUEL BOOST PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) CONTROL RELAY
REFERENCE [Group 1; Group 2-7, Configuration 1; Group 8; Group 9-13, Configuration 1] . 87
FIGURE 21: WIRE BUNDLE W0044 WIRING CHANGES [Group 1, 8] .................. 8 8
FIGURE 22: RELAY MOUNTING PANEL - GROUND STUDS AND BONDING JUMPER INSTALLATION
[Group 2-7, 9-13] ........................................ 9 0
Appendix A: ELECTRICAL BONDING .................................... 9 4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
4 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 5

Commercial 
Airplanes
737
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 737-28A1212Original Issue: July 23, 2009
Revision 1: August 27, 2010
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes changed in accordance with the original issue of this service bulletin:
- Group 2 through 7 Airplanes and Group 9 through 11 airplanes that incorporated original issue of this service
bulletin have to incorporate Accomplishment Instructions, Work instructions, Part 2 that provides work instructions
to install a Bonding Jumper between the relay mounting panel and P6 Load Control Center structure, and
measure the electrical bonding resistance between the GFI relays and the relay mounting panel.
-Group 1 and Group 8 airplanes that incorporated original issue of this service bulletin have to incorporate
Accomplishment Instructions, Work instructions, Part 3 that provides work instructions to measure the electrical
bonding resistance between the GFI relays and the Relay Module Assemblies M181, M182, and M183 in
accordance with Revision 1 of BAE Service Bulletin 65-49808-24-01, and to measure the electrical bonding
resistance between the Relay Module Assemblies M181, M182, and M183 and the P6 Load Control Center
structure.
Airplanes PM541-PM548 were added to Group 2 of this service bulletin effectivity.
REASON FOR REVISION
This revision is sent to add instructions for installation of a Bonding Jumper between P6-2 relay panel and P6
side panel for Group 2 through Group 7 and Group 9 through Group 13 airplanes. Instructions are added to
clean/prepare the contact surfaces of the relays and P6-2 panels to obtain the required electrical bonding. This
revision adds instructions to measure the electrical bonding resistance between the GFI relays and the P6-2
relay panel and between the P6-2 relay panel and P6 side panel. This revision is sent to add airplanes to the
service bulletin effectivity. Also, this revision adds instructions for Group 1 and Group 8 airplanes to measure
the electrical bonding resistance between M181, M182, and M183 Relay Module Assemblies and P6 Load
Control Center structure. Also, access instructions were added to the service bulletin.
These sections were changed:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
5 of 99

### Page 6

1. Airplanes PM541-PM548 are added to the service bulletin effectivity. Added new airplane configurations
to the group configuration table.
2. Group 12 and Group 13 had been added to the configuration table. Airplanes delivered with Auxiliary Tank
wire provisions have been moved to Group 12 and Group 13. Group/Configuration information has been
added to define those airplanes that have already accomplished initial release of the service bulletin.
3. Changed the concurrent requirements reference from original issue of BAE Component Service Bulletin
65-49808-24-01 to Revision 1 of the BAE Component Service Bulletin 65-49808-24-01.
4. Removed the reference to the Fault Isolation Manual and changed the IPC reference in Paragraph 1.K.,
Publications affected. The 737-100/-200/-300/-400/-500 airplane models do not have a Fault Isolation
Manual.
5. Task hour tables had been added for each airplane group configuration. The task hour estimates were
changed to include the removal and installation of the galley number one.
6. Three kits, availability, and price information was added to paragraph 2.A. Material Information.
7. The work instructions were changed to include:
a. The removal and installation of the galley number one to get access to the work location.
b. The installation of a bonding jumper.
c. To prepare/clean the contact surfaces of the relays and mounting panel to obtain the required electrical
bonding.
d. To measure the bonding resistance between the GFI relays and mounting panel.
e. To measure the bonding resistance between the mounting panel and P6 Load Control Center structure.
f. Added Part 2 and Part 3 for airplanes that incorporated original issue of the service bulletin.
8. Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph
3.A. General Information - Notes.
9. Figure 1 was changed to change the reference to Revision 1 of the BAE Component Service Bulletin
65-49808-24-01. Step was added to measure the electrical bonding resistance between Relay Module
Assemblies M181, M182, and M183 and the P6 Load Control Center structure.
10. Figure 2, 3, 4, 5, 6, 7 have been changed to prepare/clean the contact surfaces of the relays and mounting
panel in order to obtain the required electrical bonding.
11. Figure 22 has been added. this figure provides instructions to add a bonding jumper between relay mounting
panel and P6 Load Control Center structure and measure the bonding resistance between the relay mounting
panel and P6 Load Control Center structure.
12. Appendix A that provides information for electrical bonding was added to Paragraph 3.A., Work Instructions.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
6 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 7

Pages with no vertical lines have no important changes.
REVISION HISTORY
July 23, 2009Original Issue:
August 27, 2010Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
7 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 8

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
8 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
737
Service Bulletin
ALERT
SummaryNumber: 737-28A1212Original Issue: July 23, 2009
Revision 1: August 27, 2010
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
BAE Component Service Bulletin 65-49808-24-01, Revision 1, is necessary to be accomplished prior to or
concurrent with this service bulletin for Group 1 and Group 8 airplanes. BAE Component Service Bulletin
65-49808-24-01 gives the parts and instructions to replace relays in the M181, M182, and M183 Relay Module
Assemblies.
BACKGROUND
This service bulletin gives the instructions to replace the power control relays for the fuel boost pumps. The
relays are located in the P6 circuit breaker panel in the flight compartment. The new relays include a Ground
Fault Interrupt (GFI) feature. The GFI relay feature will protect the fuel pumps from damage caused by electrical
arcing because the electrical power will be removed from the pump if a ground fault is detected. Electrical arcing
could create a possible source of ignition of flammable fuel vapors in the fuel tanks. Ignition of flammable fuel
vapors could cause a fire or explosion which could put the airplane in an unsafe condition.
This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88, "Fuel Tank
System Fault Tolerance Evaluation Requirements".
This change affects section 9 of the Maintenance Planning Data (MPD) Document. The Airworthiness Limitations
(AWL) "28-AWL-23" (737-100/200/200C airplanes) and "28-AWL-22" (737-300/400/500 airplanes) are related
to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
9 of 99

### Page 10

ACTION (PRR 35440-10RS)
Airplane Work
1. Get access to the flight compartment.
2. For Groups 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13 airplanes, at the P6 Load Control Center install two ground
studs and a ground bonding jumper.
3. For Groups 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13 airplanes measure the electrical bonding between the P6-2
relay panel and P6 Load Control Center structure.
4. For Group 2 Configuration 1, and Group 4 Configuration 1, replace (6) relays with Ground Fault Interrupt
(GFI) relays. For Group 3 Configuration 1, Group 5-7 Configuration 1, and Group 9-13 Configuration 1,
replace (8) relays with Ground Fault Interrupt (GFI) relays. Measure the electrical bonding between the GFI
relays and the P6-2 panel.
5. For Groups 1 and 8 airplanes install the Ground Fault Interrupt (GFI) relays in Relay Module Assemblies
M181, M182, and M183 in accordance with BAE Component Service Bulletin 65-49808-24-01 and change
wire W044. Measure the electrical bonding between M181, M182, M183 and the adjacent P6 Load Control
Center structure.
6. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel boost pumps.
EFFECTIVITY
All 737-100/-200/-200C/-300/-400/-500 Airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends that operators make the changes shown in this service bulletin within 60 months after the
date of Revision 1 of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
10 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 11

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
11 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 12

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
12 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 13

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1212
Original Issue: July 23, 2009
Revision 1: August 27, 2010
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR35440-10RS for data about
this change.
DESCRIPTIONCONFIGURATIONGROUP
737-100/200/200C Airplanes that require BAE Component Service
Bulletin 65-49808-24-01, Revision 1. W0044 Wire Bundle Wiring
Changes.
-1
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not measure the electrical bonding between the
GFI relays and the Relay Module Assemblies M181, M182, and M
183. Also these airplanes did not measure the electrical bonding
between Relay Module Assemblies M181, M182, and M183 and P6
Load Control Center structure.
2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
13 of 99

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
737-100/200/200C/300/400/500 Airplanes - 6 Relays without Spacers,
located in the P6 panel.
-2
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-100/200/300/400/500 Airplanes - (8) S283A004-1 Relays
including (2) Relays installed for the Auxiliary Fuel Tanks. W0044
Wire Bundle Wiring Changes.
-3
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-100/200/300/400/500 Airplanes - (6) S283A004-6 Relays.-4
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-300/400/500 Airplanes - (4) S283A004-6 Relays and (2)
S283A004-1 Relays.
-5
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
14 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 15

DESCRIPTIONCONFIGURATIONGROUP
737-300/400/500 Airplanes - (4) S283A004-6 Relays and (4)
S283A004-1 Relays including (2) Relays installed for the Auxiliary
Fuel Tanks.
-6
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-300/400/500 Airplanes - (6) S283A004-6 Relays and (2)
S283A004-1 Relays including (2) Relays installed for the Auxiliary
Fuel Tanks. W0044 Wire Bundle Wiring Changes.
-7
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-100/200 Airplanes that require BAE Component Service Bulletin
65-49808-24-01, Revision dated February 19, 2008, and Fuel Boost
Pumps Connector and Grounds Inspections. W0044 Wire Bundle
Wiring Changes.
-8
737-100/200 Airplanes on which Boeing Service Bulletin 737-28A1263
, and the original issue of SB 737-28A1212 have not been
incorporated.
1
737-100/200 Airplanes on which Boeing Service Bulletin 737-28A1263
has been incorporated previously, and the original issue of SB
737-28A1212 has not been incorporated.
2
737-100/200 Airplanes on which Boeing Service Bulletin 737-28A1263
has not been incorporated, and the original issue of SB 737-28A1212
has been incorporated. These airplanes did not measure the electrical
bonding between the GFI relays and the Relay Module Assemblies
M181, M182, and M 183. Also these airplanes did not measure the
electrical bonding between Relay Module Assemblies M181, M182,
and M183 and P6 Load Control Center structure.
3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
15 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 16

DESCRIPTIONCONFIGURATIONGROUP
737-300/400/500 Airplanes - (8) S283A004-1 Relays including (2)
Relays installed for the Auxiliary Fuel Tanks. W0044 Wire Bundle
Wiring Changes.
-9
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-100/200 Airplanes - (8) S283A004-1 Relays including (2) Relays
installed for the Auxiliary Fuel Tanks. W0044 Wire Bundle Wiring
Changes.
-10
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated SB 737-28A1212 R0. These airplanes
did not install the Ground Bonding Jumper between P6-2 Relay Panel
and P6 Load Control Center structure.
2
737-300/400/500 Airplanes - (8) S283A004-1 Relays including (2)
Relays installed for the Auxiliary Fuel Tanks. W0044 Wire Bundle
Wiring Changes.
-11
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
737-100/200/300/400/500 Airplanes delivered with provisional wires
for Auxiliary Tank - (8) S283A004-1 Relays including (2) Relays
installed for Auxiliary Tank (if installed), and W0044 Wire Bundle
Wiring Changes.
-12
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
16 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 17

DESCRIPTIONCONFIGURATIONGROUP
737-300/400/500 Airplanes delivered with provisional wires for
Auxiliary Tank - (8) S283A004-1 Relays including (2) Relays installed
for Auxiliary Tank (if installed). and W0044 Wire Bundle Wiring
Changes.
-13
Airplanes that did not incorporate the original issue of SB
737-28A1212.
1
Airplanes that incorporated the original issue of SB 737-28A1212.
These airplanes did not install the Ground Bonding Jumper between
P6-2 Relay Panel and P6 Load Control Center structure.
2
Airplane Models:
737-100, 737-200, 737-200C, 737-300, 737-400, 737-500
GroupVariable Number
8PA001 - PA014
1PA015 - PA022
8PA099
1PA231 - PA232
1PC001 - PC005
8PG001 - PG017
1PG018 - PG075
8PG199
8PG201 - PG202
1PG203 - PG230
1PG251 - PG255
8PG271 - PG273
1PG274 - PG279
8PG301 - PG302
1PG303 - PG314
8PG331
1PG332
1PG351 - PG356
1PG375
1PG401 - PG403
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
17 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 18

GroupVariable Number
1PG431 - PG440
2PG441 - PG442
1PG471 - PG475
1PG501 - PG505
1PG571 - PG578
2PG579 - PG586
1PG621 - PG630
1PG651 - PG652
1PG704 - PG705
2PH001
2PH011 - PH013
2PH021 - PH024
1PH701 - PH708
2PH709 - PH715
2PH731 - PH732
2PH741 - PH743
1PJ001 - PJ002
2PJ003 - PJ006
3PJ007 - PJ009
1PJ031 - PJ032
1PJ071 - PJ072
1PJ101 - PJ104
2PJ105 - PJ119
3PJ201 - PJ219
4PJ301 - PJ302
4PJ551 - PJ561
4PJ601 - PJ615
6PJ811
5PJ816 - PJ817
2PK026 - PK029
2PK041 - PK053
2PK061 - PK067
3PK068 - PK070
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
18 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 19

GroupVariable Number
2PK081 - PK082
2PK091 - PK099
2PK101 - PK103
2PK111 - PK120
2PK141 - PK146
2PK201 - PK204
2PK211 - PK223
2PK231 - PK241
2PK251 - PK256
12PK257
2PK258
2PK271 - PK274
2PK281 - PK289
2PK291
2PK301 - PK318
2PK341
2PK351 - PK355
3PK356 - PK359
12PK360
2PK361
2PK391
2PK431 - PK433
2PK451 - PK452
2PK461 - PK469
2PK495
2PK501
12PK502 - PK504
2PK511 - PK515
2PK519
2PK521 - PK528
2PK541 - PK565
2PK581
2PK591 - PK599
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
19 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 20

GroupVariable Number
2PK601 - PK606
3PK607 - PK610
2PK611 - PK617
2PK621 - PK637
2PK641 - PK642
3PK661
2PK662 - PK666
2PK671 - PK681
2PK691 - PK697
2PK711 - PK716
2PK731 - PK765
2PK771 - PK779
2PK801 - PK804
2PK819 - PK827
2PK830
2PK861 - PK863
12PK871 - PK872
3PK873
12PK874
2PK881 - PK884
2PK901 - PK938
2PK971 - PK974
2PL001 - PL028
2PL061
2PL081
2PL101 - PL113
2PL151
2PL171 - PL172
2PL201 - PL203
2PL221
2PL401 - PL408
3PL409 - PL410
2PL411
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
20 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 21

GroupVariable Number
3PL412
2PL413 - PL417
12PL421
2PL441
2PL451 - PL456
2PL471
2PL491
3PL501
12PL502 - PL503
3PL504 - PL506
2PL551 - PL562
2PL581
3PL601 - PL603
2PL611
2PL621 - PL626
3PL631 - PL632
2PL711 - PL712
2PL716 - PL747
2PL756
2PL758
2PL761 - PL770
2PL781 - PL788
2PL793
1PL801 - PL803
2PM001 - PM006
2PM016 - PM017
2PM021 - PM023
2PM051 - PM066
3PM101 - PM107
12PM108 - PM119
12PM141 - PM142
2PM171
2PM181
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
21 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 22

GroupVariable Number
2PM251 - PM255
2PM281 - PM283
2PM381 - PM399
2PM401 - PM417
2PM541 - PM550
4PM551 - PM564
3PN001 - PN002
2PN021 - PN043
2PN081 - PN086
2PN101 - PN117
2PN131 - PN163
2PN401 - PN420
2PN431 - PN433
2PN451 - PN456
2PN471 - PN474
2PN481
2PN491 - PN493
2PN501
4PN502
2PN511
4PN512
10PN521
2PP001 - PP054
2PP101 - PP169
2PP181 - PP187
4PP188 - PP199
2PP201 - PP205
2PP221
2PP231 - PP243
2PP281 - PP286
2PP301 - PP305
2PP351 - PP353
2PP376 - PP384
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
22 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 23

GroupVariable Number
2PP391 - PP393
2PP401 - PP440
11PP471 - PP475
13PP501 - PP520
2PP521 - PP522
2PP631 - PP634
2PP651 - PP652
2PP671 - PP689
11PP690 - PP694
2PP695 - PP699
2PP701 - PP706
11PP707 - PP716
2PP717 - PP733
2PP771 - PP779
2PP801 - PP808
2PP821 - PP827
2PP831 - PP848
2PP851 - PP852
2PP861 - PP877
2PP891 - PP899
2PP901 - PP936
2PP946 - PP948
2PP951 - PP952
2PP961 - PP965
4PP966 - PP967
2PP981 - PP982
4PP983 - PP990
2PP991
4PP993
2PQ001 - PQ016
2PQ026 - PQ041
2PQ051 - PQ092
2PQ101 - PQ199
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
23 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 24

GroupVariable Number
2PQ201 - PQ202
4PQ221 - PQ230
2PQ231 - PQ232
4PQ233 - PQ237
2PQ241 - PQ242
4PQ243
4PQ251 - PQ267
4PQ281 - PQ299
4PQ301 - PQ307
4PQ331 - PQ332
4PQ341 - PQ348
4PQ361 - PQ373
4PQ391 - PQ395
4PQ401 - PQ418
4PQ421
4PQ431 - PQ438
4PQ447 - PQ448
4PQ451
4PQ454
4PQ471 - PQ475
4PQ479 - PQ481
4PQ486 - PQ487
4PQ491 - PQ493
4PQ771 - PQ772
4PQ791 - PQ793
4PQ801 - PQ805
5PQ931 - PQ935
4PQ951
4PQ971 - PQ997
4PR001 - PR017
4PR021 - PR034
5PR041 - PR045
5PR061 - PR072
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
24 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 25

GroupVariable Number
4PR077 - PR080
5PR081 - PR082
4PR091 - PR092
4PR096
4PR101
4PR121 - PR122
4PR131 - PR132
4PR141 - PR143
4PR161 - PR172
4PR181
2PS601 - PS631
2PS636 - PS638
2PS641 - PS644
4PS651 - PS657
4PS666 - PS669
4PS691 - PS692
2PS701 - PS706
2PS751 - PS799
4PS811
4PS836 - PS837
2PS841 - PS846
2PS851 - PS852
2PS856
13PS861 - PS863
13PS866 - PS868
2PS871 - PS874
2PS896 - PS897
2PS901 - PS941
13PS956 - PS957
4PS961 - PS963
4PS971 - PS978
4PT001 - PT015
4PT021 - PT031
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
25 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 26

GroupVariable Number
4PT041 - PT064
4PT101 - PT105
5PT121 - PT138
4PT146 - PT148
4PT161 - PT170
5PT181 - PT188
4PT211 - PT220
5PT295
4PT301 - PT309
5PT331 - PT360
4PT381 - PT399
4PT401 - PT438
4PT501 - PT517
4PT561 - PT565
4PT581 - PT586
4PT611 - PT621
4PT641 - PT644
4PT651 - PT656
4PT671 - PT672
4PT681 - PT685
4PT701 - PT703
4PT716 - PT717
4PT721 - PT725
4PT801 - PT834
4PT851 - PT854
5PT871 - PT886
4PT901 - PT930
4PT971 - PT973
4PT981 - PT985
4PT996
4PU001 - PU025
4PU301
4PU311 - PU313
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
26 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 27

GroupVariable Number
2PV001
4PV002 - PV055
4PV201 - PV209
4PV226 - PV229
5PV231 - PV237
4PV271 - PV272
5PV281 - PV287
4PV296
4PV301 - PV302
5PV351
4PV356 - PV357
4PW001 - PW054
4PW061 - PW068
4PW072
4PW086 - PW088
4PW091 - PW094
4PW101 - PW102
4PW106
4PW111 - PW120
4PW156 - PW157
4PW161 - PW171
4PW201 - PW252
4PW261 - PW268
4PW271 - PW276
4PW278
4PW281 - PW293
4PW296
5PW301 - PW327
4PW401 - PW408
4PW411 - PW418
4PW421 - PW424
4PW431 - PW435
5PW441 - PW450
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
27 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 28

GroupVariable Number
5PW461 - PW467
5PW501 - PW504
6PW511 - PW522
6PW524
5PW525 - PW529
6PW530
4PW531 - PW550
4PW556 - PW557
5PW561 - PW564
5PW571 - PW576
4PW591 - PW596
4PW611 - PW622
4PW631 - PW637
4PW661 - PW662
4PW681 - PW683
7PW701
9PW702
5PW711 - PW717
4PW741 - PW742
4PW761
4PW771
4PW831
4PW851 - PW856
1PX071
1PX701
1PY001 - PY006
2PY007 - PY008
2PY021 - PY022
2PY031
2PY036 - PY037
2PY046 - PY048
2PY051 - PY053
2PY056 - PY057
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
28 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 29

GroupVariable Number
2PY101 - PY103
2PY111 - PY113
2PY131 - PY135
2PY141 - PY143
2PY151 - PY154
2PY156 - PY157
2PY161 - PY162
2PY166
2PY191
2PY201
2PY221 - PY222
2PY231
2PY241 - PY244
2PY270 - PY275
2PY281
2PY286
1PY301 - PY304
1PY321 - PY323
1PY341 - PY344
2PY345 - PY346
1PY361 - PY362
2PY381
2PY401
2PY409 - PY411
2PY421 - PY422
2PY441
2PY451
2PY461 - PY463
2PY591 - PY595
2PY611 - PY612
2PY621
2PY631
2PY651
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
29 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 30

GroupVariable Number
2PY671 - PY672
2PY721
2PY741
2. Spares Affected
None.
B. Concurrent Requirements
BAE Component Service Bulletin 65-49808-24-01, Revision 1, is necessary to be accomplished prior
to or concurrent with this service bulletin for Group 1 and Group 8 airplanes. BAE Component Service
Bulletin 65-49808-24-01 gives the parts and instructions to replace relays in the M181, M182, and
M183 Relay Module Assemblies.
C. Reason
This service bulletin gives the instructions to replace the power control relays for the fuel boost pumps.
The relays are located in the P6 circuit breaker panel in the flight compartment. The new relays include
a ground fault interrupt (GFI) feature. The GFI relay feature will protect the fuel pumps from damage
caused by electrical arcing because the electrical power will be removed from the pump if a ground
fault is detected. Electrical arcing could create a possible source of ignition of flammable fuel vapors
in the fuel tanks. Ignition of flammable fuel vapors could cause a fire or explosion which could put the
airplane in an unsafe condition.
This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88, "Fuel
Tank System Fault Tolerance Evaluation Requirements".
This change affects section 9 of the Maintenance Planning Data (MPD) Document.The Airworthiness
Limitations (AWL) "28-AWL-23" (737-100/200/200C airplanes) and "28-AWL-22" (737-300/400/500
airplanes) are related to this service bulletin.
These sections were changed:
1. Airplanes PM541-PM548 are added to the service bulletin effectivity. Added new airplane
configurations to the group configuration table.
2. Group 12 and Group 13 had been added to the configuration table. Airplanes delivered with Auxiliary
Tank wire provisions have been moved to Group 12 and Group 13. Group/Configuration information
has been added to define those airplanes that have already accomplished initial release of the
service bulletin.
3. Changed the concurrent requirements reference from original issue of BAE Component Service
Bulletin 65-49808-24-01 to Revision 1 of the BAE Component Service Bulletin 65-49808-24-01.
4. Removed the reference to the Fault Isolation Manual and changed the IPC reference in Paragraph
1.K., Publications affected. The 737-100/-200/-300/-400/-500 airplane models do not have a Fault
Isolation Manual.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
30 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 31

5. Task hour tables had been added for each airplane group configuration. The task hour estimates
were changed to include the removal and installation of the galley number one.
6. Three kits, availability, and price information was added to paragraph 2.A. Material Information.
7. The work instructions were changed to include:
a. The removal and installation of the galley number one to get access to the work location.
b. The installation of a bonding jumper.
c. To prepare/clean the contact surfaces of the relays and mounting panel to obtain the required
electrical bonding.
d. To measure the bonding resistance between the GFI relays and mounting panel.
e. To measure the bonding resistance between the mounting panel and P6 Load Control Center
structure.
f. Added Part 2 and Part 3 for airplanes that incorporated original issue of the service bulletin.
8. Terminology has been changed in the Work Instructions to agree with the terminology defined in
Paragraph 3.A. General Information - Notes.
9. Figure 1 was changed to change the reference to Revision 1 of the BAE Component Service
Bulletin 65-49808-24-01. Step was added to measure the electrical bonding resistance between
Relay Module Assemblies M181, M182, and M183 and the P6 Load Control Center structure.
10. Figure 2, 3, 4, 5, 6, 7 have been changed to prepare/clean the contact surfaces of the relays and
mounting panel in order to obtain the required electrical bonding.
11. Figure 22 has been added. this figure provides instructions to add a bonding jumper between relay
mounting panel and P6 Load Control Center structure and measure the bonding resistance between
the relay mounting panel and P6 Load Control Center structure.
12. Appendix A that provides information for electrical bonding was added to Paragraph 3.A., Work
Instructions.
D. Description
Airplane Work
1. Get access to the flight compartment.
2. For Groups 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13 airplanes, at the P6 Load Control Center install two
ground studs and a ground bonding jumper.
3. For Groups 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13 airplanes measure the electrical bonding between the
P6-2 relay panel and P6 Load Control Center structure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
31 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 32

4. For Group 2 Configuration 1, and Group 4 Configuration 1, replace (6) relays with Ground Fault
Interrupt (GFI) relays. For Group 3 Configuration 1, Group 5-7 Configuration 1, and Group 9-13
Configuration 1, replace (8) relays with Ground Fault Interrupt (GFI) relays. Measure the electrical
bonding between the GFI relays and the P6-2 panel.
5. For Groups 1 and 8 airplanes install the Ground Fault Interrupt (GFI) relays in Relay Module
Assemblies M181, M182, and M183 in accordance with BAE Component Service Bulletin
65-49808-24-01 and change wire W044. Measure the electrical bonding between M181, M182,
M183 and the adjacent P6 Load Control Center structure.
6. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel
boost pumps.
Revision 1 - More work is necessary on airplanes changed in accordance with the original issue of this
service bulletin. Group 2 through 7 Airplanes and Group 9 through 11 airplanes that incorporated
original issue of this service bulletin have to incorporate Accomplishment Instructions, Work instructions,
Part 2 that provides work instructions to install a Bonding Jumper between the relay mounting panel
and P6 Load Control Center structure, and measure the electrical bonding resistance between the GFI
relays and the relay mounting panel. Group 1 and Group 8 airplanes that incorporated original issue
of this service bulletin have to incorporate Accomplishment Instructions, Work instructions, Part 3 that
provides work instructions to measure the electrical bonding resistance between the GFI relays and
the Relay Module Assemblies M181, M182, and M183 in accordance with Revision 1 of BAE Service
Bulletin 65-49808-24-01, and to measure the electrical bonding resistance between the Relay Module
Assemblies M181, M182, and M183 and the P6 Load Control Center structure.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
1-2737-100, 737-200, 737-200C
Group 2:
Affected Maintenance Zones
ZoneModel
1-2737-200, 737-200C
Group 2:
Affected Maintenance Zones
ZoneModel
102737-300, 737-400
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
32 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 33

Group 3-4, 10, 12:
Affected Maintenance Zones
ZoneModel
1-2737-200
Group 4-5:
Affected Maintenance Zones
ZoneModel
102737-300, 737-400, 737-500
Group 6-7, 9:
Affected Maintenance Zones
ZoneModel
102737-400
Group 8:
Affected Maintenance Zones
ZoneModel
1-2, 3-5, 4-5737-100, 737-200
Group 11, 13:
Affected Maintenance Zones
ZoneModel
102737-300
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that operators make the changes shown in this service bulletin within 60 months
after the date of Revision 1 of this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
33 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 34

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.251.251Figure 1
1.901.901Figure 21
0.500.501Close Access
1.252.502Test
5.406.65TOTAL FOR EACH AIRPLANE
Group 2, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
3.503.501Figure 2
0.400.401Figure 9
1.001.001Figure 22
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
34 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 35

Group 2, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
15.1528.40TOTAL FOR EACH AIRPLANE
Group 3, 12, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501Figure 3
1.601.601Figure 10
1.001.001Figure 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
17.3530.60TOTAL FOR EACH AIRPLANE
Group 4, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
3.503.501Figure 4
1.001.001Figure 22
0.500.501Close Access
1.252.502Test
6.758.00TOTAL FOR EACH AIRPLANE
Group 5, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
3.503.501Figure 5
1.001.001Figure 22
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
35 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 36

Group 5, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Close Access
1.252.502Test
6.758.00TOTAL FOR EACH AIRPLANE
Group 6, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501Figure 6
0.400.401Figure 11
1.001.001Figure 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
16.1529.40TOTAL FOR EACH AIRPLANE
Group 7, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501Figure 7
0.400.401Figure 11
1.001.001Figure 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
16.1529.40TOTAL FOR EACH AIRPLANE
Group 8, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
36 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 37

Group 8, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
1.251.251Figure 1
1.201.201Figure 16
1.901.901Figure 21
0.500.501Close Access
1.252.502Test
6.607.85TOTAL FOR EACH AIRPLANE
Group 8, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.251.251Figure 1
0.400.401Figure 19
1.901.901Figure 21
0.500.501Close Access
1.252.502Test
5.807.05TOTAL FOR EACH AIRPLANE
Group 9, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501Figure 3
0.400.401Figure 11
1.001.001Figure 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
16.1529.40TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
37 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 38

Group 10, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501Figure 3
0.400.401Figure 12
1.001.001Figure 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
16.1529.40TOTAL FOR EACH AIRPLANE
Group 11, 13, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501Figure 3
1.601.601Figure 13
1.001.001Figure 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
17.3530.60TOTAL FOR EACH AIRPLANE
Group 2-7, 9-13, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.001.001Figure 22
0.500.501Close Access
1.252.502Test
3.254.50TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
38 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 39

Group 1, Configuration 2; Group 8, Configuration 3:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.251.251Figure 1
0.500.501Close Access
1.252.502Test
3.504.75TOTAL FOR EACH AIRPLANE
NOTE: The change to the relay module assembly in accordance with BAE Component Service Bulletin
65-49808-24-01 is not included.
H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
NegligibleNegligibleAll Airplanes
I. Electrical Load Data
1. Direct Current (DC) Loads
BusAmperesAirplanes
DC Bus 1- 0.71Groups 1, 2, and 8
DC Bus 2- 0.71
DC Bus 1- 0.95Groups 3, 9, 10, and 11
DC Bus 2- 0.95
DC Bus 1+ 0.03Group 4
DC Bus 2+ 0.03
DC Bus 1- 0.22Group 5
DC Bus 2- 0.22
DC Bus 1- 0.46Group 6
DC Bus 2- 0.46
DC Bus 1- 0.21Group 7
DC Bus 2- 0.21
2. Type
Continuous
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
39 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 40

J. References
1. Existing Data:
a. Engineering Change Memo PRR 35440-10RS
b. Standard Wiring Practices Manual (SWPM) 20-00-11, 20-10-11, 20-30-12, 20-60-00, 20-60-08,
20-71-11, 20-81-11
c. 737-100/200 Aircraft Maintenance Manual (AMM) 24-22-00, 25-31-11
d. 737-300/400/500 Aircraft Maintenance Manual (AMM) 24-22-00, 25-31-11
e. 737 Wiring Diagram 28-23-01, 28-23-02
f. Boeing Service Bulletin 737-28A1263, "FUEL - Engine Fuel Feed System - Fuel Boost Pump
Electrical Wire and Sleeve in Fuel Tank Conduit - Inspection / Replacement"
g. BAE Component Service Bulletin 65-49808-24-01
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
RELAY ASSY - LOAD CONTROL CENTER69-73627-( )
LOAD CONTROL CENTER (STRUCTURE) P-6 PANEL65-49815
LOAD CONTROL CENTER INSTL - P6 PANEL65C25703
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
None.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
28-22737 Maintenance Manual
28-23737 Wiring Diagram Manual
737-100/200 IPC 24-50 , 737-100/200 IPC
28-20, 737-300/400/500 IPC 28-22, 737-
300/400/500 IPC 28-23
737 Illustrated Parts Catalog
28-20737 Schematic Diagram
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
40 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 41

Chapter-SectionPublication
Section 9737 Maintenance Planning Document
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
41 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 42

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
42 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 43

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane, as shown
below. If there is a limit to the quantity of available kits, a supply sequence is given by Spares. More
kits become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from the date
Boeing gets the purchase order. Operators are encouraged to share schedule requirements with Boeing
for incorporation of the service bulletin.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the date of this
Service Bulletin
(US Dollars)
ROLT as of the
date of this Ser-
vice Bulletin (Cal-
endar Days)
NameKit Number
(e)349KIT - RETROFIT GFI RELAYS IN P6 - NON-
AUX CONFIGURATION
65C37854-12 (a)
(e)349KIT - RETROFIT GFI RELAYS IN P6 - AUX
OR AUX PROVISIONS CONFIGURATION
65C37854-13 (b) (d)
(e)349KIT - RETROFIT BONDING JUMPER65C37854-14 (c)
(a) This Top Kit is applicable to Group 2 Configuration 1.
(b) This Kit is applicable to: Group 3 Configuration 1, Group 6 Configuration 1, Group 7 Configuration 1, Group
9 Configuration 1, Group 10 Configuration 1, Group 11 Configuration 1, Group 12 Configuration 1, and
Group 13 Configuration 1.
(c) This Kit is applicable to: Group 2 Configuration 2, Group 3 Configuration 2, Group 4 Configuration 2, Group
5 Configuration 2, Group 6 Configuration 2, Group 7 Configuration 2, Group 9 Configuration 2, Group 10
Configuration 2, and Group 11 Configuration 2, Group 12 Configuration 2, and Group 13 Configuration 2.
(d) Airplanes in Group 12 and 13 have been delivered with wire provisions for Auxiliary Tank installation. If
Auxiliary Tanks have been installed on these airplanes operators need to order this kit. If Auxiliary Tanks
have not been installed on these airplanes there are more parts than necessary in this kit. Operators need
to order only the necessary parts to incorporate this service bulletin. The necessary parts can be ordered
as end item parts. Contact Boeing Spares for ordering the necessary end item parts from kit 65C37854-
13.
(e) At the time of the release of the service bulletin the price of the kits were not available. Boeing will provide
the price of the kits by an Information Notice (IN).
The kits/parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. Prices are in United States Dollars. Terms: Net 30 days.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
43 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 44

Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 65C37854
NotesExisting Part
Number
NameQTYNew Part Number
-14-13-12
Kit - Retrofit, GFI
RELAYS IN P6 -
NON-AUX CON-
FIGURATION
..-65C37854-12
Kit - Retrofit, GFI
RELAYS IN P6 -
AUX OR AUX
PROVISIONS
CONFIGURATION
.-.65C37854-13
Kit - Retrofit, Bond-
ing Jumper
-1165C37854-14
TOP KIT - GFI RE-
LAYS IN P6 -
NON-AUX CON-
FIGURATION
..161-74479-1
TOP KIT - GFI RE-
LAYS IN P6 - AUX
OR AUX PROVI-
SIONS CONFIGU-
RATION
.1.61-74479-2
Kit - Retrofit, Bond-
ing Jumper
-1165C37854-14
BONDING
JUMPER
1..BACJ40K5A5A6
NUT2..BACN10YR3CD
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
44 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 45

Kit 65C37854
NotesExisting Part
Number
NameQTYNew Part Number
-14-13-12
SCREW2..BACS12GU3K10
WASHER6..NAS1149D0316H
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one
grip length longer than indicated. Also, if any fasteners part numbers listed are not
available or have been superseded, substitute fasteners may be supplied in kits.
Boeing Document D-590 and Boeing Drawing 65-88700 are used to determine the
part numbers used as substitutes.
Kit 61-74479
NotesNameNew Part Number -1-2-101-102
(a)Top Kit, GFI Relays in P6 - Non- Aux Configuration-...61-74479-1
(b)Top Kit, GFI Relays in P6 - Aux or Aux Provisions
Configuration
.-..61-74479-2
Wire Kit, W0044 Wire Bundle1...61-74479-101
Wire Kit, W0044 Wire Bundle.1..61-74479-102
(a)Lacing Tape, White11..61-74479-2001
(b)Filler Wire11..61-74479-2002
Connector Identification Tape, Imprinted "D01606
M/W R00055 CTR R B/P"
..1161-74478-10301
Connector Identification Tape, Imprinted "D01608
M/W R00054 CTR L B/P"
..1161-74478-10302
Connector Identification Tape, Imprinted "D01818
M/W R00146 AFT AUX FWD BOOST PUMP"
...161-74478-10401
Connector Identification Tape, Imprinted "D01820
M/W R00147 AFT AUX AFT BOOST PUMP"
...161-74478-10402
Connector Identification Tape, Imprinted "D01602
M/W R00020 AFT B/P 2"
..1161-74479-10101
Connector Identification Tape, Imprinted "D01604
M/W R00021 FWD B/P 2"
..1161-74479-10102
Connector Identification Tape, Imprinted "D01610
M/W R00019 FWD B/P 1"
..1161-74479-10103
Connector Identification Tape, Imprinted "D01612
M/W R00018 AFT B/P 1"
..1161-74479-10104
Contact..1418BACC47CP2T
(a) Make from BMS 13-54, Type 3, Class 1, Length As Required.
(b) Make from BMS 13-48 Type 10, Class 1, AWG 18, Length As Required.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
45 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 46

2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specification
(a) (b) (l)Ground Fault Interrupter (GFI) Relay2, 4, 6, or 8S283A004-1 (LEACH P/N
9524G-10674)
(a) (c)Ground Fault Interrupter (GFI) Relay4 or 6S283A004-6 (LEACH P/N KCG-
X4L-001)
(a) (d)Relay Installation Kit4 or 6002-9667-001-000
(e)Seal Plug6MS27488-16-1
(e) (f)M23053/5-103-4 or M23053/5-104-
4
As RequiredThermofit Sleeve, Yellow, Inner
Diameter 0.093 Inch or 0.125
Inch
(g) (h)Contact2031-9134-004
(g) (f)Connector Identification Sleeve, Im-
printed "D01142 M/W M00183 P6
REY MOD"
1BACT19C-T
(g) (i)Wire10 FeetBMS 13-58, Type 1, Class 1,
AWG 22
(g) (j)Lacing TapeAs RequiredBMS 13-54, Type 3, Class 1,
Color White
(g)Splice1BACT12C20
(g) (k)Adhesive Tape, Width 0.5 InchAs RequiredPermacel, P-421 Tape
(g)Sleeve, Inner Diameter 0.25 Inch,
Imprinted "SM206"
As RequiredTFE-4X Sleeve
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145
(b) For Group 2 Configuration 1 airplanes, quantity required is (6). For Group 3 Configuration 1, Group 9
Configuration 1, Group 10 Configuration 1, Group 11 Configuration 1 airplanes, quantity required is (8).
For Group 5 Configuration 1 and Group 7 Configuration 1 airplanes, quantity required is (2). For Group
6 Configuration 1 airplanes, quantity required is (4).
(c) For Group 4 Configuration 1 and Group 7 Configuration 1 airplanes, quantity required is (6). For Group
5 Configuration 1 and Group 6 Configuration 1 airplanes, quantity required is (4).
(d) Used for the installation of the S283A004-6 relays only. For Group 4 Configuration 1 and Group 7
Configuration 1 airplanes, quantity required is (6). For Group 5 Configuration 1 and Group 6 Configuration
1 airplanes, quantity required is (4).
(e) Used for Group 8 configuration 1 and Group 8 Configuration 2 airplanes only.
(f) It is acceptable to use an equivalent material as shown in SWPM 20-00-11 and SWPM 20-10-11.
(g) Used for Group 1, Group 8 Configuration 1, and Group 8 Configuration 2 airplanes only.
(h) ITT Cannon (71468) 666 E. Dyer Rd. Santa Ana, CA 92705-5684 Phone: (714) 628-4700, FAX: (714)
628-2249
(i) Cut and code the wires as follows: "W044-8005-22" and "W044-8006-22". Each wire length is 60 inches.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
46 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 47

NotesNameQTYPart Number / Specification
(j) BMS 13-54, Type 3, Class 1, Finish C, Size 75/12 or 110/14, Grade D, color white, length as required.
(k) It is acceptable to use an equivalent tape (with temperature grade D) as shown in SWPM 20-30-12.
(l) Airplanes in Group 12 and 13 have been delivered with wire provisions for Auxiliary Tank installation.
If Auxiliary Tanks have been installed on these airplanes operators need to order this kit. If Auxiliary
Tanks have not been installed on these airplanes there are more parts than necessary in this kit. Oper-
ators need to obtain only the necessary parts to incorporate this service bulletin.
3. Parts Modified and Reidentified:
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
NotesNew Part NumberNameQTYExisting Part
Number
(a)65-49808-( )M181 Relay Module
Assembly
165-49808-( )
(a)65-49808-( )M182 Relay Module
Assembly
165-49808-( )
(a)65-49808-( )M183 Relay Module
Assembly
165-49808-( )
(a) Make the change given in BAE Component service bulletin 65-49808-24-01. The BAE
component service bulletin gives the new part numbers for the M181, M182, and M183
modules.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
47 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 48

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
48 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 49

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions identified in Paragraph 3.B., Work Instructions, and the Figure(s)
give the recommended sequence of steps. The sequence of steps to do this service
bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. The work instructions are divided into work packages. Task Hours and Elapsed Hours
for each package are given in Paragraph 1.G., Manpower. You can do each work
package independently.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in Structural Repair Manual (SRM)
51
– Torque limits to tighten nuts and bolts are in SRM 51
6. Use the approved fastener and process material substitutions in accordance with
737 SRM 51. Alternate fasteners are listed in 737 SRM 51 and Boeing Drawing
65-88700. .
7. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
8. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
49 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 50

9. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
10. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
13. This service bulletin includes functional test procedures for the systems changed or
modified by this service bulletin. More functional tests can possibly be necessary in
accordance with standard maintenance practices because of interruption to other
airplane systems.
14. Some Boeing parts are supplied in a temporary configuration. Those parts are
identified with a 'U', 'W', or 'Y' in place of the '-' (dash) in the part number. It is
permitted to install parts identified with a 'U', 'W', or 'Y' as an alternative to the '-'
(dash) part number. Boeing Drawing 005W0900 contains more data.
B. WORK INSTRUCTIONS
Group 1; Group 2-7, Configuration 1; Group 8; Group 9-13, Configuration 1:
PART 1
1. REMOVE THE EXISTING FUEL BOOST PUMP RELAYS AND INSTALL GFI FUEL BOOST PUMP
RELAYS
a. Remove the electrical power from the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
b. Get access to the flight compartment.
c. In the flight compartment, move the First Officer's seat forward to create room in front of P6
Load Control Panel. Refer to 737-100/200 AMM 25-11-0 or 737-300/400/500 AMM 25-11-11
as accepted procedures. If necessary remove the First Officer's seat if/as necessary. Refer
to 737-100/200 AMM 25-11-11 or 737-300/400/500 AMM 25-11-11 as accepted procedures.
d. In the flight compartment, remove and keep the adjacent lining panels outboard of the P6-2
circuit breaker panel. Refer to 737-100/200 AMM 25-16-11 or 737-300/400/500 AMM 25-11-21
as accepted procedures.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
50 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 51

e. Open and lower the P6-1 (65C25704-( ) ) and P6-2 (65C25704) panels.
f. Group 1, 8:
Change the M181, M182, and M183 relay module assemblies in accordance with FIGURE 1
and FIGURE 20.
g. Group 2-7, 9-13, Configuration 1:
Install Ground Studs and Bonding Jumper in accordance with FIGURE 22. measure the
electrical bonding resistance between P6-2 panel and the P6 side panel in accordance with
FIGURE 22.
h. Group 2, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, and R55 in accordance with
FIGURE 2. Measure the electrical bonding between the fuel pump power relays R19, R18,
R21, R20, R54, R55 and P6-2 panel in accordance with FIGURE 2 .
i. Group 3, 9-13, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, R55, R146, and R147 in
accordance with FIGURE 3. Measure the electrical bonding between the fuel pump power
relays R18, R19, R20, R21, R54, R55, R146, R147 and P6-2 panel in accordance with FIGURE
3 .
j. Group 4, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, and R55 in accordance with
FIGURE 4 and FIGURE 20. Measure the electrical bonding between the fuel pump power
relays R18, R19, R20, R21, R54, R55 and P6-2 panel in accordance with FIGURE 4 .
k. Group 5, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, and R55 in accordance with
FIGURE 5 and FIGURE 20. Measure the electrical bonding between the fuel pump power
relays R18, R19, R20, R21, R54, R55 and P6-2 panel in accordance with Figure 5.
l. Group 6, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, R55, R146, and R147 in
accordance with FIGURE 6. Measure the electrical bonding between the fuel pump power
relays R18, R19, R20, R21, R54, R55, R146, R147 and P6-2 panel in accordance with FIGURE
6 .
m. Group 7, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, R55, R146, and R147 in
accordance with FIGURE 7. Measure the electrical bonding between the fuel pump power
relays R18, R19, R20, R21, R54, R55, R146, R147 and P6-2 panel in accordance with FIGURE
7 .
n. Group 2-3, 6-7, 9-13, Configuration 1:
Remove the galley number one to get access to the W0044 wire bundle in the P6 panel. Refer
to 737-100/200 AMM 25-31-11 or 737-300/400/500 AMM 25-31-11 as an accepted procedure.
o. Group 2, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 9, and FIGURE 20.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
51 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 52

p. Group 3, 12, Configuration 1:
Change the W0044 wire bundle in accordance with Figures FIGURE 8, FIGURE 10, and
FIGURE 20.
q. Group 6-7, 9, Configuration 1:
Change the W0044 wire bundle in accordance with Figures FIGURE 8, FIGURE 11, and
FIGURE 20.
r. Group 10, Configuration 1:
Change the W0044 wire bundle in accordance with Figures FIGURE 8, FIGURE 12, and
FIGURE 20.
s. Group 11, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 13, FIGURE 20.
t. Group 1, 8:
Change the W0044 wire bundle in accordance with FIGURE 21.
u. Group 2-3, 6-7, 9-13, Configuration 1:
Install the galley number one. Refer to 737-100/200 AMM 25-31-11 or 737-300/400/500 AMM
25-31-11 as an accepted procedure.
v. Group 8, Configuration 1:
If service bulletin 737-28A1263 has not been incorporated, change the wiring at the fuel boost
pump connectors in accordance with FIGURE 14, FIGURE 15, and FIGURE 16.
w. Group 8, Configuration 2:
If service bulletin 737-28A1263 has been incorporated, change the wiring at the fuel boost
pump connectors in accordance with FIGURE 17, FIGURE 18, and FIGURE 19.
x. In the flight compartment, install the adjacent lining panels outboard of the P6-2 circuit breaker
panel. Refer to 737-100/200 AMM 25-16-11 or 737-300/400/500 AMM 25-11-21 as accepted
procedures.
y. Close the P6-1 (65C25704-( ) ) and P6-2 (65C25704) panels.
z. Restore the position of the the First Officer's seat if it was moved forward to create room in
front of P6 Load Control Panel. Refer to 737-100/200 AMM 25-11-0 or 737-300/400/500 AMM
25-11-11 as accepted procedures. If the First Officer's seat was removed, install the First
Officer's seat. Refer to 737-100/200 AMM 25-11-11 or 737-300/400/500 AMM 25-11-11 as
accepted procedures.
aa. Restore the electrical power to the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
ab. Do the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST". Refer, as applicable,
to 737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as accepted procedures.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
52 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 53

Group 2-7, 9-13, Configuration 2:
PART 2, INSTALL GROUND STUDS AND BONDING JUMPER ON RELAY MOUNTING PANEL
AND TEST THE GFI RELAYS
1. Remove the electrical power from the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
2. Get access to the flight compartment.
3. Install Ground Studs and Bonding Jumper in accordance with FIGURE 22.
4. Restore the electrical power to the airplane.
5. Do the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST". Refer, as applicable,
to 737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as accepted procedures.
6. Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 8, Configuration 3:
PART 3, BOND GFI RELAYS TO MODULES AND TEST THE GFI RELAYS
1. Remove the electrical power from the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
2. Get access to the flight compartment.
3. Remove the Relay Module Assemblies M181, M182, and M183 in accordance with FIGURE 1.
4. Measure the electrical bonding resistance between the GFI relays and the Relay Module Assemblies
M181, M182, and M183 in accordance with FIGURE 1 and BAE Component Service Bulletin
65-49808-24-01 Revision 1.
5. Measure the electrical bonding resistance between the Relay Module Assemblies M181, M182,
and M183 and the P6 Load Control Center in accordance with FIGURE 1.
6. Restore the electrical power to the airplane.
7. If in step instruction 4 GFI relays were removed from the Relay Module Assemblies M181, M182,
or M183 to restore the electrical bonding do the GROUND FAULT INTERRUPTER (GFI) -
OPERATIONAL TEST. Refer to 737-100/200 AMM 28-22-41 as an accepted procedure.
8. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1: August 27, 2010
53 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 54

This Figure applies only to: Group 1, 8.
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
M181, M182, M183. (a)365-49808-( )Relay Module As-
sembly
Remove/ Keep1
M181, M182, M183. (a)365-49808-( )Relay Module As-
sembly
Install2
between M181, M182,
M183 and the adjacent
P6 Load Control Center
structure. (b)
62.5 MILLIOHMSRESISTANCEMeasure3
(a) Make the changes in accordance with Revision 1 of the BAE Component Service Bulletin 65-49808-
24-01. Measure the electrical bonding resistance between the new relays installed and M181, M182,
FIGURE 1: M181, M182, M183 RELAY MODULE ASSEMBLY REPLACEMENT
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1 August 27, 2010
54 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 55

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
and M183 Relay Module Assemblies in accordance with Revision 1 of the BAE Component Service
Bulletin 65-49808-24-01.
(b) If the resistance measurement is greater than 2.5 Milliohms (0.0025 Ohms), remove the applicable
Module Assembly and repair the ground path from the Module to airplane structure. Refer to CMM
24-09-03 for the connections to the ground stud in the module. Refer to the airplane wire diagrams
WD 24-31-01 (for M181, pins 14 and 57) , or WD 21-58-01 (M182, pins 23 and 31), or WD 28-23-01
(M183, pin 7), as applicable, for the ground connections from the modules to airplane structure. Do
again step 3.
FIGURE 1: M181, M182, M183 RELAY MODULE ASSEMBLY REPLACEMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1 August 27, 2010
55 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 56 (OCR)

BOEING SERVICE BULLETIN 737-28A1212
ALERT  ALERT
This Figure applies only to: Group 2, Configuration 1.
LINING PANEL
P6-1 CIRCUIT
BREAKER PANEL
P6-2 CIRCUIT
BREAKER PANEL
RELAY PANEL
2344  (6) RELAYS
+
_A-A  J82801
FIGURE 2: REPLACEMENT OF THE FUEL PUMP POWER RELAYS
(SHEET 1 OF 2)
Original Issue: July 23, 2009
Revision 1 August 27, 2010  BOEING PROPRIETARY -  737-28A1212
Copyright © Unpublished Work - See page 1 for details.  56 of 99

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
R18, R19, R20, R21,
R54, and R55.
610-60450-1Fuel Pump Power RelayRemove1
Remove the paint
around the relay
cutout, from the side
of the panel that will
be in contact with the
relay. (a)
6-SURFACEClean2
On the bare metal
from which the paint
was removed. Refer to
SOPM 20-43-03 as an
accepted procedure.
-ALODINE, TYPE
2, CLASS A, or
TYPE 5, CLASS F
CHEMICAL CONVERSION
COATING
Apply3
the contact surfaces of
the relay and the panel
to remove the contam-
ination. (b)
12-SURFACEClean4
R18, R19, R20, R21,
R54, and R55. Refer
to SWPM 20-81-22 as
an accepted proce-
dure for installation of
similar LEACH relays.
6S283A004-1
(LEACH P/N
9524G-10674)
Fuel Pump Power (GFI) RelayInstall5
between the flange of
the relay and the
mounting panel. (c)
60.0025 OHMS (2.5
MILLIOHMS)
RESISTANCEMeasure6
on any bare metal
around the relays. Re-
fer to SOPM 20-41-02
as an accepted proce-
dure.
-BMS 10-11, TYPE
1
EPOXY PRIMERApply7
(a) Abrasive clean by Hand or with a rotary brush in accordance with APPENDIX A, Paragraph 2.a.
(b) Use Solvent to clean the contact surfaces in accordance with APPENDIX A, Paragraph 2.b.
(c) In accordance with APPENDIX A, Paragraph 5.b. Make sure that the resistance is 2.5 milliohms or
less. If the resistance measurement is greater than 0.0025 Ohms (2.5 milliohms), then remove the
relay, clean the faying surfaces, install the relay and measure the bonding resistance again.
FIGURE 2: REPLACEMENT OF THE FUEL PUMP POWER RELAYS
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1 August 27, 2010
57 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 58 (OCR)

BOEING SERVICE BULLETIN 737-28A1212
ALERT  ALERT
This Figure applies only to: Group 3, 9-13, Configuration 1.
LINING PANEL  P6-1 CIRCUIT
BREAKER PANEL
P6-2 CIRCUIT
BREAKER PANEL
RELAY PANEL
€€ RELAYS
R146
12456 RELAYS  A-A
TYPICAL CONFIGURATION
FIGURE 3: REPLACEMENT OF THE FUEL PUMP POWER RELAYS
(SHEET 1 OF 2)
Original Issue: July 23, 2009
Revision 1 August 27, 2010  BOEING PROPRIETARY -  737-28A1212
Copyright © Unpublished Work - See page 1 for details.  58 of 99

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
R18, R19, R20, R21, R54,
R55, R146, and R147.
810-60450-6Fuel Pump Power RelayRemove1
Remove the paint around
the relay cutout, from the
side of the panel that will be
in contact with the relay. (a)
8-SURFACEClean2
On the bare metal from
which the paint was re-
moved. Refer to SOPM 20-
43-03 as an accepted pro-
cedure.
-ALODINE, TYPE
2, CLASS A, or
TYPE 5, CLASS F
CHEMICAL CONVERSION
COATING
Apply3
the contact surfaces of the
relays and the panel to re-
move the contamination. (b)
--SURFACEClean4
R18, R19, R20, R21, R54,
R55, R146, and R147. Re-
fer to SWPM 20-81-22 as
an accepted procedure for
installation of similar
LEACH relays. (d)
8S283A004-1
(LEACH P/N
9524G-10674)
Fuel Pump Power (GFI) RelayInstall5
between the flange of the
relay and the mounting
panel. (c)
80.0025 OHMS (2.5
MILLIOHMS)
RESISTANCEMeasure6
on any bare metal around
the relays. Refer to SOPM
20-41-02 as an accepted
procedure.
-BMS 10-11, TYPE
1
EPOXY PRIMERApply7
(a) Abrasive clean by Hand or with a rotary brush in accordance with APPENDIX A, Paragraph 2.a.
(b) Use Solvent to clean the contact surfaces in accordance with APPENDIX A, Paragraph 2.b.
(c) In accordance with APPENDIX A, Paragraph 5.b. Make sure that the resistance is 2.5 milliohms or
less. If the resistance measurement is greater than 0.0025 Ohms (2.5 milliohms), then remove the
relay, clean the faying surfaces, install the relay and measure the bonding resistance again.
(d) Airplanes in Group 12 and 13 have been delivered with wire provisions for Auxiliary Tanks installation.
If Auxiliary Tanks have been installed on these airplanes operators need to order this kit. If Auxiliary
Tanks have not been installed on these airplanes there are more parts than necessary in this kit. Op-
erators need to obtain only the necessary parts to incorporate this service bulletin for Tank 1, Tank 2,
and Center Tank.
FIGURE 3: REPLACEMENT OF THE FUEL PUMP POWER RELAYS
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 1 August 27, 2010
59 of 99
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 60 (OCR)

BOEING SERVICE BULLETIN 737-28A1212
ALERT  ALERT
This Figure applies only to: Group 4, Configuration 1.
LINING PANEL
P6-1 CIRCUIT
BREAKER PANEL
P6-2 CIRCUIT
BREAKER PANEL
RELAY PANEL
4X
(5 6) RELAYS
A-A  J83012
FIGURE 4: REPLACEMENT OF THE FUEL PUMP POWER RELAYS
(SHEET 1 OF 2)
Original Issue: July 23, 2009
Revision 1 August 27, 2010  BOEING PROPRIETARY -  737-28A1212
Copyright © Unpublished Work - See page 1 for details.  60 of 99

The text continues at https://openairdocs.org/service-documents/boeing/737-28a1212/file/2c16e2341548.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
